2015 Tbilisi Flood თბილისის მერია 2015 წელი

2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

2015 Tbilisi Flood

თბილისის მერია 2015 წელი

Page 2: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

The Vere is a mountain river which is unique in terms of city planning, as it flows right in the middle of the city;

The environment and conditions were radically different in the 30s when the zoo was built on the side of the river. Since

then the Vere ravine development has been carried out.

The River Vere is a natural water collector.

The River Vere - Preamble

Page 3: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

River Areal VS Tbilisi

River Areal

Papulated area of Tbilisi

Flowing areal of the river is as large as populated area of the City of Tbilisi.

The river length - 30 Km.

30 Km

Page 4: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

• The risk of devastating Flashflood will always be present without

proper mitigation . • The main cause of the city flooding started in mountains, due to

massive landslide. • Damage was escalated due to the constructed tunnel under the

Vake-Saburtalo road. Landslide clogged the narrow pass of the tunnel.

• The tunnel under Heroes’ Square bears a great risk also, due to being constricted on lower level of the area.

• People’s lives are in danger by unregulated massive constructions in the river bank;

• For the entire city population the safety issue is an absence of Early Warning System;

Exciting Risk Factors

Page 5: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Unstable zone

Landslide areas and dangerous unstable mountain zone

Page 6: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 7: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 8: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Flooding Results

• 21 people killed • 3 people missing • 120 families displaced • 420 individuals effected • Majority of zoo animals killed • Devastated zoo territory • Up to 30 damaged roads • Demolished infrastructure and communication

systems • Paralyzed city traffic

Page 9: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Devastated People, Environment and Helpless Animals

Page 10: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 11: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 12: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 13: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 14: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 15: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 16: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 17: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 18: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 19: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 20: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 21: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 22: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 23: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 24: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as
Page 25: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

• The maximum safety of people's lives;

• Maximum security of highway infrastructures;

• River. Vere - integrated space in the city;

Core Values

Page 26: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Approaches:

• The complex analysis of the situation

• Strategic goals and objectives

• The exact identification of the actions needed

• Short, medium and long-term action plans

The basic approaches and methods

Methods:

• Research

• Modeling

• Design

• Management

Page 27: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

City Short Term Plan

• Finding missing people;

• Provide displaced people with the main necessities;

• Cleaning, restoring & opening the main roads;

• Managing the paralyzed City traffic;

• Reinforcement works for damaged structures;

• Finding financial recourses.

• Implementing City Early Warning System;

Page 28: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

City Medium Term Plan

• Feasibility study;

• Comprehensive and multidisciplinary study;

• Hydrological studies for the territory from the source of the river to the end point.

• Creating the master plan of the area;

• Defining what outline is best fit for the road (what part of the road is to be cut, maintained or changed)

• Housing solutions for the displaced people;

• Registration of the territories;

Page 29: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

City Long Term Plan

Implementation of the project identified by the studies: • Proper infrastructure rehabilitation; • Master plan and long-term city planning and

engineering projects are to be elaborated; • Rehabilitation of damaged roads; • Plan for creating 2 new recreational areas on the

sides of the river Vere; • Plan for zoo relocation and repopulation; • Construction of filtration systems; • River reinforcement works for prevention purposes; • Restoring damaged educational and cultural centers.

Page 30: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Estimated Budget Short-term actions (1-3 months) • Creating early warning system; 1 Million GEL • Relocating people form potential high risk flood-zone; 30 Million GEL • Emergency Rehabilitation of existing engineering structures and spaces; 12 Million GEL • Two stationary radars (for western and eastern Georgia) - 4 Million GEL EUR (est.) • One mobile radar - 350 000 EUR (est.)

Medium-term actions (2015-2016) • Re-planning and construction of highway through the valley; 140 Million GEL • Building Heroes Square Tunnel special protective facilities; 25 Million GEL • Heroes' Square Tunnel Monitoring; 1 Million GEL • Tbilisi Zoo relocation – 30 Million EUR

Long-term actions (2016-2018) • Heroes' Square reconstruction; 40 Million GEL • Development of the special landscape cluster of Vere; 8 Million GEL • Adequate urban planning and control system; 2 Million GEL • Mziuri (78 924 sqm) /old zoo territory (91 740 sqm) recreational space $20-30 Million

Page 31: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

• Connecting roads to Tskneti-Betania

• Vere ravine and surrounding territories filled with silt (Vake-

Saburtalo Road, tunnels, Mziuri territory, Heroes’ Square,

Zoo, right bank).

