102
Romfor International Ltd. M AKING A C ONNECTION MAKING A CONNECTION MAKING A CONNECTION Backup Hand-Chain Backup Hand-Chain

5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Embed Size (px)

Citation preview

Page 1: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MA

KIN

G A

CO

NN

EC

TIO

N

MAKING A

CONNECTION

MAKING A

CONNECTION

BackupHand-ChainBackupHand-Chain

Page 2: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

TO

P D

RIV

E

DR

IL

L P

IP

E

TOP DRIVE

DRILL PIPE

TOP DRIVE

DRILL PIPE

Page 3: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger

Lines (proper length)

Slips

Upon the Driller’s instruction, assist in setting the

slips.

STAND CLEAR of elevators while connection is

broken and Top Drive assembly is being raised.

CONNECTION TO JOINT IN MOUSE HOLE - If

required, assist with pulling slips in Mouse Hole.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong

Heads

0

1

2

3

4

4

1

2

1

2

3

4

OR

Dies, Keepers, Tong Heads

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Avoid drilling fluids.

Verify elevators are properly

latched.

WATCH OUT FOR TRAPPED

TORQUE. Lay slips on side

away from rotary table.

CONNECTION TO STAND IN DERRICK - STAND CLEAR

until ready to assist with stabbing pipe/stand.

Assist with stabbing pipe/stand.

Upon Driller’s instructions, unlatch lead tongs and

assist in pulling the slips using proper lifting

techniques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

END OF PROCEDURE

5

6

7

1

1

Page 4: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL COLLAR

TOP DRIVE

DRILL COLLAR

Page 5: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses Work Gloves,

Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lined, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger

Lines (proper length)

Slips

Upon the Driller’s instruction, assist setting the slips.

When drill collar clamp is in place, install pin and

tighten clamp properly.

STAND CLEAR while pump-through-lift-sub connection

is broken and Top Drive assembly is being raised.

Slack, Missing parts, Damage,

Wear, Dies Keepers, Tong Heads

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE PUMP THRU CONNECTION IS BROKEN

Dies, Keepers, Tong Heads

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Minimum of two people.

FOLLOW INSTALLATION

PROCEDURES PER JSA.

Avoid tongs and snub lines

Unchain tongs from A-LEG.

Latch back-up tongs onto drill collar in Rotary Table,

using proper tong handles.

STAND CLEAR while lead tongs are latched onto

pump-through-sub.

Make the back-up tongs bite at the same time the

lead tongs bite; using the proper tong handles.

Keep the back-up tongs biting while the Driller breaks

the connection.

THE DRILL COLLAR CONNECTION IS BROKEN

Page 6: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Backup Hand

2

10

11

12

After back-up tongs have been unlatched; chain back-

up tongs to A-leg.

After Rotary Table stops, unlatch lead tongs.

Assist in stabbing pump-through-sub into drill collar in

Mouse Hole.

Place chain-tong on pump-through-lift-sub.

Make up pump-through-sub with chain-tongs.

Remove chain-tongs and STAND CLEAR while drill

collar is being raised from Mouse Hole.

Assist in stabbing the drill collar from Mouse Hole into

the drill collar in the Rotary Table.

Upon Driller instruction, and lead tongs are latched

onto drill collar in Rotary Table, latch make up tongs

onto top drill collar using proper tong handles, and

make tongs bite.

Upon Driller’s instruction, STAND CLEAR while

connection is being torqued.

13

14

15

16

THE DRILL COLLAR CONNECTION IS TIGHT

Upon Driller instructions, unlatch lead tongs.

After back-up tongs are unlatched, chain back-up

tongs to A-leg.

Loosen nut on drill collar clamp and remove pin.

Assist in pulling the slips, using proper lifting

techniques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

END OF PROCEDURE

Lay slips on side away from

rotary table

17

18

19

20

21

22

23

Page 7: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

KE

LLY

S

PIN

NE

R

DR

IL

L P

IP

E

KELLY SPINNER

DRILL PIPE

KELLY SPINNER

DRILL PIPE

Page 8: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger

Lines (proper length)

Slips

AFTER THE ROTARY TABLE STOPS, unchain back-

up tongs from A-LEG

Upon the Driller’s instruction, assist in setting the

slips.

Set Slips, using proper lifting techniques

Latch back-up tongs onto bottom joint in Rotary Table,

using proper tong handles.

STAND CLEAR while lead tongs are latched onto Kelly.

Make the back-up tongs bite at the same time the

lead tongs bite, using the proper tong handles.

Keep the back-up tongs biting while the Driller breaks

the connection

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong Heads

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE CONNNECTION IS BROKEN

Dies, Keepers, Tong Heads

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Minimum of two people.

Avoid tongs and snub lines.

Stay Clear of Break Out Cable

ROTATING OUT WITH THE ROTARY TABLE - Before

rotating our, the Lead Tong Hand unlatches lower tongs.

1

Page 9: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Backup Hand

2

9

9

Hold back-up tongs clear while Driller rotates out.

AFTER KELLY STOPS TURNING, and the Lead

Tong Hand unlatches bottom set of tongs. Remove

bottom set of tongs.

10

11

12

13

OR

REVERSING OUT WITH THE KELLY SPINNER -

Before spinning out, unlatch the top set of tongs,

using the proper tong handles.

Make back-up tongs bite on joint in Rotary Table,

using the propr tong handles, while Driller reverses out

Kelly.

AFTER KELLY STOPS TURNING, and the Lead Tong

Hand unlatches bottom set of tongs. Remove bottom

set of tongs.

Hold bottom set of tongs clear of Kelly.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the joint in the Mouse

Hole

STAND CLEAR, with tongs, while Driller spins Kelly.

After the Kelly stops, latch back-up tongs onto Kelly.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

THE CONNECTION IS TIGHT

Do not get in Driller’s view.

Keep feet clear of the rotary

table and slip handles.

14

15

16

2

3

Avoid drilling fluids.

Avoid tongs and snub lines.

1

2

3

4

Unlatch the bottom set of tongs.

Hold back-up tongs clear while the Driller pulls the

Kelly joint out of the Mouse Hole.

Assist in stabbing the joint from Mouse Hole into the

joint in the Rotary Table.

17

Page 10: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

3

After the Kelly stops spinning, latch the back-up tongs

on Kelly joint, using the proper tong handles.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

Lay slips on side away from

rotary table

18

THE CONNECTION IS TIGHT

Unlatch the bottom set of tongs, using the proper tong

handles.

Hold back-up tongs clear and assist in pulling the

slips, using proper lifting techniques.

Chain back-up tongs to A-leg.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

19

20

21

22

23

END OF PROCEDURE

Page 11: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

KE

LLY

S

PIN

NE

R

DR

ILL C

OLLA

R

KELLY SPINNER

DRILL COLLAR

KELLY SPINNER

DRILL COLLAR

Page 12: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hand Hat, Glasses Work Gloves,

Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger Heads

Lines (proper length)

Slips

After the rotary table stops, and upon the Driller’s

instruction, assist in setting the slips.

Set slips, using proper lifting techniques

When drill collar clamp is in place, install pin and

tighten clamp properly.

Unchain tongs from A-LEG.

Latch back-up tongs onto drill collar in Rotary Table,

using proper tong handles.

STAND CLEAR while lead tongs are latched onto

Kelly. Avoid tongs and snub lines.

Make the back-up tongs bite at the same time the

lead tongs bite, using the proper tong handles.

Keep the back-up tongs biting while the Driller breaks

the connection.

Slack, Missing parts, Damage,

Wear, Dies Keepers, Tong Heads

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE CONNECTION IS BROKEN

Dies, Keepers, Tong

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Minimum of two people.

FOLLOW INSTALLATION

PROCEDURES PER JSA.

Stay Clear of Break Out Cable

Page 13: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Backup Hand

2

10

10

11

ROTATING OUT WITH THE ROTARY TABLE - Before

rotating out, the Lead Tong Hand unlatches lower tongs.

Hold back-up tongs clear while Driller rotates out.

AFTER ROTARY STOPS, unlatch lead tongs, using

the proper tong handles.

12

13

14

15

16

Do not get in Driller’s view.

Keep feet clear of the rotary

table and slip handles.

1

2

3

OR

REVERSING OUT WITH THE KELLY SPINNER -

Before spinning out, unlatch the top set of tongs,

using the proper tong handles.

Make back-up tongs bite on drill collar in Rotary Table,

using the proper tong handles, while Driller reverses

out Kelly.

AFTER KELLY STOPS TURNING, lead tong Hand

unlatches bottom set of tongs.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the drill collar in the

Mouse Hole.

STAND CLEAR, with tongs, while Driller spins Kelly.

After the Kelly stops, latch back-up tongs onto Kelly.

Make the back-up tongs bite as the connection is

tightened, using the propr tong handles.

THE CONNECTION IS TIGHT

Unlatch the bottom set of tongs.

Hold back-up tongs clear while the Driller pulls the drill

collar out of the Mouse Hole.

Avoid drilling fluids.

Avoid tongs ad snub lines.

1

2

3

17

Page 14: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

3

Assist in stabbing the drill collar from Mouse Hole into

the drill collar in the Rotary Table.

After the Kelly stops spinning, latch the back-up tongs

on drill collar, using the proper tong handles.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

18

19

20

21

22

THE CONNECTION IS TIGHT

Unlatch the bottom set of tongs, using the proper tong

handles.

After back-up tongs are unlatched, chain back-up

tongs to A-leg.

Loosen nut on drill collar clamp and remove pin.

