4
DN 2M BUILDING LINE 3.5M BUILDING LINE 5M BUILDING LINE 4M DS BUILDING LINE 2M BUILDING LINE 4M DS BUILDING LINE 2M BUILDING LINE 4M DS BUILDING LINE 9 m² MAIN BATHR TILES 9 m² DRESSING AREA LAMINATE FLOORING 20 m² MAIN BEDR LAMINATE FLOORING 11 m² BEDR 2 LAMINATE FLOORING 11 m² BEDR 3 LAMINATE FLOORING 9 m² STUDY NOOK tiles 7 m² BATHR 2 TILES 2 m² GUEST WC TILES 34 m² GARAGE STEEL TROWEL GRANO Not Enclosed LOUNGE TILES 18 m² ENTERTAINMENT ROOM TILES 5 m² SCULLERY TILES 2 m² STAFF WC TILES 17 m² DINING ROOM TILES 11 m² KITCHEN TILES SOUTH EAST BOUNDARY - 22.98m - EXIST. 1.785m HIGH BOUNDARY WALL ACCORDING TO SPECIFICATIONS, MAINTENANCE FREE SOUTH WESTERN BOUNDARY - 25.29m - NEW 1.785m HIGH BOUNDARY WALL ACCORDING TO SPECIFICATIONS, MAINTENANCE FREE NORTH-EASTERN BOUNDARY - 25.34m - EXIST. 1.785m HIGH BOUNDARY WALL ACCORDING TO SPECIFICATIONS, MAINTENANCE FREE ENTRANCE: NO OBSTRUCTION, NO STORMWATER CULVERT, NO FIRE HYDRANT NORT-WEST BOUNDARY - 24.58m -NO BOUNDARY WALL RED SPINNER STREET STAND 5835 MIDSTREAM MEADOWS X76 STAND 5834 STAND 5844 ADJ. STRUCTURE NO ADJ. STRUCTURE STAND 5836 ADJ. STRUCTURE 12 m² STAFF ROOM TILES N STAND 5835 MIDSTREAM MEADOWS TOTAL AREA:240m² TOTAL STAND AREA: 601m² BUILDING COVERAGE RATIO (BCR): 40.0% FLOOR AREA RATIO (FAR): 0.4 FIRST FLOOR GROUND FLOOR RATIO: NOT APPLICABLE BUILDING OCCUPANCY: H4 DESIGN OCCUPANCY TIME: 24 HRS/DAY, 7 DAYS / WEEK CLIMATIC ZONE: 1 BUILDING ORIENTATION: NORTH MAXIMUM ENERGY DEMAND AND CONSUMPTION: NO REQUIREMENT self closing self locking gate 2 x Ripple boxes accesible from road electrical and telephone point for intercom 32mm CONDUIT FOR E-TUBE TO GARAGE E -TUBE E-BOX 1.5m APRON PAVING: MVA Cottage concrete paver in colour grey, size 200 x 150 x 50mm thick DRIVEWAY PAVING: MVA Cottage concrete paver in colour grey, size 200 x 150 x 50mm thick SIDE WALK - INSTANT LAWN LANDSCAPED - - INSTANT LAWN LANDSCAPED - LANDSCAPING: 1 X INDIGENOUS TREE OF MIN 50mm ø /100m² OF STAND TO BE PLANTED - INSTANT LAWN LANDSCAPED - MUNICIPAL CONNECTION A=1.0m B=2.0m D=1.2m 1 6 0 m m d i a . / Cl a s s P N 1 6 - S e w e r P V C- O D R W . 8 2 8 2 / S R 7 7 2M SERVITUDE E-tube sleeve STORMWATER WEEPHOLES wc: 110 dia HDPE soil pipe basin, wm, dw, prep bowl and sink: 50mm HDPE waste pipe 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection Soil pipe under building to be incased in concrete dustbin heat pump above gas cage w a s h i n g l i n e General note: no generator no solar panels no airconditioning units 3x 110 stub-stack 1-way vent SIDE WALK - INSTANT LAWN LANDSCAPED - sw sw 2M SERVITUDE AREA SCHEDULE STAND 5837 NO ADJ. STRUCTURE Visitor's parking Visitor's parking paving to slope away from garage entrance sw sw sw sw sw sw 1492.000 1492.000 1492. 500 1992. 500 WATER CONNECTION 110mm dia. PN12.5 16mm² 4 CORE CO PP ER LOW V O LTAG E S E R V ICE CONNECTIO N ELECTRI CAL C ONNECTIO N sw self closing self locking gate gulley ie re ie re ie ie re re ie ie 3x ae re ie ie re re ie 110 stub stack 2-way vent SVP 110 stub-stack 2-way vent 110 Stubstack 2-way vent Soil pipe under building to be incased in concrete Soil pipe under building to be incased in concrete 5500 5100 6220 1547 3203 1200 7620 2000 1600 6050 2000 3220 6140 3020 2020 1390 6340 4000 2540 2680 1890 4030 220 2070 1330 4890 1220 3800 220 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection basins, bath and showers: 50mm HDPE waste pipe basins, bath and showers: 50mm HDPE waste pipe wcs: 110 dia HDPE soil pipe wc: 110 dia HDPE soil pipe POOL to comply with SANS 1390, to discharge into municipal sewer system. Min. 5.0m away from Raft Foundation Pool heat pump Pool pump, filter ie 1.8m high screen wall 1.8m high screen wall screen wall to underside of soffit 4000 3000 220 6090 220 1300 110 1090 110 2600 110 2480 110 3330 3690 3500 3500 5 A 2/4 BM: 1492.370 1492390 1492050 satalite dish position braai/ fire- place pool pump not visable sw duct for plumbing with screen sw away from gully 110 stub- stack 1- way vent ie ie re ie W6 W5 W5 W6 W4 W7 W7 W4 W7 W4 W6 W5 W7 W4 W7 W4 D4 D5 W5 W1 W1 W1 W7 W7 W2 D3 D7 D2 W2 W5 W1 W3 W4 ADJ. DOUBLE GARAGE ADJ. SCULLERY ADJ. KITCHEN ADJ. MAIN BEDROOM ADJ. BEDROOM 2 W11 W9 W8 W6 W10 D1 D8 D8 D8 D8 D8 D8 D3 D6 D8 3500 3220 5220 2750 10600 3910 7550 1928 142 6050 2000 3500 6220 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according to engineer's specifications and specialist waterproofing@ min fall of 1:70 COLOUR: NCS S 0510-R60B Charcoal aluminium window frames 500 max between FFL and NGL All windows to comply with Part N of NBR Semi-face Brick: SABRIX Pinotage Light Smooth plaster and paint in colour: COLOUR: NCS S 0510-R60B Dark plaster and paint in colour: NCS S6502-G Precast concrete window sill, plaster band and concrete roof slab in colour: NCS S6502-G pool pump and heat pump position, not visable 1.8m high screen wall Timber panel paint in colour: NCS S5020-Y80R heat pump warm water storage heat pump behind 935mm high parapet wall 1.8m high screen wall 935 4590 heat pump warm water storage 1495450 1495110 1495450 ROOF CONSTRUCTION: TRUSSES: S.A. PINE TRUSSES DESIGNED IN ACCORDANCE WITH INTERNATIONAL TRUSS SYSTEMS AND MANUFACTURED IN ACCORDANCE WITH ITC ALL CONFORMING TO THE RELEVANT SABS CODES OF PRACTISE ESPECIALLY SANS 10243 AND SANS 10400-L, WITH PITCH OF 5° AND 0mm OVERHANG AND INCLUDING ALL RELEVANT BRACING, HIPS AND VALLEY-SETS, ETC. ROOF COVERING: Roof sheeting to be Chromadek galvanised steel sheeting with Globalcoat finish ( Colour : CHARCOAL GREY) to one side and half coat Globalcoat Grey other side and accessories fixed to timber purlins at 2000mm centres. Girth 550mm ridge cap and 610mm valley gutter, fixed in accordance with manufacturer`s specifications. ROOF PITCH: 5°; ROOF OVERHANG: according to roof plan. ROOF INSULATION: Rigid extruded polystyrene board insulation with an R value of 2.16. density to be 11.5kg/m³ and a thickness of 100mm GUTTER NOTE: NO GUTTERS FACIAS: Everite medium density plain ungrooved Nutec fascia boards (Code: 041-237), size 150 x 10mm, fixed to timber rafters twice screwed with 12 x 40mm countersunk brass screws with aluminium fascia jointing plate between boards and aluminium H-profile fascia corner joiners at board ends. GEYSER NOTE: HEAT PUMP TO BE PLACED BEHIND PARAPET WALLS. (NOT VISABLE) Concrete slab position of heat pump behind parapet wall ROOF CONSTRUCTION: ROOF SLABS: REINFORCED CONCRETE ROOF SLABS AS DESIGNED BY ENGINEER. 