• Svanidze Street for removal of construction waste and excess

soil.

Cleaning Works

City’s Most effected areas:

Page 32: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

• Tksneti-Betania connecting road; • Vere Ravine; • Right Bank of Mtkvari, near the ramps of Laguna Vere, damaged

dikes; • Right Bank of Mtkvari, from Laguna Vere ramps to Marjanishvili

Bridge; • Damaged infrastructure on the Zoo territory; • Damaged infrastructure on Svanidze Street, demolition of

damaged buildings; • River bank reinforcement works on Tskneti Street, demolition of

under risk buildings; • Connecting road to Napetvrebi settlement; • Connecting road to Akhaldaba Village.

Reconstruction works

Page 33: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Restoration plan for the territory damaged by floods

Additional primary works: • Removal of the party of cliff and cleaning works near 83

Chavchavadze street; • Cleaning works on the collector on Vaso Abashidze Street; • Cleaning works on Uchaneishvili Street for current ravine soil that

came apart; • Demolition of the building on 42 Chavchavadze Street; • Cleaning works on Tamarashvili Street for cliff fragments that fell

off; • Cleaning works on 15 Tsagareli Street for water collectors; • Restoration of road on Saakadze Square; • Cleaning works on Bakhtrioni Street; • Cleaning works on the road connecting Saburtalo to Vake (Khiliani

street).

Page 34: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Restoration plan for the territory damaged by floods

Restoration of roads: • Uchaneishvili Street asphalt overhaul; • Damaged collector and road on Melikishvili Street; • 19 Chavchavadze avenue, near Pixel building; • Chikobava avenue in Chughureti district; • Vakhushti Bagrationi street in Didube district; • Nakashidze street in Krtsanisi district; • Chitaia street in Chughureti district; • Khoshtaria street in Mtsatsminda and Vera district; • Lori street in Isani district; • 84 Javakhishvili street; • University street and Saburtalo cemetery; • Shatberashvili Street; • Ialbuzi Street.

Page 35: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Infrastructure

• Cleaning works in the Vere ravine (from Tksneti-Betania to Tbilisi) – 1 000 000 GEL

• Investigation of damaged roads in the Vere ravine and repair works (or construction of new roads) – 15 000 000 GEL

• Rehabilitation of road infrastructure damaged by the flood – 90 000 000 GEL

• Restoration of drainage and other municipal infrastructure – 5 500 000 GEL

• Geological study of the surroundings of Tbilisi and defining high risk zones – GEL 1 000 000

Page 36: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

• Hydrological studies (for a 5-year period) to define territories unfit for construction.

• Hydrological studies to make a 50-year forecast of the territory.

Hydrological studies

Page 37: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Geological studies

• Geological studies to define landslide territories.

• Defining buffer areas of the river, taking into account the river groves and dikes.

Page 38: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Urban Development

Urban face of districts in the central part of the City has been changed

For detailed evaluation of the situation and proper planning of works we need:

New aerial ledaral shooting and Digital Orthophoto

Estimated budget cost ranges from 600 00 to 800 000 GEL

Page 39: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Svanidze street Totally

Lots- 49

Chikovani street

Tskneti Street

Lots - 124

Flooded area - 83 691 sq. m.

Flooded area- 66 523 sq. m.

Lots - 29

Flooded area - 188 817 sq. m.

Zoo Teritory

Lots - 16

Flooded area - 143 680 sq. m.

Flood effected areas

Page 40: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

RAP • Tskneti street,

• Chiqovani street,

• Dolidze street,

• Khipshidze street near the grove

Total 60 Ha

Resettlement Action Plan

• Svanidze street

60 Ha - 70 000 GEL

Resettlement Implementation Plan

RIP

300 lots

300 lots - 300 000 GEL

Future risk-zones

Total could be up to 250 000 000 GEL

Page 41: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Victim families are in need of:

• Housing

• Basic furniture

• Basic appliances

• Domestic items (Utensils and dishes, linen, detergents and cleansers, others)

• Essential items (personal hygiene items, first aid kits)

• Items For children under 5 y.o.