Assist in pulling the slips, using proper lifting

techniques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

END OF PROCEDURE

Lay slips on side away from

rotary table

23

24

25

Page 15: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor Interntional Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

SPIN

NIN

G C

HA

IN

DR

IL

L P

IP

E

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Page 16: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger

Lines (proper length)

Slips

AFTER THE ROTARY TABLE STOPS, unchain back-

up tongs from A-LEG

Upon the Driller’s instruction, assist in setting the

slips.

Set Slips, using proper lifting techniques.

Latch back-uo tongs onto bottom joint in Rotary Table,

using proper tong handles.

STAND CLEAR while lead tongs are latched onto Kelly.

Make the back -up tongs bite at the same time the

lead tongs bite, using the proper tong handles.

Keep the back-up tongs biting while the Driller breaks

the connection.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong Heads

0

1

2

3

4

5

6

7

8

9

THE CONNECTION IS BROKEN

Dies, Keepers, Tong Heads

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Minimum of two people.

Avoid tongs and snub lines.

Stay Clear of Break Out Cable

ROTATING OUT WITH THE ROTARY TABLE -

Before rotating out, the Lead Tong Hand unlatches

lower tongs.

Hold back-up tongs clear while Driller rotates out. Do not get in Driller’s view.

Keep feet clear of the Rotary

Table and slip handles.

0

2

1

2

3

4

1

2

Page 17: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Backup Hand

2

9

9

AFTER ROTARY STOPS, unlatch lead tongs, using

the proper tong handles.

10

11

12

13

OR

REVERSING OUT WITH SPINNING CHAIN - Before

spinning out, unlatch the top set tongs, using the

proper tong handles.

Wrap chain, clockwise, aroung Kelly-saver-sub.

While Driller is pulling on chain, MAKE SURE your

hands and fingers are in proper position. Control

spinning chain, especially tail, while reversing out Kelly.

AFTER KELLY STOPS TURNING, remove excess

chain from Kelly-saver-sub and wrap, clockwise, onto

the joint in Mouse Hole.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the joint in the Mouse

Hole.

STAND CLEAR while Lead Tong Hand latches back-

up tong onto Kelly-saver-sub.

While Driller is pulling on chain, MAKE SURE your

hands and fingers are in proper position. Control

spinning chain, especially tail, while spinning joint in

Mouse Hole onto Kelly.

AFTER JOINT IN MOUSE HOLE STOPS TURNING,

remove excess chain.

Move to back-up tong position. STAND CLEAR while

Lead-Tong Hand latches lead tongs onto Kelly joint.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

THE CONNECTION IS TIGHT

MAKE SURE spinning chain is

placed into one-gallon bucket.

14

15

16

3

MAKE SURE not to cross chain.

MAKE SURE to hold proper

tension on tail of chain.

1

2

3

4

Unlatch the bottom set of tongs.17

MAKE SURE stripper rubber is

on joint in Mouse Hole before

wrapping chain.

Avoid drilling fluids.

Move to position behind Mouse

Hole.

Page 18: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

After Lead Tongs Hand latched tongs onto joint in

rotary, wrap spinning chain, counter clockwise, onto

tool joint while the Driller pulls the Kelly joint out of the

Mouse Hole.

Assist in stabbing the joint from Mouse Hole into the

joint in the Rotary Table.

While Driller is pulling on chain, throw and control

spinning chain using proper technique while Kelly joint

is being spun up.

After the Kelly joint stops spinning, remove excess

chain and latch the back-up tongs on Kelly joint, using

the proper tong handles.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

MAKE SURE stripper rubber

does not ride up on tool joint.18

THE CONNECTION IS TIGHT

Unlatch the bottom set of tongs, using the proper

tong handles.

Hold back-up tongs clear and assist in pulling the

slips, using proper lifting techniques.

Chain back-up tongs to A-leg.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

19

20

21

22

23

END OF PROCEDURE

24

25

26

MAKE SURE cover is placed on

Mouse Hole.

MAKE SURE to hold proper

tension on tail of chain. MAKE

SURE your hands and fingers

are in proper position.

Lay slips on side away from

rotary table.

3

Page 19: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Backup HandBackup Hand

SPIN

NIN

G C

HA

IN

DR

ILL C

OLLA

R

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Page 20: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger

Tong and Tong Hanger

Lines (proper length)

Slips

After the rotary table stops, and upon the Driller’s

instruction, assist in setting the slips.

Set Slips, using proper lifting techniques

When drill collar clamp is in place, install pin and

tighten clamp properly.

Unchain tongs from A-LEG

Latch back-up tongs onto drill collar in Rotary Table,

using proper tong handles.

STAND CLEAR while lead tongs are latched onto Kelly.

Make the back-up tongs bite at the same time the

lead tongs bite, using the proper tong handles.

Keep the back-up tongs biting while the Driller breaks

the connection.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong Heads

0

1

2

3

4

5

6

7

8

1

2

1

2

3

4

THE CONNECTION IS BROKEN

Dies, Keepers, Tong Head

Broken Cable, Shackle

Bolts, Inserts, Keepers,Cleaned

and Doped, Handle Condition

Minimum of two people.

FOLLOW INSTALLATION

PROCEDURES PER JSA.

Avoid tongs and snub lines.

Stay Clear of Break Out Cable9

Page 21: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Backup Hand

2

10

10

ROTATING OUT WITH THE ROTARY TABLE - Before

rotating out, the Lead Tong Hand unlatches lower tongs.

Hold back-up tongs clear while Driller rotates out.

AFTER ROTARY STOPS, unlatch lead tongs, using

the proper tong handles.

11

12

13

14

OR

REVERSING OUT WITH SPINNING CHAIN - Before

spinning out, unlatch the top set of tongs, using the

proper tong handles.

Wrap chain, clockwise, around Kelly-saver-sub.

While Driller is pulling on chain, MAKE SURE your

hands and fingers are in proper position. Control

spinning chain, especially tail, while reversing out Kelly.

AFTER KELLY STOPS TURNING, remove excess

chain from Kelly-saver-sub.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the drill collar in the

Mouse Hole.

Wrap chain, counter-clockwise, around Kelly-saver-

sub.

While Driller is pulling on chain, MAKE SURE your

hands and fingers are in proper position. Control

spinning chain, especially tail, while spinning Kelly

into drill collar in Mouse Hole.

AFTER JOINT IN MOUSE HOLE STOPS TURNING,

remove excess chain.

After the Kelly stops, latch back-up tongs onto Kelly.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

THE CONNECTION IS TIGHT

Do not get in Driller’s view.

Keep feet clear of the rotary

table and slip handles.

15

16

17

MAKE SURE spinning chain is

placed into one-gallon bucket.

MAKE SURE not to cross chain.

1

2

3

MAKE SURE to hold proper

tension on tail of chain.

Avoid drilling fluids.

MAKE SURE not to cross chain.

1

2

3

4

Page 22: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Backup Hand

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

3

Unlatch the bottom set of tongs.

After lead tongs are latched to the drill collar in the

Rotary Table, wrap chain counter-clockwise on drill

collar in rotary table.

Assist in stabbing the drill collar from Mouse Hole

into the drill collar in the Rotary Table.

“Walk” chain up onto drill collar.

While Driller is pulling on chain, MAKE SURE your

hands and fingers are in proper position. Control

spinning chain, especially tail, while spinning Kelly

into drill collar in Rotary Table.

AFTER KELLY AND DRILL COLLAR STOPS

TURNING, remove excess chain from drill collar.

Latch the back-up tongs on drill collar, using the

proper tong handles.

Make the back-up tongs bite as the connection is

tightened, using the proper tong handles.

MAKE SURE not to cross chain.

18

THE CONNECTION IS TIGHTENED

Unlatch the bottom set of tongs, using the proper

tong handles.

After back-up tongs are unlatched. chain back-up

tongs to A-leg.

Loosen nut on drill collar clamp and remove pin.

Assist in pulling the slips, using proper lifting

techniques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

19

20

21

22

23

END OF PROCEDURE

24

25

26

Lay slips on side away from

rotary table.

27

28

29

30

Page 23: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MA

KIN

G A

CO

NN

EC

TIO

N

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

Page 24: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL PIPE

TOP DRIVE

DRILL PIPE

Page 25: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support

Review JSA for climbing derricks.

CONNECTION TO JOINT IN MOUSE HOLE - check

for flow and maintain the mud system.

Follow Driller’s instructions.

OR

CONNECTION TO STAND IN DERRCK - Before the first

connection is made. Review JSA for climbing derricks.

Latch stand as elevators clear the monkey board.

Return to rig floor. Check for flow and maintain the

mud system.

Follow Driller’s instructions.

END OF PROCEDURE

Review fall protection requirements.

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

2

3

1

2

1

2

3

Page 26: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL COLLAR

TOP DRIVE

DRILL COLLAR

Page 27: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to making the first connection, review JSA. At

the start of the tour hold Safety Meetings on the jobs.

During the connection procedure, check for flow and

maintains the mud system.

Follow Driller’s instructions.

END OF PROCEDURE

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

3

Page 28: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

KE

LLY

S

PIN

NE

R

DR

IL

L P

IP

E

KELLY SPINNER

DRILL PIPE

KELLY SPINNER

DRILL PIPE

Page 29: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support

Prior to making the first connection, review JSA. At

the start of the tour hold Safety Meetings on the jobs.

During the connection procedure, check for flow and

maintains the mud system.

Follow Driller’s instructions.

END OF PROCEDURE

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

3

Page 30: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

KE

LLY

S

PIN

NE

R

DR

ILL C

OLLA

R

KELLY SPINNER

DRILL COLLAR

KELLY SPINNER

DRILL COLLAR

Page 31: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to making the first connection, review JSA. At

the start of the tour hold Safety Meetings on the jobs.

