Upload
dotruc
View
213
Download
0
Embed Size (px)
Citation preview
2014/201
Cont
MAYOR’S M
GENERAL M
ABOUT NA
AWARDS A
THE MAYO
COUNCIL M
OUR ORGA
VISION AN
RELATED D
SUMMARY
HOW TO R
THEME 1
ONE COMM
THEME 2
A SUSTAINA
THEME 3
A PLACE TO
THEME 4
PROACTIVE
STATUTOR
CAPITAL W
APPENDIX
APPENDIX
5 Annual Re
tents
MESSAGE .....
MANAGERS FO
ARRABRI SHIR
AND CITATION
OR AND COUN
MEETINGS AN
ANISATION ....
D VALUES ....
DOCUMENTS .
Y FOR THE 10
READ THIS DO
MUNITY .........
ABLE ENVIRO
O THRIVE .......
E LEADERSHIP
RY INFORMAT
WORKS REPOR
1 – PAYMENT
2 – AUDITED
port
.....................
OREWORD ...
RE .................
NS .................
NCILLORS .......
ND DECISION M
.....................
.....................
.....................
YEAR COMM
CUMENT ......
......................
NMENT .........
......................
P AND ADVOCA
TION ..............
RT .................
T OF EXPENSE
FINANCIAL R
.....................
.....................
.....................
.....................
.....................
MAKING .......
.....................
.....................
.....................
UNITY STRAT
.....................
......................
......................
......................
ACY ...............
.....................
.....................
ES AND PROV
REPORT
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
TEGIC PLAN ...
.....................
......................
......................
......................
......................
.....................
.....................
VISIONS OF FA
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ACILITIES TO C
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
......................
......................
......................
......................
.....................
.....................
COUNCILLORS
P
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
......................
......................
......................
......................
....................
....................
S POLICY
age | 2
............. 3
............. 5
............. 6
............. 8
............. 9
........... 11
........... 12
........... 13
........... 14
........... 15
........... 16
............ 17
............ 32
............ 39
............ 57
........... 75
........... 97
2014/201
May
Narrabri S
As the Shi
Although
impacts of
England N
29% of NS
2013 was
Region co
future.
This financ
Council’s s
future of t
identified
been rece
will implem
Shire rises
Narrabri S
last 12 mo
achieved.
O
Vi
nu
sle
Th
Th
au
op
Na
of
gr
Re
Na
Na
re
to
re
5 Annual Re
ors M
Shire's rapid
re enters thi
drought con
f decisions to
North West. T
SW’s total ou
$8.9 billion r
ntinues to b
cial year saw
service to th
the Ratepaye
for amalgam
ently declared
ment the str
s from streng
Shire Council
onths with a
ur external s
isitors Inform
umerous pro
eepovers an
he numerous
heatre which
udiences thro
pportunity fo
arrabri Shire
f the Airport
rant funds fro
esources for
arrabri Shire
arrabri Shire
esourcing for
o provide a p
esidents of B
port
essag
economic gr
is new phase
ditions cont
o all membe
This data ref
utput. The Ne
representing
e a strong co
w the Fit For T
e communit
er investmen
mation, Narra
d “Fit For Th
rong framew
gth to streng
has develop
large amoun
services such
mation Centr
ograms such
d Boggabri D
s events hos
h catered to
oughout our
or something
e Council com
redevelopm
om the $6m
Regions fun
e Council.
e Council sec
r the Baan Ba
potable wate
aan Baa.
ge
rowth has ke
e of its histor
inue through
rs of our Shi
lects the Gro
ew England N
g 6% of Regio
ontributor in
The Future r
y, to provide
nt. Although
abri Shire Co
e Future’ by
work to ensur
gth into the f
ped dramatic
nt of milesto
h as the Libra
re were invol
as Authors t
Drover’s Cam
ted by The C
wide variety
r Shire, provi
g for everyon
mpleted the f
ment project
illion from th
ding secured
ured funding
aa Water Sup
r supply to t
ept planning
ry the challe
hout the Reg
re. The NSW
oss Regional
North West
onal NSW to
n Regional NS
review of Loc
e a sustainab
not
ouncil has
y IPART and
re that the
future.
cally in the
ones
aries and
lved in
talks, Toy
mpfire.
Crossing
y of
iding an
ne.
first stages
utilising
he
d by
g and began
pply Project
he
for the futur
nges and op
gion and it is
W Governmen
Product for
Region contr
tal of $138 b
SW and is ex
cal Governm
ble service an
re at the top
portunities a
imperative t
nt has releas
Regional NS
ribution to G
billion. The N
pected to co
ent highlight
nd provide b
P
p of the agen
are real and
to remain co
sed data refle
SW at $138 b
Gross Region
New England
ontinue to gr
ting the nee
better plannin
age | 3
da for Counc
exciting.
onscious of
ecting the Ne
billion in 2013
al Product in
North West
row in the ne
d to review
ng for the
cil.
ew
3,
n
ear
2014/201
Na
tim
Cr
La
Fa
Sh
fo
Co
Au
su
There are
have also
Manager’s
light such
As we step
would like
positive en
Conrad Bo
MAYOR
A special c
was annou
Lillian Hul
5 Annual Re
arrabri Shire
mber bridge
reek Bridge,
aunch of the
acebook pag
hire to the 20
ollowing Cou
ouncil secure
ugmentation
upply.
also many o
been a num
s, Council ha
as the Narra
p forward int
e to extend m
ngagement w
olton
congratulatio
unced as the
bert Memor
port
e Council also
s throughou
Baradine Cre
new look us
e which give
068 people w
ncil.
ed $12.5 mil
n project wh
other success
ber of issues
as been at th
abri Shire air
to the future
my thanks to
with the yea
ons to Gemm
e 2015 award
rial Prize.
o successfully
t the Shire. T
eek Bridge a
ser friendly N
es updates on
who follow t
lion in fundin
ich is current
sful complete
s that have a
e forefront t
service issue
e, strengthen
the Commu
r past and be
ma Ferguson
d winner of t
y secured $5
The bridges t
nd Wee Waa
Narrabri Shir
n maintenan
he page. Cou
ng from Reso
tly underway
ed programs
arisen and ev
to acknowled
es.
n what we ha
unity, Counci
efore us.
who
the
5.3 million in
to be replace
a Lagoon Bri
e Council We
nce, emergen
uncil also joi
ources for Re
y to ensure t
s and achieve
ven with the
dge and try t
ave and cont
llors and Co
funding to b
es are Brigalo
dge.
ebsite. This i
ncies and gra
ned Twitter
egions for th
the sustainab
ements thro
changes in t
to resolve an
tinue to spin
uncil Staff fo
P
begin the rep
ow Creek Br
is supported
ading works
with 84 peo
he Narrabri W
bility of Narr
oughout the S
the role of G
nything that
n the wheels
or their enthu
age | 4
placement o
idge, Dubbo
by Council’s
throughout t
ple currently
Water
rabri water
Shire. There
eneral
has come to
of commerc
usiasm and
f
s
the
y
ce I
2014/201
Gene
Narrabri S
October, 2
Narrabri S
The Statem
result of $
However,
after a cha
Interesting
50
19
52
$1
2,
2,
26
31
Narrabri S
communit
with Coun
services to
Stewart ToGENERAL
5 Annual Re
eral M
Shire Council
2015. The 20
Shire Council
ments identi
$133k that w
the isolated
ange in Coun
g facts in rel
0,000 visitors
90 functions
2,246 loans t
111,691 in gr
307km of ro
158,000,000
6,097 Head o
1,411 tourist
Shire Council
ty has minim
ncil, staff and
o expectatio
odd MANAGER
port
Manage
received its
014/2015 Fin
being the 6
ified an over
was submitted
General Fun
ncil processe
ation to Nar
s to the Narr
hosted at Th
through the
rant funding
oads maintain
0 litres of pot
of stock sold
ts visiting the
is well unde
mal impact in
d the public t
ns and conti
ers M
second succ
nancial State
2nd of 152 c
rall surplus o
d to IPART as
nd result ide
es, a very acc
rabri Shire C
rabri Shire Po
he Crossing T
Narrabri Shir
to construct
ned
table water p
through the
e Visitor’s Inf
erway to iden
the way forw
to continue t
nue to make
essag
cessive unqu
ments were
councils in NS
f $159k whic
s part of Cou
ntified that C
ceptable resu
Council servic
ools
Theatre
re Libraries’
t the Narrab
produced fo
e Narrabri Sa
formation Ce
ntify all area
ward to bein
to achieve th
e Narrabri Sh
e
ualified audit
lodged with
SW.
ch was marg
uncil’s Fit for
Council was
ult for the fin
ces for the ye
ri Communit
r the Shire
leyards
entre
s of financia
ng ‘Fit For Th
he results tha
hire a great p
t statements
the Office o
inally better
r the Future I
$192k worse
nancial year.
ear include:
ty Recycling
l reduction t
he Future’. I l
at will make
place to work
P
within the m
of Local Gove
r than the pr
Improvemen
e than predic
Centre
to ensure tha
look forward
us sustainab
k and live.
age | 5
month of
ernment, wit
edicted defic
nt Plan.
cted. Overal
at the
d to working
ble, deliver
th
cit
l,
2014/201
Abou
Covering 1
Kamilaroi
major attr
drawn to t
known as
Australia T
advancem
Narrabri
Approxim
centred a
majority
outlying to
Aborigina
Australia a
high, bein
home, a h
Shire has
that of the
up 22.2%
Shire popu
Economic
Historicall
industries
Shire, 11.
included S
and Cafes,
Narrabri S
million in
regional N
Agricultur
after and
and expor
internatio
The resou
Narrabri S
resulted in
with exte
Forest are
5 Annual Re
ut Nar
13,000 km2,
Highways ru
ractions, top
the area. On
“Big Sky” co
Telescope Co
ment.
Shire is h
ately 57% of
round the m
of the rem
owns of Wee
l and Torres
average of 2
g 89.5% aga
high percent
increased in
e NSW avera
of the Narra
ulation.
growth and
y famous in
that will bu
.7% worked
School Educ
, Restaurant
Shire has incr
the 2010/2
NSW average
re remains N
grow a wor
rting Narrab
onally recogn
urces sector
Shire. Narrab
n a wealth o
nsive coal a
ea; one of the
port
rrabri
our Shire is
un through N
rate facilitie
ne glimpse of
ountry. The s
ompact Array
ome to ov
f the Narrab
main centre o
maining resi
e Waa and B
s Strait Islan
.5%. The per
inst the NSW
age compar
n recent year
age, which w
abri Shire po
d opportunit
n the agricu
uild on our s
in Sheep,
ation 4.8%,
ts and Takeaw
reased its Gr
2011 financia
es.
Narrabri Shir
rld class prod
bri Shire goo
nised as an in
is another
bri Shire is w
of opportunit
and natural
e largest ons
Shire
the heart of
Narrabri Shire
es and accom
f a clear nigh
eemingly en
y, whose six
ver 13,000
ri Shire popu
of Narrabri,
dents living
oggabri.
der people
rcentage of p
W average of
ed to the NS
rs from 37.4
was 37.5 year
pulation and
y
ultural secto
strong econo
Beef Cattle
Other Crop
way Food Se
ross Regiona
al year grow
e’s most imp
duct. Agricu
ods to the w
nnovative cen
important i
ithin one of
ty for both e
gas deposits
shore natura
f the rich Nam
e bringing pe
mmodation, m
ht sky will lea
dless horizo
radio telesc
people.
ulation is
with the
g in the
make up 10
people in Na
f 68.6%. In N
SW average
4 years in 200
rs in 2006 an
d people age
or, Narrabri
omic founda
and Grain
Growing 4.6
ervices 3.2%.
l Product fro
wing at an a
portant indu
ltural proces
world. With
ntre for agric
industry wit
the largest c
employment
s with Santo
al gas reserve
moi Valley in
eople from a
many confer
ave you with
ns have facil
opes are gle
0.7% of the
arrabri Shire
arrabri Shire
of 72.5%. T
06 to 39 yea
d 38 years in
ed 65 years a
Shire is loo
ation. In 201
Farming. O
6%, Agricult
om $517 mill
nnual rate o
ustry. The fe
ssing and ha
3 governme
cultural rese
h a number
coal reserves
and ancillar
os extracting
es.
n North West
ll compass p
rences and h
no doubts a
itated the gr
aming beaco
population c
who were b
e, 93.6% of p
he median a
ars in 2011. T
n 2011. Child
nd over mak
oking to the
11, of the em
ther major
ure and Fish
ion in 2005/
of 5.3% whic
ertile black so
andling is a v
ent research
arch and ast
r of coal mi
s in NSW. Th
y business. T
g coal seam
P
t NSW. The N
points. With
high profile p
as to why thi
rowth of the
ons of scient
compared to
born in Austr
people speak
age of reside
This increase
dren aged 0 ‐
ke up 15.7%
e future acr
mployed peo
industries o
hing Support
/2006 financ
ch is well a
oil plains ar
vital industr
h stations, N
tronomy.
ines current
his new indus
The region is
gas from t
age | 6
Newell and
easy access,
erformers ar
s region is
e CSIRO
tific
o the NSW a
alia is relativ
k only English
ents in Narra
e is higher th
‐ 14 years m
of the Narra
oss a range
ople in Narra
of employm
t Services 3.
ial year to $8
bove state a
e highly sou
y, value‐add
arrabri Shire
tly operating
stry has alrea
s well endow
he Pilliga St
re
and
vely
h at
abri
han
ake
abri
e of
abri
ent
.3%
845
and
ght
ding
e is
g in
ady
wed
tate
2014/201
Abou
The econo
diversifies
apparent t
As the Shi
provide in
beginning
booklets p
Council als
event such
1515 and
has also b
through F
sector. Th
within Cou
Council is
communit
Council pr
arrangem
matters of
forwarded
within the
The main
customer
8.35am to
should the
Contact D
Tel:
Fax:
Email:
Website:
The Annua
external c
Website w
(Printing o
This Annu
Interest D
Act, 2009,
5 Annual Re
ut Nar
omy of Narra
s and broade
through an i
re is made u
nformation to
the Informa
printed and p
so utilises Fa
h as flooding
quite often p
ecome a com
acebook. Th
e news reel
uncil such as
currently up
ty in accessin
rovides infor
ent to suppo
f interest to
d to further r
e Narrabri Sh
Administrati
service desk
o 5pm. Counc
e public wish
etails for Co
(02) 6
(02) 6
counc
www.
al Report is p
osts incurred
www.narrabr
or copying ch
al Report ha
Disclosures Ac
, Companion
port
rrabri
abri Shire is i
ens from its a
ncreasing de
up of three m
o all commu
ation is provi
provided thr
acebook prov
g or traffic in
people share
mmunication
e Narrabri S
provides the
s events, spe
pdating the C
ng informatio
mation thro
ort the statio
the commun
radio station
hire.
ion Building
k to assist an
cil is accessib
h to attend th
uncil are:
799 6866
799 6888
cil@narrabri.
.narrabri.nsw
produced an
d in the prod
ri.nsw.gov.au
harges may a
as been prep
ct, 1994, Car
n Animals Act
Shire
n a robust p
agrarian base
epth in produ
main towns a
nity membe
de through p
oughout the
viding up to
cidents or in
e Posts from
n channel an
hire Council
e community
cial meeting
Council webs
on.
ugh radio sta
on Council pr
nity to reach
ns outside the
for Council i
yone wishing
ble to provid
he Administr
.nsw.gov.au
w.gov
d published
duction of th
u and can be
apply).
ared in acco
rer’s Recogni
t, 11998 and
osition. This
e into vertica
uction, manu
nd four villa
rs. Through t
print in the t
e Shire.
date inform
nterruptions.
the account
d a number
website is a
y with update
gs of interest
site in view o
ations, partic
rovides ads a
h further mem
e shire to re
s located at
g to approac
de feedback,
ration Buildi
internally th
his report. Th
e obtained in
rdance with
ition Act, 20
d the Environ
is projected
ally integrate
ufacturing, lo
ges, Council
the public co
three specific
ation which
. Council’s Fa
t to further r
of issues hav
lso utilised to
es on issues
t to the publi
of making the
cularly the lo
about service
mbers of the
ach the remo
46‐48 Maitla
ch Council w
answer enq
ng.
hrough Narra
his report is a
n printed form
the Local Go
10, the Gove
nmental Plan
to grow in f
ed industries
ogistics and s
uses a numb
onsultation c
c newspaper
has proven v
acebook acco
each other S
ve been reso
o provide inf
that are occ
c or change
e site user fr
ocal station M
es provisions
e community
ote member
and Street, N
hich is open
uiries and as
abri Shire Co
available on t
mat or on CD
overnment A
ernment Info
ning and Ass
P
future as the
s. Further div
service‐base
ber of differe
conducted in
rs and variou
valuable thro
ount has a fo
Shire residen
olved after b
formation to
curring in the
of times for
riendly to ass
Max FM. As a
s, public mee
y. Media rele
rs of the com
Narrabri and
Monday thr
ssist with app
uncil. There
the Narrabri
D upon reque
Act 1993, the
ormation (Pu
sessment Ac
age | 7
e economy
versification
ed industries
ent medias t
n the process
us Shire
ough large
ollowing of
nts. Faceboo
eing identifie
o the public
e Shire or
facilities.
sist the
a sponsorshi
etings or
eases are also
mmunities
has a
rough to Frid
plications
are no
Shire Counc
est to Counc
e Public
ublic Access)
ct 1979.
is
.
o
s of
k
ed
ip
o
day
cil
cil
2014/201
Awa
5 Annual Re
rds an
port
nd Citaationss
Coun
Netw
throu
Awar
betw
Kami
the K
withi
Touc
Kami
to sh
storie
Steve
invite
Coun
The N
the w
Awar
After
Aqua
stren
deve
provi
mem
Narra
numb
Pink
Gene
For 2
work
comp
Civil C
Oper
Main
Front
Tech
Infor
ncil at the 20
work confere
ugh the Coun
rd which reco
ween the Nar
laroi Indigen
Kamilaroi Ind
n the Narrab
hscreen prov
laroi traditio
owcase thei
es in total na
en Booby and
ed to the Sep
ncil meeting t
Narrabri Aqu
winner of the
rds under the
r the opening
atic Centre th
gth to streng
lop new prog
de a service
bers to utilis
abri Shire Co
ber of signifi
Ribbon Day,
es Day.
014/2015 Co
er and new e
pleting qualif
Construction
ations, Loca
tenance (Wa
tline Manage
nology, Reco
mation and C
P
14 NSW LG A
nce received
ncil Partners
ognised the
rrabri Shire C
nous Commu
digenous Tou
bri Visitors C
vides stories
onal history a
r history. Th
arrated by Cr
d Pam Smith
ptember 201
to receive th
uatic Centre w
e 2014 NBN B
e category o
g of the new
he facility ha
gth and cont
grams and e
to all comm
se and enjoy
ouncil partici
cant fundrai
Movember,
ouncil had 3
entrant train
fications in H
n (Plant Oper
l Governmen
aste Manage
ement, Infor
ordkeeping a
Cultural Serv
age | 8
Aboriginal
d recognition
hip Of The Y
partnership
Council and t
unity through
uchscreen
entre. The
s in relation t
and a platfor
ere are eight
raig Trindall,
h who were
14 Ordinary
he award.
was announc
Best Busines
f Tourism.
Narrabri
s gone from
tinues to
equipment to
munity
y.
pated in a
sers includin
, Jeans for
5 existing
nees
Horticulture,
rations), Wa
nt, Asset
ement),
rmation
and Library,
vices.
n
ear
he
h
to
rm
t
ced
ss
o
ng
ter
2014/201
The M
Cr Conrad Lot 197, APO Box 23WEE WAAMobile: Email: Cr Leslie K Centre of 87 MaitlanNARRABRHome: Mobile: Email: Cr Ron Low 77 MaitlanWEE WAAMobile: Email:
Cr Bolt
5 Annual Re
Mayo
d Bolton (Ma
Alma Street 30 A NSW 2388
0427 954 salto.conrcr.bolton@
Knox
Town Accomnd Street I NSW 23906792 53900413 057 murriman5cr.knox@n
wder
nd Street A NSW 2388
0427 944 ronlowdecr.lowder@
ton Cr Kno
port
r and
ayor)
8 828 [email protected]@narrabri.ns
mmodation
0 0 038 [email protected].
8 419 r1@[email protected]
x Cr Lowd
Counc
om sw.gov.au
om.au gov.au
.com sw.gov.au
er
cillorss
Cr Ken Flow 15 NingadhNARRABRI Home:Mobile:Email: c Cr Catherin “Booroomin175 BoorooBOGGABRI Mobile:Fax:Email: Cr Lloyd Fin 97 ThornfieBOGGABRI Mobile:Email:
Cr Flo
wer
un Circuit NSW 2390 6792 3295 0457 811 62ken.flower74cr.flower@n
e Collyer
n” omin Road NSW 2382 0428 674 346743 4372 cr.collyer@
nlay
eld Crossing RNSW 2382 0429 612 66cr.finlay@n
ower Cr
P
42
@narrabri.nsw
Road
65 narrabri.nsw.
Collyer C
age | 9
om .gov.au
w.gov.au
.gov.au
Cr Finlay
2014/201
Cr Maxine “Cardonis929 PilligaPO Box 18WEE WAAHome: Fax: Email: Cr Robyn 4 Bowen SNARRABRFax: Mobile: Email: Cr Catheri 168 YarriePO Box 16NARRABRHome: Work: Fax: Mobile: Email:
Cr Booby
5 Annual Re
e Booby
” a Road 86 A NSW 238
6796 22516796 [email protected]@
Faber
Street I NSW 23967923 6210417 230 [email protected]@
ine Redding
e Lake Road 68W I WEST NSW6792 31086792 11986792 11980428 923 narrabriwcr.redding
y Cr Faber
port
88 1 3 @[email protected]
90 1 762 [email protected]
(Deputy Ma
W 2390 8 8 8 108
westpo@[email protected]
Cr Redding
sw.gov.au
es.com.au w.gov.au
ayor)
pond.com.aunsw.gov.au
g
Cr John Tou “Norwood”Airport RoaNARRABRI Home:Mobile:Email: jo cr
Cr Bevan O “Moema”NARRABRI Home:Fax:Mobile:Email:
Cr Tou
ugh
d NSW 2390 6792 3277 0408 922 [email protected]@nar
’Regan
NSW 23906793 8641 6793 8646 0429 938 [email protected]@
ugh
Pa
69 bigpond.com rrabri.nsw.go
0
41 bigpond.com
@narrabri.nsw
Cr O’Regan
ge | 10
ov.au
m w.gov.au
n
2014/2015
Coun
Narrabri Sh
also conduc
which all Co
Fina
Plan
Pub
Roa
Tra
The
rep
Fina
Ordinary Co
items in the
meetings ar
Extraordina
advertised o
January.
Business pa
IPads. Coun
Business pa
Council Adm
Council and
available fro
does not oc
Annual Repo
cil Me
ire Council O
cts Committe
ouncillors are
ance and Go
o Cr Flow
nning and D
o Cr Colly
blic infrastru
o Cr Boob
ads and Flee
o Cr Finla
ffic Facilities
e Traffic Facil
resentatives
ancial Year.
ouncil meetin
e Agenda dur
re available f
ary Council m
on the Coun
apers are ava
ncillors are ab
apers are ava
ministration
d Committee
om Council’s
ccur until the
ort
eeting
Ordinary Cou
ee Meetings
e members:
overnance
wer (Chair)
evelopment
yer (Chair)
ucture and Co
by (Chair)
t
y (Chair)
s Committee
lities Commi
s and Counci
ngs are open
ring the Pub
from the Cou
meetings are
cil Website w
ailable for Co
ble to access
ailable to the
Building.
meeting pro
s website on
e next Ordina
s and
uncil meeting
on the first T
t
ommunity F
e
ttee is comp
l staff. Cr Fin
n to the publ
lic Form on a
urier.
called on sh
when timefra
ouncillors at t
s and conside
e public via th
oceedings ar
e week after
ary meeting
Decis
gs are condu
Tuesday of e
acilities
prised of Roa
nlay was the
ic and reside
application p
ort notice on
ames permit
the very leas
er motions p
he Council w
re recorded f
r the meetin
of Council.
sion‐m
cted on the
each month.
ads and Mari
delegate for
ents are able
prior to the m
n occasion to
t. No meetin
st three days
prior to the m
website and a
for the purpo
g conclusion
making
third Tuesda
The followin
time Service
r this commit
e to address t
meeting. Adv
o address pa
gs are condu
s prior to the
meeting to m
a copy is ava
ose of minut
, however ad
Page
g
ay of each m
ng are the Co
es representa
ttee for the
the Council i
vertising of u
articular issue
ucted during
e meeting in
make informe
ilable for vie
te taking. Mi
doption of th
e | 11
onth. Counc
ommittees o
atives, Police
2014/15
in relation to
upcoming
es and
g the month o
soft copy on
ed decisions.
ewing in the
nutes are
he minutes
cil
of
e
o
of
n
2014/2015
Our O
Narrabri Sh
Services, En
that Counci
organised.
deliver mor
Council willcommunity is below.
Annual Repo
Organi
hire Council
ngineering a
l is well prep
It will chang
re frontline s
l continue toneeds. The
ort
isation
is managed
nd Planning
pared for fut
ge the way
ervices.
o review its Organisation
n
by its Gene
and Develo
ture works a
we deliver s
structure tonal Structure
eral Manage
pment. The
nd projects t
some servic
o ensure it ae as per func
er and the D
adopted str
that will imp
es, increase
aligns with sction as ado
Directors of
ructure has b
prove the wa
efficiency,
service level pted by Cou
Page
three divisi
been establi
ay we work a
and improve
requiremenuncil on 26 N
e | 12
ions, Corpor
ished to ens
and how we
e our ability
nts to meet November, 20
rate
ure
are
y to
the 014
2014/2015
Vision
Over the ne
advantages
diversity of
resources se
health, edu
Narra
str
regio
provid
env
entire
Annual Repo
n and
ext decade, N
of a regiona
our econom
ector. In turn
cation and r
Vision
abri Shire
rong and v
onal growt
ding a qua
vironment
e Shire co
ort
Value
Narrabri Shir
al lifestyle alo
my, returning
n this will str
etail. This wi
n
will be a
vibrant
th centre
ality living
t for the
mmunity
es
e will cemen
ong with a w
to the comm
rengthen the
ill make the a
C
Tp
U
C
nt a reputatio
wide range of
munity the b
e ability of ou
area an even
Consultation a
To deliver servicprovide a qualit
Inno
Councrea
Exem
Councusto
Uncompromis
Council’s integr
on for itself a
f activities to
benefits of a
ur Shire to o
n more attra
and Facilitatio
ces to and reprty living environ
ovation
ncil will always tive and lateral
Leadership
To provide lecommunity a
Effective C
Effective costaff will, at
Value for M
The provisionefficient.
mplary Custo
ncil will endeavomers.
sing Integrity
ity will be main
as a vibrant c
o enjoy. We w
busy agricult
ffer a full ran
ctive place t
on
esent the internment within av
endeavour to b thinking.
and Teamwo
adership and tond the Council.
