105
A N 2014/201 Ann Narrabr 5 Annual Re nual ri Shire port Rep Counc port cil 2014 t 4/2015 P age | 1

A nnual Report - Narrabri Shire Council/Strategic... · l and Torres verage of 2 g 89.5% aga igh percent increased in NSW avera of the Narra lation. ... ople from a any confer ve

  • Upload
    dotruc

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

AN

 

2014/201

 

AnnNarrabr

5 Annual Re

nualri Shire

port 

 

Rep Counc

portcil 2014

t 4/2015

Page | 1  

2014/201

Cont

MAYOR’S M

GENERAL M

ABOUT NA

AWARDS A

THE MAYO

COUNCIL M

OUR ORGA

VISION AN

RELATED D

SUMMARY

HOW TO R

 

THEME 1 

ONE COMM

THEME 2 

A SUSTAINA

THEME 3 

A PLACE TO

THEME 4 

PROACTIVE

 

STATUTOR

CAPITAL W

 

APPENDIX 

APPENDIX 

 

5 Annual Re

tents 

MESSAGE .....

MANAGERS FO

ARRABRI SHIR

AND CITATION

OR AND COUN

MEETINGS AN

ANISATION ....

D VALUES ....

DOCUMENTS .

Y FOR THE 10 

READ THIS DO

MUNITY .........

ABLE ENVIRO

O THRIVE .......

E LEADERSHIP

RY INFORMAT

WORKS REPOR

1 – PAYMENT

2 – AUDITED 

port 

   

.....................

OREWORD ...

RE  .................

NS .................

NCILLORS .......

ND DECISION M

.....................

.....................

.....................

YEAR COMM

CUMENT ......

......................

NMENT .........

......................

P AND ADVOCA

TION ..............

RT .................

T OF EXPENSE

FINANCIAL R

 

 

.....................

.....................

.....................

.....................

.....................

MAKING .......

.....................

.....................

.....................

UNITY STRAT

.....................

......................

......................

......................

ACY ...............

.....................

.....................

ES AND PROV

REPORT 

 

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

TEGIC PLAN ...

.....................

......................

......................

......................

......................

.....................

.....................

VISIONS OF FA

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

ACILITIES TO C

   

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

......................

......................

......................

......................

.....................

.....................

COUNCILLORS

P

 

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

......................

......................

......................

......................

....................

....................

S POLICY 

age | 2  

............. 3 

............. 5 

............. 6 

............. 8 

............. 9 

........... 11 

........... 12 

........... 13 

........... 14 

........... 15 

........... 16 

............ 17 

............ 32 

............ 39 

............ 57 

........... 75 

........... 97 

2014/201

May

Narrabri S

As the Shi

Although 

impacts of

England N

29% of NS

2013 was 

Region co

future.  

This financ

Council’s s

future of t

identified 

been rece

will implem

Shire rises

 

Narrabri S

last 12 mo

achieved. 

 

O

Vi

nu

sle

 

Th

Th

au

op

 

Na

of

gr

Re

Na

 

Na

re

to

re

 

5 Annual Re

ors M

Shire's rapid 

re enters thi

drought con

f decisions to

North West. T

SW’s total ou

$8.9 billion r

ntinues to b

cial year saw

service to th

the Ratepaye

for amalgam

ently declared

ment the str

s from streng

Shire Council

onths with a 

 

ur external s

isitors Inform

umerous pro

eepovers an

he numerous

heatre which

udiences thro

pportunity fo

arrabri Shire

f the Airport 

rant funds fro

esources for 

arrabri Shire

arrabri Shire

esourcing for

o provide a p

esidents of B

port 

essag

economic gr

is new phase

ditions cont

o all membe

This data ref

utput. The Ne

representing

e a strong co

w the Fit For T

e communit

er investmen

mation, Narra

d “Fit For Th

rong framew

gth to streng

 has develop

large amoun

services such

mation Centr

ograms such 

d Boggabri D

s events hos

h catered to 

oughout our

or something

e Council com

redevelopm

om the $6m

Regions fun

e Council. 

e Council sec

r the Baan Ba

potable wate

aan Baa. 

 

ge   

rowth has ke

e of its histor

inue through

rs of our Shi

lects the Gro

ew England N

g 6% of Regio

ontributor in

The Future r

y, to provide

nt. Although

abri Shire Co

e Future’ by

work to ensur

gth into the f

ped dramatic

nt of milesto

h as the Libra

re were invol

as Authors t

Drover’s Cam

ted by The C

wide variety

r Shire, provi

g for everyon

mpleted the f

ment project 

illion from th

ding secured

ured funding

aa Water Sup

r supply to t

 

ept planning

ry the challe

hout the Reg

re. The NSW

oss Regional 

North West 

onal NSW to

n Regional NS

review of Loc

e a sustainab

not 

ouncil has 

y IPART and 

re that the 

future.  

cally in the 

ones 

aries and 

lved in 

talks, Toy 

mpfire. 

Crossing 

y of 

iding an 

ne. 

first stages 

utilising 

he 

d by 

g and began 

pply Project 

he 

for the futur

nges and op

gion and it is

W Governmen

Product for 

Region contr

tal of $138 b

SW and is ex

cal Governm

ble service an

   

re at the top

portunities a

imperative t

nt has releas

Regional NS

ribution to G

billion. The N

pected to co

ent highlight

nd provide b

P

 

p of the agen

are real and 

to remain co

sed data refle

SW at $138 b

Gross Region

New England 

ontinue to gr

ting the nee

better plannin

age | 3  

da for Counc

exciting. 

onscious of 

ecting the Ne

billion in 2013

al Product in

North West

row in the ne

d to review 

ng for the 

cil. 

ew 

3, 

 

ear 

2014/201

 

Na

tim

Cr

 

La

Fa

Sh

fo

 

Co

Au

su

 

 

There are 

have also 

Manager’s

light such 

 

As we step

would like

positive en

 

Conrad Bo

MAYOR 

 

 

 

 

 

 

 

A special c

was annou

Lillian Hul

5 Annual Re

arrabri Shire

mber bridge

reek Bridge, 

aunch of the 

acebook pag

hire to the 20

ollowing Cou

ouncil secure

ugmentation

upply. 

also many o

been a num

s, Council ha

as the Narra

p forward int

e to extend m

ngagement w

olton 

congratulatio

unced as the

bert Memor

port 

e Council also

s throughou

Baradine Cre

new look us

e which give

068 people w

ncil.  

ed $12.5 mil

n project wh

other success

ber of issues

as been at th

abri Shire air

to the future

my thanks to

with the yea

ons to Gemm

e 2015 award

rial Prize. 

o successfully

t the Shire. T

eek Bridge a

ser friendly N

es updates on

who follow t

lion in fundin

ich is current

sful complete

s that have a

e forefront t

service issue

e, strengthen

 the Commu

r past and be

ma Ferguson

d winner of t

y secured $5

The bridges t

nd Wee Waa

Narrabri Shir

n maintenan

he page. Cou

ng from Reso

tly underway

ed programs

arisen and ev

to acknowled

es. 

n what we ha

unity, Counci

efore us.

 who 

the 

5.3 million in

to be replace

a Lagoon Bri

e Council We

nce, emergen

uncil also joi

ources for Re

y to ensure t

s and achieve

ven with the 

dge and try t

ave and cont

llors and Co

 

 funding to b

es are Brigalo

dge. 

ebsite. This i

ncies and gra

ned Twitter 

egions for th

the sustainab

ements thro

changes in t

to resolve an

tinue to spin

uncil Staff fo

P

begin the rep

ow Creek Br

is supported

ading works 

with 84 peo

he Narrabri W

bility of Narr

oughout the S

the role of G

nything that 

n the wheels 

or their enthu

age | 4  

placement o

idge, Dubbo 

 by Council’s

throughout t

ple currently

Water 

rabri water 

Shire. There 

eneral 

has come to

of commerc

usiasm and 

the 

 

ce I 

2014/201

Gene

 

Narrabri S

October, 2

Narrabri S

The Statem

result of $

However, 

after a cha

Interesting

50

19

52

$1

2,

2,

26

31

Narrabri S

communit

with Coun

services to

 

 

 

Stewart ToGENERAL  

5 Annual Re

eral M

Shire Council

2015. The 20

Shire Council

ments identi

$133k that w

the isolated

ange in Coun

g facts in rel

0,000 visitors

90 functions 

2,246 loans t

111,691 in gr

307km of ro

158,000,000

6,097 Head o

1,411 tourist

Shire Council

ty has minim

ncil, staff and

o expectatio

odd MANAGER 

port 

Manage

 received its

014/2015 Fin

 being the 6

ified an over

was submitted

 General Fun

ncil processe

ation to Nar

s to the Narr

hosted at Th

through the 

rant funding

oads maintain

0 litres of pot

of stock sold 

ts visiting the

 is well unde

mal impact in

d the public t

ns and conti

 

ers M

 second succ

nancial State

2nd of 152 c

rall surplus o

d to IPART as

nd result ide

es, a very acc

rabri Shire C

rabri Shire Po

he Crossing T

Narrabri Shir

 to construct

ned 

table water p

through the

e Visitor’s Inf

erway to iden

the way forw

to continue t

nue to make

essag

cessive unqu

ments were 

councils in NS

f $159k whic

s part of Cou

ntified that C

ceptable resu

Council servic

ools 

Theatre 

re Libraries’

t the Narrab

produced fo

e Narrabri Sa

formation Ce

ntify all area

ward to bein

to achieve th

e Narrabri Sh

ualified audit

lodged with

SW.  

ch was marg

uncil’s Fit for

Council was 

ult for the fin

ces for the ye

ri Communit

r the Shire 

leyards 

entre 

s of financia

ng ‘Fit For Th

he results tha

hire a great p

   

t statements 

 the Office o

inally better

r the Future I

$192k worse

nancial year. 

ear include: 

ty Recycling 

l reduction t

he Future’. I l

at will make 

place to work

P

 

 within the m

of Local Gove

r than the pr

Improvemen

e than predic

Centre 

to ensure tha

look forward

us sustainab

k and live. 

age | 5  

 

month of 

ernment, wit

edicted defic

nt Plan. 

cted. Overal

at the 

d to working 

ble, deliver 

th 

cit 

l, 

2014/201

Abou

Covering 1

Kamilaroi 

major attr

drawn to t

known as 

Australia T

advancem

 

Narrabri 

Approxim

centred a

majority 

outlying to

 

Aborigina

Australia a

high, bein

home, a h

Shire has 

that of the

up 22.2% 

Shire popu

 

Economic

Historicall

industries

Shire,  11.

included S

and Cafes,

 

Narrabri S

million  in 

regional N

 

Agricultur

after and 

and  expor

internatio

 The  resou

Narrabri S

resulted in

with  exte

Forest are

5 Annual Re

ut Nar

13,000 km2, 

Highways ru

ractions, top

the area. On

“Big Sky” co

Telescope Co

ment. 

Shire  is  h

ately 57% of

round the m

of  the  rem

owns of Wee

l and Torres

average of 2

g 89.5% aga

high percent

increased in

e NSW avera

of the Narra

ulation.  

 growth and

y  famous  in

  that will bu

.7%  worked 

School Educ

, Restaurant

Shire has incr

the  2010/2

NSW average

re remains N

grow a wor

rting Narrab

onally recogn

urces  sector 

Shire. Narrab

n a wealth o

nsive  coal  a

ea; one of the

port 

rrabri 

our Shire is 

un through N

 rate facilitie

ne glimpse of

ountry. The s

ompact Array

ome  to  ov

f the Narrab

main centre o

maining  resi

e Waa and B

s Strait  Islan

.5%. The per

inst the NSW

age compar

n recent year

age, which w

abri Shire po

d opportunit

n  the  agricu

uild on our s

in  Sheep, 

ation 4.8%, 

ts and Takeaw

reased its Gr

2011  financia

es.  

Narrabri Shir

rld class prod

bri  Shire  goo

nised as an in

is  another 

bri Shire is w

of opportunit

and  natural 

e largest ons

Shire

the heart of 

Narrabri Shire

es and accom

f a clear nigh

eemingly en

y, whose six 

ver  13,000 

ri Shire popu

of Narrabri, 

dents  living

oggabri.  

der people 

rcentage of p

W average of

ed to the NS

rs from 37.4

was 37.5 year

pulation and

y  

ultural  secto

strong econo

Beef  Cattle 

Other Crop 

way Food Se

ross Regiona

al  year  grow

e’s most  imp

duct. Agricu

ods  to  the w

nnovative cen

important  i

ithin one of 

ty for both e

gas  deposits

shore natura

f the rich Nam

e bringing pe

mmodation, m

ht sky will lea

dless horizo

radio telesc

people. 

ulation is 

with the 

g  in  the 

make up 10

people in Na

f 68.6%. In N

SW average 

4 years in 200

rs in 2006 an

d people age

or,  Narrabri 

omic  founda

and  Grain 

Growing 4.6

ervices 3.2%.

l Product fro

wing  at  an  a

portant  indu

ltural proces

world. With 

ntre for agric

industry wit

the largest c

employment 

s with  Santo

al gas reserve

moi Valley in

eople from a

many confer

ave you with 

ns have facil

opes are gle

0.7% of  the 

arrabri Shire 

arrabri Shire

of 72.5%. T

06 to 39 yea

d 38 years in

ed 65 years a

Shire  is  loo

ation.  In 201

Farming.  O

6%, Agricult

  

om $517 mill

nnual  rate o

ustry. The  fe

ssing and ha

3  governme

cultural rese

h  a  number

coal reserves

and ancillar

os  extracting

es. 

n North West

ll compass p

rences and h

no doubts a

itated the gr

aming beaco

population  c

who were b

e, 93.6% of p

he median a

ars in 2011. T

n 2011. Child

nd over mak

oking  to  the

11, of  the em

ther  major 

ure and Fish

ion in 2005/

of  5.3% whic

ertile black so

andling  is a v

ent  research

arch and ast

r  of  coal mi

s in NSW. Th

y business. T

g  coal  seam 

P

t NSW. The N

points. With 

high profile p

as to why thi

rowth of the

ons of scient

compared  to

born in Austr

people speak

age of reside

This increase

dren aged 0 ‐

ke up 15.7% 

e  future  acr

mployed peo

industries  o

hing Support

/2006 financ

ch  is well  a

oil plains ar

vital  industr

h  stations, N

tronomy.  

ines  current

his new indus

The region is

  gas  from  t

 

age | 6  

Newell and 

easy access, 

erformers ar

s region is 

e CSIRO 

tific 

o  the NSW a

alia is relativ

k only English

ents  in Narra

e is higher th

‐ 14 years m

of the Narra

oss  a  range

ople  in Narra

of  employm

t Services 3.

ial year to $8

bove  state  a

e highly sou

y, value‐add

arrabri  Shire

tly  operating

stry has alrea

s well endow

he  Pilliga  St

re 

and 

vely 

h at 

abri 

han 

ake 

abri 

e  of 

abri 

ent 

.3% 

845 

and 

ght 

ding 

e  is 

g  in 

ady 

wed 

tate 

2014/201

Abou

The econo

diversifies

apparent t

 

As the Shi

provide in

beginning

booklets p

 

Council als

event such

1515 and 

has also b

through F

sector. Th

within Cou

Council is 

communit

 

Council pr

arrangem

matters of

forwarded

within the

 

The main 

customer 

8.35am to

should the

 

Contact D

Tel:    

Fax:    

Email:    

Website:  

 

The Annua

external c

Website w

(Printing o

 

This Annu

Interest D

Act, 2009,

5 Annual Re

ut Nar

omy of Narra

s and broade

through an i

re is made u

nformation to

 the Informa

printed and p

so utilises Fa

h as flooding

quite often p

ecome a com

acebook. Th

e news reel 

uncil such as

currently up

ty in accessin

rovides infor

ent to suppo

f interest to 

d to further r

e Narrabri Sh

Administrati

service desk

o 5pm. Counc

e public wish

etails for Co

(02) 6

(02) 6

counc

www.

al Report is p

osts incurred

www.narrabr

or copying ch

al Report ha

Disclosures Ac

, Companion

port 

rrabri 

abri Shire is i

ens from its a

ncreasing de

up of three m

o all commu

ation is provi

provided thr

acebook prov

g or traffic in

people share

mmunication

e Narrabri S

provides the

s events, spe

pdating the C

ng informatio

mation thro

ort the statio

the commun

radio station

hire. 

ion Building 

k to assist an

cil is accessib

h to attend th

uncil are: 

799 6866 

799 6888 

cil@narrabri.

.narrabri.nsw

produced an

d in the prod

ri.nsw.gov.au

harges may a

as been prep

ct, 1994, Car

n Animals Act

Shire

n a robust p

agrarian base

epth in produ

main towns a

nity membe

de through p

oughout the

viding up to 

cidents or in

e Posts from 

n channel an

hire Council 

e community

cial meeting

Council webs

on. 

ugh radio sta

on Council pr

nity to reach

ns outside the

for Council i

yone wishing

ble to provid

he Administr

.nsw.gov.au

w.gov 

d published 

duction of th

u and can be

apply). 

ared in acco

rer’s Recogni

t, 11998 and

osition. This 

e into vertica

uction, manu

nd four villa

rs. Through t

print in the t

e Shire.  

date inform

nterruptions.

 the account

d a number 

website is a

y with update

gs of interest

site in view o

ations, partic

rovides ads a

h further mem

e shire to re

s located at 

g to approac

de feedback, 

ration Buildi

internally th

his report. Th

e obtained in

rdance with 

ition Act, 20

d the Environ

is projected

ally integrate

ufacturing, lo

ges, Council 

the public co

three specific

ation which 

. Council’s Fa

t to further r

of issues hav

lso utilised to

es on issues 

t to the publi

of making the

cularly the lo

about service

mbers of the

ach the remo

46‐48 Maitla

ch Council w

answer enq

ng. 

hrough Narra

his report is a

n printed form

the Local Go

10, the Gove

nmental Plan

 to grow in f

ed industries

ogistics and s

uses a numb

onsultation c

c newspaper

has proven v

acebook acco

each other S

ve been reso

o provide inf

that are occ

c or change 

e site user fr

ocal station M

es provisions

e community

ote member

and Street, N

hich is open 

uiries and as

abri Shire Co

available on t

mat or on CD

overnment A

ernment Info

ning and Ass

P

future as the

s. Further div

service‐base

ber of differe

conducted in

rs and variou

valuable thro

ount has a fo

Shire residen

olved after b

formation to

curring in the

of times for 

riendly to ass

Max FM. As a

s, public mee

y. Media rele

rs of the com

Narrabri and 

Monday thr

ssist with app

uncil. There 

the Narrabri

D upon reque

Act 1993, the

ormation (Pu

sessment Ac

age | 7  

e economy 

versification 

ed industries

ent medias t

n the process

us Shire 

ough large 

ollowing of 

nts. Faceboo

eing identifie

o the public 

e Shire or 

facilities. 

sist the 

a sponsorshi

etings or 

eases are also

mmunities 

has a 

rough to Frid

plications 

are no 

 Shire Counc

est to Counc

e Public 

ublic Access) 

ct 1979.

is 

s of 

ed 

ip 

day 

cil 

cil 

2014/201

Awa

5 Annual Re

rds an

port 

nd Citaationss 

 

Coun

Netw

throu

Awar

betw

Kami

the K

withi

Touc

Kami

to sh

storie

Steve

invite

Coun

 

The N

the w

Awar

After

Aqua

stren

deve

provi

mem

 

Narra

numb

Pink 

Gene

 

For 2

work

comp

Civil C

Oper

Main

Front

Tech

Infor

ncil at the 20

work confere

ugh the Coun

rd which reco

ween the Nar

laroi Indigen

Kamilaroi Ind

n the Narrab

hscreen prov

laroi traditio

owcase thei

es in total na

en Booby and

ed to the Sep

ncil meeting t

Narrabri Aqu

winner of the

rds under the

r the opening

atic Centre th

gth to streng

lop new prog

de a service 

bers to utilis

abri Shire Co

ber of signifi

Ribbon Day, 

es Day.  

014/2015 Co

er and new e

pleting qualif

Construction

ations, Loca

tenance (Wa

tline Manage

nology, Reco

mation and C

P

14 NSW LG A

nce received

ncil Partners

ognised the 

rrabri Shire C

nous Commu

digenous Tou

bri Visitors C

vides stories

onal history a

r history. Th

arrated by Cr

d Pam Smith

ptember 201

to receive th

uatic Centre w

e 2014 NBN B

e category o

g of the new

he facility ha

gth and cont

grams and e

 to all comm

se and enjoy

ouncil partici

cant fundrai

 Movember,

ouncil had 3

entrant train

fications in H

n (Plant Oper

l Governmen

aste Manage

ement, Infor

ordkeeping a

Cultural Serv

age | 8  

Aboriginal 

d recognition

hip Of The Y

partnership 

Council and t

unity through

uchscreen 

entre. The 

s in relation t

and a platfor

ere are eight

raig Trindall, 

h who were 

14 Ordinary 

he award.  

was announc

Best Busines

f Tourism. 

 Narrabri 

s gone from 

tinues to 

equipment to

munity 

y.  

pated in a 

sers includin

, Jeans for 

5 existing 

nees 

Horticulture, 

rations), Wa

nt, Asset 

ement), 

rmation 

and Library, 

vices.

ear 

he 

to 

rm 

ced 

ss 

ng 

ter 

2014/201

The M

  Cr Conrad   Lot 197, APO Box 23WEE WAAMobile: Email:   Cr Leslie K Centre of 87 MaitlanNARRABRHome: Mobile: Email:   Cr Ron Low 77 MaitlanWEE WAAMobile: Email:  

Cr Bolt

5 Annual Re

Mayo

d Bolton (Ma

Alma Street 30 A  NSW  2388

0427 954 salto.conrcr.bolton@

Knox 

Town Accomnd Street I  NSW  23906792 53900413 057 murriman5cr.knox@n

wder 

nd Street A  NSW  2388

0427 944 ronlowdecr.lowder@

ton      Cr Kno

port 

r and 

ayor) 

8 828 [email protected]@narrabri.ns

mmodation 

0 0 038 [email protected].

8 419 r1@[email protected]

x       Cr Lowd

Counc

om sw.gov.au 

om.au gov.au 

.com sw.gov.au 

er 

cillorss

   Cr Ken Flow 15 NingadhNARRABRI  Home:Mobile:Email:   c Cr Catherin “Booroomin175 BoorooBOGGABRI Mobile:Fax:Email: Cr Lloyd Fin 97 ThornfieBOGGABRI Mobile:Email:  

Cr Flo

wer  

un Circuit NSW  2390 6792 3295 0457 811 62ken.flower74cr.flower@n

e Collyer  

n” omin Road NSW  2382 0428 674 346743 4372 cr.collyer@

nlay  

eld Crossing RNSW  2382 0429 612 66cr.finlay@n

ower         Cr 

P

27 [email protected].

42 

@narrabri.nsw

Road 

65 narrabri.nsw.

 

Collyer         C

age | 9  

om .gov.au 

w.gov.au 

.gov.au 

Cr Finlay

2014/201

                      Cr Maxine “Cardonis929 PilligaPO Box 18WEE WAAHome: Fax: Email:   Cr Robyn  4 Bowen SNARRABRFax: Mobile: Email:   Cr Catheri 168 YarriePO Box 16NARRABRHome: Work: Fax: Mobile: Email:  

Cr Booby

5 Annual Re

e Booby  

” a Road 86 A   NSW   238

6796 22516796 [email protected]@

Faber 

Street I   NSW   23967923 6210417 230 [email protected]@

ine Redding 

e Lake Road 68W I WEST  NSW6792 31086792 11986792 11980428 923 narrabriwcr.redding

y      Cr Faber 

port 

88 1 3 @[email protected]

90 1 762 [email protected]

(Deputy Ma

W  2390 8 8 8 108 

westpo@[email protected]

     Cr Redding

 sw.gov.au 

es.com.au w.gov.au 

ayor) 

pond.com.aunsw.gov.au

 

 

Cr John Tou “Norwood”Airport RoaNARRABRI  Home:Mobile:Email:  jo  cr 

Cr Bevan O “Moema”NARRABRI  Home:Fax:Mobile:Email:

    Cr Tou

ugh  

 d NSW  2390 6792 3277 0408 922 [email protected]@nar

’Regan  

 NSW   23906793 8641 6793 8646 0429 938 [email protected]@

ugh                  

Pa

69 bigpond.com rrabri.nsw.go

41 bigpond.com

@narrabri.nsw

    Cr O’Regan

ge | 10  

 

ov.au 

m w.gov.au 

2014/2015 

Coun

 Narrabri Sh

also conduc

which all Co

 

Fina

 

Plan

 

Pub

 

Roa

 

Tra

 

The

rep

Fina

 

Ordinary Co

items in the

meetings ar

 

Extraordina

advertised o

January. 

 

Business pa

IPads. Coun

Business pa

Council Adm

 

Council and

available fro

does not oc

Annual Repo

cil Me

ire Council O

cts Committe

ouncillors are

ance and Go

o Cr Flow

nning and D

o Cr Colly

blic infrastru

o Cr Boob

ads and Flee

o Cr Finla

ffic Facilities

e Traffic Facil

resentatives

ancial Year. 

ouncil meetin

e Agenda dur

re available f

ary Council m

on the Coun

apers are ava

ncillors are ab

apers are ava

ministration 

d Committee

om Council’s

ccur until the

ort 

eeting

Ordinary Cou

ee Meetings 

e members: 

overnance 

wer (Chair) 

evelopment

yer (Chair) 

ucture and Co

by (Chair) 

y (Chair) 

s Committee

lities Commi

s and Counci

ngs are open

ring the Pub

from the Cou

meetings are 

cil Website w

ailable for Co

ble to access

ailable to the

Building. 

 meeting pro

s website on

e next Ordina

s and 

uncil meeting

on the first T

ommunity F

ttee is comp

l staff. Cr Fin

n to the publ

lic Form on a

urier. 

called on sh

when timefra

ouncillors at t

s and conside

e public via th

oceedings ar

e week after

ary meeting 

Decis

gs are condu

Tuesday of e

acilities 

prised of Roa

nlay was the 

ic and reside

application p

ort notice on

ames permit

the very leas

er motions p

he Council w

re recorded f

r the meetin

of Council.

sion‐m

cted on the 

each month.

ads and Mari

delegate for

ents are able

prior to the m

n occasion to

t. No meetin

st three days

prior to the m

website and a

for the purpo

g conclusion

making

third Tuesda

The followin

time Service

r this commit

e to address t

meeting. Adv

o address pa

gs are condu

s prior to the

meeting to m

a copy is ava

ose of minut

, however ad

Page

ay of each m

ng are the Co

es representa

ttee for the 

the Council i

vertising of u

articular issue

ucted during

e meeting in 

make informe

ilable for vie

te taking. Mi

doption of th

e | 11  

onth. Counc

ommittees o

atives, Police

2014/15 

in relation to

upcoming 

es and 

g the month o

soft copy on

ed decisions.

ewing in the 

nutes are 

he minutes 

cil 

of 

of 

 

2014/2015 

Our O

Narrabri  Sh

Services, En

that Counci

organised. 

deliver mor

Council willcommunity is below. 

Annual Repo

Organi

hire  Council 

ngineering a

l is well prep

It will  chang

re frontline s

l continue  toneeds. The 

ort 

isation

is managed

nd Planning 

pared for fut

ge  the way 

ervices. 

o  review  its Organisation

  by  its Gene

and Develo

ture works a

we deliver  s

structure  tonal Structure

 

eral Manage

pment. The 

nd projects t

some  servic

o ensure  it ae as per func

er  and  the D

adopted str

that will imp

es,  increase 

aligns with  sction as ado

Directors  of 

ructure has b

prove the wa

efficiency, 

service  level pted by Cou

Page

three  divisi

been establi

ay we work a

and  improve

requiremenuncil on 26 N

e | 12  

ions,  Corpor

ished to ens

and how we 

e our  ability

nts  to meet November, 20

rate 

ure 

are 

y  to 

the 014 

2014/2015 

Vision

Over the ne

advantages

diversity of 

resources se

health, edu

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Narra

str

regio

provid

env

entire

Annual Repo

n and 

ext decade, N

 of a regiona

our econom

ector. In turn

cation and r

Vision

abri Shire 

rong and v

onal growt

ding a qua

vironment

e Shire co

ort 

Value

Narrabri Shir

al lifestyle alo

my, returning

n this will str

etail. This wi

will be a 

vibrant 

th centre 

ality living

t for the 

mmunity 

es 

e will cemen

ong with a w

to the comm

rengthen the

ill make the a

C

Tp

U

C

 

nt a reputatio

wide range of

munity the b

e ability of ou

area an even

Consultation a

To deliver servicprovide a qualit

Inno

Councrea

Exem

Councusto

Uncompromis

Council’s integr

on for itself a

f activities to

benefits of a 

ur Shire to o

n more attra

and Facilitatio

ces to and reprty living environ

ovation

ncil will always tive and lateral

Leadership 

To provide lecommunity a

Effective C

Effective costaff will, at

Value for M

The provisionefficient.

mplary Custo

ncil will endeavomers.

sing Integrity

ity will be main

as a vibrant c

o enjoy. We w

busy agricult

ffer a full ran

ctive place t

on

esent the internment within av

endeavour to b thinking.

and Teamwo

adership and tond the Council.

Communicatio

ommunication bt all times, be o

Money

n of Council serv

mer Service

vour to provide 

ntained at the h

Page

community, 

will make the

tural sector a

nge of servic

to live and w

rests of the whovailable resour

be innovative a

rk

o evoke a spirit.

on

between the Coof paramount im

vices will alway

the highest lev

highest level at 

e | 13  

offering all t

e most of th

and growing

ces, including

ork.   

ole communiityces.

nd will follow a

t of teamwork w

ouncil, the commportance.

ys be cost effec

vel of service to

all times.

the 

y and 

a path of 

within the 

mmunity and 

tive and 

o all its 

2014/2015 

Relat

Communit

Narrabri Sh

Community

Shire Comm

 

Resourcing

This strateg

that identifi

 

The Workfo

employees 

 

The Resourc

Council to c

An Asset M

achieve the

overarching

Other Struc

 

Delivery Pr

In considera

Program ide

 

Operationa

This plan hig

Delivery Pro

Annual Repo

ed Do

ty Strategic 

ire Council a

y Strategic pl

munity. 

g Strategy 

gy identifies t

ies the finan

orce Plan is a

that are ava

ce Strategy a

complete fut

anagement S

e community

g plan to inco

ctures and Pa

rogram 

ation of all th

entifies the O

al Plan 

ghlights the 

ogram and e

ort 

ocume

Plan 

after commu

an indicates 

the resource

cial resource

also part of th

ilable to assi

also requires

ure objectiv

Strategy det

y needs. Coun

orporate the

arks and Ope

he elements 

Objectives th

objectives a

nable Counc

ents 

nity consulta

the directio

es available t

es that are st

he resourcin

ist with the d

s an Asset M

es.  

ermines the 

ncil currently

e areas of Tra

en Spaces. 

of the Comm

hat Council w

nd actions to

cil to report a

ation adopte

n Council wi

to Council. Th

tructured to 

g Strategy a

developmen

anagement S

 level of serv

y is combinin

ansport, Wat

munity Strat

will meet ove

o be implem

annually on s

ed a Commu

ll follow in t

he Strategy i

ensure Coun

nd identifies

t of Council o

Strategy to c

vices require

ng existing A

ter Services, 

egic Plan and

er the next fo

mented over t

specific obje

nity Strategic

he next ten y

ncludes a Lo

ncil meets its

s the number

objectives an

complete the

d for infrastr

sset Manage

Waste Wate

d the Resour

our years. 

the financial 

ctives. 