255mm OR 170mm THICK AS PER SPAN REQUIREMENTS. SCREED(MIN. 50, MAX.100mm THICK) OVER AT MIN. FALL 1:100 TOWARDS RAIN WATER GUTTER(M/S LIPPED CHANNEL). TORCH ON WATERPROOFING AS BY APPROVED APPLIER, TURN INTO GUTTER AND EDGE ANGLE IRON AS PER DETAIL. PAINT FINISH COLOUR: DDDD . ROOF PITCH:0°; ROOF OVERHANG: ACCORING TO ROOFPLAN. ROOF INSULATION: RIGID EXTRUDED POLYSTYRENE INSULATION BOARD WITH A R VALUE OF 2.16. DENSITY TO BE 11.5kg/m³ AND THICKNESS OF 50mm. GUTTER NOTE: 175x50x20x3mm M/S LIPPED-CHANEL PLACED AS INDICATED ON ROOF PLAN FACIAS: NO FACIAS GEYSER NOTE: GEYSER TO BE PLACED BEHIND PARAPET WALL. (NOT VISABLE) 935mm high parapet wall 935mm high parapet wall slope screed slope screed slope screed slope screed slope screed slope screed slope screed slope screed slope screed slope screed Chimney to comply with Part V of NBR GROUND FLOOR 1492390 ROOF PLAN 1495450 LOWER GROUND FLOOR 1492050 170 500 390 935 2465 255 1245 1492390 1492050 1495450 NGL fill cut fill NGL 34 m² GARAGE STEEL TROWEL GRANO 17 m² DINING ROOM TILES 18 m² ENTERTAINMENT ROOM TILES 170 170 3060 3060 2805 ROOF CONSTRUCTION: TRUSSES: S.A. PINE TRUSSES DESIGNED IN ACCORDANCE WITH INTERNATIONAL TRUSS SYSTEMS AND MANUFACTURED IN ACCORDANCE WITH ITC ALL CONFORMING TO THE RELEVANT SABS CODES OF PRACTISE ESPECIALLY SANS 10243 AND SANS 10400-L, WITH PITCH OF 5° AND OVERHANG(AS PER ROOF PLAN) AND INCLUDING ALL RELEVANT BRACING, HIPS AND VALLEY-SETS, ETC. ROOF COVERING: ROOF SHEETING TO BE CHROMADEK GALV. STEEL SHEETING WITH GLOBALCOAT FINISH (COLOUR: CHARCOAL GREY) TO ONE SIDE AND HALF COAT GLOBALCOAT GREY OTHER SIDE AND ACCESSORIES FIXED TO TIMBER PURLINS AT 2000MM CENTERS. GIRTH 550mm RIDGE CAP AND 610mm VALLEY GUTTER, FIXED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ROOF PITCH: 5°; ROOF OVERHANG: ACCORDING TO ROOF PLAN . ROOF INSULATION: RIGID EXTRUDED POLYSTYRENE BOARD INSULATION WITH AN R-VALUE OF 2.16. DENSITY TO BE 11.5KG/M³ AND A THICKNESS OF 100MM FACIAS: EVERITE MEDIUM DENSITY PLAIN UNGROOVED NUTEC FACIA BOARDS(CODE: 041-237), SIZE 150 x 10MM FISED TIMBER RAFTERS TWICE SCREWED WITH 12 x 40MM COUNTERSHUNK BRASS SCREWS WITH ALUMINIUM FACIA JOINTING PLATE BETWEEN BOARDS AND ALUMINIUM H-PROFILE FACIA CORNER JOINERS AT BOARD ENDS. ROOF CONSTRUCTION: ROOF SLABS: REINFORCED CONCRETE ROOF SLABS AS DESIGNED BY ENGINEER. 255mm OR 170mm THICK AS PER SPAN REQUIREMENTS. SCREED(MIN. 50, MAX.100mm THICK) OVER AT MIN. FALL 1:100 TOWARDS RAIN WATER GUTTER(M/S LIPPED CHANNEL). TORCH ON WATERPROOFING AS BY APPROVED APPLIER, TURN INTO GUTTER AND EDGE ANGLE IRON AS PER DETAIL. ROOF PITCH: 0°; ROOF OVERHANG: ACCORING TO ROOFPLAN. ROOF INSULATION: RIGID EXTRUDED POLYSTYRENE INSULATION BOARD WITH A R VALUE OF 2.16. DENSITY TO BE 11.5kg/m³ AND THICKNESS OF 50mm. GUTTER NOTE: 175x50x20x3mm M/S LIPPED-CHANEL PLACED AS INDICATED ON ROOF PLAN GEYSER NOTE: GEYSER TO BE PLACED BEHIND 935MM HIGH PARAPET WALL. (NOT VISABLE) heat pump warm water storage heat pump behind 935mm high parapet wall RAFT FOUNDATION ACCORDING TO ENGINEER'S SPECIFICATIONS AND DESIGN. 75mm THICK CONC. SURFACE BED WITH 10Mpa AT 28 DAYS STRENGTH ON, 30mm THICK ISOBOARD® HIGH DENSITY 32-36KG/m³ RIGID EXTRUDED POLYSTYRENE 100% CLOSED CELL INSULATION BOARDING, 600mm WIDE, WITH BUTT JOINTS LAID ON0.25mm POLYOLYFIN USB DPM ON NATURAL GRAVEL BASE, COMPACTED IN LAYERS OF 150mm TO 95% MOD. AASHTO DENSITY. 75mm DRAINAGE LAYER UNDER SURFACEBED. staircase note: R@170mm T@280mm CEILING FINISH: RHINOLITE PLASTER AND PAINT CONC. SOFFITS TO RECEIVE RHINOLITE PLASTER AND PAINT DPM F.G.L. F.G.L. 3500 3220 5220 2750 10600 3910 7550 1928 142 6050 2000 3500 6220 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 1492390 1492220 1492050 1492390 wc: 110 dia HDPE soil pipe basin, wm, dw, prep bowl and sink: 50mm HDPE waste pipe 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection Soil pipe under building to be incased in concrete 3x 110 stub-stack 1-way vent gulley ie re ie re ie ie re ie ie 6x ie re gulley ie ie re re ie 110 stub stack 2-way vent SVP 110 stub-stack 2-way vent 110 Stubstack 2-way vent Soil pipe under building to be incased in concrete Soil pipe under building to be incased in concrete 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection 110 HDPE sewer pipe with min fall 1:40 connected to main sewer connection basins, bath and showers: 50mm HDPE waste pipe basins, bath and showers: 50mm HDPE waste pipe wcs: 110 dia HDPE soil pipe wc: 110 dia HDPE soil pipe POOL to comply with SANS 1390, to discharge into municipal sewer system. Min. 5.0m away from Raft Foundation ie 110 stub- stack 1- way vent ie ie re ie up PROJECT NO. REV NO. PAGE NO. DATE REV DESCRIPTION NO REVISIONS PROJECT DRAWINGS DATE SCALE DRAWN CHECKED SCALE SIGNATURE: CLIENT SIGNATURE: ARCHITECT REV. PAGE NO. Date IN: 2017/09/20 12:45:45 PM As indicated A 1/4 A 1/4 PROPOSED NEW HOUSE ON STAND 5835 MIDSTREAM MEADOWS APPROVAL 24/05/2017 Author A 0001 A 1 : 100 SDP GROUND FLOOR 1 TYPICAL 3D View 2 1 : 100 TYPICAL FINISHES 3 1 : 200 ROOF PLAN 4 1 : 100 Section 1 5 1 : 200 FOUNDATION PLAN 6

