Definitions: Frequency Rate:  A measurement of injury rate. It calculates the frequency of recordable cases per 200,000 man hours worked. Severity Rate:  A measurement of how severe recordable injuries are. It calculates the number of leave days of all injured personnels per 200,000 man hour s worked. Lost Time Injury Frequency Rate  An internat ional recognised standard for measuring injury rates. It is calculates the frequency of lost time injur ies per million man hours worked. Recordable Case  Any work-related accident that for all employees (office, field and shopfloor) and contractor working at site that requires medical treatment other than first aid or results in the inability of the injured person to resume normal work in spite of the first aid treatment given to complete the shift or returns at the start of the next shift. The number of recordable case is calculated per injured personnel. If in an accident, there are two persons need to receive medical treatment, then the number of recordable case is 2. Medical Treatment  Any treatment that involves the provision of medical or surgical care for injuries that are not minor through the application of procedures or systematic therapeutic measures First Aid  Any one-time treatment, and follow-up visit f or the purpose of observation, or minor scratches, cuts, burns, splinters, and so fort h, which do not ordinary require medical car e. Such one-time treatment, and follow-up visit for the purpose of observation, is considered first aid even through provided by a physical or registered professional personnel First Aid Injury is not Recordable case (see below) to be reported. Nevertheless, it should be recorded within Reginal Centre (RC) and Manufacturing Centre (MC). Lost Time Injury:  Any accident that results in loss of one or more shifts. Accidents are not limited to field staff but include all workers. Journey accidents that occur whilst at work that result in the loss of one of more shifts are deemed to be an accident. Journey accident going to work and coming from work are not deemed to be reportable accidents. Man Hours Works: Total number of actual man hours work by all personnel in the business in the reporting period for all employees including subcontractors working at site . Leave day: The number of days an injured personnel cannot work. Leave days includes weekends, holidays, publi c holidays and rostered days off. For instance, if a recordable injury happened on May 10 and the injured personnel can resume work on June 13. The leave period is May 11 to June 12 so the number of leave days is 33 (21 days in May, 12 days in June). The day that the recordable case happened is not counted as leave day Number of Employees: It is the number of employees (full time, part time, temporary) at the month end Third Party Accident It is accidents of users and other members of the public in connection with TKE product/services Month of injury = the calendor month that the injury happened. E.g. accident happened on 30 Sept is counted for the month of September 

4-Sft Report BD RC India TKE AP(Oct. Month 2013-14)

Embed Size (px)

DESCRIPTION

sdfsdf

Citation preview

DefinitionsDefinitions:Frequency Rate:A measurement of injury rate. It calculates the frequency of recordable cases per 200,000 man hours worked.Severity Rate:A measurement of how severe recordable injuries are. It calculates the number of leave days of all injured personnels per 200,000 man hours worked.Lost Time Injury Frequency RateAn international recognised standard for measuring injury rates. It is calculates the frequency of lost time injuries per million man hours worked.Recordable CaseAny work-related accident that for all employees (office, field and shopfloor) and contractor working at site that requires medical treatment other than first aid or results in the inability of the injured person to resume normal work in spite of the first aid treatment given to complete the shift or returns at the start of the next shift.The number of recordable case is calculated per injured personnel. If in an accident, there are two persons need to receive medical treatment, then the number of recordable case is 2.Medical TreatmentAny treatment that involves the provision of medical or surgical care for injuries that are not minor through the application of procedures or systematic therapeutic measuresFirst AidAny one-time treatment, and follow-up visit for the purpose of observation, or minor scratches, cuts, burns, splinters, and so forth, which do not ordinary require medical care. Such one-time treatment, and follow-up visit for the purpose of observation, is considered first aid even through provided by a physical or registered professional personnelFirst Aid Injury is not Recordable case (see below) to be reported. Nevertheless, it should be recorded within Reginal Centre (RC) and Manufacturing Centre (MC).Lost Time Injury:Any accident that results in loss of one or more shifts. Accidents are not limited to field staff but include all workers. Journey accidents that occur whilstat work that result in the loss of one of more shifts are deemed to be an accident. Journey accident going to work and coming from work are not deemed to be reportable accidents.Man Hours Works:Total number of actual man hours work by all personnel in the business in the reporting period for all employees including subcontractors working at site.Leave day:The number of days an injured personnel cannot work. Leave days includes weekends, holidays, public holidays and rostered days off. For instance, if a recordable injury happened on May 10 and the injured personnel can resume work on June 13. The leave period is May 11 to June 12 so the number of leave days is 33 (21 days in May, 12 days in June). The day that the recordable case happened is not counted as leave dayNumber of Employees:It is the number of employees (full time, part time, temporary) at the month endThird Party AccidentIt is accidents of users and other members of the public in connection with TKE product/servicesMonth of injury = the calendor month that the injury happened. E.g. accident happened on 30 Sept is counted for the month of September