Communicatio
ommunication bt all times, be o
Money
n of Council serv
mer Service
vour to provide
ntained at the h
Page
community,
will make the
tural sector a
nge of servic
to live and w
rests of the whovailable resour
be innovative a
rk
o evoke a spirit.
on
between the Coof paramount im
vices will alway
the highest lev
highest level at
e | 13
offering all t
e most of th
and growing
ces, including
ork.
ole communiityces.
nd will follow a
t of teamwork w
ouncil, the commportance.
ys be cost effec
vel of service to
all times.
the
e
g
g
y and
a path of
within the
mmunity and
tive and
o all its
2014/2015
Relat
Communit
Narrabri Sh
Community
Shire Comm
Resourcing
This strateg
that identifi
The Workfo
employees
The Resourc
Council to c
An Asset M
achieve the
overarching
Other Struc
Delivery Pr
In considera
Program ide
Operationa
This plan hig
Delivery Pro
Annual Repo
ed Do
ty Strategic
ire Council a
y Strategic pl
munity.
g Strategy
gy identifies t
ies the finan
orce Plan is a
that are ava
ce Strategy a
complete fut
anagement S
e community
g plan to inco
ctures and Pa
rogram
ation of all th
entifies the O
al Plan
ghlights the
ogram and e
ort
ocume
Plan
after commu
an indicates
the resource
cial resource
also part of th
ilable to assi
also requires
ure objectiv
Strategy det
y needs. Coun
orporate the
arks and Ope
he elements
Objectives th
objectives a
nable Counc
ents
nity consulta
the directio
es available t
es that are st
he resourcin
ist with the d
s an Asset M
es.
ermines the
ncil currently
e areas of Tra
en Spaces.
of the Comm
hat Council w
nd actions to
cil to report a
ation adopte
n Council wi
to Council. Th
tructured to
g Strategy a
developmen
anagement S
level of serv
y is combinin
ansport, Wat
munity Strat
will meet ove
o be implem
annually on s
ed a Commu
ll follow in t
he Strategy i
ensure Coun
nd identifies
t of Council o
Strategy to c
vices require
ng existing A
ter Services,
egic Plan and
er the next fo
mented over t
specific obje
nity Strategic
he next ten y
ncludes a Lo
ncil meets its
s the number
objectives an
complete the
d for infrastr
sset Manage
Waste Wate
d the Resour
our years.
the financial
ctives.
Page
c Plan in Jun
years as dire
ong Term Fin
s objectives.
rs of approp
nd actions.
e overall fram
ructure and
ement Plans
er Services B
rcing Strateg
year in refle
e | 14
e 2013. The
ected by the
ancial Plan
riately skilled
mework for
assets to
to create an
uildings and
gy the Delive
ection of the
d
n
ry
2014/2015
Summ
The Commu
for itself as
activities to
benefits of
our Shire to
even more
In line with
the barriers
1. Na
2. Ai
3. Re
4. Re
5. Es
6. Ad
7. Ex
8. Ad
iti
9. Re
10. Re
11. Su
12. En
13. A
14. En
15. Pr
The Strateg
specifically
• 10CSt
• O
Annual Repo
mary fo
unity Strateg
a vibrant co
o enjoy. We w
a busy agricu
o offer a full
attractive pl
this vision a
s, the followi
arrabri Shire
irport to be o
egional stan
egional stan
stablished an
dequate hea
xpanded tert
dequate acc
inerant)
egional stan
evenue and
ustainable la
nsure a clean
safe place to
nsure Counc
roactively en
gic objectives
relate to the
0 Year ommunity trategic Pla
Objectives
Strate
ort
or the 1
gic 10 year pl
mmunity, of
will make the
ultural secto
range of serv
ace to live a
and after app
ing strategic
e to be a reg
of regional q
dard Narrab
dard industr
nd sustainab
alth services
tiary educat
ommodatio
dard infrastr
income grow
and use
n, green env
o live, work
il is complia
ngage with t
s are aimed a
e role Counci
n
gies
10 Yea
an highlight
ffering all the
e most of the
r and growin
vices, includi
nd work.
plying particu
objectives h
ional centre
quality
bri CBD
rial land/par
ble investme
to meet the
ional facilitie
n available t
ructure
wth strategy
ironment fo
and experie
nt with statu
he commun
at the broade
il plays with
• 4 Year DProgram
Ac
ar Com
ed the futur
e advantages
e diversity of
ng resources
ing health, e
ular focus on
have been es
rks developm
ent program
e needs of a
es (agricultu
to meet dem
y in place
or the future
ence the dive
utory regula
ity
er Shire com
the Commo
elivery m
ctions
mmunit
e direction o
s of a region
f our econom
s sector. In tu
education an
n the opport
stablished fo
ments
in place
regional cen
ure, educatio
mand (reside
ersity of cult
ations
mmunity. The
n Objective.
• AnnOpe
ty Strat
of Council by
al lifestyle al
my, returning
urn this will s
d retail. This
unities for gr
r Narrabri Sh
ntre
on, business,
ential, comm
ural activitie
e Strategies u
ual erational Pla
Budge
Page
tegic P
y developing
long with a w
g to the com
strengthen t
s will make th
rowth while
hire Council:
, mining and
munity, indus
es
under each O
an
et
e | 15
Plan
a reputation
wide range o
munity the
he ability of
he area an
acknowledg
d health)
strial, aged a
Objective
n
of
ging
and
Actio
OC1
OC1.
OC1.EnvirDevefor thintegPlan recom
OC1.
OC1.desig
T
ac
2014/2015
How T
The activitie
identified in
These them
1. One
2. A su
3. A P
4. Pro
The Operat
actions rela
In order to a
numbering
activities to
Understand
ons
Regional stan
1 Develop a C
1.1 Review thronmental Plaelopment Conthe Narrabri CBgrate the CBD content and mmendations
2 Retail areas
2.1 Develop dgn of CBD Mas
This column cont
ctions Council ide
undertake in 20
Annual Repo
To Rea
es and progr
n the Commu
mes are:
e Community
ustainable En
lace To Thriv
oactive Leade
ional Plan ou
te to as iden
assist in the
system has b
o be carried o
ding the Tabl
ndard Narrabr
CBD Master P
he Local n, trol Plan BD to Master
s
DiDe
s are shaded,
detailed ster Plan
DiDe
S
ide
tains the
entified to
014/15.
ort
ad This
rams in the A
unity Strateg
y
nvironment
ve
ership
utcomes for
ntified in the
monitoring a
been created
out during th
es:
ResponsibManager
ri CBD
lan for Narrab
irector Plannievelopment
attractive an
irector Plannievelopment
This row contain
Strategic Objectiv
ntified in the Com
Strategic Pla
This colum
Council Man
to carry o
Docum
Annual Repor
gic Plan.
the 2014/15
Delivery Pro
and reportin
d to identify
he 2014/15 f
ble r
bri in consulta
ng and
ConDCPDistCom
d well mainta
ng and Detasuccirrig
ns the
ves as
mmunity
n.
mn contains the
nager responsible
out the action.
ment
rt are catego
5 financial ye
ogram.
ng of activitie
individual ac
inancial year
Performa
ation with th
ntent of CBD MP for Narrabri trict. Positive Cmmerce feedb
ained and pro
ailed design ccessful shade gation system
This row co
Strategies as id
Four Year Del
e
orised accord
ear have bee
es against the
ctions. The t
r in referenc
ance Indicato
e Chamber of
Master Plan inCentral BusinChamber of back
ovide facilities
completed to atree planting installation
ontains the
dentified in the
ivery Program
This column cont
performance ind
measure and re
action again
ding to the fo
n summarise
e Operationa
ables in the
e to the Ope
r
f Commerce
forms ess
M20
s for the elder
allow and De
tains the
icator to
port the
nst.
Page
our themes t
ed under the
al Plan and D
document w
erational Plan
Progress a
Master plan ad013.
rly and disabl
esign complet
This
progress
June 201
perfor
e | 16
that were
e theme that
Delivery Prog
will only refer
n.
at 30 June 20
dopted Novem
led
ted.
column provides
of the action as a
15 in reflection of
rmance indicator
t the
gram a
rence
15
mber
s
at 30
f the
s.
2014/20
OneValuOur com
Everyon
Council.
member
52Loa
Nar
Lib
$1Gra
the
of N
$3Gra
the
Wa
Drin
relo
015 Annual R
e Commuing thmmunity beli
ne has a cont
. Continuing
rs or commu
2,246 ans throu
rrabri Sh
raries
10,000ant Fundi
Reveget
Narrabri
3,636 ant fundi
Wee Wa
r Memo
nking Fo
ocation
Report
munityhe contrieves strong
tribution to
efforts are n
unity.
ugh
hire
0 ing for
tation
Lake
ng for
aa Boer
rial
untain
y ributioly in the Cou
make and ev
needed to en
1
em
e
co
3p
Ch
on thatuncil’s vision
veryone des
ngage our yo
190Functio
The Cro
Thea
35Existing C
mployees
entrant tr
ompleted
qualifica
3051 Cparticipate
28Program
hildren he
Librar
t everyon statement
serves to sha
oung people
ons at
ossing
tre
5 Council
and new
rainees
d various
ations
Children
ed in the
6 ms for
eld in the
ries
one canof an entire
are in investm
e and to invo
Gr
th
5V
Se
P
n make Shire comm
ments made
olve the indig
$16,0rant Fun
he Revita
of Regi
Librar
50,000Visits to N
Shire
35Overs
Visitor
Narrabri
durin
eptembe
Page | 18
e munity”.
e by
genous
000 ding for
alisation
ional
ries
0 Narrabri
Pools
5 seas rs to
i Shire
ng
er, 2014
A
TP
Actions
OC1 Region
OC1.1 Deve
OC1.1.1 RevDevelopmenintegrate threcommend
OC1.2 Retai
OC1.2.1 Dev
OC1.2.2 Retfor all other beds for new
OC1.2.3 Impmaster plan
OC1.2.5 Seepublicly accesouth of the
OC1.2.7 Addseating areacombined wheights and
OC1.2.8 Devintersectionwith adjacenLibrary, Scho
Annual Report 201
Theme 1: OnPrincipal activities
al standard Narrab
lop a CBD Master P
view the Local Envirnt Control Plan for te CBD Master Plan dations
l areas are shaded,
velop detailed desig
tain existing on strePrecinct Streets buw tree planting
plement recommen in relevant stages
ek consent from Ausessible courtyard ine Post Office site wi
d a pergola or abor a at each of the 4 CBwith lowering existinaddition of new se
velop detailed desig of Doyle and Barwnt business ownersools and TAFE; and
14/2015
ne communis – projects and s
bri CBD
Plan for Narrabri in
ronmental Plan, the Narrabri CBD tocontent and
, attractive and we
gn of CBD Master P
eet parking configurut create garden isla
nded landscape plan
stralia Post to creatn the open space arthin the core CBD
structure to the exBD Core block endsng end of block walating
gn for roundabout awon Streets in consu, Neighbourhood Cconstruct
ity ‐ Valuingservices
Resp
n consultation with
o Director Developm
ell maintained and
Plan Director Developm
ration and
Director Developm
n Director Developm
te a rea
Director Developm
xisting s, l
Director Developm
at ultation Centre,
Director
g the contrib
ponsible Manager
h the Chamber of Co
Planning and ment
provide facilities fo
Planning and ment
Planning and ment
Planning and ment
Planning and ment
Planning and ment
Engineering Service
butions that
P
ommerce
Content of CBNarrabri CentChamber of C
or the elderly and d
Detailed desishade tree plinstallation
Retail areas aappealing
CBD Master Pin staged app
Retail areas aappealing
Retail areas aappealing
es
Proposed inteconstructed tand pedestriaprimary scho
everyone ca
Performance Indica
BD Master Plan infotral Business DistricCommerce feedbac
disabled
gn completed to alanting and irrigatio
are shaded and aest
Plan landscape planproach
are shaded and aest
are shaded and aest
ersection treatmento improve safety foans, particularly theol children
an make
ator
orms DCP for ct. Positive k
low successful on system
thetically
n implemented
thetically
thetically
t designed and or vehicle users e aged and
Progres
Master plan adopte
Design completed.
Not commenced.
Not commenced.
Approval not proviconcerns with Telst
Not commenced.
Detailed design com
Page | 19
ss at 30 June 2015
ed November 2013
ded by Australia Potra cables in that lo
mpleted.
9
3.
ost due to ocation.
A
Actions
OC1.3 To deOC1.3.1 Proother levels
OC1.3.2 Promethods incbusinesses a
OC1.3.3 Narparking are parking spac
OC1.3.4 Minstreet car pa
OC1.4 Estab
OC1.4.1 DranominationsCommittee
OC1.4.2 EstaCommittee q
OC1.4.3 CBDto obtain depriority Mas
OC2 Region
OC2.1 Deve
OC2.1.1 Devand Open Spdebate and
OC2.2 Facilit
OC2.2.1 Devbusiness
Annual Report 201
eliver adequate maomote public transpof government
omote and support cluding buses, walkand services in town
rrabri CBD recommimplemented to maces in and around t
nimise cost on businarking
blish and Chair a CB
aft Terms of Referens for a CBD Master
ablish CBD Master quarterly meeting a
D Master Plan Impleetailed design and cster Plan works
al standard industr
lop, adopt, monito
velop Levels of Servpace and present toadoption prior to im
tate the developm
velop industrial and
14/2015
ain street car parkinport needs of the Sh
alternative transpoing and cycling to an centres
endations regardinaximise available cahe CBD
ness owners for ma
BD Master Plan Imp
nce and call for Plan Implementatio
Plan Implementatioand reporting sched
ementation Commicostings for agreed
rial land developm
or and review Level
vice for Parks, Cemeo Council for discusmplementation
ment of industrial an
d commercial land f
Resp
ng hire to
General M
ort access
Director Developm
ng car ar Director
ain Director
plementation Comm
on Director Developm
on dule
Director Developm
ittee is high
Director Developm
ents
ls of Service annua
eteries ssion,
Commun
nd commercial land
for new Director Developm
ponsible Manager
Manager
Planning and ment
Engineering Service
Engineering Service
mittee
Planning and ment
Planning and ment
Planning and ment
lly for all key servic
nity Facilities Manag
d
Planning and ment
P
Increase in puuse of public
It is easy for pbus, cycling oImplementat
es Available car
es Business contparking are cafunds reserve
Terms of Refeand committe
Quarterly meestablished
Detailed desideveloped anCouncil by Co
ces provided by Co
ger
Maintenancefacilities, parkProvide for reand parks
Appropriate l
Performance Indica
ublic transport avaitransport
people to access thor walking. Approprion of Walk and Cyc
parking is maximise
tributions toward aalculated, communed transparently for
erence prepared in ee formed
eeting and reporting
gn for high priority nd recommendationommittee
ouncil
e of public buildingsks and gardens in aegional standard ind
and available for n
ator
lable. Increased
e CBD via car, riate parking. cle Strategy.
ed
additional car nicated and r future use
draft format
g schedule
works n made to
s, sporting ll communities. dustrial land
ew business
Progres
Lobbying opportunidentified.
Walk and cycle way
Car park maximisatappropriate.
Not commenced.
Not commenced.
Not commenced.
Centre median and
Levels of Service andeveloped and imp
Council has existingand is working withother land stock to
Page | 20
ss at 30 June 2015
nities undertaken as
y policy was adopte
tion is being review
d lighting designs co
nd Maintenance Staplemented.
g commercial land fh a private investoro the market.
0
s
ed.
wed as
ompleted.
andards
for sale r to bring
A
Actions
OC3 Adequa
OC3.1 Prom
OC3.1.1 Ado
OC3.1.2 Devprogram
OC3.1.3 Dev
OC3.2 Provi
OC3.2.1 ConAquatic Cenopportunitieimprovemen
OC3.2.5 Bog
OC3.2.6 Bogtoddler and
OC3.2.7 Bog
OC3.2.8 BogSheeting
OC3.2.9 BogBlocks
OC3.2.11 Wmain pool
OC3.3 Advo
OC3.3.1 MeTaskforce to OC3.4 Deve
OC3.4.1 Funpossible to d
OC4 Expand
OC4.1 Deve
OC4.1.1 Enafeeder progand work ex
Annual Report 201
ate health services
motion of walking a
opt Walk and Cycle
velop and impleme
velop a footpath re
de access to public
nduct a detailed revtre after 12 monthes for efficiencies ant
ggabri Caravan Park
ggabri Swimming Pomain pools
ggabri Swimming Po
ggabri Swimming P
ggabri Swimming P
Wee Waa Swimming
ocate for adequate
et with relevant pao discuss health serv
lop a Shirewide Re
nding identified anddevelop a Shirewide
ded tertiary educat
lop the community
able community devrams such as apprexperience
14/2015
to meet the needs
nd cycling
Strategy
nt footpath inspect
placement program
c swimming pools i
view of the Narrabrs of operations to ind continuous
k Swimming Pool U
ool – Repair and pa
ool‐Electrical Repai
Pool –Replace Asbes
Pool –Replace Starti
g Pool – Repair and
health services to
arties through the Mvices
ecreation Plan
d applied for wheree Recreation Plan
ional facilities (agr
y and recognise the
velopment throughenticeships, trainee
Resp
s of a regional cent
Commun
tion Director
m Director
n Narrabri, Wee W
ri dentify
Commun
pgrade Commun
aint Commun
rs Commun
stos Commun
ing Commun
paint Commun
meet the needs of
Medical General M
e Director
iculture, education
e diverse composit
h ships Human R
ponsible Manager
tre
nity Facilities Manag
Engineering Service
Engineering Service
Waa and Boggabri
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
a regional centre
Manager
Corporate Services
n, business, mining
ion of the commun
Resources Manager
P
ger Strategy Ado
es Program deve
es Program deve
ger Narrabri Aqureviewed to aoperations. B
ger Completed w
ger Completed w
ger Completed w
ger Completed w
ger Completed w
ger Completed w
Number of spShire
s Funding appl
and health)
nity
r Increase in coopportunitieslocal workfor
Performance Indica
pted by Council
eloped
eloped
atic Centre operatioallow increase in effBusiness Plan review
within budget
within budget
within budget
within budget
within budget
within budget
pecialists, GPs and n
ied for
ommunity access tos. Provide assistancrce opportunities fo
ator
ons are ficient wed
nurses in the
o developmentce to develop or all. Promotion
Progres
Narrabri Shire WalNovember 2014.
Not commenced.
Not commenced.
Review of Aquatic conducted. Efficienimprovement actio
Not commenced.
Works completed.
Works completed.
Works completed.
Works completed.
Works completed.
No meetings held.
No funding oppo
Access to work expCouncil continues awebsite. Council ha
Page | 21
ss at 30 June 2015
k and Cycle Plan ad
Centre Business Plancies and continuouons being implemen
rtunities identifie
perience opportunitand is promoted onas continued to
1
dopted in
an 2012 us nted.
d.
ties within n Council's
A
Actions
OC4.1.2 Idecan reflect t
OC4.1.3 Proenable counthe commun
OC4.2 Grow
OC4.2.1 Enaand proceduCouncil activ
OC4.3 Deve
OC4.3.1 Meproviders toopportunitie
OC4.3.2 IntrNarrabri Shi
OC4.4 Provi
OC4.4.1 Contraining cou
Annual Report 201
ntify options for hohe composition of
ovide systems, policncil’s workforce to rnity
w volunteer involve
able volunteer involures to support thevities
lop increase in loca
et with TAFE and oo discuss training anes
roduce potential stare area
de opportunities fo
ntinue to distributerses and programs
14/2015
ow council’s workfothe community
cies and proceduresreflect the composi
ement
lvement through poir engagement with
al training and pop
ther educational send workforce
aff for any industry
or local operators a
information on relto local operators
Resp
orce Human R
s to tion of Human R
olicies hin Human R
pulation workplace
ervice
Human R
to the Human R
and businesses to b
evant Tourism
ponsible Manager
Resources Manager
Resources Manager
Resources Manager
opportunities
Resources Manager
Resources Manager
be educated and in
Manager
P
of apprentice
r Options ident
r Policies and p
r Systems in pl
r Achieve increskill levels
r Facilitate em
ncrease skill levels f
Assist in crea
Performance Indica
eships
tified and progresse
procedures in place
ace for engaging vo
ease in people obta
ployment growth
for tourism
ting employment o
ator
ed
e
olunteers
ining higher
opportunities
Progres
accommodate an aa group training orhave commenced iFor The Dole opporenhance the commexperience with Co
Not commenced.
Equal Employmentmanagement plan
System in place for
Meeting held with Registered Trainingchanges to traineesCouncil. For 2014/2worker and new enqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio
Not commenced.
Operators are provto opportunities cothrough DestinatioTourism Organisati
Page | 22
ss at 30 June 2015
apprentice mechaniganisation. Investignto the provision ortunities which will munities access to wouncil.
t Opportunity policyin place.
r engaging voluntee
State Training and g Organisations to dship funding and op2015 Council had 3ntrant trainees comorticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv
vided information inoncerning training con NSW/Inland Regiion.
2
ic through gations of Work further
work
y and
ers.
discuss ptions for 5 existing
mpleting nstruction , Local aste nt, ing and vices.
n relation courses ional
A
Actions
OC4.4.2 Conand other reNational tou
OC4.4.3 Invitraining progNew EnglanOrganisation
OC4.5 Proac
OC4.5.1 Lobof New Englfacilities
OC4.6 Provi
OC4.6.1 MaNorth RegioTamworth R
OC4.6.2 Ensoptimal use
OC4.6.4 Ens
OC4.6.5 EnsBoggabri) ar
OC4.6.6 Cut
Annual Report 201
ntinue to make opeesource materials purism agencies
itations to operatorgrams and briefingsd‐North West and In
ctively engage with
bby government ageand for expanded t
de library services
intain the partnersonal Library Service Regional Council
sure library buildingof space is achieve
sure open hours are
sure branch librariere flexible spaces w
t‐Off Drain Library a
14/2015
erators aware of staproduced by State a
rs to participate in s run by DestinatioInland Regional Tou
h government agen
encies and the Univtertiary education
and facilities for th
hip with the Centracoordinated by
gs are maintained aed
e appropriate
s (Narrabri, Wee Wwith multi format co
and Patching
Resp
atistics and Tourism
n NSW, urism
Tourism
ncies for expanded
versity General M
he benefit of the co
al
Library M
nd Library M
Library M
Waa and ontent
Library M
Library M
ponsible Manager
Manager
Manager
tertiary education
Manager
ommunity
Manager
Manager
Manager
Manager
Manager
P
Local operato
Training progtourism
facilities
Continue lobbfacilities upgr
Libraries are modern envirfor use for all
Libraries are modern envirfor use for all
Libraries are modern envirfor use for all
Libraries are modern envirfor use for all
Libraries are modern envirfor use for allavailable for Libraries are modern envir
Performance Indica
ors assist in building
grams held to enabl
bying for Governmerades and new deve
maintained as welcronments. Libraries community memb
maintained as welcronments. Libraries community memb
maintained as welcronments. Libraries community memb
maintained as welcronments. Libraries community memb
maintained as welcronments. Libraries community. Libraruse for all communmaintained as welcronments members
ator
g tourism
e increased
ent funding for elopment
come and s are available bers
come and s are available bers
come and s are available bers
come and s are available bers
come and s are available ries are nity members. come and s.
Progres
Quarterly newslettoperators.
Operators are provto opportunities cothrough DestinatioTourism Organisati
Lobbying opportunidentified.
There have been a between Central NNarrabri including tprinter and Tech Sa
Use of optimal spa
Not commenced.
The Narrabri Librarreplaced under Revgrant funding. Whehave been orderedcreate flexible spac
Not commenced.
Page | 23
ss at 30 June 2015
ter distributed to To
vided information inoncerning training con NSW/Inland Regiion.
nities undertaken as
number of joint prorthern Regional Lithe circulation of thavvy Seniors.
ce continually revie
ry circulation desk hvitalising Regional Leels and additional d for Narrabri Librarce.
3
ourism
n relation courses ional
s
ojects ibraries & he 3D
ewed.
has been Libraries shelves ry to
A
Actions
OC4.7 Encou
OC4.7.1 Disccommunity
OC5 Adequa
OC5.1 Time
OC5.1.1 Lan
OC5.1.2 Uni
OC5.1.3 136
OC5.1.4 34C
OC5.1.5 Airp
OC5.2 More
OC5.2.1 App
OC5.3 Coun
OC5.3.1 Coudisadvantag
OC6 A safe p
OC6.1 Imple
OC6.1.1 ProShelter
OC6.1.2 Raisowner respoLegislation
OC6.1.3 Constray compaanimals whe
OC6.4 Take
OC6.4.2 Coo
Annual Report 201
urage schools and
cuss childcare need
ate accommodatio
ly release of land fo
nd released when ap
ts to be built
6 Rose Street Wee W
C George Street (Dr
port residence
e timely Developme
proved within legisl
cil applies influenc
uncil advocates for ged
place to live, work
ement requirement
ovide and operate a
se awareness of imonsibilities under th
nduct compliance aanion animals and iere necessary
a lead role in the p
ordinate response t
14/2015
private operators t
ds with providers an
n available to mee
or residential deve
ppropriate
Waa (Dr’s residence
’s residence)
ent Application app
lative guidelines
ce at Government l
those who are
and experience th
ts of the Companio
Companion Anima
pounded animals ahe Companion Anim
udits of homeless ampound companio
planning and provis
to natural disasters
Resp
to provide addition
nd General M
t demand (residen
elopment
EconomiManager
Property
e) Property
Property
Property
provals
Director Developm
evel to provide sol
General M
e diversity of cultu
on Animals Act
als Director Developm
and mals
Strategy Manager
and n
Strategy Manager
sion of Emergency
Director
ponsible Manager
nal childcare faciliti
Manager
tial, community, in
c Development r
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
Planning and ment
utions for those in
Manager
ural activities
Planning and ment
and Land Use r
and Land Use r
Management Serv
Engineering Service
P
ies
Adequate chi
ndustrial, aged and
Adequate acc
er Adequate acc
er Completed w
er Completed w
er Completed w
Decrease in alegislative gu
disadvantaged sit
Influence ap
Companion amanaged. Proshelter
Community A
Compliance A
vices
es Reduction in damage due t
Performance Indica
ldcare facilities in t
itinerant)
commodation
commodation for C
within budget
within budget
within budget
approval timeframeidelines
uations where app
pplied
nimals are approprovision and operati
Awareness Raised
Audits conducted
property and infrasto floods
ator
the Shire
ouncil staff
es within
plicable
riately on of an animal
structure
Progres
Not commenced.