During the connection procedure, check for flow and

maintains the mud system.

Follow Driller’s instructions.

END OF PROCEDURE

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

3

Page 32: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

SPIN

NIN

G C

HA

IN

DR

IL

L P

IP

E

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Page 33: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to making the first connection, review JSA. At

the start of the tour hold Safety Meetings on the jobs.

During the connection procedure, check for flow and

maintains the mud system.

Follow Driller’s instructions.

END OF PROCEDURE

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

3

Page 34: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

DerrickmanDerrickman

SPIN

NIN

G C

HA

IN

DR

ILL C

OLLA

R

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Page 35: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Derrickman

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements- Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to making the first connection, review JSA. At

the start of the tour hold Safety Meetings on the jobs.

During the connection procedure, check for flow and

maintains the mud system.

Follow Driller’s instructions.

END OF PROCEDURE

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100%

tied-off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

Notify the Driller immediately of

ANY problems with mud system.

0

1

2

3

Page 36: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MA

KIN

G A

CO

NN

EC

TIO

N

MAKING A

CONNECTION

MAKING A

CONNECTION

DrillerDriller

Page 37: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

TO

P D

RIV

E

DR

IL

L P

IP

E

TOP DRIVE

DRILL PIPE

TOP DRIVE

DRILL PIPE

Page 38: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM, etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Driller and drilling recorder, if required.

Unchain break handle.

Stop rotation of Top Drive.

If required, release back torque - SLOWLY.

When Top Drive comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back to bottom,

if necessary.

WHEN TOOL JOINT IS AT PROPER POSITION (slip

setting position), kick out pumps.

Instruct Floor Hands to set slips.

Slack off on drill string, paying close attention to

weight indicator.

If slide drilling, insure Top Drive

brake is released before making

connection.

WATCH WEIGHT INDICATOR

FOR DRAG.

MAKE SURE the slips are set

properly.

DO NOT EXCEED TRAVELLING

BLOCK ASSEMBLY WEIGHT.

0

1

2

3

4

5

6

7

8

9

10

1

2

3

4

1

2

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 39: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Driller

2

11

12

13

14

15

16

17

18

19

19

20

21

Check pump gauge for zero pressure and close Top

Drive Safety Valve (remote).

Close gripper around tool joint.

Engage torque boost to break connection 1/2 round.

Disengage torque boost after connection is broke.

THE CONNECTION IS BROKEN

REVERSE OUT WITH THE TOP DRIVE.

Release gripper.

Instruct Hands to watch lines and proper clearance of

Top Drive assembly in derrick during raising and

lowering procedures.

Raise travelling equipment and Top Drive out of joint in

rotary.

CONNECTION TO JOINT IN MOUSE HOLE - Using

pipe handler control, latch onto joint in Mouse Hole

with elevators.

Raise pipe out of Mouse Hole keeping pipe centered

using handler.

OR

RE-CHECK GAUGE FOR

TRAPPED PRESSURE.

MAKE SURE Top Drive

handler is properly locked.

Avoid drilling fluids.

Use low drum.

CONNECTION TO STAND IN DERRICK - Run Top

Drive assembly up derrick, while extending link tilts, to

designated point above monkey board for connection

onto stand in derrick.

Once elevators are latched by Derrickman, pick up

slowly with Top Drive while retracting extended link

tilts.

Pick up for proper positioning over tool joint in rotary

table.

Engage “Spin/Maintain”, then lower pipe into tool joint

in rotary.WATCH WEIGHT INDICATOR.

MAKE SURE employees are in

safe position.

1

2

1

2

Before moving blocks, verify that

Derrickman is 100% TIED-OFF.

Establish two-way communication

between Driller and Derrickman.

Page 40: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

3

Continue to slack off until joint is made up.

When Top Drive stops spinning, wait on proper

placement of lead tongs, then torque connection

properly.

WATCH WEIGHT INDICATOR.22

23

24

25

26

27

28

29

30

31

THE CONNECTION IS TIGHT

DO NOT OVER-TORQUE.

MAKE SURE Hands are clear.Use Top Drive to raise drill string high enough to

release all torque before instructing Floor Hands to

pull slips.

MAKE SURE slips are pulled and Floor Hands are

clear, then open Top Drive Safety Valve (remote).

Engage the mud pump(s), at slow rate, and verify

returns.

IF MAKING PIPE UP IN MOUSE HOLE, DO NOT

RESUME DRILLING UNTIL MOUSE HOLE STAND IS

MADE UP AND ALL FLOOR HANDS ARE CLEAR.

Bring pump(s) and RPM up to proper speed.

Lower the drill sting and set proper weight on bit.

Chain the brake and engage drilling recorder.

Attach automatic Driller to break handle and engage.

Add joint/stand to pipe tally. Mark recorder as

needed.

Watch pressure gauge.

If required, refer to pipe

handling procedures.

If required. set PVT and Flow

END OF PROCEDURE

1

2

Page 41: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL COLLAR

TOP DRIVE

DRILL COLLAR

Page 42: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM, etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Driller and drilling recorder, if required.

Unchain break handle.

Stop rotation of Top Drive.

If required, release back torque - SLOWLY.

When Top Drive comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back to

bottom, if necessary.

WHEN DRILL COLLAR CONNECTION IS AT

PROPER POSITION (slip setting position), kick out

pumps.

Instruct Floor Hands to set slips and install drill collar

clamp.

Slack off on drill string, paying close attention to

weight indicator.

Watch weight indicator for drag.

0

1

2

3

4

5

6

7

8

9

10

1

2

3

4

1

2

MAKE SURE slips and clamp

are installed properly.

DO NOT exceed traveling block

assembly weight.

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 43: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Driller

2

11

12

Check pump gauge for zero pressure and close Top

Drive Safety Valve (remote).

Close gripper around pump thru lift sub.

Engage torque boost to break connection 1/2 round.

Disengage torque boost after pump thru connection is

broken.

13

14

15

16

THE PUMP THRU CONNECTION IS BROKEN

REVERSE OUT WITH THE TOP DRIVE.

Release gripper.

Raise travelling equipment and Top Drive until elevators

are against top of pump-thru-sub.

When tongs, and crew members, are in proper break

out position for pump-thru-sub, engage break out cat-

head pulling lead tongs and breaking connection.

THE COLLAR CONNECTION IS BROKEN

RE-CHECK GAUGE FOR

TRAPPED PRESSURE.

MAKE SURE Top Drive

handler is properly locked.

17 Avoid drilling fluids.

MAKE SURE crew members

feet are clear of the rotary table

and slip handles.

Engage rotary - SLOWLY- rotating out drill collar from

pump-thru-lift-sub. BE AWARE OF BACK TORQUE.

AFTER ROTARY STOPS - Verify tongs and crew

members are in proper position, pick up on Top Drive.

Instruct Floor Hands to watch lines and proper

clearance of Top Drive assembly in derrick during

raising and lowering procedures.

Raise travelling equipment and Top Drive until elevators

are against top of pump-thru-sub out of drill collar in

Rotary.

Avoid drilling fluids.

18

19

20

21

22 Instruct Hands to watch lines

and proper clearance of Top

Drive assembly in derrick during

raising and lowering procedures.

Avoid drilling fluids.

Page 44: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

3

CONNECTION TO DRILL COLLAR IN MOUSE HOLE -

Using pipe handler control, extend pump-thru-sub over

drill collar in Mouse Hole.

Lower sub into drill collar in Mouse Hole.

Instruct Floor Hands to make up pump-thru-sub with

chain tongs.

Pick up drill collar out of Mouse Hole keeping pipe

centered using handler.

Pick up for proper positioning over drill collar in rotary

table.

Lower drill collar to stab drill collar into drill collar in

rotary table.

Engage “Spin/Maintain”, then lower Top Drive into

pump-thru-sub.

Continue to slack off until drill collar and pump-thru-

sub is made up and torqued properly.

FOR COLLAR CONNECTION - When pump-thru-sub

is properly torqued, wait on proper placement of tongs,

then torque collar connection properly.

Use low drum.

23

THE DRILL COLLAR CONNECTION IS TIGHT

WATCH WEIGHT INDICATOR.

MAKE SURE employees are in

safe position.

WATCH WEIGHT INDICATOR.

DO NOT OVER-TORQUE.

Use Top Drive to raise drill string high enough to

release all torque before instructing Floor Hands to

remove collar clamp.

Instruct Floor Hands to remove drill collar clamp.

Use top Drive to raise drill string high enough to make

sure slips are pulled and Floor Hands are clear, then

open Top Drive Safety Valve (remote).

Engage the mud pump(s), at slow rate, and verify

returns.

DO NOT RESUME DRILLING UNTIL NEXT DRILL

COLLAR IS PLACED IN MOUSE HOLE AND ALL

FLOOR HANDS ARE CLEAR.

24

25

26

27

28

29

30

31

32

TIGHTEN WITH CAT-HEAD.

DO NOT OVER-TORQUE.

MAKE SURE Floor Hands are

clear.

Watch pressure gauge.

33

34

35

36

Page 45: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Driller

4

37

38

Bring pump(s) and RPM up to proper speed

Lower the drill string and set proper weight on bit.

Chain the break engage drilling recorder.

Attach automatic Driller to break handle and engage.

Add collar to pipe tally. Mark recorder as needed.

39

40

END OF PROCEDURE

If required, set PVT and Flow Sho.