Input fieldsInput fieldsExplanationFieldMfgNo. of EmployeesNumber of employeesYYNo. of working hoursEmpl.EmployeeYYContra.ContractorYYTotalTotalNo. of accidentNumber of recordable cases (need to prepare accident investigation report)Empl.EmployeeYYContra.ContractorYYTotalTotalYYNo. of LTI Empl.Number of lost time injuries (employee only)YYNo. of leave daysTotalEmpl.EmployeeYYContra.ContractorYYTotalTotalYYFrequency rateEmpl.EmployeeYYContra.ContractorYYTotalTotalYYSeverity rateEmpl.EmployeeYYContra.ContractorYYTotalTotalYYLTIFR Empl.Lost time injury frequency rate (employee only)YYNo. of 3rd party accidentNumber of 3rd party accident (need to prepare third party accident report)YYDate of SubmissionInsert the date of submission of the reportYYNo. of EmployeesMgrNo. of Managers and aboveYYSupNo. of SupervisorsYYServNo. of field service techniciansYYOtherOther employees not Mgr, Sup and ServYYNo. of active project / SiteNINo. of active New Installation projects - with physical work at site performed by employee/contractorYNModNo. of active Modification projects - with physical work at site performed by employee/contractorYNRepairNo. of active Repair projects - with physical work at site performed by employee/contractorYNServNo. o active Service jobsites - with physical work at site performed by employee/contractorYNRecordable caseacc no.Accumulated total number of accident (recordable case) from the start of fiscal year (empl.+ contra.)YYoutstandingNo. of recordable case accident investigation report not finalised by BUYYThird-party accidentacc no.Accumulated total number of third party accident rom the start of fiscal yearYYoutstandingNo. of recordable case accident investigation report not finalised by BUYYSafety TrainingMgr hrNo. of training hours of managers and aboveYYSup hrNo. of training hours of supervisorsYYGen hrNo. of training hours of employees other than managers and above and supervisorsYYAll hrTotal training hours (Mgr hr + Sup hr + Gen hr)YYhr / mgrNo. of trainng hours of managers and above per no. of managers and aboveYYhr / supNo. of trainng hours of supervisors per no. of supervisorsYYhr / GenNo. of training hours of General employees per no. of General employeesYYhr / AllNo. of training hours of all employees per no. of all employeesYYhr / working hrNo. of training hours of all employees per no. of all employee working hoursYYTool box talkNI no.No. of tool box talk for New Installation projectsYNAMod no.No. of tool box talk for Modificaiton projectsYNARep no.No. of tool box talk for Repair projectsYNASer no.No. of tool box talk for Service technician or Factory shopfloor workersYno. / NINo. of tool box talk for New Installation projects per no. of active NI projectsYNAno. / ModNo. of tool box talk for Modificaiton projects per no. of active modification projectsYNAno. / RepairNo. of tool box talk for Repair projects per no. of active repair projectsYNAFreq. Serv.frequency of service technicians/factory shopfloor workers attended service tool box talk or factory shopfloor tool box talkYYSafety meetingSC/SubSCNo. of safety committee meeting and sub-committee meetingsYYClientNo. of safety meeting attended with the clientsYYContNo. of safety meeting attended with the contractorsYYOtherNo. of safety meeting attended with other parties (e.g. government / RC / BU)YYCorrect. & Prevent. ActionB/FNo. of outstanding CPA brought forward from previous periodYYNewNo. of New Corrective and Preventive Actions generated in this periodYYDoneNo. of Corrective and Preventive Actions done within this periodYYC/FNo. of outstanding CPA carried forward to next periodYYHazard ReportB/FNo. of outstanding Hazard Report brought forward from previous periodYYNewNo. of New Hazard Report generated in this periodYYDoneNo. of Hazard Reports resolved within this periodYYC/FNo. of outstanding Hazard Report carried forward to next periodYYSafety PromotionActivityNo. of safety promotion activitiesYYMan hourNo. of man hours involved to organise the promotion activity and those participants who participate in the promotion activities - employee and contractor worker onlyYYSafety InspectionBr MgrNo. of safety inspection performed by Field Branch Manager (and above for field HQ) or Manufacturing Facility Manager (and above for Manufacturing)YYSafetyNo. of safety inspection performed by Safety OfficerYYSup no.No. of safety inspection performed by SupervisorYYMgr no.No. of safety inspection performed by Manager other than Field Branch Manager or Manufacturing Facility ManagerYYNo. / SupNo. of safety inspection performed by Supervisor per no. of SupervisorYYNo. / MgrNo. of safety inspection performed by Manager per no. of ManagerYYTotal InspectionNo. of safety inspection performed by various functions including safety committee membersYYInspection by CategoriesNI no.No. of safety inspection for New Installation projectsYNAMod no.No. of safety inspection for Modification projectsYNARep no.No. of safety insepction for Repair projectsYNASer no.No. of safety inspection for Service jobsitesYNAPenetration by Categoriesno. / NINo. of safety inspection for NI projects per no. of active NI projects with physical activitiesYNAno. / modNo. of safety inspection for Mod projects per no. of active Mod projects with physical activiitesYNAno. / repairNo. of safety inspection for repair projects per no. of active repairs projects with physical activitiesYNAno. / servNo. of safety inspection for NI projects per no. of active service jobsitesYNASafety InfractionNo. of safety infraction / CitationYYEmerg. DrillNo. of various kinds of emergency drill or actualYYRisk Ass.New/AmendNo. of risk assessments newly introduced, reviewed or amendedYYSWM / WINew/AmendNo. of safe work methods / work instructions newly introduced, reviewed or amendedYYSafety Inspection Plan YTDBr MgrNo. of safety inspection performed by Field Branch Manager (and above for field HQ) or Manufacturing Facility Manager (and above for Manufacturing) Plan YTDYYSafetyNo. of safety inspection performed by Safety Officer Plan YTDYYSup no.No. of safety inspection performed by Supervisor Plan YTDYYMgr no.No. of safety inspection performed by Manager other than Field Branch Manager or Manufacturing Facility Manager Plan YTDYYSafety Inspection Actual YTDBr MgrNo. of safety inspection performed by Field Branch Manager (and above for field HQ) or Manufacturing Facility Manager (and above for Manufacturing) Actual YTDYYSafetyNo. of safety inspection performed by Safety Officer Actual YTDYYSup no.No. of safety inspection performed by Supervisor Actual YTDYYMgr no.No. of safety inspection performed by Manager other than Field Branch Manager or Manufacturing Facility Manager Actual YTDYYSafety Inspection AchievementBr MgrActual YTD/Plan YTDYYSafetyActual YTD/Plan YTDYYSupActual YTD/Plan YTDYYMgrActual YTD/Plan YTDYY