Page

c Plan in Jun

years as dire

ong Term Fin

s objectives.

rs of approp

nd actions. 

e overall fram

ructure and 

ement Plans 

er Services B

rcing Strateg

year in refle

e | 14  

e 2013. The 

ected by the 

ancial Plan 

 

riately skilled

mework for 

assets to 

to create an

uildings and

gy the Delive

ection of the 

 

ry 

2014/2015 

Summ 

The Commu

for itself as 

activities to

benefits of 

our Shire to

even more 

 

In line with 

the barriers

 

1. Na

2. Ai

3. Re

4. Re

5. Es

6. Ad

7. Ex

8. Ad

iti

9. Re

10. Re

11. Su

12. En

13. A 

14. En

15. Pr

 

The Strateg

specifically 

• 10CSt

• O

Annual Repo

mary fo

unity Strateg

a vibrant co

o enjoy. We w

a busy agricu

o offer a full 

attractive pl

this vision a

s, the followi

arrabri Shire

irport to be o

egional stan

egional stan

stablished an

dequate hea

xpanded tert

dequate acc

inerant)  

egional stan

evenue and 

ustainable la

nsure a clean

safe place to

nsure Counc

roactively en

gic objectives

relate to the

0 Year ommunity trategic Pla

Objectives

Strate

ort 

or the 1

gic 10 year pl

mmunity, of

will make the

ultural secto

range of serv

ace to live a

and after app

ing strategic 

e to be a reg

of regional q

dard Narrab

dard industr

nd sustainab

alth services 

tiary educat

ommodatio

dard infrastr

income grow

and use  

n, green env

o live, work 

il is complia

ngage with t

s are aimed a

e role Counci

n

gies

10 Yea

an highlight

ffering all the

e most of the

r and growin

vices, includi

nd work. 

plying particu

objectives h

ional centre

quality  

bri CBD  

rial land/par

ble investme

to meet the

ional facilitie

n available t

ructure  

wth strategy

ironment fo

and experie

nt with statu

he commun

at the broade

il plays with 

• 4 Year DProgram

Ac

ar Com

ed the futur

e advantages

e diversity of

ng resources

ing health, e

ular focus on

have been es

  

rks developm

ent program 

e needs of a 

es (agricultu

to meet dem

y in place  

or the future

ence the dive

utory regula

ity  

er Shire com

the Commo

elivery m

ctions

mmunit

e direction o

s of a region

f our econom

s sector. In tu

education an

n the opport

stablished fo

ments  

in place  

regional cen

ure, educatio

mand (reside

  

ersity of cult

ations  

mmunity. The

n Objective.

• AnnOpe

ty Strat

of Council by

al lifestyle al

my, returning

urn this will s

d retail. This

unities for gr

r Narrabri Sh

ntre  

on, business,

ential, comm

ural activitie

e Strategies u

ual erational Pla

Budge

Page

tegic P

y developing 

long with a w

g to the com

strengthen t

s will make th

rowth while 

hire Council: 

, mining and

munity, indus

es  

under each O

an

et

e | 15  

Plan 

a reputation

wide range o

munity the 

he ability of 

he area an 

acknowledg

 

d health)  

strial, aged a

Objective 

of 

ging 

and 

Actio

OC1 

OC1.

OC1.EnvirDevefor thintegPlan recom

OC1.

OC1.desig

T

ac

2014/2015 

How T 

The activitie

identified in

These them

1. One

2. A su

3. A P

4. Pro

The Operat

actions rela

In order to a

numbering 

activities to

Understand

 

 

 

ons 

Regional stan

1 Develop a C

1.1 Review thronmental Plaelopment Conthe Narrabri CBgrate the CBD content and mmendations

2 Retail areas

2.1 Develop dgn of CBD Mas

 

This column cont

ctions Council ide

undertake in 20

Annual Repo

To Rea

es and progr

n the Commu

mes are: 

e Community

ustainable En

lace To Thriv

oactive Leade

ional Plan ou

te to as iden

assist in the 

system has b

o be carried o

ding the Tabl

ndard Narrabr

CBD Master P

he Local n, trol Plan BD to Master 

DiDe

s are shaded, 

detailed ster Plan 

DiDe

S

ide

tains the 

entified to 

014/15. 

ort 

ad This

rams in the A

unity Strateg

y  

nvironment 

ve  

ership 

utcomes for 

ntified in the

monitoring a

been created

out during th

es: 

ResponsibManager

ri CBD 

lan for Narrab

irector Plannievelopment 

attractive an

irector Plannievelopment 

This row contain

Strategic Objectiv

ntified in the Com

Strategic Pla

This colum

Council Man

to carry o

 Docum

Annual Repor

gic Plan.  

the 2014/15

Delivery Pro

and reportin

d to identify 

he 2014/15 f

ble r 

bri in consulta

ng and 

ConDCPDistCom

d well mainta

ng and Detasuccirrig

ns the 

ves as 

mmunity 

n. 

mn contains the 

nager responsible

out the action. 

ment

rt are catego

5 financial ye

ogram. 

ng of activitie

individual ac

inancial year

Performa

ation with th

ntent of CBD MP for Narrabri trict. Positive Cmmerce feedb

ained and pro

ailed design ccessful shade gation system 

This row co

Strategies as id

Four Year Del

orised accord

ear have bee

es against the

ctions. The t

r in referenc

ance Indicato

e Chamber of

Master Plan inCentral BusinChamber of back 

ovide facilities

completed to atree planting installation 

ontains the 

dentified in the 

ivery Program 

This column cont

performance ind

measure and re

action again

ding to the fo

n summarise

e Operationa

ables in the 

e to the Ope

r

f Commerce 

forms ess 

M20

s for the elder

allow and  De

tains the 

icator to 

port the 

nst. 

Page

our themes t

ed under the

al Plan and D

document w

erational Plan

Progress a

Master plan ad013. 

rly and disabl

esign complet

This 

progress 

June 201

perfor

e | 16  

that were 

e theme that

Delivery Prog

will only refer

n. 

at 30 June 20

dopted Novem

led

ted. 

column provides

of the action as a

15 in reflection of

rmance indicator

t the 

gram a 

rence 

15

mber 

at 30 

f the 

s. 

2014/20

 

015 Annual RReport  

 

PPage | 17  

2014/20

OneValuOur com

Everyon

Council.

member

52Loa

Nar

Lib

 

$1Gra

the

of N

$3Gra

the

Wa

Drin

relo

015 Annual R

e Commuing thmmunity beli

ne has a cont

. Continuing 

rs or commu

2,246 ans throu

rrabri Sh

raries 

10,000ant Fundi

 Reveget

Narrabri 

3,636 ant fundi

 Wee Wa

r Memo

nking Fo

ocation 

Report  

munityhe contrieves strong

tribution to 

efforts are n

unity. 

ugh 

hire 

0 ing for 

tation 

Lake 

 

ng for 

aa Boer 

rial 

untain 

y ributioly in the Cou

make and ev

needed to en

1

em

e

co

3p

Ch

on thatuncil’s vision

veryone des

ngage our yo

190Functio

The Cro

Thea

35Existing C

mployees 

entrant tr

ompleted

qualifica

3051 Cparticipate

28Program

hildren he

Librar

t everyon statement 

serves to sha

oung people

ons at 

ossing 

tre

5 Council 

and new 

rainees 

d various 

ations 

Children 

ed in the 

6 ms for 

eld in the 

ries 

one canof an entire 

are in investm

e and to invo

Gr

th

 

5V

Se

P

n make Shire comm

ments made

olve the indig

$16,0rant Fun

he Revita

of Regi

Librar

50,000Visits to N

Shire 

35Overs

Visitor

Narrabri

durin

eptembe

Page | 18  

e munity”. 

e by 

genous 

000 ding for 

alisation 

ional 

ries 

0 Narrabri

Pools

5  seas  rs to 

i Shire 

ng  

er, 2014

 

A

TP

Actions 

OC1 Region

OC1.1 Deve

OC1.1.1 RevDevelopmenintegrate threcommend

OC1.2 Retai

OC1.2.1 Dev

OC1.2.2 Retfor all other beds for new

OC1.2.3 Impmaster plan

OC1.2.5 Seepublicly accesouth of the

OC1.2.7 Addseating areacombined wheights and 

OC1.2.8 Devintersectionwith adjacenLibrary, Scho    

Annual Report 201

Theme 1: OnPrincipal activities

al standard Narrab

lop a CBD Master P

view the Local Envirnt Control Plan for te CBD Master Plan dations 

l areas are shaded,

velop detailed desig

tain existing on strePrecinct Streets buw tree planting 

plement recommen in relevant stages

ek consent from Ausessible courtyard ine Post Office site wi

d a pergola or abor a at each of the 4 CBwith lowering existinaddition of new se

velop detailed desig of Doyle and Barwnt business ownersools and TAFE; and 

14/2015 

ne communis – projects and s

bri CBD 

Plan for Narrabri in

ronmental Plan, the Narrabri CBD tocontent and 

, attractive and we

gn of CBD Master P

eet parking configurut create garden isla

nded landscape plan

stralia Post to creatn the open space arthin the core CBD 

structure to the exBD Core block endsng end of block walating 

gn for roundabout awon Streets in consu, Neighbourhood Cconstruct 

ity ‐ Valuingservices 

Resp

n consultation with

o  Director Developm

ell maintained and 

Plan Director Developm

ration and 

Director Developm

n  Director Developm

te a rea 

Director Developm

xisting s, l 

Director Developm

at ultation Centre, 

Director 

g the contrib

ponsible Manager

h the Chamber of Co

Planning and ment 

provide facilities fo

Planning and ment 

Planning and ment 

Planning and ment 

Planning and ment 

Planning and ment 

Engineering Service

butions that 

P

ommerce

Content of CBNarrabri CentChamber of C

or the elderly and d

Detailed desishade tree plinstallation 

Retail areas aappealing 

CBD Master Pin staged app

Retail areas aappealing 

Retail areas aappealing 

es 

Proposed inteconstructed tand pedestriaprimary scho

 

everyone ca

Performance Indica

BD Master Plan infotral Business DistricCommerce feedbac

disabled 

gn completed to alanting and irrigatio

are shaded and aest

Plan landscape planproach 

are shaded and aest

are shaded and aest

ersection treatmento improve safety foans, particularly theol children 

 

an make 

ator

orms DCP for ct. Positive k 

low successful on system 

thetically 

n implemented 

thetically 

thetically 

t designed and or vehicle users e aged and 

   

Progres

Master plan adopte

Design completed.

Not commenced. 

Not commenced. 

Approval not proviconcerns with Telst

Not commenced. 

Detailed design com

Page | 19

ss at 30 June 2015 

ed November 2013

ded by Australia Potra cables in that lo

mpleted. 

9  

3. 

ost due to ocation. 

A

Actions 

OC1.3 To deOC1.3.1 Proother levels 

OC1.3.2 Promethods incbusinesses a

OC1.3.3 Narparking are parking spac

OC1.3.4 Minstreet car pa

OC1.4 Estab

OC1.4.1 DranominationsCommittee 

OC1.4.2 EstaCommittee q

OC1.4.3 CBDto obtain depriority Mas

OC2 Region

OC2.1 Deve

OC2.1.1 Devand Open Spdebate and 

OC2.2 Facilit

OC2.2.1 Devbusiness 

Annual Report 201

eliver adequate maomote public transpof government 

omote and support cluding buses, walkand services in town

rrabri CBD recommimplemented to maces in and around t

nimise cost on businarking 

blish and Chair a CB

aft Terms of Referens for a CBD Master 

ablish CBD Master quarterly meeting a

D Master Plan Impleetailed design and cster Plan works 

al standard industr

lop, adopt, monito

velop Levels of Servpace and present toadoption prior to im

tate the developm

velop industrial and

14/2015 

ain street car parkinport needs of the Sh

alternative transpoing and cycling to an centres 

endations regardinaximise available cahe CBD 

ness owners for ma

BD Master Plan Imp

nce and call for Plan Implementatio

Plan Implementatioand reporting sched

ementation Commicostings for agreed 

rial land developm

or and review Level

vice for Parks, Cemeo Council for discusmplementation 

ment of industrial an

d commercial land f

Resp

ng hire to 

General M

ort access 

Director Developm

ng car ar  Director 

ain Director 

plementation Comm

on Director Developm

on dule 

Director Developm

ittee is high 

Director Developm

ents

ls of Service annua

eteries ssion, 

Commun

nd commercial land

for new Director Developm

ponsible Manager

Manager 

Planning and ment 

Engineering Service

Engineering Service

mittee

Planning and ment 

Planning and ment 

Planning and ment 

lly for all key servic

nity Facilities Manag

d

Planning and ment 

P

Increase in puuse of public 

It is easy for pbus, cycling oImplementat

es  Available car 

es Business contparking are cafunds reserve

Terms of Refeand committe

Quarterly meestablished 

Detailed desideveloped anCouncil by Co

ces provided by Co

ger 

Maintenancefacilities, parkProvide for reand parks 

Appropriate l

 

Performance Indica

ublic transport avaitransport 

people to access thor walking. Approprion of Walk and Cyc

parking is maximise

tributions toward aalculated, communed transparently for

erence prepared in ee formed 

eeting and reporting

gn for high priority nd recommendationommittee 

ouncil 

e of public buildingsks and gardens in aegional standard ind

and available for n

 

ator

lable. Increased 

e CBD via car, riate parking. cle Strategy. 

ed 

additional car nicated and r future use 

draft format 

g schedule 

works n made to 

s, sporting ll communities. dustrial land 

ew business

   

Progres

Lobbying opportunidentified. 

Walk and cycle way

Car park maximisatappropriate. 

Not commenced. 

Not commenced. 

Not commenced. 

Centre median and

Levels of Service andeveloped and imp

Council has existingand is working withother land stock to

Page | 20

ss at 30 June 2015 

nities undertaken as

y policy was adopte

tion is being review

d lighting designs co

nd Maintenance Staplemented.  

g commercial land fh a private investoro the market. 

0  

ed. 

wed as 

ompleted. 

andards 

for sale r to bring 

A

Actions 

OC3 Adequa

OC3.1 Prom

OC3.1.1 Ado

OC3.1.2 Devprogram 

OC3.1.3 Dev

OC3.2 Provi

OC3.2.1 ConAquatic Cenopportunitieimprovemen

OC3.2.5 Bog

OC3.2.6 Bogtoddler and 

OC3.2.7 Bog

OC3.2.8 BogSheeting 

OC3.2.9 BogBlocks 

OC3.2.11 Wmain pool 

OC3.3 Advo

OC3.3.1 MeTaskforce to OC3.4 Deve

OC3.4.1 Funpossible to d

OC4 Expand

OC4.1 Deve

OC4.1.1 Enafeeder progand work ex

Annual Report 201

ate health services 

motion of walking a

opt Walk and Cycle 

velop and impleme

velop a footpath re

de access to public

nduct a detailed revtre after 12 monthes for efficiencies ant 

ggabri Caravan Park

ggabri Swimming Pomain pools 

ggabri Swimming Po

ggabri  Swimming P

ggabri  Swimming P

Wee Waa  Swimming

ocate for adequate 

et with relevant pao discuss health serv

lop a Shirewide Re

nding identified anddevelop a Shirewide

ded tertiary educat

lop the community

able community devrams such as apprexperience 

14/2015 

to meet the needs

nd cycling 

Strategy 

nt footpath inspect

placement program

c swimming pools i

view of the Narrabrs of operations to ind continuous 

k Swimming Pool U

ool – Repair and pa

ool‐Electrical Repai

Pool –Replace Asbes

Pool –Replace Starti

g Pool – Repair and 

health services to 

arties through the Mvices 

ecreation Plan 

d applied for wheree Recreation Plan 

ional facilities (agr

y and recognise the

velopment throughenticeships, trainee

Resp

s of a regional cent

Commun

tion Director 

m  Director 

n Narrabri, Wee W

ri dentify 

Commun

pgrade Commun

aint Commun

rs  Commun

stos Commun

ing Commun

paint Commun

meet the needs of 

Medical General M

e Director 

iculture, education

e diverse composit

h ships  Human R

ponsible Manager

tre

nity Facilities Manag

Engineering Service

Engineering Service

Waa and Boggabri

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

a regional centre

Manager 

Corporate Services

n, business, mining

ion of the commun

Resources Manager

P

ger  Strategy Ado

es  Program deve

es Program deve

ger Narrabri Aqureviewed to aoperations. B

ger Completed w

ger  Completed w

ger Completed w

ger  Completed w

ger  Completed w

ger  Completed w

Number of spShire 

s  Funding appl

 and health)

nity

r Increase in coopportunitieslocal workfor

 

Performance Indica

pted by Council 

eloped 

eloped 

atic Centre operatioallow increase in effBusiness Plan review

within budget

within budget 

within budget

within budget 

within budget 

within budget 

pecialists, GPs and n

ied for 

ommunity access tos. Provide assistancrce opportunities fo

 

ator

ons are ficient wed 

nurses in the 

o developmentce to develop or all. Promotion 

   

Progres

Narrabri Shire WalNovember 2014. 

Not commenced. 

Not commenced.

Review of Aquatic conducted. Efficienimprovement actio

Not commenced.

Works completed.

Works completed.

Works completed.

Works completed.

Works completed.

No meetings held.

No funding oppo

Access to work expCouncil continues awebsite. Council ha

Page | 21

ss at 30 June 2015 

k and Cycle Plan ad

Centre Business Plancies and continuouons being implemen

rtunities identifie

perience opportunitand is promoted onas continued to 

1  

dopted in 

an 2012 us nted. 

d. 

ties within n Council's 

A

Actions 

OC4.1.2 Idecan reflect t

OC4.1.3 Proenable counthe commun

OC4.2 Grow

OC4.2.1 Enaand proceduCouncil activ

OC4.3 Deve

OC4.3.1 Meproviders toopportunitie

OC4.3.2 IntrNarrabri Shi

OC4.4 Provi

OC4.4.1 Contraining cou

Annual Report 201

ntify options for hohe composition of 

ovide systems, policncil’s workforce to rnity 

w volunteer involve

able volunteer involures to support thevities 

lop increase in loca

et with TAFE and oo discuss training anes 

roduce potential stare area 

de opportunities fo

ntinue to distributerses and programs 

14/2015 

ow council’s workfothe community 

cies and proceduresreflect the composi

ement

lvement through poir engagement with

al training and pop

ther educational send workforce 

aff for any industry

or local operators a

 information on relto local operators 

Resp

orce Human R

s to tion of  Human R

olicies hin  Human R

pulation workplace 

ervice 

Human R

 to the Human R

and businesses to b

evant Tourism 

ponsible Manager

Resources Manager

Resources Manager

Resources Manager

opportunities

Resources Manager

Resources Manager

be educated and in

Manager 

P

of apprentice

r  Options ident

r  Policies and p

r  Systems in pl

r Achieve increskill levels 

r  Facilitate em

ncrease skill levels f

Assist in crea

 

Performance Indica

eships 

tified and progresse

procedures in place

ace for engaging vo

ease in people obta

ployment growth 

for tourism

ting employment o

 

ator

ed 

olunteers 

ining higher 

opportunities 

   

Progres

accommodate an aa group training orhave commenced iFor The Dole opporenhance the commexperience with Co

Not commenced. 

Equal Employmentmanagement plan 

System in place for

Meeting held with Registered Trainingchanges to traineesCouncil. For 2014/2worker and new enqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio

Not commenced. 

Operators are provto opportunities cothrough DestinatioTourism Organisati

Page | 22

ss at 30 June 2015 

apprentice mechaniganisation. Investignto the provision ortunities which will munities access to wouncil. 

t Opportunity policyin place. 

r engaging voluntee

State Training and g Organisations to dship funding and op2015 Council had 3ntrant trainees comorticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv

vided information inoncerning training con NSW/Inland Regiion. 

2  

ic through gations of Work further 

work 

y and 

ers.  

discuss ptions for 5 existing 

mpleting nstruction , Local aste nt, ing and vices.  

n relation courses ional 

A

Actions 

OC4.4.2 Conand other reNational tou

OC4.4.3 Invitraining progNew EnglanOrganisation

OC4.5 Proac

OC4.5.1 Lobof New Englfacilities 

OC4.6 Provi

OC4.6.1 MaNorth RegioTamworth R

OC4.6.2 Ensoptimal use 

OC4.6.4 Ens

OC4.6.5 EnsBoggabri) ar

OC4.6.6 Cut

Annual Report 201

ntinue to make opeesource materials purism agencies 

itations to operatorgrams and briefingsd‐North West and In 

ctively engage with

bby government ageand for expanded t

de library services 

intain the partnersonal Library Service Regional Council 

sure library buildingof space is achieve

sure open hours are

sure branch librariere flexible spaces w

t‐Off Drain Library a

14/2015 

erators aware of staproduced by State a

rs to participate in s run by DestinatioInland Regional Tou

h government agen

encies and the Univtertiary education 

and facilities for th

hip with the Centracoordinated by 

gs are maintained aed 

e appropriate 

s (Narrabri, Wee Wwith multi format co

and Patching 

Resp

atistics and  Tourism 

n NSW, urism 

Tourism 

ncies for expanded 

versity General M

he benefit of the co

al 

Library M

nd Library M

Library M

Waa and ontent 

Library M

Library M

ponsible Manager

Manager 

Manager 

tertiary education

Manager 

ommunity

Manager 

Manager 

Manager 

Manager 

Manager 

P

Local operato

Training progtourism 

 facilities

Continue lobbfacilities upgr

Libraries are modern envirfor use for all

Libraries are modern envirfor use for all

Libraries are modern envirfor use for all

Libraries are modern envirfor use for all

Libraries are modern envirfor use for allavailable for Libraries are modern envir 

 

Performance Indica

ors assist in building

grams held to enabl

bying for Governmerades and new deve

maintained as welcronments. Libraries community memb

maintained as welcronments. Libraries community memb

maintained as welcronments. Libraries community memb

maintained as welcronments. Libraries community memb

maintained as welcronments. Libraries community. Libraruse for all communmaintained as welcronments members

 

ator

g tourism 

e increased 

ent funding for elopment 

come and s are available bers 

come and s are available bers 

come and s are available bers 

come and s are available bers 

come and s are available ries are nity members. come and s. 

   

Progres

Quarterly newslettoperators. 

Operators are provto opportunities cothrough DestinatioTourism Organisati

Lobbying opportunidentified. 

There have been a between Central NNarrabri including tprinter and Tech Sa

Use of optimal spa

Not commenced. 

The Narrabri Librarreplaced under Revgrant funding. Whehave been orderedcreate flexible spac

Not commenced. 

Page | 23

ss at 30 June 2015 

ter distributed to To

vided information inoncerning training con NSW/Inland Regiion. 

nities undertaken as

number of joint prorthern Regional Lithe circulation of thavvy Seniors. 

ce continually revie

ry circulation desk hvitalising Regional Leels and additional d for Narrabri Librarce. 

3  

ourism 

n relation courses ional 

ojects ibraries & he 3D 

ewed. 

has been Libraries shelves ry to 

A

Actions 

OC4.7 Encou

OC4.7.1 Disccommunity 

OC5 Adequa

OC5.1 Time

OC5.1.1 Lan

OC5.1.2 Uni

OC5.1.3 136

OC5.1.4 34C

OC5.1.5 Airp

OC5.2 More

OC5.2.1 App

OC5.3 Coun

OC5.3.1 Coudisadvantag

OC6 A safe p

OC6.1 Imple

OC6.1.1 ProShelter 

OC6.1.2 Raisowner respoLegislation 

OC6.1.3 Constray compaanimals whe

OC6.4 Take 

OC6.4.2 Coo

Annual Report 201

urage schools and 

cuss childcare need

ate accommodatio

ly release of land fo

nd released when ap

ts to be built

6 Rose Street Wee W

C George Street (Dr

port residence

e timely Developme

proved within legisl

cil applies influenc

uncil advocates for ged 

place to live, work 

ement requirement

ovide and operate a

se awareness of imonsibilities under th

nduct compliance aanion animals and iere necessary 

a lead role in the p

ordinate response t

14/2015 

private operators t

ds with providers an

n available to mee

or residential deve

ppropriate 

Waa (Dr’s residence

’s residence) 

ent Application app

lative guidelines 

ce at Government l

those who are 

and experience th

ts of the Companio

 Companion Anima

pounded animals ahe Companion Anim

udits of homeless ampound companio

planning and provis

to natural disasters 

Resp

to provide addition

nd General M

t demand (residen

elopment

EconomiManager

Property

e)  Property

Property

Property

provals

Director Developm

evel to provide sol

General M

e diversity of cultu

on Animals Act

als Director Developm

and mals 

Strategy Manager

and n 

Strategy Manager

sion of Emergency 

Director 

ponsible Manager

nal childcare faciliti

Manager 

tial, community, in

c Development r 

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

Planning and ment 

utions for those in

Manager 

ural activities

Planning and ment 

and Land Use r 

and Land Use r 

Management Serv

Engineering Service

P

ies

Adequate chi

ndustrial, aged and

Adequate acc

er Adequate acc

er Completed w

er  Completed w

er  Completed w

Decrease in alegislative gu

 disadvantaged sit

Influence ap

Companion amanaged. Proshelter 

Community A

Compliance A

vices

es Reduction in damage due t

 

Performance Indica

ldcare facilities in t

 itinerant)

commodation  

commodation for C

within budget

within budget 

within budget 

approval timeframeidelines 

uations where app

pplied 

nimals are approprovision and operati

Awareness Raised 

Audits conducted  

property and infrasto floods 

 

ator

the Shire 

ouncil staff

es within 

plicable

riately on of an animal 

structure 

   

Progres

Not commenced. 

Council has existingand is working withother land stock to

Not commenced.

Works completed.

Works completed

Works completed

Average DA turnarorequired informatiodays. Well below le

Lobbying opportunidentified. 

Companion animalaccordance with le

Ongoing educationwith inspection and

Councils Ranger seratepayer requestsabandoned animal

Have been availabl

Page | 24

ss at 30 June 2015 

g commercial land fh a private investoro the market. 

d. 

d. 

ound time from recon for 2014/2015 wegislated period of 4

nities undertaken as

’s shelter operatedgal obligations. 

n program in conjund enforcement duti

rvices responding ts as received re stras. 

e to support as nee

4  

for sale r to bring 

ceipt of all was 18 42 days. 

d in 

nction ies.  

to ay/ 

eded.  

A

Actions 

OC6.4.3 Prodisasters 

OC6.5 Offer

OC6.5.1 Carleast on a qu

OC6.5.2 Devservices thatChildren’s BPreschool St

OC6.5.3 Proresidents 

OC6.5.4 Actmainstreamcommunity 

OC6.6 Facilit

OC6.6.1 Conand events t

OC6.6.2 Woconference conference 

OC6.6.3 Wopromote ma

Annual Report 201

ovide support for co

r library services an

rry out programs in uarterly basis 

velop a plan of childt can be applied at ook week . Simultatory time 

ovide home library s

ively seek/foster pa and socially isolate

tate, coordinate, e

ntinue to support athat bring visitors in

ork with The Crossinand meeting venueand meetings mark

ork with The Crossinajor entertainment 

14/2015 

ombat agencies dur

nd programs as wel

all branch libraries

dren’s programs anbranch libraries. neous Story time. 

services to housebo

artnerships with boed sectors of the 

encourage and deve

nd assist local festivnto the Shire 

ng Theatre and othee operators to buildket 

ng Theatre to attracevents 

Resp

ring 

Director 

ll as outreach servi

 at 

Library M

Library M

ound Library M

oth 

Library M

elop festivals and e

vals Tourism 

er d the  Tourism 

ct and Tourism 

ponsible Manager

Engineering Service

ces to disadvantag

Manager 

Manager 

Manager 

Manager 

events for the Narr

Manager 

Manager 

Manager 

P

es Reduction in damage due t

ged sectors of the c

Programs conbranch 

No. active bo

No. of progra

No. of progra

rabri Shire

Local festivals

More confereNarrabri Shire

More major eNarrabri Shire

 

Performance Indica

property and infrasto floods 

community

nducted each quart

ok group. 

ams for adults  

ams for children 

s and  events suppo

ences and meetingse 

entertainment evene 

 

ator

structure 

ter at each 

orted 

s held in 

nts held in 

   

Progres

Council is part of thManagement ComEmergency ManageCouncil supported exercises at the air

In the last year Narrange of events forgroups. Across the programs and meeparticipants and 31

Across the Shire lasevents and program759 adults and 305which included Stoand Preschool visitevents. 

Narrabri Libraries dInstitutions.  

Narrabri Libraries fschools, preschoolsdeliver services. Otthe libraries are hoseniors through theprogram. 

Assistance and supand local events wipromotional dvd's 

Council assisted anTheatre and other 

Council assisted anTheatre and other 

Page | 25

ss at 30 June 2015 

he Local Emergencymittee, Chaired Locement Committee,mock response plarport.  

rrabri Libraries hostr children, adults anShire there were 5

etings, with 1786 ad137 child participan

st year there were 2ms, specifically for c51 attended these eorytime, Baby Bouns as well as other s

delivered items to 4

formed partnerships, aged care facilitiether isolated groupsome schooled studee Tech Savvy Senior

pport provided to coith bid applicationsand images. 

nd supported The Cvenue operators. 

nd supported The Cvenue operators. 

5  

y cal  and nning 

ted a wide nd isolated 02 events, dult nts. 

