10 th Annual Supplier Conference December 4th, 2015

8th Annual Supplier Conference

Embed Size (px)

Citation preview

Page 1: 8th Annual Supplier Conference

10th Annual

Supplier Conference December 4th, 2015

Page 2: 8th Annual Supplier Conference

Welcome 2015 Supplier Conference

Ben Moglen

Director, Supply Chain Strategy & Operations

December 4, 2015

Page 3: 8th Annual Supplier Conference

In the Event of an Emergency

• If we have an earthquake, we will all duck and cover.

• Emergency evacuation assembly point is the parking lot through the two side emergency exits.

• Those certified in CPR/First Aid, please raise your hands.

• AED machines are located at the front desk.

• Calvin Chac will notify the front desk.

• Cindy Silveira will meet emergency personnel at the main lobby.

Page 4: 8th Annual Supplier Conference

2015 Award Winners

Award Winner

2015 Supplier of the Year Barnard Pipeline Inc.

Small Business Supplier of the Year Mesa Associates, Inc.

Responsible Supplier of the Year Altec Industries

Safety Supplier of the Year Chicago Bridge & Iron Company

Generation Supplier of the Year Syblon Reid

Electric T&D Supplier of the Year McFarland Cascade

Gas Operations Supplier of the Year Barnard Pipeline Inc.

Corporate Supplier of the Year Verizon Wireless

Page 5: 8th Annual Supplier Conference

Gold Shovel Standard Program Supplier Conference

Aaron Rezendez

Supervisor, Public Awareness

December 4, 2015

Page 6: 8th Annual Supplier Conference

Gold Shovel Standard

Background

In August 2014 we announced a first-of-its-kind excavation safety initiative

• Designed to reduce dig-ins

• Enhance employee and public safety

• Starting in 2016, excavators must be Gold Shovel Standard certified to perform excavation work on behalf of PG&E.

• To become Gold Shovel Standard Certified

• Create a Dig-in Prevention Policy:

• Leadership Commitment

• Training Program covering California’s One Call Law and Cal/OSHA requirements

• Corrective Action Process

• Employee Acknowledgement and Accountability Commitment

• Performance:

• Maintain no more than two (2) dig-ins over a rolling 12 month period.

Page 7: 8th Annual Supplier Conference

Gold Shovel Standard

Structure and Governance

• Policy Committee- Dig-In Prevention Policy developed and supported by peers

• Accu-Bore

• ARB, Inc.

• Michels Corporation

• Canus Corporation

• Coastal Paving, Inc.

• West Valley Construction Company, Inc.

• Review Committee- Internal leadership to approve certifications and provided general governance

• Steering Committee- Corporate Officers to execute program effectiveness

Page 8: 8th Annual Supplier Conference

Gold Shovel Standard Effectiveness

• 222 Gold Shovel Certified companies

• 37% Reduction in 2nd Party Dig-ins since inception

Page 9: 8th Annual Supplier Conference

Gold Shovel Standard

Universal Acceptance

Honor your current Gold Shovel Certification

Gold Shovel Standard integrates with other systems

Integration with systems

Page 10: 8th Annual Supplier Conference

Thank you.

Page 11: 8th Annual Supplier Conference

Contractor Safety Overview

Diane Thurman,

Director, Standards and Program (SH&E)

Mike Meko,

Director, Nuclear Supply Chain

Page 12: 8th Annual Supplier Conference

Kern Power Plant Fatal Injury

Contractor fell from an elevated

lift while working on the

demolition of a fuel storage tank

One fatality

CPUC - Kern Order Instituting

Investigation (OII) resulted

Kern Power Plant Serious

Injuries

The flying debris from an

explosion / implosion during the

demolition of the Plant sent

shrapnel into a group of onlookers

One man was seriously injured and

four other people were injured

San Bruno Gas

Explosion

A 30-inch (76 cm) diameter

steel natural gas pipeline

exploded into flames

Eight deaths

$1.4B penalties

A Few Unforgettable Events

9 SEP

2010

19 JUN

2012

3 AUG

2013

Page 13: 8th Annual Supplier Conference

PG&E’s Contractor Safety Journey

2015

CPUC

Agreement

Transition

from PICS to

ISNetworld

(ISN)

Includes all

Prime

Medium/High

risk service

suppliers by

the end of

the year

2014

Enterprise-wide

implementation

with all

portfolios

Focus on Prime

suppliers

providing High

Risk services

2013

Pilot Year

with Power

Generation

2016

Program

expands to

include all

sub-

contractors

that provide

Medium/High

risk services

Must be pre-

qualified in

ISN by the

end of 2016

Page 14: 8th Annual Supplier Conference

Program Defined: Four Elements of the Contractor Safety Program

.

. .