Council has existingand is working withother land stock to
Not commenced.
Works completed.
Works completed
Works completed
Average DA turnarorequired informatiodays. Well below le
Lobbying opportunidentified.
Companion animalaccordance with le
Ongoing educationwith inspection and
Councils Ranger seratepayer requestsabandoned animal
Have been availabl
Page | 24
ss at 30 June 2015
g commercial land fh a private investoro the market.
d.
d.
ound time from recon for 2014/2015 wegislated period of 4
nities undertaken as
’s shelter operatedgal obligations.
n program in conjund enforcement duti
rvices responding ts as received re stras.
e to support as nee
4
for sale r to bring
ceipt of all was 18 42 days.
s
d in
nction ies.
to ay/
eded.
A
Actions
OC6.4.3 Prodisasters
OC6.5 Offer
OC6.5.1 Carleast on a qu
OC6.5.2 Devservices thatChildren’s BPreschool St
OC6.5.3 Proresidents
OC6.5.4 Actmainstreamcommunity
OC6.6 Facilit
OC6.6.1 Conand events t
OC6.6.2 Woconference conference
OC6.6.3 Wopromote ma
Annual Report 201
ovide support for co
r library services an
rry out programs in uarterly basis
velop a plan of childt can be applied at ook week . Simultatory time
ovide home library s
ively seek/foster pa and socially isolate
tate, coordinate, e
ntinue to support athat bring visitors in
ork with The Crossinand meeting venueand meetings mark
ork with The Crossinajor entertainment
14/2015
ombat agencies dur
nd programs as wel
all branch libraries
dren’s programs anbranch libraries. neous Story time.
services to housebo
artnerships with boed sectors of the
encourage and deve
nd assist local festivnto the Shire
ng Theatre and othee operators to buildket
ng Theatre to attracevents
Resp
ring
Director
ll as outreach servi
at
Library M
d
Library M
ound Library M
oth
Library M
elop festivals and e
vals Tourism
er d the Tourism
ct and Tourism
ponsible Manager
Engineering Service
ces to disadvantag
Manager
Manager
Manager
Manager
events for the Narr
Manager
Manager
Manager
P
es Reduction in damage due t
ged sectors of the c
Programs conbranch
No. active bo
No. of progra
No. of progra
rabri Shire
Local festivals
More confereNarrabri Shire
More major eNarrabri Shire
Performance Indica
property and infrasto floods
community
nducted each quart
ok group.
ams for adults
ams for children
s and events suppo
ences and meetingse
entertainment evene
ator
structure
ter at each
orted
s held in
nts held in
Progres
Council is part of thManagement ComEmergency ManageCouncil supported exercises at the air
In the last year Narrange of events forgroups. Across the programs and meeparticipants and 31
Across the Shire lasevents and program759 adults and 305which included Stoand Preschool visitevents.
Narrabri Libraries dInstitutions.
Narrabri Libraries fschools, preschoolsdeliver services. Otthe libraries are hoseniors through theprogram.
Assistance and supand local events wipromotional dvd's
Council assisted anTheatre and other
Council assisted anTheatre and other
Page | 25
ss at 30 June 2015
he Local Emergencymittee, Chaired Locement Committee,mock response plarport.
rrabri Libraries hostr children, adults anShire there were 5
etings, with 1786 ad137 child participan
st year there were 2ms, specifically for c51 attended these eorytime, Baby Bouns as well as other s
delivered items to 4
formed partnerships, aged care facilitiether isolated groupsome schooled studee Tech Savvy Senior
pport provided to coith bid applicationsand images.
nd supported The Cvenue operators.
nd supported The Cvenue operators.
5
y cal and nning
ted a wide nd isolated 02 events, dult nts.
286 children. events ce, School pecial
4
ps with es to s using ents and rs
ommunity ,
rossing
rossing
A
Actions
OC6.6.4 Woother opera
OC6.6.6 Ideevents for th
OC6.6.7 Wogroups to bi
OC6.7 Provi
OC6.7.1 Proorganisationand events
OC6.7.2 Con
OC6.7.3 Conregionally thadvertising
OC6.8 Prom
OC6.8.1 InveManagemen
OC6.8.2 Invetouring prog
OC6.9 Facilit
OC6.9.3 Coo
OC6.9.4 Inve“destinationMusic Festiv
OC6.9.5 Facperformance
OC6.9.6 Fac
OC6.9.7 Fac
Annual Report 201
ork with transport, ators to develop and
ntify and endeavouhe Shire
ork with local sportid for and host even
de assistance and a
ovide advice and assns looking to hold a
ntinue to maintain t
ntinue to publicise ehrough print, digita
mote The Crossing T
estigate the establint Network within t
estigate options forgrams
tate and/or coordi
ordinate a Bridal Op
estigate potential fn” festival (eg Elvis Fval in Tamworth)
ilitate touring and pes
ilitate weddings an
ilitate conferences,
14/2015
accommodation and market event pac
ur to attract foot loo
ng and community nts within the Shire
advice to local eve
sistance to local nd /or bid for festiv
the events Calende
events locally and l, radio and televisi
Theatre as a region
shment of a Venuethe Region and bey
r linking into region
inate festivals and
pen Day
or an annual Festival in Parkes, C
planned events and
nd special occasions
, meetings
Resp
d ckages
Tourism
ose Tourism
e Tourism
nt organisers and i
vals Tourism
er Tourism
on Tourism
nal and state theatr
es yond
The CrosManager
nal The CrosManager
events at The Cros
The CrosManager
Country The CrosManager
d The CrosManager
s The CrosManager
The CrosManager
ponsible Manager
Manager
Manager
Manager
individuals / group
Manager
Manager
Manager
re and entertainme
sing Theatre Venuer
sing Theatre Venuer
sing Theatre
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
P
Event packag
Foot loose ev
Events hosted
s looking to organi
Tourism mark
A Shire‐wide community m
Local events
ent venue
e Network esta
e More program
e A number of the communi
e A number of the communi
e A number of the communi
e A number of the communi
e A number of the communi
Performance Indica
ged developed and
vents held in Narrab
d
se or bid for event
keting materials dis
calendar is availablmembers to publicis
publicised where p
ablished
ms at The Crossing
festivals and eventity at The Crossing T
festivals and eventity at The Crossing T
festivals and eventity at The Crossing T
festivals and eventity at The Crossing T
festivals and eventity at The Crossing T
ator
marketed
bri Shire
ts
stributed
le for local se events
ossible
Theatre
ts are held for Theatre
ts are held for Theatre
ts are held for Theatre
ts are held for Theatre.
ts are held for Theatre.
Progres
Council worked witevent packages.
Council assisted wivisiting car rally’s.
Council worked witcommunity groups
Council worked witdevelop event packwith bids.
The events calendapublicise events.
Council publicised available.
Member of Arts No(11 venues across t
Member of Arts No(11 venues across t
Not commenced.
Not commenced.
Regular events proThere were 11 showyear.
Regular events proThere were 13 eveyear.
Regular events proThere were 109 ev
Page | 26
ss at 30 June 2015
th local operators t
th footloose events
th local sporting an to develop event p
th local organisatiokages and provide a
ar was maintained t
events through all a
orth West, On Tour the region.
orth West, On Tour the region.
ogrammed and delivws facilitated durin
ogrammed and delivnts facilitated durin
ogrammed and delivents facilitated dur
6
o develop
s such as
d packages.
ns to assistance
to
avenues
network
network
vered. ng the
vered. ng the
vered. ring the
A
Actions
OC6.10 Faci
OC6.10.1 Encentre and efinancial con
OC6.11 Imp
OC6.11.1 Exrenewal, rep
OC6.11.2 Rereferencing Managemen
OC6.11.3 Coeach asset cOpen Space
OC6.12 Com
OC6.12.1 Dereview a Levparks, garde
OC6.12.2 DePlan which rthe commun
OC6.12.3 Prthe Open SpNarrabri Creplayground
OC6.12.4 Prthe Open SpNarrabri CreGarden adja
OC6.12.5 Idemanaged byManagemen
Annual Report 201
litate community b
ncourage communitevaluate spatial neentribution
lement Parks and O
xamine renewal bacplacement and disp
eview capital worksthe renewal demannt Plan
ollect better data anclass and category aAsset Managemen
mmunity members
evelop, adopt, implvels of Service and Mens and sporting ve
evelop and adopt a reflects the sport annity
repare and adopt a pace Precinct on theeek including considadjacent to the New
repare and adopt a pace Precinct on theeek including considacent the Hospital c
entify the location y Council which reqnt and create a prio
14/2015
based programs at
ty programs for theeds and level of Cou
Open Space Asset M
cklog and categoriseposal
s proposed for 2013nds in the Asset
nd financial variableand update the Parknt Plan
are regular users o
ement, monitor anMaintenance Progrnues
Sport and Recreatind recreation need
Plan of Managemee eastern side of thderation of a futurewell Highway
Plan of Managemee western side of thderation of a Commcar park
of Crown Reserves uire Plans of oritised list based on
Resp
The Crossing Thea
e uncil The Cros
Manager
Management Plan
e into Commun
3‐2022 Commun
es for ks and Commun
of parks, gardens an
nd ram for Commun
ion s of Commun
ent for e e
Commun
ent for he munity
Commun
n Property
ponsible Manager
tre
sing Theatre Venuer
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nd sporting venues
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
and Assets Manag
P
Community (interested.
e A number of the communiCommunity (interested.
ger Park and Ope
ger Park and Ope
ger Park and Ope
s
ger Levels of Serv
ger Narrabri Shiredeveloped an
ger Plan of Manabanks develo
ger Plan of Manabanks develo
er Accurate andadopted
Performance Indica
including youth) ac
festivals and eventity at The Crossing Tincluding youth) ac
en Space Asset Man
en Space Asset Man
en Space Asset Man
vice adopted by Cou
e Sport and Recreatnd adopted by Coun
gement for easternped and adopted
gement for westerped and adopted
prioritised list com
ator
ctive and
ts are held for Theatre. ctive and
nagement Plan
nagement Plan
nagement Plan
uncil
tion Plan ncil
n side of creek
n side of creek
mpleted and
Progres
year.
Community relatedEisteddfod, ADFAS,Friends of The Crosevents during the y
Parks and Open Spreviewed and curre
Parks and Open Spreviewed and curre
Parks and Open Spreviewed and curre
Levels of Service andeveloped and imp
Not commenced.
Not commenced.
Not commenced.
Reserves listed, somcomplete but not y
Page | 27
ss at 30 June 2015
d events including N, Carols by Candlelissing Theatre. Thereyear.
ace Asset Managemently in final draft.
ace Asset Managemently in final draft.
ace Asset Managemently in final draft.
nd Maintenance Staplemented.
me Plans Of Managyet comprehensive.
7
Narrabri ght and e were 29
ment Plan
ment Plan
ment Plan
andards
gement .
A
Actions
function, us
OC6.12.6 Printo the preManagemen
OC6.12.8 Cocore CBD areactivities
OC6.12.9 RePlaygroundsprocedures
OC6.12.10 Cascertain coManagemen
OC6.12.11 RSpace assetsSpace Asset
OC6.12.13 Aand incorpoof Service fo
OC6.12.15 Inthe Terms oNarrabri Lakrole and resNarrabri Lak
OC6.12.16 InBeaches andaccordance
OC6.12.19 Bequipment
OC6.12.20 B
OC6.12.26 NDoyle and B
Annual Report 201
e and strategic imp
rovide input, from aparation of Plans ont Plans prepared b
ouncil to encourageea by facilitating co
eview and update ths Risk Management
Conduct audit of plaompliance with Playnt Policy
Renew, replace or ds in accordance witManagement Plan
Adopt the Narrabri rate maintenance ror Parks and Garden
n consultation withf Reference/Constike Advisory Commitponsibility for implke Plan of Managem
nstall Remote Suped Pools under Counwith StateCover Gu
Boggabri Parks ‐ Vic
Boggabri Parks – CB
Narrabri (Town) pararwan Streets
14/2015
portance to Council
a tourism perspectivf Management andby Council and local
e community use ofommunity events an
he Narrabri Shire t Policy and implem
aygrounds across Sygrounds Risk
dispose of Park and h the Parks and Op
Lake Plan of Managrequirements into Ln
h the committee, retution for the Sectittee including definementation of the ment
ervision Signs at Resncil management in uideline
ckery Park Replace P
BD Irrigation system
rks –Install Roundab
Resp
ve, d Asset Trusts
Commun
f the nd Commun
ment Commun
hire to
Commun
Open pen Commun
gement Levels Commun
eview on 355 ning its Commun
serves, Commun
Play Commun
m Commun
bout at Director
ponsible Manager
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
nity Facilities Manag
Engineering Service
P
ger Tourism facto
ger Number of evincreases eac
ger Playgrounds maintained to
ger Audit of all pltaken to ensu
ger Council manaaccordance wManagement
ger MaintenanceManagement
ger Terms of Referole and respand adopted
ger Appropriate suse of parks, well as hazard
ger Completed w
ger Completed w
es Completed w
Performance Indica
ored into planning d
vents and activities ch year
regularly inspectedo a safe standard
laygrounds completure playgrounds are
ages its existing assewith the adopted Ast Plan
e standards adoptedt including in Levels
erence/Constitutiononsibility of commiPlan of Manageme
signage clearly detareserves, beaches ads
within budget
within budget
within budget
ator
documents
in the CBD
and
ted and action e safe for use
ets in sset
d in Plan of s of Service
n reflects the ittee members ent
ails acceptable and pools as
Progres
Not commenced.
Events and commuBusiness District suresources.
Relevant employeePlayground risk assStandards. Playgromaintained to a saf
Relevant employeePlayground risk assStandards. Playgromaintained to a saf
Parks and Open Spreviewed and curre
Narrabri Lake Plan and included in Coumaintenance progr
Narrabri Lake Advisadvisory CommitteImplementation ofongoing primarily tcommunity group i
Not commenced.
Works completed.
Not commenced.
Not commenced.
Page | 28
ss at 30 June 2015
unity use of the Cenupported within ava
es formally trained sessment and Austrunds regularly inspfe standard.
es formally trained sessment and Austrunds regularly inspfe standard.
ace Asset Managemently in final draft.
of Management aduncil's levels of servram.
sory Committee is aee of Council. f the Plan of Managthrough grant fundiinput.
8
ntral ailable
in ralian pected and
in ralian pected and
ment Plan
dopted vice and
an
gement ing and
A
Actions
OC6.12.27 Nsignage
OC6.13 Tow
OC6.13.1 FaCommitteesNarrabri andrepresentat
OC6.14 Enco
OC6.14.1 Coto celebrate
OC6.15 Mon
OC6.15.1 CoCommittee, environmenPlan.
Annual Report 201
Narrabri (West) Par
wns and Village Entr
acilitate the formatis with documented d Wee Waa consistives
ourage and recogn
ouncil to host a yeae local volunteers
nitor crime rates an
ouncil to work with and NSW Police to
nt and implement C
14/2015
ks – Remote Superv
ry Points in the Shi
ion of Tidy Towns Terms of Referencing of community
ise the work of vol
rly volunteer celeb
nd promote Narrab
the Crime Prevento support a safe ouncil’s Crime Prev
Resp
vision Commun
ire are visually and
e for EconomiManager
unteers
ration Director
bri Shire as a safe a
ion
vention General M
ponsible Manager
nity Facilities Manag
aesthetically appe
c Development r
Corporate Services
and secure environm
Manager
P
ger Completed w
ealing to residents
Tidy Towns Cmembers in N
s Annual celebWeek
ment for families
Council repreCommittee m
Performance Indica
within budget
and visitors
ommittees formedNarrabri and Wee W
ration held during V
esentation at Crimemeetings
ator
by community Waa
Volunteers
Prevention
Progres
Not commenced.
Not commenced.
Volunteer Week ceweek of May 2015.
Crime Prevention Sreferred to relevan
Page | 29
ss at 30 June 2015
elebrations held in s.
Strategy adopted annt Minister for endo
9
second
nd orsement.
Annual R
A SuRespThe comthat a quEveryon
$7Granfor th
ofCestr
C
1Mee
confe
at Th
T
Planninto ame
havcom
Report 2014
ustainaect For
mmunity is muality living ee can contri
70,000nt Fundinhe Contrf Green rum, EulaCreek
109 etings and
erences he
he Crossin
Theatre
4 ng propoend the Lve been mpleted
/2015
able Enr Our Wmindful that tenvironmentbute whethe
0 ng rol
ah
d
eld
ng
osals LEP
nvironWhole L
he whole of t for the entier living and
2Head
thro
S
$1Grathe c
tC
Rec
VisithePilli
Marc
nmentiving Ethe living enire Shire comworking in t
26,0d of stoc
ough Nar
Saleyard
111,69
nt Fundinconstructihe NarrabCommunitcycling Ce
910itors spene night at ga Bore B
from ch – June
Environnvironment nmmunity is acowns or villa
097
k sold
rrabri
ds
91
ng for ion of bri ty entre
0 nding the
Baths
2015
nment needs to be cchievable forages or in rur
rec
D
A
PCr
Page |
t considered tr the future.ral areas.
59Tonne
co‐min
cycling c
kerbs
138Developm
Applicat
Determi
730Patrons atrossing Th
Café
32
to ensure
5
s of
gled
ollected
ide
8
ment
ions
ned
09 t The heatre
A
TP
Actions
SE1 Sustaina
SE1.1 Review
SE1.1.2 Reviand identifyimplementa
SE1.3 Ensure
SE1.3.1 Deveservices inclapplications
SE1.4 Deter
SE1.4.1 Devepriorities
SE1.5 Sustai
SE1.5.1 Increconstruction
SE1.5.2 Quarehabilitatio
SE1.5.4 Sustpits
SE1.5.5 Revi
SE1.6 Active
SE1.6.1 Idenpartner withnoxious andbiodiversity
Annual Report 201
Theme 2: A Principal activitie
able land use
w and develop stat
iew Council’s Local y required amendmation of the plan
e comprehensive G
elop a plan of workuding Web Based, s
mine access requir
elop Urban Streets
inable use of resou
eased use of recycln
rries & gravel pits aon at the end of the
tainable manageme
iew gravel sale pric
ely partner with the
ntify and capitalise oh public and privated invasive species toin the Shire
14/2015
A sustainables – projects and
tutory and non‐ sta
Environmental Planents following the g
GIS services are ava
ks for upgrading maGPS and 3D mappin
rements to current
& intersections up
urces
ed materials in roa
are managed to alloeir useful life
ent of quarries and
es
e Northern Inland W
on opportunities toe land owners to mao minimise the impa
le environmd services
Resp
atutory plans to pro
n 2012 gazettal a
Director Developm
ailable to support t
apping ng
Property
land bank within t
grade Director
d Road Ser
ow Road Ser
gravel Road Ser
Road Ser
Weeds Advisory Co
o anage act on
Strategy Manager
ment - Respe
ponsible Manager
ovide for orderly a
Planning and ment
the management o
and Assets Manag
towns
Engineering Service
rvices Manager
rvices Manager
rvices Manager
rvices Manager
ommittee to imple
and Land Use r
pect for our w
P
nd sustainable dev
Review unde
f land and property
er
Software purstaff training to best practiadministratioand updated.
es Strategic planAdoption by C
Materials rec
Funds in rese
Manage Quasustainability
Gravel price i
ment the Weed Ac
Weed Action implemented
whole living
Performance Indica
velopment
rtaken
y
chased and implemprovided. GIS serviice design and planon services. GIS serv.
nning for urban devCouncil
ycled where possib
erve for quarry reha
rries and Gravel Pity in mind
n line with market
ction Plan and Invas
Plan and Invasive sd
ng environm
ator
mented. Initial ices contribute ning vices developed
velopment.
ble
abilitation
s with
forces
sive Species Plan
species Plan
ment
Progres
Four (4) separate pthe LEP were compreview of Narrabri was also completedneed for consultan
Currently reviewingsoftware for implemMapInfo (MI) instaAnalyst included, Mreviewed as web‐bspatial data.
Not commenced.
Materials Recycledopportunities ident
Funds being placedrehabilitation.
Managing Quarriesfuture rehabilitatio
Gravel price adjust
Several communitycoordinated by Coueducation days, prafunded chemical su
Page | 33
ss at 30 June 2015
planning proposals tpleted in the year aGrowth Managemed. All in house withts.
g WaterRIDE flood mentation. Upgradlled, Spectrum SpatMapInfo Stratus beibased catalogue of C
where possible whtified.
d in reserve for qua
s and Gravel Pits to on.
ed in line with mar
y eradication prograuncil including comactical assistance aupply.
3
to amend nd a ent Plan out the
modelling e to tial ng Councils
hen
rry
enable
ket forces.
ams were munity nd grant
A
Actions
SE1.7 Devel
SE1.7.1 Liaisweed managactions of th
SE1.8 Devel
SE1.8.1 Liaisweed managactions of th
SE2 Ensure a
SE2.1 Exerciwith statuto
SE2.1.1 Asseand provide
SE2.1.2 Provservices for
SE2.1.3 AsseCertificates
SE2.1.4 Issuesection 68 o
SE2.1.5 Issuecertificates (zoning inforthe Council property to
SE2.1.6 Prepdiagrams
SE2.1.7 Provservices
SE2.1.8 Loca
SE2.1.9 Prov
Annual Report 201
op, implement and
se with and integratgement as per Weehe North West Loca
op, implement and
se with and integratgement as per Weehe Namoi Catchmen
a clean, green envi
ise Council’s statutory requirements a
ess and determine d updated monthly r
vide building and ceconstruction
ess and determine cas required
e approvals and/orof the Local Governm
e statutory certifica(Planning certificatemation as well as idrequire current andbe aware of)
pare, amend and di
vide pre and post d
al Government (LG)
vide an analysis of d
14/2015
d monitor the Bord
te noxious and invaed Action Plan withal Lands Services
d monitor the Nam
te noxious and invaed Action Plan withnt Management Au
ironment for the fu
tory functions undeand / or Council Pol
development applicreport to Council
ertification inspecti
complying develop
r inspect work undement Act 1993
ates including 149 es identify propertydentify other matted prospective owne
stribute drainage
evelopment applica
) performance mon
development trend
Resp
der Rivers Gwydir C
asive
Strategy Manager
moi Catchment Actio
asive uthority
Strategy Manager
uture
er the Environmentlicy and Standards
cations Director Developm
on Strategy Manager
ment Strategy Manager
er Strategy Manager
y ers that ers of a
Strategy Manager
Strategy Manager
ation Strategy Manager
itoring StrategyManager
s being Strategy
ponsible Manager
Catchment Action P
and Land Use r
on Plan
and Land Use r
tal Planning and As
Planning and ment
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use
P
Plan
Plan impleme
Plan impleme
ssessment Act 1979
DevelopmentDevelopmentstatutory fram
Building Cert
Complying deprovided
Section 68 Ap
Issue all certireceipt and ademonstrate
Drainage Diag
Pre and post provided
LG performan
Analysis of tr
Performance Indica
ented
ented
9 properly and equ
t Applications assest is regulated in accmework
ification Services pr
evelopment assess
pplications assessed
ficates within an avudit of 10 random s accuracy
grams completed
Development Appl
nce monitoring data
ends provided
ator
itably and determi
ssed, cordance with
rovided
ment services
d and approved
verage 7 days of certificates
ication services
a submitted
Progres
Numerous grant fuwith Local Land Ser
Requirements of W
ine applications eff
Average Developmtime from receipt ofor 2014/2015 waslegislated period of
Certification servic
Complying develop
Local approvals com
Certificates were isturnaround time of
Drainage diagrams licenced plumber uDepartment of Fair
Service provided w
Data submitted on
Trends reported.
Page | 34
ss at 30 June 2015
unding programs corvices.
Weeds Action Plan b
ficiently and in acco
ment Application turof all required infors 18 days. Well belof 42 days.
es provided.
pment certificates is
mpleted.
ssued regularly withf well less than 7 da
required to be comunder requirementsr Trading.
where requested.
time.
4
ompleted
being met.
ordance
rnaround rmation ow
ssued.
h average ays.
mpleted by s of
A
Actions
experienced
SE2.2 Impro
SE2.2.1 Imp(OSSM) Polic
SE2.2.2 Promprogram andsustainable
SE2.3 Suppo
SE2.3.1 Undfor the Loca
SE2.4 Devel
SE2.4.1 Appfunding fromClimate Cha
SE2.5 Devel
SE2.5.1 AppAction Plan
SE2.6 Capita
SE2.6.1 Incluplanning
SE2.7 Devel
SE2.7.1 AppAction Plan require pres
SE2.7.2 Croswith the Touensure cons
Annual Report 201
d within the Local G
ove the monitoring
lement the On‐site cy as adopted by th
mote community awd provide informatioutcomes on OSSM
ort effective report
ertake a State of thl Government Area
op a Climate Chang
ly for Local Adaptatm the federal governge Risk and Adapt
op a Greenhouse A
ly for funding to de
al works are subjec
ude environmental
op an Environment
ly for funding to deto identify environmservation and/or pr
ss reference the Envurism Plan and othesistency
14/2015
Government Area
and management
Sewerage Managehe Council
wareness of the OSion on best practiceM
ting regimes on env
he Environment Repa
ge Risk and Adapta
tions Pathways or srnment to develop tation Plan
Action Plan to ident
evelop a Greenhous
ct to environmenta
assessment in proj
tal Action Plan evelop an Environmmental features whrotection
vironmental Actioner relevant plans to
Resp
Manager
of onsite effluent d
ement Strategy Manager
SSM e for
Strategy Manager
vironmental compl
port Strategy Manager
ation Plan
similar a Director
tify strategies and
se Director
al assessment
ject Director
mental hich Director
n Plan o
Director Developm
ponsible Manager
r
disposal within the
and Land Use r
and Land Use r
liance
and Land Use r
Corporate Services
actions to reduce p
Corporate Services
Engineering Service
Corporate Services
Planning and ment
P
e region
OSSM policy
OSSM supporoutcomes
State of the EEnvironmentagencies
s Funding sourChange Risk a
power consumptio
s Funding sourAction Plan
es Reflected in P
s Funding sourEnvironment
Other relevanEnvironmentconsistency aactions
Performance Indica
implemented
rts positive environ
Environment Reportal reporting is subm
ce secured to deveand Adaption Plan
n and emissions
ce secured to deve
Project Managemen
ce secured to deveal Action Plan
nt plans align with tal Action Plan to acand avoid conflicts i
ator
mental
t undertaken. mitted to State
lop Climate
lop Greenhouse
nt Plans
lop
the chieve n strategies and
Progres
On‐Site Sewer Manprogram complete
On‐Site Sewer Manand audit program Site Sewer Manageincluding new inforeducational compofinalisation.