286 children. events ce, School pecial 

ps with es to s using ents and rs 

ommunity , 

rossing 

rossing 

A

Actions 

OC6.6.4 Woother opera

OC6.6.6 Ideevents for th

OC6.6.7 Wogroups to bi

OC6.7 Provi

OC6.7.1 Proorganisationand events 

OC6.7.2 Con

OC6.7.3 Conregionally thadvertising 

OC6.8 Prom

OC6.8.1 InveManagemen

OC6.8.2 Invetouring prog

OC6.9 Facilit

OC6.9.3 Coo

OC6.9.4 Inve“destinationMusic Festiv

OC6.9.5 Facperformance

OC6.9.6 Fac

OC6.9.7 Fac

Annual Report 201

ork with transport, ators to develop and

ntify and endeavouhe Shire 

ork with local sportid for and host even

de assistance and a

ovide advice and assns looking to hold a

ntinue to maintain t

ntinue to publicise ehrough print, digita

mote The Crossing T

estigate the establint Network within t

estigate options forgrams 

tate and/or coordi

ordinate a Bridal Op

estigate potential fn” festival (eg Elvis Fval in Tamworth) 

ilitate touring and pes 

ilitate weddings an

ilitate conferences,

14/2015 

accommodation and market event pac

ur to attract foot loo

ng and community nts within the Shire

advice to local eve

sistance to local nd /or bid for festiv

the events Calende

events locally and l, radio and televisi

Theatre as a  region

shment of a Venuethe Region and bey

r linking into region

inate festivals and 

pen Day 

or an annual Festival in Parkes, C

planned events and

nd special occasions

, meetings 

Resp

d ckages 

Tourism 

ose Tourism 

e Tourism 

nt organisers and i

vals  Tourism 

er Tourism 

on  Tourism 

nal and state theatr

es yond 

The CrosManager

nal  The CrosManager

events at The Cros

The CrosManager

Country The CrosManager

d The CrosManager

s The CrosManager

The CrosManager

ponsible Manager

Manager 

Manager 

Manager 

individuals / group

Manager 

Manager 

Manager 

re and entertainme

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

P

Event packag

Foot loose ev

Events hosted

s looking to organi

Tourism mark

A Shire‐wide community m

Local events 

ent venue

e Network esta

e More program

e  A number of the communi

e  A number of the communi

e  A number of the communi

e  A number of the communi

e  A number of the communi

 

Performance Indica

ged developed and 

vents held in Narrab

se or bid for event

keting materials dis

calendar is availablmembers to publicis

publicised where p

ablished 

ms at The Crossing 

festivals and  eventity at The Crossing T

festivals and  eventity at The Crossing T

festivals and  eventity at The Crossing T

festivals and  eventity at The Crossing T

festivals and  eventity at The Crossing T

 

ator

marketed 

bri Shire 

ts

stributed 

le for local se events 

ossible 

Theatre 

ts are held for Theatre 

ts are held for Theatre 

ts are held for Theatre 

ts are held for Theatre.  

ts are held for Theatre. 

   

Progres

Council worked witevent packages. 

Council assisted wivisiting car rally’s.

Council worked witcommunity groups

Council worked witdevelop event packwith bids. 

The events calendapublicise events. 

Council publicised available. 

Member of Arts No(11 venues across t

Member of Arts No(11 venues across t

Not commenced. 

Not commenced. 

Regular events proThere were 11 showyear. 

Regular events proThere were 13 eveyear. 

Regular events proThere were 109 ev

Page | 26

ss at 30 June 2015 

th local operators t

th footloose events

th local sporting an to develop event p

th local organisatiokages and provide a

ar was maintained t

events through all a

orth West, On Tour the region. 

orth West, On Tour the region. 

ogrammed and delivws facilitated durin

ogrammed and delivnts facilitated durin

ogrammed and delivents facilitated dur

6  

o develop 

s such as 

d packages. 

ns to assistance 

to 

avenues 

network 

network 

vered. ng the 

vered. ng the 

vered. ring the 

A

Actions 

OC6.10 Faci

OC6.10.1 Encentre and efinancial con

OC6.11 Imp

OC6.11.1 Exrenewal, rep

OC6.11.2 Rereferencing Managemen

OC6.11.3 Coeach asset cOpen Space 

OC6.12 Com

OC6.12.1 Dereview a Levparks, garde

OC6.12.2 DePlan which rthe commun

OC6.12.3 Prthe Open SpNarrabri Creplayground 

OC6.12.4 Prthe Open SpNarrabri CreGarden adja

OC6.12.5 Idemanaged byManagemen

Annual Report 201

litate community b

ncourage communitevaluate spatial neentribution 

lement Parks and O

xamine renewal bacplacement and disp

eview capital worksthe renewal demannt Plan 

ollect better data anclass and category aAsset Managemen

mmunity members 

evelop, adopt, implvels of Service and Mens and sporting ve

evelop and adopt a reflects the sport annity 

repare and adopt a pace Precinct on theeek including considadjacent to the New

repare and adopt a pace Precinct on theeek including considacent the Hospital c

entify the location y Council which reqnt and create a prio

14/2015 

based programs at 

ty programs for theeds and level of Cou

Open Space Asset M

cklog and categoriseposal 

s proposed for 2013nds in the Asset 

nd financial variableand update the Parknt Plan 

are regular users o

ement, monitor anMaintenance Progrnues 

Sport and Recreatind recreation need

Plan of Managemee eastern side of thderation of a futurewell Highway 

Plan of Managemee western side of thderation of a Commcar park 

of Crown Reserves uire Plans of oritised list based on

Resp

The Crossing Thea

e uncil  The Cros

Manager

Management Plan

e into Commun

3‐2022 Commun

es for ks and  Commun

of parks, gardens an

nd ram for  Commun

ion s of  Commun

ent for e e 

Commun

ent for he munity 

Commun

n Property

ponsible Manager

tre

sing Theatre Venuer 

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nd sporting venues

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

 and Assets Manag

P

Community (interested. 

e A number of the communiCommunity (interested. 

ger  Park and Ope

ger  Park and Ope

ger  Park and Ope

s

ger  Levels of Serv

ger Narrabri Shiredeveloped an

ger Plan of Manabanks develo

ger Plan of Manabanks develo

er Accurate andadopted 

 

Performance Indica

including youth) ac

festivals and  eventity at The Crossing Tincluding youth) ac

en Space Asset Man

en Space Asset Man

en Space Asset Man

vice adopted by Cou

e Sport and Recreatnd adopted by Coun

gement for easternped and adopted 

gement for westerped and adopted 

 prioritised list com

 

ator

ctive and 

ts are held for Theatre. ctive and 

nagement Plan 

nagement Plan 

nagement Plan 

uncil 

tion Plan ncil 

n side of creek 

n side of creek 

mpleted and 

   

Progres

year.

Community relatedEisteddfod, ADFAS,Friends of The Crosevents during the y

Parks and Open Spreviewed and curre

Parks and Open Spreviewed and curre

Parks and Open Spreviewed and curre

Levels of Service andeveloped and imp

Not commenced. 

Not commenced. 

Not commenced. 

Reserves listed, somcomplete but not y

Page | 27

ss at 30 June 2015 

d events including N, Carols by Candlelissing Theatre. Thereyear. 

ace Asset Managemently in final draft.  

ace Asset Managemently in final draft.  

ace Asset Managemently in final draft.  

nd Maintenance Staplemented.  

me Plans Of Managyet comprehensive.

7  

Narrabri ght and e were 29 

ment Plan 

ment Plan 

ment Plan 

andards 

gement . 

A

Actions 

function, us

OC6.12.6 Printo the preManagemen

OC6.12.8 Cocore CBD areactivities 

OC6.12.9 RePlaygroundsprocedures 

OC6.12.10 Cascertain coManagemen

OC6.12.11 RSpace assetsSpace Asset 

OC6.12.13 Aand incorpoof Service fo

OC6.12.15 Inthe Terms oNarrabri Lakrole and resNarrabri Lak

OC6.12.16 InBeaches andaccordance 

OC6.12.19 Bequipment 

OC6.12.20 B

OC6.12.26 NDoyle and B

Annual Report 201

e and strategic imp

rovide input, from aparation of Plans ont Plans prepared b

ouncil to encourageea by facilitating co

eview and update ths Risk Management

Conduct audit of plaompliance with Playnt Policy 

Renew, replace or ds in accordance witManagement Plan

Adopt the Narrabri rate maintenance ror Parks and Garden

n consultation withf Reference/Constike Advisory Commitponsibility for implke Plan of Managem

nstall Remote Suped Pools under Counwith StateCover Gu

Boggabri Parks ‐ Vic

Boggabri Parks – CB

Narrabri (Town) pararwan Streets 

14/2015 

portance to Council 

a tourism perspectivf Management andby Council and local

e community use ofommunity events an

he Narrabri Shire t Policy and implem

aygrounds across Sygrounds Risk 

dispose of Park and h the Parks and Op 

Lake Plan of Managrequirements into Ln 

h the committee, retution for the Sectittee including definementation of the ment 

ervision Signs at Resncil management in uideline 

ckery Park Replace P

BD Irrigation system

rks –Install Roundab

Resp

ve, d Asset  Trusts 

Commun

f the nd  Commun

ment Commun

hire to 

Commun

Open pen  Commun

gement Levels  Commun

eview on 355 ning its  Commun

serves, Commun

Play Commun

m  Commun

bout at Director 

ponsible Manager

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

nity Facilities Manag

Engineering Service

P

ger  Tourism facto

ger Number of evincreases eac

ger Playgrounds maintained to

ger Audit of all pltaken to ensu

ger Council manaaccordance wManagement

ger MaintenanceManagement

ger Terms of Referole and respand adopted 

ger Appropriate suse of parks, well as hazard

ger  Completed w

ger Completed w

es  Completed w

 

Performance Indica

ored into planning d

vents and activities ch year 

regularly inspectedo a safe standard 

laygrounds completure playgrounds are

ages its existing assewith the adopted Ast Plan 

e standards adoptedt including in Levels

erence/Constitutiononsibility of commiPlan of Manageme

signage clearly detareserves, beaches ads 

within budget 

within budget

within budget 

 

ator

documents 

in the CBD 

 and 

ted and action e safe for use 

ets in sset 

d in Plan of s of Service 

n reflects the ittee members ent 

ails acceptable and pools as 

   

Progres

Not commenced. 

Events and commuBusiness District suresources.  

Relevant employeePlayground risk assStandards. Playgromaintained to a saf

Relevant employeePlayground risk assStandards. Playgromaintained to a saf

Parks and Open Spreviewed and curre

Narrabri Lake Plan and included in Coumaintenance progr

Narrabri Lake Advisadvisory CommitteImplementation ofongoing primarily tcommunity group i

Not commenced. 

Works completed.

Not commenced.

Not commenced. 

Page | 28

ss at 30 June 2015 

unity use of the Cenupported within ava

es formally trained sessment and Austrunds regularly inspfe standard.  

es formally trained sessment and Austrunds regularly inspfe standard.  

ace Asset Managemently in final draft.  

of Management aduncil's levels of servram.  

sory Committee is aee of Council. f the Plan of Managthrough grant fundiinput.  

8  

ntral ailable 

in ralian pected and 

in ralian pected and 

ment Plan 

dopted vice and 

an 

gement ing and 

A

Actions 

OC6.12.27 Nsignage 

OC6.13 Tow

OC6.13.1 FaCommitteesNarrabri andrepresentat

OC6.14 Enco

OC6.14.1 Coto celebrate

OC6.15 Mon

OC6.15.1 CoCommittee, environmenPlan. 

Annual Report 201

Narrabri (West) Par

wns and Village Entr

acilitate the formatis with documented d Wee Waa consistives 

ourage and recogn

ouncil to host a yeae local volunteers 

nitor crime rates an

ouncil to work with and NSW Police to

nt and implement C

14/2015 

ks – Remote Superv

ry Points in the Shi

ion of Tidy Towns Terms of Referencing of community 

ise the work of vol

rly volunteer celeb

nd promote Narrab

the Crime Prevento support a safe ouncil’s Crime Prev

Resp

vision Commun

ire are visually and

e for  EconomiManager

unteers

ration Director 

bri Shire as a safe a

ion 

vention General M

ponsible Manager

nity Facilities Manag

 aesthetically appe

c Development r 

Corporate Services

and secure environm

Manager 

P

ger  Completed w

ealing to residents 

Tidy Towns Cmembers in N

s Annual celebWeek 

ment for families

Council repreCommittee m

 

Performance Indica

within budget 

and visitors

ommittees formedNarrabri and Wee W

ration held during V

esentation at Crimemeetings 

 

ator

 by community Waa 

Volunteers 

 Prevention 

   

Progres

Not commenced. 

Not commenced. 

Volunteer Week ceweek of May 2015.

Crime Prevention Sreferred to relevan

Page | 29

ss at 30 June 2015 

elebrations held in s. 

Strategy adopted annt Minister for endo

9  

second 

nd orsement. 

A

 

Annual Report 20114/2015 

 

        Page | 300  

Annual R

 

 

 

Report 2014/2015 

 

Page | 31  

Annual R

A SuRespThe comthat a quEveryon

$7Granfor th

ofCestr

C

1Mee

confe

at Th

T

Planninto ame

havcom

Report 2014

ustainaect For

mmunity is muality living ee can contri

70,000nt Fundinhe Contrf Green rum, EulaCreek 

109 etings and

erences he

he Crossin

Theatre 

4 ng propoend the Lve been mpleted 

/2015 

able Enr Our Wmindful that tenvironmentbute whethe

0 ng rol 

ah 

eld 

ng 

osals LEP 

nvironWhole L

he whole of t for the entier living and 

2Head

thro

S

$1Grathe c

tC

Rec

VisithePilli

Marc

nmentiving Ethe living enire Shire comworking in t

26,0d of stoc

ough Nar

Saleyard

111,69

nt Fundinconstructihe NarrabCommunitcycling Ce

910itors spene night at ga Bore B

from ch – June 

Environnvironment nmmunity is acowns or villa

097 

k sold 

rrabri 

ds 

91

ng for ion of bri ty entre 

0 nding the 

Baths 

2015 

nment needs to be cchievable forages or in rur

rec

D

A

PCr

Page |

t considered tr the future.ral areas. 

 59Tonne

co‐min

cycling c

kerbs

138Developm

Applicat

Determi

730Patrons atrossing Th

Café  

32  

to ensure  

s of 

gled 

ollected 

ide 

ment 

ions 

ned 

09 t The heatre 

A

TP

Actions 

SE1 Sustaina

SE1.1 Review

SE1.1.2 Reviand identifyimplementa

SE1.3 Ensure

SE1.3.1 Deveservices inclapplications

SE1.4 Deter

SE1.4.1 Devepriorities 

SE1.5 Sustai

SE1.5.1 Increconstruction

SE1.5.2 Quarehabilitatio

SE1.5.4 Sustpits 

SE1.5.5 Revi

SE1.6 Active

SE1.6.1 Idenpartner withnoxious andbiodiversity 

Annual Report 201

Theme 2: A Principal activitie

able land use

w and develop stat

iew Council’s Local y required amendmation of the plan   

e comprehensive G

elop a plan of workuding Web Based, s 

mine access requir

elop Urban Streets 

inable use of resou

eased use of recycln 

rries & gravel pits aon at the end of the

tainable manageme

iew gravel sale pric

ely partner with the

ntify and capitalise oh public and privated invasive species toin the Shire 

14/2015 

A sustainables – projects and

tutory and non‐ sta

Environmental Planents following the g

GIS services are ava

ks for upgrading maGPS and 3D mappin

rements to current 

& intersections up

urces

ed materials in roa

are managed to alloeir useful life 

ent of quarries and 

es

e Northern Inland W

on opportunities toe land owners to mao minimise the impa

le environmd services

Resp

atutory plans to pro

n 2012 gazettal a

Director Developm

ailable to support t

apping ng 

Property

land bank within t

grade Director 

d Road Ser

ow Road Ser

gravel Road Ser

Road Ser

Weeds Advisory Co

o anage act on 

Strategy Manager

ment - Respe

ponsible Manager

ovide for orderly a

Planning and ment 

the management o

 and Assets Manag

towns

Engineering Service

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager

ommittee to imple

and Land Use r 

pect for our w

P

nd sustainable dev

Review unde

f land and property

er 

Software purstaff training to best practiadministratioand updated.

es Strategic planAdoption by C

Materials rec

Funds in rese

Manage Quasustainability

Gravel price i

ment the Weed Ac

Weed Action implemented

 

whole living

Performance Indica

velopment

rtaken 

y

chased and implemprovided. GIS serviice design and planon services. GIS serv. 

nning for urban devCouncil 

ycled where possib

erve for quarry reha

rries and Gravel Pity in mind 

n line with market 

ction Plan and Invas

Plan and Invasive sd 

 

ng environm

ator

mented. Initial ices contribute ning vices developed 

velopment. 

ble 

abilitation 

s with 

forces

sive Species Plan

species Plan 

   

ment

Progres

Four (4) separate pthe LEP were compreview of Narrabri was also completedneed for consultan

Currently reviewingsoftware for implemMapInfo (MI) instaAnalyst included, Mreviewed as web‐bspatial data.  

Not commenced. 

Materials Recycledopportunities ident

Funds being placedrehabilitation. 

Managing Quarriesfuture rehabilitatio

Gravel price adjust

Several communitycoordinated by Coueducation days, prafunded chemical su 

Page | 33

ss at 30 June 2015 

planning proposals tpleted in the year aGrowth Managemed. All in house withts.  

g WaterRIDE flood mentation. Upgradlled, Spectrum SpatMapInfo Stratus beibased catalogue of C

 where possible whtified. 

d in reserve for qua

s and Gravel Pits to on. 

ed in line with mar

y eradication prograuncil including comactical assistance aupply. 

3  

to amend nd a ent Plan out the 

modelling e to tial ng Councils 

hen 

rry 

enable 

ket forces. 

ams were munity nd grant 

A

Actions 

SE1.7 Devel

SE1.7.1 Liaisweed managactions of th

SE1.8 Devel

SE1.8.1 Liaisweed managactions of th

SE2 Ensure a

SE2.1 Exerciwith statuto

SE2.1.1 Asseand provide

SE2.1.2 Provservices for 

SE2.1.3 AsseCertificates 

SE2.1.4 Issuesection 68 o

SE2.1.5 Issuecertificates (zoning inforthe Council property to 

SE2.1.6 Prepdiagrams  

SE2.1.7 Provservices  

SE2.1.8 Loca

SE2.1.9 Prov

Annual Report 201

op, implement and

se with and integratgement as per Weehe North West Loca

op, implement and

se with and integratgement as per Weehe Namoi Catchmen

a clean, green envi

ise Council’s statutory requirements a

ess and determine d updated monthly r

vide building and ceconstruction  

ess and determine cas required 

e approvals and/orof the Local Governm

e statutory certifica(Planning certificatemation as well as idrequire current andbe aware of) 

pare, amend and di

vide pre and post d

al Government (LG)

vide an analysis of d

14/2015 

d monitor the Bord

te noxious and invaed Action Plan withal Lands Services    

d monitor the Nam

te noxious and invaed Action Plan withnt Management Au

ironment for the fu

tory functions undeand / or Council Pol

development applicreport to Council 

ertification inspecti

complying develop

r inspect work undement Act 1993 

ates including 149 es identify propertydentify other matted prospective owne

stribute drainage 

evelopment applica

) performance mon

development trend

Resp

der Rivers Gwydir C

asive  

Strategy Manager

moi Catchment Actio

asive  uthority 

Strategy Manager

uture

er the Environmentlicy and Standards

cations  Director Developm

on  Strategy Manager

ment  Strategy Manager

er  Strategy Manager

y ers that ers of a 

Strategy Manager

Strategy Manager

ation  Strategy Manager

itoring  StrategyManager

s being  Strategy 

ponsible Manager

Catchment Action P

and Land Use r 

on Plan

and Land Use r 

tal Planning and As

Planning and ment 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use 

P

Plan

Plan impleme

Plan impleme

ssessment Act 1979

DevelopmentDevelopmentstatutory fram

Building Cert

Complying deprovided  

Section 68 Ap

Issue all certireceipt and ademonstrate

Drainage Diag

Pre and post provided  

LG performan

Analysis of tr

 

Performance Indica

ented 

ented 

9 properly and equ

t Applications assest is regulated in accmework 

ification Services pr

evelopment  assess

pplications assessed

ficates within an avudit of 10 random s accuracy 

grams completed 

Development Appl

nce monitoring data

ends provided 

 

ator

itably and determi

ssed, cordance with 

rovided  

ment services 

d and approved  

verage 7 days of certificates 

ication services 

a submitted 

   

Progres

Numerous grant fuwith Local Land Ser

Requirements of W

ine applications eff

Average Developmtime from receipt ofor 2014/2015 waslegislated period of

Certification servic

Complying develop

Local approvals com

Certificates were isturnaround time of

Drainage diagrams licenced plumber uDepartment of Fair

Service provided w

Data submitted on 

Trends reported.

Page | 34

ss at 30 June 2015 

unding programs corvices. 

Weeds Action Plan b

ficiently and in acco

ment Application turof all required infors 18 days. Well belof 42 days. 

es provided. 

pment certificates is

mpleted. 

ssued regularly withf well less than 7 da

required to be comunder requirementsr Trading. 

where requested. 

time. 

4  

ompleted 

being met.  

ordance 

rnaround rmation ow 

ssued. 

h average ays. 

mpleted by s of 

A

Actions 

experienced

SE2.2 Impro

SE2.2.1 Imp(OSSM) Polic

SE2.2.2 Promprogram andsustainable 

SE2.3 Suppo

SE2.3.1 Undfor the Loca

SE2.4 Devel

SE2.4.1 Appfunding fromClimate Cha

SE2.5 Devel

SE2.5.1 AppAction Plan 

SE2.6 Capita

SE2.6.1 Incluplanning  

SE2.7 Devel

SE2.7.1 AppAction Plan require pres

SE2.7.2 Croswith the Touensure cons

Annual Report 201

d within the Local G

ove the monitoring 

lement the On‐site cy as adopted by th

mote community awd provide informatioutcomes on OSSM

ort effective report

ertake a State of thl Government Area

op a Climate Chang

ly for Local Adaptatm the federal governge Risk and Adapt

op a Greenhouse A

ly for funding to de

al works are subjec

ude environmental 

op an Environment

ly for funding to deto identify environmservation and/or pr

ss reference the Envurism Plan and othesistency 

14/2015 

Government Area 

and management 

Sewerage Managehe Council 

wareness of the OSion on best practiceM 

ting regimes on env

he Environment Repa  

ge Risk and Adapta

tions Pathways or srnment to develop tation Plan 

Action Plan to ident

evelop a Greenhous

ct to environmenta

assessment in proj

tal Action Plan evelop an Environmmental features whrotection 

vironmental Actioner relevant plans to

Resp

Manager

of onsite effluent d

ement  Strategy Manager

SSM e for 

Strategy Manager

vironmental compl

port Strategy Manager

ation Plan

similar a  Director 

tify strategies and 

se Director 

al assessment

ject Director 

mental hich  Director 

n Plan o 

Director Developm

ponsible Manager

r

disposal within the

and Land Use r 

and Land Use r 

liance

and Land Use r 

Corporate Services

actions to reduce p

Corporate Services

Engineering Service

Corporate Services

Planning and ment 

P

e region

OSSM policy 

OSSM supporoutcomes 

State of the EEnvironmentagencies 

s Funding sourChange Risk a

power consumptio

s Funding sourAction Plan 

es  Reflected in P

s Funding sourEnvironment

Other relevanEnvironmentconsistency aactions  

 

Performance Indica

implemented 

rts positive environ

Environment Reportal reporting is subm

ce secured to deveand Adaption Plan

n and emissions

ce secured to deve

Project Managemen

ce secured to deveal Action Plan 

nt plans align with tal Action Plan to acand avoid conflicts i

 

ator

mental 

t undertaken. mitted to State 

lop Climate 

lop Greenhouse 

nt Plans 

lop 

the chieve n strategies and 

   

Progres

On‐Site Sewer Manprogram complete

On‐Site Sewer Manand audit program Site Sewer Manageincluding new inforeducational compofinalisation. 

State Of Environme2016. Negotiationscontinuing. 

No funding opportfor this type of pro

No funding opportfor this type of pro

Environmental asseproject planning. 

No funding opportfor this type of pro

No Environmental 

Page | 35

ss at 30 June 2015 

nagement System ad.  

nagement System incompleted. New dement System stratrmation sheets andonents completed, a

ent report not due s regarding regional

unities have been iject. 

unities have been iject. 

essment undertake

unities have been iject. 

Action Plan develo

5  

audit 

nspection raft On‐egy d awaiting 

until l plan 

dentified 

dentified 

en in 

dentified 

ped. 

A

Actions 

SE2.8 To par

SE2.8.1 Cou

SE2.9 Provid

SE2.9.2 DeveManagemenContract 

SE2.9.3 Devestrategies rerecycling in Contractor a

SE2.10 Man

SE2.10.1 DeNarrabri Lan(LEMP) 

SE2.10.2 Finof the Narra

SE2.10.3 MaStations in cEnvironmenlegislation a

SE2.10.4 Dethe Narrabriin accordancguidelines 

SE2.10.7 Na

SE2.10.8 Wa

SE2.10.14 Ex

Annual Report 201

rticipate in Commu

ncil involvement in

de a safe, reliable a

elop and implemennt Plan (CMP) for th

elop and implemenegarding waste avoconsultation with Cand the Northern In

age waste collectio

velop, implement, ndfill Environmenta

nalise, adopt and coabri Shire Waste Ma

anage the Narrabri compliance with thental Protection Licennd guidelines 

velop and adopt ani Landfill to guide ace with relevant leg

rrabri Weighbridge

aste Data Collection

xtension of Current

14/2015 

unity Consultative C

 CCC 

and economic wast

nt the Contract he Waste Services 

nt community educidance, reuse and Council Waste Collenland Regional Was

on, disposal and re

monitor and reviewal Management Plan

ommence implemenanagement Strategy

Landfill and Transfee Narrabri Landfill nce and relevant 

n overall Master Plappropriate developgislation, regulation

e and Gatehouse  

n Software  

t Cells and Landfill A

Resp

Committee (CCC)

General M

te collection and di

Strategy Manager

ation 

ection ste  

Strategy Manager

ecycling in accordan

w the n 

Strategy Manager

ntation y 

Strategy Manager

er Strategy Manager

an for pment ns and 

Strategy Manager

Strategy Manager

Strategy Manager

Area  Strategy 

ponsible Manager

Manager 

isposal service whi

and Land Use r 

and Land Use r 

nce with relevant le

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use 

P

Council involvmonitoring osector 

ch meets modern e

Formal CMP dpractice admnext 10 years

Recycling tontonnages dec

egislation, regulatio

High priority within time, tbudget 

No breaches Licence or rel

Master Plan ffuture develo

Completed w

Completed w

Completed w

Completed w

 

Performance Indica

vement in CCC and f dust and noise in 

environmental stan

developed as a guidinistration of the cos 

nnages increase; wacrease 

ons and guidelines

strategies and actioto the quality requi

of the Environmentlevant legislation oc

for Narrabri Landfilopment 

within budget 

within budget 

within budget 

within budget

 

ator

environmental the resource 

ndards

de for best ontract over 

aste to landfill 

ons completed red and within 

tal Protection ccur 

l site to guide 

   

Progres

Council is also pursmonitoring at a reg

Contract Managemscope being discuscontract prior to de

Northern Inland Reprograms on targetcontractor re educacontinuing.  

Local EnvironmentNarrabri landfill de

Formalised waste mawaiting completiodevelopment prior

Councils waste opeevidenced by licencand no improveme

Interim Master placompliance with EnAuthority requiremmanagement. Newdeveloped after up

Design works comp

Awaiting install of w

Works completed.

Page | 36

ss at 30 June 2015 

suing dust and noisegional level. 

ment Plan requiremsed between 3 couevelopment.  

egional Weeds educt. Discussions with ation program requ

al Management Plaveloped and imple

management strateon of upgrading stagr to implementation

erations compliant ce requirements beent programs being 

n completed to ensnvironmental Protements to determine w overall plan to be pgrade program com

pleted.  

weighbridge.  

6  

ents and ncils in 

cation 

uirements 

an for mented.  

egy ge of n.  

as eing met issued.  

sure ection program 

mpleted.   

A

Actions 

SE2.10.15 N

SE2.10.17 W

SE2.10.18 N

SE2.11 Man

SE2.11.1 Opto meet licerequirement

SE2.11.2 Ref

SE2.11.3 UpStation & va

SE2.11.5 Ref

SE2.11.7 Up

SE2.11.8 CleTreatment P

SE2.11.9 Opfacilities to mrequirement

SE2.11.10 Mpumping staindustrial cuand disposaenvironmen

SE2.11.14 U

Annual Report 201

arrabri Internal Ent

Wee Waa Seal Trans

arrabri Design/Inve

age wastewater an

perate and maintainnce conditions andts 

furbish /replace dig

pgrade and maintainalves ‐ Wee Waa 

furbish Digester mi

pgrade and maintain

ean Stormwater DetPlant ‐ Narrabri 

perate and maintainmeet licence conditts 

Maintain the sewer rations to serve residustomers and convel to meet licence contal requirements 

pgrade electrical &

14/2015 

try/Exit Roadworks 

sfer Station access R

estigation/Planning

nd effluent in a sus

n sewage treatment environmental 

gester mixer ‐ Wee 

n Trickling Filter Pu

xer ‐ Narrabri 

n drying beds ‐ Narr

tention areas at Sew

n effluent managemtions and environm

reticulation systemdential, commerciaey sewage for treatonditions and 

& mechanical compo

Resp

Manager

Strategy Manager

Road Strategy Manager

g Strategy Manager

stainable manner

t plants Water Se

Waa  Water Se

mp Water Se

Water Se

rabri  Water Se

werage Water Se

ment mental  Water Se

m and l and ment  Water Se

onents‐ Water Se

ponsible Manager

r

and Land Use r 

and Land Use r 

and Land Use r 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager

P

Completed w

Completed w

High priority within time, tbudget 

No Non‐ComLicences 

Works prograimplemented

Works prograimplemented

Works prograimplemented

Works prograimplemented

Works prograimplemented

No Non‐ComLicences 

Maintenanceachieved 

Works progra

 

Performance Indica

within budget 

within budget 

strategies and actioto the quality requi

pliances with Enviro

ams developed, updd within allocated ti

ams developed, updd within allocated ti

ams developed, updd within allocated ti

ams developed, updd within allocated ti

ams developed, updd within allocated ti

pliances with Enviro

e targets and upgrad

ams developed, upd

 

ator

ons completed red and within 

onmental 

dated and imeframes 

dated and imeframes 

dated and imeframes 

dated and imeframes 

dated and imeframes 

onmental 

de programs 

dated and 

   

Progres

Design works comp

Not commenced. 