Contractor

Pre-

Qualification

Contract

Terms

Post Job:

Evaluation of

Safety

Performance

Jobsite

Contractor

Oversight

Qualifies

contractors to

work for PG&E

that meet

Sourcing, LOB

and Safety

standard

Clearly

communicates

contract terms

that hold

contractors

accountable for

safety

Enhances the

Company’s

site specific

safety

Evaluates

Contractor

Safety

Performance

Page 15: 8th Annual Supplier Conference

• Risk determination based on Scope of Work

• Contractor’s work that meet PG&E’s definition of “High” and “Medium” risk proceed to next step

• Assess contractor based on standardized performance criteria or “Acceptance Criteria”

• Contractor’s rating based against industry classification

• Assign a grade as “A” and “B” (Approved) or “C” and “F” (Not Approved)

• Verify contractor performance criteria on an annual basis

• Sourcing informs LoB that a contractor has not met pre-qualification criteria with 2 options:

• (1) Contractors will no longer be allowed to do business with PG&E

• (2) Establish a formal Governance Process to monitor the safety performance of the contractor

Contractor Pre-Qualification Process

Third-Party

Administrator

Governance

Process

Supplier

Risk Rating

Page 16: 8th Annual Supplier Conference

• Pre-Qualification Process

• Roles & Responsibilities

• Third-Party Administrator

• Governance Process

• Contract Terms: Clearly communicates contract terms that hold contractors accountable for safety

• Standardized reporting protocols for incident notifications and required timely causal or root-cause analysis and corrective actions with due dates

• Align PG&E safety standards or best practices with contractors’ work

• Enhances the Company’s site specific safety

• Evaluation of Safety Performance: Evaluates Contractor Safety Performance

Contractor Safety Program Processes

Contract Terms

Contractor

Oversight

And

Post Job

Evaluation

Contractor Safety

Prequalification

Page 17: 8th Annual Supplier Conference

Sub-Contractors Our required goal for 2016 is enrollment of sub-contractors.

It is the Prime Contractor’s responsibility to: List all Sub-Contractors performing work on PG&E projects.

Evaluate ALL Sub-Contractor Safety Risk Level (Low, Medium, or High).

Facilitating registration of ALL Sub-Contractors identified as Medium and High in ISNetworld (http://www.isnetworld.com).

Review and verification of Safety Performance to ensure we have the best in the industry performing services on PG&E Assets

Contractor Oversight Contractors are required to maintain effective oversight of work

crews.

Changes in project work scope require evaluation ensuring

compliance with contractor safety agreement and if necessary

addition of modifications to existing measures.

Each Line of Business will develop and approve contractor

oversight procedures by end of 2015, and will implement their

contractor oversight procedures by end of 2016.

Incorporate enhanced standard contract terms to address contractor safety into all existing

contracts that have high or medium risk contractor safety tasks included the scope of work.

Change Orders

Page 18: 8th Annual Supplier Conference

2015 Supplier Conference

GENERATION OVERVIEW

Nuclear & Power Generation

Michael L. Jones

Vice President, Power Generation

Page 19: 8th Annual Supplier Conference

ITEMS TO DISCUSS

19

•What we Value

•2015 Successes: DCPP, HBPP and Hydro

•2016 and Beyond – Work and Future

Opportunities: DCPP, HBPP and Hydro

Page 20: 8th Annual Supplier Conference

WHAT WE VALUE

20

•Safety

•Collaboration

•Reliability

•Quality Work & Work Products

•On plan and on budget

•Total Cost of Ownership and First Cost

•Supplier Diversity

Page 21: 8th Annual Supplier Conference

2015 SUCCESSES – DIABLO CANYON

21

•1R19/2R19 refueling outage preparation and execution

•Snubber Replacement Program

•Turbine Maintenance including a rotor replacement

•Implementation of an Integrated Services Supplier (ISS) contract: Engineering,

Construction, Maintenance, Outage and Project services bundled under a

single Contract valued at $50MM in 2015

•Contract for the U2 Main Generator Stator Upgrade: Phase 1 to be Design and

Manufacturing, Phase 2 to be Installation.

•Fukushima FLEX strategy support

•Completion of ISFSI Loading Campaign of 8 casks

•Physical Security Enhancements

•Cyber Security Project kickoff

•Supplier Diversity Performance at 27.3% out of a 22.9% EOY Target

•Fuel Handling Bridge Crane Upgrades

Page 22: 8th Annual Supplier Conference

Diablo Canyon Low Pressure Turbine Swap

Page 23: 8th Annual Supplier Conference

2015 SUCCESSES – HUMBOLT BAY

DECOMMISSIONING

23

•Recipient of The Shermer L. Sibley Safety & Health Award, PG&E’s

highest safety award.

