Method statement
Composite formwork beams
7/27/2019 999804102_2011_10_online
2/20
2 999804102 - 10/2011
Introduction User information Composite formwork beams
The Formwork Experts
Introduction
by Doka Industrie GmbH, A-3300 Amstetten
7/27/2019 999804102_2011_10_online
3/20
User information Composite formwork beams Introduction
3999804102 - 10/2011
The Formwork Experts
Contents
4 Introduction
4 Elementary safety warnings
6 Doka services
8 Eurocodes at Doka
99 Product description
10 Instructions for assembly and use
12 Technical condition
15 Transporting, stacking and storing
16 Component overview
http://-/?-http://-/?-7/27/2019 999804102_2011_10_online
4/20
4 999804102 - 10/2011
Introduction User information Composite formwork beams
The Formwork Experts
Introduction
Elementary safety warnings
User target groups
This User Information booklet (Method Statement) isaimed at everyone who will be working with the Dokaproduct or system it describes. It contains informa-tion on the standard design for setting up this sys-
tem, and on correct, compliant utilisation of the sys-tem.
All persons working with the product describedherein must be familiar with the contents of this man-ual and with all the safety instructions it contains.
Persons who are incapable of reading and under-standing this booklet, or who can do so only with dif-ficulty, must be instructed and trained by the cus-tomer.
The customer is to ensure that the information mate-rials provided by Doka (e.g. User Information book-lets, Instructions for Assembly and Use, OperatingInstruction manuals, plans etc.) are available to all
users, and that they have been made aware of themand have easy access to them at the usage location.
In the relevant technical documentation and form-work utilisation plans, Doka shows the workplacesafety precautions that are necessary in order to usethe Doka products safely in the usage situationsshown.In all cases, users are obliged to ensure compliancewith national OH&S (occupational health and safety)rules throughout the entire project and to take appro-priate additional or alternative workplace safety pre-cautions where necessary.
Hazard assessment The customer is responsible for drawing up, docu-
menting, implementing and continually updating ahazard assessment at every job-site.This document serves as the basis for the site-spe-cific hazard assessment, and for the instructionsgiven to users on how to prepare and utilise the sys-tem. It does not substitute for these, however.
Remarks on this document
This User Information booklet can also be used as a
generic method statement or incorporated with asite-specific method statement.
Many of the illustrations in this booklet show thesituation during formwork assembly and aretherefore not always complete from the safetypoint of view.
Any safety accessories not shown in these illustra-tions must still be used by the customer, in accord-ance with the applicable rules and regulations.
Further safety instructions, especially warnings,will be found in the individual sections of thisdocument!
Planning
Provide safe workplaces for those using the form-work (e.g. for when it is being erected/dismantled,modified or repositioned etc). It must be possible toget to and from these workplaces via safe access
routes! If you are considering any deviation from the
details and instructions given in this booklet, orany application which goes beyond thosedescribed in the booklet, then revised static cal-culations must be produced for checking, as wellas supplementary assembly instructions.
Rules applying during all phases ofthe assignment:
The customer must ensure that this product iserected and dismantled, reset and generally used forits intended purpose under the direction and super-vision of suitably skilled persons with the authority toissue instructions.These persons' mental and physical capacity mustnot in any way be impaired by alcohol, medicines ordrugs.
Doka products are technical working applianceswhich are intended for industrial/commercial useonly, always in accordance with the respective DokaUser Information booklets or other technical docu-mentation authored by Doka.
The stability of all components and units must beensured during all phases of the construction work!
The functional/technical instructions, safety warn-ings and loading data must all be strictly observedand complied with. Failure to do so can cause acci-dents and severe (even life-threatening) damage tohealth, as well as very great material damage.
Fire-sources are not permitted anywhere near theformwork. Heating appliances are only allowed ifproperly and expertly used, and set up a safe dis-tance away from the formwork.
The work must take account of the weather condi-tions (e.g. risk of slippage). In extreme weather,steps must be taken in good time to safeguard theequipment, and the immediate vicinity of the equip-ment, and to protect employees.
