11
5 - Phasing Strategy

5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

5 - Phasing Strategy

Page 2: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

Design Plan & Feasibility Study | November 2017 93

The Design Plan explains the strategic design principles for development on the individual sites within the Town Centre.

The various ladders of development described earlier in the document explain the approach to phased development and realisation of the Design Plan in the long term. Although the proposed phasing strategy indicated in this document suggests a preferred approach, major developments sites such as the William Hunter Way Car Park may well come up for development in early phases of the process.

In this section, we have detailed various elements that could be phased through this process.

Early phases focus on strategic public realm and landscape initiatives to help improve connections and gateways into the Town Centre.

Council owned sites could be developed in the early phases, helping to set a good precedent for future and other upcoming developments in and around the Town Centre.

Our phasing approach has been unpacked in 5 key phases, each showing how the Town Centre Design Plan can be implemented over the short-medium and long term. Some key considerations have been highlighted here.

For each phase, action projects are strategically identifi ed with a list of recommended actions and deliverables.

These are accompanied by a list of icons that briefl y describe each action.

5 - Phasing Strategy

Implementation Strategy

The fi rst phase should focus on improving the linkages from the Town Centre to the station, with Kings Road being the primary focus. The western gateway into the High Street needs to be better defi ned – hence the Westbury Way parking site, improved public realm at the junction of Kings Road and the High Street and improvements to shop frontages and retail uses at the western end of the High Street are identifi ed as projects within this early phase.

In the second phase, the focus is to establish a secondary north-south link between the Town Centre and the train station – Crown Street. Key projects identifi ed for this phase are Crown Street improvements and infi ll, the western section of Queens Road, the Chapel Ruins site and the Chatham Way parking site.

The third phase focuses on the eastern end of the Town Centre. There is an opportunity to spatially integrate the surrounding school sites and their access routes to the core of the Town Centre. This will strengthen the secondary movement system between the Town Centre and the train station. Key projects for this phase include the southern portion of the William Hunter Way parking site, Ongar and Ingrave Road, the eastern gateway to the High Street, and the areas around the St Thomas’ of Canterbury C of E park.

In the fourth phase, the key projects highlighted include the northern section of the William Hunter Way parking site, and improved access from North Road and North Road Avenue.

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Leisure (health & beauty, spa)

Housing

Restaurants

Offi ce

Retail

Boutique Cinema

Parking

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Providing appropriate signage to assist in way fi nding

Rationalizing of service yards and / or providing management plans

Façade and shop front improvements

Memorial / Art installations

Internal / external connections for buildings

Proposed cycling routes

Proposed / improve pedestrian routes

Landscape interventions (hard and soft)

Consultation with owners / stakeholders

Street Lighting

Conservation

Public realm interventions

Ancient site interventions

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

Icon Key

Proposed Site Uses for Identifi ed Sites

Actions projects and InitiativesSignage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

In the fi fth phase, the Baytree Centre is better integrated with the High Street through establishing a new north – south and east-west link through this site.

As part of the long term strategy, it is critical to consider linkages and connections through the Sainsbury’s site – to integrate areas north of the Town Centre into the heart of the town. The design plan therefore recommends a further phase, which could enable a possible ‘rethink’ of the Sainsbury’s site to create activity along William Hunter Way and greater fl ows of pedestrians/ cyclists through this site.