3 F.G.L. Section 1 5 · 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according

Embed Size (px)

Citation preview

Page 1: 3 F.G.L. Section 1 5 · 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according

DN

2M BUILDING LINE3.5

M B

UIL

DIN

G L

INE

5M

BU

ILD

ING

LIN

E

4M DS BUILDING LINE

2M BUILDING LINE

4M DS BUILDING LINE

2M

BU

ILD

ING

LIN

E

4M

DS

BU

ILD

ING

LIN

E

9 m²

MAIN BATHRTILES

9 m²

DRESSING AREALAMINATE FLOORING

20 m²

MAIN BEDRLAMINATE FLOORING

11 m²

BEDR 2LAMINATE FLOORING

11 m²

BEDR 3LAMINATE FLOORING

9 m²

STUDY NOOKtiles

7 m²

BATHR 2TILES

2 m²

GUEST WCTILES

34 m²

GARAGESTEEL TROWEL GRANO

Not Enclosed

LOUNGETILES

18 m²

ENTERTAINMENT ROOMTILES

5 m²

SCULLERYTILES

2 m²

STAFF WCTILES

17 m²

DINING ROOMTILES

11 m²

KITCHENTILES

SO

UT

H E

AS

T B

OU

ND

AR

Y -

22.9

8m

- E

XIS

T. 1.7

85m

HIG

H B

OU

ND

AR

Y W

ALL A

CC

OR

DIN

G T

O S

PE

CIF

ICA

TIO

NS

,M

AIN

TE

NA

NC

E F

RE

E

SOUTH WESTERN BOUNDARY - 25.29m - NEW 1.785mHIGH BOUNDARY WALL ACCORDING TOSPECIFICATIONS, MAINTENANCE FREE

NORTH-EASTERN BOUNDARY - 25.34m - EXIST.1.785m HIGH BOUNDARY WALL ACCORDING TO

SPECIFICATIONS, MAINTENANCE FREE

EN

TR

AN

CE

: N

O O

BS

TR

UC

TIO

N,

NO

ST

OR

MW

AT

ER

CU

LV

ER

T,

NO

FIR

E H

YD

RA

NT

NO

RT

-WE

ST

BO

UN

DA

RY

- 2

4.5

8m

-N

O B

OU

ND

AR

Y W

ALL

RE

D S

PIN

NE

R S

TR

EE

T

ST

AN

D 5

835 M

IDS

TR

EA

MM

EA

DO

WS

X76

STAND 5834

STAND 5844ADJ. STRUCTURE

NO ADJ. STRUCTURE

STAND 5836ADJ. STRUCTURE

12 m²

STAFF ROOMTILES

N

STAND 5835 MIDSTREAM MEADOWS

TOTAL AREA:240m²

TOTAL STAND AREA: 601m²

BUILDING COVERAGE RATIO (BCR): 40.0%FLOOR AREA RATIO (FAR): 0.4FIRST FLOOR GROUND FLOOR RATIO: NOT APPLICABLE

BUILDING OCCUPANCY: H4DESIGN OCCUPANCY TIME: 24 HRS/DAY, 7 DAYS / WEEK

CLIMATIC ZONE: 1

BUILDING ORIENTATION:NORTH

MAXIMUM ENERGY DEMAND AND CONSUMPTION: NOREQUIREMENT

self closingself lockinggate

2 x Ripple boxesaccesible from road

electrical and telephonepoint for intercom

32m

m C

ON

DU

IT F

OR

E-T

UB

E T

O G

AR

AG

E

E-TU

BE

E-BOX

1.5m APRON PAVING:MVA Cottage concrete

paver in colour grey, size200 x 150 x 50mm thick

DRIVEWAY PAVING:MVA Cottage concrete

paver in colour grey, size200 x 150 x 50mm thick

SIDE WALK- INSTANT LAWN LANDSCAPED -

- INSTANT LAWNLANDSCAPED -

LANDSCAPING: 1 XINDIGENOUS TREE

OF MIN 50mm ø/100m² OF STANDTO BE PLANTED

- INSTANTLAWN

LANDSCAPED -

MUNICIPALCONNECTIONA=1.0mB=2.0mD=1.2m

160mm dia./ClassPN16 -Sewer PVC-O

DRW.8282/SR77

2M

SE

RV

ITU

DE

E-t

ube s

leeve

ST

OR

MW

AT

ER

WE

EP

HO

LE

S

wc: 110dia HDPEsoil pipe

basin, wm,dw, prepbowl andsink: 50mmHDPEwaste pipe

110 H

DP

E s

ew

er

pip

ew

ith m

in fall

1:4

0connecte

d t

o m

ain

sew

er

connection

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

Soil

pip

e u

nder

build

ing

to b

e incased in c

oncre

te

dustbin

heatpumpabove

gas cagewashing

line

General note: no generator no solar panels noairconditioning units

3x 110stub-stack1-way vent

SIDE WALK- INSTANT LAWN LANDSCAPED -

sw

sw

2M SERVITUDE

AREA SCHEDULE

STAND 5837NO ADJ. STRUCTURE

Vis

itor's p

ark

ing

Vis

itor's p

ark

ing

pavin

g t

o s

lope a

way fro

m g

ara

ge e

ntr

ance

swsw

sw

sw

sw

sw

14

92.0

00

14

92.0

001492.5

00

1992.5

00

WATERCONNECTION

110mm dia.PN12.5

16mm² 4 CORE COPPER

LOW VOLTAGE SERVICE

CONNECTION

ELECTRICAL

CONNECTION

sw

self closingself lockinggate

gulley

iere

iere

ie

iere

re

ie

ie

3x ae

re

ie

iere

re ie

110 stubstack 2-wayvent SVP

110 stub-stack2-way vent

110 Stubstack2-way vent

Soil pipe under buildingto be incased in concrete

Soil pipe under buildingto be incased in concrete

5500

5100

62201547 3203

1200

7620 2000

1600

6050

2000

3220

6140