•Completed Reactor Pressure Vessel Segmentation and Removal

•Demolition of Liquid Radwaste Building to Grade

•Started Cutter Soil Mix (CSM) wall construction

•Spent Fuel Pool (liner removed, surfaces coated, and water drained)

•HBPP #3 Refueling Building systems and components removal achieved

“Open Air Demolition” status

•Implemented Earned Value Management system for CB&I work scope

•Completed 50% of Discharge Canal remediation

•Submitted HBPP Final End State Permit to California Coastal Commission

•Hosted IAEA R2D2 Workshop at HBPP on Final Status Surveys

Page 24: 8th Annual Supplier Conference

2015 SUCCESSES – HUMBOLT BAY

DECOMMISSIONING

24 Reactor Pressure Vessel Segmentation, Horizontal Saw Fixture

Page 25: 8th Annual Supplier Conference

2015 SUCCESSES – HUMBOLT BAY

DECOMMISSIONING

25

BG-50 and BG-40 CSM Wall installation

around Unit 3 Building

CSM Wall Batch Plant and Unit

3 Building

Discharge Canal

Page 26: 8th Annual Supplier Conference

2015 SUCCESSES – HYDRO

26

•Recipient of the Margaret Mooney Award for Innovation for the Helms

Rotor Replacement Project

•Generator Rewind Bundle: Comprised of 8 projects totaling $23M in

base spend and another $20M in optional Work. Benefits include over

$7M in cost savings and 30% supplier diversity commitment.

•Helms Pumped Storage Plant Rotors Replacement Project – 3 new

400 MW units replaced on schedule and under budget

•Commissioned 2 units at Rock Creek Powerhouse totaling 120 MW

•Developed Outage Management Planning through 2020

•Created new Planning Organization to Partner with Project Execution

•Awarded Fall Canal capital improvements project

Page 27: 8th Annual Supplier Conference

Helms Pumped Storage Rotor Replacement Project

Page 28: 8th Annual Supplier Conference

2016 and Beyond – Work and Future

Opportunities

28

Page 29: 8th Annual Supplier Conference

2016 FUTURE OPPORTUNITIES – DIABLO CANYON

29

•Reverse Osmosis Water Filtration System

•Capital Facility Improvements

•Cranes and Fuel Handling

•Chemistry Upgrades

•Intake Equipment, Pumps & Motors

•More than 40 Facilities Maintenance Contracts with

individual Contractors available for bundling under the

ISS in 2016

Page 30: 8th Annual Supplier Conference

2016 FUTURE OPPORTUNITIES – HYDRO

30

Exciter Bundle Buy (2016-2020) • 23 Units in one procurement: $10M -$12M in equipment cost

• Standardized Scope of Work: Replace existing exciters with either full

static or pilot excitation

• Packaged Services: Equipment design, fabrication, delivery, support to

installation & commissioning, spare parts, training (Does not include

installation)

Governor Bundle Buy (2016-2020) • 23 Units in one procurement: $5M -$7M in equipment cost

• Standardized Scope of Work: Replace existing digital controls or replace

mechanical controls with digital controls

• Packaged Services: Equipment design, fabrication, delivery, support to

installation & commissioning, spare parts, training (Does NOT include

installation)

Page 31: 8th Annual Supplier Conference

2016 FUTURE OPPORTUNITIES – HYDRO

31

Page 32: 8th Annual Supplier Conference

BREAK

Page 33: 8th Annual Supplier Conference

Supply Chain Responsibility: Building a Diverse, Sustainable and Ethical Supply Chain

2015 Supplier Conference

Joan Kerr

Director, Supply Chain Responsibility

Page 34: 8th Annual Supplier Conference

The Year(s) of the Prime

Page 35: 8th Annual Supplier Conference

Ethical Supply Chain

Leadership

Environmental

Leadership

Supplier Diversity

Leadership

PG&E Supplier Requirements:

Supply Chain Responsibility

Page 36: 8th Annual Supplier Conference

It’s a Shared Commitment

PG&E

Prime

Suppliers

Diverse

Businesses

Page 37: 8th Annual Supplier Conference

Supplier Diversity

more than 40% attributed to

Prime Suppliers

Direct DBE60%

Subcontracting30%

Business Solution

Partnerships / VARs

10-20%

Prime Supplier Program

40%+

Supplier Diversity Results Breakdown

PG&E spent $2.1 billion with DBEs in 2014

Page 38: 8th Annual Supplier Conference

Environmental Sustainability

PG&E’s supplier participation in

industry sustainability

benchmarking for 4th consecutive

year

PG&E recognized as the top contributor

to supply chain sustainability in the

utility sector

100%

Page 39: 8th Annual Supplier Conference

Supplier Ethics & Code of Conduct

Ethical Supply Chain

Economic Vitality

Better Business Solutions

Customer Satisfaction

Sales Enablement

67% of our top suppliers signed acceptance YTD

Page 40: 8th Annual Supplier Conference

All. In.

Supply Chain Responsibility

Page 41: 8th Annual Supplier Conference

Supplier Quality Assurance

Jim Adamson

Director, Supplier Quality Assurance

Page 42: 8th Annual Supplier Conference

Engaging With Suppliers

How Supplier Quality partners with you to achieve the requirements:

Safe, Reliable, and Affordable Material To assure material functions safely, Quality requirements are based on Design specs.

Reliability of Transmission/Distribution systems is dependent on quality materials

Quality enables affordability through reduced scrap, rework, & production expediting

Qualify New Suppliers, Manufacturing Sites, and Material QMS Audit Program surveys potential suppliers for ability to meet our requirements

QMS Program routinely audits current supplier sites for compliance to maintain our QSL

SQA Program conducts material qualifications for new designs and process changes

Supplier Change Control Requests (SCR) Process supplier change requests that affect fit, form, or function of procured material

This includes change in manufacturing site location, change in sub-suppliers, a two year

break in production, and changes to key manufacturing equipment.

