  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    8PNM Rev C

    TOTAL E&P UK Elgin 2013 Fabric Maintenance Campaign

    Client Representative (if applicable):

    Dereck Smith

    Brief Details of Scope:

    Access and Coatings Campaign to the Elgin PUQ Fire Zone 8PNM

    Country: UK Offshore

    Area Office: Aberdeen

    Work Pack Engineer: Tom Cairns

    Date: 17-Apr-13

    Revision of Document Date Rev A Creation of Work Pack 11-Mar-13 Rev A1 Internal Edit of Work Pack 21-Mar-13 Rev C Final Version 17-Apr-13

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    Contents

    1. Work Pack Sign Off And Introduction

    2. Project Plan

    3. Fire Zone Set Up Plan

    4. Job Cards

    5. Cape Job Risk Assessments

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    1. Work Pack Sign Off

    CAPE Job Title Name Signature Date Comments

    Cape Offshore Focal Point

    Cape QA/QC

    Cape Access Supervisor

    Cape HSEQ

    Cape Project Manager

    TOTAL Job Title Name Signature Date Comments

    Total Campaign Engineer

    Total Representative

    Total Manager

    Total Offshore Rep

    Total Offshore Rep

    Total HSEQ

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    Introduction

    This work pack details the tasks proposed for the Fire Zone 8PNM. The purpose of

    these works is to remove notifications and anomalies on the structure, and to prevent

    further corrosion of the asset. As per the Campaign Methodology Document (CMD), work involved in this Fire Zone has been highlighted as a high priority.

    The survey for 8PNM has been completed by use of R2S and photographs taken

    offshore. The survey identified 5 jobs to be completed all requiring traditional scaffold access. Work method involved is set out in the CMD and shall be adhered to at all

    times.

    The following revision reference is used to identify the progress of the work pack

    involved:

    Rev A Initial edit for review and comment

    Rev B Preconstruction review

    Rev C Final signed work pack issued prior to commencement of any works offshore

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    2. Project Plan

    The Campaign Execution Plan specifies how Job Cards, as per Section 3, are to be

    sequenced. A detailed breakdown of each task involved on the Job Card has been

    taken into account and assisted in identifying the quantity of time budgeted to each

    task.

    Curing time for coatings has been set at 10 hours per 150m.

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    3. Fire Zone Set Up Plan

  • Elgin 2013 Coatings Campaign

    Set Up 3

    Plant and Equipment Set Up Set up No 3 5 ton scaffold at Leg 3

  • Elgin 2013 Coatings Campaign

    8PNM - Rev C

    4. Job Cards

    The Job Cards detail the estimated man hours that have been allocated to each task

    requiring completion. Upon completion of job card, it will be signed off and returned to Cape Onshore for review along with any documentation of relevance including data

    showing variation to the proposed tasks.

    Man hours are based on average norms for task and a productive working day of 8.5

    hours.

    Please note that the following elements are likely to have an impact +/- on the

    estimated durations of this project: Changes in access requirements, type size of scaffold, etc.

    Availability of over-side elements / boat cover

    Changes in height these are calculated using R2S

    Changes to scope of work as not seen on R2S, e.g. additional elements

    Symops with other Contractors not currently visible in the plan

    Elgin PUQ POB issues

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference: 7.5 2.3 2Job ID / reference:Task Description:

    Total Man Hours

    Estimated Men

    26.7 3.016.2 3.013.4 3.0

    0.00.00.00.00.0

    56.3

    Name

    Elgin Area: Machinery Deck19.02.2013 R2S file (photo): MD 086

    R2S Fire zone:

    Job card No: 8PNM 001 Corrosion level: >RI3Structure name/i.d NA

    8PNM8PNM Paint spec: P01

    2013 Elgin Campaign Job Card

    Scaffold Hours 26.74Access type: Scaffold

    4300002629 Access size8PNM 001

    Access Task Items Hours Per Man Comments Exclusions

    Erect Access 8.9

    Difficulty factor BBirdcage Scaffold to allow access to all sides including the underside steel top level

    Main deck - structure adjacent to C6600 methanol storage tank Hand Rails to be removed prior to Scaff Erect

    0 0.00 0.0

    Full encapsulation 5.4Dismantle access 4.5

    0 0.0TOTAL HOURS

    0 0.00 0.0

    Job card completion approvalClient name Position Signature Date

    Task Verified As Job Card Job Title Comments

    Photos/ Plans

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference:Job ID / reference:Task Description:

    Total Man Hours

    Estimated Men

    0.00.00.00.0

    11.5 3.00.0

    12.2 3.013.0 3.0

    0.03.0 3.00.0 0.05.1 3.0

    0.044.90.0

    44.9

    Name

    19.02.2013 R2S file (photo): MD 086R2S Fire zone: 8PNM

    Elgin Area: Machinery Deck

    8PNM Paint spec: P01Job card No: 8PNM 001 Corrosion level: >RI3

    Structure name/i.d NA

    8PNM 001Birdcage Scaffold to allow access to all sides including the underside steel top level

    Main deck - structure adjacent to C6600 methanol storage tank Hand Rails to be removed prior to Scaff Erect

    Coating Task Item Hours Per Man

    2013 Elgin Campaign Job Card

    Access type: Scaffold Coating Hours

    4300002629

    0 (< 3000 psi) Fresh Water Wash 3.80

    000

    Apply First Coat 1.00 0.0Apply Top Coat 1.7

    Spot blast identified rust and blistering with garnet to SA2.5 4.1Sweep blast existing topcoat adjacent to identified areas 4.30

    0Comments / ExclusionsGratings to be removed

    Uni strut brackets to be removed (approx. 10 positions)

    000

    Client name Position Signature Date

    Task Verified As Job Card Job Title Comments

    Photos/Plans

    Job card completion approval

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference: 4.5 4.5 4Job ID / reference:Task Description:

    Total Man Hours

    Estimated Men

    62.8 3.038.0 3.031.4 3.0

    0.00.00.00.00.0

    132.1

    Name

    Elgin Area: Machinery Deck19.02.2013 R2S file (photo): MD086,088,101,100

    R2S Fire zone:

    Job card No: 8PNM 002 Corrosion level: >RI3Structure name/i.d NA

    8PNM8PNM Paint spec: P01

    2013 Elgin Campaign Job Card

    Scaffold Hours 62.78Access type: Scaffold

    4300002629 Access size8PNM 002

    Access Task Items Hours Per Man Comments Exclusions

    Erect Access 20.9

    Difficulty factor BBirdcage Scaffold to allow access to all sides including the underside steel top level

    Main deck - structure adjacent to C6600 methanol storage tank

    0 0.00 0.0

    Full encapsulation 12.7Dismantle access 10.5

    0 0.0TOTAL HOURS

    0 0.00 0.0

    Job card completion approvalClient name Position Signature Date

    Task Verified As Job Card Job Title Comments

    Photos/ Plans

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference:Job ID / reference:Task Description:

    Total Man Hours

    Estimated Men

    0.00.00.00.0

    30.4 3.00.0

    30.4 3.044.4 3.0

    0.06.0 3.00.0 0.0

    14.6 3.00.0

    125.80.0

    125.8

    Name

    19.02.2013 R2S file (photo): MD086,088,101,100R2S Fire zone: 8PNM

    Elgin Area: Machinery Deck

    8PNM Paint spec: P01Job card No: 8PNM 002 Corrosion level: >RI3

    Structure name/i.d NA

    8PNM 002Birdcage Scaffold to allow access to all sides including the underside steel top level

    Main deck - structure adjacent to C6600 methanol storage tank

    Coating Task Item Hours Per Man

    2013 Elgin Campaign Job Card

    Access type: Scaffold Coating Hours

    4300002629

    0 (< 3000 psi) Fresh Water Wash 10.10

    000

    Apply First Coat 2.00 0.0Apply Top Coat 4.9

    Spot blast identified rust and blistering with garnet to SA2.5 10.1Sweep blast existing topcoat adjacent to identified areas 14.80

    0Comments / Exclusions

    Uni strut brackets to be removed (approx. 26 positions)

    000

    Client name Position Signature Date

    Task Verified As Job Card Job Title Comments

    Photos/Plans

    Job card completion approval

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference:Job ID / reference:Task Description:

    Photos

    Elgin Area: Machinery Deck19.02.2013 R2S file (photo): MD086,088,101,100

    R2S Fire zone: 8PNM8PNM Paint spec: P01

    Job card No: 8PNM 002 Corrosion level: >RI3Structure name/i.d NA

    8PNM 002Birdcage Scaffold to allow access to all sides including the underside steel top level

    2013 Elgin Campaign Job Card

    Access type: Scaffold Coating Hours

    4300002629

    Main deck - structure adjacent to C6600 methanol storage tank

  • Asset:Date of surveyType of survey: Work pack No:

    Job card start date:Job card finish date:Contract reference: 6 4 3Job ID / reference:Task Description:

    Total Man Hours

    Estimated Men

    50.1 3.033.8 3.0