41

Page 46: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

KE

LLY

S

PIN

NE

R

DR

IL

L P

IP

E

KELLY SPINNER

DRILL PIPE

KELLY SPINNER

DRILL PIPE

Page 47: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM, etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Driller and drilling recorder, if required.

Unchain break handle.

Kick out the Rotary Table.

If required, release back torque - SLOWLY.

When rotary comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back to

bottom, if necessary.

WHEN KELLLY BUSHING CLEARS ROTARY

TABLE, kick out pumps.

Raise tool joint 10 ft (minimum) above rotary table.

Lower the drill string to the position needed to set the

slips.

Instruct Floor Hands to set slips.

WATCH WEIGHT INDICATOR

FOR DRAG.

Be aware of operator

requirements.

MAKE SURE the slips are set

properly.

0

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

4

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 48: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Driller

2

13

14

Slack off on drill string, paying close attention to

weight indicator.

As the Floor Hands put on the tongs, check the pump

pressure gauge and instruct Motorman to close Kelly-

Safety-valve (if required).

When tongs, and crew members, are in proper break

out position, engage break out cat-head pulling lead

tongs and breaking connection.

15

16

16

17

THE CONNECTION IS BROKEN

ROTATING OUT WITH THE ROTARY TABLE - After

bottom tongs are removed and clear, engage rotary -

SLOWLY - rotating out drill string.

AFTER ROTARY STOPS - Verify tongs and crew

members are in proper position, pick up on Kelly.

OR

DO NOT EXCEED TRAVELLING

BLOCK ASSEMBLY WEIGHT.

18

CHECK FOR TRAPPED

PRESSURE.

BE AWARE OF TIGHT

CONNECTIONS.

1

2

REVERSING OUT WITH THE KELLY SPINNER - After

top tongs are removed and cleared, engage left hand

Kelly spinner motor - SLOWLY - reversing out Kelly.

AFTER KELLY STOPS TURNING - Verify tongs and

crew members are in proper position, pick up on Kelly.

As the Kelly is moved to the Mouse Hole, lower the

Kelly into the box of the joint in the Mouse Hole.

Verify tongs and crew members are in proper position,

engage the right hand Kelly spinner motor and spin

Kelly into joint in Mouse Hole.

Verify tongs and crew members are in proper position,

engage make up cat-head pulling tongs to tighten

connection properly.

Verify tongs and crew members are in proper position

and the Kelly-Safety-valve is open, raise the Kelly joint

from Mouse Hole - SLOWLY.

BE AWARE OF BACK

TORQUE. MAKE SURE crew

members’ feet are clear of the

rotary table and slip handles.

19

20

1

2 MAKE SURE connection is

completely rotated out.

MAKE SURE all crew

members are in their proper

positions.

MAKE SURE connection is

completely rotated out.

MAKE SURE all crew

members are in their proper

positions.

SPIN IN SLOWLY. DO NOT

RUN INTO SNUB LINE.

DO NOT OVER TORQUE.

LOOK UP! Check Kelly hose

and travelling assembly for

Page 49: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

3

Lower Kelly joint into the drill string in the Rotary

Table.

Verify tongs and crew members are in proper

position, then engage the right hand Kelly spinner

and rotate Kelly joint into drill string - SLOWLY.

Verify tongs and crew members are in proper position,

engage make up cat-head pulling tongs to tighten

connection properly.

DO NOT EXCEED TRAVELLING

BLOCK ASSEMBLY WEIGHT.21

CONNECTION IS TIGHT

SPIN IN SLOWLY. DO NOT

RUN INTO SNUB LINE.

DO NOT OVER TORQUE.

Raise drill string allowing crew members to pull slips.

Engage the mud pump(s) and verify returns.

Lower the drill string and set Kelly bushings into rotary

table.

Engage the rotary table, AT SLOW SPEED

Wait for the crew members to place another joint of

drill pipe into the Mouse Hole.

Bring pump and rotary up to proper speed.

Lower the drill string and set proper weight on bit.

Chain the brake engage drilling recorder.

Attach automatic driller to break handle and engage.

Add joint to pipe tally. Mark recorder as needed.

22

23

24

25

26

27

28

29

30

WATCH WEIGHT INDICATOR.

Check for proper pressure.

Check for leaks.

WATCH WEIGHT INDICATOR.

END OF PROCEDURE

TRAVELLING ASSEMBLY

STATIONARY.

If required, set PVT and Flow Sho.

31

32

33

Page 50: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

KE

LLY

S

PIN

NE

R

DR

ILL C

OLLA

R

KELLY SPINNER

DRILL COLLAR

KELLY SPINNER

DRILL COLLAR

Page 51: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM, etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Drilling and drilling recorder, if required.

Unchain break handle.

Kick out the Rotary Table.

If required, release back torque - SLOWLY.

When rotary comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back to

bottom, if necessary.

WHEN KELLY BUSHING CLEARS ROTARY

TABLE, kick out pumps.

Raise tool joint 10 ft (minimum) above rotary table.

Lower the drill string to the position needed to set the

slips.

Instruct Floor Hands to set slips and install drill collar

clamp. MAKE SURE the slips are set properly.

WATCH WEIGHT INDICATOR

FOR DRAG.

Be aware of operator

requirements.

0

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

4

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 52: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Driller

2

13

14

Slack off on drill string, paying close attention to

weight indicator.

As the Floor Hands put on the tongs, check the pump

pressure gauge and instruct Motorman to close Kelly-

Safety-valve (if required).

When tongs, and crew members, are in proper break

out position, engage break out cat-head pulling lead

tongs and breaking connection.

15

16

16

17

THE CONNECTION IS BROKEN

ROTATING OUT WITH THE ROTARY TABLE - After

bottom tongs are removed and clear, engage rotary -

SLOWLY - rotating out drill string.

AFTER ROTARY STOPS - Verify tongs and crew

members are in proper position, pick up on Kelly.

OR

DO NOT EXCEED

TRAVELLING BLOCK

18

ASSEMBLY WEIGHT.

CHECK FOR TRAPPED

PRESSURE.

BE AWARE OF TIGHT

CONNECTIONS.

1

2

REVERSING OUT WITH THE KELLY SPINNER - After

top tongs are removed and cleared, engage left hand

Kelly spinner motor - SLOWLY - reversing out Kelly.

AFTER KELLY STOPS TURNING - Verify tongs and

crew members are in proper position, pick up on Kelly.

As the Kelly is moved to the Mouse Hole, lower the

Kelly into the box of the collar in the Mouse Hole.

Verify tongs and crew members are in proper position,

engage the right hand Kelly spinner motor and spin

Kelly into collar in Mouse Hole.

Verify tongs and crew members are in proper position,

engage the appropriate cat-head per torque

requirements. Pull tongs to tighten connection

properly.

Verify tongs and crew members are in proper position

and the Kelly-Safety-valve is open, raise the Kelly joint

from Mouse Hole - and drill collar from Mouse Hole -

SLOWLY.

BE AWARE OF BACK

TORQUE. MAKE SURE crew

members feet are clear of the

rotary table and slip handles.

19

20

1

2 MAKE SURE connection is

completely rotated out.

MAKE SURE all crew members

are in their proper positions.

MAKE SURE connection is

completely rotated out.

SPIN IN SLOWLY. DO NOT

RUN INTO SNUB LINE.

TIGHTEN COLLARS TO

RECOMMENDED TORQUE

REQUIREMENTS.

LOOK UP! Check Kelly hose

and travelling assembly for

clearances.

Page 53: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

3

Lower drill collar into the drill string in the Rotary

Table.

Verify tongs and crew members are in proper

position, then engage the right hand Kelly spinner

and rotate Kelly joint into drill string - SLOWLY.

Verify tongs and crew members are in proper position,

engage the appropriate cat-head per torque

requirements. Pull tongs at tighten connection properly.

DO NOT EXCEED TRAVELLING

BLOCK ASSEMBLY WEIGHT .21

CONNECTION IS TIGHT

SPIN IN SLOWLY. DO NOT

RUN INT SNUB LINE.

TIGHTEN COLLARS TO

RECOMMENDED TORQUE

REQUIREMENTS.

Raise drill string allowing crew members to remove

drill collar clamp.

Raise drill string allowing crew members to pull slips.

Engage the mud pump(s) and verify returns.

Lower the drill string and set Kelly bushings into rotary

table.

Engage the Rotary Table, AT SLOW SPEED -

TRAVELLING ASSEMBLY STATIONARY.

Wait for the crew members to place another joint of

drill collar into the Mouse Hole.

Bring pump and rotary up to proper speed.

Lower the drill string and set proper weight on bit.

Chain the brake engage drilling recorder.

Attach automatic driller to break handle and engage.

Add joint to pipe tally. Mark recorder as needed.

22

23

24

25

26

27

28

29

30

WATCH WEIGHT INDICATOR.

WATCH WEIGHT INDICATOR.

Check for proper pressure.

Check for leaks.

END OF PROCEDURE

WATCH WEIGHT INDICATOR.

If required, set PVT Flow Sho.

31

32

33

34

Page 54: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

SPIN

NIN

G C

HA

IN

DR

IL

L P

IP

E

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Page 55: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Driller and drilling recorder, if required.

Unchain break handle.

Kick out the Rotary Table.

If required, release back torque - SLOWLY.

When rotary comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back to

bottom, if necessary.

WHEN KELLY BUSHING CLEARS ROTARY

TABLE, kick out pumps.

Raise tool joint 10 ft (minimum) above rotary table.

Lower the drill string to the position needed to set the

slips.

Instruct Floor Hands to set slips.

WATCH WEIGHT INDICATOR

FOR DRAG.

Be aware of operator

requirements.