We perform site qualification and PPQP (PG&E Part Qualification Plan)

Page 43: 8th Annual Supplier Conference

Engaging With Suppliers

How Supplier Quality partners with you to achieve the requirements:

Supplier Corrective Action Request (SCAR) Warning and “containment” if there is a material problem

Corrective action (SCAR) that identifies and corrects discrete and systemic

problems

Timely Return Material Authorization (RMA) number when PG&E needs to return

discrepant material

Receiving Inspection & Issue Resolution

Standardized plan and contacts for timely onsite material sorting by supplier

Documented results for material sorting and proper re-identification of material

inspected

Material Quality & KPI Metrics Supplier trends safety incidences (Near Hit, Event) and proactively addresses

required improvements

Supplier’s trends internal quality rejects for Receiving, In-Process, Final Inspection,

& PG&E identified

Supplier’s Corrective Action Program documents the improvement plan for all non-

conformances

Page 44: 8th Annual Supplier Conference

Rating our Suppliers

How We Rate Suppliers:

DPPM: At or below requirement each month

Audits / SCARs: Adequate, timely response with no repeated issues

Qualifications & Change Control (SCR) : Adequate, timely &

transparent

Communication: Proactive notification of significant quality events

Scorecard Impact on Sourcing:

Future allocations are dependent on the supplier’s score.

If requirements are not maintained it may lead to supplier probation

and the product line being diverted to alternate suppliers that are

meeting the requirements.

Page 45: 8th Annual Supplier Conference

Requirements

PG&E Audit for compliance

to ISO 9001 or equivalent

Record Retention

Qualification Process

Sub-Supplier Control

Change Management

Notification

Post Qualification reporting

http://www.pge.com/en/b2b/purc

hasing/suppliers/index.page

T&Cs in Purchase Order

Supplier Qualification Manual

45

Page 46: 8th Annual Supplier Conference

Jim Adamson

Director

Randy Roberts

Electric / Hydro / Solar

SQA Manager

SQA Engineer

Matthew

SQA Engineer

Arden

SQA Engineer

Derrick

SQA Engineer Minh

SQA Engineer Curtis

SQA Engineer Lenny

Ashikur Khan

Gas

SQA Manager

SQA Engineer

Rigo

SQA Engineer

Antonio

SQA Engineer

Leo

SQA Engineer John

SQA Engineer Jerome

SQA Engineer Sidney

Kevin Tasselmyer

QMS Audits & Compliance SQA Manager

QMS Expert

Gene

QMS Auditor

David

QMS Auditor Jim

QMS Auditor Alxious Bailey

Quality Records, Clerks (Pilar,

Roxanne, Yasmin)

Ramon Ware

QC Inspection SQA Manager

Source Inspector Principle

Paul

Source Inspector

Rick

Source Inspector Parmjit

Source Inspector Tom

Source Inspector Scott

Receiving Inspectors Ariel,

Jaclyn, Lois, Marshall, Peter, Ray

Contracted Inspection Services

Director

Admin

Key

35 2015 SQA Staff

9 Contracted Services

Supplier Quality Assurance

Page 47: 8th Annual Supplier Conference

Material Quality

• 92% Reduction in Material Defects

• Strong 1st Decile performance in Benchmarking

• Rated as Utility Industry Leader for Supplier Quality Programs

Value to LOB

• Qualified supply of nine new material technologies

• Quality programs assure material is 99.84% defect free

• $24M (50% YoY) of PG&E cost eliminated

Suppliers

• Supplier Mentoring - Worst to Best • Invested in automated equipment & new advanced facilities

• Three achieved Zero DPPM & up to 10 months in a row

Sourcing

• Improved Security of Supply – added 10 suppliers globally

• New scorecard algorithm for enhanced annual business review

• Driving the industry to one standard through benchmarking

Results of Supplier Quality Programs

Page 48: 8th Annual Supplier Conference

Best in Class Performance & Improving

19,507

5,593

2,459

393

4,196

1,887

889

2,456 2,126

919 1,017 955

1,959

- -

1,621

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

2012 2013 2014 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 YTD

All DPPM

DPPM 12 Mo Average

99.84% Defect Free

4th – 20,800

3rd – 10,100

1st – 4,200

Performance Benchmark

Quartiles

2nd – 6,000

2,500

Page 49: 8th Annual Supplier Conference

Driving the Industry to One

Standard Through Benchmarking

Sourcing • Sourcing Cost as a % of Managed Spend

• Sourcing Effectiveness (Savings as % of Managed Spend)

• Hard Saving (Tier I/II as a % of Spend)

• Return on Investment (ROI)

• Accounts Payable – AP personnel cost as a % of

Managed Spend

• Non-competitively bid spend as a % of managed spend

Warehousing • Bundle Fill Rate

• Number of Active Suppliers or Active Suppliers Per $1M

Spend

• Total lines per material handler

• Warehouse cost per line

• Inventory Turns

• Materials returned to inventory – count & dollar amount

(Material Utilization)