State Of Environme2016. Negotiationscontinuing.
No funding opportfor this type of pro
No funding opportfor this type of pro
Environmental asseproject planning.
No funding opportfor this type of pro
No Environmental
Page | 35
ss at 30 June 2015
nagement System ad.
nagement System incompleted. New dement System stratrmation sheets andonents completed, a
ent report not due s regarding regional
unities have been iject.
unities have been iject.
essment undertake
unities have been iject.
Action Plan develo
5
audit
nspection raft On‐egy d awaiting
until l plan
dentified
dentified
en in
dentified
ped.
A
Actions
SE2.8 To par
SE2.8.1 Cou
SE2.9 Provid
SE2.9.2 DeveManagemenContract
SE2.9.3 Devestrategies rerecycling in Contractor a
SE2.10 Man
SE2.10.1 DeNarrabri Lan(LEMP)
SE2.10.2 Finof the Narra
SE2.10.3 MaStations in cEnvironmenlegislation a
SE2.10.4 Dethe Narrabriin accordancguidelines
SE2.10.7 Na
SE2.10.8 Wa
SE2.10.14 Ex
Annual Report 201
rticipate in Commu
ncil involvement in
de a safe, reliable a
elop and implemennt Plan (CMP) for th
elop and implemenegarding waste avoconsultation with Cand the Northern In
age waste collectio
velop, implement, ndfill Environmenta
nalise, adopt and coabri Shire Waste Ma
anage the Narrabri compliance with thental Protection Licennd guidelines
velop and adopt ani Landfill to guide ace with relevant leg
rrabri Weighbridge
aste Data Collection
xtension of Current
14/2015
unity Consultative C
CCC
and economic wast
nt the Contract he Waste Services
nt community educidance, reuse and Council Waste Collenland Regional Was
on, disposal and re
monitor and reviewal Management Plan
ommence implemenanagement Strategy
Landfill and Transfee Narrabri Landfill nce and relevant
n overall Master Plappropriate developgislation, regulation
e and Gatehouse
n Software
t Cells and Landfill A
Resp
Committee (CCC)
General M
te collection and di
Strategy Manager
ation
ection ste
Strategy Manager
ecycling in accordan
w the n
Strategy Manager
ntation y
Strategy Manager
er Strategy Manager
an for pment ns and
Strategy Manager
Strategy Manager
Strategy Manager
Area Strategy
ponsible Manager
Manager
isposal service whi
and Land Use r
and Land Use r
nce with relevant le
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use
P
Council involvmonitoring osector
ch meets modern e
Formal CMP dpractice admnext 10 years
Recycling tontonnages dec
egislation, regulatio
High priority within time, tbudget
No breaches Licence or rel
Master Plan ffuture develo
Completed w
Completed w
Completed w
Completed w
Performance Indica
vement in CCC and f dust and noise in
environmental stan
developed as a guidinistration of the cos
nnages increase; wacrease
ons and guidelines
strategies and actioto the quality requi
of the Environmentlevant legislation oc
for Narrabri Landfilopment
within budget
within budget
within budget
within budget
ator
environmental the resource
ndards
de for best ontract over
aste to landfill
ons completed red and within
tal Protection ccur
l site to guide
Progres
Council is also pursmonitoring at a reg
Contract Managemscope being discuscontract prior to de
Northern Inland Reprograms on targetcontractor re educacontinuing.
Local EnvironmentNarrabri landfill de
Formalised waste mawaiting completiodevelopment prior
Councils waste opeevidenced by licencand no improveme
Interim Master placompliance with EnAuthority requiremmanagement. Newdeveloped after up
Design works comp
Awaiting install of w
Works completed.
Page | 36
ss at 30 June 2015
suing dust and noisegional level.
ment Plan requiremsed between 3 couevelopment.
egional Weeds educt. Discussions with ation program requ
al Management Plaveloped and imple
management strateon of upgrading stagr to implementation
erations compliant ce requirements beent programs being
n completed to ensnvironmental Protements to determine w overall plan to be pgrade program com
pleted.
weighbridge.
6
e
ents and ncils in
cation
uirements
an for mented.
egy ge of n.
as eing met issued.
sure ection program
mpleted.
A
Actions
SE2.10.15 N
SE2.10.17 W
SE2.10.18 N
SE2.11 Man
SE2.11.1 Opto meet licerequirement
SE2.11.2 Ref
SE2.11.3 UpStation & va
SE2.11.5 Ref
SE2.11.7 Up
SE2.11.8 CleTreatment P
SE2.11.9 Opfacilities to mrequirement
SE2.11.10 Mpumping staindustrial cuand disposaenvironmen
SE2.11.14 U
Annual Report 201
arrabri Internal Ent
Wee Waa Seal Trans
arrabri Design/Inve
age wastewater an
perate and maintainnce conditions andts
furbish /replace dig
pgrade and maintainalves ‐ Wee Waa
furbish Digester mi
pgrade and maintain
ean Stormwater DetPlant ‐ Narrabri
perate and maintainmeet licence conditts
Maintain the sewer rations to serve residustomers and convel to meet licence contal requirements
pgrade electrical &
14/2015
try/Exit Roadworks
sfer Station access R
estigation/Planning
nd effluent in a sus
n sewage treatment environmental
gester mixer ‐ Wee
n Trickling Filter Pu
xer ‐ Narrabri
n drying beds ‐ Narr
tention areas at Sew
n effluent managemtions and environm
reticulation systemdential, commerciaey sewage for treatonditions and
& mechanical compo
Resp
Manager
Strategy Manager
Road Strategy Manager
g Strategy Manager
stainable manner
t plants Water Se
Waa Water Se
mp Water Se
Water Se
rabri Water Se
werage Water Se
ment mental Water Se
m and l and ment Water Se
onents‐ Water Se
ponsible Manager
r
and Land Use r
and Land Use r
and Land Use r
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
P
Completed w
Completed w
High priority within time, tbudget
No Non‐ComLicences
Works prograimplemented
Works prograimplemented
Works prograimplemented
Works prograimplemented
Works prograimplemented
No Non‐ComLicences
Maintenanceachieved
Works progra
Performance Indica
within budget
within budget
strategies and actioto the quality requi
pliances with Enviro
ams developed, updd within allocated ti
ams developed, updd within allocated ti
ams developed, updd within allocated ti
ams developed, updd within allocated ti
ams developed, updd within allocated ti
pliances with Enviro
e targets and upgrad
ams developed, upd
ator
ons completed red and within
onmental
dated and imeframes
dated and imeframes
dated and imeframes
dated and imeframes
dated and imeframes
onmental
de programs
dated and
Progres
Design works comp
Not commenced.
Design and investigupgrade program ccompliance progra
Non compliance idprocess to be moni
Manufacturing of rprogress.
Works completed.
Works completed.
Not commenced.
Not commenced.
Monthly effluent saidentify non complBoggabri currently augmentation due development .
Continued servicingplace. A preventatifinal stages of draftPollution Incident Mdrafted to include astations.
Work completed.
Page | 37
ss at 30 June 2015
pleted.
gation works for cacontinuing with ongm.
entified and treatmitored.
replacement mixer
ampling taking placying discharges. Thsubjected to assessto impact of the Ci
g and monitoring pive maintenance prting for implementaManagement Plan hall risk areas such a
7
pital going
ment
in
ce to he plant at sment for veo
program in rogram in ation. A has been as pump
A
Actions
Elizabeth Str
SE2.11.15 Sefittings annu
SE2.11.16 Coinfrastructu
SE2.11.17 Dprogram
SE2.11.18 Conetwork
SE2.11.19 Uinfrastructulegislative dplanning req
SE2.11.20 Enreview of Na
SE2.11.22 Acompliance Developmen
SE2.11.23 Bo
SE2.11.24 N
SE2.11.26 W
SE2.11.28 BoTelemetry ‐
SE2.11.31 NUpgrade ‐ N
SE2.11.32 WTelemetry ‐
SE2.11.34 FeUpgrade Tel
Annual Report 201
reet Pump Station
ervice all Sewer Pumually
onstruct new and rre as required
evelop initial maint
ontinue with CCTV
ndertake long termre works and effluerought managemenquirements
ngage consultancy arrabri Shire wastew
ssess and issue conwith sewage relatent and new subdivis
oggabri Sewer ‐ Up
arrabri Sewer ‐ Upg
Wee Waa Sewer ‐ Up
oggabri Sewer TreaBoggabri Treatmen
arrabri Sewer Treatarrabri Treatment W
Wee Waa Sewer TreWee Waa Treatme
ederation Farm Sewlemetry ‐ Federatio
14/2015
mp Station pumps a
replacement
tenance/replaceme
assessments of sew
m planning of futureent reuse facilities tnt and capital work
firm to undertake awater collection ne
nditions and ensureed aspects of sions
pgrade Telemetry
grade Telemetry
pgrade Telemetry
atment Works ‐ Upgnt Works
tment Works ‐ TeleWorks
atment Works ‐ Upent Works
wer Treatment Woron Farm
Resp
and Water Se
Water Se
ent Water Se
werage Water Se
e sewer to meet ks
Water Se
a etwork
Water Se
e Water Se
Water Se
Water Se
Water Se
grade Water Se
emetry Water Se
pgrade Water Se
rks ‐ Water Se
ponsible Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
P
implemented
Works prograimplemented
Works prograimplemented
Works prograimplemented
Works prograimplemented
Strategies preimplemented
Strategies preimplemented
Trade Waste maintained a
Completed w
Completed w
Completed w
Completed w
Completed w
Completed w
Completed w
Performance Indica
d
ams developed, updd
ams developed, updd within allocated ti
ams developed, updd within allocated ti
ams developed, updd within allocated ti
epared, reviewed ad as required
epared, reviewed ad as required
Policy and dischargnd recorded
within budget
within budget
within budget
within budget
within budget
within budget
within budget
ator
dated and
dated and imeframes
dated and imeframes
dated and imeframes
nd
nd
ge agreements
Progres
Servicing done regu
Constructed as req
Program is continunew works and ren
Contract in place foin Narrabri, Wee WAssessments of pipscope of future bud
Requirements idenand Integrated WaNarrabri networks review. Wee Waa amodelling in final swill identify infrastrequired.
Consultant engageprogressed.
Assessments and crequired.
Finalisation of Phas
Finalisation of Phas
Finalisation of Phas
Finalisation of Phas
Finalisation of Phas
Finalisation of Phas
Finalisation of Phas
Page | 38
ss at 30 June 2015
ularly.
uired.
ously updated to innewals.
or CCTV and relininWaa and Boggabri. pe conditions will prdget requirements.
ntified in the sewer ter Cycle Managemmodelling in final sand Boggabri netwotages of design. Moructure improveme
d and networks mo
onditions were issu
se 2 in progress.
se 2 in progress.
se 2 in progress.
se 2 in progress.
se 2 in progress.
se 2 in progress.
se 2 in progress.
8
nclude
g of pipes
rovide .
modelling ment Plan. stage of orks odelling ents
odelling
ued where
Annual R
A plA strbusinThe peo
commun
destinat
2,3Roads m
Council
$5,
Grantfor thReplaTimb
$1,6
Grantfor thRene
Report 2014
lace torong divnesses, sople of Narra
nity has a str
tion for peop
307kmmaintained
300,0
t Fundinhe acementer Bridge
694,00
t Fundinhe Bridgeewal Proj
/2015
o thrivverse ec servicesbri Shire are
rong desire t
ple to live, ru
ms d by
000
g
t of es
00
g e ject
ve conomys and t very proud
o see its Shir
un businesses
$Gra
deveKamT
Touris
Inform
me
bua
econ
y that atourists of the region
re prosper. T
s and visit.
$18,70ant Fundinthe furthelopmentmilaroi StTouchscre
31,41
sts at The
mation Ce
56eetings hwith locusinesseassist winomic gr
attract n in which th
They want th
00 ng for er t of the tories een
11
Visitors
entre
held al s to th rowth
ts and r
hey work and
he Shire to be
$12Gr
the
A
$6Graforof tAir
DProbD
Page |
retains
d live. The
e attractive a
2,310rant fund
e Narrabr
Supp
Augment
Proje
6,000,ant Fundr the Upgthe Narrrport Run
12 Loca
Developmojects asby EconoDevelopm
40
s
as a
,494ding for
ri Water
ply
tation
ect
,000ding grade rabri nway
l ment ssisted omic ment
A
TsP
Actions
PT1 Narrabr
PT1.1 Engag
PT1.1.1 Mee
PT1.1.2 EngaWee Waa ChPromotions
PT1.1.3 Mee
PT1.1.4 Mee
PT1.1.5 Atteorganisation
PT1.1.6 SupNarrabri Cha
PT1.1.7 FaciCommerce a
PT1.1.8 Faciof Commerc
PT1.1.9 FaciPromotions
PT1.1.10 MeTablelands r
PT1.2 Provid
PT1.2.1 Assiprojects
PT1.2.2 Part
Annual Report 201
Theme 3: Aservices andPrincipal activitie
ri Shire to be a regi
ge with local busine
et with local busine
age with Narrabri Chamber of CommerGroup
et with research org
et regularly with ind
end business eventsns
port business appreamber of Commerc
litate meeting betwand Council
litate meeting betwce and Council
litate meeting betwGroup and Council
eet with coordinatorenewable energy p
de assistance to bu
st local business or
ticipate in local bus
14/2015
A place to d tourists es – projects and
ional centre
ess and industry re
esses
Chamber of Commerce and Boggabri Bu
ganisations
dustry representati
s organised by loca
eciation event heldce
ween Narrabri Cham
ween Wee Waa Cha
ween Boggabri Busi
or of the New Englaprecinct project
usinesses looking to
rganisations with lo
iness functions as i
thrive - A
d services Resp
epresentatives to gr
EconomiManager
erce, usiness
EconomiManager
EconomiManager
ves EconomiManager
l EconomiManager
by EconomiManager
mber of EconomiManager
amber EconomiManager
ness EconomiManager
and EconomiManager
o expand
ocal EconomiManager
nvited EconomiManager
A strong di
ponsible Manager
row and facilitate o
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
iverse econ
Performance
opportunities
Increased ecoAssist existingeconomic ba
Monitor and the local econ
Build strong r
Build strong r
Build strong r
Event ongoin
Meeting held
Meeting held
Meeting held
Build strong r
Assist with lo
Attend local a
nomy that
e Indicator
onomic growth andg business to develoase
report regularly onnomy
relationships with lo
relationships with in
relationships with in
g and successful
d or attended twice
d or attended twice
d or attended twice
relationships with in
cal projects
and regional functio
attracts an
d diversity. op broader
the health of
ocal groups
ndustry sectors
ndustry sectors
per year
per year
per year
ndustry sectors
ons
nd retains
Progres
56 meetings held.
Attend Chamber anAssociation meetinChamber represent
No research organifinancial year.
Met with industry ra total of 18 times.
Attended 4 busines
Attend and sponsoCommerce Busines
Meetings infrequen
Meetings infrequen
Meetings infrequen
Attended 2 meetin
Assisted with 12 lo
Attended and partiregional functions.
Page | 41
businesses
ss at 30 June 2015
nd Business Progresngs. Met with NSW tative.
isations met with in
representative orga
ss events.
or Narrabri Chambess Awards.
ntly being held.
ntly being held.
ntly being held.
gs.
cal developments.
icipated in 5 local a
1
es,
ss Business
n this
anisations
r of
nd
A
Actions
PT1.2.3 Sendreleased Sta
PT1.2.4 Conin conjunctio
PT1.3 Active
PT1.3.1 Dev
PT1.3.2 Devemploymen
PT1.3.4 Prep
PT1.3.5 Prepsuccesses
PT1.3.6 Mai
PT1.3.7 Und
PT1.3.8 Und
PT1.3.9 Worfurther inve
PT1.3.10 Dissocial media
Annual Report 201
d emails to local buate and Federal assi
duct seminars and on with partners
ely market and pro
elop business locat
elop marketing mat lands
pare business news
pare news announc
ntain existing Shire
dertake Boggabri bu
dertake Wee Waa b
rk with the agricultustment
stribution of Counca platforms
14/2015
usinesses regarding istance programs
workshops for bus
omote Narrabri Shir
tion profile
terial regarding ava
s/economic updates
cements on econom
e website
usiness community
business community
ural sector to attrac
il information throu
Resp
newly EconomiManager
inesses EconomiManager
re as a business de
EconomiManager
ailable EconomiManager
s EconomiManager
mic EconomiManager
EconomiManager
plan EconomiManager
y plan EconomiManager
ct EconomiManager
ugh EconomiManager
ponsible Manager
c Development r
c Development r
stination
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
Performance
Conveyed fun
Facilitate bus
Regular prod
Regular prod
Regular prod
Articles in pa
Keep website
Complete theplan
Complete theplan
Increase in adrelated indus
Provide ongo
e Indicator
nding programmes
siness workshops
uction of brochures
uction of brochures
uction of brochures
per, radio and TV a
e up to date
e Boggabri township
e Wee Waa townsh
dditional agriculturatries
oing relevant inform
to industry
s
s
s
s appropriate
p marketing
ip marketing
al service
mation
Progres
Information sent owhen received. Sevassistance events sWee Waa ChambeBoggabri Business
Facilitated Small Buenable local small badvisors.
Suite of brochures New Business AddrBusiness and Resid
Suite of brochures New Business AddrBusiness and Resid
Suite of brochures New Business AddrBusiness and Residon website.
Arranged for 9 posbusiness to be run
Council's updated alaunched in March consistently.
Boggabri TownshipAugust 2014.
Wee Waa Businesscompleted March 2
Working with 6 agrexpand existing opdevelopment.
Daily provision of cinformation being posted through Fac
Page | 42
ss at 30 June 2015
n to local business veral government bsent onto the Narrars of Commerce anPromotions.
usiness Bus into Nabusiness to talk to b
current; inclusive oress, Economic Profents Guide.
current; inclusive oress, Economic Profents Guide.
current; inclusive oress, Economic Profents Guide. Update
itive news stories ain the local paper.
and refreshed webs2015 and was upd
p Marketing Plan co
s Community Marke2010.
ricultural businesseerations and attrac
community based placed on website acebook and Twitter
2
groups business abri and d
rrabri to business
of Your file and
of Your file and
of Your file and es placed
about
site ated
ompleted
eting Plan
es to ct new
and r.
A
Actions
PT1.4 Ensur
PT1.4.1 Partincluding: NCouncils
PT1.4.2 Advother Goverrelevant issu
PT1.5 Revie
PT1.5.1 ComShire TourisCommence
PT1.6 Partic
PT1.6.1 Conorganisation
PT1.6.2 PartInland NSW regions.
PT1.7 Partic
PT1.7.1 ConPromotions
PT1.7.6 Com3 – and exte
PT1.7.7 Con
PT1.7.8 Supthe Baradine
PT1.7.9 Conbe a designa
Annual Report 201
re that the Council
ticipate in Regional amoi Councils, Ass
ocate for the interernment Departmenues as they arise
w and monitor the
mplete and have Com Destination Manimplementation
cipate in the develo
tinue to participatens relevant to Narra
ticipate in the deveRegion, New Engla
cipate in the develo
tinued involvemenCommittee
mmence developmeend route to the we
tinue to promote t
port the joint Coune to Mungindi Road
tinue to lobby for Mated Tourist Route
14/2015
is well represented
and State Forums sociation of Mine Re
ests of the Shire witts and organisation
e implementation o
uncil adopt the Narnagement Plan.
opment of Regiona
e in Tourism relatedabri Shire
lopment of DMPs fand‐North West and
opment of touring
t in the Newell High
ent of State Touringest
he Baradine – Pillig
ncil funding submissd
MR127 – Pilliga Roa
Resp
d at Regional, State
elated General M
th ns on General M
of the Tourism Plan
rrabri Tourism
al and State tourism
d
Tourism
for the d sub Tourism
routes, products an
hway Tourism
g Route Tourism
ga link Tourism
sion for Tourism
ad to Tourism
ponsible Manager
e and Federal Forum
Manager
Manager
n 2013‐2018
Manager
m marketing and De
Manager
Manager
nd experiences at a
Manager
Manager
Manager
Manager
Manager
Performance
ms to promote the
Continued mattendance a
Ongoing and
Completed pdeveloped antourism outco
estination Manage
Council’s con
Deliver positiShire
a local, sub‐regiona
Council’s con
Route develoformulated
Tourists using
Baradine to M
Road classifie
e Indicator
interests of Narrab
embership involvemt meetings
as opportunities ar
lan. Tourism markend utilised. Developomes for the Shire.
ment Plans and in
tinued representat
ve tourism outcom
al, regional and sta
tinued representat
oped and promotion
g the link
Mungindi Road rece
ed as Tourist Route
bri Shire
ment and
rise
eting materials p positive
tourism and other
tion
mes for Narrabri
ate level
tion
nal program
eives funding
Progres
Approximately 360and 95 tweets.
Council was an acti
Lobbying opportunidentified.
Council adopted DPlan and framewo
committees, work
Council is an activeassociations: KamilNew England North& National Parks an
Inland Regional TouDestination ManagNorth West Marke
Council was an actiHighway Promotio
Council completed and developed ma
Council marketed ato Pilliga link.
Information obtainobtained.
Lobbying continuin
Page | 43
ss at 30 June 2015
0 Facebook posts fo
ive participant.
nities undertaken as
Destination Managerk.
king parties etc
e member of Tourislaroi, Newell, Naturh West, Great Artesnd Wildlife Service.
urism Organisationgement Plan, New Eting.
ive member of the ns Committee.
audit of tourism prrketing material.
and promoted the B
ned. Funding not ye
ng.
3
or the year
s
ement
m related re's Way, sian Drive .
England
Newell
roduct
Baradine
et
A
Actions
PT1.8 Contin
PT1.8.1 ConGovernment
PT1.8.2 ProvPlans Of MaShire
PT1.9 Develgroups, surr
PT1.9.1 Conmarketing ccooperativeorganisationTourism, Wamarketing cbusiness ope
PT1.9.2 Attethroughout
PT1.9.3 Partwhere relev
PT1.9.4 Worpackages fo
PT1.9.5 ConShire includifliers, maintand DVDs, mlibrary etc
PT1.9.6 Conwebsite, andmarket
Annual Report 201
nued liaison with G
tinue to work with t organisations
vide input from a tonagement prepare
lop and implementrounding LGAs and
tinue to be involveampaigns and parti marketing initiativns: Destination NSWarrumbungle Clusteommittees, Surrouerators
end relevant trade aAustralia
ticipate in journalistant
rk with CountryLinkr Narrabri Shire
tinue to produce ining updating visitorain and continue tomaintain and expan
tinue to maintain ad use social media t
14/2015
Government Agenc
relevant State
ourism perspective d for areas within t
t marketing and pro the local tourism s
d in the developmeicipate in relevant ves with the followiW, Inland RTO, NE‐Ner, Tourism route nding LGAs, Tourism
and consumer show
t and industry fami
k to develop new
nformation on Narrrs guides and informo develop touch scrd image (photo and
and update tourismto communicate wi
Resp
cies and other agen
Tourism
into the Tourism
omotional strategiesector
ent of
ng NW
m and
Tourism
ws Tourism
lies Tourism
Tourism
abri mation reen d film)
Tourism
m ith the Tourism
ponsible Manager
ncies that manage t
Manager
Manager
es and campaigns i
Manager
Manager
Manager
Manager
Manager
Manager
Performance
tourism assets
Deliver positiShire
Deliver positiShire
in conjunction with
Deliver positiShire
Deliver positiShire
Deliver positiShire
Deliver positiShire
Deliver positiShire
Deliver positiShire
e Indicator
ve tourism outcom
ve tourism outcom
h Destination NSW
ve tourism outcom
ve tourism outcom
ve tourism outcom
ve tourism outcom
ve tourism outcom
ve tourism outcom
mes for Narrabri
mes for Narrabri
, the Regional Tour
mes for Narrabri
mes for Narrabri
mes for Narrabri
mes for Narrabri
mes for Narrabri
mes for Narrabri
Progres
Partnerships formeRoutes developed wDepartment of Primpartnership with NService.
Narrabri Shire DestInland Regional TouManagement, NewHighway.
rism Organisation,
Council actively pacampaigns with DeNewell Highway, KaEngland North Wes
Council attended MMelbourne and Pe
Council hosted jouThe Travel Blogger Travel OZ.
Packages are no loNSW.
Tourism book prod2014, all promotionupdated image librevents by dvd.
Council maintainedutilised social medi
Page | 44
ss at 30 June 2015
ed and projects sucwith Local Land Sermary Industries. Onational Parks and W
tination Managemeurism Organisationwell Highway and Ka
Touring Route ma
rticipates in marketestination NSW. Inlaamilaroi Highway ast.
Maitland, Newcastlenrith consumer trad
rnalist famils whichand Greg Grainger
nger available with
duced and distributenal material updaterary, captured imag
d tourism website aia.
