29
NODE-B Commissioning guidelines JYOSTNA INFRASTRUCTURE PRIVATE LIMITED Er Himanshu Maurya +919807888440

3G COMMISSIONING STEPS

Embed Size (px)

Citation preview

Page 1: 3G COMMISSIONING STEPS

NODE-B Commissioning guidelines

JYOSTNA INFRASTRUCTURE PRIVATE LIMITED

Er Himanshu Maurya+919807888440

Page 2: 3G COMMISSIONING STEPS

PLEASE ENSURE THE FOLLOWING IP AT YOUR LAPTOP FOR CONNECTING NODE-B

Page 3: 3G COMMISSIONING STEPS

ENSURE THAT SOFTWARE VERSION OF VERSION OF WN6.0 IS INSTALLED IN YOUR LAPTOP

This can be cross checked by clicking About option on left side of the BTS Manager Window

Page 4: 3G COMMISSIONING STEPS

CONNECT TO THE NODE-B

User Name: Nemuadmin

Password: nemuuser

The following Pop-up Window will be observed.

Click on Update SW option.

Page 5: 3G COMMISSIONING STEPS

CLICK ON CONTINUE HERE FOR UPDATING FILE

Page 6: 3G COMMISSIONING STEPS

BROWSE HERE FOR FILE. CLICK ON UPDATE. ONCE THE SOFTWARE IS UPDATED, THE HARDWARE WILL BE VISIBLE (in uncommissioned state)

Page 7: 3G COMMISSIONING STEPS

NOW START COMMISSIONING. CLICK ON TEMPLATE IN COMMISSIONING TYPE. BROWSE THE GOLDEN COMMISSIONING FILE (specific for RNC). THEN CLICK NEXT

Page 8: 3G COMMISSIONING STEPS

EDIT SITE NAME, LOCATION, DESCRIPTION, BTS ID, TRS (Transmission) IP, BTS IP, RNC IP & NTP SERVER IP. (most imp)

Page 9: 3G COMMISSIONING STEPS

CLICK ON CLOSE

Page 10: 3G COMMISSIONING STEPS

CLICK ON NEXT.

Page 11: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: 4 E1s in IMA 33 would be already selected)

Page 12: 3G COMMISSIONING STEPS

CLICK NEXT (Note: IF 1 (E1) AND IF2 (E2) in TIMING SOURCE already done)

Page 13: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: Traffic already defined)

Page 14: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: TRAFFIC already mapped) (VP1,VP0 and their VCs)

Page 15: 3G COMMISSIONING STEPS

CLICK NEXT (Note: DCN INTERFACE already mapped)

Page 16: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: RNC IP should be in DEFAULT GATEWAY IP)

Page 17: 3G COMMISSIONING STEPS

CLICK ON NEXT

Page 18: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: Iub sync in use would be already clicked)

Page 19: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: CELLS already created with 20W power

Page 20: 3G COMMISSIONING STEPS

CLICK NEXT

Page 21: 3G COMMISSIONING STEPS

CLICK NEXT. (Note: UARFCN already inserted as per plan)

Page 22: 3G COMMISSIONING STEPS

CLICK NEXT.

Page 23: 3G COMMISSIONING STEPS

CLICK NEXT

Page 24: 3G COMMISSIONING STEPS

CLICK NEXT

Page 25: 3G COMMISSIONING STEPS

CLICK NEXT

Page 26: 3G COMMISSIONING STEPS

CLICK ON SEND PARAMETERS. BY THIS THE PARAMETERS WOULD BE SENT TO NODE-B

Page 27: 3G COMMISSIONING STEPS

CLICK NEXT

Page 28: 3G COMMISSIONING STEPS

CLICK NEXT

Page 29: 3G COMMISSIONING STEPS

CLICK FINISH. SAVE THE COMMISSIONING FILE & COMISSIONING REPORT ON YOUR LAPTOPS AND INCLUDE COMMISSIONING REPORT’s HARD COPY IN SITE FOLDER.