Page 42: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Housing for the victims

• Families with 1-2 members

• Families with 3-4 members

• Families with 5-6 members

• Families with 7-8 members

47

38

5

2

45 sq. m. 65 sq. m. 90 sq. m. 110 sq. m.

Number of families

Necessary living space

Page 43: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Housing cost for the victims

47

38

5

2

45 sq. m. 65 sq. m. 90 sq. m. 110 sq. m.

Number of families

Necessary living space

Rent - 900 GEL Total - 42 300 GEL

Rent - 1300 GEL Total - 49 400 GEL

Rent - 1800 GEL Total - 9 000 GEL

Rent - 2200 GEL Total - 4 400 GEL

Buy - $45 000

Buy - $65 000

Buy - $90 000

Buy - $110 000

Total - 105 100 GEL per month

Total - 1 261 200 GEL per year

Total price cost: $2 115 000 $2 470 000

$450 000 $220 000

Total cost $5 255 000

Total - 92 Families

Page 44: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Healthcare

• 105 children are effected by the disaster

Rehabilitation activities - 80 000 - 100 000 GEL

Page 45: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Items for families with 2 members

• Washing Machine

• Gas appliance

• Refrigerator

• Water/gas heater

• Computer

• Air-conditioning

• Vacuum cleaner

• Iron / Iron board

• TV

• Hair dryer

• Blender

• Kitchen furniture (cabinet, table, chairs)

• Bedroom furniture (bed, mattress, closet, bed-side table)

• Living-room furniture (sofa, armchairs, coffee table, cupboard)

• Separate Bed

• Dining table

• Dishes – 6 items each: plate, bowl, glass, knife, fork, spoon (tea, table), cup,

• 2 each - knife, boiler, frying-pan, bowl, 1 tea-kettle

• Linen set, towel set (large, small), mattress, blanket, bedspread, pillow

• Detergents/cleansers/cleaning appliances - broom, dustpan, dust mop, wipes, sponge, scrubbers, brush, detergents, laundry pins, buckets, jug

• Misc. - clock (wall), lamp (5 items), duct tape, push pins, extender

• Personal hygiene items- shampoo, soap, toothbrush/ paste, antiperspirant, cotton wool discs, cotton buds/ items of personal use, comb, scissors

• First aid kit

• bed

• stroller

• Bathroom items

• Wet wipes, diapers, shampoo, soaps, baby oils/powder, cotton wool buds, scissors, comb

• inhaler

Home appliances

furniture

Other domestic items

Essential items

For children under 5

4 000 GEL 4 100 GEL

810 GEL

160 GEL

930 GEL

Total: 9 070 GEL

Page 46: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Items for families with 3 members

• Washing Machine

• Gas appliance

• Refrigerator

• Water/gas heater

• Computer

• Air-conditioning

• Vacuum cleaner

• Iron / Iron board

• TV

• Hair dryer

• Blender

• Kitchen furniture (cabinet, table, chairs)

• Bedroom furniture (bed, mattress, closet, bed-side table)

• Living-room furniture (sofa, armchairs, coffee table, cupboard)

• Separate Bed

• Dining table

• Dishes – 6 items each: plate, bowl, glass, knife, fork, spoon (tea, table), cup,

• 2 each - knife, boiler, frying-pan, bowl, 1 tea-kettle

• Linen set, towel set (large, small), mattress, blanket, bedspread, pillow

• Detergents/cleansers/cleaning appliances - broom, dustpan, dust mop, wipes, sponge, scrubbers, brush, detergents, laundry pins, buckets, jug

• Misc. - clock (wall), lamp (5 items), duct tape, push pins, extender

• Personal hygiene items- shampoo, soap, toothbrush/ paste, antiperspirant, cotton wool discs, cotton buds/ items of personal use, comb, scissors

• First aid kit

• bed

• stroller

• Bathroom items

• Wet wipes, diapers, shampoo, soaps, baby oils/powder, cotton wool buds, scissors, comb