Design and investigupgrade program ccompliance progra

Non compliance idprocess to be moni

Manufacturing of rprogress. 

Works completed.

Works completed.

Not commenced. 

Not commenced. 

Monthly effluent saidentify non complBoggabri currently augmentation due development . 

Continued servicingplace. A preventatifinal stages of draftPollution Incident Mdrafted to include astations. 

Work completed.

Page | 37

ss at 30 June 2015 

pleted.  

gation works for cacontinuing with ongm.  

entified and treatmitored.  

replacement mixer 

ampling taking placying discharges. Thsubjected to assessto impact of the Ci

g and monitoring pive maintenance prting for implementaManagement Plan hall risk areas such a

7  

pital going 

ment 

in 

ce to he plant at sment for veo 

program in rogram in ation. A has been as pump 

A

Actions 

Elizabeth Str

SE2.11.15 Sefittings annu

SE2.11.16 Coinfrastructu

SE2.11.17 Dprogram 

SE2.11.18 Conetwork 

SE2.11.19 Uinfrastructulegislative dplanning req

SE2.11.20 Enreview of Na

SE2.11.22 Acompliance Developmen

SE2.11.23 Bo

SE2.11.24 N

SE2.11.26 W

SE2.11.28 BoTelemetry ‐ 

SE2.11.31 NUpgrade ‐ N

SE2.11.32 WTelemetry ‐ 

SE2.11.34 FeUpgrade Tel

Annual Report 201

reet Pump Station

ervice all Sewer Pumually 

onstruct new and rre as required 

evelop initial maint

ontinue with CCTV 

ndertake long termre works and effluerought managemenquirements 

ngage consultancy arrabri Shire wastew

ssess and issue conwith sewage relatent and new subdivis

oggabri Sewer ‐ Up

arrabri Sewer ‐ Upg

Wee Waa Sewer ‐ Up

oggabri Sewer TreaBoggabri Treatmen

arrabri Sewer Treatarrabri Treatment W

Wee Waa Sewer TreWee Waa Treatme

ederation Farm Sewlemetry ‐ Federatio

14/2015 

mp Station pumps a

replacement 

tenance/replaceme

assessments of sew

m planning of futureent reuse facilities tnt and capital work

firm to undertake awater collection ne

nditions and ensureed aspects of sions 

pgrade Telemetry 

grade Telemetry 

pgrade Telemetry 

atment Works ‐ Upgnt Works 

tment Works ‐  TeleWorks 

atment Works ‐ Upent Works 

wer Treatment Woron Farm 

Resp

and Water Se

Water Se

ent Water Se

werage Water Se

e sewer to meet ks 

Water Se

a etwork 

Water Se

e Water Se

Water Se

Water Se

Water Se

grade Water Se

emetry Water Se

pgrade Water Se

rks ‐ Water Se

ponsible Manager

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager

ervices Manager

ervices Manager

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

P

implemented

Works prograimplemented

Works prograimplemented

Works prograimplemented

Works prograimplemented

Strategies preimplemented

Strategies preimplemented

Trade Waste maintained a

Completed w

Completed w

Completed w

Completed w

Completed w

Completed w

Completed w

 

Performance Indica

ams developed, updd  

ams developed, updd within allocated ti

ams developed, updd within allocated ti

ams developed, updd within allocated ti

epared, reviewed ad as required 

epared, reviewed ad as required 

Policy and dischargnd recorded 

within budget

within budget

within budget

within budget 

within budget 

within budget 

within budget 

 

ator

dated and 

dated and imeframes 

dated and imeframes 

dated and imeframes 

nd 

nd 

ge agreements 

   

Progres

Servicing done regu

Constructed as req

Program is continunew works and ren

Contract in place foin Narrabri, Wee WAssessments of pipscope of future bud

Requirements idenand Integrated WaNarrabri networks review. Wee Waa amodelling in final swill identify infrastrequired. 

Consultant engageprogressed. 

Assessments and crequired.  

Finalisation of Phas

Finalisation of Phas

Finalisation of Phas

Finalisation of Phas

Finalisation of Phas

Finalisation of Phas

Finalisation of Phas

Page | 38

ss at 30 June 2015 

ularly.  

uired. 

ously updated to innewals. 

or CCTV and relininWaa and Boggabri. pe conditions will prdget requirements.

ntified in the sewer ter Cycle Managemmodelling in final sand Boggabri netwotages of design. Moructure improveme

d and networks mo

onditions were issu

se 2 in progress. 

se 2 in progress. 

se 2 in progress. 

se 2 in progress. 

se 2 in progress. 

se 2 in progress. 

se 2 in progress. 

8  

nclude 

g of pipes 

rovide . 

modelling ment Plan. stage of orks odelling ents 

odelling 

ued where 

Annual R

 

Report 2014

 

/2015 

 

Page | 39  

Annual R

A plA strbusinThe peo

commun

destinat

2,3Roads m

Council 

$5, 

Grantfor thReplaTimb

$1,6 

Grantfor thRene

Report 2014

lace torong divnesses, sople of Narra

nity has a str

tion for peop

307kmmaintained

300,0

t Fundinhe acementer Bridge

694,00

t Fundinhe Bridgeewal Proj

/2015 

o thrivverse ec servicesbri Shire are

rong desire t

ple to live, ru

ms d by 

 

000 

t of es 

00 

g e ject 

ve conomys and t very proud 

o see its Shir

un businesses

$Gra

deveKamT

 

Touris

Inform

me

bua

econ

y that atourists of the region

re prosper. T

s and visit. 

$18,70ant Fundinthe furthelopmentmilaroi StTouchscre

31,41

sts at The 

mation Ce

56eetings hwith locusinesseassist winomic gr

attract n in which th

They want th

00 ng for er t of the tories een 

11  

Visitors 

entre 

held al s to th rowth 

ts and r

hey work and

he Shire to be

$12Gr

the

A

$6Graforof tAir

DProbD

Page |

retains

d live. The 

e attractive a

2,310rant fund

e Narrabr

Supp

Augment

Proje

6,000,ant Fundr the Upgthe Narrrport Run

12 Loca

Developmojects asby EconoDevelopm

40  

s

as a 

,494ding for 

ri Water 

ply 

tation 

ect 

,000ding grade rabri nway 

l ment ssisted omic ment 

A

TsP

Actions 

PT1 Narrabr

PT1.1 Engag

PT1.1.1 Mee

PT1.1.2 EngaWee Waa ChPromotions 

PT1.1.3 Mee

PT1.1.4 Mee

PT1.1.5 Atteorganisation

PT1.1.6 SupNarrabri Cha

PT1.1.7 FaciCommerce a

PT1.1.8 Faciof Commerc

PT1.1.9 FaciPromotions 

PT1.1.10 MeTablelands r

PT1.2 Provid

PT1.2.1 Assiprojects  

PT1.2.2 Part

Annual Report 201

Theme 3: Aservices andPrincipal activitie

ri Shire to be a regi

ge with local busine

et with local busine

age with Narrabri Chamber of CommerGroup 

et with research org

et regularly with ind

end business eventsns 

port business appreamber of Commerc

litate meeting betwand Council 

litate meeting betwce and Council 

litate meeting betwGroup and Council

eet with coordinatorenewable energy p

de assistance to bu

st local business or

ticipate in local bus

14/2015 

A place to d tourists es – projects and

ional centre 

ess and industry re

esses  

Chamber of Commerce and Boggabri Bu

ganisations 

dustry representati

s organised by loca

eciation event heldce 

ween Narrabri Cham

ween Wee Waa Cha

ween Boggabri Busi 

or of the New Englaprecinct project 

usinesses looking to

rganisations with lo

iness functions as i

thrive - A

d services Resp

epresentatives to gr

EconomiManager

erce, usiness 

EconomiManager

EconomiManager

ves EconomiManager

l  EconomiManager

 by  EconomiManager

mber of  EconomiManager

amber  EconomiManager

ness  EconomiManager

and  EconomiManager

o expand

ocal  EconomiManager

nvited EconomiManager

A strong di

ponsible Manager

row and facilitate o

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

iverse econ

Performance

opportunities

Increased ecoAssist existingeconomic  ba

Monitor and the local econ

Build strong r

Build strong r

Build strong r

Event ongoin

Meeting held

Meeting held

Meeting held

Build strong r

Assist with lo

Attend local a

 

nomy that

e Indicator

onomic growth andg business to develoase 

report regularly onnomy 

relationships with lo

relationships with in

relationships with in

g and successful  

d or attended twice 

d or attended twice 

d or attended twice 

relationships with in

cal projects 

and regional functio

 

attracts an

d diversity. op broader 

 the health of 

ocal groups 

ndustry sectors 

ndustry sectors 

per year 

per year 

per year 

ndustry sectors 

ons 

   

nd retains

Progres

56 meetings held.

Attend Chamber anAssociation meetinChamber represent

No research organifinancial year.  

Met with industry ra total of 18 times.

Attended 4 busines

Attend and sponsoCommerce Busines

Meetings infrequen

Meetings infrequen

Meetings infrequen

Attended 2 meetin

Assisted with 12 lo

Attended and partiregional functions.

Page | 41

businesses

ss at 30 June 2015 

nd Business Progresngs. Met with NSW tative. 

isations met with in

representative orga 

ss events. 

or Narrabri Chambess Awards.  

ntly being held. 

ntly being held. 

ntly being held. 

gs. 

cal developments. 

icipated in 5 local a

1  

es,

ss Business 

n this 

anisations 

r of 

nd 

A

Actions 

PT1.2.3 Sendreleased Sta

PT1.2.4 Conin conjunctio

PT1.3 Active

PT1.3.1 Dev

PT1.3.2 Devemploymen

PT1.3.4 Prep

PT1.3.5 Prepsuccesses 

PT1.3.6 Mai

PT1.3.7 Und

PT1.3.8 Und

PT1.3.9 Worfurther inve

PT1.3.10 Dissocial media

Annual Report 201

d emails to local buate and Federal assi

duct seminars and on with partners 

ely market and pro

elop business locat

elop marketing mat lands 

pare business news

pare news announc

ntain existing Shire

dertake Boggabri bu

dertake Wee Waa b

rk with the agricultustment 

stribution of Counca platforms 

14/2015 

usinesses regarding istance programs 

workshops for bus

omote Narrabri Shir

tion profile  

terial regarding ava

s/economic updates

cements on econom

e website 

usiness community 

business community

ural sector to attrac

il information throu

Resp

 newly  EconomiManager

inesses  EconomiManager

re as a business de

EconomiManager

ailable  EconomiManager

s EconomiManager

mic  EconomiManager

EconomiManager

plan EconomiManager

y plan EconomiManager

ct  EconomiManager

ugh  EconomiManager

ponsible Manager

c Development r 

c Development r 

stination

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

Performance

Conveyed fun

Facilitate bus

Regular prod

Regular prod

Regular prod

Articles in pa

Keep website

Complete theplan 

Complete theplan 

Increase in adrelated indus

Provide ongo

 

e Indicator

nding programmes 

siness workshops 

uction of brochures

uction of brochures

uction of brochures

per, radio and TV a

e up to date 

e Boggabri township

e Wee Waa townsh

dditional agriculturatries 

oing relevant inform

 

to industry 

s appropriate 

p marketing 

ip marketing 

al service 

mation 

   

Progres

Information sent owhen received. Sevassistance events sWee Waa ChambeBoggabri Business 

Facilitated Small Buenable local small badvisors. 

Suite of brochures New Business AddrBusiness and Resid

Suite of brochures New Business AddrBusiness and Resid

Suite of brochures New Business AddrBusiness and Residon website. 

Arranged for 9 posbusiness to be run 

Council's updated alaunched in March consistently. 

Boggabri TownshipAugust 2014. 

Wee Waa Businesscompleted March 2

Working with 6 agrexpand existing opdevelopment. 

Daily provision of cinformation being posted through Fac

Page | 42

ss at 30 June 2015 

n to local business veral government bsent onto the Narrars of Commerce anPromotions.  

usiness Bus into Nabusiness to talk to b

current; inclusive oress, Economic Profents Guide. 

current; inclusive oress, Economic Profents Guide. 

current; inclusive oress, Economic Profents Guide. Update

itive news stories ain the local paper. 

and refreshed webs2015 and was upd

p Marketing Plan co

s Community Marke2010. 

ricultural businesseerations and attrac

community based placed on website acebook and Twitter

2  

groups business abri and d 

rrabri to business 

of Your file and 

of Your file and 

of Your file and es placed 

about 

site ated 

ompleted 

eting Plan 

es to ct new 

and r. 

A

Actions 

PT1.4 Ensur

PT1.4.1 Partincluding: NCouncils  

PT1.4.2 Advother Goverrelevant issu

PT1.5 Revie

PT1.5.1 ComShire TourisCommence 

PT1.6 Partic

PT1.6.1 Conorganisation

PT1.6.2 PartInland NSW regions. 

PT1.7 Partic

PT1.7.1 ConPromotions 

PT1.7.6 Com3 – and exte

PT1.7.7 Con

PT1.7.8 Supthe Baradine

PT1.7.9 Conbe a designa

Annual Report 201

re that the Council 

ticipate in Regional amoi Councils,  Ass

ocate for the interernment Departmenues as they arise 

w and monitor the

mplete and have Com Destination Manimplementation 

cipate in the develo

tinue to participatens relevant to Narra

ticipate in the deveRegion, New Engla

cipate in the develo

tinued involvemenCommittee 

mmence developmeend route to the we

tinue to promote t

port the joint Coune to Mungindi Road

tinue to lobby for Mated Tourist Route 

14/2015 

is well represented

and State Forums sociation of Mine Re

ests of the Shire witts and organisation

e implementation o

uncil adopt the Narnagement Plan. 

opment of Regiona

e in Tourism relatedabri Shire 

lopment of DMPs fand‐North West and

opment of touring 

t in the Newell High

ent of State Touringest 

he Baradine – Pillig

ncil funding submissd 

MR127 – Pilliga Roa

Resp

d at Regional, State

elated  General M

th ns on  General M

of the Tourism Plan

rrabri Tourism 

al and State tourism

Tourism 

for the d sub  Tourism 

routes, products an

hway Tourism 

g Route Tourism 

ga link  Tourism 

sion for Tourism 

ad to Tourism 

ponsible Manager

e and Federal Forum

Manager 

Manager 

n 2013‐2018

Manager 

m marketing and De

Manager 

Manager 

nd experiences at a

Manager 

Manager 

Manager 

Manager 

Manager 

Performance

ms to promote the

Continued mattendance a

Ongoing and 

Completed pdeveloped antourism outco

estination Manage

Council’s con

Deliver positiShire 

a local, sub‐regiona

Council’s con

Route develoformulated 

Tourists using

Baradine to M

Road classifie

 

e Indicator

 interests of Narrab

embership involvemt meetings 

as opportunities ar

lan. Tourism markend utilised. Developomes for the Shire.

ment Plans and in 

tinued representat

ve tourism outcom

al, regional and sta

tinued representat

oped and promotion

g the link 

Mungindi Road rece

ed as Tourist Route

 

bri Shire

ment and 

rise 

eting materials p positive  

tourism and other 

tion 

mes for Narrabri 

ate level

tion 

nal program 

eives funding 

   

Progres

Approximately 360and 95 tweets.  

Council was an acti

Lobbying opportunidentified. 

Council adopted DPlan and framewo

committees, work

Council is an activeassociations: KamilNew England North& National Parks an

Inland Regional TouDestination ManagNorth West Marke

Council was an actiHighway Promotio

Council completed and developed ma

Council marketed ato Pilliga link. 

Information obtainobtained. 

Lobbying continuin   

Page | 43

ss at 30 June 2015 

0 Facebook posts fo

ive participant. 

nities undertaken as

Destination Managerk.

king parties etc 

e member of Tourislaroi, Newell, Naturh West, Great Artesnd Wildlife Service.

urism Organisationgement Plan, New Eting. 

ive member of the ns Committee. 

audit of tourism prrketing material. 

and promoted the B

ned. Funding not ye

ng.

3  

or the year 

ement

m related re's Way, sian Drive . 

 England 

Newell 

roduct 

Baradine 

et 

A

Actions 

PT1.8 Contin

PT1.8.1 ConGovernment

PT1.8.2 ProvPlans Of MaShire 

PT1.9 Develgroups, surr

PT1.9.1 Conmarketing ccooperativeorganisationTourism, Wamarketing cbusiness ope

PT1.9.2 Attethroughout 

PT1.9.3 Partwhere relev

PT1.9.4 Worpackages fo

PT1.9.5 ConShire includifliers, maintand DVDs, mlibrary etc 

PT1.9.6 Conwebsite, andmarket 

Annual Report 201

nued liaison with G

tinue to work with t organisations 

vide input from a tonagement prepare

lop and implementrounding LGAs and

tinue to be involveampaigns and parti marketing initiativns: Destination NSWarrumbungle Clusteommittees, Surrouerators 

end relevant trade aAustralia 

ticipate in journalistant 

rk with CountryLinkr Narrabri Shire 

tinue to produce ining updating visitorain and continue tomaintain and expan

tinue to maintain ad use social media t

14/2015 

Government Agenc

relevant State 

ourism perspective d for areas within t

t marketing and pro the local tourism s

d in the developmeicipate in relevant ves with the followiW,  Inland RTO, NE‐Ner, Tourism route nding LGAs, Tourism

and consumer show

t and industry fami

k to develop new 

nformation on Narrrs guides and informo develop touch scrd image (photo and

and update tourismto communicate wi

Resp

cies and other agen

Tourism 

into the  Tourism 

omotional strategiesector 

ent of 

ng NW 

m and 

Tourism 

ws Tourism 

lies Tourism 

Tourism 

abri mation reen d film) 

Tourism 

m ith the  Tourism 

ponsible Manager

ncies that manage t

Manager 

Manager 

es and campaigns i

Manager 

Manager 

Manager 

Manager 

Manager 

Manager 

Performance

tourism assets

Deliver positiShire 

Deliver positiShire 

in conjunction with

Deliver positiShire 

Deliver positiShire 

Deliver positiShire 

Deliver positiShire 

Deliver positiShire 

Deliver positiShire 

 

e Indicator

ve tourism outcom

ve tourism outcom

h Destination NSW

ve tourism outcom

ve tourism outcom

ve tourism outcom

ve tourism outcom

ve tourism outcom

ve tourism outcom

 

mes for Narrabri 

mes for Narrabri 

, the Regional Tour

mes for Narrabri 

mes for Narrabri 

mes for Narrabri 

mes for Narrabri 

mes for Narrabri 

mes for Narrabri 

   

Progres

Partnerships formeRoutes developed wDepartment of Primpartnership with NService. 

Narrabri Shire DestInland Regional TouManagement, NewHighway. 

rism Organisation, 

Council actively pacampaigns with DeNewell Highway, KaEngland North Wes

Council attended MMelbourne and Pe

Council hosted jouThe Travel Blogger Travel OZ. 

Packages are no loNSW. 

Tourism book prod2014, all promotionupdated image librevents by dvd. 

Council maintainedutilised social medi

Page | 44

ss at 30 June 2015 

ed and projects sucwith Local Land Sermary Industries. Onational Parks and W

tination Managemeurism Organisationwell Highway and Ka

Touring Route ma

rticipates in marketestination NSW. Inlaamilaroi Highway ast. 

Maitland, Newcastlenrith consumer trad

rnalist famils whichand Greg Grainger

nger available with

duced and distributenal material updaterary, captured imag

d tourism website aia. 

4  

h as Bird rvices and ngoing Wildlife 

ent Plan,  Plan of amilaroi 

rketing 

ting and, and New 

e, de shows. 

h included r from 

 Train 

ed in ed, ges of 

and 

A

Actions 

PT1.9.7 ConWarehouse 

PT1.10 Enco

PT1.10.1 Coproduce infocollateral 

PT1.11 Cont

PT1.11.1 Ensactivities thathe Narrabri

PT1.11.2 CoAboriginal a

PT1.12 Enco

PT1.12.1 Inc

PT1.12.2 Sup

PT1.12.3 InvProgram in c

PT1.12.4 Coand implem

PT1.13 Revi

PT1.13.1 Ap

PT1.14 Deve

PT1.14.1 Ap

PT2 Airport 

PT2.1 Devel

PT2.1.1 Devthe life cycle

Annual Report 201

tinue to update Stadata base 

ourage involvemen

ntinue to work withormation and mark

tinue to showcase 

sure that all major at are of interest toi Visitor Informatio

ntinue to develop ert / artefact display

ourage involvemen

clusion in historical 

pport the Friends o

vestigate a Volunteeconjunction with ot

llaborate with Narrent training for bus

ew and implement

propriate funding i

elop Community Ec

propriate funding i

to be of regional q

lop and implement

elop an Asset Manae cost and total ma

14/2015 

ate Tourism Data 

t of tourism operat

h Tourism operatorketing and promotio

local industries and

industries / economo visitors are showcn Centre 

exhibits – includingy 

t of the community

exhibits across the

of the Crossing Thea

ers Development ther areas of Counc

rabri Tourism to devsinesses 

t the Community E

dentified and appli

conomic Developm

dentified and appli

quality 

t Airport Asset Man

agement Plan recogintenance and capi

Resp

Tourism 

tors/attractions an

rs to onal 

Tourism 

d products through

mic cased in  Tourism 

 an Tourism 

y and other key pa

 Shire  Tourism 

atre  Director 

cil Director 

velop Tourism 

conomic Developm

ied for  EconomiManager

ment Strategic Plans

ied for  EconomiManager

nagement Plan

gnising tal 

Airport M

ponsible Manager

Manager 

nd other key partne

Manager 

h the Narrabri Visit

Manager 

Manager 

artners

Manager 

Corporate Services

Corporate Services

Manager 

ment Strategic Plan

c Development r 

s for Bellata and Ba

c Development r 

Manager 

Performance

Deliver positiShire 

ers in the productio

Continue to eavailable in ethroughout th

tor Information Cen

Local busines

Promotion of

Indigenous cotourism activ

s  Attend meeti

s  Program inve

Training deve

s for Pilliga and Gw

Funding sourcommunity 

aan Baa

Funding sourcommunity 

Asset Managedeveloped an

 

e Indicator

ve tourism outcom

on of information a

ensure that visitor iach of the towns anhe Shire 

ntre 

ss supported by Tou

f aboriginal culture 

ommunity includedities 

ings and support w

estigated 

eloped and impleme

wabegar, Narrabri, 

ced. Collaboration 

ced. Collaboration 

ement Airport Masnd  fully implement

 

mes for Narrabri 

and marketing colla

nformation is nd villages 

urism 

and history 

d and engaged in 

here possible 

ented  

Boggabri and Wee

with 

with 

ter Plan is ed  

   

Progres

State Tourism Dataundertaken. 

ateral and marketi

Visitor Informationrequired. Local opeinformation and aryearly.

Promotional materlocals. 

Council received fuNSW to capture anKamilaroi Stories. FNovember, 2015. 

Historical images a

Venue Manager a mattended meetings

Not commenced. 

Not commenced. 

e Waa

No funding availab

No funding availab

Not commenced. 

Page | 45

ss at 30 June 2015 

a Warehouse updat

ng and promoting 

n updates undertakeerators provided wirchway signage upd

rial available for vis

unding from Multicund develop additionFilming to commen

nd history books av

member and regulas. 

le from State Gove

le from State Gove

5  

tes 

the Shire 

en as ith dated 

itors and 

ultural nal ce 

vailable. 

arly 

rnment. 

rnment. 

A

Actions 

renewal cos 

PT2.2 Poten

PT2.2.2 DesiAirport Apro

PT2.2.6 Desiincluding pasections of a

PT2.2.7 Manaccordance regulations a

PT3 Regiona

PT3.2 Ensur

PT3.2.1 Devdevelopmenbuildings 

PT3.2.2 Ensuprovision of work schedu

PT3.2.4 CarrTheatre 

PT3.2.5 Devupgrade wofor The Cros

PT3.2.7 FinaRoom at The

PT3.2.8 Rep

PT3.2.9 RepRoom/PerfoTheatre 

PT3.2.12 Findisplayed at

Annual Report 201

t of the Airport ove

ntial airlines suppor

ign and construct eon 

ign and construct garallel taxiways for ball‐weather surface

nage Narrabri Airpowith relevant federand the Aerodrome

al standard infrastr

re that all public bu

elop a works schednt, renewal and ma

ure that all buildingelectricity supply aule 

ry out routine main

elop a ten year planrks as part of the Assing Theatre 

alise the refurbishme Crossing Theatre

lace café furniture 

lace the carpet in tormers Dressing Roo

nd suitable area for t The Crossing Thea

14/2015 

er the next 10 years

rted and encourage

extension to Narrab

grass taxiway netwoboth runways with  

ort operations in ral and state legislae Manual 

ructure 

uildings are develop

dule for the long‐terintenance of all pu

gs are safe in terms and develop mainte

ntenance on The Cro

n for major renewaAsset Management 

ment of the Exhibitio

at The Crossing The

he Green oms at The Crossin

the art collection ttre 

Resp

ed through improv

bri Airport M

ork Airport M

ation,  Airport M

ped, renewed and 

rm blic  Property

of the enance  Property

ossing Property

al and Plan  Property

on  The CrosManager

eatre The CrosManager

g The CrosManager

to be  The CrosManager

ponsible Manager

ved infrastructure

Manager 

Manager 

Manager 

maintained at ado

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

Performance

Narrabri Airpwith all releva

Grass taxiwayuse 

Annual CASA Corrective Ac

pted service levels

er Agreed servicsatisfied. 

er Agreed servicbuildings undCompleted as

er  Maintenance

er  Plan develope

e Refurbishmen

e Café furniture

e  Carpet in the budget 

e  The art colleccommunity 

 

e Indicator

ort Apron extendedant standards 

ys support safe Apr

Audits result in nil ctions 

for the use of Cou

ce levels achieved. C

ce levels achieved. Idertaken and scheds per works schedu

e carried out within 

ed 

nt of Exhibition Roo

e replaced 

Green Room repla

ction to be viewed b

 

d in compliance 

ron and Runway 

or minimal 

ncil and the comm

Community 

Inspection of all ule developed. le 

budget 

om 

ced within 

by the 

   

Progres

Not commenced. 

Airport operations guidelines. 

Not commenced. 

unity

Buildings' Asset Maformat. 

Currently renewingbuildings in Boggab

Reactive maintena

Not commenced. 

Works completed.

Works completed.

Works completed.

Select number of pRoom. Suitable perfound. 

Page | 46

ss at 30 June 2015 

conducted within l

anagement Plan in 

g wiring for two combri. 

nce completed as id

pieces hung in Exhibrmanent location st

6  

legislative 

draft 

mmunity 

dentified. 

bition till to be 

A

Actions 

PT3.2.14 GeCrossing The

PT3.2.18 Bo

PT3.2.19 De

PT3.2.21 Bo

PT3.2.22 72 

PT3.3 Devel

PT3.3.2 Furtarea and thepoint, securcamping are

PT3.3.3 Insta

PT3.3.6 Impwithin the S

PT3.3.8 OrgaCaravan Par

PT3.3.9 Connotification or missing 

PT3.3.10 Whoperators toattraction si

PT3.3.11  CaFacility  

PT3.3.12  Ca

PT3.4 Impro

PT3.4.1 Dete

Annual Report 201

enerators for Backueatre 

ggabri Courthouse 

emolish Boggabri Co

ggabri Urban Area 

Gibbons Street Car

lop and maintain v

ther develop the Pile Pilliga Wetlands Wity cameras, additioea, access points on

allation of picnic fa

rove presentation ahire 

anise and administerks 

tinued monitoring to Council / RMS w

here requested, asso prepare funding sgnage 

aravan Park ‐ Narra

aravan Park ‐ Narra

ove flood immunity

ermine priority link

14/2015 

p Power Supply at T

Upgrade 

ourthouse Ext Toile

Rooms Electrical U

rpet Replacement 

isitor facilities and 

lliga Bore Baths, caWalk including a duonal gravel cappingn the walk 

cilities at Dripping 

and signpost looko

er leases for Counc

of tourism signs anwhen signs are dama

sist tourist attractioubmissions for tou

bri Disabled Ablutio

bri Electrical Upgra

y for remote comm

ks for upgrade 

Resp

The  The CrosManager

Property

ts  Property

pgrade Property

Property

infrastructure with

mping mp g on the 

Tourism 

Rock Tourism 

uts Tourism 

cil Tourism 

nd aged  Tourism 

on rist  Tourism 

ons Property

de   Property

munities

Director 

ponsible Manager

sing Theatre Venuer 

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

hin the Narrabri Sh

Manager 

Manager

Manager 

Manager 

Manager 

Manager 

 and Assets Manag

 and Assets Manag

Engineering Service

Performance

e Completed w

er  Completed w

er Completed w

er Completed w

er Completed w

hire

Completed 

Completed

Completed 

Completed 

Damaged/ retimely manne

Funding secu

er  Completed w

er  Completed w

es  Priorities ado

 

e Indicator

within budget 

within budget 

within budget

within budget

within budget

moved signs are reer 

red for tourism att

within budget 

within budget 

opted by Council for

 

eplaced in a 

raction signage 

r flood events 

   

Progres

Not commenced. 

Grant proposal unsReserve Managemfunding sends this category. Reactive funding allows. 

Not commenced.

Not commenced.

Not commenced.

Pilliga wetlands wasignage.  

Walkway and signa

Audit completed anrequire. 

Task Completed. 

Audit of signage coreplaced as require

Audit of existing sigTourism operators existing tourism sig

Project managed blieu of rent. 

Project managed blieu of rent. 