Supplier Diversity • % of Supplier Diversity Spend

SQA • % Defective parts per million (DPPM)

Safety • Contractor Safety – DART rate

• Contractor Safety –Lost Work Day Rate (LWDC)

Workforce Composition • Number of employees per $1B of Managed Spend

Benchmarking Metrics

49

Page 50: 8th Annual Supplier Conference

SAP Qualified Supplier List (QSL)

• Access to approved sites & products

• Audit schedule for site re-qualification

• Tracking of QMS non-conformances

• 1,100+ Suppliers & Sub-Suppliers

• 85 Site Audits in 2015 - BIC

50

Page 51: 8th Annual Supplier Conference

Vision for Material Quality - 2016

5,252

2,131 1,800 1,650

9,735

5,013

2,000 1,750

0

3,000

6,000

9,000

2012 2013 2014 2015 2016

Actual & Forecasted 2016 Objective

Gas Electric

2. SQA department ISO9001 Certification 2016 - Q1

3. Number of MC Ranked Critical Increases 2016 - Q1

4. Supplier Change Control System (eSCR) 2016 - Q4

1. DPPM 19,507

Page 52: 8th Annual Supplier Conference

Supplier Change Request System

Supplier submits

eSCR

SQA receive process,deg

n change, recall

Engineering approves /

rejects

M&C/GC approves /

rejects

MH approves rejects

Sourcing approves

rejects

SQA responds w/ qualification requirement

SAP holds Record of

change

eSCR

Web interface with SAP

1. Change Manufacturing Process or Design

2. Transfer production

3. Material Recall

• Documentation

complete, drives weekly

X Functional meetings

• Requires new tools, work

procedures, added steps

• Purge cost, use old design first

• Record even without MC change

• Record of Material Recall

• Confirmation change

meets spec / std

• Meets design intent &

system capable

• Require new PO or affect

Project Schedule?

Page 53: 8th Annual Supplier Conference

Question & Answers

Safety

Reliability

Affordability

Team Work is the Enabler

Page 54: 8th Annual Supplier Conference

Electric Overview

Tom Wright Director, Substation Maintenance & Construction

December 4, 2015

Page 55: 8th Annual Supplier Conference

Electric Organization

Electric Business & Performance Management (Strategic Direction & Coordination, Work Planning, Continuous Improvement, Metrics &

Governance)

Transmission Operations

• Construction of new transmission & substation assets in accordance with California Independent System Operator (CAISO)

• Consolidated Grid Operations

• Line & Substation Maintenance

• Transmission System Automation

Distribution Operations

• Customer Service Delivery, Restoration & Operations, Overhead / Underground Construction, Maintenance, Estimating, Customer Interface

Catastrophic Emergency Preparedness

• Enterprise Infrastructure Risk Mitigation

• Logistics & Mutual Aid

• Asset Damage Modeling

Asset Management (System Data Capture)

Asset Management • System Safety

• Asset Strategy

• Operational Risk and Compliance

• Central Engineering and Standards

Exe

cu

tio

n

Work Type Orientation

President

Electric

Geisha Williams

Electric Strategy & Asset

Management

• System Safety

• Reliability Strategy

• Asset Strategy

• Operational Risk & Compliance

• Central Engineering, Mapping & Standards

• Know our

customers,

provide them with

simple/proactive

service.

• 6.1 Million

Residential

customers served,

11,000 large

commercial &

industrial, &

360,000 small &

medium business

customers

• 12 Energy

Efficiency savings

programs

• 10 million meters

read, deployed >9

million SmartMeters

Dir

ectio

n

Power Generation &

Nuclear

Power Generation • Provides

approximately 5,400 MW Capacity of Utility Owned Generation through our Hydro, Fossil & Renewable Power Plants

Nuclear

• Diablo Canyon Power Plant: leading nuclear power plant in the country; only operational nuclear plant in California

• Two reactors totaling 1,100 MWe producing ~18,000 GWh of electricity.

Energy Policy & Procurement

• Manages the electric and gas portfolio to ensure reliable energy supply while reducing costs and risk

• Provides safe, reliable, and reasonably priced electricity and natural gas to our customers in an environmentally sensitive manner

• Monitor future policies and market structures to benefit customers and protect interests of shareholders

Electric Strategy

& Asset

Management

Pat Hogan

Customer Care

Laurie

Giammona

Electric Transmission &

Distribution Operations

Greg Kiraly

Electric Business

& Performance

Management

Bill Arndt

Energy Policy &

Procurement

Fong Wan

Power

Generation &

Nuclear

Ed Halpin

55

Page 56: 8th Annual Supplier Conference

T&D Overview: Electric System

Electric T&D consists of:

• Transmission lines, substations and the distribution system:

‒ 860 substations

‒ 3,200 main line cables

‒ 1.0 million transformers

‒ 2.4 million poles (including towers)