Page 3: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

94

1. Western end Gateway Site

• Westbury Way parking site prepared for development

• Improvements to the Kings Rd/High Street/ Weald Rd/Western Rd junction

• Improve pedestrian crossing and enhancements

• Public way fi nding

• Landscaping and street lighting

2. Upgrade of Kings Road

• Pedestrian and cycling improvements

• Landscaping and street lighting

• Facade and shop front improvements

3. Kings & Queen’s Rd Junction

• Improvements to the Kings & Queen’s Rd junction

• Improve pedestrian crossing and enhancements

• Public way fi nding

4. Service Route & Access

• Consolidate service road between library, Baytree Centre and adjacent residential areas

• Implementation of Service and delivery management plan

5 - Phasing Strategy

Phase 1

Kings Rd

High Street

Que

ens

Rd

Wes

tern

Rd

3

Willi

am H

unter W

ay

2

1

4

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Ingrave Rd

Towards the station

Page 4: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

Design Plan & Feasibility Study | November 2017 95

Kings Rd

High Street

Wes

tern

Rd

Willi

am H

unter W

ay

Ingrave Rd

Towards the station

Phase 2

1. Western Road, William Hunter Way & Western Road Junction

• Improvements to the Western Rd & William Hunter Way junction

• Public way fi nding

• Pedestrian and cycling improvements

• Landscaping and street lighting

2. Historic Market Square

• The site to form part of a strategic public realm intervention (subject to archaeological study)

• Alleyway improvements between High Street and William Hunter Way

• Improve pedestrian crossing and enhancements along High Street

3. Historic Main Square

• Old Ruins site to form part of a strategic public realm intervention (subject to archaeological study)

• Alleyway improvements between High Street and William Hunter Way

4. Chatham Way Parking Site

• The site being prepared for development

5. Upgrade of the southern portion of Crown Street

• Pedestrian and cycling improvements

• Landscaping and street lighting

• Alleyway improvements

5 - Phasing Strategy

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

1

2

3

45

6

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

6. Upgrade of the western portion of Queens Rd

• Pedestrian and cycling improvements

• Landscaping and street lighting

Que

ens

Rd

Page 5: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

96

Kings Rd

High Street

Wes

tern

Rd

Willi

am H

unter W

ay

Ingrave Rd

Towards the station

5 - Phasing Strategy

Phase 3

1. William Hunter Way Parking Site

• Parking site prepared for development (southern portion)

• Pedestrian and cycling improvements between William Hunter Way and Western Road

• Landscaping and street lighting

• Northern portion of site to be used as parking area at grade

2. Upgrade of Ongar Road and Ingrave Road

• Pedestrian and cycling improvements

• Landscaping and street lighting

3. Eastern end Gateway Site

• Improvements to the Ongar Rd/High Street/ Ingrave Rd junction

• Improve pedestrian crossing and enhancements

4. Upgrade of Cathedral park and environs

• Pedestrian and cycling improvements

• Landscaping and street lighting

5. Upgrade of Rose Valley Road

• Pedestrian improvements

• Street lighting

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

1

2

3

4

5

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Towards the station

Que

ens

Rd

Page 6: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

Design Plan & Feasibility Study | November 2017 97

Kings Rd

High Street

Wes

tern

Rd

Willi

am H

unter W

ay

Ingrave Rd

Towards the station

5 - Phasing Strategy

Phase 4

1. William Hunter Way Car Park (northern portion)

• Parking site prepared for development

• Pedestrian and cycling improvements between William Hunter Way and Ongar Road

• Landscaping and street lighting

2. Upgrade of North Road & North Road Avenue

• Pedestrian improvements

• Street lighting

1

2

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Towards the station

Que

ens

Rd

Page 7: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

98

5 - Phasing Strategy

Phase 5

1. Service Yard Site

1.1 Minimum Intervention

• Service yard site spatially reconfi gured

• Landscaping and street lighting

1.2 Maximum Intervention

• Service yard site prepared for development

• Public realm space to incorporate service delivery (promote fl exibility)

• Landscaping and street lighting

2. Baytree Centre

• Improve unit sizes and internal movement layouts (north-south & east-west orientation)

3. Service Yard Site

• Service yard site prepared for development

• Street lighting

4. Multistorey Car Park

Minimum Intervention

• Reconfi gure internal parking layout

• Built housing around existing parking deck structure

Maximum Intervention

• Demolish and redevelop the site for development (parking to be included)