Culgoora Road wasdesign is in place aReview Environme

Page | 47

ss at 30 June 2015 

successful in the lasent Fund programsbuilding into high rmaintenance sched

alkway completed in

age completed.  

nd signage updated

ompleted and signaed.  

gnage completed aencouraged to updgnage. 

by Southern Cross P

by Southern Cross P

s looked at for Weend advice sought ontal Factors from N

7  

st 2 Public s, minimal risk duled as 

ncluding 

d as 

ge 

nd date 

arks in 

arks in 

e Waa. A n an NSW Office 

A

Actions 

PT3.4.2 Lobbflood immunHighway) 

PT3.5 Provid

PT3.5.1 Opetreatment pto prove potmeeting Ausstandards 

PT3.5.2 Revimaintenanc

PT3.5.4 DevManagemen

PT3.5.6 Reviimprovementreatment pdemand and

PT3.5.7 ComShire water:(SCADA) telecomponentsstations, Wa

PT3.5.8 Comto improve tdrinking watHealth Depa

Annual Report 201

by State Governmenity at Glencoe Cha

de a secure, reliabl

erate and maintain wplants, reservoirs antable water to consstralian Drinking W

iew WH&S systemse manuals for each

elop Narrabri Risk Bnt Plan & implemen

iew, investigate andnts to water storagprocesses and contrd growth 

mplete programmed:  Supervisory, Contemetry system,  Tres,   Reservoirs, boosater Meters 

mplete design and athe quantity of the ter to consistently cartment requireme

14/2015 

ent for funding to imannel (SH29 Kamilar

le water supply to t

water sources, watnd distributions systsumers with water ater Guidelines hea

s, operations and h bore site 

Based Water nt 

d undertake any ree infrastructure, warol systems to meet

d upgrades of Narratrol And Data Acquieatment processes ster stations, bore p

associated documenNarrabri township comply with ADWSnts 

Resp

mprove roi  General M

the community

ter tems 

alth Water Se

Water Se

Water Se

quired ater t 

Water Se

abri isition and pump 

Water Se

ntation 

 and Water Se

ponsible Manager

Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

Performance

Priorities ado

No health relincidents 

WH&S systemmanuals revie

Plan develope

Priority workcompleted onand within th

Works complstandard and

Design CompSpecifications

 

e Indicator

opted by Council for

ated drinking wate

ms, operations and ewed 

ed and implemente

s planned, designedn time, to a satisfache allocated  budget

eted on time, to a s within the allocate

lete, Tender/Contrs Complete 

 

r flood events 

r quality 

maintenance 

ed 

d and ctory standard t 

satisfactory ed  budget 

act and 

   

Progres

Environment and HA design was done creek around the breviewed when NSHeritage provide umodelling. 

Lobbying opportunidentified. 

No health related dincidents. OperatioAustralian Drinking

Work Process Guidmanuals were revieManagement Systeincluded in the InteManagement Plan.

Completed and incManagement Syste

Networks modellinBoggabri far advan

Not commenced. 

The Drinking Watedrafted and reviewis included in the a

Page | 48

ss at 30 June 2015 

Heritage.for a rerouting of M

back of Auscott. ThiW Office Environmpdated Mulgate flo

nities undertaken as

drinking water qualons carried out in teg Water Guidelines.

delines and Operatioewed during Drinkiem review. These aegrated Water Cycl. 

cluded in the Drinkinem.  

ng of Narrabri, Weeced.  

r Management Systwed. Iron removal trugmentation proje

8  

Mulgate s will be ent and ow 

ity erms of .  

onal ng Water re to be e 

ng Water 

 Waa and 

tem was reatment ct. 

A

Actions 

PT3.5.9 RepSupply viabi

PT3.5.10 Re

PT3.5.11 Maconsumers aappropriate 

PT3.5.12 Serand Mains V

PT3.5.13 Pro

PT3.5.14 Ad

PT3.5.15 Reout as progr

PT3.5.16 ReWaa 

PT3.5.24 ReSt – Boggab(270m) 

PT3.5.25 ReOakham St –Street (270m

PT3.5.29 Uninfrastructuwater secur

Annual Report 201

ort to Council re: Glity 

port to Council re: 

aintain the reticulatand meet fire fighti

rvice and when necValves 

oduce preventive m

here to preventive 

active and preventrammed and as req

place CBD stop valv

place water supply ri, between  Boston

place water supply – Boggabri, betweem) 

ndertake long‐term re works including ity for urban areas 

14/2015 

Gwabegar and Pilliga

Baan Baa Water Su

tion systems to servng requirements as

cessary replace Hyd

maintenance progra

maintenance prog

ive maintenance cauired 

ves as required ‐ W

 infrastructure in:On Street to Burton S

 infrastructure in: ‐en  Burton Street to

planning of future supply to village arto meet legislative 

Resp

a Water Se

upply  Water Se

ve s  Water Se

drants Water Se

am  Water Se

ram  Water Se

arried Water Se

Wee Water Se

Oakham Street  Water Se

 o Dalton  Water Se

water eas,  Water Se

ponsible Manager

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

Performance

Report prese

Report prese

Maintenanceachieved withsatisfactory sbudget 

Completed 

Maintenanceproduced witsatisfactory sbudget 

Maintenanceproduced witsatisfactory sbudget 

Work documrequirementsto/complete 

Work complestandard and

Work complestandard and

Work complestandard and

Strategies preimplemented

 

e Indicator

nted to Council 

nted to Council 

e targets and upgradhin allocated timefrtandard and within

e targets and upgradthin allocated timeftandard and within

e targets and upgradthin allocated timeftandard and within

ented to comply wis and times taken toworks recorded an

eted on time, to a sa within the allocate

eted on time, to a sa within the allocate

eted on time, to a sa within the allocate

epared, reviewed ad as required 

 

de programs rames, to a n the allocated  

de programs frames, to a n the allocated  

de programs frames, to a n the allocated  

ith licence o responded d analysed 

atisfactory ed  budget 

atisfactory ed  budget 

atisfactory ed  budget 

nd 

   

Progres

Bore condition repreplacement progr

Report finalised anapproved. Project mconsultants have bcommenced. 

Networks maintain

Regular checks of vreplaced when nec

Consultant appointmaintenance progr

Plan and schedulesby consultant. 

Maintenance workmaintenance mana

Specifications draftorder to obtain quo

Work Completed.

Work Completed.

Strategies includedIntegrated Water C

Page | 49

ss at 30 June 2015 

ort submitted to Coam approved. 

d Baan Baa water smanagement and deen appointed. Pro

ned and renewals in

valve operations docessary. 

ted to draft preventram. 

s. The Plan is being 

k carried out. The agement plan in dra

ted for renewal wootes. 

d in the new formatCycle Management 

9  

ouncil and 

scheme design oject 

nstalled. 

one and 

tative 

drafted 

aft. 

rks in 

t Plan. 

A

Actions 

drought marequirement

PT3.5.30 PreManagemendemand ma

PT3.5.31 Asscompliance and new sub

PT3.5.32 Invenhance thelegislative dplanning req

PT3.5.34 Unfor towns/viPlans for Towmanagemen

PT3.5.35 Engreview of Na

PT3.5.36 Pro

PT3.5.38 Be

PT3.5.41 Bo

PT3.5.43  Gw

PT3.5.44 Na

PT3.5.45 Na

PT3.5.46 Pill

PT3.5.47 We

PT3.6 Devel

PT3.6.1 Impadopted preinto fees and

PT3.6.2 Penimplement t

Annual Report 201

nagement and capits and future growt

epare an integratednt Plan including wanagement 

sess and issue condwith water related bdivisions 

vestigate and undere drought emergenrought managemenquirements 

ndertake and reviewillages and update wns/villages to ment and capital works

gage Consultancy Farrabri Shire water 

ovide WaterWise ed

llata water ‐ Upgrad

ggabri Water ‐ Upg

wabegar Water ‐ Up

rrabri Water ‐ Upgr

rrabri Water ‐ Asbe

liga Water ‐ Teleme

ee Waa Water ‐ Up

lop and adopt Busi

lement actions resueferred option (fromd charges and oper

ding the adopted pthe recommendatio

14/2015 

ital works planning th 

d Water Cycle ater conservation a

ditions and ensure aspects of Develop

rtake improvementcy supply to meet nt and capital work

w Water Supply MoDevelopment Serviet legislative demas planning requirem

Firm to undertake asupply network 

ducation programs

de Telemetry  

grade Telemetry  

pgrade Telemetry  

rade Telemetry  

estos Mains Replace

etry Upgrade  

grade Telemetry  

ness Plan for the N

ulting from Councilm NLSC business plarating protocols 

preferred option abons of the Narrabri 

Resp

and  Water Se

pment  Water Se

ts to 

ks Water Se

odelling cing nd ments 

Water Se

a Water Se

  Water Se

Water Se

Water Se

Water Se

Water Se

ement  Water Se

Water Se

Water Se

Narrabri Livestock S

's an) 

Strategy Manager

ove, Live 

Strategy Manager

ponsible Manager

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager 

ervices Manager

ervices Manager

ervices Manager

ervices Manager

ervices Manager

ervices Manager

ervices Manager

Selling Centre (Sale

and Land Use r 

and Land Use r 

Performance

Water Cycle M

New developrequirements

Work programand report to

Servicing planframes 

Report to Cou

Strategies preimplemented

Completed w

Completed w

Completed w

Completed w

Completed w

Completed w

Completed w

eyards)

Completed 

Completed 

 

e Indicator

Management Plan C

ments conform wits 

m delivered on timeo council 

ns updated within a

uncil 

epared, reviewed ad as required 

within budget

within budget

within budget

within budget

within budget

within budget

within budget

 

Completed 

th Council 

e within budget 

allocated time 

nd 

   

Progres

Consultant appointdevelopment. 

Completed as requ

Drought and demaincluded in the newCycle Managementnetworks will assistthe networks. 

Modelling of Narrain progress. Develoincluded in the newCycle Management

Consultant appointmodelled to identif

Not commenced. 

Installation of new 

Installation of new 

Installation of new 

Installation of new 

Various sections al

Installation of new 

Installation of new 

Discussions and neassociation comme

Recommendationsand asset modifica

Page | 50

ss at 30 June 2015 

ted and Plan under 

uired. 

nd management plw format Integratedt Plan. Modelling oft to identify shortco

abri, Wee Waa and opment serving planw format Integratedt Plan.  

ted and networks hfy bottlenecks. 

equipment comme

equipment comme

equipment comme

equipment comme

ready renewed.  

equipment comme

equipment comme

egotiations with ageenced.  

 regarding capital ution complete. 

0  

lans are d Water f the omings in 

Boggabri ns d Water 

have been 

enced. 

enced. 

enced. 

enced. 

enced. 

enced. 

ents 

upgrades 

A

Actions 

Stock Centre

 PT3.6.3 Gra

PT3.6.7 New

PT3.6.8 Safe

PT3.7 Provid

PT3.7.1 Instadepot 

PT3.7.4 ComPlant ManagInstitute Of Guidelines 

PT3.7.5 ConSection with

PT3.7.6 ConOpen Space 

PT3.7.7 ReviWaa and Bo

PT3.7.8 Comprogram.Dewith IPWEA best practice

PT3.7.9 Devprogram 

PT3.7.10 Deoperational 

PT3.7.11 Revoperations t

Annual Report 201

e Safety Manageme

ant Co‐contribution

w Draft Facilities  

ety Signage  

de  modern depots

all security perimet

mplete a review of tgement Plan for PlaPublic Works Engin

struct operational chin the Narrabri Dep

struct operational cSections within the

iew operational reqoggabri Depots 

mplete the Plant repvelop plant replaceFleet Managemente) 

elop and implemen

evelop and implemetraining needs for a

view workshop infrto be in line with W

14/2015 

ent System 

 to Ramp  

s and reliable Plant

ter fencing for Narr

the whole of life cycant in accordance wneering Australia 

compounds for Roapot 

compounds for Pare Narrabri Depot 

quirements for the 

placement ement plan in conjut benchmark (To in

nt Plant safety inspe

ent ongoing plant all plant 

rastructure and Workcover requirem

Resp

Strategy Manager

Strategy Manager

Strategy Manager

t to support the inf

rabri Plant and

cle with 

Plant and

ads Plant and

rks and Plant and

Wee Plant and

unction dustry 

Plant and

ection Plant and

Plant and

ments Plant and

ponsible Manager

and Land Use r 

and Land Use r 

and Land Use r 

rastructure activiti

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

Performance

Completed w

Completed w

Completed w

es to meet best pra

Completed 

Completed an

Completed 

Completed 

Completed 

Completed wtimeframes 

Maintenance

Developed 

Reviewed 

 

e Indicator

within budget 

within budget 

within budget 

actice managemen

nd adopted by Cou

within defined budge

e schedules underta

 

nt principles

ncil 

et an 

aken 

   

Progres

Works completed.

Works completed.

Safety signage prov

Not commenced. 

Plant Managementcurrently in final dr

Not commenced. 

Not commenced. 

Initial inspections oDepots have takenthrough requireme

Not commenced. 

Currently implemeinspection regime. finalised, currently and low risk plant i

Not commenced. 

Workshop has beeand a list of improv 

Page | 51

ss at 30 June 2015 

vided as required. 

t Plan and Plant Polraft format.  

of Boggabri and Weplace. Currently w

ents for each Depot

nting Plant AssessoAll high risk plant hworking through mtems. 

n inspected by Worvements is being un

1  

licies 

ee Waa orking t. 

or have been medium 

rk Cover ndertaken. 

A

Actions 

PT3.7.24 Na

PT3.7.25 Na

PT3.7.26 Tra

PT3.7.27 Gri

PT3.8 Provid

PT3.8.1 Worto improve r

PT3.8.2 Mai

PT3.8.3 Reviconsultation

PT3.8.4 Reviprogram 

PT3.8.5 Revi

PT3.8.7 Impprogram 

PT3.8.8 Revifloodway pr

PT3.8.9 Dev

PT3.8.10 Revfor sealed ro

PT3.8.11 Anannual rene

PT3.8.12 Rev

PT3.8.13 Rev

Annual Report 201

rrabri Depot – Mov

rrabri Depot – shed

actor for Grids 

id Roller  

de lasting repair so

rk with and influencroads 

ntain & improve Ro

iew levels of servicen 

iew & implement ro

iew routine rural ro

lement advanced r

iew & implement rurogram 

elop dust suppress

view an annual bituoads & streets 

nual reseal programwal plus 10% of res

view kerb & gutter 

view priority roads,

14/2015 

ve Pressure Cleaner

d gardens  

olutions to Council 

ce government age

oad Infrastructure 

e through commun

outine road inspect

oad grading program

oad warning sign 

ural road unsealed 

ion seal program 

umen resealing pro

m (including forecaseal backlog) 

replacement progr

, town & village str

Resp

r   Plant and

Plant and

Plant and

Plant and

owned roads

encies Road Ser

Road Ser

nity Road Ser

tion Road Ser

m  Road Ser

Road Ser

Road Ser

Road Ser

ogram Road Ser

st Road Ser

ram  Road Ser

eets  Road Ser

ponsible Manager

d Depot Manager 

d Depot Manager 

d Depot Manager 

d Depot Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager

Performance

Completed w

Completed w

Completed w

Completed w

Increase in ex

Road infrastrwhere possib

Reduction in 

Road inspectdocumented

Rural unsealeto agreed ser

Project comp

Funds are ava

Funds are ava

Funds are ava

Project comp

Funds are ava

Funds are ava

 

e Indicator

within budget 

within budget 

within budget 

within budget 

xternal roads fundin

ucture maintained ble 

complaints about r

ions are regularly c

ed roads are maintarvice standards 

pleted on time & on

ailable to undertake

ailable to undertake

ailable to undertake

pleted on time & on

ailable to undertake

ailable to undertake

 

ng 

and improved 

roads 

ompleted and 

ained according 

n budget 

e upgrades 

e upgrades

e upgrades 

n budget 

e upgrades 

e upgrades

   

Progres

Review of current rrunoff by Environmcompleted and to arequirements identintegrated into new

Parks and Gardens Department sheds

Not purchased, detrequisite. 

Not purchased, detrequisite. 

Achieved external several grants prog

Road infrastructureperiodic maintenan

Not commenced. 

Road inspections hdocumented. 

Rural unsealed roaaccording to agree

Not commenced. 

Not commenced. 

Not commenced.

Funds were availabaccomplished. 

Funds were availabwere accomplished

Funds were availabaccomplished. 

Not commenced.

Page | 52

ss at 30 June 2015 

requirements for Dmental Health Coordalign with legislativtified requirementsw wash bay system

now using old Wat.  

termined not opera

termined not opera

roads funding througrams. 

e maintained throunce activities. 

ave been complete

ds were maintainedd service standards

ble and bitumen sea

ble and scheduled rd. 

ble and kerb and gu

2  

epot dinator e s will be . 

ter 

ational 

ational 

ugh 

gh 

ed and 

d s. 

aling was 

reseals 

utter was 

A

Actions 

upgrade pro

PT3.8.14 Liaroad infrastr

PT3.8.15 Rev

PT3.8.16 Revprogram 

PT3.8.17 Im

PT3.8.18 MaMaintenancServices con

PT3.8.19 Deinspection p

PT3.8.20 Deexisting residevelopmen

PT3.8.21 Liainfrastructuproperties fodevelopmen

PT3.8.22 Mainfrastructu

PT3.8.23 Plamanagemen

PT3.8.24 Ensstormwater,are included

PT3.8.25 Derepair of stopriority wor

PT3.8.26 Destormwater 

Annual Report 201

ogram 

ise with industry toructure 

view sealed road &

view bridge upgrad

plement bridge ren

aintain Council partce Council Contractsntract 

evelop & implementprogram 

eliver appropriate stdential, commerciant. 

ise with developersre who are consideor residential, comnt 

aintain and improvere 

an for future works nt infrastructure is i

sure compliance of, water and sewer ed in DAs 

evelop an action plaormwater systems tks from the revised

evelop a long‐term passets to at least “

14/2015 

o promote investme

& street renewal pro

de & replacement 

newal program 

ticipation in to Roads/Roads and Mariti

t routine culvert 

tormwater servicesal and industrial 

s regarding stormwering new estates ormercial and industr

e stormwater 

to ensure flood in place and mainta

f all legal access, engineering conditi

an for the renewal athat are identified ad AMP 

plan for the upgradLevel 2 ‐ good” 

Resp

ent in Road Ser

ogram  Road Ser

Road Ser

Road Ser

d me  Road Ser

Road Ser

s for Road Ser

water r rial 

Road Ser

Road Ser

ained Road Ser

ions  Road Ser

and as high  Road Ser

de of all Road Ser

ponsible Manager

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

Performance

Industry viewa worthy inve

Funds are ava

Funds are ava

Funds are ava

State Highwaacceptable st

Culvert inspedocumented

Services deliv

Liaising wher

Infrastructure

Future works

Development

Priority workreported upo

Long‐term pla

 

e Indicator

ws upgraded road inestment 

ailable to undertake

ailable to undertake

ailable to undertake

ys are maintained ttandard 

ctions are regularly

vered 

e required  

e maintained and im

 planned for 

t Applications comp

s identified and proon annually 

an developed 

 

nfrastructure as 

e upgrades 

e upgrades 

e upgrades 

to an 

y completed & 

mproved 

ply 

ogrammed and 

   

Progres

Not commenced. 

Funds were availabwere accomplished

Funds were availabreplacements were

Funds were availabwere accomplished

State Highways weMaintenance CounMaritime Services a

Culvert inspectionsdocumented as parSchedule. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Page | 53

ss at 30 June 2015 

ble and scheduled rd. 

ble and scheduled e accomplished. 

ble and scheduled rd. 

ere maintained to Rncil Contracts / Roadacceptable standar

s regularly completert of Road Inspectio

3  

renewals 

renewals 

oad ds and rd. 

ed and on 

A

Actions 

PT3.8.27 Des94 Plans tosystems 

PT3.8.29 Upstormwater 

PT3.8.31 Comissing link 

PT3.8.33 Lobfunding for urepeatedly d

PT3.8.34 Supachieve infra

PT3.8.35 Mato date tech

PT3.8.36 Coagencies to 

PT3.8.41 ShiTherribri Ro(VPA ‐ Maul

PT3.8.42 ShiManilla Rd &Turrawonga

PT3.8.43 ShiReseals  

PT3.8.44 ShiRd – Constru

PT3.8.50 Bobetween Bu

PT3.8.62 ShiBridge and a

PT3.8.63 Shiadvance wa

PT3.8.65 Shif/way signpo

Annual Report 201

evelop Voluntary Pla assist with the pro

pgrade Reid & Dewhsystem (Narrabri)

nstruct & Seal MR 3

bby federal governupgrades to infrastdamaged by floodin

pplement flood damastructure upgrade

aintain staff traininghnology 

llaborate with otheachieve industry be

ire Roads East – Seaad and replacemenes Creek)  

ire Roads East – Sea& associated works a)  

ire Roads East – Sea

ire Roads East – Unuct and Seal end of

ggabri Streets – Lynrton and Boston St

ire Roads East – Seaassociated roadwor

ire Roads West – Serning signs 

ire Roads West – –osting west 

14/2015 

anning Agreementsovision of stormwat

hurst Street interse

357 ‐ Rangari Road 

ment for applicatioructure which is ng 

mage restoration fues instead of renew

g in the application

er local Governmenest practice 

aled ‐  Upgrade of nt of Harparary Brid

aled ‐  Seal 4.1km oin mining precinct 

aled ‐  Various Shire

nsealed ‐  SR18 – Wf seal to Boral Quarr

n Street Drainage treets 

aled –Replace Harprks (VPA Boggabri C

ealed – Road curve 

Stormwater – c/wa

Resp

s and ter  Road Ser

ection Road Ser

Road Ser

on of Road Ser

unds to als 

Road Ser

n of up Road Ser

t Road Ser

dge  Road Ser

of (VPA  Road Ser

e Road Road Ser

ave Hill ry 

Road Ser

Road Ser

parary Coal) 

Road Ser

Road Ser

ay Road Ser

ponsible Manager

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

rvices Manager 

Performance

Plans develop

Project comp

Project comp

Betterment frestoration p

Upgrades arerestoration 

Continuous im

Continuous im

Project comp

Project comp

Project comp

Project comp

Project comp

Project comp

Project comp

Project comp

 

e Indicator

ped 

pleted on time and w

pleted on time and w

unding applied to frojects 

e incorporated with

mprovement 

mprovement 

pleted on time and w

pleted on time and w

pleted on time and w

pleted on time and w

pleted on time and w

pleted on time and w

pleted on time and w

pleted on time and w

 

within budget 

within budget 

lood damage 

 flood damage 

within budget 

within budget 

within budget 

within budget 

within budget 

within budget 

within budget 

within budget 

   

Progres

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Not commenced. 

Upgrade of TherribHarparary Bridge u

Not commenced. 

Various Shire Road

Accomplished NarrWave Hill Road. 

Boggabri Streets –Burton and Boston

Harparary Bridge u

Shire Roads West –advance warning si

Shire Roads West –floodway signposti

Page | 54

ss at 30 June 2015 

bri Road and replaceunder construction. 

s resealed as per sc

rabri Shire Council s

Lyn Street Drainage Streets accomplish

under construction. 

– Sealed – Road curigns installed. 

– Stormwater – caung west accomplish

4  

ement of 

chedule. 

section of 

e between hed. 

rve 

seway, hed. 

A

Actions 

PT3.8.68 NaReplacemencondition ra

PT3.9 Reduc

PT3.9.4 Comtownship ur

PT3.9.5 DevWorks basedManagemenutilise and d

PT3.9.6 Maiinfrastructu

PT3.9.7 PlanNarrabri tow

PT3.10 Mitig

PT3.10.1 Preeffective, suexpansion p

PT3.11 Mitig

PT3.11.1 Pre

effective, su

infrastructu

PT3.12 Iden

PT3.12.1 Ass

infrastructu

T3.13 Bench

PT3.13.1 ShaCouncils 

Annual Report 201

rrabri Streets Sealent Program (prioritieating) 

ction in property an

mmission a Flood Byrban area 

elop a Floodplain Md on strategies idennt Studies for Narradetermine priorities

ntain and repair flore as per the Flood

n for future flood bywnship 

gate concerns abou

epare and execute ustainable water suprogram 

gate concerns abou

epare and execute 

ustainable sewage c

re expansion progr

tify infrastructure 

sess future growth 

re improvements 

hmark performance

are best practice an

14/2015 

ed –Kerb and Guttees to come from 

nd infrastructure d

ypass Study for Nar

Management Prograntified in the Flood abri and Wee Waa as for future projects

ood protection plain Management

ypass management

ut the quality and a

a long term, cost pply infrastructure 

ut the quality and a

a long term, cost 

collection and treat

am 

Improvements 

& demand for 

e/ standards again

nd successes with o

Resp

er Road Ser

damage due to floo

rabri Director 

am of 

and s 

Director 

t study Director 

t in Director 

availability of wate

Water Se

availability of sewa

ment Water Se

Director 

st other Councils

other Director 

ponsible Manager

rvices Manager 

ods

Engineering Service

Engineering Service

Engineering Service

Engineering Service

er supplies with the

ervices Manager 

age collection and t

ervices Manager 

Engineering Service

Engineering Service

Performance

Project comp

es  Commissione

es  Program of W

es  Works priorit

es Future flood township pla

e Shire

Program prep

treatment systems

Program prep

es  Engage with e

es  Continuous im

 

e Indicator

pleted on time and w

ed 

Works completed 

tised 

bypass managemennned for 

pared 

s with the Shire

pared 

existing and new lo

mprovement 

 

within budget 

nt in Narrabri 

ocal business 

   

Progres

Narrabri Streets KeProgram underway

Not commenced. 

Not commenced. 

Works identified fo

Not commenced. 

These requirementIntegrated Water C

These requirementIntegrated Water C

Identified in BoggaTreatment Plant ansought. Also simila$5.3M grant for timState grant for Baa$1.69M grant for H

Infrastructure NSWCouncil's work as athe economic prese

Page | 55

ss at 30 June 2015 

erb and Gutter Reply. 

or the Wee Waa flo

ts are included in thCycle Management 

ts are included in thCycle Management 

bri with the Sewerand $3.1M grant funr work done for thember bridges west, n Baa Water, the FHarparary bridge.  

W utilised Narrabri Sa model of good praentation of busines

5  

lacement 

od levee.  

he draft Plan. 

he draft Plan. 

age ding e State the $2.2M ederal 

Shire actice for ss cases. 

A

Actions 

PT3.13.2 Cogroup meeti

T3.14 Impro

PT3.14.1 Deissues for thSenior Manalobby State 

 

Annual Report 201

ntinue regular atteings 

ove funding for infr

evelop 1‐2 page Fache Community/Counagement and Command Federal Memb

14/2015 

ndance at peer exc

rastructure and ser

t Sheets on key strancil to allow Councmunity Representatbers 

Resp

change Director 

rvices

ategic illors, tives to 

Director 

ponsible Manager

Engineering Service

Engineering Service

Performance

es  Continuous im

es  Funding ident

 

e Indicator

mprovement 

tified and applied f

 

or 

   

Progres

Attended Namoi Comeetings. 

Identified in BoggaTreatment Plant ansought. Also simila$5.3M grant for timState grant for Baa$1.69M grant for H

Page | 56

ss at 30 June 2015 

ouncil Water Allian

bri with the Sewerand $3.1M grant funr work done for thember bridges west, n Baa Water, the FHarparary bridge.  

6  

ce 

age ding e State the $2.2M ederal 

Annual R

 

Report 2014/2015 

 

Page | 57  

Annual R

Proa

ManOur com

Shire. So

to make

commun

1

In to

ma

3CEv

CEv

Cro

Report 2014

active

naging fmmunity reco

ometimes we

e changes. Ho

nication, effi

151.3k

 otal of Wmains 

aintainedCounci

33,2Cinema &vent PatroThe CrosTheatr

 

29Communvents at ossing Th

/2015 

e leade

for all ognises that 

e need contr

owever, the 

cient suppor

km

Water 

d by l 

53  & Live ons at sing re 

 nity The 

heatre 

ership

and stCouncil does

ributions fro

community 

rt of develop

1

In

m

 

ido

p and a

tandings not have co

m State and 

does look to

pment and a 

113.3  

 total of main

maintainCounc

42Busineengage

dentify por prosp

invest

51Entries iAnnual Snaps

PhotogrCompet

advoc

g up foromplete con

Federal gov

o Council for 

preparedne

km 

Sewer ns ed by cil 

2 esses ed to partners pective tors 

1  in the Shire hot raphic tition 

cacy

r our Shtrol over eve

ernments an

strong leade

ss to meet c

Page |

hire ery aspect of

nd agencies i

ership, clear 

commitment

2,158, 0Lit

Total vowater 

produceye

Ma20

Council the ne

friendly

2

Week pin NarrMedicaas partBursary  

58  

f the 

in order 

s.  

000, 000tres  

olume of potable ed for the ear 

arch 015 launchedew user y website

2   

lacemenrabri for l Studentt of BushProgram

nt 

t  m 

A

TP

Actions 

LA1 Establis

LA1.1 Identi

LA1.1.1 Subsfor target in

LA1.1.2 Con

LA1.1.3 Conidentify pros

LA1.2 Engag

LA1.2.1 AtteConduct busprospective 

LA1.2.2 Atteconferencesinvestors 

LA1.2.3 Engaidentify part

LA1.2.4 Con

Annual Report 201

Theme 4: PrPrincipal activitie

shed and sustainab

ify prospective inve

scribe to and reviewdustries 

duct industry mark

duct market researspective investors

ge with prospective

end regular industrysiness developmentinvestors and partn

end industry specifis for target industrie

age with partners (tners and prospecti

duct familiarisation

14/2015 

Proactive leaes – projects and

ble investment prog

estors to grow eco

w industry publicat

ket research 

rch (lead generation

e investors 

y networking eventt trips to engage wners 

c trade shows or es to identify prosp

business multiplierive investors 

n tours of the regio

adership and services

Resp

gram in place 

nomy 

ions  EconomiManager

EconomiManager

n) to  EconomiManager

ts ith 

EconomiManager

pective EconomiManager

rs) to  EconomiManager

n EconomiManager

nd advocacy

ponsible Manager

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

c Development r 

cy - Managin

Performance

Keep updated

Increase econ

Economic gro

Build strong r

Economic gro

Economic gro

Economic gro

 

ng for all an

e Indicator

d through industry 

nomic growth and d

owth and diversity

relationships with in

owth and diversity

owth and diversity

owth and diversity

 

nd standing

publications 

diversity 

ndustry sectors 

   

g up for our

Progres

Kept up‐to‐date thinclusive of AustralReview, ManufactuAgriculture and ResOrganisation of EcoDevelopment, Freigmiscellaneous. 

Economic Profile isrecent Australian Binformation and prinvestors. Reviewe& economic develoreports, Whitehave

100+ reviews of bunewspapers, magareports.  

Met with 32 currenlooking to expand adevelopment/s wit

Attended 6 businesand presented at 2

Engaged with 42 in

5 familiarisation toinvesting organisatNarrabri Shire town

Page | 59

r Shire

ss at 30 June 2015 

rough a range of mlian Mining Journal,uring, Australian Busource Economics, onomic Cooperatioght Transport NSW

s updated featuringBureau of Statistics rovided to potentiad Financial Review,opment websites, aen Coal, Santos.  

usiness websites, zines annual and in

nt and potential busand/or initiate thin the Shire. 

ss events and confe2 of them. 

ndividual businesses

ours held to enable tions understand thn. 