All connections must be checked regularly to ensurethat they still fit properly and are functioning cor-rectly.It is very important to check all screw-type connec-tions and wedge-clamped joins whenever the con-struction operations require (particularly after excep-tional events such as storms), and to tighten them ifnecessary.
7/27/2019 999804102_2011_10_online
5/20
User information Composite formwork beams Introduction
5999804102 - 10/2011
The Formwork Experts
Assembly
The equipment/system must be inspected by thecustomer before use, to ensure that it is in suitablecondition. Steps must be taken to rule out the use ofany components that are damaged, deformed, orweakened due to wear, corrosion or rot.
Combining our formwork systems with those of othermanufacturers could be dangerous, risking damageto both health and property. If you intend to combinedifferent systems, please contact Doka for advicefirst.
The assembly work must be carried out by suitablyqualified employees of the client's.
It is not permitted to modify Doka products; any suchmodifications constitute a safety risk.
Erecting the formwork
Doka products and systems must be set up in sucha way that all loads acting upon them are safelytransferred!
Pouring
Do not exceed the permitted fresh-concrete pres-sures. Excessively high pouring rates lead to form-work overload, cause greater deflection and riskcausing breakage.
Striking the formwork
Do not strike the formwork until the concrete hasreached sufficient strength and the person in chargehas given the order for the formwork to be struck!
When striking the formwork, never use the crane tobreak concrete cohesion. Use suitable tools such astimber wedges, special pry-bars or system featuressuch as Framax stripping corners.
When striking the formwork, do not endanger thestability of any part of the structure, or of any scaf-folding, platforms or formwork that is still in place!
Transporting, stacking and storing
Observe all regulations applying to the handling offormwork and scaffolding. In addition, the Dokaslinging means must be used - this is a mandatoryrequirement.
Remove any loose parts or fix them in place so thatthey cannot be dislodged or fall free!
All components must be stored safely, following allthe special Doka instructions given in the relevantsections of this User Information booklet!
Regulations; industrial safety
Always observe all industrial safety regulations andother safety rules applying to the application and uti-lisation of our products in the country and/or regionin which you are operating.
Instruction as required by EN 13374:
If a person or object falls against, or into, the edge
protection system and/or any of its accessories, theedge protection component affected may only con-tinue in use after it has been inspected and passedby an expert.
Maintenance
Only original Doka components may be used asspare parts. Repairs may only be carried out by themanufacturer or authorised facilities.
Symbols usedThe following symbols are used in this booklet:
MiscellaneousWe reserve the right to make alterations in the interestsof technical progress.
Important note
Failure to observe this may lead to malfunc-tion or damage.
CAUTION / WARNING / DANGER
Failure to observe this may lead to materialdamage, and to injury to health which mayrange up to the severe or even life-threaten-ing.
Instruction
This symbol indicates that actions need to betaken by the user.
Sight-check
Indicates that you need to do a sight-checkto make sure that necessary actions havebeen carried out.
TipPoints out useful practical tips.
Reference
Refers to other documents and materials.
7/27/2019 999804102_2011_10_online
6/20
6 999804102 - 10/2011
Introduction User information Composite formwork beams
The Formwork Experts
Doka services
Support in every phase of theprojectDoka offers a broad spectrum of services, all with a sin-gle aim: to help you succeed on the site.
Every project is unique. Nevertheless, there is onething that all construction projects have in common and that is a basic structure with five phases. We atDoka know our clients' varying requirements. With ourconsulting, planning and other services, we help youachieve effective implementation of your formworkassignment using our formwork products in every oneof these phases.