3020

2020

1390

6340

4000

2540 26801890

4030 220

2070

1330

4890

1220

3800

220

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

basins, bath andshowers: 50mm HDPEwaste pipe

basins, bath andshowers: 50mmHDPE waste pipe

wcs: 110 dia HDPEsoil pipe

wc: 110diaHDPEsoil pipe

POOLto comply with SANS1390, to discharge

into municipal sewersystem. Min.

5.0m away from RaftFoundation

Poolheat

pump

Poolpump,filter

ie

1.8m highscreen wall

1.8m highscreen wall

screen wall tounderside ofsoffit

4000

3000

220

6090

220

1300

110

1090

110

2600

110

2480

110

3330

3690

3500

3500

5

A 2/4

BM:1492.370

1492390 1492050

satalitedish

position

braai/ fire-place

pool pumpnot visable

sw

duct forplumbing

with screen

sw awayfrom gully

110 stub-stack 1-way vent

ieiere

ie

W6

W5W5 W6 W4 W7

W7

W4

W7W4

W6

W5

W7

W4

W7

W4

D4

D5 W5

W1

W1

W1

W7 W7

W2

D3D7

D2

W2

W5

W1

W3

W4

ADJ. DOUBLE GARAGE

ADJ. SCULLERY

ADJ. KITCHEN

AD

J. M

AIN

BE

DR

OO

M

ADJ. BEDROOM 2

W11

W9

W8

W6W10

D1

D8

D8

D8

D8

D8

D8

D3

D6

D8

3500

3220 5220 2750 10600

3910

7550

1928

142

6050

2000

3500 622013570

2000

2775

3770

1360

4940

1390

6340

4000

2760

2460 5920 220

3x ie

2090

490

Chimney to complywith Part V of NBR

Reinforced Concrete Roof Slab according toengineer's specifications and specialist

waterproofing@ min fall of 1:70COLOUR: NCS S 0510-R60B

Charcoal aluminium window frames

500 max between FFLand NGL

All windows to comply with Part N of NBR

Semi-face Brick: SABRIX Pinotage

Light Smooth plaster and paint incolour: COLOUR: NCS S 0510-R60B

Dark plaster and paint in colour: NCS S6502-G

Precast concrete window sill, plaster band andconcrete roof slab in colour: NCS S6502-G

pool pump andheat pumpposition, notvisable

1.8m highscreen wall

Timber panel paint in colour: NCS S5020-Y80R

heatpump

warm waterstorage

heat pump behind935mm high parapet wall

1.8m highscreen wall

935

4590

heatpump

warmwater

storage

14954501495110

1495450

ROOF CONSTRUCTION:

TRUSSES:S.A. PINE TRUSSES DESIGNED IN ACCORDANCE WITH INTERNATIONAL TRUSSSYSTEMS AND MANUFACTURED IN ACCORDANCE WITH ITC ALL CONFORMING TOTHE RELEVANT SABS CODES OF PRACTISE ESPECIALLY SANS 10243 AND SANS10400-L, WITH PITCH OF 5° AND 0mm OVERHANG AND INCLUDING ALL RELEVANTBRACING, HIPS AND VALLEY-SETS, ETC.

ROOF COVERING:

Roof sheeting to be Chromadek galvanised steel sheeting with Globalcoat finish ( Colour :CHARCOAL GREY) to one side and half coat Globalcoat Grey other side and accessoriesfixed to timber purlins at 2000mm centres.

Girth 550mm ridge cap and 610mm valley gutter, fixed in accordance with manufacturer`sspecifications.

ROOF PITCH:5°; ROOF OVERHANG: according to roof plan.

ROOF INSULATION:Rigid extruded polystyrene board insulation with an R value of 2.16. density to be 11.5kg/m³and a thickness of 100mm

GUTTER NOTE: NO GUTTERS

FACIAS:Everite medium density plain ungrooved Nutec fascia boards (Code: 041-237), size 150 x10mm, fixed to timber rafters twice screwed with 12 x 40mm countersunk brass screws withaluminium fascia jointing plate between boards and aluminium H-profile fascia corner joiners atboard ends.

GEYSER NOTE:HEAT PUMP TO BE PLACED BEHIND PARAPET WALLS. (NOT VISABLE)

Concrete slab

position ofheat pumpbehindparapet wall

ROOF CONSTRUCTION:

ROOF SLABS:

REINFORCED CONCRETE ROOF SLABS AS DESIGNED BY ENGINEER.255mm OR 170mm THICK AS PER SPAN REQUIREMENTS.SCREED(MIN. 50, MAX.100mm THICK) OVER AT MIN. FALL 1:100 TOWARDS RAIN WATERGUTTER(M/S LIPPED CHANNEL).TORCH ON WATERPROOFING AS BY APPROVED APPLIER, TURN INTO GUTTER ANDEDGE ANGLE IRON AS PER DETAIL.PAINT FINISH COLOUR: DDDD.ROOF PITCH:0°; ROOF OVERHANG: ACCORING TO ROOFPLAN.

ROOF INSULATION:

RIGID EXTRUDED POLYSTYRENE INSULATION BOARD WITH A R VALUE OF 2.16.DENSITY TO BE 11.5kg/m³ AND THICKNESS OF 50mm.