MAKE SURE the slips are set

properly.

0

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

4

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 56: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Driller

2

13

14

Slack-off on drill string, paying close attention to

weight indicator.

As the Floor Hands put on the tongs, the Driller

checks the pump pressure gauge and instructs

Motorman to close Kelly-Safety-valve (if required).

When tongs, and crew members, are in proper break

out position, engage break out cat-head pulling lead

tongs and breaking connection.

15

16

16

17

THE CONNECTION IS BROKEN

ROTATING OUT WITH THE ROTARY TABLE - After

bottom tongs are removed and clear, engage rotary-

SLOWLY - rotating out drill string. BE AWARE OF

BACK TORQUE.

AFTER ROTARY STOPS - Verify tongs and crew

members are in proper position, pick up on Kelly.

OR

DO NOT EXCEED TRAVELING

BLOCK ASSEMBLY WEIGHT.

18

CHECK FOR TRAPPED

PRESSURE.

BE AWARE OF TIGHT

CONNECTIONS.

1

2

REVERSING OUT WITH SPINNING CHAIN - After

top tongs are removed and cleared and spinning

chain is wrapped, clockwise, around Kelly-saver-sub

- SLOWLY ENGAGE MAKE UP CAT-HEAD,

reversing the Kelly out - SLOWLY.

AFTER KELLY STOPS TURNING - Verify tongs,

spinning chain, and crew members are in proper

position, pick up on Kelly.

As the Kelly is moved to the Mouse Hole, lower the

Kelly into the box of the joint in the Mouse Hole.

Verify tongs and crew members are in proper position,

engage the make up cat-head and spin the joint in

Mouse Hole into the Kelly.

MAKE SURE crew members

feet are clear of the rotary table

and slip handles.

MAKE SURE Kelly connection

is completely rotated out before

picking up.

MAKE SURE all employees

are in proper position,

especially Floor Hands, before

engaging cat-head.

MAKE SURE Kelly connection

is completely reversed out

before picking up and make sure

the spinning chain is wrapped

properly on joint in Mouse Hole,

before picking up Kelly.

MAKE SURE all crew members

are in proper position, BE AWARE

of feet and hand damage potential.

SPIN IN SLOWLY. DO NOT

RUN INTO SNUB LINE.

1

2

Page 57: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

3

Verify tongs and crew members are in proper position,

engage make up cat-head pulling tongs to tighten

connection properly.

Verify tongs and crew members are in proper position

and the Safety valve is open, raise the Kelly joint from

Mouse Hole - SLOWLY.

Verify tongs, spinning chain, and crew members are in

proper position.

Lower Kelly joint into the drill string in the rotary table,

DO NOT EXCEED TRAVELING BLOCK ASSEMBLY

WEIGHT, then engage the make up cat-head and

rotate Kelly joint into drill string - SLOWLY.

Verify tongs and crew members are in proper position,

engage make up cat-head pulling tongs to tighten

connection properly.

TIGHTEN COLLARS TO

RECOMMENDED TORQUE

REQUIREMENTS. Do not over torque.

19

CONNECTION IS TIGHT

LOOK UP! Check Kelly hose

and travelling assembly for

clearances.

MAKE SURE chain is in proper

position.

Raise drill string allowing crew members to pull slips.

Engage the mud pump(s) and verify returns.

Lower the drill string and set Kelly bushings into

rotary table.

Engage the rotary table, AT SLOW SPEED

Wait for the crew members to place another joint of

drill pipe into the Mouse Hole

Bring pump and rotary up to proper speed.

20

21

22

23

24

25

26

27

28

29

MAKE SURE chain is thrown to

proper position on Kelly joint

while engaging cat-head.

MAKE SURE all employees are

in proper position while making

up connection.

Be aware of pinch points.

Do not over torque.

WATCH WEIGHT INDICATOR.

Check for properpressure.

Check for leaks.

WATCH WEIGHT INDICATOR.

TRAVELING ASSEMBLY

STATIONARY.

Page 58: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Driller

4

30

31

32

33

Lower the drill string and set proper weight on bit.

Chain the brake engage drilling recorder.

Attach automatic driller to break handle and engage.

Add joint to pipe tally. Mark recorder as needed.

END OF PROCEDURE

If required, set PVT and Flow Sho.

Page 59: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

DrillerDriller

MAKING A

CONNECTION

SPIN

NIN

G C

HA

IN

DR

ILL C

OLLA

R

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Page 60: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Driller

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Know string weight, torque requirements, pump

pressure, drilling RPM, etc.

Fit for duty check on all Hands.

Verify that equipment has been inspected and is in

good working condition.

If necessary, blow horn to notify crew for connection.

READY FOR CONNECTION

Kick out Auto-Driller and drilling recorder, if required.

Unchain break handle.

Kick out the Rotary Table.

If required, release back torque - SLOWLY.

When rotary comes to a complete stop, raise drill

string off bottom.

Depending upon hole condition, ream back t bottom,

if necessary.

WHEN KELLY BUSHING CLEARS ROTARY

TABLE, kick out pumps.

Raise collar connection (joint) 10 ft (minimum) above

Rotary Table.

Lower the drill string to the position needed to set the

slips.

Instruct Floor Hands to set slips and install collar

clamp.

WATCH WEIGHT INDICATOR

FOR DRAG.

Be aware of operator

requirements.

MAKE SURE THE SLIPS AND

CLAMPS ARE PROPERLY

INSTALLED

0

1

2

3

4

5

6

7

8

9

10

11

12

1

2

3

4

If the Derrickman is required

to work in Derrick, the

Derrickman is to be 100% tied-

off at all times.

Two-way communications is

required betwees the Driller

and the Derrickman.

NEVER lock Rotary Table

except to make-up bit.

Page 61: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Driller

2

13

14

Slack off on drill string, paying close attention to

weight indicator.

As the Floor Hands put on the tongs, the Driller

checks the pump pressure gauge and instructs

Motorman to close Kelly-Safety-valve (if required).

When tongs, and crew members, are in proper break

out position, engage break out cat-head pulling lead

tongs and breaking connection.

15

16

16

17

THE CONNECTION IS BROKEN

ROTATING OUT WITH TH ROTARY TABLE - After

bottom tongs are removed and clear, engage rotary -

SLOWLY - rotating out drill string. BE AWARE OF

BACK TORUE.

AFTER ROTARY STOPS - Verify tongs and crew

members are in proper position, pick up on Kelly.

OR

DO NOT EXCEED TRAVELING

BLOCK ASSEMBLY WEIGHT.

17

CHECK FOR TRAPPED

PRESSURE.

BE AWARE OF TIGHT

CONNECTIONS.

1

2

REVERSING OUT WITH SPINNING CHAIN - After

top tongs are removed and cleared and spinning

chain is wrapped, clockwise, around Kelly-saver-sub

- SLOWLY ENGAGE MAKE UP CAT-HEAD,

reversing the Kelly out - SLOWLY.

AFTER KELLY STOPS TURNING - Verify tongs,

spinning chain, and crew members are in proper

position, pick up on Kelly.

As the Kelly is moved to the Mouse Hole, lower the

Kelly into the box of the joint in the Mouse Hole.

Verify tongs and crew members are in proper position,

engage the make up cat-head and spin the KELLY into

the drill collar in the Mouse Hole.

MAKE SURE crew members

feet are clear of the rotary table

and slip handles.

MAKE SURE connection is

completely rotated out

MAKE SURE all employees

are in proper position,

especially Hands, before

engaging cat-head.

MAKE SURE Kelly connection

is completely reversed out

before picking up and make sure

the spinning chain is wrapped

properly on joint in Mouse Hole,

before picking up Kelly.

MAKE SURE all crew members

are in proper position. Be

aware of pinch points.

SPIN IN SLOWLY. DO NOT

RUN INTO SNUB LINE.

1

2

18

Page 62: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor INternational Ltd. Driller

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

3

Verify tongs and crew members are in proper position,

engage the appropriate cat-head per torque

requirements, Pull tongs to tighten connection properly.

Verify tongs and crew members are in proper position

and the Kelly-Safety-valve is open, raise the drill

collar from Mouse Hole - SLOWLY.

Verify tongs, spinning chain, and crew members are in

proper position.

Lower Kelly and drill collar into the drill collar in the

rotary table. DO NOT EXCEED TRAVELING BLOCK

ASSEMBLY WEIGHT, then engage the make up cat-

head and rotate Kelly joint into drill string - SLOWLY.

Verify tongs and crew members are in proper position,

engage the appropriate cat-head per torque

requirements. Pull tongs to tighten connection properly.

TIGHTEN COLLLARS TO

RECOMMENDED TORQUE

REQUIREMENTS

19

CONNECTION IS TIGHT

LOOK UP! Check Kelly hose

and travelling assembly for

clearances.

MAKE SURE chain is in proper

position.

Raise drill string allowing crew members to remove

drill collar clamp.

Raise drill string allowing crew members to pull slips.

Engage the mud pump(s) and verify returns.

Lower the drill string and set Kelly bushings into rotary

table.

Engage the Rotary Table, AT SLOW SPEED

Wait for the crew members to place another joint of

drill collar into the Mouse Hole.

Bring pump and rotary up to proper speed.

20

21

22

23

24

25

26

27

28

29

30

MAKE SURE chain is “walked” up

by hand to proper position on drill

collar BEFORE ENGAGING CAT -

HEAD. MAKE SURE all crew

members are in proper position,

while making up connection.

Be aware of pinch points.

TIGHTEN COLLARS TO

RECOMMENDED TORQUE

REQUIREMENTS.