• inhaler

Home appliances

furniture

Other domestic items

Essential items

For children under 5

4 000 GEL 4 350 GEL

960 GEL

160 GEL

930 GEL

Total: 9 470 GEL

Page 47: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Items for families with 4-5 members

• Washing Machine

• Gas appliance

• Refrigerator

• Water/gas heater

• Computer

• Air-conditioning

• Vacuum cleaner

• Iron / Iron board

• TV

• Hair dryer

• Blender

• Kitchen furniture (cabinet, table, chairs)

• Bedroom furniture (bed, mattress, closet, bed-side table)

• Living-room furniture (sofa, armchairs, coffee table, cupboard)

• Separate Bed

• Dining table

• Dishes – 6 items each: plate, bowl, glass, knife, fork, spoon (tea, table), cup,

• 2 each - knife, boiler, frying-pan, bowl, 1 tea-kettle

• Linen set, towel set (large, small), mattress, blanket, bedspread, pillow

• Detergents/cleansers/cleaning appliances - broom, dustpan, dust mop, wipes, sponge, scrubbers, brush, detergents, laundry pins, buckets, jug

• Misc. - clock (wall), lamp (5 items), duct tape, push pins, extender

• Personal hygiene items- shampoo, soap, toothbrush/ paste, antiperspirant, cotton wool discs, cotton buds/ items of personal use, comb, scissors

• First aid kit

• bed

• stroller

• Bathroom items

• Wet wipes, diapers, shampoo, soaps, baby oils/powder, cotton wool buds, scissors, comb

• inhaler

Home appliances

furniture

Other domestic items

Essential items

For children under 5

4 000 GEL 5 700 GEL

1 160 GEL

160 GEL

930 GEL

Total: 11 020GEL

Page 48: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (1)

Heavy Equipment: • Tracked excavator 20 tons - 1 unit; • Tracked excavator 30 tons - 2 units; • 20 ton crane - 2 units; • 25-ton bulldozer - 2 units; • Rescue vehicles off-road 4X4 - 35 units; • A fire vehicles 4X4 and 4X2 3-5-7 ton - 50 units; • Bronto-elevator for 70 m. height (ladder basket)

- 1 unit; • Silt extractor - 2 units.

Page 49: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (2)

Equipment for emergency rescue operations in water and debris: • Equipment for operations in debris: • Video Camera - 1 unit; • Seismic-acoustic device - 1 unit; • Water jet engine boats 2 units; • High performance contaminated water pump - 30

units; • Water Pump Honda GX 200 -20 units (estimated cost of

one unit 800 USD); • Silt extractor pump - 5 units; • Underwater search machine (echolot) - 2 units.

Page 50: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (3) Equipment for emergency-rescue works: • Hydraulic cutting set – 20 units; • Cargo lifting pneumatic pillow – 10 units • Cargo lifting mechanical jacks – 10 units • 2kw portable lights – 20 units; • 2-3-5-20 kw Generators – 50 units; • Mechanical manual winch 3,2 tone – 20 units; • Internal combustion engine winch 1,6 tone – 20 units; • 5 tone rope wear protector - 40 units; • Fire hearth detection device – 4 units; • Metal mechanical cutter – 32 units; • Metal electric cutter – 20 units; • Reinforced concrete cutting machine – 4 units; • Combustion engine saw – 30 units; • Perforator – 10 units; • Plastic pipes connecting iron – 10 units;

Page 51: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (4)

The technology-equipment for reaction of chemical incidents:

• Mobile Chemical Lab 1 unit;

• Industrial chemical toxic substance detection Detector 4 units;

• Decontamination shower - 2 units.

• In addition, for the improvement of the quality of the operations and achievement of better coordination between relevant units of the MoIA, it is recommended to use the best international practice, target-oriented consultations and conduct specific trainings.

