11
2014 Accountability Commissioner’s Decisions – April 4, 2014

2014 Accountability

  • Upload
    zoie

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

2014 Accountability. Commissioner’s Decisions – April 4, 2014. Ratings. Same rating labels as 2013 Campuses and Districts must meet the targets on each Index for which they have performance data. What’s new for 2014. Index Target is 55 ELL Inclusion - - PowerPoint PPT Presentation

Citation preview

Page 1: 2014 Accountability

2014 AccountabilityCommissioner’s Decisions – April 4, 2014

Page 2: 2014 Accountability

RatingsSame rating labels as 2013

Campuses and Districts must meet the targets on each Index for which they have performance data

Page 3: 2014 Accountability
Page 4: 2014 Accountability

What’s new for 2014

• Index Target is 55

• ELL Inclusion -Yrs 2-4: Spanish STAAR Phase-in 1 Level

II English STAAR ELL Progress

MeasureYrs 5+: STAAR Phase-in Level II

• EOC English I & II –Reading results from Summer and Fall

2013English I & II results from Spring 2014

• EOC Substitute Assessments – Results included as outlined by current

agency rules

Page 5: 2014 Accountability

What’s new for 2014

• (Index Target remains at 5th percentile)

• High Schools/Secondary/AEA-No evaluation for Index 2

• STAAR M & STAAR AltResults will be included

• ELL Inclusion -Yrs 2-4: Spanish STAAR Progress

Measure English STAAR ELL Progress

MeasureYrs 5+: STAAR Progress Measure

Page 6: 2014 Accountability

What’s new for 2014

• Index Target is 5th percentile

• Two point credit for Final Level III

• Minimum Size criteria –Prior year meets minimum 25 tests

(Index 1) for both reading and math

• ELL Inclusion -Yrs 2-4: Spanish STAAR Phase-in 1 Level

II and Level IIIEnglish STAAR ELL Progress

Measure and STAAR Final Level II

Yrs 5+: STAAR Phase-in Level II and Level III

Page 7: 2014 Accountability

What’s new for 2014

• Index Target is 12/13/18/13/56

TargetDistricts and Campuses that do not have results in all four components

(STAAR component)Elem – 12Mid – 13High – 18

District – 13

Districts and Campuses with all four components

56

Page 8: 2014 Accountability

What’s new for 2014

• Credit for Final Level II Two or more tests

• ELL Inclusion -Yrs 2-4: Spanish (Any subject) STAAR

Final Level IIEnglish (Not tested on any

Spanish version is NOT included)

Yrs 5+: STAAR Final Level II

• Other Postsecondary IndicatorsCollege Ready Graduates

Adv. Course/Dual Enrollment Completion -2015

CTE (TBD) -2015

• Component Weight is 25% for each

Page 9: 2014 Accountability

What’s new for 2014

• Distinction Designation for Closing Achievement Gaps• Campuses in top Quartile for Index 3

• Distinction Designation for Postsecondary Readiness• Elem and Middle Campuses in top Quartile• High School Campuses in top Quartile must meet > 33% of

measures

• Academic Achievement• Science and Social Studies

Page 10: 2014 Accountability

“Double Testing” WaiverUSDE denied WaiverMS Algebra I EOC results onlyMS Algebra I HS graduationCourse completion analysisWe are not alone!

Page 11: 2014 Accountability

Resources & Contact Info

Jennifer Womack

512.919.5308

[email protected]

Jonathan Delgado

512.919.5131

[email protected]

Assessment and Accountability Blog http://www5.esc13.net/thescoop/assessment/

Presentationshttp://www4.esc13.net/data_assessment/resources/

System Support Home Pagehttp://www4.esc13.net/data_assessment/