Project development phase Tendering phase Operations scheduling phase
Taking well-founded decisionsthanks to professional advice andconsulting
Optimising the preliminary workwith Doka as an experienced part-ner
Controlled, regular forming oper-ations, for greater efficiencyresulting from realistically calculatedformwork concepts
Find precisely the right formworksolutions, with the aid of
help with the bid invitation
in-depth analysis of the initial sit-uation
objective evaluation of the plan-ning, execution, and time-risks
Draw up potentially winning bids, by
basing them on realistically calcu-lated guideline prices
making the right formworkchoices
having an optimum time-calcula-tion basis
Plan cost-effectively right from theoutset, thanks to
detailed offers
determination of the commission-ing quantities
co-ordination of lead-times andhandover deadlines
1 2 3
7/27/2019 999804102_2011_10_online
7/20
User information Composite formwork beams Introduction
7999804102 - 10/2011
The Formwork Experts
The advantages for you
thanks to professional advice andconsulting
Cost savings and time gainsWhen we advise and support youright from the word "go", we canmake sure that the right formworksystems are chosen and thenused as planned. This lets youachieve optimum utilisation of theformwork equipment, and effec-tive forming operations becauseyour workflows will be correct.
Maximised workplace safetyThe advice and support we cangive you in how to use the equip-ment correctly, and as planned,leads to greater safety on the job.
TransparencyBecause our services and costsare completely transparent, thereis no need for improvisation dur-ing the project and no unpleas-ant surprises at the end of it.
Reduced close-out costsOur professional advice on theselection, quality and correct useof the equipment helps you avoiddamage, and minimise wear-and-tear.
(Shell) construction phase (Shell) completion phase
Optimum resource utilisationwith assistance from the DokaFormwork Experts
Seeing things through to a posi-tive conclusionwith professional support
Workflow optimisation, thanks to
thorough utilisation planning
internationally experiencedproject technicians
appropriate transport logistics
on-site support
Doka Services are a byword fortransparency and efficiency here,offering
jointly handled return of rentedformwork
professional dismantling
efficient cleaning and recondition-ing using special equipment
4 5
7/27/2019 999804102_2011_10_online
8/20
8 999804102 - 10/2011
Introduction User information Composite formwork beams
The Formwork Experts
Eurocodes at Doka
In Europe, a uniform series of Standards known asEurocodes (EC) was developed for the constructionfield by the end of 2007. These are intended to providea uniform basis, valid throughout Europe, for productspecifications, tenders and mathematical verification.
The EC are the world's most highly developed Stand-ards in the construction field.
In the Doka Group, the EC are to be used as standardfrom the end of 2008. They will thus supersede the DINnorms as the "Doka standard" for product design.
The widely used "Permissible stress design" (compar-ing the actual stresses with the permissible stresses)has been superseded by a new safety concept in theEC.
The EC contrast the actions (loads) with the resistance(capacity). The previous safety factor in the permissiblestresses is now divided into several partial factors. Thesafety level remains the same!
Comparison of the safety concepts (example)
Ed Design value of effect of actions(E ... effect; d ... design)Internal forces from action Fd(VEd, NEd, MEd)
Rd Design value of the resistance(R ... resistance; d ... design)Design capacity of cross-section(VRd, NRd, MRd)
Fd Design value of an action Steel: Rd = Rk Timber: Rd = kmod
RkFd = F Fk M M
(F ... force)
Fk Characteristic value of an action"actual load", service load(k ... characteristic)e.g. dead weight, live load, concrete pressure,wind
Rk Characteristic value of the resistancee.g. moment resistance to yield stress
F Partial factor for actions(in terms of load; F ... force)e.g. for dead weight, live load, concrete pres-sure, windValues from EN 12812
M Partial factor for a material property(in terms of material; M...material)e.g. for steel or timberValues from EN 12812
kmod Modification factor(only for timber to takeaccount of the moisture and the duration of loadaction)e.g. for Doka beam H20Values as given in EN 1995-1-1 and EN 13377
Ed
Rd
Permissible stress design EC/DIN concept
Factual Fpermissible Ed Rd
A Utilisation factor
60 [kN]
60
7/27/2019 999804102_2011_10_online
9/20
User information Composite formwork beams
9999804102 - 10/2011
The Formwork Experts
Product description
Doka beam I tec 20Doka beams I tec 20 are solid-web beams made ofwood and derived timber products. They are intendedfor use in wall and floor-slab formwork only.