4
h as Bird rvices and ngoing Wildlife
ent Plan, Plan of amilaroi
rketing
ting and, and New
e, de shows.
h included r from
Train
ed in ed, ges of
and
A
Actions
PT1.9.7 ConWarehouse
PT1.10 Enco
PT1.10.1 Coproduce infocollateral
PT1.11 Cont
PT1.11.1 Ensactivities thathe Narrabri
PT1.11.2 CoAboriginal a
PT1.12 Enco
PT1.12.1 Inc
PT1.12.2 Sup
PT1.12.3 InvProgram in c
PT1.12.4 Coand implem
PT1.13 Revi
PT1.13.1 Ap
PT1.14 Deve
PT1.14.1 Ap
PT2 Airport
PT2.1 Devel
PT2.1.1 Devthe life cycle
Annual Report 201
tinue to update Stadata base
ourage involvemen
ntinue to work withormation and mark
tinue to showcase
sure that all major at are of interest toi Visitor Informatio
ntinue to develop ert / artefact display
ourage involvemen
clusion in historical
pport the Friends o
vestigate a Volunteeconjunction with ot
llaborate with Narrent training for bus
ew and implement
propriate funding i
elop Community Ec
propriate funding i
to be of regional q
lop and implement
elop an Asset Manae cost and total ma
14/2015
ate Tourism Data
t of tourism operat
h Tourism operatorketing and promotio
local industries and
industries / economo visitors are showcn Centre
exhibits – includingy
t of the community
exhibits across the
of the Crossing Thea
ers Development ther areas of Counc
rabri Tourism to devsinesses
t the Community E
dentified and appli
conomic Developm
dentified and appli
quality
t Airport Asset Man
agement Plan recogintenance and capi
Resp
Tourism
tors/attractions an
rs to onal
Tourism
d products through
mic cased in Tourism
an Tourism
y and other key pa
Shire Tourism
atre Director
cil Director
velop Tourism
conomic Developm
ied for EconomiManager
ment Strategic Plans
ied for EconomiManager
nagement Plan
gnising tal
Airport M
ponsible Manager
Manager
nd other key partne
Manager
h the Narrabri Visit
Manager
Manager
artners
Manager
Corporate Services
Corporate Services
Manager
ment Strategic Plan
c Development r
s for Bellata and Ba
c Development r
Manager
Performance
Deliver positiShire
ers in the productio
Continue to eavailable in ethroughout th
tor Information Cen
Local busines
Promotion of
Indigenous cotourism activ
s Attend meeti
s Program inve
Training deve
s for Pilliga and Gw
Funding sourcommunity
aan Baa
Funding sourcommunity
Asset Managedeveloped an
e Indicator
ve tourism outcom
on of information a
ensure that visitor iach of the towns anhe Shire
ntre
ss supported by Tou
f aboriginal culture
ommunity includedities
ings and support w
estigated
eloped and impleme
wabegar, Narrabri,
ced. Collaboration
ced. Collaboration
ement Airport Masnd fully implement
mes for Narrabri
and marketing colla
nformation is nd villages
urism
and history
d and engaged in
here possible
ented
Boggabri and Wee
with
with
ter Plan is ed
Progres
State Tourism Dataundertaken.
ateral and marketi
Visitor Informationrequired. Local opeinformation and aryearly.
Promotional materlocals.
Council received fuNSW to capture anKamilaroi Stories. FNovember, 2015.
Historical images a
Venue Manager a mattended meetings
Not commenced.
Not commenced.
e Waa
No funding availab
No funding availab
Not commenced.
Page | 45
ss at 30 June 2015
a Warehouse updat
ng and promoting
n updates undertakeerators provided wirchway signage upd
rial available for vis
unding from Multicund develop additionFilming to commen
nd history books av
member and regulas.
le from State Gove
le from State Gove
5
tes
the Shire
en as ith dated
itors and
ultural nal ce
vailable.
arly
rnment.
rnment.
A
Actions
renewal cos
PT2.2 Poten
PT2.2.2 DesiAirport Apro
PT2.2.6 Desiincluding pasections of a
PT2.2.7 Manaccordance regulations a
PT3 Regiona
PT3.2 Ensur
PT3.2.1 Devdevelopmenbuildings
PT3.2.2 Ensuprovision of work schedu
PT3.2.4 CarrTheatre
PT3.2.5 Devupgrade wofor The Cros
PT3.2.7 FinaRoom at The
PT3.2.8 Rep
PT3.2.9 RepRoom/PerfoTheatre
PT3.2.12 Findisplayed at
Annual Report 201
t of the Airport ove
ntial airlines suppor
ign and construct eon
ign and construct garallel taxiways for ball‐weather surface
nage Narrabri Airpowith relevant federand the Aerodrome
al standard infrastr
re that all public bu
elop a works schednt, renewal and ma
ure that all buildingelectricity supply aule
ry out routine main
elop a ten year planrks as part of the Assing Theatre
alise the refurbishme Crossing Theatre
lace café furniture
lace the carpet in tormers Dressing Roo
nd suitable area for t The Crossing Thea
14/2015
er the next 10 years
rted and encourage
extension to Narrab
grass taxiway netwoboth runways with
ort operations in ral and state legislae Manual
ructure
uildings are develop
dule for the long‐terintenance of all pu
gs are safe in terms and develop mainte
ntenance on The Cro
n for major renewaAsset Management
ment of the Exhibitio
at The Crossing The
he Green oms at The Crossin
the art collection ttre
Resp
s
ed through improv
bri Airport M
ork Airport M
ation, Airport M
ped, renewed and
rm blic Property
of the enance Property
ossing Property
al and Plan Property
on The CrosManager
eatre The CrosManager
g The CrosManager
to be The CrosManager
ponsible Manager
ved infrastructure
Manager
Manager
Manager
maintained at ado
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
Performance
Narrabri Airpwith all releva
Grass taxiwayuse
Annual CASA Corrective Ac
pted service levels
er Agreed servicsatisfied.
er Agreed servicbuildings undCompleted as
er Maintenance
er Plan develope
e Refurbishmen
e Café furniture
e Carpet in the budget
e The art colleccommunity
e Indicator
ort Apron extendedant standards
ys support safe Apr
Audits result in nil ctions
for the use of Cou
ce levels achieved. C
ce levels achieved. Idertaken and scheds per works schedu
e carried out within
ed
nt of Exhibition Roo
e replaced
Green Room repla
ction to be viewed b
d in compliance
ron and Runway
or minimal
ncil and the comm
Community
Inspection of all ule developed. le
budget
om
ced within
by the
Progres
Not commenced.
Airport operations guidelines.
Not commenced.
unity
Buildings' Asset Maformat.
Currently renewingbuildings in Boggab
Reactive maintena
Not commenced.
Works completed.
Works completed.
Works completed.
Select number of pRoom. Suitable perfound.
Page | 46
ss at 30 June 2015
conducted within l
anagement Plan in
g wiring for two combri.
nce completed as id
pieces hung in Exhibrmanent location st
6
legislative
draft
mmunity
dentified.
bition till to be
A
Actions
PT3.2.14 GeCrossing The
PT3.2.18 Bo
PT3.2.19 De
PT3.2.21 Bo
PT3.2.22 72
PT3.3 Devel
PT3.3.2 Furtarea and thepoint, securcamping are
PT3.3.3 Insta
PT3.3.6 Impwithin the S
PT3.3.8 OrgaCaravan Par
PT3.3.9 Connotification or missing
PT3.3.10 Whoperators toattraction si
PT3.3.11 CaFacility
PT3.3.12 Ca
PT3.4 Impro
PT3.4.1 Dete
Annual Report 201
enerators for Backueatre
ggabri Courthouse
emolish Boggabri Co
ggabri Urban Area
Gibbons Street Car
lop and maintain v
ther develop the Pile Pilliga Wetlands Wity cameras, additioea, access points on
allation of picnic fa
rove presentation ahire
anise and administerks
tinued monitoring to Council / RMS w
here requested, asso prepare funding sgnage
aravan Park ‐ Narra
aravan Park ‐ Narra
ove flood immunity
ermine priority link
14/2015
p Power Supply at T
Upgrade
ourthouse Ext Toile
Rooms Electrical U
rpet Replacement
isitor facilities and
lliga Bore Baths, caWalk including a duonal gravel cappingn the walk
cilities at Dripping
and signpost looko
er leases for Counc
of tourism signs anwhen signs are dama
sist tourist attractioubmissions for tou
bri Disabled Ablutio
bri Electrical Upgra
y for remote comm
ks for upgrade
Resp
The The CrosManager
Property
ts Property
pgrade Property
Property
infrastructure with
mping mp g on the
Tourism
Rock Tourism
uts Tourism
cil Tourism
nd aged Tourism
on rist Tourism
ons Property
de Property
munities
Director
ponsible Manager
sing Theatre Venuer
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
hin the Narrabri Sh
Manager
Manager
Manager
Manager
Manager
Manager
and Assets Manag
and Assets Manag
Engineering Service
Performance
e Completed w
er Completed w
er Completed w
er Completed w
er Completed w
hire
Completed
Completed
Completed
Completed
Damaged/ retimely manne
Funding secu
er Completed w
er Completed w
es Priorities ado
e Indicator
within budget
within budget
within budget
within budget
within budget
moved signs are reer
red for tourism att
within budget
within budget
opted by Council for
eplaced in a
raction signage
r flood events
Progres
Not commenced.
Grant proposal unsReserve Managemfunding sends this category. Reactive funding allows.
Not commenced.
Not commenced.
Not commenced.
Pilliga wetlands wasignage.
Walkway and signa
Audit completed anrequire.
Task Completed.
Audit of signage coreplaced as require
Audit of existing sigTourism operators existing tourism sig
Project managed blieu of rent.
Project managed blieu of rent.
Culgoora Road wasdesign is in place aReview Environme
Page | 47
ss at 30 June 2015
successful in the lasent Fund programsbuilding into high rmaintenance sched
alkway completed in
age completed.
nd signage updated
ompleted and signaed.
gnage completed aencouraged to updgnage.
by Southern Cross P
by Southern Cross P
s looked at for Weend advice sought ontal Factors from N
7
st 2 Public s, minimal risk duled as
ncluding
d as
ge
nd date
arks in
arks in
e Waa. A n an NSW Office
A
Actions
PT3.4.2 Lobbflood immunHighway)
PT3.5 Provid
PT3.5.1 Opetreatment pto prove potmeeting Ausstandards
PT3.5.2 Revimaintenanc
PT3.5.4 DevManagemen
PT3.5.6 Reviimprovementreatment pdemand and
PT3.5.7 ComShire water:(SCADA) telecomponentsstations, Wa
PT3.5.8 Comto improve tdrinking watHealth Depa
Annual Report 201
by State Governmenity at Glencoe Cha
de a secure, reliabl
erate and maintain wplants, reservoirs antable water to consstralian Drinking W
iew WH&S systemse manuals for each
elop Narrabri Risk Bnt Plan & implemen
iew, investigate andnts to water storagprocesses and contrd growth
mplete programmed: Supervisory, Contemetry system, Tres, Reservoirs, boosater Meters
mplete design and athe quantity of the ter to consistently cartment requireme
14/2015
ent for funding to imannel (SH29 Kamilar
le water supply to t
water sources, watnd distributions systsumers with water ater Guidelines hea
s, operations and h bore site
Based Water nt
d undertake any ree infrastructure, warol systems to meet
d upgrades of Narratrol And Data Acquieatment processes ster stations, bore p
associated documenNarrabri township comply with ADWSnts
Resp
mprove roi General M
the community
ter tems
alth Water Se
Water Se
Water Se
quired ater t
Water Se
abri isition and pump
Water Se
ntation
and Water Se
ponsible Manager
Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
Performance
Priorities ado
No health relincidents
WH&S systemmanuals revie
Plan develope
Priority workcompleted onand within th
Works complstandard and
Design CompSpecifications
e Indicator
opted by Council for
ated drinking wate
ms, operations and ewed
ed and implemente
s planned, designedn time, to a satisfache allocated budget
eted on time, to a s within the allocate
lete, Tender/Contrs Complete
r flood events
r quality
maintenance
ed
d and ctory standard t
satisfactory ed budget
act and
Progres
Environment and HA design was done creek around the breviewed when NSHeritage provide umodelling.
Lobbying opportunidentified.
No health related dincidents. OperatioAustralian Drinking
Work Process Guidmanuals were revieManagement Systeincluded in the InteManagement Plan.
Completed and incManagement Syste
Networks modellinBoggabri far advan
Not commenced.
The Drinking Watedrafted and reviewis included in the a
Page | 48
ss at 30 June 2015
Heritage.for a rerouting of M
back of Auscott. ThiW Office Environmpdated Mulgate flo
nities undertaken as
drinking water qualons carried out in teg Water Guidelines.
delines and Operatioewed during Drinkiem review. These aegrated Water Cycl.
cluded in the Drinkinem.
ng of Narrabri, Weeced.
r Management Systwed. Iron removal trugmentation proje
8
Mulgate s will be ent and ow
s
ity erms of .
onal ng Water re to be e
ng Water
Waa and
tem was reatment ct.
A
Actions
PT3.5.9 RepSupply viabi
PT3.5.10 Re
PT3.5.11 Maconsumers aappropriate
PT3.5.12 Serand Mains V
PT3.5.13 Pro
PT3.5.14 Ad
PT3.5.15 Reout as progr
PT3.5.16 ReWaa
PT3.5.24 ReSt – Boggab(270m)
PT3.5.25 ReOakham St –Street (270m
PT3.5.29 Uninfrastructuwater secur
Annual Report 201
ort to Council re: Glity
port to Council re:
aintain the reticulatand meet fire fighti
rvice and when necValves
oduce preventive m
here to preventive
active and preventrammed and as req
place CBD stop valv
place water supply ri, between Boston
place water supply – Boggabri, betweem)
ndertake long‐term re works including ity for urban areas
14/2015
Gwabegar and Pilliga
Baan Baa Water Su
tion systems to servng requirements as
cessary replace Hyd
maintenance progra
maintenance prog
ive maintenance cauired
ves as required ‐ W
infrastructure in:On Street to Burton S
infrastructure in: ‐en Burton Street to
planning of future supply to village arto meet legislative
Resp
a Water Se
upply Water Se
ve s Water Se
drants Water Se
am Water Se
ram Water Se
arried Water Se
Wee Water Se
Oakham Street Water Se
o Dalton Water Se
water eas, Water Se
ponsible Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
Performance
Report prese
Report prese
Maintenanceachieved withsatisfactory sbudget
Completed
Maintenanceproduced witsatisfactory sbudget
Maintenanceproduced witsatisfactory sbudget
Work documrequirementsto/complete
Work complestandard and
Work complestandard and
Work complestandard and
Strategies preimplemented
e Indicator
nted to Council
nted to Council
e targets and upgradhin allocated timefrtandard and within
e targets and upgradthin allocated timeftandard and within
e targets and upgradthin allocated timeftandard and within
ented to comply wis and times taken toworks recorded an
eted on time, to a sa within the allocate
eted on time, to a sa within the allocate
eted on time, to a sa within the allocate
epared, reviewed ad as required
de programs rames, to a n the allocated
de programs frames, to a n the allocated
de programs frames, to a n the allocated
ith licence o responded d analysed
atisfactory ed budget
atisfactory ed budget
atisfactory ed budget
nd
Progres
Bore condition repreplacement progr
Report finalised anapproved. Project mconsultants have bcommenced.
Networks maintain
Regular checks of vreplaced when nec
Consultant appointmaintenance progr
Plan and schedulesby consultant.
Maintenance workmaintenance mana
Specifications draftorder to obtain quo
Work Completed.
Work Completed.
Strategies includedIntegrated Water C
Page | 49
ss at 30 June 2015
ort submitted to Coam approved.
d Baan Baa water smanagement and deen appointed. Pro
ned and renewals in
valve operations docessary.
ted to draft preventram.
s. The Plan is being
k carried out. The agement plan in dra
ted for renewal wootes.
d in the new formatCycle Management
9
ouncil and
scheme design oject
nstalled.
one and
tative
drafted
aft.
rks in
t Plan.
A
Actions
drought marequirement
PT3.5.30 PreManagemendemand ma
PT3.5.31 Asscompliance and new sub
PT3.5.32 Invenhance thelegislative dplanning req
PT3.5.34 Unfor towns/viPlans for Towmanagemen
PT3.5.35 Engreview of Na
PT3.5.36 Pro
PT3.5.38 Be
PT3.5.41 Bo
PT3.5.43 Gw
PT3.5.44 Na
PT3.5.45 Na
PT3.5.46 Pill
PT3.5.47 We
PT3.6 Devel
PT3.6.1 Impadopted preinto fees and
PT3.6.2 Penimplement t
Annual Report 201
nagement and capits and future growt
epare an integratednt Plan including wanagement
sess and issue condwith water related bdivisions
vestigate and undere drought emergenrought managemenquirements
ndertake and reviewillages and update wns/villages to ment and capital works
gage Consultancy Farrabri Shire water
ovide WaterWise ed
llata water ‐ Upgrad
ggabri Water ‐ Upg
wabegar Water ‐ Up
rrabri Water ‐ Upgr
rrabri Water ‐ Asbe
liga Water ‐ Teleme
ee Waa Water ‐ Up
lop and adopt Busi
lement actions resueferred option (fromd charges and oper
ding the adopted pthe recommendatio
14/2015
ital works planning th
d Water Cycle ater conservation a
ditions and ensure aspects of Develop
rtake improvementcy supply to meet nt and capital work
w Water Supply MoDevelopment Serviet legislative demas planning requirem
Firm to undertake asupply network
ducation programs
de Telemetry
grade Telemetry
pgrade Telemetry
rade Telemetry
estos Mains Replace
etry Upgrade
grade Telemetry
ness Plan for the N
ulting from Councilm NLSC business plarating protocols
preferred option abons of the Narrabri
Resp
and Water Se
pment Water Se
ts to
ks Water Se
odelling cing nd ments
Water Se
a Water Se
Water Se
Water Se
Water Se
Water Se
Water Se
ement Water Se
Water Se
Water Se
Narrabri Livestock S
's an)
Strategy Manager
ove, Live
Strategy Manager
ponsible Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
ervices Manager
Selling Centre (Sale
and Land Use r
and Land Use r
Performance
Water Cycle M
New developrequirements
Work programand report to
Servicing planframes
Report to Cou
Strategies preimplemented
Completed w
Completed w
Completed w
Completed w
Completed w
Completed w
Completed w
eyards)
Completed
Completed
e Indicator
Management Plan C
ments conform wits
m delivered on timeo council
ns updated within a
uncil
epared, reviewed ad as required
within budget
within budget
within budget
within budget
within budget
within budget
within budget
Completed
th Council
e within budget
allocated time
nd
Progres
Consultant appointdevelopment.
Completed as requ
Drought and demaincluded in the newCycle Managementnetworks will assistthe networks.
Modelling of Narrain progress. Develoincluded in the newCycle Management
Consultant appointmodelled to identif
Not commenced.
Installation of new
Installation of new
Installation of new
Installation of new
Various sections al
Installation of new
Installation of new
Discussions and neassociation comme
Recommendationsand asset modifica
Page | 50
ss at 30 June 2015
ted and Plan under
uired.
nd management plw format Integratedt Plan. Modelling oft to identify shortco
abri, Wee Waa and opment serving planw format Integratedt Plan.
ted and networks hfy bottlenecks.
equipment comme
equipment comme
equipment comme
equipment comme
ready renewed.
equipment comme
equipment comme
egotiations with ageenced.
regarding capital ution complete.
0
lans are d Water f the omings in
Boggabri ns d Water
have been
enced.
enced.
enced.
enced.
enced.
enced.
ents
upgrades
A
Actions
Stock Centre
PT3.6.3 Gra
PT3.6.7 New
PT3.6.8 Safe
PT3.7 Provid
PT3.7.1 Instadepot
PT3.7.4 ComPlant ManagInstitute Of Guidelines
PT3.7.5 ConSection with
PT3.7.6 ConOpen Space
PT3.7.7 ReviWaa and Bo
PT3.7.8 Comprogram.Dewith IPWEA best practice
PT3.7.9 Devprogram
PT3.7.10 Deoperational
PT3.7.11 Revoperations t
Annual Report 201
e Safety Manageme
ant Co‐contribution
w Draft Facilities
ety Signage
de modern depots
all security perimet
mplete a review of tgement Plan for PlaPublic Works Engin
struct operational chin the Narrabri Dep
struct operational cSections within the
iew operational reqoggabri Depots
mplete the Plant repvelop plant replaceFleet Managemente)
elop and implemen
evelop and implemetraining needs for a
view workshop infrto be in line with W
14/2015
ent System
to Ramp
s and reliable Plant
ter fencing for Narr
the whole of life cycant in accordance wneering Australia
compounds for Roapot
compounds for Pare Narrabri Depot
quirements for the
placement ement plan in conjut benchmark (To in
nt Plant safety inspe
ent ongoing plant all plant
rastructure and Workcover requirem
Resp
Strategy Manager
Strategy Manager
Strategy Manager
t to support the inf
rabri Plant and
cle with
Plant and
ads Plant and
rks and Plant and
Wee Plant and
unction dustry
Plant and
ection Plant and
Plant and
ments Plant and
ponsible Manager
and Land Use r
and Land Use r
and Land Use r
rastructure activiti
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
Performance
Completed w
Completed w
Completed w
es to meet best pra
Completed
Completed an
Completed
Completed
Completed
Completed wtimeframes
Maintenance
Developed
Reviewed
e Indicator
within budget
within budget
within budget
actice managemen
nd adopted by Cou
within defined budge
e schedules underta
nt principles
ncil
et an
aken
Progres
Works completed.
Works completed.
Safety signage prov
Not commenced.
Plant Managementcurrently in final dr
Not commenced.
Not commenced.
Initial inspections oDepots have takenthrough requireme
Not commenced.
Currently implemeinspection regime. finalised, currently and low risk plant i
Not commenced.
Workshop has beeand a list of improv
Page | 51
ss at 30 June 2015
vided as required.
t Plan and Plant Polraft format.
of Boggabri and Weplace. Currently w
ents for each Depot
nting Plant AssessoAll high risk plant hworking through mtems.
n inspected by Worvements is being un
1
licies
ee Waa orking t.
or have been medium
rk Cover ndertaken.
A
Actions
PT3.7.24 Na
PT3.7.25 Na
PT3.7.26 Tra
PT3.7.27 Gri
PT3.8 Provid
PT3.8.1 Worto improve r
PT3.8.2 Mai
PT3.8.3 Reviconsultation
PT3.8.4 Reviprogram
PT3.8.5 Revi
PT3.8.7 Impprogram
PT3.8.8 Revifloodway pr
PT3.8.9 Dev
PT3.8.10 Revfor sealed ro
PT3.8.11 Anannual rene
PT3.8.12 Rev
PT3.8.13 Rev
Annual Report 201
rrabri Depot – Mov
rrabri Depot – shed
actor for Grids
id Roller
de lasting repair so
rk with and influencroads
ntain & improve Ro
iew levels of servicen
iew & implement ro
iew routine rural ro
lement advanced r
iew & implement rurogram
elop dust suppress
view an annual bituoads & streets
nual reseal programwal plus 10% of res
view kerb & gutter
view priority roads,
14/2015
ve Pressure Cleaner
d gardens
olutions to Council
ce government age
oad Infrastructure
e through commun
outine road inspect
oad grading program
oad warning sign
ural road unsealed
ion seal program
umen resealing pro
m (including forecaseal backlog)
replacement progr
, town & village str
Resp
r Plant and
Plant and
Plant and
Plant and
owned roads
encies Road Ser
Road Ser
nity Road Ser
tion Road Ser
m Road Ser
Road Ser
Road Ser
Road Ser
ogram Road Ser
st Road Ser
ram Road Ser
eets Road Ser
ponsible Manager
d Depot Manager
d Depot Manager
d Depot Manager
d Depot Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
Performance
Completed w
Completed w
Completed w
Completed w
Increase in ex
Road infrastrwhere possib
Reduction in
Road inspectdocumented
Rural unsealeto agreed ser
Project comp
Funds are ava
Funds are ava
Funds are ava
Project comp
Funds are ava
Funds are ava
e Indicator
within budget
within budget
within budget
within budget
xternal roads fundin
ucture maintained ble
complaints about r
ions are regularly c
ed roads are maintarvice standards
pleted on time & on
ailable to undertake
ailable to undertake
ailable to undertake
pleted on time & on
ailable to undertake
ailable to undertake
ng
and improved
roads
ompleted and
ained according
n budget
e upgrades
e upgrades
e upgrades
n budget
e upgrades
e upgrades
Progres
Review of current rrunoff by Environmcompleted and to arequirements identintegrated into new
Parks and Gardens Department sheds
Not purchased, detrequisite.
Not purchased, detrequisite.
Achieved external several grants prog
Road infrastructureperiodic maintenan
Not commenced.
Road inspections hdocumented.
Rural unsealed roaaccording to agree
Not commenced.
Not commenced.
Not commenced.
Funds were availabaccomplished.
Funds were availabwere accomplished
Funds were availabaccomplished.
Not commenced.