Smart Grid functionality restores the balance Hydro Power Plants

Nuclear Power Plants

Natural Gas Generators

Distribution

Substations

Solar Farms / Power Plants

Wind Farms

Transmission Lines

Utility-scale StorageUtility-scale Storage

Distributed StorageDistributed Storage

Plug-in Electric

Vehicles

Rooftop Solar

Smart

Meters

Smart Grid functionality restores the balance Hydro Power Plants

Nuclear Power Plants

Natural Gas Generators

Distribution

Substations

Solar Farms / Power Plants

Wind Farms

Transmission Lines

Utility-scale StorageUtility-scale Storage

Distributed StorageDistributed Storage

Plug-in Electric

Vehicles

Rooftop Solar

Customers

Smart

Meters

Electric T&D Network

56

‒ 5.4 million electric customers

‒ 70,000 square mile service area

‒ 18,600 miles of transmission lines

‒ 143,000 miles of distribution lines

Page 57: 8th Annual Supplier Conference

Electric T&D

SVP Electric Distribution Operations – Greg Kiraly

VP Transmission Operations – Gregg Lemler

Central Coast Region Electric

Ben Almario

San Jose/De Anza

Mission

Peninsula

Central Coast

Los Padres

Restoration & Control Mark Quinlan

Bay Area Region

Central Coast Region

Northern Region

Central Valley Region

Dispatch

GC Electric Chris Baker

Bay Area Northern

Central Coast Central Valley

Bay Area Electric

Andy Dashner

San Francisco

East Bay

Diablo

North Bay

Electric Distribution Business Operations

Jessica LaPonsey

Work & Program Mgmt

Work Methods & Training/Qlty Mgmt

Project & Contract Mgmt

Performance Mgmt

State Infrastructure Projects

Central Valley Region Electric

Jeff Deal

Stockton

Yosemite

Fresno

Kern

Northern Region Electric

Tony Mar

Humboldt

North Valley

South Valley

Sacramento/Sierra

Customer Service Delivery

Mike Kress

Central (RMC)

Service Planning North

Service Planning South

Performance & Compliance

Transmission Lines M&C

Robert Cupp

T-Line Maint–North

T-Line Maint –South

T-Line Constr–South

T-Line Constr–North

Substations M&C

Tom Wright

Bay Area

North Coast

North Valley

South Valley

Central Coast

Subst Const Inspections

Work Management

Transmission Business Operations

Vanita Chhabra

Transmission Portfolio Management

Work & Resource Management

Work Methods & Procedures

Contract Management

Compliance & Quality

57

Page 58: 8th Annual Supplier Conference

Electric Transmission and Distribution – Delivering Today and Enabling Tomorrow

Integrated Planning Workforce Strategy Optimized Technology Continuous Improvement

Customers Enhance technology choice

& flexibility

Increase customer

satisfaction

For our

Optimize

capital and

expense spend

Drive

continuous

improvement

mindset

Safe

First quartile public & workforce safety performance

Continue to meet

compliance

obligations

Reliable

First quartile

reliability

Effective

response to

catastrophic

emergencies

Support a flexible electric resource portfolio

Clean Affordable

Grid of Things

58

Page 59: 8th Annual Supplier Conference

What is NERC CIP?

Critical Infrastructure Protection

o A series of Reliability Standards designed to protect physical and cyber assets critical to The Electric Grid.

Purpose o Grid Reliability, Operability, and Security

Examples of NERC CIP facilities / assets

o Grid Control Centers o Transmission Substations o Servers o Relays o Controllers / Printers

Cyber Attacks by U.S. Adversaries o In 2014, the Director of the NSA (National Security Agency), Michael Rogers,

stated publicly what has always been known privately…

“China, as well as, one or two other countries “is capable of

launching cyber-attacks to shut down the Electric Grid and other critical infrastructures in the United States”

59

Page 60: 8th Annual Supplier Conference

Why is There a Need for Critical Infrastructure Protection?

Increased Cyber Warfare Nation-States

– Advanced Persistent Threat (APT)

• Espionage Cyber Attacks

• Based Disruption Cyber Attacks

• Destruction Cyber Attacks

60

Page 61: 8th Annual Supplier Conference

Why is Critical Infrastructure Protection Needed?

National Cyber and Physical Incident Trending Industrial Control Incidents Reported to DHS ICS-CERT 2014

PG&E: In the Month of October 2014

• 7.5 Million suspicious e-mails sent to our network

• Over 600 suspicious cyber events

• 11 cyber espionage events

61

Page 62: 8th Annual Supplier Conference

Electrification

Technology declining costs & improving capabilities

• Smart grid technology has been rolled out at an increasing number of utilities

Energy efficiency continues to improve with new technology

• Steady lifecycle upgrades to newer appliances yielding reduction in energy needs with no loss of lifestyle changes

Visible Trends Underlying Trends

Visible and Underlying Industry Trends

Renewable Resource Penetration

Distributed Generation

• PG&E territory ideal for rooftop solar - 30% of nationwide rooftop solar in PG&E service territory and growing significantly

– As of Q1 2013, 1361 MW of DG is currently installed in our service territory, a 27% increase from the previous year

• Increasing number of DG developers are moving downstream from Transmission wholesale into Distribution wholesale DG market