Other features include:
Timber-plastic composite formwork beam
Long service life ensured by the 'Top' beam-endreinforcement and the plastic sheet on the broadsideof the flange.
Increases load-bearing capacity by approx. 80 %compared to the Doka beam H20
Reduces equipment quantities in both floor and wallformwork
Beam-flange markings in a 50 cm grid for theDokaflex and Dokaflex 30 tec systems
Same overall height and width as Doka beams H20,so compatible with existing Doka systems
Overall height tolerance 1.0 mm, assuming 12% timber moisturecontent.
I tec 20
ApprovalNumber
Z-9.1-773
20
.0
4.
08.0
A Web
B Flange
C Distance-marks on beam-flanges, for Dokaflex system
D System holes
E End-reinforcement
F Notch for chalk line
G I tec sheet
The innovative end-reinforcement on the Dokabeam I tec 20 greatly reduces damage to thebeam-ends.
All standard and custom lengths, from 1.80m
to 5.90m, come fitted with the 'Top' beam-end reinforcement.
Doka beams I tec 20 of over 5.90m and up to12.00m in length are square-cut and treated
with I tec 20 beam-end sealant. If the ends of beams are square-cut at Doka
branches or at jobsites, they must be treatedwith I tec 20 beam-end sealant in order toensure the full lifespan of the beam.
A
B
E
C
D
F
G
7/27/2019 999804102_2011_10_online
10/20
10 999804102 - 10/2011
User information Composite formwork beams
The Formwork Experts
Instructions for assembly and use
Doka beams I tec 20 are formwork beams made ofwood and derived timber products. They are intendedfor use in load-bearing towers and formwork and areloaded in the direction of the height of the beam.
Practical example
In order to maximise durability, it is important to handlethe components with due care; this applies particularlywhen stripping out floor-slab formwork.
Deflection diagram
M ... permitted bending momentQ ... permitted shear forcep ... actual load (service load)
9768-200-01
Technical data:
Permitted bending moment: 9 kNm
Permitted shear force: 20 kN
Rigidity: 640 kNm2
Weight: 5.6 kg/lin.m
These values allow for a F = 1.5, a kmod of 0.9 and aM = 1.3.
Based on a residual moisture content of 20 % or less.The values must be adjusted accordingly if conditionsof use differ.
Deflection[mm]
Support centres L [m]
L
p [kN/m]
30
25
20
15
10
5
0
1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
98036-100
Q
M
L/250
L/500
0.5 kN/m
1
2
2.53
3.54
4.5
5
6
7
8
9
10
12.5
15
20
25
30
1.5
7/27/2019 999804102_2011_10_online
11/20
User information Composite formwork beams
11999804102 - 10/2011
The Formwork Experts
Possible incorrect usages
WARNING
Always position Doka formwork beams"upright".
Correct "upright" positioning(load direction is parallel to web
plane).
Incorrect positioning "turned onside" (load direction at right
angles to web plane).Wall formwork
Floor formwork
WARNING
The uses illustrated below are prohibited, asare other, similar uses!
Do not use as scaffold flooring.
Do not use as traffic-route flooring.
9791
-206
-01
9791
-205
-01
9791
-219
-01
9791
-220
-01
9791
-200
-01
9791
-201
-01
7/27/2019 999804102_2011_10_online
12/20
12 999804102 - 10/2011
User information Composite formwork beams
The Formwork Experts
Technical condition
The following quality criteria define the extent of dam-age permissible in terms of load-bearing strength.
Use is prohibited if damage is beyond these limits.
Flange
Angled cracks (across the grain) Not permissible.
Straight cracks (parallel to the flange)
parallel to flange, permissible up to width a = 2 mm.
If the flange can be parted at the crack the beam isnot in usable condition.
Splintering at side
permissible up to depth a = 10 mm and length b =500 mm on one side.
Angled splintering across the edge
permissible up to a = 30 mm across the diagonal andup length b = 500 mm.