GUTTER NOTE:

175x50x20x3mm M/S LIPPED-CHANEL PLACED AS INDICATED ON ROOF PLAN

FACIAS: NO FACIAS

GEYSER NOTE:GEYSER TO BE PLACED BEHIND PARAPET WALL. (NOT VISABLE)

935mm highparapet wall

935mm highparapet wall

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

slopescreed

Chimney tocomply withPart V of NBR

GROUND FLOOR

1492390

ROOF PLAN

1495450

LOWER GROUND FLOOR

1492050

170

500

390

935

2465

255

1245

14923901492050

1495450

NGL

fillcut

fillNGL

34 m²

GARAGESTEEL TROWEL GRANO

17 m²

DINING ROOMTILES

18 m²

ENTERTAINMENT ROOMTILES

170

170

3060

3060

2805

ROOF CONSTRUCTION:

TRUSSES:S.A. PINE TRUSSES DESIGNED IN ACCORDANCE WITH INTERNATIONAL TRUSS SYSTEMS AND MANUFACTURED IN ACCORDANCE WITH ITC ALLCONFORMING TO THE RELEVANT SABS CODES OF PRACTISE ESPECIALLY SANS 10243 AND SANS 10400-L, WITH PITCH OF 5° AND OVERHANG(AS PERROOF PLAN) AND INCLUDING ALL RELEVANT BRACING, HIPS AND VALLEY-SETS, ETC.

ROOF COVERING:ROOF SHEETING TO BE CHROMADEK GALV. STEEL SHEETING WITH GLOBALCOAT FINISH (COLOUR: CHARCOAL GREY) TO ONE SIDE AND HALF COATGLOBALCOAT GREY OTHER SIDE AND ACCESSORIES FIXED TO TIMBER PURLINS AT 2000MM CENTERS.

GIRTH 550mm RIDGE CAP AND 610mm VALLEY GUTTER, FIXED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.

ROOF PITCH:5°; ROOF OVERHANG: ACCORDING TO ROOF PLAN.

ROOF INSULATION:RIGID EXTRUDED POLYSTYRENE BOARD INSULATION WITH AN R-VALUE OF 2.16. DENSITY TO BE 11.5KG/M³ AND A THICKNESS OF 100MM

FACIAS:EVERITE MEDIUM DENSITY PLAIN UNGROOVED NUTEC FACIA BOARDS(CODE: 041-237), SIZE 150 x 10MM FISED TIMBER RAFTERS TWICE SCREWEDWITH 12 x 40MM COUNTERSHUNK BRASS SCREWS WITH ALUMINIUM FACIA JOINTING PLATE BETWEEN BOARDS AND ALUMINIUM H-PROFILE FACIACORNER JOINERS AT BOARD ENDS.

ROOF CONSTRUCTION:

ROOF SLABS:REINFORCED CONCRETE ROOF SLABS AS DESIGNED BY ENGINEER. 255mm OR 170mm THICK AS PER SPAN REQUIREMENTS.SCREED(MIN. 50, MAX.100mm THICK) OVER AT MIN. FALL 1:100 TOWARDS RAIN WATER GUTTER(M/S LIPPED CHANNEL).TORCH ON WATERPROOFING AS BY APPROVED APPLIER, TURN INTO GUTTER AND EDGE ANGLE IRON AS PER DETAIL.

ROOF PITCH:0°; ROOF OVERHANG: ACCORING TO ROOFPLAN.

ROOF INSULATION:

RIGID EXTRUDED POLYSTYRENE INSULATION BOARD WITH A R VALUE OF 2.16. DENSITY TO BE 11.5kg/m³ AND THICKNESS OF 50mm.

GUTTER NOTE:175x50x20x3mm M/S LIPPED-CHANEL PLACED AS INDICATED ON ROOF PLAN

GEYSER NOTE:GEYSER TO BE PLACED BEHIND 935MM HIGH PARAPET WALL. (NOT VISABLE)

heatpump

warm waterstorage

heat pump behind935mm high parapet wall

RAFT FOUNDATION ACCORDING TO ENGINEER'S SPECIFICATIONS AND DESIGN.

75mm THICK CONC. SURFACE BED WITH 10Mpa AT 28 DAYS STRENGTHON, 30mm THICK ISOBOARD® HIGH DENSITY 32-36KG/m³ RIGID EXTRUDED POLYSTYRENE 100%

CLOSED CELL INSULATION BOARDING, 600mm WIDE, WITH BUTT JOINTS LAID ON0.25mmPOLYOLYFIN USB DPM ON NATURAL GRAVEL BASE, COMPACTED

IN LAYERS OF 150mm TO 95% MOD. AASHTO DENSITY.75mm DRAINAGE LAYER UNDER SURFACEBED.

staircasenote:R@170mmT@280mm

CEILING FINISH: RHINOLITE PLASTERAND PAINT

CONC. SOFFITS TO RECEIVE RHINOLITEPLASTER AND PAINT

DPMF.G.L.

F.G.L.

3500

3220 5220 2750 10600

3910

7550

1928

142

6050

2000

3500 6220 13570 2000

2775

3770

1360

4940

1390

6340

4000

2760

2460 5920 220

1492390

1492220

14920501492390

wc: 110dia HDPEsoil pipe

basin, wm,dw, prepbowl andsink: 50mmHDPEwaste pipe

110 H

DP

E s

ew

er

pip

ew

ith m

in fall

1:4

0connecte

d t

o m

ain

sew

er

connection

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

Soil

pip

e u

nder

build

ing

to b

e incased in c

oncre

te

3x 110stub-stack1-way vent

gulley

iereiere

ieiere

ieie

6x iere

gulley

ie

iere

re ie

110 stubstack 2-wayvent SVP

110 stub-stack2-way vent

110 Stubstack2-way vent

Soil pipe under buildingto be incased in concrete

Soil pipe under buildingto be incased in concrete

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

110 HDPE sewer pipewith min fall 1:40connected to mainsewer connection

basins, bath andshowers: 50mm HDPEwaste pipe

basins, bath andshowers: 50mmHDPE waste pipe

wcs: 110 dia HDPEsoil pipe

wc: 110diaHDPEsoil pipe

POOLto comply with SANS1390, to discharge

into municipal sewersystem. Min.

5.0m away from RaftFoundation

ie110 stub-stack 1-way vent

ieiere

ie

up

PROJECT NO. REV NO. PAGE NO.

DATE REV DESCRIPTION NO

REVISIONS

PROJECT

DRAWINGS

DATE SCALE DRAWN CHECKED SCALE

SIGNATURE: CLIENT SIGNATURE: ARCHITECT

REV.PAGE NO.Date IN:

2017/09/2012:45:45 PM

As indicated

A 1/4

A 1/4

PROPOSED NEW HOUSE ON STAND 5835MIDSTREAM MEADOWS

APPROVAL

24/05/2017

Author

A

0001 A

1 : 100

SDP GROUND FLOOR1

TYPICAL 3D View2

1 : 100

TYPICAL FINISHES3

1 : 200

ROOF PLAN4

1 : 100

Section 15

1 : 200

FOUNDATION PLAN6

Page 2: 3 F.G.L. Section 1 5 · 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according