WATCH WEIGHT INDICATOR.

WATCH WEIGHT INDICATOR.

Check for proper pressure.

Check for leaks.

WATCH WEIGHT INDICATOR.

TRAVELLING ASSEMBLY

STATIONARY.

Page 63: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Driller

4

31

32

Lower the drill string and set proper weight on bit.

Chain the brake engage drilling recorder.

Attach automatic driller to break handle and engage.

Add joint to pipe tally. Mark recorder as needed.

33

34

END OF PROCEDURE

If required, set PVT and Flow Sho.

Page 64: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MA

KIN

G A

CO

NN

EC

TIO

N

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman-Lead TongFloorman-Lead Tong

Page 65: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

TO

P D

RIV

E

DR

IL

L P

IP

E

TOP DRIVE

DRILL PIPE

TOP DRIVE

DRILL PIPE

Page 66: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar Clamp,

Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

Upon instruction by the Driller, assist in setting the slips.

STAND CLEAR of elevators while connection is

broken and Top Drive assembly is raised.

CONNECTION JOINT IN MOUSE HOLE - If required,

assist with slips in Mouse Hole.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong

Heads.

Dies, Keepers, Tong Heads.

Broken Cable, Shackles.

Bolts, Inserts, Keepers, Cleanedand Doped, Handle Condition.

Avoid drilling fluids.

Verify elevators are properly

latched.

Derrickman is required to be

100% Tied-Off at all times.

WATCH OUT FOR TRAPPED

TORQUE. Lay slips on side

away from rotary table.

0

1

2

3

4

4

5

6

7

8

9

1

2

1

2

3

4

OR

CONNECTION TO STAND IN DERRICK - STAND

CLEAR until ready to assist with stabbing pipe/stand.

Dope tool-joint in rotary and assist with stabbing

pipe/stand.

Latch lead tongs onto tool-joint in rotary table, using

proper tong handles and make tongs bite.

Upon Driller instructions and after Back-Up Hand

unlatches lead tongs, hold lead tongs clear and assist

in pulling the slips using proper lifting techniques.

Chain lead tongs to A-leg.

Assist in cleaning the rig floor, and follow Drillers

instructions.

END OF PROCEDURE

Page 67: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL COLLAR

TOP DRIVE

DRILL COLLAR

Page 68: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

1

PPE Requirements - Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

Upon instruction by the Driller, assist in setting the

slips.

Place drill collar clamp around collar and hold in place

until pin is in place and clamp is properly tightened.

Stand clear while pump-thru-lift-sub connection is

broken and Top Drive assembly is raised.

Wait until the back-up tongs are in place, on the

bottom joint and latched.

Place tong on the top joint and latch using the proper

handles.

Make the lead tongs bite at the same time the back-up

tongs bite, using the proper tong handles.

Keep the lead tongs biting while the Driller breaks the

pump-thru-sub-connection.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong

Heads.

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE PUMP THRU CONNECTION IS BROKEN

Dies, Keepers, Tong Heads.

Broken Cable, Shackles.

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition.

FOLLOW INSTALLATION

PROCEDURES PER JSA

DO NOT help pulling back-up

tongs. MAKE SURE Chain

Hand is out of the way.

Stay Clear of Break Out Cable.

Unlatch back-up tongs.

Page 69: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

Floorman-Lead Tong

2

10

11

12

Keep the lead tongs biting while the Driller rotates

pump-thru-sub out of drill collar in rotary table.

After rotary table stops, and lead tongs are unlatched,

chain lead tongs to A-leg.

Assist in stabbing pump-thru-sub into drill collar in

Mouse Hole.

Assist with making up pump-thru-sub with chain-tongs.

Dope drill collar in rotary table.

Assist in stabbing the drill collar from Mouse Hole into

the drill collar in the Rotary Table.

Latch lead tongs onto drill collar in Rotary Table, using

proper tong handles, and make tongs bite.

Upon Driller’s instruction, stand clear while connection

is being torqued.

13

14

15

16

17

18

Lay slips on side away from

Rotary Table.

19

THE DRILL COLLAR CONNECTION IS TIGHT

Upon Driller’s instructions, unlatch back up tongs.

After lead tongs are unlatched, chain lead tongs to A-leg.

Assist in removing the drill collar clamp by holding

proper handles as clamp is loosened and pin is

removed.

Remove clamp from drill collar and place in proper

location.

Assist in pulling the slips using proper lifting

techniques.

Assist in cleaning the rig floor, and follow Driller’s

instructions.

END OF PROCEDURE

20

21

22

23

Page 70: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

KE

LLY

S

PIN

NE

R

DR

IL

L P

IP

E

KELLY SPINNER

DRILL PIPE

KELLY SPINNER

DRILL PIPE

Page 71: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

After the Rotary Table stops, unchain tongs from A-LEG.

Upon the Driller’s signal, assist in setting the slips.

Set Slips, using proper lifting techniques.

Wait until the back-up tongs are in place, on the

bottom joint and latched.

Place tong on the top joint and latch, using the proper

handles.

Make the lead tongs bite at the same time the back-

up tongs bite, using the proper tong handles.

Keep the lead tongs biting while the Driller breaks the

connection.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong

Heads.

Dies, Keepers, Tong Heads.

Broken Cable, Shackles.

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition.

Minimum of two people.

Do not help pulling back-up

tongs. Make sure Chain Hand is

out of the way.

Stay Clear of Break Out Cable.

Keep feet clear of the rotary table

and slip handles.

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE CONNECTION IS BROKEN

ROTATING OUT WITH THE ROTARY TABLE -

Unlatch the lower tongs. Make the top tongs bite

using the proper tong handles while rotating out.

1

Page 72: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Floorman-Lead Tong

2

9

9

10

AFTER ROTARY STOPS, and Back-Up Hand un-

latches lead tongs, remove lead tongs.

11

12

13

14

15

16

Avoid drilling fluids.

2

1

2

17

OR

REVERSING OUT WITH THE KELLY SPINNER -

After Back-Up Hand unlatches lead tongs, hold lead

tongs clear of Kelly.

AFTER KELLY STOPS TURNING, unlatch bottom set

of tongs.

Place the lead tongs on the joint in the Mouse Hole.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the joint in the Mouse

Hole.

Make the lead tongs bite on the joint in the Mouse

Hole, using the proper tong handles, while the Driller

spins the Kelly.

After the Kelly stops, step back while the top tongs are

latched onto Kelly.

After the top tongs are on the Kelly, make the bottom

tongs bite.

Make the lead tongs bite as the connection is tight-

ened, using the proper tong handles.

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

Latch the lead tongs onto the joint in the Rotary Table.

Dope the connection in the Rotary Table as the Driller

pulls the joint out of the Mouse Hole.

Assist in stabbing the joint from Mouse Hole into the

joint in the Rotary Table.

18

19

20

Page 73: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

3

Make the lead tongs bite on the joint in the Rotary

Table, using the proper tong handles, while the Driller

spins the Kelly-joint.

AFTER THE KELLY STOPS SPINNING, STAND CLEAR

while the top tongs are latched onto the Kelly-joint.

After the top set of tongs are latched, make the lead

tongs bite using the proper tong handles, while the

connection is tightened.

21

22

23

24

25

26

27

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

After Back-Up Hand unlatches lead tongs, hold lead

tongs clear and assist in pulling the slips, using proper

lifting techniques.

Chain lead tongs to A-leg.

Assist in cleaning the rig floor, or follow Driller instruc-

tions.

END OF PROCEDURE

Lay slips on side away from

rotary table.

Page 74: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

KE

LLY

S

PIN

NE

R

DR

ILL C

OLLA

R

KELLY SPINNER

DRILL COLLAR

KELLY SPINNER

DRILL COLLAR

Page 75: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

. 1

Set Slips, using proper lifting techniques.

PPE Requirements - Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

After the Rotary Table stops, and upon the Driller’s

instructions, assist in setting the slips.

Slack, Missing parts, Damage,

Wear, Dies,Keepers, Tong Heads.

Dies, Keepers, Tong Heads.

Broken Cable, Shackles.

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition.

Minimum of two people.

FOLLOW INSTRUCTION

PROCEDURES PER JSA.Place drill collar clamp around collar and hold in place

until pin is in place and clamp is properly tightened.

Unchain tongs from A-LEG.

STAND CLEAR until the back-up tongs are in place (on

the drill collar in the rotary) and are properly latched.

Place tong on the top joint and latch using the proper

handles.

Make the lead tongs bite at the same time the back-

up tongs bite, using the proper tong handles.

Keep the lead tongs biting while the Driller breaks the

connection.

THE CONNECTION IS BROKEN

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

Do not help pulling back-up

tongs. MAKE SURE Chain

Hand is out of the way.

Stay Clear of Break Out Cable.

Page 76: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Floorman-Lead Tong

2

10

10

11

Keep feet clear of the rotary

table, drill collar clamp, and

slip handles.

ROTATING OUT WITH THE ROTARY TABLE - Unlatch

the lower tongs. Make the top tongs bite using the

proper tong handles while rotating out with the rotary.

AFTER ROTARY STOPS, and Back-Up Hand un-

latches lead tongs, remove lead tongs.

Hold tongs clear of the Kelly.

OR

REVERSING OUT WITH THE KELLY SPINNER -

After Back-Up Hand unlatches lead tongs, hold lead

tongs clear of Kelly.

AFTER KELLY STOPS TURNING, unlatch bottom

set of tongs.

Place the lead tongs on the drill collar in the Mouse

Hole.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the drill collar in the

Mouse Hole.

12

13

14

15

16

17

Avoid drilling fluids.