Page | 52
ss at 30 June 2015
requirements for Dmental Health Coordalign with legislativtified requirementsw wash bay system
now using old Wat.
termined not opera
termined not opera
roads funding througrams.
e maintained throunce activities.
ave been complete
ds were maintainedd service standards
ble and bitumen sea
ble and scheduled rd.
ble and kerb and gu
2
epot dinator e s will be .
ter
ational
ational
ugh
gh
ed and
d s.
aling was
reseals
utter was
A
Actions
upgrade pro
PT3.8.14 Liaroad infrastr
PT3.8.15 Rev
PT3.8.16 Revprogram
PT3.8.17 Im
PT3.8.18 MaMaintenancServices con
PT3.8.19 Deinspection p
PT3.8.20 Deexisting residevelopmen
PT3.8.21 Liainfrastructuproperties fodevelopmen
PT3.8.22 Mainfrastructu
PT3.8.23 Plamanagemen
PT3.8.24 Ensstormwater,are included
PT3.8.25 Derepair of stopriority wor
PT3.8.26 Destormwater
Annual Report 201
ogram
ise with industry toructure
view sealed road &
view bridge upgrad
plement bridge ren
aintain Council partce Council Contractsntract
evelop & implementprogram
eliver appropriate stdential, commerciant.
ise with developersre who are consideor residential, comnt
aintain and improvere
an for future works nt infrastructure is i
sure compliance of, water and sewer ed in DAs
evelop an action plaormwater systems tks from the revised
evelop a long‐term passets to at least “
14/2015
o promote investme
& street renewal pro
de & replacement
newal program
ticipation in to Roads/Roads and Mariti
t routine culvert
tormwater servicesal and industrial
s regarding stormwering new estates ormercial and industr
e stormwater
to ensure flood in place and mainta
f all legal access, engineering conditi
an for the renewal athat are identified ad AMP
plan for the upgradLevel 2 ‐ good”
Resp
ent in Road Ser
ogram Road Ser
Road Ser
Road Ser
d me Road Ser
Road Ser
s for Road Ser
water r rial
Road Ser
Road Ser
ained Road Ser
ions Road Ser
and as high Road Ser
de of all Road Ser
ponsible Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
Performance
Industry viewa worthy inve
Funds are ava
Funds are ava
Funds are ava
State Highwaacceptable st
Culvert inspedocumented
Services deliv
Liaising wher
Infrastructure
Future works
Development
Priority workreported upo
Long‐term pla
e Indicator
ws upgraded road inestment
ailable to undertake
ailable to undertake
ailable to undertake
ys are maintained ttandard
ctions are regularly
vered
e required
e maintained and im
planned for
t Applications comp
s identified and proon annually
an developed
nfrastructure as
e upgrades
e upgrades
e upgrades
to an
y completed &
mproved
ply
ogrammed and
Progres
Not commenced.
Funds were availabwere accomplished
Funds were availabreplacements were
Funds were availabwere accomplished
State Highways weMaintenance CounMaritime Services a
Culvert inspectionsdocumented as parSchedule.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Page | 53
ss at 30 June 2015
ble and scheduled rd.
ble and scheduled e accomplished.
ble and scheduled rd.
ere maintained to Rncil Contracts / Roadacceptable standar
s regularly completert of Road Inspectio
3
renewals
renewals
oad ds and rd.
ed and on
A
Actions
PT3.8.27 Des94 Plans tosystems
PT3.8.29 Upstormwater
PT3.8.31 Comissing link
PT3.8.33 Lobfunding for urepeatedly d
PT3.8.34 Supachieve infra
PT3.8.35 Mato date tech
PT3.8.36 Coagencies to
PT3.8.41 ShiTherribri Ro(VPA ‐ Maul
PT3.8.42 ShiManilla Rd &Turrawonga
PT3.8.43 ShiReseals
PT3.8.44 ShiRd – Constru
PT3.8.50 Bobetween Bu
PT3.8.62 ShiBridge and a
PT3.8.63 Shiadvance wa
PT3.8.65 Shif/way signpo
Annual Report 201
evelop Voluntary Pla assist with the pro
pgrade Reid & Dewhsystem (Narrabri)
nstruct & Seal MR 3
bby federal governupgrades to infrastdamaged by floodin
pplement flood damastructure upgrade
aintain staff traininghnology
llaborate with otheachieve industry be
ire Roads East – Seaad and replacemenes Creek)
ire Roads East – Sea& associated works a)
ire Roads East – Sea
ire Roads East – Unuct and Seal end of
ggabri Streets – Lynrton and Boston St
ire Roads East – Seaassociated roadwor
ire Roads West – Serning signs
ire Roads West – –osting west
14/2015
anning Agreementsovision of stormwat
hurst Street interse
357 ‐ Rangari Road
ment for applicatioructure which is ng
mage restoration fues instead of renew
g in the application
er local Governmenest practice
aled ‐ Upgrade of nt of Harparary Brid
aled ‐ Seal 4.1km oin mining precinct
aled ‐ Various Shire
nsealed ‐ SR18 – Wf seal to Boral Quarr
n Street Drainage treets
aled –Replace Harprks (VPA Boggabri C
ealed – Road curve
Stormwater – c/wa
Resp
s and ter Road Ser
ection Road Ser
Road Ser
on of Road Ser
unds to als
Road Ser
n of up Road Ser
t Road Ser
dge Road Ser
of (VPA Road Ser
e Road Road Ser
ave Hill ry
Road Ser
Road Ser
parary Coal)
Road Ser
Road Ser
ay Road Ser
ponsible Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
rvices Manager
Performance
Plans develop
Project comp
Project comp
Betterment frestoration p
Upgrades arerestoration
Continuous im
Continuous im
Project comp
Project comp
Project comp
Project comp
Project comp
Project comp
Project comp
Project comp
e Indicator
ped
pleted on time and w
pleted on time and w
unding applied to frojects
e incorporated with
mprovement
mprovement
pleted on time and w
pleted on time and w
pleted on time and w
pleted on time and w
pleted on time and w
pleted on time and w
pleted on time and w
pleted on time and w
within budget
within budget
lood damage
flood damage
within budget
within budget
within budget
within budget
within budget
within budget
within budget
within budget
Progres
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Not commenced.
Upgrade of TherribHarparary Bridge u
Not commenced.
Various Shire Road
Accomplished NarrWave Hill Road.
Boggabri Streets –Burton and Boston
Harparary Bridge u
Shire Roads West –advance warning si
Shire Roads West –floodway signposti
Page | 54
ss at 30 June 2015
bri Road and replaceunder construction.
s resealed as per sc
rabri Shire Council s
Lyn Street Drainage Streets accomplish
under construction.
– Sealed – Road curigns installed.
– Stormwater – caung west accomplish
4
ement of
chedule.
section of
e between hed.
rve
seway, hed.
A
Actions
PT3.8.68 NaReplacemencondition ra
PT3.9 Reduc
PT3.9.4 Comtownship ur
PT3.9.5 DevWorks basedManagemenutilise and d
PT3.9.6 Maiinfrastructu
PT3.9.7 PlanNarrabri tow
PT3.10 Mitig
PT3.10.1 Preeffective, suexpansion p
PT3.11 Mitig
PT3.11.1 Pre
effective, su
infrastructu
PT3.12 Iden
PT3.12.1 Ass
infrastructu
T3.13 Bench
PT3.13.1 ShaCouncils
Annual Report 201
rrabri Streets Sealent Program (prioritieating)
ction in property an
mmission a Flood Byrban area
elop a Floodplain Md on strategies idennt Studies for Narradetermine priorities
ntain and repair flore as per the Flood
n for future flood bywnship
gate concerns abou
epare and execute ustainable water suprogram
gate concerns abou
epare and execute
ustainable sewage c
re expansion progr
tify infrastructure
sess future growth
re improvements
hmark performance
are best practice an
14/2015
ed –Kerb and Guttees to come from
nd infrastructure d
ypass Study for Nar
Management Prograntified in the Flood abri and Wee Waa as for future projects
ood protection plain Management
ypass management
ut the quality and a
a long term, cost pply infrastructure
ut the quality and a
a long term, cost
collection and treat
am
Improvements
& demand for
e/ standards again
nd successes with o
Resp
er Road Ser
damage due to floo
rabri Director
am of
and s
Director
t study Director
t in Director
availability of wate
Water Se
availability of sewa
ment Water Se
Director
st other Councils
other Director
ponsible Manager
rvices Manager
ods
Engineering Service
Engineering Service
Engineering Service
Engineering Service
er supplies with the
ervices Manager
age collection and t
ervices Manager
Engineering Service
Engineering Service
Performance
Project comp
es Commissione
es Program of W
es Works priorit
es Future flood township pla
e Shire
Program prep
treatment systems
Program prep
es Engage with e
es Continuous im
e Indicator
pleted on time and w
ed
Works completed
tised
bypass managemennned for
pared
s with the Shire
pared
existing and new lo
mprovement
within budget
nt in Narrabri
ocal business
Progres
Narrabri Streets KeProgram underway
Not commenced.
Not commenced.
Works identified fo
Not commenced.
These requirementIntegrated Water C
These requirementIntegrated Water C
Identified in BoggaTreatment Plant ansought. Also simila$5.3M grant for timState grant for Baa$1.69M grant for H
Infrastructure NSWCouncil's work as athe economic prese
Page | 55
ss at 30 June 2015
erb and Gutter Reply.
or the Wee Waa flo
ts are included in thCycle Management
ts are included in thCycle Management
bri with the Sewerand $3.1M grant funr work done for thember bridges west, n Baa Water, the FHarparary bridge.
W utilised Narrabri Sa model of good praentation of busines
5
lacement
od levee.
he draft Plan.
he draft Plan.
age ding e State the $2.2M ederal
Shire actice for ss cases.
A
Actions
PT3.13.2 Cogroup meeti
T3.14 Impro
PT3.14.1 Deissues for thSenior Manalobby State
Annual Report 201
ntinue regular atteings
ove funding for infr
evelop 1‐2 page Fache Community/Counagement and Command Federal Memb
14/2015
ndance at peer exc
rastructure and ser
t Sheets on key strancil to allow Councmunity Representatbers
Resp
change Director
rvices
ategic illors, tives to
Director
ponsible Manager
Engineering Service
Engineering Service
Performance
es Continuous im
es Funding ident
e Indicator
mprovement
tified and applied f
or
Progres
Attended Namoi Comeetings.
Identified in BoggaTreatment Plant ansought. Also simila$5.3M grant for timState grant for Baa$1.69M grant for H
Page | 56
ss at 30 June 2015
ouncil Water Allian
bri with the Sewerand $3.1M grant funr work done for thember bridges west, n Baa Water, the FHarparary bridge.
6
ce
age ding e State the $2.2M ederal
Annual R
Proa
ManOur com
Shire. So
to make
commun
1
In to
ma
3CEv
CEv
Cro
Report 2014
active
naging fmmunity reco
ometimes we
e changes. Ho
nication, effi
151.3k
otal of Wmains
aintainedCounci
33,2Cinema &vent PatroThe CrosTheatr
29Communvents at ossing Th
/2015
e leade
for all ognises that
e need contr
owever, the
cient suppor
km
Water
d by l
53 & Live ons at sing re
nity The
heatre
ership
and stCouncil does
ributions fro
community
rt of develop
1
In
m
ido
p and a
tandings not have co
m State and
does look to
pment and a
113.3
total of main
maintainCounc
42Busineengage
dentify por prosp
invest
51Entries iAnnual Snaps
PhotogrCompet
advoc
g up foromplete con
Federal gov
o Council for
preparedne
km
Sewer ns ed by cil
2 esses ed to partners pective tors
1 in the Shire hot raphic tition
cacy
r our Shtrol over eve
ernments an
strong leade
ss to meet c
Page |
hire ery aspect of
nd agencies i
ership, clear
commitment
2,158, 0Lit
Total vowater
produceye
Ma20
Council the ne
friendly
2
Week pin NarrMedicaas partBursary
58
f the
in order
s.
000, 000tres
olume of potable ed for the ear
arch 015 launchedew user y website
2
lacemenrabri for l Studentt of BushProgram
0
d
e
nt
t m
A
TP
Actions
LA1 Establis
LA1.1 Identi
LA1.1.1 Subsfor target in
LA1.1.2 Con
LA1.1.3 Conidentify pros
LA1.2 Engag
LA1.2.1 AtteConduct busprospective
LA1.2.2 Atteconferencesinvestors
LA1.2.3 Engaidentify part
LA1.2.4 Con
Annual Report 201
Theme 4: PrPrincipal activitie
shed and sustainab
ify prospective inve
scribe to and reviewdustries
duct industry mark
duct market researspective investors
ge with prospective
end regular industrysiness developmentinvestors and partn
end industry specifis for target industrie
age with partners (tners and prospecti
duct familiarisation
14/2015
Proactive leaes – projects and
ble investment prog
estors to grow eco
w industry publicat
ket research
rch (lead generation
e investors
y networking eventt trips to engage wners
c trade shows or es to identify prosp
business multiplierive investors
n tours of the regio
adership and services
Resp
gram in place
nomy
ions EconomiManager
EconomiManager
n) to EconomiManager
ts ith
EconomiManager
pective EconomiManager
rs) to EconomiManager
n EconomiManager
nd advocacy
ponsible Manager
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
c Development r
cy - Managin
Performance
Keep updated
Increase econ
Economic gro
Build strong r
Economic gro
Economic gro
Economic gro
ng for all an
e Indicator
d through industry
nomic growth and d
owth and diversity
relationships with in
owth and diversity
owth and diversity
owth and diversity
nd standing
publications
diversity
ndustry sectors
g up for our
Progres
Kept up‐to‐date thinclusive of AustralReview, ManufactuAgriculture and ResOrganisation of EcoDevelopment, Freigmiscellaneous.
Economic Profile isrecent Australian Binformation and prinvestors. Reviewe& economic develoreports, Whitehave
100+ reviews of bunewspapers, magareports.
Met with 32 currenlooking to expand adevelopment/s wit
Attended 6 businesand presented at 2
Engaged with 42 in
5 familiarisation toinvesting organisatNarrabri Shire town
Page | 59
r Shire
ss at 30 June 2015
rough a range of mlian Mining Journal,uring, Australian Busource Economics, onomic Cooperatioght Transport NSW
s updated featuringBureau of Statistics rovided to potentiad Financial Review,opment websites, aen Coal, Santos.
usiness websites, zines annual and in
nt and potential busand/or initiate thin the Shire.
ss events and confe2 of them.
ndividual businesses
ours held to enable tions understand thn.
9
mediums , Financial ureau
n W, Energy +
g most
l , business nnual
ndustry
sinesses
erences
s.
potential he entire
A
Actions
LA1.2.5 Provdevelopmen
LA1.4 Ensur
LA1.4.1 Com
LA1.5 Provid
LA1.5.1 Provsuitable site
LA1.5.2 Offebetween bu
LA2 Revenu
LA2.1 Maint
LA2.1.1 Dev
LA2.1.2 Aligorganisation
LA2.1.3 Devworkforce p
Annual Report 201
vide packages of infnt projects
re that investment
mmunity feedback o
de assistance to fac
vide assistance to bes
er to organise pre‐losinesses and plann
e and income grow
tain a high perform
elop and maintain
n employee performnal plans and goals
elop and maintain plan
14/2015
formation specific t
in community infra
on distribution of fu
cilitate investment
businesses in finding
odgement meetinging department
wth strategy in plac
ming workforce tha
a highly skilled wor
mance with
a current and relev
Resp
to EconomiManager
astructure is fairly
unds General M
t and increase total
g EconomiManager
s EconomiManager
ce
t is responsive to t
rkforce Human R
Human R
vant Human R
ponsible Manager
c Development r
and transparently
Manager
l jobs in Shire
c Development r
c Development r
he needs of the org
Resources Manager
Resources Manager
Resources Manager
Performance
Economic gro
distributed around
Community
Economic gro
New jobs cre
ganisation and the
r
Actions from Plans implemorganisation services offer
r
Actions from Plans implemorganisation services offer
r
Actions from Plans implemorganisation services offer
e Indicator
owth and diversity
d the Shire
satisfaction surve
owth and diversity
ated
community
Delivery Program amented. Realign manstructure to be in lired
Delivery Program amented. Realign manstructure to be in lired
Delivery Program amented. Realign manstructure to be in lired
ey
and Operational nagement and ine with Council
and Operational nagement and ine with Council
and Operational nagement and ine with Council
Progres
16 suites of promoa range of businessopportunities with
Not commenced.
Sourced, directed oin the provision of new potential deve
7 pre‐developmentbusinesses enablinthe proposed deveto provide directio
For 2014/2015 Couand new entrant trqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio
Work has commen
Workforce Plan in p
Page | 60
ss at 30 June 2015
tional materials proses enquiring aboutin Narrabri Shire.
.
or acted as an interpossible suitable sielopments.
t meetings arrangeg both parties to unelopment and allown to clients.
uncil had 35 existingrainees completing orticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv
ced.
place.
0
ovided to t
rmediary tes for
d with nderstand
w Council
g worker
nstruction , Local aste nt, ing and vices.
A
Actions
LA2.1.4 Provsystems thaemployees a
LA2.1 Maint
LA2.2.1 AppDepartment
LA2.2.2 Idenincluding froprograms at
LA2.3 Ensur
LA2.3.1 Revi
LA2.4 Plan f
LA2.4.1 Devmaintenancsoftware for
LA2.4.2 Assiof new systeSoftware)
Annual Report 201
vide a range of resot support the attracand knowledge
tain a high perform
ply for funding fromts, Authorities and P
ntify and apply for fom government andt The Crossing Thea
re Council’s procure
iew procurement p
for long term provi
elop a long term ree programme for syr Council
st with the assessmems and software. (
14/2015
ources, services andction and retention
ming workforce tha
m Government Private Enterprise
funding and grants d private sponsorshatre
ement practices ac
practices
sion of Information
eplacement and ystems, servers and
ment and implemen(eg Asset Managem
Resp
d n of Human R
t is responsive to t
Director
hip for Director
hieve best value fo
Financial
n Services
d Informat
ntation ment Informat
ponsible Manager
Resources Manager
he needs of the org
Corporate Services
Corporate Services
or the Council and C
Services Manager
tion Services Manag
tion Services Manag
Performance
r
Actions from Plans implemorganisation services offer
ganisation and the
s When opport
s When opport
Community
Annual review
ger All systems arequirements
ger Asset Manage30/6/15
e Indicator
Delivery Program amented. Realign manstructure to be in lired
community
tunities arise
tunities arise
w completed
re current and mees
ement software op
and Operational nagement and ine with Council
et Councils
perational by
Progres
Council provided a and systems that sretention of emplocommenced to com ‐ Streamlining of re ‐ Investigations intand On‐boarding. ‐ Salary System revdrafted and consulcommenced. ‐ Wellness Strategy
For 2014/2015 Couand new entrant trqualifications in Ho(Plant Operations),Government, AssetManagement), FroInformation TechnoLibrary, Informatio
Work has commen
Annual review com
Migrated from PhySoftware.
In conjunction withassessment is in pr
Page | 61
ss at 30 June 2015
range of resourcesupport the attractiooyees. The followingmpliment: ecruitment processto electronic Recrui
view with documentation with the wo
y development.
uncil had 35 existingrainees completing orticulture, Civil Con, Water Operationst Maintenance (Wantline Managemenology, Recordkeepin and Cultural Serv
ced.
mpleted.
ysical to Virtual Env
h asset manager sofrogress.
1
s, services on and g have
ses. itment
ntation rkforce
g worker
nstruction , Local aste nt, ing and vices.
ironment.
ftware,
A
Actions
LA2.4.3 Reviprocedures
LA2.5 Maint
LA2.5.1 Renitems: Asset
LA2.5.2 Ensu
LA2.5.3 Insta
LA2.6 Maint
LA2.6.1 Maitechnology i
LA2.6.2 Wor
LA2.6.3 Serv
LA2.7 Assist
LA2.7.1 Coois implemen
LA2.8 Ensur
LA2.8.1 Prov
LA2.9 Devel
LA2.9.1 FinaTheatre (incareas.)
LA2.9.2 FinaTheatre
LA2.9.3 DevCrossing TheManagemen
LA2.9.4 DevProcedures
LA2.9.5 Dev
Annual Report 201
iew Information Se
tain and coordinate
ew/upgrade duringt Management Prog
ure annual licence f
all Exponare Public
tain and coordinate
ntain an asset regisinfrastructure/item
rkgroup Printers
ver Consolidation P
t staff to remain up
rdinate training fornted
re staff have sound
vide training to staf
lop and review plan
alise the Business Plcluding Cinemas, Ca
alise the Marketing
elop an Asset Manaeatre that links withnt Strategy
elop policies and Stfor the Crossing Th
elop a procuremen
14/2015
rvices policies and
e the renewal of in
g 2013/14 the followgram
fees are up to date
mapping software
e the renewal of in
ster of all informatims
roject
p to date with new
r staff as new techn
knowledge of Cou
ff as required
ns for the effective
lan for The Crossingandy Bar, Café and E
Plan for the Crossin
agement Plan for Th Council’s Asset
tandard Operating eatre
nt policy for the Cro
Resp
Informat
nformation technol
wing Informat
Informat
Informat
nformation technol
on Informat
Informat
Informat
information techn
nology Informat
uncil process and pr
Director
e long term develop
g Event
The CrosManager
ng The CrosManager
he The CrosManager
The CrosManager
ossing The Cros
ponsible Manager
tion Services Manag
ogy software and s
tion Services Manag
tion Services Manag
tion Services Manag
ogy infrastructure
tion Services Manag
tion Services Manag
tion Services Manag
nology advances
tion Services Manag
rocedures
Corporate Services
pment and manage
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venue
Performance
ger Annual review
systems
ger Renewed/upg
ger Completed w
ger Completed w
ger Register main
ger Completed w
ger Completed w
ger Ongoing and
s Staff are usin
ement of commerc
e Plan finalised
e Plan finalised
e Plan develope
e Policies and p
e Policy develo
e Indicator
w completed
graded
with budget
with budget
ntained and up to d
with budget
with budget
as required
g InfoXpert to its fu
ial business units
ed
procedures develop
ped
date
ull potential
ped
Progres
Email and internet
Not commenced.
All appropriate lice
The latest version o
All Desktops, LaptoDevices are up‐to‐d
Controls implemen
Works completed.
Training organised
Training provided aof expertise of recocontinually improv
Draft Plan prepared
Draft Plan prepared
Not commenced.
Policies and Proced
Policies and Proced
Page | 62
ss at 30 June 2015
policy have been re
enses reviewed.
of Exponare is insta
ops, printers and Mdate.
nted to reduce print
as required.
as and when requirords management sed.
d.
d.
dures implemented
dures implemented
2
eviewed.
alled.
obile
ting cost.
ed. Level system
d.
d.
A
Actions
Theatre that
LA3 Ensure
LA3.1 Counc
LA3.1.1 Ensurlegislative com
LA3.1.2 Devepractices and
LA3.1.7 Enablthe communi
LA3.2 Adopt
LA3.2.1 Ensuworkforce s
Annual Report 201
t links to Council’s P
Council is complian
cil leads by exampl
re Council HR operatimpliance and best pra
lop staff skills and exp conditions
le a workforce that rety
t a service attitude
ure council systemsupport a business r
14/2015
Procurement Policy
nt with statutory re
le
ons and managemenactice standards
pertise and ensure sa
eflects the compositio
e across Council
s, policies, processerequirement
Resp
y Manager
egulations
t meets Human R
afe work Human R
on of Human R
es and Human R
ponsible Manager
r
Resources Manager
Resources Manager
Resources Manager
Resources Manager
Performance
r Council is rec
r Council is a sa
r Work experieengagement
r Desired cultusatisfaction, L
e Indicator
ognised as an emp
afe place to work
ence opportunities. of indigenous comm
re achieved, EmploLow turnover of sta
loyer of choice
Inclusion and munities
oyee aff, Customer
Progres
Council commenceoperations against best practice standcommenced: ‐ Streamlining of re ‐ Investigations intand On‐boarding. ‐ Salary System revdrafted and consulcommenced. ‐ Wellness Strategy
StateCover self audPlan developed witStateCover. Investielectronic databaseon health and safetreview of its Salarydevelopment of coof skills and expertpractices.
Access to work expCouncil was promoCouncil's Reconciliabeing developed aninclusion and engagcommunities.
Not commenced.
Page | 63
ss at 30 June 2015
ed reviewing its exislegislative complia
dards. The following
ecruitment processto electronic Recrui
view with documentation with the wo
y development.
dit completed and Ath priorities as agregations into the usee for recording andty has commencedy System will includeompetencies for attaise to ensure safe w
perience opportunitoted on Council's wation Action Plan isnd will guide Councgement of indigeno
3
sting nce and g have
ses. itment
ntation rkforce
Action eed with e of an reporting . Council's e the ainment work
ties within ebsite. currently cil's ous
A
Actions
LA3.3 Effect
LA3.3.1 Idenchange
LA3.4 Exerci
LA3.4.1 Impprogram to dumping
LA3.4.2 Impprogram to parking with
LA3.4.3 Impinspection reswimming p
LA3.4.4 Impabandoned related area
LA3.4.5 Impreview of Li
LA3.5 Maint
LA3.5.1 Undto ensure ap
LA3.5.2 Impon food safe
Annual Report 201
tive and efficient co
ntify possibilities fo
ise Council’s regula
lement and conducidentify, manage an
lement and conducidentify, manage anhin the CBD areas
lement a swimmingegime for all domepools within the urb
lement a program fvehicles within theas
lement a program fiquid Trade Waste p
tain and improve fo
dertake inspections ppropriate public he
lement education aety and handling
14/2015
ouncil operations
r improvement and
atory functions to e
ct an illegal dumpinnd prosecute illega
ct a parking controlnd prosecute illega
g pool monitoring astic and commerciaban areas of the LGA
for the review of LGA upon roads an
for the monitoring premises within the
ood safety standar
of regulated businealth standards are
and awareness activ
Resp
d General M
ensure compliance
ng l
Strategy Manager
l
Strategy Manager
and al A
Strategy Manager
nd road Strategy Manager
and e shire
Strategy Manager
rds in accordance w
esses e met
Strategy Manager
vities Strategy Manager
ponsible Manager
Manager
with statutory req
and Land Use r
and Land Use r
and Land Use r
and Land Use r
and Land Use r
with the NSW partn
and Land Use r
and Land Use r
Performance
first approachtraining “How
Improvementsuccessfully
quirements
Illegal Dumpi
Parking Contr
Swimming Po
Program for a
Program imp
nership program
Food PremiseEducation anbeen implemwithin Narrabby the food a
Food PremiseEducation anbeen implemwithin Narrabby the food a
e Indicator
h is realised, Customw can we help “attit
ts identified and im
ng Program Condu
rol Program conduc
ool Program conduc
abandoned vehicles
lemented for Liquid
es Inspections unded awareness of fooented. Food safetybri Shire are to a stauthority
es Inspections unded awareness of fooented. Food safetybri Shire are to a stauthority
mer Service tude
mplemented
cted
cted
cted
s undertaken
d Trade Waste
ertaken. od safety has standards andard required
ertaken. od safety has standards andard required
Progres
Opportunities for cimplemented wher
Program implemen
Regular parking enimplemented in CB
All commercial poopools inspected/ aurequested.
New system regardcompliance initiateand impounding ya
Program implemen
NSW food authoritcompleted with foocompleted.
Food inspection preducation and inforecourses as requir
Page | 64
ss at 30 June 2015
change and improvere identified.
nted and ongoing.
forcement programBD area.
ols inspected and doudited as required a
ding abandoned vehed with new towingard established.
nted and ongoing.
ty agreement requirod inspection progr
ogram focused towrmation with provired to proprietors.