Chimney to complywith Part V of NBR

Reinforced Concrete Roof Slab according toengineer's specifications and specialist

waterproofing@ min fall of 1:70COLOUR: NCS S 0510-R60B

Charcoal aluminium window frames

500 max between FFLand NGL

All windows to comply with Part N of NBR

Semi-face Brick: SABRIX Pinotage

Light Smooth plaster and paint in colour:COLOUR: NCS S 0510-R60B

Dark plaster and paint in colour: NCS S6502-G

Precast concrete window sill, plaster band andconcrete roof slab in colour: NCS S6502-G

pool pump andheat pumpposition, notvisable

1.8m highscreen wall

rwdp

Timber panel paint in colour: NCS S5020-Y80R

heatpump

warm waterstorage

heat pump behind935mm high parapet wall

1.8m highscreen wall

4995

90

332

935

screen wallto soffit ofroof slab

ngl

ngl

420 re

ie

wc: 110dia HDPEsoil pipe

basin, bathand shower:50mmHDPEwaste pipe

110 HDPE sewer pipe withmin fall 1:40 connected tomain sewer connection

stubstack2- way vent

stubstack2- way vent

Soil pipe under buildingto be incased in concrete

ie

ie

re

ie

re

D5D4 W4

W7

W4

W7

W5

W6

W5

W6

Chimney to complywith Part V of NBR

Reinforced Concrete Roof Slab according toengineer's specifications and specialist

waterproofing@ min fall of 1:70COLOUR: NCS S 0510-R60B

Charcoal aluminium window frames

500 max between FFLand NGL

All windows to comply with Part N of NBR

Semi-face Brick: SABRIX Pinotage

Light Smooth plaster and paint in colour:COLOUR: NCS S 0510-R60B

Dark plaster and paint in colour: NCS S6502-G

Precast concrete window sill, plaster band andconcrete roof slab in colour: NCS S6502-G rwdp

heatpump

warm waterstorage

1.8m highscreen wall1.8m high

screen wall

rwdp

Timber panel paint in colour: NCS S5020-Y80R

pool pumpand heatpump, notvisable

400 2

57

371

5216

nglngl

ngl

satelitedish

rere

ie ie

gully

stubstack2- way vent

wc: 110dia HDPE

soil pipe

basin, wm,dw, prepbowl and

sink: 50mmHDPE

waste pipe

110 HDPE sewer pipe withmin fall 1:40 connected to

main sewer connection

Soil pipe under buildingto be incased in concrete

2xgully

wc: 110 diaHDPE soil pipe

basin, sh and bath:50mm HDPE

waste pipe

3x stubstack2- way vent

W1 W1 W5

W6

W8

W9

W4

W7

W4

W7

W5

W6

W4

W7

Chimney to complywith Part V of NBR

Reinforced Concrete Roof Slab according toengineer's specifications and specialist

waterproofing@ min fall of 1:70COLOUR: NCS S 0510-R60B

Charcoal aluminium window frames

500 max between FFLand NGL

All windows to comply with Part N of NBR

Semi-face Brick: SABRIX Pinotage

Light Smooth plaster and paint incolour: COLOUR: NCS S 0510-R60B

Dark plaster and paint in colour: NCS S6502-G

Precast concrete window sill, plaster band andconcrete roof slab in colour: NCS S6502-G

pool pump andheat pumpposition, notvisable

1.8m highscreen wall

rwdp

heatpump

warm waterstorage

heat pump behind935mm high parapet wall

935

188

363

5156

ngl

nglre

wc: 110dia HDPE

soil pipe

wm, sinkand dw:

50mmHDPE

waste pipe

110 HDPE sewer pipe withmin fall 1:40 connected to

main sewer connection

stubstack2- way vent

ie

ie

re

ie

gully

iere

W2

W7 W7 W1

SANDBLAST: SOUTH AN WEST WINDOWS(MIN. 80% OBSCURITY)

Chimney to complywith Part V of NBR

Reinforced Concrete Roof Slab according toengineer's specifications and specialist

waterproofing@ min fall of 1:70COLOUR: NCS S 0510-R60B

Charcoal aluminium window frames

500 max between FFLand NGL

All windows to comply with Part N of NBR

Semi-face Brick: SABRIX Pinotage

Light Smooth plaster and paint incolour: COLOUR: NCS S 0510-R60B

Dark plaster and paint in colour: NCS S6502-G

Precast concrete window sill, plaster band andconcrete roof slab in colour: NCS S6502-G

pool pump andheat pumpposition, notvisable

1.8m highscreen wall

Timber panel paint in colour: NCS S5020-Y80R

heatpump

warm waterstorage

heat pump behind935mm high parapet wall

1.8m highscreen wall

935

4590

screen wallto soffit ofroof slab

nglngl

re re

ieie

gully

stubstack2- way vent

wc: 110dia HDPEsoil pipe

basin, wm,dw, prepbowl andsink: 50mmHDPEwaste pipe

110 HDPE sewer pipe withmin fall 1:40 connected tomain sewer connection

Soil pipe under buildingto be incased in concrete

2xgully

wc: 110 diaHDPE soil pipe

basin, sh and bath:50mm HDPEwaste pipe

3x stubstack2- way vent

W4

W1 W2W5 D1

SANDBLAST: SOUTH AN WEST WINDOWS(MIN. 80% OBSCURITY)

GROUND FLOOR

1492390

ROOF PLAN

1495450

LOWER GROUND FLOOR

1492050

170 340

935

2465

255

1245

170

500

390

2465

255

1245

14923901492050

1495450

NGL

fillcut

fillNGL

MASONRYWALL

GATE DETAIL: SIDE GATE

60x60x3mm SQUARETUBE FRAME WITH120x60x3mm REQTUBE IN-FILL SPACED60mm APPART,PAINTED CHARCOAL.GATE FIXED TOPLASTERED WALLSWITH MILD STEELHINGES

SCALE 1:50

920

60

120

ADDITIONAL SCREED

REINFORCEDCONCRETE RAFT

DETAIL 1 (Additional screed)

REINFORCED CONCRETE RAFT

WASTE WATER PIPE AS FOLLOWS:1) HDPE PIPE WITHOUT ANY JOINTS2) ELECTROFUSION WELDED BENTS3) ENCASED IN REINFORCED CONCRETERAFT AS SHOWN (REBAR AROUND)4) 1:60 MINIMUM FALL5) THIS DETAIL NOT APPLICABLETOPRESSURIZED WATER PIPES

100

300

REINFORCED CONCRETE RAFT

DETAIL 2 (Encased in raft)

STEP IN RAFT AS PER ENGINEER DETAILS

WASTE WATER PIPE AS FOLLOWS:1) uPVC OR HDPE PIPES ABOVE RAFT SLAB2) PIPES ENCASED IN SCREET AS SHOWN1:60MINIMUM FALL

HDPE PRESURIZD WATER PIPEWITHOUT ANY JOINTS

DETAIL 3(Raft detail at service duct/pipe outlet)

NOTES1) A CERTIFICATE OF COMPLIENCE FOR ALLPLUMBING WORK SHALL BE PROVIDED INACCORDANCE WITH THE REQUIREMENTS OFTHE PLUMBING INDUSTRY REGISTRATIONBOARD BY A LISENCED QUALIFIED PLUMBER2)ALL WASTE WATER PIPES UNDERGROUND ORBELOW FLOOR LEVEL (SEE DETAIL 2) SHALL BEHDPE PIPES.3) ALL UNDERGROUND PRESURIZED WATERPIPES AS WELL AS PIPES IN SCREEDS SHALL BEHDPE WITH WELDED JONTS (PE100 PN12.5)4) NO WASTE WATER PIPES OR PESURIZEDWATER PIPES BELOW THE REINFORCEDCONCRETE RAFT DPC