&CTKE BU Asia Pacific Safety Report [Month, Year] note

BD All MonthsTKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementYTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Oct00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Nov00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Dec00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Jan00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Feb00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Mar00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Apr00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000May00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000June00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000July00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Aug00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000Sept00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report submitted to HQ

Oct 2013TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementOct-13YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Nov 2013TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementNov-13YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Dec 2013TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementDec-13YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Jan 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementJan-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Feb 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementFeb-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Mar 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementMar-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Apr 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementApr-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

May 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementMay-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Jun 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementJun-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Jul 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementJul-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Aug 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementAug-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C

Sep 2014TKE (Bangladesh)No. ofNo. of working hoursNo. of accident (TRC)No. of LTINo. of leave daysFrequency rateSeverity rateLTIFRNo.of 3rd partyNo. of employeeDown timeAccidentRecordable caseThird-party accidentNo. of EmployeesNo. of active project / SiteSafety TrainingTool box talk - Numbers doneSafety meetingCorrect. & Prevent. ActionHazard ReportSafety PromotionSafety InspectionTotalInspection by CategoriesPenetration by CategoriesSafetyEmerg.Risk Ass.SWM / WISafety Inspection Plan YTDSafety Inspection AchievementSep-14YTD:2013 - 14EmployeesEmpl.Contractor.TotalEmpl.Contra.TotalEmpl.Empl.Contra.TotalEmpl.Contra.TotalEmpl.Contra.TotalEmpl.AccidentTraffic AccidentWorkTrafficacc no.outstandingacc no.outstandingMgrSupServOtherNIModRepairServMgr hrSup hrGen hrAll hrhr / mgrhr / suphr / Genhr / Allhr / work hrNIModRepSerno. / NIno. / Modno. / RepairFreq. Serv.SC/SubSCClientContOtherB/FNewDoneC/FB/FNewDoneC/FActivityMan hourBr MgrSafetySup no.Mgr no.No. / SupNo. / MgrInspectionNI no.Mod no.Rep no.Ser no.no. / NIno. / modno. / repairno. / servInfractionDrillNew/AmendNew/AmendBr MgrSafetySup no.Mgr no.Br MgrSafetySupMgrReport Dt.Total000000000000.00.00.00.00.00.00.0000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Zone HQ000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Dhaka000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Chittagong000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.0000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00Sylhet000000000000.00.00.00.00.00.00.000000000000000000000.000.000.000.000.00%00000.000.000.000.000000000000000000000.000.00000000.000.000.000.00000000000.000.000.000.00

Including overtimeFrom residance to work place or backDowntime in production hours for occupational accident (excluding weekends and holidays)Downtime in production hours for traffic accident (excluding weekends and holidays)No. of active Job sites - with physical work at site performed by employee/contractorNo. of risk assessments newly introduced, reviewed or amendedNo. of SWP newly made, reviewed or amendedSft Insp planned by Field Br.Mgr & above for field HQ) for YTDTotal accident happened in YTDReports not finalized by APTotal accidents happened in YTDReports not finalized by APfrequency of service technicians attended tool box talksuch as All India Safety Council or MRMInsp. by Br Mgr& above from Field HQInsp by Mgr other than Field Br Mgr.Citations issuedDate,report receivedby Zone S/C