4
ement
m
omestic and
hicle g contract
rements ram
wards sion of
A
Actions
LA3.6 Ensur
LA3.6.1 EnsuLocal Goverunder which
LA3.6.2 Ensuup to date
LA3.6.3 MeeInformationInformationDisclosure (P
LA3.7 Ensur
LA3.7.1 An aprovided forElectoral Off
LA3.7.2 ProvCouncillors
LA3.7.3 Provenable the M
LA3.7.4 Provlegislative coExpenses an
LA3.7.5 Ensuprepared in making
LA3.7.6 EnsuConduct are
LA3.8 Devel
LA3.8.1 EnsuCommunity
LA3.8.2 Revihuman reso
Annual Report 201
re Council adheres t
ure that Council offnment Act and anyh they operate
ure that delegation
et statutory require Public Access Act ( Protection Act (PPPID)
re that sound syste
allocation for Local r annually and suppfice for the running
vide training and su
vide administrative Mayor to undertake
vide financial paymonstraints and Counnd Provision of Facil
ure Council agendasuch a way that the
ure Code of Meetine current and releva
lop and review Inte
ure Council decisionStrategic Plan
iew Workforce Planurce requirements
14/2015
to all Legislation un
ficers comply with t legislative framew
s for Council office
ements of Governm(GIPA), Privacy & PeIPA) & Public Intere
ms and processes a
Government Electiport is provided to tg of elections as req
upport for the Mayo
support to the Mae his role
ent to Councillors ancil’s Policy – Paymlities to Councillors
s and reports are ey enable sound de
ng Practice and Codant
egrated Planning D
ns are consistent w
n to meet Council’s
Resp
nder which it opera
the work General M
rs are General M
ment ersonal est
Director
are in place for goo
ons is the quired
Director
or and General M
yor to General M
as per ment of
Director
ecision General M
e of Director
Documents to cover
with General M
Human R
ponsible Manager
ates
Manager
Manager
Corporate Services
od governance at C
Corporate Services
Manager
Manager
Corporate Services
Manager
Corporate Services
r all of Council’s res
Manager
Resources Manager
Performance
No reported
Annual Revie
s No reported completed on
Councillor level
s Budget alloca
Access to trai
Position of Pebe retained
s Councillors Feexpenses are
Ongoing reviedistribution. C
s Annual review
sponsibilities, curre
Annual review
r Annual review
e Indicator
breaches
w completed
breaches. Annual ren time.
ation adopted each
ining provided each
ersonal Assistant to
ees and Reimbursemade
ew of agendas and Comprehensively p
w undertaken
ent and into the fut
w completed
w completed
eturns
year
h year
o Mayor and GM
ment of
reports before prepared reports
ture
Progres
No reported breach
Not commenced.
No reported breachcompleted on time
Allocation placed infuture use.
Not commenced.
Personal Assistant
Payments made toThursday of the fol
Ongoing review of distribution conducprepared reports p
Code of Conduct anreviewed and updarequirements.
Council reports idePlan objectives.
Not commenced.
Page | 65
ss at 30 June 2015
hes.
hes. Annual returnse.
nto Restricted Asse
position retained.
Councillors on the lowing month.
agendas and reporcted. Comprehensivprovided.
nd Code of Meetingated as per legislativ
entified Community
5
s
ets for
first
rts before vely
g Practice ve
y Strategic
A
Actions
LA3.8.3 Revi
LA3.8.4 Revi
LA3.8.5 ReviDelivery Pro
LA3.8.6 ReviOperational
LA3.8.7 Revibudget estim
LA3.8.8 Revi
LA3.8.9 Prep
LA3.8.10 Pre
LA3.9 Ensur
LA3.9.1 Revipolicies, statservice char
LA3.10 Impl
LA3.10.1 Proaccordance requirement
LA3.10.3 Ensand process
LA3.10.4 Rev(eg investmecontribution
LA3.10.5 Ad
LA3.10.6 Rev
LA3.10.7 Accreport provi
LA3.10.8 Int
Annual Report 201
iew Asset Managem
iew Long‐term Fina
iew and report on aogram
iew annually in line Plan
iew and develop Opmates
iew and report on a
pare Annual Report
epare State of Envir
re Council is guided
iew (and develop atement of businessrter as required
lement and mainta
ovide financial and with management ts
sure debtors, credites are in place
view policies that dent, purchasing, dens)
minister Council’s A
view Fees and Char
curate monthly incoided to Council
ternal audit review
14/2015
ment Strategy and P
ancial Plan (10 years
achievements of 4 y
e with preparation o
perational Plan incl
annual budget
t
ronment Report
d by relevant and cu
s required) Councils ethics and custom
ain Accounting Best
performance reporand statutory
tors and payroll sys
direct financial operebt collection, hards
Audit contract
rges annually
ome and expenditu
process
Resp
Policy Property
s) Financial
year Director
of Director
uding Director
Director
Director
Director Developm
urrent Policies
er General M
t Practice and finan
rting in Financial
stems Financial
rations ship, Financial
Financial
Financial
ure Financial
Financial
ponsible Manager
and Assets Manag
Services Manager
Corporate Services
Corporate Services
Corporate Services
Corporate Services
Corporate Services
Planning and ment
Manager
ncial management
Services Manager
Services Manager
Services Manager
Services Manager
Services Manager
Services Manager
Services Manager
Performance
er Annual review
Annual review
s 6 monthly rev
s Quarterly rev
s Annual review
s Quarterly rev
s Annual review
Annual review
Statutory revElections is coof new policie
principles to ensur
Quarterly repon Delivery Pendorsed by
Timely compl
Annual review
tender to be
Annual review
Councillors kn
Internal revie
e Indicator
w completed
w completed
views completed
views completed
w completed
views completed
w completed
w completed
iew within first 12 mompleted . Review es is undertaken wh
re all performance,
ports to Council Six lan to Council AnnuCouncil by 30 Nove
letion of processes
w completed
awarded during 20
w completed
now what things co
ews occur to ensure
months of /development hen required
, legislative and rep
monthly report ual Report ember each year
14/15
ost
e compliance
Progres
Review completed
Review completed
Not commenced.
Review completed
Operational Plan arequired timeframe
Quarterly Budget Rin line with legislat
Annual Report comCouncil in line with
Annual review not Planning and Repo
Development of neundertaken when r
porting requiremen
Reports completed
Processes complet
Review completed
Tender awarded.
Review completed
Not commenced.
Not commenced.
Page | 66
ss at 30 June 2015
.
.
.
nd Budget adoptede.
Reviews submitted tive requirements.
mpleted and submith legislative require
required by Integrarting.
ew policies and revirequired.
nts are satisfied
d.
ed.
.
.
6
d within
to Council
tted to ments.
ated
iews
A
Actions
LA3.10.9 Probudget or re
LA3.11 Ensu
LA3.11.1 Ensintegrates w
LA3.11.2 UnTerm Financof the Annu
LA3.11.3 Dethe Council’
LA3.11.4 Ideapplicable fo
LA3.12 Main
LA3.12.1 Revassets
LA3.12.2 DeCouncil prop
LA3.13 Main
LA3.13.1 Re
LA3.14 Prov
LA3.14.1 Deensure com
LA3.14.2 Enselectronic co
LA3.14.3 Retfor all files fr
LA3.14.4 Revversion of In
Annual Report 201
ojects delivered on eport must be prov
ure that Council’s Lo
sure that Council’s with Council’s long t
ndertake an annual cial Plan in conjunctal Operational Plan
evelop and review as Long Term Financ
entify any need for or a special rates va
ntain an assets reg
view asset listing an
evelop and maintainperty
ntain appropriate i
new Council’s insur
vide Quality, compr
evelop a Records Mapliance with releva
sure registration oforrespondence
tention and disposarom previous recor
view requirements nfoXpert
14/2015
time within ± 10% ided to Council
ong Term Financia
financial system term financial plan
review of Council’stion with the prepan
a loan strategy in lincial Plan
and develop plan ifariation application
ister that includes
nd record valuation
n a register of lease
nsurance levels for
rance
rehensive, accessib
anagement Plan tont Acts and legislat
f all council written
al project to commrds system, RecFind
for the upgrade to
Resp
of Financial
l Plan aligns with lo
Financial
s Long aration Financial
ne with Financial
f
Financial
all of the Council’s
ns of Property
es of Property
r Council
Property
ble and relevant rec
tion
Informat
and Informat
ence d
Informat
o next Informat
ponsible Manager
Services Manager
ong term and annu
Services Manager
Services Manager
Services Manager
Services Manager
s assets
and Assets Manag
and Assets Manag
and Assets Manag
cords
tion Services Manag
tion Services Manag
tion Services Manag
tion Services Manag
Performance
Much better jobs on time funding stop
ual budget requirem
Annual review
Annual reviewplan is compl
Annual review
Annual review
er Annually andbecome due
er Register deve
er Completed
ger Records Manutilised
ger Documents re
ger RecFind
ger As required
e Indicator
financial managemand on budget. Locreducing
ments
w completed
w completed. Long eted and accurate
w completed
w completed
as Class of Assets Ras per legislation
eloped by 30/6/16
agement Plan com
egistered
ment. Deliver cal roads
term financial
Revaluations
pleted and
Progres
Reports completed
Not commenced.
Review completed
Review completed
Identified a need foapplication and dra
Valuations occurre
Register complete.
Council’s insurance
Record managemecurrent Records Ac
Automated acknowreceived emails imby post for all othe
Records re‐boxed arequirements.
Current version insons.
Page | 67
ss at 30 June 2015
d.
.
.
or potential future aft plan underway.
d as per legislation
e cover current.
nt system is complct and relevant legis
wledgement responplemented and reser correspondence.
according to State R
stalled with addition
7
.
iant with slation.
nse for ponded to
Records
nal add‐
A
Actions
LA1.15 Ensu
LA3.15.2 RevManagemen
LA3.15.3 RevManagemen
LA3.15.4 RevPlan
LA3.15.5 RevAsset Manag
LA3.15.6 RevAsset Manag
LA3.15.7 Rev
LA3.15.8 Rev
LA3.15.9 RevManagemen
LA3.15.10 DManagemen
LA3.15.11 DCentre’ Asse
LA3.15.12 RPolicy annuaOperations
LA3.16 Deve
LA3.16.1 UnManagemen• Asset regis• Asset cond• Asset main• Predictive • Deteriorat• Risk analys
Annual Report 201
ure Asset Managem
view the ‘Roads & nt Plan
view the ‘Bridges &nt Plan
view the ‘Stormwat
view the ‘Parks & Ggement Plan
view the ‘Buildings gement Plan
view the ‘Water’ As
view the ‘Sewer’ As
view the ‘Waste Fant Plan
Develop the ‘Narrabnt Plan
Develop the ‘Narrabet Management Pla
eview the Asset Maally prior to the prePlan
elop and implemen
ndertake a gap analynt Plans to identify ster dition assessmentsntenance and manamodelling tion modelling sis
14/2015
ment Strategy, Polic
Road Assets’ Asset
& Box Culverts >6m’
ter’ Asset Managem
Gardens and Open S
and Land Improve
sset Management P
sset Management P
acilities’ Asset
bri Airport’ Asset
bri Livestock Selling an
anagement Strategeparation of the ann
nt an Asset Manage
ysis for all Asset gaps in data includ
agement systems
Resp
cy and Plans provid
Property
’ Asset Property
ment Property
Space’ Property
ments’ Property
Plan Property
Plan Property
Property
Property
Property
y and nual Property
ement Program tha
ing:
Property
ponsible Manager
de best practice dir
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
and Assets Manag
at identifies all fact
and Assets Manag
Performance
rections for the dev
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Initial review OLG requirem
er Lifecycle planCaptured as p
tors required for im
er Assets upgradlevels
e Indicator
velopment, renewa
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
completed on timements
ns developed with 1part of the GIS
mplementing the As
ded to meet identif
al and maintenance
e then as per
e then as per
e then as per
e then as per
e then as per
e then as per
e then as per
e then as per
e then as per
e then as per
10+ years focus.
sset Management
fied service
Progres
e of all of Council’s
Incorporated withiManagement Plan.
Incorporated withiManagement Plan.
Not commenced.
Parks & Open Spacdraft format.
Buildings' Asset Maformat.
Contractor Asset M
Contractor Asset M
Buildings Asset Maformat.
Transport Asset Maformat.
Buildings Asset Maformat.
Lifecycle plans devGIS.
Strategy and Plans
Transport, BuildingAsset Management
Page | 68
ss at 30 June 2015
infrastructure asse
n Draft Transport A.
n Draft Transport A.
ce Asset Manageme
anagement Plan in
Management Plan re
Management Plan re
nagement Plan now
anagement Plan no
nagement Plan now
eloped but not incl
s
gs and Parks & Opent Plans in draft form
8
ets
Asset
Asset
ent Plan in
draft
eviewed.
eviewed.
w in draft
ow in draft
w in draft
uded in
n Space mat.
A
Actions
Lifecycle cos
LA3.17 Impl
LA3.17.1 Exarenewal, rep
LA3.17.2 Revreferencing Managemen
LA3.17.3 Coeach asset cand Land Im
LA3.18 Put i
LA3.18.1 PutCouncil to suand templatguidelines
LA3.20 Main
LA3.20.1 Rev
LA3.20.3 Rev
LA3.21 Deve
LA3.21.1 Derecognising and capital ryears
LA3.22 Man
LA3.22.1 Mafuneral direcenquiries fo
LA3.22.2 ImCemeteries Service
Annual Report 201
sting’s
lement Buildings an
amine renewal bacplacement and disp
view capital works the renewal demannt Plan
llect better data anclass and category amprovements Asset
in place policies an
t in place the policiupport events – inctes and internal pro
ntain & update Ass
view roads asset m
view bridge asset m
elop and adopt Wa
evelop an Asset Manthe life cycle cost arenewal cost of Wa
nage and operate ce
anage interments, rctors, record keepinr cemeteries in Nar
plement required min accordance with
14/2015
nd Land Improvem
klog and categoriseposal
proposed for 2013nds in the Asset
nd financial variableand update the BuilManagement Plan
nd procedures with
es and procedures cluding an events motocols and procedu
set Management Pl
management plan
management plan
aste Asset Managem
nagement Plan and total maintenanaste over the next 1
emeteries to meet
reservations, liaisonng, and genealogy rrabri Shire
maintenance at Couh adopted Levels of
Resp
ments Asset Manage
e into All Depar
‐2022 All Depar
es for ding All Depar
in Council that will
within manual ure
Tourism
lans
Director
Director
ment Plan
nce 10
Strategy Manager
all legislative requ
n with Commun
uncil Commun
ponsible Manager
ement Plan
rtments
rtments
rtments
l streamline and fa
Manager
Engineering Service
Engineering Service
and Land Use r
uirements
nity Facilities Manag
nity Facilities Manag
Performance
Completed
Completed
Completed
cilitate the hosting
Events manuprotocols and
es Asset manage
es Asset manage
Plan develope
ger Legislative re
ger Narrabri Cem
e Indicator
g of events in the Sh
al and templates and procedure guideli
ement plan reviewe
ement plan reviewe
ed
quirements are com
meteries are kept ne
hire
nd internal nes produced
ed annually
ed annually
mplied with
eat and tidy
Progres
Upgrade/New/Renand 'Parks & Open
Upgrade/New/Renand 'Parks & Open
Buildings' Asset Maformat.
Event Manual and
Transport Asset Maformat.
Transport Asset Maformat.
Waste assets includManagement Plans
Cemeteries in Narrlegislative requirem
Narrabri Cemeterieconsistently high st
Page | 69
ss at 30 June 2015
newal planned for 'BSpace'.
newal planned for 'BSpace'.
anagement Plan no
templates in draft f
anagement plan in
anagement plan in
ded in organisations.
rabri Shire operatedments.
es are maintained ttandard.
9
Buildings'
Buildings'
ow in draft
format.
draft
draft
nal Asset
d within
o a
A
Actions
LA3.22.3 CoNarrabri Law
LA3.22.4 Be
LA4 Proactiv
LA4.1 Suppo
LA4.1.1 Impassessment procedures
LA4.1.2 Conwebsite to ethe commun
LA4.2 Regul
LA4.2.1 Infothrough locawebsite and
LA4.2.2 Proainform the C
LA4.2.3 DevOfficers to imwhy and whfor applicatiprojects of C
LA4.3 Counc
LA4.3.1 Atte
Annual Report 201
nstruct and landscawn Cemetery to me
llata Cemetery – As
vely engage with th
ort effective and tr
lement an electronsystem to support and provision of inf
duct a review of infensure appropriate nity
arly communicate
rm the community al media (newspaped social media
actively engage witCommunity about C
elop a Communicatmplement detailinghat using various coon to promote all sCouncil
cil encourages the
end meetings with v
14/2015
ape future section oeet design
sh Internment
he community
ansparent informa
nic DA tracking and internal operationaformation to the pu
formation on Couninformation delive
with the communi
of Council activitieer and radio), Coun
h and transparentlyCouncil activities
tion Plan for all Coug the who, when, hommunication mediservices, programs
dissemination of co
various community
Resp
of Commun
Commun
ation to the public o
al ublic
Director Developm
cil’s ry to
EconomiManager
ity on activities of C
es ncil
EconomiManager
y EconomiManager
uncil ow, iums and
EconomiManager
ommunity informa
y Economi
ponsible Manager
nity Facilities Manag
nity Facilities Manag
on Development M
Planning and ment
c Development r
Council
c Development r
c Development r
c Development r
ation and awarenes
c Development
Performance
ger Project comptime and with
ger Completed w
Matters
Electronic DA
Information o
Proactively einform the co
Community k
Communicatiprovides cleaCouncil Office
ss of activities, pro
Community G
e Indicator
pleted to required sthin budget
within budget
A tracking System im
on Council’s websit
ngage with and tranommunity about Co
kept informed of Co
ion Plan documenter expectations and ers
grams and trends w
Groups are supporte
tandard, on
mplemented
e reviewed
nsparently ouncil activities
ouncil activities
ed which guidelines to
within Narrabri Shi
ed by Council
Progres
Not commenced.
Not commenced.
Not commenced.
Council's new websfeaturing a design tand navigated on tAll content on old sand importance besite.
Information was pra regular basis throCouncil's website, Fand Media Release
Council has been wengagement with tthrough social medintroduced into Thengagement.
Not commenced.
ire
Council attended In
Page | 70
ss at 30 June 2015
site launched Marcthat can be easily vablets and mobile psite reviewed for reefore placement on
rovided to the comough the News ReeFacebook and twittes.
working to increase the community partdia. Your Council wae Courier to provid
nteragency meeting
0
ch 2015 viewed phones. elevance the new
munity on l on ter posts
ticularly as also e further
gs and
A
Actions
groups and to share inforegular basis
LA4.3.2 Comdistributed
LA4.3.3 Comby Council isAdministratCrossing The
LA4.5 Counc
LA4.5.1 PartBush Bursar
LA4.5.2 CouWomen’s Da
LA4.5.3 Coufacilitate Yo
LA4.5.4 Orga
LA4.5.5 Couactivities wit
LA4.5.8 Enga
Annual Report 201
provide opportunitormation and profes
mmunity Directory r
mmunity informatios displayed where aion Building, Touriseatre and on Counc
cil to actively encou
ticipate in the NSW ry Scheme
ncil to facilitate a yay event
ncil to apply for funuth Week activities
anise Shire Snapsho
ncil to assist and suthin Narrabri Shire
age with communit
14/2015
ties for service provessional developme
regularly updated a
on generated and reapplicable throughosm, Libraries and Thcil’s website
urage community a
Rural Doctors Netw
yearly International
nding for Youth Wes
ot Competition
upport Seniors Wee
ty groups
Resp
viders ent on a
Manager
and EconomiManager
eceived out the he
EconomiManager
activity and promo
work EconomiManager
EconomiManager
eek and EconomiManager
EconomiManager
ek EconomiManager
EconomiManager
ponsible Manager
r
c Development r
c Development r
ote the participatio
c Development r
c Developmentr
c Development r
c Development r
c Development r
c Development r
Performance
and commun
Community Gand commun
Community Gand commun
n, involvement and
Improved mepractitioners
Council to actinvolvement
Provide oppo
Provide oppoinvolvement
Celebrate old
Meetings atte
e Indicator
ity information is s
Groups are supporteity information is s
Groups are supporteity information is s
d engagement of th
edical services and min Narrabri Shire
tively promote the and engagement of
ortunities for youth
ortunity for commu
der people
ended
hared
ed by Council hared
ed by Council hared
he community
more
participation, f women
nity
Progres
provided updates aregularly provided through email. Asscommunity events
Updated when newdistributed throughAdministration BuiCentre. Council's ncommunity to fill intheir details.
Information regulavarious Council outThe Crossing TheatCentre. Council's Fapopularity and becinformation.
Bush Bursary studeShire for her 2 wee2014.
Not commenced.
Funding received ato mark the openin
The Shire SnapshotDecember 2014, Jaentries were receiv
Seniors Week functShire in March 201
Council staff activecommunity groupsinformation about through social med
Page | 71
ss at 30 June 2015
as required. Informto interagency netwisted with the promand activities.
w details are receiveh Council's websitelding and Visitor Infew website allows n an online form to
rly disseminated thtlets including the Ltre and Visitor Inforacebook page increame a "go‐to" for lo
ent was hosted in Nek placement in Nov
nd event held in Apng of the Youth Sha
t competition held anuary 2015 periodved in total.
tions held across N5 and supported by
ely worked with loca to help disseminattheir programs anddia and the website
1
ation work motion of
ed and , formation the update
hrough Libraries, rmation eased in ocal
Narrabri vember
pril 2015 ck.
over the . 51
arrabri y Council.
al te d activities e.
A
Actions
LA4.6 Celeb
LA4.6.1 Carrcelebrate ancommunity
LA4.6.2 Ann
LA4.6.3 Ann
LA4.7 Ensur
LA4.7.1 Reviensure it remrequirement
LA4.7.2 Conthe Council
LA4.7.3 Couforums incluPrevention,
LA4.8 Prepa
LA4.8.1 Distmeeting dat
LA4.9 Provid
LA4.9.1 Maimonitors en
LA4.9.2 Und
LA4.9.3 Provadopt a "Ho
LA4.9.4 Acknof corresponresponse timcorresponde
LA4.10 Prov
LA4.10.1 De
Annual Report 201
rate and acknowle
ry out Civic ceremond acknowledge ach
ual volunteer celeb
ual NAIDOC Week
re that the commun
iew Community Engmains relevant to Cts
vene and/or suppo
ncillors and/or officuding: Chambers of Medical Taskforce
are and Promote Co
ribute and advertistes
de quality, compre
ntain a Customer Rnquiries and respon
dertake bookings fo
vide Customer servow can we help?" at
nowledgement lettndence received frome set for staff to reence. Adhere to Cu
vide quality informa
evelop and maintain
14/2015
edge achievements
nies and Functions hievements of the
bration held
celebration held
nity has a range of
gagement StrategyCouncil’s consultatio
ort s355 Committee
cers attend commuf Commerce, Crimee
ouncil meetings
se business papers a
ehensive, accessible
Request System thase times
or council facilities
ice training to all stttitude
ters sent on day on om the public. 14 deply to all general stomer Service Poli
ation to customers
n a suite of common
Resp
of the community
to Director
Director
Director
opportunities to e
y to on General M
es of General M
unity e General M
and General M
e and relevant cust
t Director
Director
taff and Director
receipt ay
icy
Director
s
nly Director
ponsible Manager
y
Corporate Services
Corporate Services
Corporate Services
ngage with the Cou
Manager
Manager
Manager
Manager
tomer services
Corporate Services
Corporate Services
Corporate Services
Corporate Services
Corporate Services
Performance
s Council to acof volunteers
s Council to envolunteers
s Involvement
uncil
Annual review
Regular meetCouncil
Regular attenCouncil
Provide easy community
s Improvementqueries
s Minimal com
s Perception thhelpful
s Community S
s Annual review
e Indicator
knowledge and recs
courage and recog
of indigenous comm
w completed
tings are held and r
ndance at meetings
access to Council fo
t in quality and resp
plaints
hat Council staff are
Satisfaction with en
w completed. All sta
ognise the work
nise the work of
munity
reported to
reported to
or total
ponse times to
e friendly and
quiries
aff adhere to
Progres
Volunteer Week ceweek of May 2015.
Volunteer Week ceweek of May 2015.
NAIDOC Week Cele
Not commenced.
Regular meetings oreported to Counci
Councillors and CoCommunity forumsidentified.
Business papers anadvertised online a
Customer request s
No complaints rece
Training provided areceived.
Acknowledgement
Not commenced.
Page | 72
ss at 30 June 2015
elebrations held in s.
elebrations held in s.
ebrations held in Ju
of Section 355 Comil.
uncil Officers attens where opportunit
nd meeting dates wand in local newspa
system in place.
eived.
as identified. No co
s of correspondenc
2
second
second
ly 2014.
mittees
ded ties were
ere pers.
mplaints
ce sent.