98041-200-01
98041-200-01
98041-200-01
98041-201-01
a
b
98041-201-01
98041-201-01
a
b
98041-201-01
7/27/2019 999804102_2011_10_online
13/20
User information Composite formwork beams
13999804102 - 10/2011
The Formwork Experts
Openings in joints
permissible up to a = 1 mm.
Saw cuts
Superficial saw cuts up to depth a = 2 mm are per-missible.
Flange end
Splintering a up to length = 60 mm is permissible.
Damage to the plastic cap has no effect on load-bearing strength, but beams damaged evincingdamage of this kind do not necessarily meet thequality criteria for Doka rental formwork
Drilled holes
Not permissible, with the exception of system holes:
- Waling attachment with beam screw
- Attachment of table head with beam screw
a ... 15 mmb ... 112 mmc ... 396 mmDrilled-hole diameter max. 10 mm
98041-207-01
a
98041-207-01
9791-209-02
a
9791-209-01
98041-208-01
a
98041-208-01
97
91
-207
-09
98041-203-01
b b
a
98041-203-02
c
a
7/27/2019 999804102_2011_10_online
14/20
14 999804102 - 10/2011
User information Composite formwork beams
The Formwork Experts
Web
Damage to web
permissible only if slight and at one side of the beam.
Damage to web end
permissible up to max. a = 20 mm
Drilled holes in web
Permissible drilled holes:
Standard holes
- Each standard beam has 2 drilled holes, dia. 21.5mm
Additional system holes for:
- Flange claw
- Fastening plate
- Connection splice plate
- Table head 30
- Lifting bracket
- Portal head
One drilled hole of maximum diameter 20 mm per run-ning metre in addition to the system holes is permissi-ble.
If the incidence of drilled holes is frequent the overallcondition of the beam is definitive.
Detachment of flange from web
Not permissible.
9791-216-01
9791-216-01
98041-202-01
a
98041-202-01
98041-207-01
98041-207-01
9791-207-05
7/27/2019 999804102_2011_10_online
15/20
User information Composite formwork beams
15999804102 - 10/2011
The Formwork Experts
Transporting, stacking and storing
TransportAlways use strap slings to lift stacked beams - do not
use chains.
Stacked beams
max. 3000 kg per stack
Always use edge protectors when strapping beamstogether. Edge protectors can be padding made ofplastic, wood or cardboard.
Ground conditions for stacking
Maximum angle of inclination of ground 3%.
The ground on which the stack is to be placed mustbe adequately firm and level. Best-case conditionsare concreted or paved storage areas.
Storage on asphalt:Depending on the parts stored, place wooden bat-tens, strips of formwork sheeting or metal sheetbetween the parts and the asphalt surface to ensurethat the weight is adequately spread.
Storage on other surfaces (sand, gravel...):Adopt suitable measures for storage (e.g. place thickplywood sheets underneath the loads).
Reprocessing scrap materialDoka formwork beams contain no wood preservativesand, consequently, they can be deposited for reproc-essing.
Reprocessing by incineration in suitable incinerationplants is recommended. It is advisable not to attempt toburn scrap material in open fires or domestic wood-burners.
Always comply with the applicable local or national reg-ulations.
Protect stacked beams from extreme climaticinfluences such as exposure to sunshine ormoisture by covering them (with breathable tar-paulins). This reduces cracking. Only coverthem never envelope them completely.
When moving beams not securely strappedtogether, take care that loose beams cannotslip.