Page 52: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (5)

• Chainsaw 660 – 20 units

• Water pump– 3 unit (1 hour 1200 liters capacity)

• Water pump – 5 units (1 hour 800 liters capacity)

• Winch – 2 units

• Projectors with powerful independent battery – 30 units

# Description Quantity

1 Replace of the vehicles of low cross-country ability with the 4X4 crossover-type

vehicles to move the large amount of forensic equipment to the scene

Substitution of 22 vehicles

(throughout the country)

2 Wireless floodlights of great capacity for illumination of the scene

80 items

(throughout the country)

3 3D scanning system for air (quadrocopter) and infantry detailed laser scanning of the

scene

2 systems

(throughout the country)

4 Thermal imager with images storage function

10 items

(throughout the country)

Page 53: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Readiness for emergency situations (6) Needs of the LEPL 112

• - Organization of training for the “112” operators/dispatchers on reports management specifics during a large-scale emergency situation;

• - Operation of relevant application for transfer of the information in visual form to the "112" by civilians;

• - Creation of necessary infrastructure for automatic determination of the exact location of the report initiator;

• - Creation of an alternative Data Center in order to protect the infrastructure (fiber optic network) necessary for reception of reports in case of force majeure and insurance of such Data Center;

• - Creation of the “112” alternate center to ensure the mobilization of the required number of primary and standby shifts in case of large-scale emergencies at the same occasion, within the term of sharp increase of the repetitive messages of identical nature and its equipping with computers and relevant technique;

• - Enactment of so called "Mobile Center" in case of large-scale emergencies that means purchase of relevantly equipped bus for mobilization of primary and standby shifts where in transportation mode operators shall continuously receive reports, process and further forward the information to the relevant authorized services.

Page 54: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

The list of special equipment needed for emergency situations

Page 55: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Zoo relocation to Tbilisi Sea

LAKESIDE RECREATION

OPEN RANGE ZOO

ZOO CORE

DENDROPARK FARM EXPERIENCE

SERVICES

ENTRANCE HUB

CONCEPT STRUCTURE

Page 56: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

ENVISAGED ZOO DEVELOPMENT PHASES

Phase 1

Secure main site with Bio-Security fence.

Secure open range areas.

Construct main vehicular and pedestrian routes in open range areas.

Service buildings and services.

Construct staff accommodation.

Deployment of underground services/utilities (‘utilidor’).

Tree planting works including irrigation system.

Phase 2

Relocate open range animals to site establishing early populations.

Construct display enclosures to accommodate existing species.

Upgrade main access junction and services access.

Construct entry building and hub.

Construct boulevard.

Complete pedestrian circulation.

Construct main car park.

Phase 3

Relocate species.

Close City Zoo.

Construct first phase of concessions and restaurants.

Construct display/outdoor classroom area.

Open Zoo to public.

Phase 4

Confirm program for new zoo species procurement.

Construct Secondary hub and reptile house.

Upgrade Dendropark portion of zoo.

Phase 5

Construct new displays / exhibits for new major attraction species

Second phase of concessions / restaurants.

Construct research / lab building.

Phase 6

Construct tunnelled road crossing to lake side recreation

Construct bird show amphitheatre and associated landscaping.

Tender expressions of interest for design/construct and management

of an Aquarium attraction.

Phase 7

Construct Aquarium attraction.

Complete final phase of zoo concessions

Page 57: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Additional Long Term Plans and Needs

For the future we need to think about public

transport plan and other necessary plans for safe livable space.

• Public transport plan implementation period is estimated for 1-5 years.

• Complex Public Transport system cost – 399 500 000 Million EUR

• 7000 Hazard buildings that need reinforcement or demolition.

Page 58: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Transport Systems • The June 13th flood in Tbilisi showed us that in Tbilisi the public transport system is not

adequate to the needs of Tbilisi inhabitants. • After the disaster, the problem of transportation was not only due to the damaged

infrastructure but also due to the absence or underdevelopment of the multimodal transport network.

• Two main means of public transport in the city are: buses and metro. The former needs to be developed both in quantity and quality and the latter needs expansion and overhaul repair.

• Cableway and tramway transport networks are to be added to the public transport system. • The development of the public transport will result in the decreased use of private vehicles.

Page 59: 2015 Tbilisi Floodsegecc.com/Resources/Tbilisi Flood1.pdf · 2015-08-28 · River Areal VS Tbilisi River Areal Papulated area of Tbilisi Flowing areal of the river is as large as

Conclusion

Rapid Damaged and Needs Assessment will start on June 18 and is expected to take 2-3

weeks.

A refined presentation including a more detailed cost estimation will be circulated once the

assessment is completed.