50mm SURFACE BED WITH A STRENGTHOF 10MPa AFTER 28 DAYS

FILLING LAID AND MECHANICALLYCOMPACTED IN LAYERS < 150mm

BRICK WALL

15mmPLASTERAND PAINT

POLYOLEFIN SHEETING

250 X 600MM RAFT FOUNDATION ACCORDING TOENGINEERS SPECIFICATIONS

RAFT FOUNDATION WITH DPC AND INSULATIONSCALE 1:20

EXTRUDED POLYSTYRENE ISO BOARD OREXPANDED POLYSTERENE ARERECOMENDED OR ANY OTHER SIMILARINSULATION WITH A R-VALUE OF 1,0

TILE FLOOR FINISH

NGL

600 m

in

100mm MERANTI SKIRTING

JOINT

BRICK WALL

CONCRETE ROOF SLAB AND INSULATIONSCALE 1:20

15mmPLASTERAND PAINT

255mm CONCRETE ROOF SLABACCORDING TO ENGINEERSSPECIFICATIONS

CEMENT SCREED, SLOPED TO M/SLIP CHANEL GUTTER, MIN 50mmTHICK. MIN. SLOPE 1:100

50MM THICK ISOBOARDINSULATION, GLUED TOUNDERSIDE OF ROOF SLAB

175x50x20mm M/S LIP CHANELGUTTER PLACED ON ROOF SLAB

50x50x3mm M/S ANGLE SEC.AS EDGE DRIP DETAIL

TORCH-ON WATER PROOFING ASPER APPROVED CONTRACTOR,TURN DOWN INTO GUTTER ANDANGLE IRON EDGE-DRIP.

FLOOR TO CEILING VENESTRATION

CONCRETE ROOF SLAB AND INSULATION BY FLOOR TOCEILING GLAZING

SCALE 1:20

255mm CONCRETE ROOF SLABACCORDING TO ENGINEERSSPECIFICATIONS

CEMENT SCREED, SLOPED TO M/SLIP CHANEL GUTTER, MIN 50mmTHICK. MIN. SLOPE 1:100

50MM THICK ISOBOARDINSULATION, GLUED TOUNDERSIDE OF ROOF SLAB

175x50x20mm M/S LIP CHANELGUTTER PLACED ON ROOF SLAB

50x50x3mm M/S ANGLE SEC.AS EDGE DRIP DETAIL

TORCH-ON WATER PROOFING ASPER APPROVED CONTRACTOR,TURN DOWN INTO GUTTER ANDANGLE IRON EDGE-DRIP.

150MM STEP BACK IN INSULATION

TIMBER RAFTERS @ 1500mm SPACING

BRICK WALL

SCALE 1:20

9,5mm GYPSUM BOARD

0,5mm CONCEALED FIX KLIP-LOK 700LIGHT INDUSTRIAL Z275 SPELTERGALVANISED STEEL ROOF SHEETINGWITH GLOBALCOAT FINISH FIXED TOPURLINS @ 1500mm CENTRES

15mm PLASTER AND PAINT

110mm FLEXIBLE FIBRE GLASS BLANKETINSULATION WITH AN R-VALUE OF 0.68.DENSITY TO BE 10-18kg/m³.

varied

SHADOW LINE CORNICE STRIP

300x8,5mm CROMADEK RIBBED FACIA

ROOF DETAIL

114x38mm SAPINE WALL PLATE

5.0

PLASTER AND PAINT

COLUMNS TO BEPAINTED SAMECOLOUR AS WALL

SCALE 1:50BOUNDARY WALL: ELEVATION

BRICK ON EGDE PLASTER ANDPAINT DARKER

COLUMN PLASTER AND PAINTLIGHTER

SCALE 1:50BOUNDARY WALL: CORBEL DETAIL

CORBELL: BRICK ONEGDE PLASTER ANDPAINT DARKER

CORBEL DETAIL AS PER SECTION

NGL 200 X 500MMCONCRETEFOUNDATION

AD

JA

CE

NT

PR

OP

ER

TY

110

PROJECT NO. REV NO. PAGE NO.

DATE REV DESCRIPTION NO

REVISIONS

PROJECT

DRAWINGS

DATE SCALE DRAWN CHECKED SCALE

SIGNATURE: CLIENT SIGNATURE: ARCHITECT

REV.PAGE NO.Date IN:

2017/09/2012:45:47 PM

As indicated

A 2/4

A 2/4

PROPOSED NEW HOUSE ON STAND 5835MIDSTREAM MEADOWS

APPROVAL

24/05/2017

Author

A

0001 A

1 : 100

NORTH ELEVATION1

1 : 100

EAST ELEVATION2

1 : 100

SOUTH ELEVATION3

1 : 100

WEST ELEVATION4

1 : 100

CUT AND FILL DIAGRAM5

Page 3: 3 F.G.L. Section 1 5 · 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according

1490

590

590

890

590

1490

1190

1790

590

1790

590

590 1190

590

2001

2125

2001

680

2393

2125

680

2393

1352

2201

4940

2165

965

2210

2400

2100

3590

2090

965

2210

762

2210

965

2210

PROJECT NO. REV NO. PAGE NO.

DATE REV DESCRIPTION NO

REVISIONS

PROJECT

DRAWINGS

DATE SCALE DRAWN CHECKED SCALE

SIGNATURE: CLIENT SIGNATURE: ARCHITECT

REV.PAGE NO.Date IN:

2017/09/2012:45:47 PM

1 : 50

A 3/4

A 3/4

PROPOSED NEW HOUSE ON STAND 5835MIDSTREAM MEADOWS

APPROVAL

24/05/2017

Author

A

0001 A

1 : 50

W1

1 : 50

W2

1 : 50

W3 1 : 50

W4

1 : 50

W5 1 : 50

W6 1 : 50

W7

1 : 50

W8 1 : 50

W9

1 : 50

W10 1 : 50

W11

Window Schedule

TypeMark Height Width

HeadHeight

SillHeight Comments

W1 590 1490 2460 1870

W1 590 1490 1525 935

W1 590 1490 1525 935

W1 590 1490 1185 595

W2 890 590 2125 1235

W2 890 590 2460 1570

W3 1490 590 2125 635

W4 1790 1190 2125 335

W4 1790 1190 2125 335

W4 1790 1190 2125 335

W4 1790 1190 2425 635

W4 1790 1190 2125 335

W4 1790 1190 2125 335

W5 1790 590 2425 635

W5 1790 590 2125 335

W5 1790 590 2125 335

W5 1790 590 2125 335

W5 1790 590 2125 335

W6 590 590 2715 2125

W6 590 590 2715 2125

W6 590 590 2715 2125

W6 590 590 2715 2125

W7 590 1190 1525 935

W7 590 1190 2715 2125

W7 590 1190 2715 2125

W7 590 1190 2715 2125

W7 590 1190 1525 935

W7 590 1190 2715 2125

W7 590 1190 2715 2125

W8 2125 2001 2125 0

W9 680 2001 2805 2125

W10 2125 2393 2125 0

W11 680 2393 2805 2125

Window Schedule TOTALS

TypeMark Count Height Width Description

W1 4 590 1490 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W2 2 890 590 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W3 1 1490 590 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W4 6 1790 1190 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W5 5 1790 590 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W6 4 590 590 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W7 7 590 1190 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W8 1 2125 2001 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W9 1 680 2001 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W10 1 2125 2393 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

W11 1 680 2393 PRIMADOR 38mm Aluminium Frame Finish Window fitted in accordance with manufacturer'sspecification, plugged and screwed to brickwork or concrete.