Lengths of beam
Up to 6.50 m Over 6.50 m
Max. n of beams per stack 60 40
Minimum n of timber supports(min. 10 x 8 x 109 cm)
2 3
Dimension 'a' 108 cm
Dimension 'b' 78 cm 56 cm
98041-204-01 98041-204-02
98041-204-03
a
b
Packets of 60 beams Packets of 40 beams
Max. 2 packets on top of oneanother
Max. 4 packets on top of oneanother
98041-205-01 98041-206-01
7/27/2019 999804102_2011_10_online
16/20
Article n[kg] Article n[kg]
16 999804102 - 10/2011
Component overview User information Composite formwork beams
The Formwork Experts
ComponentoverviewDoka SystemComponentsBeam I tec20
Doka beam I tec 20 1.80m 10.1 188001000
Doka beam I tec 20 2.45m 13.7 188002000
Doka beam I tec 20 2.65m 14.8 188003000
Doka beam I tec 20 2.90m 16.2 188004000
Doka beam I tec 20 3.30m 18.5 188005000
Doka beam I tec 20 3.60m 20.2 188006000
Doka beam I tec 20 3.90m 21.8 188007000
Doka beam I tec 20 4.50m 25.2 188008000
Doka beam I tec 20 4.90m 27.4 188009000
Doka beam I tec 20 5.35m 30.0 188013000
Doka beam I tec 20 5.90m 33.0 188010000
Doka beam I tec 20 .....m 5.6 188011000Doka-Trger I tec 20
Doka beam I tec 20 12.00m 67.2 188012000Doka-Trger I tec 20 12,00m
I tec 20 beam-end sealant 2.5l 2.5 188014000I tec 20-Endenversiegelung 2,5l
Varnished yellow
Grey
Varnished yellow
Grey
Yellow
7/27/2019 999804102_2011_10_online
17/20
User information Composite formwork beams Component overview
17999804102 - 10/2011
The Formwork Experts
7/27/2019 999804102_2011_10_online
18/20
18 999804102 - 10/2011
Component overview User information Composite formwork beams
The Formwork Experts
7/27/2019 999804102_2011_10_online
19/20
User information Composite formwork beams Component overview
19999804102 - 10/2011
The Formwork Experts
7/27/2019 999804102_2011_10_online
20/20
The Doka beam I tec 20 a technologically superlative product
Day in, day out, thousands of Doka solid-web formwork beams do sterling service on building sites the world over.Our superior standard of manufacturing ensures uniformly high quality and load-bearing strength
for safe and dependable usage.
You can rent, lease or buy Doka formwork beams.
At any of the Doka branches in your region.
Why not give us a call?
The Doka Group's central plant at Amstetten, Austria
Kazakhstan
Latvia
Lithuania
Luxembourg
Marocco
Mexico
Netherlands
New Zealand
Oman
PanamaPoland
Portugal
Romania
Russia
Senegal
Serbia
Slovakia
Slovenia
Spain
Switzerland
Taiwan
Thailand
Ukraine
Vietnam
Doka international
Doka GmbHJosef Umdasch Platz 1, A 3300 Amstetten, Austria
Tel.: +43 (0)7472 605-0, Fax: +43 (0)7472 64430E-Mail: [email protected]
Internet: www.doka.com
AlgeriaSARL Doka Algrie24 A Route de la RassautaBordj-El-Kifane, BP 170, 16120 AlgerTelephone: +213 21 21 27 42
Telefax: +213 21 21 28 98E-Mail: [email protected]
CanadaDoka Canada Ltd.5404 - 36th Street S.E.