Make the lead tongs bite on the drill collar in the

Mouse Hole, using the proper tong handles, while the

Driller spins the Kelly.

After the Kelly stops, step back while the top tongs

are latched onto Kelly.

After the top tongs are on the Kelly, make the bottom

tongs bite.

Make the lead tongs bite as the connection is tight-

ened, using the proper tong handles.

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

Latch the lead tongs onto the drill collar in the Rotary

Table.

Dope the connection in the Rotary Table as the Driller

pulls the drill collar out of the Mouse Hole.

1

2

3

1

2

18

19

20

Page 77: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

3

After Back-Up Hand unlatches lead tongs, chain lead

tongs to A-leg.

Assist in stabbing the drill collar from Mouse Hole into

the drill collar in the Rotary table.

Make the lead tongs bite on the drill collar in the

Rotary Table, using the proper tong handles, while the

Driller spins the Kelly and drill collar.

AFTER THE KELLY STOPS SPINNING, STAND CLEAR

while the top tongs are latched onto the drill collar.

After the top set of tongs are latched, make the lead

tongs bite using the proper tong handles, while the

connection is tightened.

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

Lay slips on side away from

rotary table.

Assist in removing the drill collar clamp by holding

proper handles as clamp is loosened and pin is

removed.

Remove clamp from drill collar and place in proper

location.

Assist in pulling the slips using proper lifting tech-

niques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

END OF PROCEDURE

21

22

23

24

25

26

27

28

29

30

Page 78: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

SPIN

NIN

G C

HA

IN

DR

IL

L P

IP

E

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Page 79: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

After the Rotary Table stops, unchain tongs from A-LEG.

Upon the Driller’s signal, assist in setting the slips.

Set Slips, using proper lifting techniques.

Wait until the back-up tongs are in place, on the

bottom joint and latched.

Place tong on the top joint and latch using the proper

handles.

Make the lead tongs bite at the same time the back-

up tongs bite, using the proper tong handles.

Keep the lead tongs biting while the Driller breaks the

connection.

Slack, Missing parts, Damage,

Wear, Dies, Keepers, Tong

Heads.

Dies, Keepers, Tong Heads.

Broken Cable, Shackles.

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition.

Minimum of two people.

DO NOT help pulling back-up

tongs. MAKE SURE Chain

Hand is out of the way.

Stay Clear of Break Out Cable.

0

1

2

3

4

5

6

7

9

1

2

1

2

3

4

THE CONNECTION IS BROKEN

ROTATING OUT WITH THE ROTARY TABLE -

Unlatch the lower tongs. Make the top tongs bite

using the proper tong handles while rotating out.

Keep feet clear of the rotary

table and slip handles.1

Page 80: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Floorman-Lead Tong

2

9

9

10

AFTER ROTARY STOPS, and back-up Hand un-

latches lead tongs, remove lead tongs.

11

12

13

14

15

16

Avoid drilling fluids.

2

1

2

17

OR

REVERSING OUT WITH SPINNING CHAIN - After Back-up

Hand unlatches lead tongs, hold lead tongs clear of Kelly

while being reversed out.

AFTER KELLY STOPS TURNING, unlatch bottom set

of tongs.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the joint in the Mouse

Hole.

Place and latch back-up tongs on Kelly saver sub.

Make the back up tongs bite, using the proper tongs

handles, while the Driller spins the Mouse Hole joint

into the Kelly

Place the lead tongs on the joint in the Mouse Hole.

Make the lead tongs bite as the connection is tight-

ened, using the proper tong handles.

THE MOUSE HOLE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

Latch the lead tongs onto the drill pipe in the Rotary

Table.

Dope the connection in the Rotary Table as the Driller

pulls the drill pipe out of the Mouse Hole.

Assist in stabbing the drill pipe from Mouse Hole into

the drill pipe in the Rotary Table.

Make the lead tongs bite on the drill pipe in the

Rotary Table, using the proper tong handles, while the

Driller spins the Kelly joint.

AFTER THE KELLY STOPS SPINNING, STAND CLEAR

while the top tongs are latched onto the Kelly joint.

18

19

20

STAND CLEAR of spinning

Page 81: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

3

After the top set of tongs are latched, make the lead

tongs bite using the proper tong handles, while the

connection is tightened.

21

22

23

24

25

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

After back up hand unlatches lead tongs, hold lead

tongs clear and assist in pulling the slips using proper

lifting techniques.

Chain lead tongs to A-leg.

Assist in cleaning the rig floor, or follow Driller instruc-

tions.

END OF PROCEDURE

Lay slips on side away from

rotary table.

Page 82: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

Floorman -

Lead Tong

Floorman -

Lead Tong

SPIN

NIN

G C

HA

IN

DR

ILL C

OLLA

R

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Page 83: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support.

Prior to the first connection, review JSA.

Inspect Equipment: Lines, Shackles, Slips, Collar

Clamp, Tong and Tong Hanger.

Tong and Tong Hanger.

Lines (proper length).

Slips.

After the rotary table stops, and upon the Driller’s

instructions, assist in setting the slips.

Set Slips, using proper lifting techniques.

Place drill collar clamp around collar and hold in place

until pin is in place and clamp is properly tightened.

Unchain tongs from A-LEG.

STAND CLEAR until the back-up tongs are in place (on

the drill collar in the rotary) and are properly latched.

Place tong on the top joint and latch using the proper

handles.

Make the lead tongs bite at the same time the back-up

tongs bite, using the proper tong handles.

Keep the lead tongs biting while the Driller breaks the

connection

Slack, Missing parts, Damage,

Wear, Dies,Keepers, Tong Heads

Dies, Keepers, Tong Heads

Broken Cable, Shackles

Bolts, Inserts, Keepers, Cleaned

and Doped, Handle Condition

Minimum of two people.

FOLLOW INSTRUCTION

PROCEDURES PER JSA.

DO NOT help pulling back-up

tongs.

MAKE SURE Chain Hand is out

of the way.

Stay Clear of Break Out Cable

0

1

2

3

4

5

6

7

8

9

1

2

1

2

3

4

THE CONNECTION IS BROKEN

Page 84: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

Romfor International LTd. Floorman-Lead Tong

2

10

10

11

ROTATING OUT WITH THE ROTARY TABLE - Unlatch

the lower tongs. Make the top tongs bite using the

proper tong handles while rotating out with the rotary.

AFTER ROTARY STOPS, and Back-Up Hand

unlatches lead tongs, remove lead tongs.

12

13

14

15

16

17

STAY CLEAR OF CHAIN

Avoid drilling fluids.

1

2

1

2

3

18

OR

REVERSING OUT WITH SPINNING CHAIN - After

Back-Up Hand unlatches lead tongs, chain lead

tongs to A-leg.

Assist with wrapping chain on Kelly (if required).

Make the back-up tongs bite, using the proper tong

handles.

AFTER KELLY STOPS TURNING, unlatch make-up

tongs.

Unchain lead tongs from A-leg and place lead tongs

onto drill collar in Mouse Hole.

STAND CLEAR while the Driller picks up on the Kelly.

Assist with stabbing Kelly into the drill collar in the

Mouse Hole.

Make the lead tongs bite on the drill collar in the

Mouse Hole, using the proper tong handles, while the

Driller spins the Kelly.

After the Kelly stops, step back while the top tongs

are latched onto Kelly.

After the top tongs are on the Kelly, make the bottom

tongs bite.

Make the lead tongs bite as the connection is

tightened, using the proper tong handles.

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

4

Keep feet clear of the Rotary

Table, drill roller clamp and slip

handles.

Page 85: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Floorman-Lead Tong

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

29

3

Latch the lead tongs onto the drill collar in the Rotary

Table.

Dope the connection in the Rotary Table as the Driller

pulls the drill collar out of the Mouse Hole.

Assist in stabbing the drill collar from Mouse Hole into

the drill collar in the Rotary Table.

Assist with wrapping chain on drill collar (if required).

Make the lead tongs bite on the drill collar in the

Rotary Table, using the proper tong handles, while the

Driller spins the Kelly and drill collar.

AFTER THE KELLY STOPS SPINNING, STAND CLEAR

while the top tongs are latched onto the drill collar.

After the top set of tongs are latched, make the lead

tongs bite using the proper tong handles, while the

connection is tightened.

19

20

21

22

23

24

25

26

27

28

THE CONNECTION IS TIGHT

Unlatch the top set of tongs, using the proper tong

handles.

After Back-Up Hand unlatches lead tongs, chain lead

tongs to A-leg.

Assist in removing the drill collar clamp by holding

proper handles as clamp is loosened and pin is

removed.

Remove clamp from drill collar and place in proper

location.

Assist in pulling the slips using proper lifting

techniques.

Assist in cleaning the rig floor, or follow Driller’s

instructions.

END OF PROCEDURE

30

31

Chain will be walked up by

chain hand.

Lays slips on side away from

Rotary Table.

Page 86: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MA

KIN

G A

CO

NN

EC

TIO

N

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

Page 87: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

TO

P D

RIV

E

DR

IL

L P

IP

E

TOP DRIVE

DRILL PIPE

TOP DRIVE

DRILL PIPE

Page 88: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. -

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Upon instruction by the Driller, assist in setting the

slips.

Stand clear of elevators while connection is broken

and Top Drive assembly is being raised.

Once pump-thru-sub and drill collar is made up and

raised, tail drill collar in rotary table.

Assist with stabbing drill collar.

Stand clear while tool-joint is being tightened.

Upon Driller’s instructions, assist in pulling the slips

using proper lifting tecnhiques.

Follow Driller’s instructions.