9  

mediums , Financial ureau 

n W, Energy + 

g most 

l , business nnual 

ndustry 

sinesses 

erences 

s. 

potential he entire 

A

Actions 

LA1.2.5 Provdevelopmen

LA1.4 Ensur

LA1.4.1 Com

LA1.5 Provid

LA1.5.1 Provsuitable site

LA1.5.2 Offebetween bu

LA2 Revenu

LA2.1 Maint

LA2.1.1 Dev

LA2.1.2 Aligorganisation

LA2.1.3 Devworkforce p

Annual Report 201

vide packages of infnt projects 

re that investment 

mmunity feedback o

de assistance to fac

vide assistance to bes  

er to organise pre‐losinesses and plann

e and income grow

tain a high perform

elop and maintain 

n employee performnal plans and goals

elop and maintain plan 

14/2015 

formation specific t

in community infra

on distribution of fu

cilitate investment

businesses in finding

odgement meetinging department 

wth strategy in plac

ming workforce tha

a highly skilled wor

mance with 

a current and relev

Resp

to  EconomiManager

astructure is fairly 

unds  General M

t and increase total

g  EconomiManager

s  EconomiManager

ce 

t is responsive to t

rkforce  Human R

Human R

vant Human R

ponsible Manager

c Development r 

and transparently 

Manager 

l jobs in Shire 

c Development r 

c Development r 

he needs of the org

Resources Manager

Resources Manager

Resources Manager

Performance

Economic gro

distributed around

Community 

Economic gro

New jobs cre

ganisation and the

Actions from Plans implemorganisation services offer

Actions from Plans implemorganisation services offer

Actions from Plans implemorganisation services offer 

 

e Indicator

owth and diversity

d the Shire 

satisfaction surve

owth and diversity

ated 

 community 

Delivery Program amented. Realign manstructure to be in lired 

Delivery Program amented. Realign manstructure to be in lired 

Delivery Program amented. Realign manstructure to be in lired 

 

ey 

and Operational nagement and ine with Council 

and Operational nagement and ine with Council 

and Operational nagement and ine with Council 

   

Progres

16 suites of promoa range of businessopportunities with

Not commenced.

Sourced, directed oin the provision of new potential deve

7 pre‐developmentbusinesses enablinthe proposed deveto provide directio

For 2014/2015 Couand new entrant trqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio

Work has commen

Workforce Plan in p

Page | 60

ss at 30 June 2015 

tional materials proses enquiring aboutin Narrabri Shire. 

or acted as an interpossible suitable sielopments. 

t meetings arrangeg both parties to unelopment and allown to clients.  

uncil had 35 existingrainees completing orticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv

ced. 

place. 

0  

ovided to t 

rmediary tes for 

d with nderstand 

w Council 

g worker 

nstruction , Local aste nt, ing and vices. 

A

Actions 

LA2.1.4 Provsystems thaemployees a

LA2.1 Maint

LA2.2.1 AppDepartment

LA2.2.2 Idenincluding froprograms at

LA2.3 Ensur

LA2.3.1 Revi

LA2.4 Plan f

LA2.4.1 Devmaintenancsoftware for

LA2.4.2 Assiof new systeSoftware) 

Annual Report 201

vide a range of resot support the attracand knowledge 

tain a high perform

ply for funding fromts, Authorities and P

ntify and apply for fom government andt The Crossing Thea

re Council’s procure

iew procurement p

for long term provi

elop a long term ree programme for syr Council 

st with the assessmems and software. (

14/2015 

ources, services andction and retention

ming workforce tha

m Government Private Enterprise 

funding and grants d private sponsorshatre 

ement practices ac

practices 

sion of Information

eplacement and ystems, servers and

ment and implemen(eg Asset Managem

Resp

d n of  Human R

t is responsive to t

Director 

hip for  Director 

hieve best value fo

Financial

n Services 

d  Informat

ntation ment  Informat

ponsible Manager

Resources Manager

he needs of the org

Corporate Services

Corporate Services

or the Council and C

 Services Manager

tion Services Manag

tion Services Manag

Performance

Actions from Plans implemorganisation services offer

ganisation and the

s  When opport

s  When opport

Community 

Annual review

ger All systems arequirements

ger Asset Manage30/6/15 

 

e Indicator

Delivery Program amented. Realign manstructure to be in lired 

 community 

tunities arise 

tunities arise 

w completed 

re current and mees 

ement software op

 

and Operational nagement and ine with Council 

et Councils 

perational by 

   

Progres

Council provided a and systems that sretention of emplocommenced to com ‐ Streamlining of re ‐ Investigations intand On‐boarding. ‐ Salary System revdrafted and consulcommenced.  ‐ Wellness Strategy

For 2014/2015 Couand new entrant trqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio

Work has commen

Annual review com

Migrated from PhySoftware. 

In conjunction withassessment is in pr  

Page | 61

ss at 30 June 2015 

range of resourcesupport the attractiooyees. The followingmpliment: ecruitment processto electronic Recrui

view with documentation with the wo

y development. 

uncil had 35 existingrainees completing orticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv

ced. 

mpleted. 

ysical to Virtual Env

h asset manager sofrogress. 

1  

s, services on and g have 

ses. itment    

ntation rkforce 

g worker 

nstruction , Local aste nt, ing and vices. 

ironment. 

ftware, 

A

Actions 

LA2.4.3 Reviprocedures 

LA2.5 Maint

LA2.5.1 Renitems: Asset

LA2.5.2 Ensu

LA2.5.3 Insta

LA2.6 Maint

LA2.6.1 Maitechnology i

LA2.6.2 Wor

LA2.6.3 Serv

LA2.7 Assist

LA2.7.1 Coois implemen

LA2.8 Ensur

LA2.8.1 Prov

LA2.9 Devel

LA2.9.1 FinaTheatre (incareas.) 

LA2.9.2 FinaTheatre 

LA2.9.3 DevCrossing TheManagemen

LA2.9.4 DevProcedures 

LA2.9.5 Dev

Annual Report 201

iew Information Se

tain and coordinate

ew/upgrade duringt Management Prog

ure annual licence f

all Exponare Public 

tain and coordinate

ntain an asset regisinfrastructure/item

rkgroup Printers

ver Consolidation P

t staff to remain up

rdinate training fornted 

re staff have sound

vide training to staf

lop and review plan

alise the Business Plcluding Cinemas, Ca

alise the Marketing 

elop an Asset Manaeatre that links withnt Strategy 

elop policies and Stfor the Crossing Th

elop a procuremen

14/2015 

rvices policies and 

e the renewal of in

g 2013/14 the followgram 

fees are up to date 

mapping software 

e the renewal of in

ster of all informatims 

roject 

p to date with new 

r staff as new techn

 knowledge of Cou

ff as required 

ns for the effective

lan for The Crossingandy Bar, Café and E

Plan for the Crossin

agement Plan for Th Council’s Asset 

tandard Operating eatre 

nt policy for the Cro

Resp

Informat

nformation technol

wing Informat

Informat

Informat

nformation technol

on Informat

Informat

Informat

information techn

nology Informat

uncil process and pr

Director 

e long term develop

g Event 

The CrosManager

ng  The CrosManager

he The CrosManager

The CrosManager

ossing  The Cros

ponsible Manager

tion Services Manag

ogy software and s

tion Services Manag

tion Services Manag

tion Services Manag

ogy infrastructure

tion Services Manag

tion Services Manag

tion Services Manag

nology advances 

tion Services Manag

rocedures 

Corporate Services

pment and manage

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venue

Performance

ger  Annual review

systems 

ger  Renewed/upg

ger Completed w

ger Completed w

ger  Register main

ger Completed w

ger Completed w

ger  Ongoing and 

s  Staff are usin

ement of commerc

e Plan finalised

e Plan finalised

e Plan develope

e Policies and p

e  Policy develo

 

e Indicator

w completed 

graded 

with budget

with budget

ntained and up to d

with budget

with budget

as required 

g InfoXpert to its fu

ial business units 

 

 

ed 

procedures develop

ped 

 

date 

ull potential 

ped 

   

Progres

Email and internet 

Not commenced. 

All appropriate lice

The latest version o

All Desktops, LaptoDevices are up‐to‐d

Controls implemen

Works completed.

Training organised 

Training provided aof expertise of recocontinually improv

Draft Plan prepared

Draft Plan prepared

Not commenced. 

Policies and Proced

Policies and Proced

Page | 62

ss at 30 June 2015 

policy have been re

enses reviewed. 

of Exponare is insta

ops, printers and Mdate. 

nted to reduce print

as required.  

as and when requirords management sed. 

d.  

d.  

dures implemented

dures implemented

2  

eviewed. 

alled. 

obile 

ting cost. 

ed. Level system 

d. 

d. 

A

Actions 

Theatre that

LA3 Ensure 

LA3.1 Counc

LA3.1.1 Ensurlegislative com

LA3.1.2 Devepractices and

LA3.1.7 Enablthe communi

LA3.2 Adopt

LA3.2.1 Ensuworkforce s

Annual Report 201

t links to Council’s P

Council is complian

cil leads by exampl

re Council HR operatimpliance and best pra

lop staff skills and exp conditions 

le a workforce that rety 

t a service attitude

ure council systemsupport a business r

14/2015 

Procurement Policy

nt with statutory re

le 

ons and managemenactice standards 

pertise and ensure sa

eflects the compositio

e across Council 

s, policies, processerequirement 

Resp

y  Manager 

egulations 

t meets Human R

afe work Human R

on of Human R

es and Human R

ponsible Manager

r

Resources Manager

Resources Manager

Resources Manager

Resources Manager

Performance

r  Council is rec

r  Council is a sa

r Work experieengagement 

r Desired cultusatisfaction, L

 

e Indicator

ognised as an emp

afe place to work 

ence opportunities. of indigenous comm

re achieved, EmploLow turnover of sta

 

loyer of choice   

Inclusion and munities 

oyee aff, Customer 

   

Progres

Council commenceoperations against best practice standcommenced:  ‐ Streamlining of re ‐ Investigations intand On‐boarding. ‐ Salary System revdrafted and consulcommenced.  ‐ Wellness Strategy

StateCover self audPlan developed witStateCover. Investielectronic databaseon health and safetreview of its Salarydevelopment of coof skills and expertpractices.  

Access to work expCouncil was promoCouncil's Reconciliabeing developed aninclusion and engagcommunities. 

Not commenced. 

Page | 63

ss at 30 June 2015 

ed reviewing its exislegislative complia

dards. The following

ecruitment processto electronic Recrui

view with documentation with the wo

y development. 

dit completed and Ath priorities as agregations into the usee for recording andty has commencedy System will includeompetencies for attaise to ensure safe w

perience opportunitoted on Council's wation Action Plan isnd will guide Councgement of indigeno

3  

sting nce and g have 

ses. itment 

ntation rkforce 

Action eed with e of an  reporting . Council's e the ainment work 

ties within ebsite.  currently cil's ous 

A

Actions 

LA3.3 Effect

LA3.3.1 Idenchange 

LA3.4 Exerci

LA3.4.1 Impprogram to dumping   

LA3.4.2 Impprogram to parking with

LA3.4.3 Impinspection reswimming p

LA3.4.4 Impabandoned related area

LA3.4.5 Impreview of  Li

LA3.5 Maint

LA3.5.1 Undto ensure ap

LA3.5.2 Impon food safe

Annual Report 201

tive and efficient co

ntify possibilities fo

ise Council’s regula

lement and conducidentify, manage an

lement and conducidentify, manage anhin the CBD areas 

lement a swimmingegime for all domepools within the urb

lement a program fvehicles within theas 

lement a program fiquid Trade Waste p

tain and improve fo

dertake inspections ppropriate public he

lement education aety and handling 

14/2015 

ouncil operations 

r improvement and

atory functions to e

ct an illegal dumpinnd prosecute illega

ct a parking controlnd prosecute illega

g pool monitoring astic and commerciaban areas of the LGA

for the review of  LGA upon roads an

for the monitoring premises within the

ood safety standar

of regulated businealth standards are

and awareness activ

Resp

d General M

ensure compliance 

ng l 

Strategy Manager

 l 

Strategy Manager

and al A 

Strategy Manager

nd road Strategy Manager

and e shire  

Strategy Manager

rds in accordance w

esses e met 

Strategy Manager

vities  Strategy Manager

ponsible Manager

Manager 

 with statutory req

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

and Land Use r 

with the NSW partn

and Land Use r 

and Land Use r 

Performance

first approachtraining “How

Improvementsuccessfully 

quirements 

Illegal Dumpi

Parking Contr

Swimming Po

Program for a

Program imp

nership program 

Food PremiseEducation anbeen implemwithin Narrabby the food a

Food PremiseEducation anbeen implemwithin Narrabby the food a 

 

e Indicator

h is realised, Customw can we help “attit

ts identified and im

ng Program Condu

rol Program conduc

ool Program conduc

abandoned vehicles

lemented for Liquid

es Inspections unded awareness of fooented. Food safetybri Shire are to a stauthority 

es Inspections unded awareness of fooented. Food safetybri Shire are to a stauthority 

 

mer Service tude 

mplemented 

cted 

cted  

cted 

s undertaken 

d Trade Waste 

ertaken. od safety has  standards andard required 

ertaken. od safety has  standards andard required 

   

Progres

Opportunities for cimplemented wher

Program implemen

Regular parking enimplemented in CB

All commercial poopools inspected/ aurequested.  

New system regardcompliance initiateand impounding ya

Program implemen

NSW food authoritcompleted with foocompleted.  

Food inspection preducation and inforecourses as requir

Page | 64

ss at 30 June 2015 

change and improvere identified. 

nted and ongoing.  

forcement programBD area.  

ols inspected and doudited as required a

ding abandoned vehed with new towingard established.  

nted and ongoing.  

ty agreement requirod inspection progr

ogram focused towrmation with provired to proprietors.  

4  

ement 

omestic and 

hicle g contract 

rements ram 

wards sion of 

A

Actions 

LA3.6 Ensur

LA3.6.1 EnsuLocal Goverunder which

LA3.6.2 Ensuup to date 

LA3.6.3 MeeInformationInformationDisclosure (P

LA3.7 Ensur

LA3.7.1 An aprovided forElectoral Off

LA3.7.2 ProvCouncillors 

LA3.7.3 Provenable the M

LA3.7.4 Provlegislative coExpenses an

LA3.7.5 Ensuprepared in making 

LA3.7.6 EnsuConduct are

LA3.8 Devel

LA3.8.1 EnsuCommunity 

LA3.8.2 Revihuman reso

Annual Report 201

re Council adheres t

ure that Council offnment Act and anyh they operate 

ure that delegation

et statutory require Public Access Act ( Protection Act (PPPID) 

re that sound syste

allocation for Local r annually and suppfice for the running

vide training and su

vide administrative Mayor to undertake

vide financial paymonstraints and Counnd Provision of Facil

ure Council agendasuch a way that the

ure Code of Meetine current and releva

lop and review Inte

ure Council decisionStrategic Plan 

iew Workforce Planurce requirements

14/2015 

to all Legislation un

ficers comply with t legislative framew

s for Council office

ements of Governm(GIPA), Privacy & PeIPA) & Public Intere

ms and processes a

Government Electiport is provided to tg of elections as req

upport for the Mayo

support to the Mae his role 

ent to Councillors ancil’s Policy – Paymlities to Councillors

s and reports are ey enable sound de

ng Practice and Codant 

egrated Planning D

ns are consistent w

n to meet Council’s 

Resp

nder which it opera

the work  General M

rs are General M

ment ersonal est 

Director 

are in place for goo

ons is the quired 

Director 

or and General M

yor to General M

as per ment of  

Director 

ecision  General M

e of Director 

Documents to cover

with General M

Human R

ponsible Manager

ates 

Manager 

Manager 

Corporate Services

od governance at C

Corporate Services

Manager 

Manager 

Corporate Services

Manager 

Corporate Services

r all of Council’s res

Manager 

Resources Manager

Performance

No reported 

Annual Revie

s No reported completed on

Councillor level 

s  Budget alloca

Access to trai

Position of Pebe retained 

s Councillors Feexpenses are

Ongoing reviedistribution. C

s  Annual review

sponsibilities, curre

Annual review

r  Annual review

 

e Indicator

breaches 

w completed 

breaches. Annual ren time. 

ation adopted each 

ining provided each

ersonal Assistant to

ees and Reimbursemade 

ew of agendas and Comprehensively p

w undertaken 

ent and into the fut

w completed 

w completed 

 

eturns 

year 

h year 

o Mayor and GM 

ment of 

reports before prepared reports 

ture 

   

Progres

No reported breach

Not commenced. 

No reported breachcompleted on time

Allocation placed infuture use. 

Not commenced. 

Personal Assistant 

Payments made toThursday of the fol

Ongoing review of distribution conducprepared reports p

Code of Conduct anreviewed and updarequirements. 

Council reports idePlan objectives. 

Not commenced. 

Page | 65

ss at 30 June 2015 

hes. 

hes. Annual returnse. 

nto Restricted Asse

position retained. 

 Councillors on the lowing month. 

agendas and reporcted. Comprehensivprovided. 

nd Code of Meetingated as per legislativ

entified Community

5  

ets for 

first 

rts before vely 

g Practice ve 

y Strategic 

A

Actions 

LA3.8.3 Revi

LA3.8.4 Revi

LA3.8.5 ReviDelivery Pro

LA3.8.6 ReviOperational

LA3.8.7 Revibudget estim

LA3.8.8 Revi

LA3.8.9 Prep

LA3.8.10 Pre

LA3.9 Ensur

LA3.9.1 Revipolicies, statservice char

LA3.10 Impl

LA3.10.1 Proaccordance requirement

LA3.10.3 Ensand process

LA3.10.4 Rev(eg investmecontribution

LA3.10.5 Ad

LA3.10.6 Rev

LA3.10.7 Accreport provi

LA3.10.8 Int

Annual Report 201

iew Asset Managem

iew Long‐term Fina

iew and report on aogram 

iew annually in line Plan 

iew and develop Opmates 

iew and report on a

pare Annual Report

epare State of Envir

re Council is guided

iew (and develop atement of businessrter as required 

lement and mainta

ovide financial and with management ts 

sure debtors, credites are in place 

view policies that dent, purchasing, dens) 

minister Council’s A

view Fees and Char

curate monthly incoided to Council 

ternal audit review 

14/2015 

ment Strategy and P

ancial Plan (10 years

achievements of 4 y

e with preparation o

perational Plan incl

annual budget 

ronment Report 

d by relevant and cu

s required) Councils ethics and custom

ain Accounting Best

performance reporand statutory 

tors and payroll sys

direct financial operebt collection, hards

Audit contract 

rges annually 

ome and expenditu

process 

Resp

Policy Property

s)  Financial

year Director 

of Director 

uding Director 

Director 

Director 

Director Developm

urrent Policies 

 er  General M

t Practice and finan

rting in Financial

stems Financial

rations ship,  Financial

Financial

Financial

ure Financial

Financial

ponsible Manager

 and Assets Manag

 Services Manager

Corporate Services

Corporate Services

Corporate Services

Corporate Services

Corporate Services

Planning and ment 

Manager 

ncial management 

 Services Manager

 Services Manager

 Services Manager

 Services Manager

 Services Manager

 Services Manager

 Services Manager

Performance

er Annual review

Annual review

s  6 monthly rev

s  Quarterly rev

s  Annual review

s  Quarterly rev

s  Annual review

Annual review

Statutory revElections is coof new policie

principles to ensur

Quarterly repon Delivery Pendorsed by 

Timely compl

Annual review

tender to be 

Annual review

Councillors kn

Internal revie

 

e Indicator

w completed

w completed

views completed 

views completed 

w completed 

views completed 

w completed 

w completed 

iew within first 12 mompleted . Review es is undertaken wh

re all performance,

ports to Council Six lan to Council AnnuCouncil by 30 Nove

letion of processes

w completed 

awarded during 20

w completed

now what things co

ews occur to ensure

 

months of /development hen required 

, legislative and rep

monthly report ual Report ember each year 

14/15

ost 

e compliance

   

Progres

Review completed

Review completed

Not commenced. 

Review completed

Operational Plan arequired timeframe

Quarterly Budget Rin line with legislat

Annual Report comCouncil in line with

Annual review not Planning and Repo

Development of neundertaken when r

porting requiremen

Reports completed

Processes complet

Review completed

Tender awarded.

Review completed

Not commenced. 

Not commenced.

Page | 66

ss at 30 June 2015 

.

.

nd Budget adoptede. 

Reviews submitted tive requirements. 

mpleted and submith legislative require

required by Integrarting. 

ew policies and revirequired. 

nts are satisfied 

d. 

ed. 

.

6  

d within 

to Council 

tted to ments. 

ated 

iews 

A

Actions 

LA3.10.9 Probudget or re

LA3.11 Ensu

LA3.11.1 Ensintegrates w

LA3.11.2 UnTerm Financof the Annu

LA3.11.3 Dethe Council’

LA3.11.4 Ideapplicable fo

LA3.12 Main

LA3.12.1 Revassets 

LA3.12.2 DeCouncil prop

LA3.13 Main

LA3.13.1 Re

LA3.14 Prov

LA3.14.1 Deensure com

LA3.14.2 Enselectronic co

LA3.14.3 Retfor all files fr

LA3.14.4 Revversion of In

Annual Report 201

ojects delivered on eport must be prov

ure that Council’s Lo

sure that Council’s with Council’s long t

ndertake an annual cial Plan in conjunctal Operational Plan

evelop and review as Long Term Financ

entify any need for or a special rates va

ntain an assets reg

view asset listing an

evelop and maintainperty 

ntain appropriate i

new Council’s insur

vide Quality, compr

evelop a Records Mapliance with releva

sure registration oforrespondence 

tention and disposarom previous recor

view requirements nfoXpert 

14/2015 

time within ± 10% ided to Council 

ong Term Financia

financial system term financial plan 

review of Council’stion with the prepan 

a loan strategy in lincial Plan 

and develop plan ifariation application

ister that includes 

nd record valuation

n a register of lease

nsurance levels for

rance

rehensive, accessib

anagement Plan tont Acts and legislat

f all council written 

al project to commrds system, RecFind

 for the upgrade to

Resp

of Financial

l Plan aligns with lo

Financial

s Long aration  Financial

ne with Financial

f  

Financial

all of the Council’s

ns of Property

es of Property

r Council 

Property

ble and relevant rec

 tion 

Informat

and Informat

ence d 

Informat

o next Informat

ponsible Manager

 Services Manager

ong term and annu

 Services Manager

 Services Manager

 Services Manager

 Services Manager

s assets 

 and Assets Manag

 and Assets Manag

 and Assets Manag

cords 

tion Services Manag

tion Services Manag

tion Services Manag

tion Services Manag

Performance

Much better jobs on time funding stop  

ual budget requirem

Annual review

Annual reviewplan is compl

Annual review

Annual review

er Annually andbecome due 

er  Register deve

er Completed

ger Records Manutilised 

ger  Documents re

ger  RecFind  

ger  As required 

 

e Indicator

financial managemand on budget. Locreducing 

ments 

w completed 

w completed. Long eted and accurate

w completed 

w completed 

as Class of Assets Ras per legislation 

eloped by 30/6/16

agement Plan com

egistered 

 

ment. Deliver cal roads 

term financial 

Revaluations  

pleted and 

   

Progres

Reports completed

Not commenced. 

Review completed

Review completed

Identified a need foapplication and dra

Valuations occurre

Register complete.

Council’s insurance

Record managemecurrent Records Ac

Automated acknowreceived emails imby post for all othe

Records re‐boxed arequirements. 

Current version insons. 

Page | 67

ss at 30 June 2015 

d. 

or potential future aft plan underway. 

d as per legislation

 

e cover current. 

nt system is complct and relevant legis

wledgement responplemented and reser correspondence. 

according to State R

stalled with addition

7  

iant with slation. 

nse for ponded to  

Records 

nal add‐

A

Actions 

LA1.15 Ensu

LA3.15.2 RevManagemen

LA3.15.3 RevManagemen

LA3.15.4 RevPlan 

LA3.15.5 RevAsset Manag

LA3.15.6 RevAsset Manag

LA3.15.7 Rev

LA3.15.8 Rev

LA3.15.9 RevManagemen

LA3.15.10 DManagemen

LA3.15.11 DCentre’ Asse

LA3.15.12 RPolicy annuaOperations 

LA3.16 Deve

LA3.16.1 UnManagemen• Asset regis• Asset cond• Asset main• Predictive • Deteriorat• Risk analys

Annual Report 201

ure Asset Managem

view the ‘Roads & nt Plan 

view the ‘Bridges &nt Plan 

view the ‘Stormwat

view the ‘Parks & Ggement Plan 

view the ‘Buildings gement Plan 

view the ‘Water’ As

view the ‘Sewer’ As

view the ‘Waste Fant Plan 

Develop the ‘Narrabnt Plan 

Develop the ‘Narrabet Management Pla

eview the Asset Maally prior to the prePlan 

elop and implemen

ndertake a gap analynt Plans to identify ster dition assessmentsntenance and manamodelling tion modelling sis 

14/2015 

ment Strategy, Polic

Road Assets’ Asset 

& Box Culverts >6m’

ter’ Asset Managem

Gardens and Open S

and Land Improve

sset Management P

sset Management P

acilities’ Asset 

bri Airport’ Asset 

bri Livestock Selling an 

anagement Strategeparation of the ann

nt an Asset Manage

ysis for all Asset gaps in data includ

agement systems 

Resp

cy and Plans provid

Property

’ Asset Property

ment Property

Space’ Property

ments’ Property

Plan  Property

Plan  Property

Property

Property

Property

y and nual  Property

ement Program tha

ing: 

Property

ponsible Manager

de best practice dir

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

 and Assets Manag

at identifies all fact

 and Assets Manag

Performance

rections for the dev

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Initial review OLG requirem

er Lifecycle planCaptured as p

tors required for im

er Assets upgradlevels 

 

e Indicator

velopment, renewa

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

completed on timements 

ns developed with 1part of the GIS 

mplementing the As

ded to meet identif

 

al and maintenance

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

e then as per 

10+ years focus. 

sset Management 

fied service 

   

Progres

e of all of Council’s

Incorporated withiManagement Plan.

Incorporated withiManagement Plan.

Not commenced. 

Parks & Open Spacdraft format. 

Buildings' Asset Maformat. 

Contractor Asset M

Contractor Asset M

Buildings Asset Maformat. 

Transport Asset Maformat. 

Buildings Asset Maformat. 

Lifecycle plans devGIS. 

Strategy and Plans

Transport, BuildingAsset Management

Page | 68

ss at 30 June 2015 

 infrastructure asse

n Draft Transport A. 

n Draft Transport A. 

ce Asset Manageme

anagement Plan in 

Management Plan re

Management Plan re

nagement Plan now

anagement Plan no

nagement Plan now

eloped but not incl

gs and Parks & Opent Plans in draft form

8  

ets 

Asset 

Asset 

ent Plan in 

draft 

eviewed. 

eviewed. 

w in draft 

ow in draft 

w in draft 

uded in 

n Space mat.  

A

Actions 

Lifecycle cos

LA3.17 Impl

LA3.17.1 Exarenewal, rep

LA3.17.2 Revreferencing Managemen

LA3.17.3 Coeach asset cand Land Im

LA3.18 Put i

LA3.18.1 PutCouncil to suand templatguidelines 

LA3.20 Main

LA3.20.1 Rev

LA3.20.3 Rev

LA3.21 Deve

LA3.21.1 Derecognising and capital ryears 

LA3.22 Man

LA3.22.1 Mafuneral direcenquiries fo

LA3.22.2 ImCemeteries Service 

Annual Report 201

sting’s 

lement Buildings an

amine renewal bacplacement and disp

view capital works the renewal demannt Plan 

llect better data anclass and category amprovements Asset 

in place policies an

t in place the policiupport events – inctes and internal pro

ntain & update Ass

view roads asset m

view bridge asset m

elop and adopt Wa

evelop an Asset Manthe life cycle cost arenewal cost of Wa

nage and operate ce

anage interments, rctors, record keepinr cemeteries in Nar

plement required min accordance with

14/2015 

nd Land Improvem

klog and categoriseposal 

proposed for 2013nds in the Asset 

nd financial variableand update the BuilManagement Plan 

nd procedures with

es and procedures cluding an events motocols and procedu

set Management Pl

management plan 

management plan 

aste Asset Managem

nagement Plan and total maintenanaste over the next 1

emeteries to meet 

reservations, liaisonng, and genealogy rrabri Shire 

maintenance at Couh adopted Levels of 

Resp

ments Asset Manage

e into All Depar

‐2022 All Depar

es for ding  All Depar

in Council that will

within manual ure 

Tourism 

lans 

Director 

Director 

ment Plan 

nce 10 

Strategy Manager

 all legislative requ

n with Commun

uncil Commun

ponsible Manager

ement Plan 

rtments 

rtments 

rtments 

l streamline and fa

Manager 

Engineering Service

Engineering Service

and Land Use r 

uirements 

nity Facilities Manag

nity Facilities Manag

Performance

Completed 

Completed 

Completed  

cilitate the hosting

Events manuprotocols and

es  Asset manage

es  Asset manage

Plan develope

ger  Legislative re

ger  Narrabri Cem

 

e Indicator

g of events in the Sh

al and templates and procedure guideli

ement plan reviewe

ement plan reviewe

ed 

quirements are com

meteries are kept ne

 

hire 

nd internal nes produced 

ed annually 

ed annually 

mplied with 

eat and tidy 

   

Progres

Upgrade/New/Renand 'Parks & Open 

Upgrade/New/Renand 'Parks & Open 

Buildings' Asset Maformat. 

Event Manual and 

Transport Asset Maformat.  

Transport Asset Maformat.  

Waste assets includManagement Plans

Cemeteries in Narrlegislative requirem

Narrabri Cemeterieconsistently high st

Page | 69

ss at 30 June 2015 

newal planned for 'BSpace'.  

newal planned for 'BSpace'.  

anagement Plan no

templates in draft f

anagement plan in 

anagement plan in 

ded in organisations.  

rabri Shire operatedments.  

es are maintained ttandard.  