Transmission

• Large number of generation interconnects to meet RPS requirements

• Continuing high RPS requirements may push up customer costs

Utility business model of shared costs across customers is coming under increasing pressure

• Factors such as DG penetration is starting to lead to an inequitable distribution of costs among customers

• Desire to reduce GHG levels is leading to electrification of:

– Transportation - Scooters, Cars, Caltrain, High Speed Rail, Port of Oakland

– Heating and Cooling - Residential, Commercial and Industrial Buildings

– Pumping - Diesel Pumps

Transmission Competition

• FERC Order 1000 removed incumbent Right of First Refusal for certain transmission (ET) projects

• CAISO Tariff codifies structure of ET competition in CA

• Multiple new entrants interested in developing ET projects in CA

• New entrants advocating to expand scope of ET projects open to competition

62

Page 63: 8th Annual Supplier Conference

Electric Financial Profile: Expense 2015-2020

• 2016 reduction of $385M or -22% from 2015 driven by the new Cost Model change; support organizations will manage their own budget and not be included in core LOB standard rates, increasing visibility and accountability

• Total expense increases from $1.34B in 2016 to $1.57B in 2020; an increase of $230M or 17%, primarily driven by:

• $72M in Customer Care due to an increase across Customer Operations, Services, and CES

• $62M in Electric Distribution due to increase in overhead and underground maintenance work

• $48M in Nuclear Generation due to double refueling outages

• $31M in Power Generation due to Hydro

63

Page 64: 8th Annual Supplier Conference

Electric Financial Profile: Capital 2015-2020

• 2016 budget flat to 2015 irrespective of the new Cost Model change due to support organization costs that are not included in core LOB standard rates allocated back as overheads for rate base and revenue requirements

• expense = reduction in budget due to support costs removed and not allocated back as overheads

• capital = budgets relatively flat due to support costs allocated back as overheads

• Total capital increases from $3.26B in 2016 to $3.587B in 2020; an increase of $313M or 10%, primarily driven by:

• $315M in Electric Distribution due to new “Grid of Things” investments such as energy storage, Smart Grid VVO, and sensors

• $57M in Electric Transmission due to Capacity, Competitive Trans Projects and HSR

• Partially offset by reduction in Generation ($68M) primarily due to Hydro

64

Page 65: 8th Annual Supplier Conference

Gas Operations Overview 2015 Supplier Conference

Kcammee Vreman

Director

Project Governance and Controls

December 4, 2015

Page 66: 8th Annual Supplier Conference

Contents

• About Gas Operations

• PG&E Gas System Profile

• Gas System and Gas Operations

• Operation Plan

• Supplier Opportunity

• Q&A

Page 67: 8th Annual Supplier Conference

About Gas Operations

Gas Operations is on a mission to become the safest, most reliable gas

company in the U.S. As a whole, Gas Operations is responsible for all aspects

of PG&E’s gas distribution and transmission operations, including planning,

engineering, maintenance and construction, restoration and emergency

response.

Gas Operations

Asset & Risk Management Financial & Resource

Management Engineering, Construction,

and Operations

• Asset Knowledge

Management

• Integrity Management

• Standards and

Procedures

• Technology R&D and

Innovation

• Training &

Implementation

• Contract Management

• Investment Planning

• Quality Assurance &

Quality Control

• Risk Management

• Strategy & Process

Excellence

• Workforce Strategy &

Resource Management

• Engineering & Design

• Major Projects &

Programs

• Gas T&D Operations

• Gas T&D Construction

• Gas Systems

Operations

• Process Safety

Management

Page 68: 8th Annual Supplier Conference

PG&E’s Gas Infrastructure

Includes:

6,700 miles of transmission

pipeline operating above 60

psig

42,000 miles of gas

distribution mains

Deliver 2.3 BCF each day on

average

4.3 million natural gas

customer accounts

Gas Training Facility in

Winters

PG&E Gas System Profile

Page 69: 8th Annual Supplier Conference

Gas Operations Key Focus Areas

• Execute critical gas work

• Complete regulatory and legal proceedings as soon as possible

Resolve Gas Issues

• Multi-year planning

• Continuous Improvement

• Corrective Action Program (CAP)

Position the Company for Success

• Drive quality at all levels

• Strengthen local presence

Partner Effectively

Asset Classes

• Transmission Pipeline

• Distribution Mains

• Distribution Services

• Compression and

Processing

• Measurement and

Control

• Customer Connected

Equipment

• Storage

• CNG/LNG

Page 70: 8th Annual Supplier Conference

Regulatory Update

General Rate Case –CPUC final decision issued August 14, 2015

Gas Transmission Rate Case – filed December 19, 2013

(Decision Pending)

“Our plan to invest in 21st century infrastructure will serve

customers by helping PG&E become one of the safest and

most reliable gas utilities in the country. Our detailed filing

identifies the risks, sets clear priorities, and lays out the

work that needs to be done to modernize our system to

meet some of the strictest safety standards in the nation.”