Calgary AB T2C 1P1Telephone: +1 403 243-6629Telefax: +1 403 243-6787
E-Mail: [email protected]
China
Doka Formwork (Shanghai) Co., Ltd.No. 3883 Yuanjiang RoadMinhang District, Building 2Shanghai 201109
Telephone: +86 21 6 090 0899Telefax: +86 21 6090 1099E-Mail: [email protected]
IndiaDoka India Pvt. Ltd.Plot No. 26 A, Sector-7, Khargar MahavirLandmark Bldg.601 to 606, 6th Floor,410210 Navi Mumbai
Telephone: +91 22 2774 6452Telefax: +91 22 2774 6451
E-Mail: [email protected]
IrelandDoka Ireland Formwork Techn. Ltd.Monasterboice, Drogheda
Tinure Industrial Complex CountyLouthTelephone: +353 41 686 1620Telefax: +353 41 686 1525
E-Mail: [email protected]
JapanDoka Japan K.K.Miwanoyama 744-6 Nagareyama-shi270-175 Chiba-KenTelephone: +81 471 78 8808
Telefax: +81 471 78 8812E-Mail: [email protected]
www.dokajapan.co.jp
KoreaDoka Korea Ltd.444-1, Yongdoo-ri, Gongdo-eup
456-821 Anseong-Si, Gyeonggi-DoTelephone: +82 31 8053 0700Telefax: +82 31 8053 0701
E-Mail: [email protected]
KuwaitDoka KuwaitDiv. of Riham Gen. Trad. & Cont. Co.Street No. 1, Plot 157-173,Shuwaikh Port Authority AreaP.O. Box 221722023 Salmiyah
Telephone: + 965 2 4822 462Telefax: +965 2 4822 472
E-Mail: [email protected]
LebanonDoka GmbH - Branch LebanonDamascus Street, Sodeco Square, Block C /9th floor - Ashrafieh
BeirutTelephone: +961 1 612 569Telefax: +961 1 612 570
E-Mail: [email protected]
NorwayDoka Norge ASHeggstadmoen 47080 HeimdalTelephone: +47 72 89 38 10
Telefax: +47 72 89 38 11E-Mail: [email protected]
Other subsidiaries andrepresentatives:
Angola
Azerbaijan
Bahrain
Belgium
Belarus
Bosnia and
Herzegovina
Brazil
Bulgaria
ChileCroatia
Czech Republic
Denmark
Egypt
Estonia
Finland
France
Germany
Greece
Hungary
Iceland
Iran
Italy
Jordan
QatarDoka Qatar WLL2nd Gate, Light Industrial Area,
Mesaieed-QatarP.O. Box 23439, Doha-QatarTelephone: +974 4 4500 628
Telefax: +974 4 4500 608
E-Mail: [email protected]
Saudi ArabiaDoka Formwork TechnologyMahmoud Othman & Sons LLCThalia Street, Al-Jol Building,4th Floor, Flat 303/403/404P.O. Box 7620Jeddah 21472Telephone: +966 0)2 669 10 08
Telefax: +966 (0)2 664 86 25E-Mail: [email protected]
SingaporeDoka Formwork Pte. Ltd.9 Gul CircleSingapore 629565Telephone: +65 6897 7737Telefax: +65 6897 8606
E-Mail: [email protected]
South AfricaDoka South Africa (Pty) Ltd.Johannesburg Branch2 Sebasa Road, Chloorkop Ext.10Kempton Park 1619, P.O.Box 8337,Halfway House, 1685 JohannesburgTelephone: +27 11 310 9709Telefax: +27 11 310 9711
E-Mail: [email protected]
SwedenDoka Sverige ABKurdsvgen 2045155 UddevallaTelephone: +46 10 45 16 300Telefax: +46 10 45 16 309E-Mail: [email protected]
TunisiaDoka Tunisia Ltd.Rue de lusine,Le Kram, Zone Industrielle2015 TunisTelephone: +216 71 977 350Telefax: +216 71 977 856
E-Mail: [email protected]
TurkeyDoka Kalip-IskeleSanayi ve Ticaret A.S.Gzeller Org. San. BlgesiInn Mah. Nazarbayev Sok. No:19
41400 Gebze, KocaeliTelephone: +90 262 751 50 66Telefax: +90 262 751 50 05
E-Mail: [email protected] Arab EmiratesDoka Gulf FZEP.O. Box 61407Jebel Ali Free Zone, Dubai
Telephone: +971 4 870 8700Telefax: +971 4 870 8702
E-Mail: [email protected]
United KingdomDoka UK Formwork Technologies LtdMonchelsea Farm, Heath RoadBoughton MonchelseaMaidstone, Kent, ME17 4JD
Telephone: +44 1622 74 90 50Telefax: +44 1622 74 90 33
E-Mail [email protected]
USADoka USA, Ltd.214 Gates RoadLittle Ferry, NJ 07643Telephone: +1 201 329-7839Telefax: +1 201 641-6254E-Mail: [email protected]: www.dokausa.com
ISO 9001Certified to