9  

Buildings' 

Buildings' 

ow in draft 

format. 

draft 

draft 

nal Asset 

d within 

o a 

A

Actions 

LA3.22.3 CoNarrabri Law

LA3.22.4 Be

LA4 Proactiv

LA4.1 Suppo

LA4.1.1 Impassessment procedures 

LA4.1.2 Conwebsite to ethe commun

LA4.2 Regul

LA4.2.1 Infothrough locawebsite and

LA4.2.2 Proainform the C

LA4.2.3 DevOfficers to imwhy and whfor applicatiprojects of C

LA4.3 Counc

LA4.3.1 Atte

Annual Report 201

nstruct and landscawn Cemetery to me

llata Cemetery – As

vely engage with th

ort effective and tr

lement an electronsystem to support and provision of inf

duct a review of infensure appropriate nity 

arly communicate 

rm the community al media (newspaped social media 

actively engage witCommunity about C

elop a Communicatmplement detailinghat using various coon to promote all sCouncil 

cil encourages the 

end meetings with v

14/2015 

ape future section oeet design 

sh Internment 

he community 

ansparent informa

nic DA tracking and internal operationaformation to the pu

formation on Couninformation delive

with the communi

 of Council activitieer and radio), Coun

h and transparentlyCouncil activities 

tion Plan for all Coug the who, when, hommunication mediservices, programs 

dissemination of co

various community

Resp

of Commun

Commun

ation to the public o

al ublic 

Director Developm

cil’s ry to 

EconomiManager

ity on activities of C

es ncil 

EconomiManager

y  EconomiManager

uncil ow, iums and 

EconomiManager

ommunity informa

y  Economi

ponsible Manager

nity Facilities Manag

nity Facilities Manag

on Development M

Planning and ment 

c Development r 

Council 

c Development r 

c Development r 

c Development r 

ation and awarenes

c Development 

Performance

ger Project comptime and with

ger  Completed w

Matters 

Electronic DA

Information o

Proactively einform the co

Community k

Communicatiprovides cleaCouncil Office

ss of activities, pro

Community G

 

e Indicator

pleted to required sthin budget 

within budget 

A tracking System im

on Council’s websit

ngage with and tranommunity about Co

kept informed of Co

ion Plan documenter expectations and ers 

grams and trends w

Groups are supporte

 

tandard, on 

mplemented 

e reviewed 

nsparently ouncil activities 

ouncil activities 

ed which guidelines to 

within Narrabri Shi

ed by Council 

   

Progres

Not commenced. 

Not commenced. 

Not commenced. 

Council's new websfeaturing a design tand navigated on tAll content on old sand importance besite.  

Information was pra regular basis throCouncil's website, Fand Media Release

Council has been wengagement with tthrough social medintroduced into Thengagement.  

Not commenced. 

ire 

Council attended In

Page | 70

ss at 30 June 2015 

site launched Marcthat can be easily vablets and mobile psite reviewed for reefore placement on 

rovided to the comough the News ReeFacebook and twittes.  

working to increase the community partdia. Your Council wae Courier to provid

nteragency meeting

0  

ch 2015 viewed phones. elevance the new 

munity on l on ter posts 

ticularly as also e further 

gs and 

A

Actions 

groups and to share inforegular basis

LA4.3.2 Comdistributed 

LA4.3.3 Comby Council isAdministratCrossing The

LA4.5 Counc

LA4.5.1 PartBush Bursar

LA4.5.2 CouWomen’s Da

LA4.5.3 Coufacilitate Yo

LA4.5.4 Orga

LA4.5.5 Couactivities wit

LA4.5.8 Enga

Annual Report 201

provide opportunitormation and profes 

mmunity Directory r

mmunity informatios displayed where aion Building, Touriseatre and on Counc

cil to actively encou

ticipate in the NSW ry Scheme 

ncil to facilitate a yay event 

ncil to apply for funuth Week activities

anise Shire Snapsho

ncil to assist and suthin Narrabri Shire

age with communit

14/2015 

ties for service provessional developme

regularly updated a

on generated and reapplicable throughosm, Libraries and Thcil’s website 

urage community a

 Rural Doctors Netw

yearly International 

nding for Youth Wes 

ot Competition 

upport Seniors Wee

ty groups 

Resp

viders ent on a 

Manager

and  EconomiManager

eceived out the he 

EconomiManager

activity and promo

work  EconomiManager

EconomiManager

eek and  EconomiManager

EconomiManager

ek  EconomiManager

EconomiManager

ponsible Manager

r

c Development r 

c Development r 

ote the participatio

c Development r 

c Developmentr 

c Development r 

c Development r 

c Development r 

c Development r 

Performance

and commun

Community Gand commun

Community Gand commun

n, involvement and

Improved mepractitioners 

Council to actinvolvement 

Provide oppo

Provide oppoinvolvement

Celebrate old

Meetings atte

 

e Indicator

ity information is s

Groups are supporteity information is s

Groups are supporteity information is s

d engagement of th

edical services and min Narrabri Shire   

tively promote the and engagement of

ortunities for youth

ortunity for commu

der people 

ended  

 

hared

ed by Council hared 

ed by Council hared 

he community 

more 

participation, f women 

nity 

   

Progres

provided updates aregularly provided through email. Asscommunity events 

Updated when newdistributed throughAdministration BuiCentre. Council's ncommunity to fill intheir details.  

Information regulavarious Council outThe Crossing TheatCentre. Council's Fapopularity and becinformation.  

Bush Bursary studeShire for her 2 wee2014.  

Not commenced. 

Funding received ato mark the openin

The Shire SnapshotDecember 2014, Jaentries were receiv

Seniors Week functShire in March 201

Council staff activecommunity groupsinformation about through social med

Page | 71

ss at 30 June 2015 

as required. Informto interagency netwisted with the promand activities.  

w details are receiveh Council's websitelding and Visitor Infew website allows n an online form to 

rly disseminated thtlets including the Ltre and Visitor Inforacebook page increame a "go‐to" for lo

ent was hosted in Nek placement in Nov

nd event held in Apng of the Youth Sha

t competition held anuary 2015 periodved in total.  

tions held across N5 and supported by

ely worked with loca to help disseminattheir programs anddia and the website

1  

ation work motion of 

ed and , formation the update 

hrough Libraries, rmation eased in ocal 

Narrabri vember 

pril 2015 ck.  

over the . 51 

arrabri y Council.  

al te d activities e.  

A

Actions 

LA4.6 Celeb

LA4.6.1 Carrcelebrate ancommunity 

LA4.6.2 Ann

LA4.6.3 Ann

LA4.7 Ensur

LA4.7.1 Reviensure it remrequirement

LA4.7.2 Conthe Council  

LA4.7.3 Couforums incluPrevention, 

LA4.8 Prepa

LA4.8.1 Distmeeting dat

LA4.9 Provid

LA4.9.1 Maimonitors en

LA4.9.2 Und

LA4.9.3 Provadopt a "Ho

LA4.9.4 Acknof corresponresponse timcorresponde

LA4.10 Prov

LA4.10.1 De

Annual Report 201

rate and acknowle

ry out Civic ceremond acknowledge ach

ual volunteer celeb

ual NAIDOC Week 

re that the commun

iew Community Engmains relevant to Cts 

vene and/or suppo

ncillors and/or officuding:  Chambers of Medical Taskforce

are and Promote Co

ribute and advertistes 

de quality, compre

ntain a Customer Rnquiries and respon

dertake bookings fo

vide Customer servow can we help?" at

nowledgement lettndence received frome set for staff to reence. Adhere to Cu

vide quality informa

evelop and maintain

14/2015 

edge achievements

nies and Functions hievements of the 

bration held 

celebration held 

nity has a range of 

gagement StrategyCouncil’s consultatio

ort s355 Committee

cers attend commuf Commerce, Crimee 

ouncil meetings 

se business papers a

ehensive, accessible

Request System thase times 

or council facilities 

ice training to all stttitude 

ters sent on day on om the public. 14 deply to all general stomer Service Poli

ation to customers

n a suite of common

Resp

 of the community

to Director 

Director 

Director 

opportunities to e

y to on  General M

es of General M

unity e  General M

and General M

e and relevant cust

t Director 

Director 

taff and Director 

receipt ay 

icy 

Director 

nly  Director 

ponsible Manager

Corporate Services

Corporate Services

Corporate Services

ngage with the Cou

Manager 

Manager 

Manager 

Manager 

tomer services 

Corporate Services

Corporate Services

Corporate Services

Corporate Services

Corporate Services

Performance

s Council to acof volunteers

s Council to envolunteers 

s Involvement 

uncil 

Annual review

Regular meetCouncil 

Regular attenCouncil 

Provide easy community 

s Improvementqueries 

s Minimal com

s Perception thhelpful 

s  Community S

s Annual review

 

e Indicator

knowledge and recs 

courage and recog

of indigenous comm

w completed 

tings are held and r

ndance at meetings

access to Council fo

t in quality and resp

plaints 

hat Council staff are

Satisfaction with en

w completed. All sta

 

ognise the work 

nise the work of 

munity

reported to 

 reported to 

or total 

ponse times to 

e friendly and 

quiries 

aff adhere to 

   

Progres

Volunteer Week ceweek of May 2015.

Volunteer Week ceweek of May 2015.

NAIDOC Week Cele

Not commenced. 

Regular meetings oreported to Counci

Councillors and CoCommunity forumsidentified. 

Business papers anadvertised online a

Customer request s

No complaints rece

Training provided areceived. 

Acknowledgement

Not commenced.

Page | 72

ss at 30 June 2015 

elebrations held in s. 

elebrations held in s. 

ebrations held in Ju

of Section 355 Comil. 

uncil Officers attens where opportunit

nd meeting dates wand in local newspa

system in place. 

eived.

as identified. No co

s of correspondenc

2  

second 

second 

ly 2014. 

mittees 

ded ties were 

ere pers. 

mplaints 

ce sent.  

A

Actions 

asked questcustomer in

LA4.11 Ensu

LA4.11.1 Revthird party poperates eff

LA4.12 Deve

LA4.12.1 Imways: Devel

LA4.12.2 Proregional and

LA4.12.3 ParExpo 

LA4.12.4 Proregional tou

LA4.12.5 Prothe Wedding

LA4.12.6 Prothe Meeting

LA4.12.7 Proan Annual M

LA4.13 Incre

LA4.13.1 Repowerful tooregarding thprograms an

LA4.13.2 Coregionally thadvertising 

Annual Report 201

ions and answers foquiries 

ure the community 

view and maintain provider to ensure Cficiently 

elop and implemen

plement the Markeop annual program

omote program thrd state media 

rticipate in the Aus

omote the use of Thuring shows and as a

omote the use of Thgs and Special Occa

omote the use of Thgs and Conference M

omote the use of ThMembership Subscr

eased use of Counc

cognise and utilise ol in disseminating he community and Cnd projects 

ntinue to publicise hrough print, digita

14/2015 

or dissemination to

can be kept inform

the contract with tCouncil’s web serve

nt Marketing and P

eting Plan in the folm of activities and p

rough advertising in

tralian Business Eve

he Crossing Theatrea performance ven

he Crossing Theatreasions Market  

he Crossing TheatreMarket 

he Crossing Theatreiption Program 

cil website and web

Council's website ainformation worldwCouncil services, 

events locally and l, radio and televisi

Resp

med via web based

the er 

EconomiManager

Promotions Program

lowing romote 

The CrosManager

n local,  The CrosManager

ents  The CrosManager

e to ue 

The CrosManager

e to  The CrosManager

e to  The CrosManager

e with  The CrosManager

b based services 

as a wide 

EconomiManager

on  EconomiManager

ponsible Manager

 media 

c Development r 

m at The Crossing T

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

sing Theatre Venuer 

c Development r 

c Development r 

Performance

Customer Ser

Ongoing and 

Theatre 

e  Marketing anand utilised 

e  Marketing anand utilised 

e  Marketing anand utilised 

e  Marketing anand utilised 

e  Marketing anand utilised 

e  Marketing anand utilised 

e  Marketing anand utilised 

Website is cupeople indeptheir questioncouncil servic

Website is cupeople indeptheir questioncouncil servic

 

e Indicator

rvice Policy

as required 

nd Promotions Prog

nd Promotions Prog

nd Promotions Prog

nd Promotions Prog

nd Promotions Prog

nd Promotions Prog

nd Promotions Prog

rrent and is accesseendently sourcing ins about the commces, programs and p

rrent and is accesseendently sourcing ins about the commces, programs and p

 

gram developed 

gram developed 

gram developed 

gram developed 

gram developed 

gram developed 

gram developed 

ed regularly by information to 

munity and projects 

ed regularly by information to 

munity and projects

   

Progres

Website maintaine

Delivered through campaign. 

Delivered through campaign. 

Not commenced. 

Delivered through campaign. 

Delivered through campaign. 

Delivered through campaign. 

Delivered through campaign. 

The launch of Couninformation being The new slide showeffective new featumore current informore eye catching 

Events publicised tSection and CounciAdvertised through

Page | 73

ss at 30 June 2015 

ed continuous opera

regular advertising

regular advertising

regular advertising

regular advertising

regular advertising

regular advertising

ncil's new website spromoted through w News Reel has beure on the site to almation to be showway.  

hrough Council's Toil's website effectivh Facebook.  

3  

ation. 

 

 

 

 

 

 

saw more the site. 

een an llow for n in a 

ourism vely. 

A

Actions 

LA4.14 Deve

LA4.14.1 Pre2013/2014 

 

Annual Report 201

elop and implemen

epare and impleme

14/2015 

nt Marketing and P

ent marketing progr

 

Resp

Promotions Program

ram for Director 

ponsible Manager

m (refer to Tourism

Corporate Services

Performance

m Plan 2013‐2018)

s  Marketing pr

 

e Indicator

ogram implemente

 

ed 

   

Progres

Marketing and proimplemented. 

Page | 74

ss at 30 June 2015 

motions program 

4  

Annual R

 

 

Report 2014/2015 

 

Page | 75  

Annual R

Lega

Summarthe Loca

Over

Details oreported

No over

during t

 

Publ

Declaratunder Se

In the 20

Narrabr

Policy an

Sect

Summarwork ca During tSection 

Legal Mat

Debt Colle

Collaterali

(Investme

Human Re

Companio

Building an

Total 

Report 2014

al Proce

ry of the staal Governme

rseas V

of overseas vd under Clau

seas visits w

he 2014/15 f

lic Inter

tion of Publiection 31 of 

014/15 finan

i Shire Counc

nd Procedur

ion 67 

ry of resolutrried out on

the 2014/15 67 of the Loc

ter 

ection Costs 

ised Debt Ob

nts) 

esources 

on Animal 

nd Developm

/2015 

eedings

te of each leent Regulatio

Visits 

visits by Couuse 217 (1) (a

were made by

financial yea

rest Dis

ic Interest Dthe Public In

ncial year Co

cil adopted a

e in 17 Dece

Resolu

tions made un private land

financial yeacal Governm

bligations 

ment 

egal proceedon, 2005 and

uncillors, sena3) of the Lo

y Councillors

ar. 

sclosur

isclosures renterest Discl

uncil did not

and impleme

mber, 2013.

utions

under Sectiod:‐ 

ar no privatement Act, 199

Cost ($)

44,6

3,6

20,6

$9,7

$1,4

80,2

ding and the d Section 42

nior staff or ocal Governm

s, council sta

re Act 1

eceived by Closures Act, 

t receive any

ented an Inte

on 67 of the L

e works were93. 

663 Recov

685 Ongoi

604 Compl

person

766 Compl

499 Compl

217  

result repor8 (4) (b) of t

other personment Regula

ff or other p

1994 an

ouncil durin1994 and Cl

y applications

ernal Report

Local Govern

e undertaken

State 

erable 

ng 

leted – profe

nnel 

leted ‐ Decla

leted ‐ Bogga

rted under Che Local Gov

ns representation, 2005. 

ersons repre

nd Reg

g the 2014/1ause 4 of th

s for Public I

ing – Public I

nment Act, 1

n requiring a 

of progress 

essional serv

ration of Da

abri Develop

Page |

Clause 217 (1vernment Ac

ting Council 

esenting Cou

gulation

15 year repoe Regulation

nterest Disc

Interest Disc

1993 concern

resolution u

and result 

vices regardin

ngerous Dog

pment Motel

76  

1) (a) of ct, 1993. 

uncil 

orted n. 

losure. 

closure 

ning 

under 

ng 

g  

 

Annual R

CounFacil

Total ampaymen For the 2 

Descrip

Provisi

Teleph

Attend

Trainin

Interstapocket

Oversepocket

Expens

Expensa Coun

 Other C 

Reimbu

Meals/

Counci

Associa

Mayora

Counci

 Council’expenseattached

Report 2014

ncillorslities 

mount of mont of Council

2014/15 fina

ption 

on of dedica

one calls ma

ance of Cou

ng of Council

ate visits by  travelling ex 

eas visits by C travelling ex 

ses of any sp 

ses involved ncillor 

Councillor Ex

ursement of 

/Refreshmen

llor insuranc

ation membe

al Fees 

llors Fees 

s Policy on tes can be foud as Append

/2015 

s Expen

oney expendlor expenses

ancial year, C

ated office eq

ade by Counc

ncillors at co

lors and prov

Councillors, xpenses 

Councillors, ixpenses 

ouse, partne

in the provis

xpenses 

travel and o

nts at Counci

ce allocation 

erships 

he provisionund on Councix 1. 

nditure

ed during ths. 

Council expe

quipment for

cillors   

onferences a

vision of skil

including tra

including tra

er or other p

sion of care f

other costs to

l meetings a

 of facilities cil’s Website

 And P

hat year on t

nded a total

r Councillors

nd seminars

ls developm

ansport, acco

nsport, acco

erson who a

for a child or

o attend mee

nd functions

for use by Ce www.narra

rovisio

the provision

 of $253,859

ent 

ommodation

ommodation 

accompanied

r an immedia

etings 

ouncillors anbri.nsw.gov.

on Of Co

n of Councill

9.13. 

n and other o

and other o

d a Councillo

ate family me

nd the payme.au. A copy o

Page |

ouncill

lor facilities 

out of 

out of 

ember of 

Total: 

Total: 

ent of Councof the Policy 

77  

or 

and the 

Amount 

$7,137.

$21,824.

$4,319.

$33,281.

 

$2,184.

$7,246.

$38,673.

$30,892.

$23,440.

$118,140.

$220,577.

cillors is 

$0

21

73

$0

34

$0

$0

$0

.28 

80

63

57

85

00

00

.85

Annual R

Seni

Details o 

Seni

StatemeClause 2 

General

Salary C

Bonus, p

Superan

Non Cas

Fringe B

Stateme

Senior S

Salary C

Bonus, p

Superan

Non Cas

Fringe B

Stateme

Report 2014

or Staf

of Senior Sta

General Ma Director Cor Director Eng Director Pla

or Staf

ent of the to217 (1) of the

 Manager 

omponents 

performance

nnuation 

sh Benefits 

Benefits 

ent Of Total R

Staff 

omponents 

performance

nnuation 

sh Benefits 

Benefits 

ent Of Total R

/2015 

ff Empl

aff in employ

nager 

rporate Servi

gineering Ser

nning and De

ff Remu

otal remunere Local Gove

Remuneratio

Remuneratio

oyed

yment durin

 

ices 

rvices 

evelopment

unerati

ration packagernment Reg

on 

on 

ng 2014/15 

ion 

ges of the Ggulation, 200

Diane Hood

Paul Wearn

Andre Komp

Paul Bawde

eneral Mana05. 

(February 2

pler 

n (March 20

ager and Sen

 

Page |

2015) 

015) 

nior Staff un

$

$

$

$

78  

nder 

$124,380

0

$11,895

$11,000

0

$147,275

$443,511

0

$41,988

$22,988

$24,142

$532,629

Annual R

Cont

Details oGovernm The folloduring t The amoconstruc2014/20  

Name of 

BretmartCalvani CGLB QuaQuarries Milbrae QScreeningCrushing Rates on

Caruana Milbrae Qand BlastRates on

AccurateAusroadsPty Ltd, DServices, Gardner T/A GracLtd, KerwSurfacingStabilco PAustraliaRates on

BMR QuaWorks PtLtd and NPatches PRates on

SJ & MS R

Jacobs G

Civilbuild

Report 2014

tracts A

of Contractsment Regula

owing table lhe 2014/201

ounts payablction contrac015 financial 

f Contractor 

t Pty Ltd T/A CCrushing Pty Ltrrying & LogisPty Ltd, M&MQuarries Pty Lg Pty Ltd and Pty Ltd ly supply cont

Mining ServicQuarries Pty Lt Pty Ltd ly supply cont

e Asphalt & Ros Stabilisers PtDiveva Pty LtdDowner EDI W& Sons Pty Lte Civil, Hiway way Asphaltingg Pty Ltd,  Pty Ltd and St Pty Ltd (SPA)ly supply cont

arries Pty Ltd,ty Ltd, Fulton Norman McMPty Ltd T/A Paly supply cont

Rice Pty Ltd t/

roup (Australi

d Pty Ltd 

/2015 

Awarde

 awarded foation, 2005. 

lists all contr15 financial y

le below arects, plus any year for Rat

Clarence Earthtd, CZL Groupstics Pty Ltd, HM Crushing PtyLtd, Regional CTrevor Prodg

tract 

ces Australia PLtd and Precis

tract 

oad Repairs Ptty Ltd, Centrad T/A Mid CoaWorks Pty Ltdd, Grace RuraStabilizers Aug Pty Ltd, Roa

tabilised Pave) tract 

 Downer EDI Hogan Industahon atches Asphalttract 

/as Proterra G

ia) Pty Ltd 

ed 

or amounts g

racts awardeyear.  

either the aapproved vates Only Supp

hmoving, p Pty Ltd, Hutchinson y Ltd, Crushing & er 

Pty Ltd, ion Drill 

ty Ltd, l West Civil st Road d, FK l Pty Ltd ustralia Pty dworx 

ments of 

ries Pty 

Group 

greater than 

ed by Counci

approved GSTariations, or ply Contract

Date 

24/06/2014

24/06/2014

15/07/2014

24/06/2014

19/08/2014

16/09/2014

17/02/2015

$150,000 un

l with a tota

T inclusive cothe total ams.   

Goods or SProvided

Contract 2Gravel Cru

Contract 2Quarry Bla

Contract 2Insitu Stab

Contract 2Supply & LConcrete

Contract 2Narrabri APavement Upgrade –

Contract 2Narrabri WAugmenta

Contract 2Harparary Replaceme

nder Clause 

l value of $1

ontract amomounts paid d

Services 

2014‐15/01 ushing 

2014‐15/02 asting 

2014‐15/03 bilisation 

2014‐15/04 Lay Asphaltic 

2014‐15/07 Airport & Lighting 

– Design 

2014‐15/08 Water Supply tion – Design 

2014‐15/09 Bridge ent 

Page |

217(1) of th

50,000 or m

unts for during the 

Amount (Incl 

$34

$14

$69

$10

$88

 $1,83

$2,37

79  

e Local 

ore 

Payable GST) 

49,096.13 

41,983.03 

94,444.04 

07,342.84 

81,189.24 

31,491.20 

75,996.20 

Annual R

Interflow

FK Gardn

CivilTeam

Mannion

Castlerea

Writ

Amountthe Loca  

Rates an

Resident

Farmland

Business 

Special R

Water Se

Sewer Se

Waste M

Report 2014

w Pty Ltd 

ner & Sons Pty

m Engineering

n Water Drillin

agh Construct

tten Of

t off Rates anal Governme

d Charges Wr

ial Rates   

d Rates 

Rates 

Rates 

ervices Charge

ervices Charge

Management C

/2015 

y Ltd 

g Pty Ltd 

ng Services Pty

ion Group Pty

ff Rates

nd Charges Went Regulatio

ritten off in 20

es (including P

es (including P

Charges (includ

y Ltd 

y Ltd 

s and C

Written of don, 2005. 

014/2015

Pensioners)

Pensioners)

ding Pensione

17/02/2015

07/04/2015

23/06/2015

23/06/2015

23/06/2015

Charges

uring the 20

ers)

Contract 2Sewer Reli

Contract 2Narrabri APavement Upgrade –

Contract 2Dubbo & BCreek BridReplaceme

Contract 2Drilling of Supply Bor

Contract 2ConstructiNarrabri RCreek Statat Narrabr

014/15 finan

Total:

2014‐15/10 ining 

2014‐15/12 Airport & Lighting 

– Civil Works 

2014‐15/14 Baradine ge ents 

2014‐15/17 Groundwaterres 

2014‐15/19 on of FS Deep ion Building ri Airport 

cial year und

Page |

$1,5

$10,5

$2,1

r  $50

$53

der Clause 1

80  

16,523.43 

74,294.66 

19,329.10 

09,927.22 

30,354.00 

132 of 

$47,955

$132

$0

$507

$29,088

$26,006

$30,682

$134,370

A

S

TG D

w

D

 

C

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

P

 

Annual Repor

Section

Total amounGovernment 

During 2014/

with it Contri

Donations of

Dona

Dona

Dona

Dona

Contribution

Austr

Senio

Nosh

Volun

ANZA

Youth

Red C

Tidy T

Famil

RSL W

General Cont

Narra

Baan 

Natu

Regio

Pensioner Re

Narra

rt 2014/2015

n 356 C

t contributeAct, 1993, r

/2015, Narra

butions and 

f Rates and S

ation of Rate

ation of Wate

ation of Sewe

ation of Wast

s to Events 

ralia Day 

or Citizens W

 on the Nam

nteers Week

AC Day 

h Week 

Cross Hire of

Towns 

ly Drug Supp

War Memoria

tributions 

abri Shire Ba

Baa Water R

ralisation Ce

onal Arts Dev

ebate Schem

abri Shire Co

ontribu

ed or otherwreported und

bri Shire Cou

Donations P

Service Charg

er Services 

er Services 

te Managem

Week

moi 

f The Crossin

port

al DA Fees 

nd 

Reimbursem

eremony 

velopment P

me 

ouncil Compo

utions

wise granted der Clause 21

uncil made th

Policy.: 

ges 

ment Services

g Theatre 

ment 

rogram

onent 

under sectio17(1)(a5) of 

he following

$

$

s  $

 

$

$

$

$

$

$

$

$

$

$

$

$

$

on 356 (finanthe Local Go

g Contributio

13,126 

9,136 

13,461 

4,907 

5,598 

2,500 

2,433 

666 

12,000 

1,132 

14,270 

800 

5,000 

2,407 

14,000 

8,925 

295 

8,393 

123,374

ncially assistovernment R

ns and Dona

Page | 81  

t others) of tRegulation, 2

ations in acco

the Local 2005. 

ordance 

 

A

N

 

 

 

 T

Nin

  

C

T

a

e

fi

 A 1

2

3

4

5

Annual Repor

Narrabri Shir

Sport

Non‐

Small

Total Donatio

Not included n the followi

C

N

H

Conditi

This Public W

amount of m

expense of m

inancial year

Asset Conditi

1 – Near Perf

2 – Superficia

3 ‐ Deteriorat

4 – Requires 

5 – Asset uns

Asset Descrip

Buildings 

Other Structu

Public Roads 

Water 

Sewer 

Drainage Wo

Totals  

rt 2014/2015

re Grant Sche

ting Grants 

Profit Specia

l Area Grants

ons & Contri

in the aboveing forms: 

Concession R

Non‐Ratable

Hire of Coun

ion OF 

Works report 

oney require

maintaining th

r. 

ion Key 

fect 

al Deteriorat

tion Evident 

major recon

serviceable 

ption 

ures 

& Other Road

orks 

emes 

al Events Gra

ibutions  

e figures are 

Rates of Hire

e Property Cl

ncil Plant and

Public 

includes a st

ed to bring t

he asset at t

ion  

struction 

d Assets 

ants 

donations, c

e for The Cro

assifications

d Equipment

Works

tatement of t

he asset up t

hat standard

$

$

$

$

contribution

ossing Theatr

the current c

to a satisfact

d and Counci

ConditionAsset

18,666 

19,223 

15,300 

295,612 

s and conces

re 

condition of 

tory standard

il’s program 

n of  Estimabring uSatisfa($’00

3

3

3

3

3

3

3  1

ssions grante

the asset, an

d, an estimat

of maintena

te to up to ctory 00) 

EstimmainSatis($’

666

55

8,925

0

0

498

0,144 

Page | 82  

ed to commu

n estimate o

te of the ann

ance for 2014

mate to ntain at sfactory $’000) 

2M

359 

38 

5,178 

279 

340 

151 

6,290 

unity groups

of the 

nual 

4/2015 

2014/2015Maintenance Program ($’000) 

391

32

6,150

328

387

23

7,255 

Annual Rep

StatemDelega

The followithe 2014/15stated unde  

Commit

Nosh on

The FrieTheatre

The New

Narrabr

 

ort 2014/20

ment Oated By

ng external 5 financial yer Clause 21

ttee 

n the Namoi 

ends Of The Ce 

wtown Park C

ri West Lake C

15 

f Extery Counc

organisationyear and wer7 (1) (a6) of 

rossing 

Committee 

Committee 

 

rnal Bodcil 

ns were Sectre delegatedthe Local Go

Delegated Fu

To facilitate athe Namoi. To raise fundPromotion of 

To facilitate aTo raise fundPromotion ofTo make recoto improveme 

The care, conPark. Collect any chthe use of thepurpose and expend thosethe Council mCommittee.To meet any ctime to time fservices chargfacility. To make the gmembers of tpurposes for constructed.Arrange the rgrounds, eith 

To raise fundPromotion ofTo make recoto improvemeArea. To carry out rWest Lake in requirements 

dies Th

tion 355 Comd to exercise overnment R

unctions

and co‐ordina

s for the purpf Narrabri Shir

and co‐ordinas for the purpf Narrabri Shirommendationents of The Cr

ntrol and man

harges and feee facilities, to objectives of e funds togethmay from time

charges whichfor electricityges in respect

grounds availthe public conwhich the fac

repair and maher by volunta

s for the purpf Narrabri Shirommendationents Narrabri 

redevelopmencompliance ws. 

hat Exe

mmittees of functions onRegulation, 2

te the event o

pose of the Core. 

te events.pose of the Core. s to Council inrossing Theat

agement of N

es fixed by Coraise funds fothe Committeher with such e to time vote 

h may be mad, water and at to the opera

able to and sansistent with tcilities were or

intenance of ry labour or o

pose of the Core. s to Council inWest Lake Re

nt works at thwith Council 

rcised 

Narrabri Shin behalf of C2005:‐ 

of Nosh on 

ommittee. 

ommittee. 

n relation re facility. 

Newtown 

ouncil for or the ee and to funds as to the 

de from ny other tion of the 

afe for all the riginally 

the otherwise. 

ommittee.

n relation ecreation 

e Narrabri 

Page | 83 

Functio

ire Council foCouncil as ou

Council Dele2014/15 

Cr Redding 

Cr Knox 

Director CorServices  Cr Tough 

Cr Tough  Cr O’Regan    

 

ons 

or all part ofutlined below

egate 

rporate 

f w 

Annual Rep

Commit

Narrabr

Rural TrWest Co

Youth C

GwabegCommit

 

ort 2014/20

ttee 

ri Airport Com

raining Centreommittee 

Centre Commi

gar Communitttee 

15 

mmittee 

e North 

ittee

ty Hall 

Delegated Fu

To assist Courequired. To assist Coumanaged.  