--Nick Stavropoulos, Executive Vice President of PG&E for Gas

Operations

Page 71: 8th Annual Supplier Conference

Work Category 2015 YTD Complete

2015 EOY Forecast 2015-17*

Trans’n. Pipe Replacement

13.7 miles 14.1 miles 60 miles

Strength Testing 62.1 miles 72.8 miles 510 miles

Dist’n. Main Replacement

21.6 miles 27 miles 75 miles

Plastic Main Replacement

45.9 miles 52.5 miles 130 miles

ILI Upgrades 35.4 miles 70 miles 530 miles

ILI Analysis 250.4 miles 268 miles 1000 miles

Valve Auto 23 valves 27 valves 120 valves

Station 54 projects 75 projects 250 projects

Gas System Operational Plan

*Amounts reflect planning estimates and are subject to change

Page 72: 8th Annual Supplier Conference

Operational Plan ILI Cont.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2000 2005 2010 2015 2020 2025

% P

igg

ab

le

Year

Accelerating ILI

upgrade work

Developments in Traditional ILI technology +

use of Non-Traditional ILI will increase

piggable mileage. Per the 2013

Piggability Study,

12.1% of the system

was identified for

Non-Traditional ILI

Page 73: 8th Annual Supplier Conference

73

Utilization of CNG & LNG

Page 74: 8th Annual Supplier Conference

Line 300B Rupture in Bakersfield

Rupture Site

Damaged Joint of

Pipe Removed

Ground wetness is

spray from rupture

3

Page 75: 8th Annual Supplier Conference

Valve Automation Edgewood

Page 76: 8th Annual Supplier Conference

Supplier Opportunity Contractors will continue to play a critical role in how PG&E plans to meet its commitments

2015 Spend by Work Breakdown

Structure

66%

5%

5%

8%

14%

1%

Construction

Engineering

Environmental

Materials

PM / CM &Support

All Other

Page 77: 8th Annual Supplier Conference

Supplier Opportunity

Contracted services will continue to span PG&E’s service area.

2015 Regional Spend 11%

35%

24%

30% Bay

Ctr Cst

Ctr Vly

North

Page 78: 8th Annual Supplier Conference

Supplier Opportunity

Improve Quality

Work Safely and Share Best Practices

Drive Operating Efficiencies

Alleviate Capacity Constraints

Promote Supplier Diversity

Page 79: 8th Annual Supplier Conference

Q&A

Page 80: 8th Annual Supplier Conference

December 4th, 2015 Yusuf Ezzy Senior Manager, SuperFit IT

Information Technology Leading the Way to a SuperFit, Digital Utility

Page 81: 8th Annual Supplier Conference

For Internal Discussion Purposes Only

“PG&E” and “IT”….

…really???

Page 82: 8th Annual Supplier Conference

For Internal Discussion Purposes Only

Cybersecurity

The Digital Utility through SuperFit IT

The “Digital Utility” is about digitizing everything we do along PG&E’s value

chain, from Dynamic Energy Resources, to “smarter” grids and pipelines, to effective

field operations, to empowering more sophisticated customers, to optimizing the

back office, and more.

Intelligent Back Office

Automated SmartGrid/ Pipelines

Dynamic Portfolio Planning Prosumer Asset

Optimization

Mobile Workforce

Optimization

Dynamic Portfolio Planning

Automated SmartGrid/Pipelines

Page 83: 8th Annual Supplier Conference

• All eyes across the enterprise are on IT to deliver

Houston…we have a Challenge

• This means new technology and new spend

• IT will need help to realize the vision

Page 84: 8th Annual Supplier Conference

Let’s Not Forget…

Safe

Reliable Affordable

…Digital Utility

Page 85: 8th Annual Supplier Conference

How Can Our Suppliers Help?

Safe

Reliable Affordable

• Cybersecurity we want safe,

secure products and services for us

and our customers

• Help us enhance PG&E’s focus on

Safety. Eg Gas detection leak

technology, mapping / asset

management technologies

• More effective screening and

background checks of resources

coming to work at PG&E

Page 86: 8th Annual Supplier Conference

How Can Our Suppliers Help?

Safe

Reliable Affordable

• Stop selling to us without showing us

the value. No bells and whistles

please!

• Offer better, more cost-effective ways

to manage contract resources

• Always keep the frame of reference of

reducing spend for our customers

• Help us reduce time-to-market for

technology programs/projects

Page 87: 8th Annual Supplier Conference

How Can Our Suppliers Help?

Safe

Reliable Affordable

• PG&E is becoming more of a

technology company

• Direct linkage between reliability of

your products and services with

reliability of PG&E’s products and

services

• We are looking for stable, tested

solutions

Page 88: 8th Annual Supplier Conference

Thank you

Page 89: 8th Annual Supplier Conference

Moderator: Ben Moglen

Director, Supply Chain Strategy & Operations

Supplier Panel 2015 Award Winners

Page 90: 8th Annual Supplier Conference

2015 Supplier Panel

Dale Lappe

Program Manager Kevin Comerford

Vice President of Sales

Greg Cederstrom

President John Wilpert

Director of Operations

Page 91: 8th Annual Supplier Conference

Closing 2015 Supplier Conference

Gun Shim

Vice President, Supply Chain Management