5yr plan 12-16

Embed Size (px)

Citation preview

  • 7/29/2019 5yr plan 12-16

    1/21

  • 7/29/2019 5yr plan 12-16

    2/21

  • 7/29/2019 5yr plan 12-16

    3/21

  • 7/29/2019 5yr plan 12-16

    4/21

  • 7/29/2019 5yr plan 12-16

    5/21

  • 7/29/2019 5yr plan 12-16

    6/21

  • 7/29/2019 5yr plan 12-16

    7/21

  • 7/29/2019 5yr plan 12-16

    8/21

  • 7/29/2019 5yr plan 12-16

    9/21

  • 7/29/2019 5yr plan 12-16

    10/21

  • 7/29/2019 5yr plan 12-16

    11/21

  • 7/29/2019 5yr plan 12-16

    12/21

  • 7/29/2019 5yr plan 12-16

    13/21

  • 7/29/2019 5yr plan 12-16

    14/21

  • 7/29/2019 5yr plan 12-16

    15/21

  • 7/29/2019 5yr plan 12-16

    16/21

  • 7/29/2019 5yr plan 12-16

    17/21

  • 7/29/2019 5yr plan 12-16

    18/21

  • 7/29/2019 5yr plan 12-16

    19/21

  • 7/29/2019 5yr plan 12-16

    20/21

  • 7/29/2019 5yr plan 12-16

    21/21

    5-Year Capital PlanFY 2012-FY 2016

    Capital Renewal Projects (8%)

    Facility Requirements FY 2012 * FY 2013 FY 2014 FY 2015 FY 2016

    Whale Branch MS Fit Sta 5 - remove & repl timbers, add gravel $1,232

    Whale Branch MS Fit Sta. 10 rem & repl timbers - add gravel typ all 10 stations $5,748

    Whale Branch MS Rm A11 - renovate all Casework $5,748

    Whale Branch MS Rm A12 - renovate casework $5,748

    Whale Branch MS Paint Corridors - 3 year plan $76,496

    Whale Branch MS Replace partitions in girls & boys group toilet $109,172

    Whale Branch MS

    Main corridor is ramped between the B Wing and the C Wing. Code required handrails have not beenProvided at the ramp and the floor surface at the ramp area is not slip resistant. $10,313

    Whale Branch MS

    Signage is mounted at varying heights throughout the school and some is mounted too high for ANSI/ADArequirements. Some spaces have not been Provided with room signage at all. Some spaces have been

    incorrectly identified $14,265Whale Branch MS Renovate girls locker room $52,293

    Whale Branch MS Install sound panels in gym $31,376

    Whale Branch MS Replace drinking fountain at SW to ball field $4,106

    Whale Branch MS Install new sound system for stage $29,113

    Whale Branch MS UPS batteries and system Replacement (complete) $2,160

    Whale Branch MS Renovate expansion joints with new sealant @ all sidewalk conditions $4,358

    Whale Branch MS Remodel Media Center windows $91,513

    Whale Branch MS

    The toilet area of the Boys Locker Room is not fully HC accessible: stall door opens in wrong direction anddoes not self-close; no vert grab bar; flush valve is too high; clear floor space is not Provided at urinal; no sinkpipe wrap; etc. $23,134

    Whale Branch MS

    The group toilets at the D, F, E, and A classrooms wings are not fully HC accessible: inadequate floor spaceat urinal; flush valve is too high, no vert grab bar; no sink pipe wrap $38,557

    Whale Branch MS Create 4 - 5 life labs $174,311

    Whale Branch MS Replace restroom sinks $115,672

    Whale Branch MS Paint Entire Building Interior - 6 year plan $305,484

    Facilities Planning and Construction

    November 2010

    * FY 2012 Projects approved by the Board 07/24/10. Subsequent years require Board approval during annual budget period. 21 Note: All project budgets include design fees, PM fees and contingency.