To investigateRural TrainingTo investigateRural Training

To investigateYouth CentreTo investigateYouth Centre

Take care, coGwabegar CoCollect any chthe use of thepurpose and expend thosethe Council mCommittee.To make the fmembers of tfor which theAny restrictioby Council. To meet any ctime to time fservices chargfacility. To maintain tGeneral Man

Structurinstallatand placomme

Council maintenthe facifor the cworks aGenera

To permit autpremises at aof carrying ouemergency wCouncil with aArrange the rand grounds, otherwise. 

unctions

ncil in determ

ncil as to how

e and progresg Centre. e and progresg Centre. 

e and progrese. e and progrese. 

ntrol and manommunity Halharges and feee facilities, to objectives of e funds togethmay from time

facility availabthe public cone facility was oon to this avai

charges whichfor electricityges in respect

the facility to ager: 

ral alterationstions require nning approvencement. 

approval is tonance, improvlity prior to thcommencemeare to be to thl Manager. thorised Counany reasonablut work or inswhen entry is na set of keys frepair and ma either by vol

mining the Infr

w the Airport s

ss the develop

ss the manage

ss the develop

ss the manage

nagement of tl. es fixed by Coraise funds fothe Committeher with such e to time vote 

ble to and safnsistent with toriginally conslability is to b

h may be mad, water and at to the opera

the satisfactio

s and permanrelevant Counal prior to 

o be obtainedvements or exhe issuing of tent of such whe satisfaction

ncil officers toe hour for thepections at tinecessary, andfor this purpointenance of untary labour

astructure 

should be 

pment of a 

ement of a 

pment of a 

ement of a 

the 

ouncil for or the ee and to funds as to the 

e for all the purpose structed. e approved 

de from ny other tion of the 

on of the 

ent ncil building 

 for major xtensions to he contract ork. Such  of the 

o enter the e purpose mes of d to supply se. the facility r or 

Page | 84 

Council Dele2014/15 

Director PlaDevelopmen Cr Flower 

Cr Faber  Cr Redding 

Cr Faber  Cr Collyer 

Cr Booby                                     

 

egate 

nning and nt 

N

CenCom

Nam

NorAdv(NIW

AusAss

NarCom

NarMa

NSWAss

Arts

NorLoa

AssRel

NarGro

ShirMa

New

NarImpCon

CrimCom

NarCom

Annual R

StateJointCoun

Stateme2005:‐ 

Name of ComOrganisat

ntral Northernmmittee 

moi Water 

rthern Inland visory CommitWAC) 

stralian Airporsociation 

rrabri Shire Bammittee 

rrabri Bush Firnagement Co

W Saleyards Osociation 

s North West 

rth West Weigads Committee

sociation of Mated Councils

rrabri Shire Inoup 

re Floodway nagement Co

well Highway 

rrabri CBD provement nsultative Com

me Preventionmmittee 

rrabri Hospitammittee 

Report 2014

ement t Ventuncil Par

ent outlined 

mittee/ tion 

n Libraries  TNLa

Tr

Weeds ttee 

TnLbE

rt Owners  TAS

and  Tp

re ommittee 

Ts

Operators  TsA

TN

ght of e 

Tf

Mining  

Tr

teragency  Tp

ommittee Tl

Taskforce  Tsa

mmittee 

T

n  Tw

l Advisory  Ts

/2015 

Of All ures, Syrticipat

below state

The Narrabri SNorthern RegLibrary is baseacross Centra

To ensure theregion. 

To promote a noxious and oLocal and Statbodies involveEngland North

To collaborateAirports to enStandard. 

To work with productivity 

To collaboratesupports the R

To collaboratesaleyards to eAustralian Sta

To promote aNorth West Re

To work with freight travel. 

To collaborateregions. 

To work with programs and

To review theand changes 

To collaboratesupport any reand promotio

To collaborate

To review andwithin the Shi

To work with service to Nar

Corporyndicatted 

ed under Cla

Fu

Shire Librariesional Library. ed in Tamwortl Northern Ne

 best manage

regional approther environmte Governmened in land manh West region

e with ownerssure that serv

the Shire ban

e resources wRFS during fire

e with ownersnsure that sendard. 

nd encourageegion. 

regions in the

e to ensure m

all community Council supp

current threa

e with all areaequirements tn. 

e on the redev

d implement sre. 

the medical inrrabri. 

rationstes Or O

use 217 (1) (

unction

s are linked toThe Central Nth and serviceew South Wale

ement of wate

roach to manamental weedsnt organisationagement thrn. 

s and operatovices are prov

d to support t

within the Shiree seasons. 

s and operatorvices are pro

e the Arts in th

e North West 

ining integrat

y organisationport. 

ats of flood to

as along the Nthat need to b

velopment of 

strategies to r

ndustry to pro

, PartnOther B

(a8) of the L

o the Central Northern Regioes the commues. 

er for the Nam

agement of s by liasing witns and other roughout the 

rs of Australiavided at Austra

their ongoing 

e to ensure Co

rs of NSW ovided at 

he New Engla

to ensure safe

tes within the 

ns to assist wi

o urban areas 

ewell Highwabe meet for sa

the Narrabri 

educe crime 

ovide the best

ershipsBodies 

ocal Govern

onal unities 

DelegAlter

moi  DelegAlter

th all 

New 

DelegAlter

an alian 

DelegAlter

DelegAlter

ouncil  DelegAlter

No derequiAssocNatio

nd  DelegAlter

e  DelegAlter

Deleg Alter

th  Deleg 

due t  Deleg 

ay to afety 

Deleg 

CBD Deleg Alter

Deleg 

t  DelegAlter

Page |

s, Trustin Whi

nment Regula

2014/2015(Alternate 

gate:  rnate:  

CC

gate:  rnate:  

CC

gate:  rnate:  

CC

gate:  rnate:  

CC

gate:   rnate:  

CC

gates:   rnate:   

CC

elegate ired as ciation is onal. 

 

gate:   rnate:   

CC

gate:   rnate:   

CC

gates:   

rnate:   

CCC

gates:    CC

gates:    CC

gates:  CC

gates:   

rnate:    

CCC

gates:  CC

gate: rnate: 

CC

85  

ts, ich 

ation, 

5 DelegateDelegate) 

Cr ReddingCr Booby 

Cr BoltonCr O’Regan 

Cr O’ReganCr Tough 

Cr FlowerCr Bolton 

Cr ReddingCr Faber 

Cr ToughCr Finlay 

Cr KnoxCr Collyer 

Cr FaberCr Finlay 

Cr FaberCr Collyer Cr Tough 

Cr ToughCr Collyer 

Cr ReddingCr O’Regan 

Cr FinlayCr Bolton 

Cr ToughCr Redding Cr O’Regan 

Cr ToughCr Faber 

Cr ReddingCr Booby 

N

 

WeeAdv

Nam

NamWor

NamUtili

AustGro

GenPerfCom

NamServ

BogCon

LilliaPrize

TarrComCom

NarCon

SantCon

The Stee

EconCom

MunCooUpg

MyaCom

FlooAsso

NarCom

Annual R

Name of CommOrganisati

e Waa Hospitaisory Commit

moi Councils 

moi Councils Wrking Group 

moi Councils Wities Binding A

tralian Rural Rup Inc 

neral Managerformance Revmmittee 

moi‐Peel Custovice Committe

gabri Coal Cosultation Com

an Hulbert Mee Committee 

rawonga Coal mmunity Consmmittee 

rabri Coal Minsultative Com

tos Communitsultative Com

Crossing Theering Committ

nomic Develommittee 

ngindi to nabarabran Rgrade Commit

all Creek Memmmittee 

odplain Managociation (FMA

rabri Australiammittee 

Report 2014

mittee/ ion 

 

al ttee 

Ts

Toinpreis

Water  Ta

Water Alliance 

Ta

Road  Tro

r’s view 

Tte

omer ee 

TS

mmunity mmittee 

TD

emorial  T

Mine ultative 

TD

ne mmittee 

TD

ty mmittee 

Ta

atre tee 

TC

opment  TE

Road tee 

Tc

morial  T

gement A) 

Tp

a Day  T

/2015 

To work with tervice to Wee

To pursue the organisation onformation anproject strategepresentationssues impactin

To work with Cnd rights 

To work with Cnd rights 

To actively wooad networks

To review the erms. 

To share resouShires 

To ensure thatDevelopments

To participate 

To ensure thatDevelopments

To ensure thatDevelopments

To ensure thatnd can assist 

To actively ideCrossing Theat

To actively ideEconomics in t

To participate ompletion 

To engage with

To work towarprone areas. 

To engage with

Func

the medical ine Waa. 

traditional obf Councils incnd intellectuagic initiatives ans to State andng Local Gove

Councils to en

Councils to en

rk towards ths 

GM performa

urces and know

t Council is aws and can assis

in the selectio

t Council is aws and can assis

t Council is aws and can assis

t Council is awas a represen

ntify the fututre 

ntify the fututhe Shire 

in developing

h the Myall Cr

rds reducing t

h the Myall Cr

ction

ndustry to pro

bjectives of a rluding resourl property shaand political d Federal Government in thi

nsure water pr

nsure water pr

he redevelopm

ance based on

wledge throu

ware of Boggast as a represe

on of annual r

ware of Tarrawst as a represe

ware of Narrabst as a represe

ware of Santosntative. 

re developme

re developme

g this project t

reek Memoria

he impacts fo

reek Memoria

ovide the best 

regional ce, aring, group 

vernments onis region. 

reservation 

reservation 

ment of rural 

n contracted 

gh out the 

bri Coal entative 

recipient.

wonga Coal entative. 

bri Coal entative. 

s operations 

ent of The 

ent of 

through to 

al Committee

or all flood 

al Committee

Delegates 

Delegate:  Alternate:

Delegate: 

Delegate:  

Delegate: Alternate:

Delegates 

Delegate: Alternate:

Delegate: Alternate:

Delegate: 

Delegate: Alternates 

Delegate: Alternates 

DelegatesAlternate: 

Delegates 

Delegates 

Delegates 

Delegate: Alternate:

Delegate:  

Delegates 

Page |

2014/2015 D(Alternate De

 

s:    CrCr

  

:  

MGeDe

    M

    MDiEnSe

   :   

MDe

s:    MDeChstaco

   :   

CrCr

   :   

CrCr

    M

   s:   

CrCrCr

   s:   

CrCrCr

s:   :    

CrCrCr

s:    CrCrCr

s:    CrCr

s:    CrCr

    :    

CrCr

    MDian

s:    CrCrM

86  

Delegateelegate) 

r Boobyr Lowder 

ayoreneral Manageputy Mayor

ayor

ayorrector ngineering ervices 

ayoreputy Mayor

ayor (Chair), eputy Mayor,hairs of the foanding ommittees 

r O’Reganr Bolton 

r Collyerr Finlay 

ayor

r Collyerr Finlay r Redding 

r Reddingr Knox r Flower 

r Toughr Redding r Booby 

r Reddingr Flower r Knox 

r Toughr Faber 

r Mayorr Finlay 

r Reddingr Knox 

ayorrector Planninnd Developme

r Toughr Knox ayor 

ger 

ur 

ng ent 

Nam

Joint RPanel (

Medica

RMS RConsul

MineraWorkin

MaulesComm

Annual Rep

me of CommitOrganisation

egional Plann(JRPP) 

al Taskforce 

egional tative Commi

als & Energy ng Group 

s Creek Coal ittee 

  

StatemVentuHeld A

Statement o Council had

Bush F

Bush fire ha

Service. Dur

hazard redu

217

2 ha

of p

Cou

pro

Ten

gro

Rur

Pre

1 Se

For

dam

ort 2014/20

tee/  

ning  To p

To rthe 

ittee To b

To cregi

To eComrepr

ment Ores, SyA Contr

outlined bel

d no controlli

Fire Haz

azard reduct

ring the 2014

uction: 

7 fire permits

azard reduct

private prope

uncil’s existin

one areas acr

nders have b

undwork ha

ral Fire Briga

sentations, P

ection 44 de

est area.  W

mage any ass

15 

process and ap

review and actShire. 

be aware of R

collaborate toons. 

ensure that Committee develresentative. 

f All Condicaterolling I

low stated u

ing interest i

zard Re

ion within N

4/2015 Finan

s were issued

tion burns w

erty, Council

ng slashing p

ross the shire

een let on th

s commence

des conduct

Parades and 

claration wa

ith quick res

sets.

Functio

pprove region

tively expand 

MS activities a

ensure minin

ouncil is awareopments and

orporates Or OInteres

under Clause

n any compa

eductio

arrabri Shire

ncial Year, th

d to local lan

ere conduct

 and Crown 

program was 

e. 

he new Deep

ed. 

ed over 35 C

other like ev

as made for a

ponses of br

on

nal developme

 the medical s

and impacts o

ng integrates w

e of Maules C can assist as 

tions, POther Bst 

e 217 (1) (a7)

anies during

on Repo

e is carried o

he following 

ndholders in 

ed by brigad

Land being h

enhanced b

p Creek Rura

Community E

vents. 

a major fire t

rigades, aircr

ents

services in 

on the Shire

within he 

Creek Coal a 

PartnerBodies I

) of the Loca

the 2014/15

ort 

ut in conjunc

activities oc

the Narrabr

des througho

hazard reduc

by RFS fundin

l Fire Brigade

Education ev

that burnt in

raft and othe

 

Delegates:   Alternate:  

Delegate:   

Delegates:   

Delegate:    

Delegate:   Alternate:  

rships, In Whic

l Governme

5 financial ye

ction with th

curred in rel

i Shire.  

out the Shire,

ced. 

ng to allow st

e Station at t

ents, includi

 the Narrabr

er personnel 

Page | 87 

2014/2015 D(Alternate De

CCC

CDSM

M

MGD

CC

Trusts,ch Cou

nt Regulatio

ear.  

he NSW Rura

ation to bus

, resulting in

trategic slash

the Airport a

ing Shows, 

ri Shire Pilliga

 this inciden

 

Delegateelegate) 

Cr ReddingCr Faber Cr O’Regan 

Cr BoobyDirector CorpoServices Mayor 

Mayor

MayorGeneral ManaDeputy Mayor

Cr FinlayCr Tough 

, Joint ncil 

on, 2005:‐ 

al Fire 

h fire 

n over 50ha 

hing in fire 

and the 

a State 

t did not 

orate 

ger r 

Annual Rep

Human

Statement oGovernmen Workforce  In June 201Integrated Pworkforce w Equal Oppo In line with section acti 

Ens

Rein

Com

Ens

Ens

dev

Ens

  

Carer’s

Statement oRecognition Council is reresource maShire Councdecisions re

 We acknow

people with

we recognis

friendly wo

Statem

Statement o 

Council had

ort 2014/20

n Reso

of activities nt Regulation

Plan 

3 Narrabri SPlanning andwho can deli

ortunity Emp

our Equal Emvely promot

suring policie

nforcing EEO

mmunicating

suring our re

suring Counc

velopment 

suring grieva

s Recog

outlined beln Act, 2010:‐

equired to coanagement pcil is compliaegarding hum

wledge that m

hin families, d

se carers’ res

rk environm

ment of

outlined bel

d no Environm

15 

urces 

to implemen, 2005:‐ 

hire Council d Reporting. ver services 

ployment 

mployment Oted EEO thro

es and proce

O principles t

g EEO inform

cruitment pr

cil provides a

nce procedu

gnition

low as Counc‐ 

omply with tpolicies and nt with this man resource

many of care

disabled fam

sponsibilities

ent. We also

f Enviro

low stated u

mental Upgr

nt the EEO m

adopted its The Plan aimand program

Opportunity ugh a variety

dures align t

through posi

mation to new

rocess promo

ll employees

ures and poli

n Act 20

cils reportin

he Carers Reprocedures,Act and takee practices. 

rs’ roles exte

mily member

s through ou

o promote th

onmen

under Section

ade Agreem

managemen

Workforce Pms to providems efficiently

(EEO) Policyy of activitie

to EEO princi

tion descript

w employees

otes Council

s with equal 

cies align to 

010 

g requireme

ecognition Ac the significaes into accou

end beyond t

s, and those

ur carers leav

he services o

nt Upgr

n 54P of the

ments in place

t plan under

Plan as part oe Narrabri Shy and effectiv

y and Manags including:

iples and leg

tions, perfor

s as part of th

 as an EEO e

access to op

EEO legislat

ents under S

ct 2010 and ant role careunt the signif

those of bein

 experiencin

ve provisions

f community

ade Ag

 Local Gover

e in 2014/15

r Clause 217 

of the Resouhire Council wvely to the co

ement Plan t

islation 

rmance appr

he orientatio

mployer 

pportunities f

ion 

ection 8 (2) o

to recognisers play withificant role ca

ng parents a

g such issue

s, flexible wo

y organisatio

greeme

rnment Act, 

 financial yea

Page | 88 

 (1) (a9) of t

rcing Strategwith a high pommunity. 

the Human 

raisals and tr

on process 

for training a

of the Carer

e, through itsin our societyarers make w

nd include c

s as family v

ork practises 

ons that supp

ents  

1993:‐ 

ar. 

 

he Local 

gy for the performing 

Resources 

aining 

and 

r’s 

s human y. Narrabri when making

are of elder 

iolence; and

and family‐

port carers.

Annual Rep

Compa

Statement oGovernmenAct:‐ 

Statement oRegulation.  Council  lodgShire had 5 Departmen Council durat the saleyrehoused wduring the 2are broken   

Expenses 

Salaries 

Operationa

Pound Main

TOTAL 

  Revenue re  

Income 

Impounding

Grant Comp

Sundry Inco

TOTAL 

   Councils  pecover Coun Known probeen  the  sotype dogs oof owners c Council willtargeted su

ort 2014/20

anion A

outlined belnt Regulation

of activities  

ged  its 2014 reports of dt of Local Go

ing the 2014yards  in Narrwith new ow2014/2015 fdown as foll

l Expenditur

ntenance and

ceived as a r

g Fees 

panion Anim

ome 

ermanent  fucils compani

blem areas ource of numopportunitiesclaiming anim

 be applyingbsidised des

15 

Animal

low as Councn, 2005 and 

relating to e

4/2015 Survedog attacks fovernment. 

4/2015 finanrabri.   Of thewners and  reinancial yearows:‐ 

e (incl. vets, 

d Repairs 

result of the 

als 

ll  time Rangion animal se

were  targetmerous  coms for rehousimals and pay

g for grant fusexing/regist

cils reportinGuidelines o

enforcing an

ey of Councifor the 2014/

cial year impese animals emaining anir Council spe

contractors,

pound activi

ger  resignedervices over 

ed where hmplaints.   As ng are limiteying the asso

unding in theration and m

g requiremeon the Exerc

nd ensuring c

il Seizure of /2015 financ

pounded 231approximatimals euthanent a total of

, consumabl

ities was bro

d  in  early  20the remaind

igh numbersthe majorit

ed.  Unfortunciated impo

e next financmicrochippin

ents under Ccise of Functi

compliance w

Cats and Docial year.  Th

1 dogs in its ely 31% wernized by  thef $134,509 o

es) 

oken up as fo

015  necessitader of the yea

s of  completty of animalsnately due tounding/regis

ial year to heg. 

lause 217 (1ions Under t

with the Com

ogs report  inhese attacks 

existing impre returned te  local  veteron companio

ollows:‐ 

ating  the  usar. 

te unregistes  impoundedo the ease ofstration/micr

elp address t

Page | 89 

1) (f) of the Lthe Compan

mpanion An

n August, 20were notifie

poundment fto their ownrinary  serviceon animal act

Amount 

Amount 

se  of  contra

ered  roamingd were  “hunf replacemenrochipping c

this situation

 

Local ion Animals 

imals Act an

015.   Narrabed to the NSW

acility locateners, 5% were.   Financialtivities.  Thes

$  55228

$  77960

$    1321

$134509

$  4845

$  9718

$    427

$14990

ct  Rangers  t

g animals hanting/piggingnt the numbeosts is low.  

n by providin

nd 

bri W 

ed re ly se 

to 

ad g” er 

ng 

Annual Rep

Off‐Leash A Off‐leash ar                                   

NarrabrbetweenBelar StCorner) Cooma ONarrabr

Narrabri between and the Nbetween the railwa

ort 2014/20

Areas 

reas are prov

ri Area 1: Then Ugoa Streereet (Coomabounded byOval and thei Showgroun

Area 2: The Maitland StNarrabri CreeViolet Streeay viaduct.  

15 

vided in the f

 

e area et and a Road y e nds. 

area reet ek bank t and 

following areeas: 

Page | 90  

Annual Rep

                               

BoggabrEncompOval, JunField andoval. BoggabrDavid GrBoggabr

Laidlaw 

Boston S

Wee Waathat is serbounded beast, Mitcand Charle

ort 2014/20

ri Area 1: passes Jubileenior League d the cricket

ri Area 2: rover Park. ri Area 3: 

St between 

St and Finche

: Educationaviced by Couby Church Stchell St to thees St to the w

15 

es 

al block uncil t to the e south west.  

Page | 91  

 

Me

MePa

Prbu

Noorgor gro

Meth(aplegrep

Meth(ot

To

Annual Rep

Gover

Statement oInformationRegulation: The Governinformationother publicagainst a derequired to  Details of ththeir outcom During the rapplicationsapplicationsSchedule 1  

edia 

embers of arliament 

ivate sector usiness 

ot for profit ganisations community oups 

embers of e public pplication by gal presentative)

embers of e public ther) 

otal 

*More than oin relation to

ort 2014/20

nment

outlined beln (Public Acc:‐ 

nment Informn held as recoc bodies, reqecision not toreport on al

he number omes and pro

reporting pes but not invs either whoto the GIPA 

T

Access granted in full 

one decision co each such de

15 

 Inform

low as Counccess) Act, 20

mation (Publiords by Statequest amendo grant accesll Governme

of Governmeocessing time

eriod, our agevalid applicatolly or in partAct.  

Table A: Num

Access granted in part 

Arei

can be made inecision. This a

mation 

cils reportin09 and Claus

ic Access) Ace Governmements to recss to informant Informatio

nt Informaties provided i

ency receivetions). Duringt because the

mber of applic

Access efused in full 

Infono

n respect of aalso applies to

(Public

g requiremese 7 of the G

ct, 2009 givesnt Agencies,cords of a peation or to aon (Public Ac

on (Public An the follow

ed a total of 9g the reportie informatio

cations by typ

ormation ot held 

In

0

3

a particular aco Table B.

c Acces

ents under SGovernment

s individuals a Governmeersonal natumend persoccess) Act, 2

ccess) Act, 2ing tables. 

9 formal acceing period, on requested 

e of applicant

nformation already available 

0

0

ccess applicat

ss) Act, 

ection 125(1Information

the right to;ent Minister,re that are innal records. 009 Access A

009 Access A

ess applicatioour agency rewas informa

t and outcom

Refuse to deal with application 

ion. If so, a re

Page | 92 

2009 

1) of Governn (Public Acc

; obtain acce, local governaccurate, aUnder this AApplications 

Applications

ons (includinefused a totaation referre

me* 

Refuse tconfirm/de

whetheinformatio

held 

ecording must

 

ment cess) 

ess to nment and nd appeal Act, Council i

received, 

ng withdrawal of 0 accessed to in 

o eny r on is 

Applicawithdr

0

0

t be made

n s 

ation rawn 

0

0

0

0

0

0

0

 

Peinap

Acap(opeinap

Acapthpeinappa

R

AA

A

A

T

In

 

Ov

Ca

Ex

Co

Le

Ex

Do

Tr

Ad

Ca

M

Ab

Annual R

ersonal formation pplications* 

ccess pplications other than ersonal formation pplications) 

ccess pplications hat are partly ersonal formation pplications anartly other 

Reason for inv

Application doAct) 

Application is 

Application co

Total number 

nvalid applica

verriding secr

abinet inform

xecutive Coun

ontempt 

egal professio

xcluded inform

ocuments aff

ransport safet

doption 

are and prote

Ministerial cod

boriginal and 

Report 2014

T

Access granted in full 

 

nd 

validity 

oes not compl

for excluded 

ontravenes res

of invalid app

ations that su

Table D

recy laws 

mation 

ncil informatio

onal privilege 

mation 

fecting law en

ty 

ection of child

de of conduct 

 environment

/2015 

able B: Numb

Access granted in part 

 

r

ly with forma

information o

straint order 

plications rece

bsequently b

D: Conclusive p

on 

nforcement an

dren

tal heritage 

ber of applicat

Access refused in full 

 

Infono

Table C

al requiremen

of the agency

(section 110 o

eived 

ecame valid a

presumption 

matters liste

nd public safe

tions by type

ormation ot held 

 

In

C: Invalid app

nts (section 41

y (section 43 o

of the Act)

applications

of overriding

ed in Schedule

ety

 of applicatio

nformation already available 

 

lications 

1 of the 

of the Act)

g public intere

e 1 of the Act

N

n and outcom

Refuse to deal with application 

Num

est against dis

Number of tim

Page |

me 

Refuse to confirm/den

whether information

is held 

mber of applic

sclosure: 

mes considera

93  

ny 

Applicatiwithdraw

 

cations

ation used*

ion wn

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Annu

*More 

conside

 

Responsible

Law enforce

Individual r

Business int

Environmen

Secrecy pro

Exempt doclegislation 

 

Decided wiextensions

Decided aft

Not decide

Tab

 

Internal rev

Review by I

Internal rev

Review by A

*The In

to the 

origina

 

Application

Applicationapplication

ual Report 20

than one public i

eration is to be re

e and effectiv

ement and se

rights, judicial

terests of age

nt, culture, ec

ovisions 

cuments unde

ithin the statu) 

ter 35 days (b

ed within time

ble G: Number

view 

Information C

view followin

ADT 

nformation Com

original decisio

al decision has 

Table 

ns by access a

ns by persons  relates (see s

014/2015 

interest considera

ecorded (but only

Table E: Oth

ma

ve governmen

ecurity 

l processes an

encies and oth

conomy and g

er interstate F

utory timefra

by agreement

e (deemed ref

r of applicatio

Commissioner

g recommend

mmissioner doe

on‐maker. The d

been made. 

H: Applicatio

pplicants 

to whom infosection 54 of 

ation may apply i

y once per applica

her public inte

atters listed in

nt 

nd natural jus

her persons

general matte

Freedom of In

Tab

me (20 days p

t with applica

fusal) 

ons reviewed 

r* 

dation under 

es not have the 

data in this case

ons for review

ormation the the Act) 

in relation to a pa

ation). This also a

erest consider

n table to sect

stice

ers

nformation 

ble F: Timelin

plus any 

nt)

To

under Part 5 

section 93 of 

 authority to va

e indicates that

w under Part 5

subject of ac

articular access a

applies in relation

rations agains

tion 14 of the

Numb

ness 

otal

of the Act (by

Dev

Act

Total

ary decisions, b

t a recommend

5 of the Act (b

N

cess 

application and, if

 to Table E. 

st disclosure: 

Act 

ber of occasiosu

Number o

y type of revie

ecision varied 

Decuph

0

0

0

0

0

ut can make rec

dation to vary or

by type of app

Number of ap

Pag

f so, each such 

 

ons when appccessful 

of application

ew and outco

ision held 

ecommendation

r uphold the 

plicant) 

pplications for

e | 94  

lication not 

0

0

0

0

0

0

0

ns 

9

0

0

9

ome) 

Total

0

0

0

0

0

r review

0

0

Annu

Env

 StateEnvir Particforce Narradurin NarraCoal  

 

NarraWhite 

 NarraWhite 

 

Narra

Conc

of: 

 

ual Report 20

vironm

ement outlinronmental P

culars of come during the y

abri Shire Cong the 2014/

abri Shire CoPty Ltd for th

4.3 millio

associate

abri Shire Coehaven Coal

$1.5 milli

Therribri 

$1 million

$200,000

$68,750 f

$500,000

 

abri Shire Coehaven Coal

$400,000

abri Shire Co

rete and Lan

$1.12 perof part of

$0.20 perthe ongo

014/2015 

mental P

ned below aslanning and 

mpliance wityear. 

ouncil has fou15 financial y

ouncil has a Phe provision 

on for the rep

ed road work

ouncil has a P (Maules Cre

on for the u

Road and Ta

n for the upg

0 for projects

for the Maul

0 for Narrabr

ouncil has a P (Tarrawong

0 to construc

ouncil has a P

ndscape Supp

r tonne of prf Wave Hill R

r tonne of pring maintena

Plannin

s Councils reAssessment

h effect of p

ur Planning Ayear. 

Planning Agreof  

placement of

ks. 

Planning Agreeek) for the p

pgrade of inf

arrioro Bridg

grade of Narr

s in Boggabri

es Creek com

ri CBD upgrad

Planning Agrea Extension)

ct and seal ro

Planning Agre

plies Pty Lim

roduct  for CRoad 

roduct for Coance of Wav

ng and 

eporting requt Act, 1979:‐

lanning agre

Agreements 

eement with

f Harparary 

eement withprovision of 

frastructure 

ge. 

rabri Airport

i and surroun

mmunity. 

des. 

eement with) for the prov

oads around 

eement with

ited for the 

ouncil Work

ouncil Worksve Hill Road.

Assess

uirements u

eements in 

in place 

h Boggabri 

Bridge and 

including 

t. 

nds.  

h vision of  

the mine. 

h Johnstone 

provision 

s upgrading 

s towards 

sment A

nder Section

Pag

Act 197

n 93G(5) of t

 

e | 95  

79 

the 

Annuual Report 20

 

014/2015  Page | 96  

C

20

Annu

apit

014/

ual Report 20

 

tal W

/20

014/2015 

Work

15 

ks PProgrramm 

Page | 97  

AAnnual Report 20114/2015          Page | 98  

AAnnual Report 20114/2015          Page | 99  

AAnnual Report 20114/2015          Page | 100  

AAnnual Report 20114/2015          Page | 101  

AAnnual Report 20114/2015          Page | 102  

AAnnual Report 20114/2015          Page | 103  

AAnnual Report 20114/2015          Page | 104  

Annuual Report 20014/2015 

Narra

46‐48

Narra

 

Telep

Fax: 

Email

Webs

abri Shire Co

8 Maitland St

abri NSW 239

phone:   0

  0

:    co

site:  w

uncil 

treet 

90 

02 6799 6866

02 6799 6888

ouncil@narr

www.narrabr

rabri.nsw.gov

ri.gov.au 

 

v.au