Avoid drilling fluids.

0

1

2

3

4

5

6

7

1

2

END OF PROCEDURE

If Mouse Hole connection, place

cover on Mouse Hole.

WATCH OUT FOR TRAPPED

TORQUE. Lay slips on side

away from rotary table.

Page 89: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd..

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

TO

P D

RIV

E

DR

ILL C

OLLA

R

TOP DRIVE

DRILL COLLAR

TOP DRIVE

DRILL COLLAR

Page 90: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Motorman

STEP SUB PROCEDURE REMARKS

TOP DRIVE DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Upon instruction by the Driller, assist in setting the

slips.

If requested, assist in installing the drill collar clamp.

Stand clear of elevators while connection is broken

and Top Drive assembly is being raised.

Once pump-thru-sub and drill collar is mde up and

raised, tail drill collar to drill collar in rotary table.

Assist with stabbing drill collar.

Stand clear while drill collar is being tightened.

Upon Driller’s instructions, assist in removing the drill

collar clamp and pulling the slips using proper lifting

techniques.

Follow Driller’s instructions.

Avoid drilling fluids.

0

1

2

3

4

5

6

7

8

1

2

END OF PROCEDURE

If Mouse Hole connection, place

cover on Mouse Hole.

WATCH OUT FOR TRAPPED

TORQUE. Lay slips on side

away from rotary table.

Page 91: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

KE

LLY

S

PIN

NE

R

DR

IL

L P

IP

E

KELLY SPINNER

DRILL PIPE

KELLY SPINNER

DRILL PIPE

Page 92: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Motorman

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements -Hard Hat, Glasses, Work Gloves,

Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Kelly-Safety-valve wrench.

Depending upon operation, wash Kelly with hose while

Driller pulls Kelly out of hole.

Upon instruction by the Driller, assist in setting the

slips.

Set Slips, using proper lifting techniques

If required, close Kelly-valve upon Driller’s signal.

STAND CLEAR while tongs are being latched,

connection is broken, and rotated out.

Proper wrench for valve. Wrench

should be designed to eliminate

possibility of dropping into hole.

0

1

2

3

4

5

6

7

1

2

THE CONNECTION IS BROKEN

Minimum of two people.

Avoid tongs and snub lines.

Avoid drilling fluids.

Avoid tongs and snub lines.

8

STAND CLEAR while the Driller picks up on the

Kelly.

Assist with stabbing Kelly into the drill pipe in the

Mouse Hole.

STAND CLEAR while connection is being made up

and tightened.

THE CONNECTION IS TIGHT

After both set of tongs are removed, open Kelly-

Safety-valve.

Depending upon operation, wash Kelly-joint off with water

hose while Driller pulls Kelly-joint out of Mouse Hole.

Tail Kelly joint to Lead Tong and Back-Up Tong Hands.

9

11

12

10

Page 93: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd. Motorman

2

13

14

Assist in stabbing, if required.

STAND CLEAR while connection is made-up and

tightened.

THE CONNECTION IS TIGHTENED

Assist in pulling slips, using proper lifting techniques.

Follow Driller’s instructions.

END OF PROCEDURE

Avoid tongs and snub lines.

Lay slips on side away from

rotary table

15

16

Page 94: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

KE

LLY

S

PIN

NE

R

DR

ILL C

OLLA

R

KELLY SPINNER

DRILL COLLAR

KELLY SPINNER

DRILL COLLAR

Page 95: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Motorman

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Kelly Safety Valve Wrench.

Depending upon operation, wash Kelly with hose

while Driller pulls Kelly out of hole.

Upon instruction by the Driller, assist in setting the

slips.

Set Slips, using proper lifting techniques

If required, close Kelly Valve on Driller’s signal

If required, assist with drill collar clamp.

STAND CLEAR while tongs are being latched,

connection is broken, and rotated out.

Proper wrench for valve. Wrench

should be designed to eliminate

possibility of dropping into hole.

0

1

2

3

4

5

6

7

8

1

2

THE CONNECTION IS BROKEN

Minimum of two people.

Avoid tongs and snub lines.

Avoid drilling fluids.

Avoid tongs and snub lines.

9

STAND CLEAR while the Driller picks up on the

Kelly.

Assist with stabbing Kelly int othe drill collar in the

Mouse Hole.

STAND CLEAR while connection is made up and

tightened.

THE CONNECTION IS TIGHT

After both set of tongs are removed, open Kelly-

Safety-valve.

Depending upon operation, wash Kelly-joint off with

water hose while Driller pulls Kelly-joint out of Mouse

Hole.

10

12

11

Page 96: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

KELLY SPINNER DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Motorman

2

13

14

Tail drill collar to Lead Tong and Back-Up Tong Hands.

Place cover over Mouse Hole.

STAND CLEAR whie connection is made-up and

tightened.

THE CONNECTION IS TIGHTENED

Upon the Driller’s instruction, assist in removing drill

collar clamp and pulling slips, using proper lifting

techniques.

Follow Driller’s instructions.

END OF PROCEDURE

Assist in stabbing, if required.

Avoid tongs and snub lines.15

16

17

Lay slips on side away from

rotary table.

Page 97: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd.

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

SPIN

NIN

G C

HA

IN

DR

IL

L P

IP

E

SPINNING CHAIN

DRILL PIPE

SPINNING CHAIN

DRILL PIPE

Page 98: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Motorman

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Gloves, Work Gloves,

Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment:, Kelly-Safety-valve wrench.

Depending upon operation, wash Kelly wrench off with

hose while Driller pulls Kelly out of hole.

Upon instruction by the Driller, assist in setting the

slips.

Set Slips, using proper lifting techniques.

If required, close Kelly-Valve upon Driller’s signal.

STAND CLEAR while tongs are being latched,

connection is broken, and rotated out.

Proper wrench for valve. Wrench

should be designed to eliminate

possibility of dropping into hole.

0

1

2

3

4

5

6

7

1

2

THE CONNECTION IS BROKEN

Minimum of two people.

Avoid tongs and snub lines.

Avoid drilling fluids.

Avoid tongs and snub lines.8

STAND CLEAR while the Driller picks up on the

Kelly.

Assist with stabbing Kelly into the joint in the

Mouse Hole.

STAND CLEAR while connection is being made up

and tightened.

THE CONNECTION IS TIGHT

After both sets of tongs are removed, open Kelly-

Safety-Valve.

Depending upon operation, wash Kelly-joint off with

hose while Driller pulls Kelly-joint out of Mouse Hole.

Tail Kelly-joint to lead and back-up tong Hands.

Place cover over Mouse Hole.

Make sure stripper rubber does

not ride up on tool joint.

9

11

12

13

10

Page 99: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL PIPE

MAKING A CONNECTION

Romfor International Ltd.

©

Motorman

2

14

15

Assist in stabbing, if necessary.

STAND CLEAR while connection is made-up and

tightened.

THE CONNECTION IS TIGHTENED

Assist in pulling slips, using proper lifting techniques.

Follow Driller’s instructions.

END OF PROCEDURE

Avoid tongs and snub lines

Lay slips on side away from

rotary table

16

17

Page 100: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International LTd.

MAKING A

CONNECTION

MAKING A

CONNECTION

MotormanMotorman

SPIN

NIN

G C

HA

IN

DR

ILL C

OLLA

R

SPINNING CHAIN

DRILL COLLAR

SPINNING CHAIN

DRILL COLLAR

Page 101: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

Romfor International Ltd. Motorman

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

. 1

PPE Requirements - Hard Hat, Glasses, Work

Gloves, Steel Toe Shoes, Back Support

Prior to the first connection, review JSA

Inspect Equipment: Kelly-Safety-valve wrench.

Depending upon operation, wash Kelly-joint off with

water hose while Driller pulls Kelly out of hole.

Upon instruction by the Driller, assist in setting the

slips.

Set Slips, using proper lifting techniques

If required, close Kelly-Valve upon Driller’s signal.

If required, assist with drill collar clamp.

STAND CLEAR while tongs are being latched,

connection is broken, and rotated out.

Proper wrench for valve. Wrench

should be designed to eliminate

possibility of dropping it into hole.

0

1

2

3

4

5

6

7

1

2

THE CONNECTION IS BROKEN

Minimum of two people.

Avoid tongs and snub lines.

Avoid drilling fluids.

Avoid tongs and snub lines.

8 STAND CLEAR while the Driller picks up on the

Kelly.

Assist with stabbing Kelly into the drill collar in the

Mouse Hole.

STAND CLEAR while connection is being made-up

and tightened.

THE CONNECTION IS TIGHT

After both sets of tongs are removed, open Kelly-

Safety-valve.

Depending upon operation, wash drill collar with hose

while Driller pulls drill collar out of Mouse Hole.

Tail drill collar to lead and back-up tong Hands

9

11

12

13

10

Page 102: 5. Making A Connection - EDC Romforedcromfor.com/wp-content/uploads/bestpractices/Making A Connectio… · Romfor International Ltd. Backup Hand STEP SUB PROCEDURE REMARKS TOP DRIVE

STEP SUB PROCEDURE REMARKS

SPINNING CHAIN DRILL COLLAR

MAKING A CONNECTION

Romfor International Ltd. Motorman

2

14

15

Place cover over Mouse Hole.

Assist in stabbing, if necessary.

STAND CLEAR while connection is made-up and

tightened.

THE CONNECTION IS TIGHT

Assist in removing drill collar clamp and pulling slips,

using proper lifting techniques.

Follow Driller’s instructions.

END OF PROCEDURE

Avoid tongs and snub lines

Lay slips on side away from

rotary table

16

17

18