Grand total: 33

1 : 50

D1 1 : 50

D2 1 : 50

D3

1 : 50

D4 1 : 50

D5

1 : 50

D6 1 : 50

D7 1 : 50

D8

Door Schedule

Type Mark LevelFrom Room:

NameTo Room:

Name Mark Comments

D1 GROUND FLOOR D1

D2 GROUND FLOOR GARAGE D2

D3 LOWER GROUNDFLOOR

SCULLERY D3

D3 GROUND FLOOR STAFFROOM

D3

D4 LOWER GROUNDFLOOR

DINING ROOM D4

D5 LOWER GROUNDFLOOR

ENTERTAINMENT ROOM

D5

D6 GROUND FLOOR GARAGE D6

D7 GROUND FLOOR STAFF WC D7

D8 GROUND FLOOR BATHR 2 STUDYNOOK

D8

D8 GROUND FLOOR BEDR 3 STUDYNOOK

D8

D8 GROUND FLOOR BEDR 2 STUDYNOOK

D8

D8 GROUND FLOOR MAIN BEDR STUDYNOOK

D8

D8 LOWER GROUNDFLOOR

KITCHEN SCULLERY D8

D8 GROUND FLOOR GUEST WC D8

D8 GROUND FLOOR STUDYNOOK

D8

D8 GROUND FLOOR MAIN BEDR MAINBATHR

D8

Door Schedule TOTALS

Type Mark Width Height Count Mark Description

D1 1321 2125 1 D1 Charcoal powder coated Aluminium pivot hinged entrance door, size 1200 x 2090mm highglazed with Clear laminated glass, complying with SANS 1263 Part 1, 2 or 3 with name of themanufacturer permanently marked on each pane visible after glazing, in accordance with NBRPart N schedule 1 and SANS 10137:2002, with clip-on glazing beads with applicable seals,fixed to brickwork or concrete, in accordance with AAAMSA Selection Guide for GlazedAluminium Architectural Aluminium Products - June 2008.

D2 4880 2135 1 D2 Horizontal slatted Timber double sectional electrically operated garage door to suit openingsize 4880 x 2215mm high with 220mm wide nibs to both sides of opening with 5000mm clearbackspace behind door and 2560mm clearance between highest point of open door and floor,supplied and installed by manufacturer’s and fitted with door operator.

D3 813 2134 2 D3 40mm thick SQ 5 meranti door with two fielded panels, size 813 x 2032mm high. Sand downtimber surface to a fine smooth finish and apply two coats quality timber sealant prior toinstallation, all in accordance with the manufacturer's recommendations.

D4 2400 2100 1 D4 PRIMADOR 30.5mm Aluminium Charcoal Finish, sliding door fitted in accordance withmanufacturer's specification, plugged and screwed to brickwork or concrete.

D5 3590 2090 1 D5 PRIMADOR 30.5mm Aluminium Charcoal Finish, stacking door fitted in accordance withmanufacturer's specification, plugged and screwed to brickwork or concrete.

D6 813 2134 1 D6 40mm thick 2 Panel Commercial HB fire door, size 813 x 2032mm high with hardwood doorframe with 75 x 50mm moulded and rebated frame sections, overall size 889 x 2,090mm highto suit 813 x 2,032mm high single door.

D7 610 2134 1 D7 40mm thick 2 Panel HB meranti two panel door, size 610 x 2032mm high. Sand down timbersurface to a fine smooth finish and apply two coats Lotus Sheen quality timber sealant prior toinstallation, all in accordance with the manufacturer's recommendations.

D8 813 2134 8 D8 40mm thick Sapele Veneer flush panel door, size 813 x 2032mm high high with hardwood doorframe with 75 x 50mm moulded and rebated frame sections, overall size 889 x 2,090mm highto suit 813 x 2,032mm high single door.

Grand total: 16

Page 4: 3 F.G.L. Section 1 5 · 13570 2000 2775 3770 1360 4940 1390 6340 4000 2760 2460 5920 220 3x ie 2090 490 Chimney to comply with Part V of NBR Reinforced Concrete Roof Slab according

36W

36W

2

2

2

TV

2

gp

36W

2

2

2

gp

TV

pu

pu

heatpump

warmwater

storage

heatpump

warmwater

storage

935mm highparapet wall

935mm highparapet wall

-

---

heatpump

warmwater

storage

WATERCONNECTION

FROM WATERCONNECTION

GARDENTAP

GARDENTAP

riserpipe

dropperpipe

dropperpipe

dropperpipe

dropperpipe

riserpipe

heatpump

warmwater

storage

dropperpipe

dropperpipe

dropperpipe

dropperpipe

-

---

DOWN LIGHTER

FLUORECENT LIGHT

SINGLE LEVER SWITCH

DOUBLE LEVER SWITCH

TRIPPLE LEVER SWITCH

SINGLE LEVER 2 WAY SWITCH

SWITCHES TO BE COMBINED IN ORDER TOREDUCE THE NUMBER OF SWITCH PANELS

SINGLE WATERPROOF PLUG

DOUBLE LEVER 2 WAY SWITCH

TRIPPLE LEVER 2 WAY SWITCH

DISTRIBUTION BOARD

EXTERNAL WALL LIGHT

DOUBLE PLUG(COUNTER LEVEL)

ISOLATOR

GARAGE MOTOR WITH PLUG

GARDEN POINT - IRRIGATION CONTROLE

TV POINT

SWIMMING POOL

DOUBLE WATERPROOF PLUG

CEILING MOUNTED LIGHT FITTING

DOUBLE PLUG(LOW LEVEL)

DOUBLE PLUG(COUNTER POP-UP TYPE)

PU

PROJECT NO. REV NO. PAGE NO.

DATE REV DESCRIPTION NO

REVISIONS

PROJECT

DRAWINGS

DATE SCALE DRAWN CHECKED SCALE

SIGNATURE: CLIENT SIGNATURE: ARCHITECT

REV.PAGE NO.Date IN:

2017/09/2012:45:48 PM

As indicated

A 4/4

A 4/4

PROPOSED NEW HOUSE ON STAND 5835MIDSTREAM MEADOWS

APPROVAL

24/05/2017

Author

A

0001 A

1 : 100

ELECTRICAL LAYOUT GFP1 1 : 100

ELECTRICAL LAYOUT RP2

1 : 100

RETICULATION LAYOUTGFP3

1 : 100

RETICULATION LAYOUTRP4

1 : 50

ELEC LEGEND