5. Upgrade of New Road

• Pedestrian improvements

• Street lighting

1

2

3 5

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

Restaurants Housing O�ce Retail Leisure (Beauty & health, Spa)

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

PP

Signage

Cinema

Service yard/delivery

Parking

Façade improvement

Memorial/installations

Internal/external connections

Cycling

Pedestrian

Landscape (trees)

Consultation

Street lighting

Conservation

Public space

Ruins

PP

Kings Rd

High Street

Que

ens

Rd

Wes

tern

Rd

Willi

am H

unter W

ay

Ingrave Rd

Towards the station

Towards the station

4

Page 8: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

Design Plan & Feasibility Study | November 2017 99

5 - Phasing Strategy

Phase 6

1 Sainsbury’s

The diagram shows the potential of the Sainsbury’s site. It gives an indicative strategy of how this land could be redeveloped in future phases. It looks at increasing the permeability and the integration of the site with the Town Centre.

Kings Rd

High Street

Que

ens

Rd

Wes

tern

Rd

Willi

am H

unter W

ay

Wates Way

1

Towards the station

Towards the station

Page 9: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

100100

6 - The Way Forward

Page 10: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

Design Plan & Feasibility Study | November 2017 101

The Design Plan has identified a range of opportunities and interventions that can enhance the vitality and viability of Brentwood Town Centre in the future, it provides a framework to guide the actions of the Council and its partners over the short, medium and long term.

Realising the potential of the town will require a coordinated approach to intervention that builds on the Design Plan’s approach to understand Brentwood as a place and how transport, urban design and commercial activity/development are inter-related in terms of maintaining the health of the town.

Getting the public realm right is a critical first step as it will knit the existing assets together and provide a framework within which new development should be integrated to ensure the Town Centre functions as a single entity. Key next steps for the public realm include:

• Make a more pedestrian friendly environment on the routes through the Town Centre.

• Lighting and wayfinding are key elements for having a safe public realm.

• Widening the side walk, using shared surfaces in key locations and having some urban furniture will help slow the traffic and make the pedestrian and cyclist more comfortable.

• Key design guidelines should be defined in order to be sure the Town Centre follows a clear strategy.

The Design Plan has also identified a range of development opportunities on land which the Council has considerable control and influence over. However, achieving the most appropriate scale, nature and mix of development on

6 - The Way Forward

individual sites will involve more detailed work and is likely to need the opportunities to be considered as a portfolio rather than a series of individual developments.

It may also require more innovative models of development/management that provide a greater level of control/influence on the nature of provision and mix of uses. For example, Build to Rent specific development may offer opportunities to curate a wider range of commercial activity than a standard Build to Sale approach.

Critically the Council will need to balance a range of priorities, which the delivery approach will need to be structured specifically to deliver. For example, it will need to consider not only the potential capital value of development but also any long term revenue potential to offset any lost parking receipts. Key next steps in terms of the development sites include:

• Early internal discussion with Property and Parking services to agree on opportunities;

• Development of a delivery strategy and approach, which would include:

- More detailed site design and viability appraisals

- Assessment of potential development/ delivery approaches against Council objectives

- Establishment of delivery and development approach/vehicle

- Soft market testing

- Partner procurement

• Allied to this process the development of site specific development/design briefs may also be required.

The success of the town will hinge on the ability for people to easily access it, park and move around. Therefore a number of transport and traffic interventions are required to ensure parking is provided in the correct locations, congestion is managed and pedestrian/cycle movement is encouraged.

Page 11: 5 - Phasing Strategy · within the Town Centre. The various ladders of development described ... around the Town Centre. Our phasing approach has been unpacked in 5 key phases, each

102

London1 Kingsland PassageLondon E8 2BB+44 (0)20 7275 7676

Manchester3rd Floor HQ Building2 Atherton Street, Manchester M3 3GS+44 (0)161 669 8740 levittbernstein.co.uk