A
Actions
asked questcustomer in
LA4.11 Ensu
LA4.11.1 Revthird party poperates eff
LA4.12 Deve
LA4.12.1 Imways: Devel
LA4.12.2 Proregional and
LA4.12.3 ParExpo
LA4.12.4 Proregional tou
LA4.12.5 Prothe Wedding
LA4.12.6 Prothe Meeting
LA4.12.7 Proan Annual M
LA4.13 Incre
LA4.13.1 Repowerful tooregarding thprograms an
LA4.13.2 Coregionally thadvertising
Annual Report 201
ions and answers foquiries
ure the community
view and maintain provider to ensure Cficiently
elop and implemen
plement the Markeop annual program
omote program thrd state media
rticipate in the Aus
omote the use of Thuring shows and as a
omote the use of Thgs and Special Occa
omote the use of Thgs and Conference M
omote the use of ThMembership Subscr
eased use of Counc
cognise and utilise ol in disseminating he community and Cnd projects
ntinue to publicise hrough print, digita
14/2015
or dissemination to
can be kept inform
the contract with tCouncil’s web serve
nt Marketing and P
eting Plan in the folm of activities and p
rough advertising in
tralian Business Eve
he Crossing Theatrea performance ven
he Crossing Theatreasions Market
he Crossing TheatreMarket
he Crossing Theatreiption Program
cil website and web
Council's website ainformation worldwCouncil services,
events locally and l, radio and televisi
Resp
o
med via web based
the er
EconomiManager
Promotions Program
lowing romote
The CrosManager
n local, The CrosManager
ents The CrosManager
e to ue
The CrosManager
e to The CrosManager
e to The CrosManager
e with The CrosManager
b based services
as a wide
EconomiManager
on EconomiManager
ponsible Manager
media
c Development r
m at The Crossing T
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
sing Theatre Venuer
c Development r
c Development r
Performance
Customer Ser
Ongoing and
Theatre
e Marketing anand utilised
e Marketing anand utilised
e Marketing anand utilised
e Marketing anand utilised
e Marketing anand utilised
e Marketing anand utilised
e Marketing anand utilised
Website is cupeople indeptheir questioncouncil servic
Website is cupeople indeptheir questioncouncil servic
e Indicator
rvice Policy
as required
nd Promotions Prog
nd Promotions Prog
nd Promotions Prog
nd Promotions Prog
nd Promotions Prog
nd Promotions Prog
nd Promotions Prog
rrent and is accesseendently sourcing ins about the commces, programs and p
rrent and is accesseendently sourcing ins about the commces, programs and p
gram developed
gram developed
gram developed
gram developed
gram developed
gram developed
gram developed
ed regularly by information to
munity and projects
ed regularly by information to
munity and projects
Progres
Website maintaine
Delivered through campaign.
Delivered through campaign.
Not commenced.
Delivered through campaign.
Delivered through campaign.
Delivered through campaign.
Delivered through campaign.
The launch of Couninformation being The new slide showeffective new featumore current informore eye catching
Events publicised tSection and CounciAdvertised through
Page | 73
ss at 30 June 2015
ed continuous opera
regular advertising
regular advertising
regular advertising
regular advertising
regular advertising
regular advertising
ncil's new website spromoted through w News Reel has beure on the site to almation to be showway.
hrough Council's Toil's website effectivh Facebook.
3
ation.
saw more the site.
een an llow for n in a
ourism vely.
A
Actions
LA4.14 Deve
LA4.14.1 Pre2013/2014
Annual Report 201
elop and implemen
epare and impleme
14/2015
nt Marketing and P
ent marketing progr
Resp
Promotions Program
ram for Director
ponsible Manager
m (refer to Tourism
Corporate Services
Performance
m Plan 2013‐2018)
s Marketing pr
e Indicator
ogram implemente
ed
Progres
Marketing and proimplemented.
Page | 74
ss at 30 June 2015
motions program
4
Annual R
Lega
Summarthe Loca
Over
Details oreported
No over
during t
Publ
Declaratunder Se
In the 20
Narrabr
Policy an
Sect
Summarwork ca During tSection
Legal Mat
Debt Colle
Collaterali
(Investme
Human Re
Companio
Building an
Total
Report 2014
al Proce
ry of the staal Governme
rseas V
of overseas vd under Clau
seas visits w
he 2014/15 f
lic Inter
tion of Publiection 31 of
014/15 finan
i Shire Counc
nd Procedur
ion 67
ry of resolutrried out on
the 2014/15 67 of the Loc
ter
ection Costs
ised Debt Ob
nts)
esources
on Animal
nd Developm
/2015
eedings
te of each leent Regulatio
Visits
visits by Couuse 217 (1) (a
were made by
financial yea
rest Dis
ic Interest Dthe Public In
ncial year Co
cil adopted a
e in 17 Dece
Resolu
tions made un private land
financial yeacal Governm
bligations
ment
s
egal proceedon, 2005 and
uncillors, sena3) of the Lo
y Councillors
ar.
sclosur
isclosures renterest Discl
uncil did not
and impleme
mber, 2013.
utions
under Sectiod:‐
ar no privatement Act, 199
Cost ($)
44,6
3,6
20,6
$9,7
$1,4
80,2
ding and the d Section 42
nior staff or ocal Governm
s, council sta
re Act 1
eceived by Closures Act,
t receive any
ented an Inte
.
on 67 of the L
e works were93.
663 Recov
685 Ongoi
604 Compl
person
766 Compl
499 Compl
217
result repor8 (4) (b) of t
other personment Regula
ff or other p
1994 an
ouncil durin1994 and Cl
y applications
ernal Report
Local Govern
e undertaken
State
erable
ng
leted – profe
nnel
leted ‐ Decla
leted ‐ Bogga
rted under Che Local Gov
ns representation, 2005.
ersons repre
nd Reg
g the 2014/1ause 4 of th
s for Public I
ing – Public I
nment Act, 1
n requiring a
of progress
essional serv
ration of Da
abri Develop
Page |
Clause 217 (1vernment Ac
ting Council
esenting Cou
gulation
15 year repoe Regulation
nterest Disc
Interest Disc
1993 concern
resolution u
and result
vices regardin
ngerous Dog
pment Motel
76
1) (a) of ct, 1993.
uncil
n
orted n.
losure.
closure
ning
under
ng
g
Annual R
CounFacil
Total ampaymen For the 2
Descrip
Provisi
Teleph
Attend
Trainin
Interstapocket
Oversepocket
Expens
Expensa Coun
Other C
Reimbu
Meals/
Counci
Associa
Mayora
Counci
Council’expenseattached
Report 2014
ncillorslities
mount of mont of Council
2014/15 fina
ption
on of dedica
one calls ma
ance of Cou
ng of Council
ate visits by travelling ex
eas visits by C travelling ex
ses of any sp
ses involved ncillor
Councillor Ex
ursement of
/Refreshmen
llor insuranc
ation membe
al Fees
llors Fees
s Policy on tes can be foud as Append
/2015
s Expen
oney expendlor expenses
ancial year, C
ated office eq
ade by Counc
ncillors at co
lors and prov
Councillors, xpenses
Councillors, ixpenses
ouse, partne
in the provis
xpenses
travel and o
nts at Counci
ce allocation
erships
he provisionund on Councix 1.
nditure
ed during ths.
Council expe
quipment for
cillors
onferences a
vision of skil
including tra
including tra
er or other p
sion of care f
other costs to
l meetings a
of facilities cil’s Website
And P
hat year on t
nded a total
r Councillors
nd seminars
ls developm
ansport, acco
nsport, acco
erson who a
for a child or
o attend mee
nd functions
for use by Ce www.narra
rovisio
the provision
of $253,859
s
s
ent
ommodation
ommodation
accompanied
r an immedia
etings
s
ouncillors anbri.nsw.gov.
on Of Co
n of Councill
9.13.
n and other o
and other o
d a Councillo
ate family me
nd the payme.au. A copy o
Page |
ouncill
lor facilities
out of
out of
r
ember of
Total:
Total:
ent of Councof the Policy
77
or
and the
Amount
$7,137.
$21,824.
$4,319.
$33,281.
$2,184.
$7,246.
$38,673.
$30,892.
$23,440.
$118,140.
$220,577.
cillors is
$0
21
73
$0
34
$0
$0
$0
.28
80
63
57
85
00
00
.85
Annual R
Seni
Details o
Seni
StatemeClause 2
General
Salary C
Bonus, p
Superan
Non Cas
Fringe B
Stateme
Senior S
Salary C
Bonus, p
Superan
Non Cas
Fringe B
Stateme
Report 2014
or Staf
of Senior Sta
General Ma Director Cor Director Eng Director Pla
or Staf
ent of the to217 (1) of the
Manager
omponents
performance
nnuation
sh Benefits
Benefits
ent Of Total R
Staff
omponents
performance
nnuation
sh Benefits
Benefits
ent Of Total R
/2015
ff Empl
aff in employ
nager
rporate Servi
gineering Ser
nning and De
ff Remu
otal remunere Local Gove
e
Remuneratio
e
Remuneratio
oyed
yment durin
ices
rvices
evelopment
unerati
ration packagernment Reg
on
on
ng 2014/15
ion
ges of the Ggulation, 200
Diane Hood
Paul Wearn
Andre Komp
Paul Bawde
eneral Mana05.
(February 2
e
pler
n (March 20
ager and Sen
Page |
2015)
015)
nior Staff un
$
$
$
$
78
nder
$124,380
0
$11,895
$11,000
0
$147,275
$443,511
0
$41,988
$22,988
$24,142
$532,629
Annual R
Cont
Details oGovernm The folloduring t The amoconstruc2014/20
Name of
BretmartCalvani CGLB QuaQuarries Milbrae QScreeningCrushing Rates on
Caruana Milbrae Qand BlastRates on
AccurateAusroadsPty Ltd, DServices, Gardner T/A GracLtd, KerwSurfacingStabilco PAustraliaRates on
BMR QuaWorks PtLtd and NPatches PRates on
SJ & MS R
Jacobs G
Civilbuild
Report 2014
tracts A
of Contractsment Regula
owing table lhe 2014/201
ounts payablction contrac015 financial
f Contractor
t Pty Ltd T/A CCrushing Pty Ltrrying & LogisPty Ltd, M&MQuarries Pty Lg Pty Ltd and Pty Ltd ly supply cont
Mining ServicQuarries Pty Lt Pty Ltd ly supply cont
e Asphalt & Ros Stabilisers PtDiveva Pty LtdDowner EDI W& Sons Pty Lte Civil, Hiway way Asphaltingg Pty Ltd, Pty Ltd and St Pty Ltd (SPA)ly supply cont
arries Pty Ltd,ty Ltd, Fulton Norman McMPty Ltd T/A Paly supply cont
Rice Pty Ltd t/
roup (Australi
d Pty Ltd
/2015
Awarde
awarded foation, 2005.
lists all contr15 financial y
le below arects, plus any year for Rat
Clarence Earthtd, CZL Groupstics Pty Ltd, HM Crushing PtyLtd, Regional CTrevor Prodg
tract
ces Australia PLtd and Precis
tract
oad Repairs Ptty Ltd, Centrad T/A Mid CoaWorks Pty Ltdd, Grace RuraStabilizers Aug Pty Ltd, Roa
tabilised Pave) tract
Downer EDI Hogan Industahon atches Asphalttract
/as Proterra G
ia) Pty Ltd
ed
or amounts g
racts awardeyear.
either the aapproved vates Only Supp
hmoving, p Pty Ltd, Hutchinson y Ltd, Crushing & er
Pty Ltd, ion Drill
ty Ltd, l West Civil st Road d, FK l Pty Ltd ustralia Pty dworx
ments of
ries Pty
t
Group
greater than
ed by Counci
approved GSTariations, or ply Contract
Date
24/06/2014
24/06/2014
15/07/2014
24/06/2014
19/08/2014
16/09/2014
17/02/2015
$150,000 un
l with a tota
T inclusive cothe total ams.
Goods or SProvided
Contract 2Gravel Cru
Contract 2Quarry Bla
Contract 2Insitu Stab
Contract 2Supply & LConcrete
Contract 2Narrabri APavement Upgrade –
Contract 2Narrabri WAugmenta
Contract 2Harparary Replaceme
nder Clause
l value of $1
ontract amomounts paid d
Services
2014‐15/01 ushing
2014‐15/02 asting
2014‐15/03 bilisation
2014‐15/04 Lay Asphaltic
2014‐15/07 Airport & Lighting
– Design
2014‐15/08 Water Supply tion – Design
2014‐15/09 Bridge ent
Page |
217(1) of th
50,000 or m
unts for during the
Amount (Incl
$34
$14
$69
$10
$88
$1,83
$2,37
79
e Local
ore
Payable GST)
49,096.13
41,983.03
94,444.04
07,342.84
81,189.24
31,491.20
75,996.20
Annual R
Interflow
FK Gardn
CivilTeam
Mannion
Castlerea
Writ
Amountthe Loca
Rates an
Resident
Farmland
Business
Special R
Water Se
Sewer Se
Waste M
Report 2014
w Pty Ltd
ner & Sons Pty
m Engineering
n Water Drillin
agh Construct
tten Of
t off Rates anal Governme
d Charges Wr
ial Rates
d Rates
Rates
Rates
ervices Charge
ervices Charge
Management C
/2015
y Ltd
g Pty Ltd
ng Services Pty
ion Group Pty
ff Rates
nd Charges Went Regulatio
ritten off in 20
es (including P
es (including P
Charges (includ
y Ltd
y Ltd
s and C
Written of don, 2005.
014/2015
Pensioners)
Pensioners)
ding Pensione
17/02/2015
07/04/2015
23/06/2015
23/06/2015
23/06/2015
Charges
uring the 20
ers)
Contract 2Sewer Reli
Contract 2Narrabri APavement Upgrade –
Contract 2Dubbo & BCreek BridReplaceme
Contract 2Drilling of Supply Bor
Contract 2ConstructiNarrabri RCreek Statat Narrabr
s
014/15 finan
Total:
2014‐15/10 ining
2014‐15/12 Airport & Lighting
– Civil Works
2014‐15/14 Baradine ge ents
2014‐15/17 Groundwaterres
2014‐15/19 on of FS Deep ion Building ri Airport
cial year und
Page |
$1,5
$10,5
$2,1
r $50
$53
der Clause 1
80
16,523.43
74,294.66
19,329.10
09,927.22
30,354.00
132 of
$47,955
$132
$0
$507
$29,088
$26,006
$30,682
$134,370
A
S
TG D
w
D
C
G
P
Annual Repor
Section
Total amounGovernment
During 2014/
with it Contri
Donations of
Dona
Dona
Dona
Dona
Contribution
Austr
Senio
Nosh
Volun
ANZA
Youth
Red C
Tidy T
Famil
RSL W
General Cont
Narra
Baan
Natu
Regio
Pensioner Re
Narra
rt 2014/2015
n 356 C
t contributeAct, 1993, r
/2015, Narra
butions and
f Rates and S
ation of Rate
ation of Wate
ation of Sewe
ation of Wast
s to Events
ralia Day
or Citizens W
on the Nam
nteers Week
AC Day
h Week
Cross Hire of
Towns
ly Drug Supp
War Memoria
tributions
abri Shire Ba
Baa Water R
ralisation Ce
onal Arts Dev
ebate Schem
abri Shire Co
5
ontribu
ed or otherwreported und
bri Shire Cou
Donations P
Service Charg
s
er Services
er Services
te Managem
Week
moi
k
f The Crossin
port
al DA Fees
nd
Reimbursem
eremony
velopment P
me
ouncil Compo
utions
wise granted der Clause 21
uncil made th
Policy.:
ges
ment Services
g Theatre
ment
rogram
onent
under sectio17(1)(a5) of
he following
$
$
$
s $
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
on 356 (finanthe Local Go
g Contributio
13,126
9,136
13,461
4,907
5,598
2,500
2,433
666
12,000
1,132
14,270
800
5,000
2,407
14,000
8,925
295
8,393
123,374
ncially assistovernment R
ns and Dona
Page | 81
t others) of tRegulation, 2
ations in acco
the Local 2005.
ordance
A
N
T
Nin
C
T
a
e
fi
A 1
2
3
4
5
Annual Repor
Narrabri Shir
Sport
Non‐
Small
Total Donatio
Not included n the followi
C
N
H
Conditi
This Public W
amount of m
expense of m
inancial year
Asset Conditi
1 – Near Perf
2 – Superficia
3 ‐ Deteriorat
4 – Requires
5 – Asset uns
Asset Descrip
Buildings
Other Structu
Public Roads
Water
Sewer
Drainage Wo
Totals
rt 2014/2015
re Grant Sche
ting Grants
Profit Specia
l Area Grants
ons & Contri
in the aboveing forms:
Concession R
Non‐Ratable
Hire of Coun
ion OF
Works report
oney require
maintaining th
r.
ion Key
fect
al Deteriorat
tion Evident
major recon
serviceable
ption
ures
& Other Road
orks
5
emes
al Events Gra
s
ibutions
e figures are
Rates of Hire
e Property Cl
ncil Plant and
Public
includes a st
ed to bring t
he asset at t
ion
struction
d Assets
ants
donations, c
e for The Cro
assifications
d Equipment
Works
tatement of t
he asset up t
hat standard
$
$
$
$
contribution
ossing Theatr
s
s
the current c
to a satisfact
d and Counci
ConditionAsset
18,666
19,223
15,300
295,612
s and conces
re
condition of
tory standard
il’s program
n of Estimabring uSatisfa($’00
3
3
3
3
3
3
3 1
ssions grante
the asset, an
d, an estimat
of maintena
te to up to ctory 00)
EstimmainSatis($’
666
55
8,925
0
0
498
0,144
Page | 82
ed to commu
n estimate o
te of the ann
ance for 2014
mate to ntain at sfactory $’000)
2M
359
38
5,178
279
340
151
6,290
unity groups
of the
nual
4/2015
2014/2015Maintenance Program ($’000)
391
32
6,150
328
387
23
7,255
s
Annual Rep
StatemDelega
The followithe 2014/15stated unde
Commit
Nosh on
The FrieTheatre
The New
Narrabr
ort 2014/20
ment Oated By
ng external 5 financial yer Clause 21
ttee
n the Namoi
ends Of The Ce
wtown Park C
ri West Lake C
15
f Extery Counc
organisationyear and wer7 (1) (a6) of
rossing
Committee
Committee
rnal Bodcil
ns were Sectre delegatedthe Local Go
Delegated Fu
To facilitate athe Namoi. To raise fundPromotion of
To facilitate aTo raise fundPromotion ofTo make recoto improveme
The care, conPark. Collect any chthe use of thepurpose and expend thosethe Council mCommittee.To meet any ctime to time fservices chargfacility. To make the gmembers of tpurposes for constructed.Arrange the rgrounds, eith
To raise fundPromotion ofTo make recoto improvemeArea. To carry out rWest Lake in requirements
dies Th
tion 355 Comd to exercise overnment R
unctions
and co‐ordina
s for the purpf Narrabri Shir
and co‐ordinas for the purpf Narrabri Shirommendationents of The Cr
ntrol and man
harges and feee facilities, to objectives of e funds togethmay from time
charges whichfor electricityges in respect
grounds availthe public conwhich the fac
repair and maher by volunta
s for the purpf Narrabri Shirommendationents Narrabri
redevelopmencompliance ws.
hat Exe
mmittees of functions onRegulation, 2
te the event o
pose of the Core.
te events.pose of the Core. s to Council inrossing Theat
agement of N
es fixed by Coraise funds fothe Committeher with such e to time vote
h may be mad, water and at to the opera
able to and sansistent with tcilities were or
intenance of ry labour or o
pose of the Core. s to Council inWest Lake Re
nt works at thwith Council
rcised
Narrabri Shin behalf of C2005:‐
of Nosh on
ommittee.
ommittee.
n relation re facility.
Newtown
ouncil for or the ee and to funds as to the
de from ny other tion of the
afe for all the riginally
the otherwise.
ommittee.
n relation ecreation
e Narrabri
Page | 83
Functio
ire Council foCouncil as ou
Council Dele2014/15
Cr Redding
Cr Knox
Director CorServices Cr Tough
Cr Tough Cr O’Regan
ons
or all part ofutlined below
egate
rporate
f w
Annual Rep
Commit
Narrabr
Rural TrWest Co
Youth C
GwabegCommit
ort 2014/20
ttee
ri Airport Com
raining Centreommittee
Centre Commi
gar Communitttee
15
mmittee
e North
ittee
ty Hall
Delegated Fu
To assist Courequired. To assist Coumanaged.
To investigateRural TrainingTo investigateRural Training
To investigateYouth CentreTo investigateYouth Centre
Take care, coGwabegar CoCollect any chthe use of thepurpose and expend thosethe Council mCommittee.To make the fmembers of tfor which theAny restrictioby Council. To meet any ctime to time fservices chargfacility. To maintain tGeneral Man
Structurinstallatand placomme
Council maintenthe facifor the cworks aGenera
To permit autpremises at aof carrying ouemergency wCouncil with aArrange the rand grounds, otherwise.
unctions
ncil in determ
ncil as to how
e and progresg Centre. e and progresg Centre.
e and progrese. e and progrese.
ntrol and manommunity Halharges and feee facilities, to objectives of e funds togethmay from time
facility availabthe public cone facility was oon to this avai
charges whichfor electricityges in respect
the facility to ager:
ral alterationstions require nning approvencement.
approval is tonance, improvlity prior to thcommencemeare to be to thl Manager. thorised Counany reasonablut work or inswhen entry is na set of keys frepair and ma either by vol
mining the Infr
w the Airport s
ss the develop
ss the manage
ss the develop
ss the manage
nagement of tl. es fixed by Coraise funds fothe Committeher with such e to time vote
ble to and safnsistent with toriginally conslability is to b
h may be mad, water and at to the opera
the satisfactio
s and permanrelevant Counal prior to
o be obtainedvements or exhe issuing of tent of such whe satisfaction
ncil officers toe hour for thepections at tinecessary, andfor this purpointenance of untary labour
astructure
should be
pment of a
ement of a
pment of a
ement of a
the
ouncil for or the ee and to funds as to the
e for all the purpose structed. e approved
de from ny other tion of the
on of the
ent ncil building
for major xtensions to he contract ork. Such of the
o enter the e purpose mes of d to supply se. the facility r or
Page | 84
Council Dele2014/15
Director PlaDevelopmen Cr Flower
Cr Faber Cr Redding
Cr Faber Cr Collyer
Cr Booby
egate
nning and nt
N
CenCom
Nam
NorAdv(NIW
AusAss
NarCom
NarMa
NSWAss
Arts
NorLoa
AssRel
NarGro
ShirMa
New
NarImpCon
CrimCom
NarCom
Annual R
StateJointCoun
Stateme2005:‐
Name of ComOrganisat
ntral Northernmmittee
moi Water
rthern Inland visory CommitWAC)
stralian Airporsociation
rrabri Shire Bammittee
rrabri Bush Firnagement Co
W Saleyards Osociation
s North West
rth West Weigads Committee
sociation of Mated Councils
rrabri Shire Inoup
re Floodway nagement Co
well Highway
rrabri CBD provement nsultative Com
me Preventionmmittee
rrabri Hospitammittee
Report 2014
ement t Ventuncil Par
ent outlined
mittee/ tion
n Libraries TNLa
Tr
Weeds ttee
TnLbE
rt Owners TAS
and Tp
re ommittee
Ts
Operators TsA
TN
ght of e
Tf
Mining
Tr
teragency Tp
ommittee Tl
Taskforce Tsa
mmittee
T
n Tw
l Advisory Ts
/2015
Of All ures, Syrticipat
below state
The Narrabri SNorthern RegLibrary is baseacross Centra
To ensure theregion.
To promote a noxious and oLocal and Statbodies involveEngland North
To collaborateAirports to enStandard.
To work with productivity
To collaboratesupports the R
To collaboratesaleyards to eAustralian Sta
To promote aNorth West Re
To work with freight travel.
To collaborateregions.
To work with programs and
To review theand changes
To collaboratesupport any reand promotio
To collaborate
To review andwithin the Shi
To work with service to Nar
Corporyndicatted
ed under Cla
Fu
Shire Librariesional Library. ed in Tamwortl Northern Ne
best manage
regional approther environmte Governmened in land manh West region
e with ownerssure that serv
the Shire ban
e resources wRFS during fire
e with ownersnsure that sendard.
nd encourageegion.
regions in the
e to ensure m
all community Council supp
current threa
e with all areaequirements tn.
e on the redev
d implement sre.
the medical inrrabri.
rationstes Or O
use 217 (1) (
unction
s are linked toThe Central Nth and serviceew South Wale
ement of wate
roach to manamental weedsnt organisationagement thrn.
s and operatovices are prov
d to support t
within the Shiree seasons.
s and operatorvices are pro
e the Arts in th
e North West
ining integrat
y organisationport.
ats of flood to
as along the Nthat need to b
velopment of
strategies to r
ndustry to pro
, PartnOther B
(a8) of the L
o the Central Northern Regioes the commues.
er for the Nam
agement of s by liasing witns and other roughout the
rs of Australiavided at Austra
their ongoing
e to ensure Co
rs of NSW ovided at
he New Engla
to ensure safe
tes within the
ns to assist wi
o urban areas
ewell Highwabe meet for sa
the Narrabri
educe crime
ovide the best
ershipsBodies
ocal Govern
onal unities
DelegAlter
moi DelegAlter
th all
New
DelegAlter
an alian
DelegAlter
DelegAlter
ouncil DelegAlter
No derequiAssocNatio
nd DelegAlter
e DelegAlter
Deleg Alter
th Deleg
due t Deleg
ay to afety
Deleg
CBD Deleg Alter
Deleg
t DelegAlter
Page |
s, Trustin Whi
nment Regula
2014/2015(Alternate
gate: rnate:
CC
gate: rnate:
CC
gate: rnate:
CC
gate: rnate:
CC
gate: rnate:
CC
gates: rnate:
CC
elegate ired as ciation is onal.
gate: rnate:
CC
gate: rnate:
CC
gates:
rnate:
CCC
gates: CC
gates: CC
gates: CC
gates:
rnate:
CCC
gates: CC
gate: rnate:
CC
85
ts, ich
ation,
5 DelegateDelegate)
Cr ReddingCr Booby
Cr BoltonCr O’Regan
Cr O’ReganCr Tough
Cr FlowerCr Bolton
Cr ReddingCr Faber
Cr ToughCr Finlay
Cr KnoxCr Collyer
Cr FaberCr Finlay
Cr FaberCr Collyer Cr Tough
Cr ToughCr Collyer
Cr ReddingCr O’Regan
Cr FinlayCr Bolton
Cr ToughCr Redding Cr O’Regan
Cr ToughCr Faber
Cr ReddingCr Booby
N
WeeAdv
Nam
NamWor
NamUtili
AustGro
GenPerfCom
NamServ
BogCon
LilliaPrize
TarrComCom
NarCon
SantCon
The Stee
EconCom
MunCooUpg
MyaCom
FlooAsso
NarCom
Annual R
Name of CommOrganisati
e Waa Hospitaisory Commit
moi Councils
moi Councils Wrking Group
moi Councils Wities Binding A
tralian Rural Rup Inc
neral Managerformance Revmmittee
moi‐Peel Custovice Committe
gabri Coal Cosultation Com
an Hulbert Mee Committee
rawonga Coal mmunity Consmmittee
rabri Coal Minsultative Com
tos Communitsultative Com
Crossing Theering Committ
nomic Develommittee
ngindi to nabarabran Rgrade Commit
all Creek Memmmittee
odplain Managociation (FMA
rabri Australiammittee
Report 2014
mittee/ ion
al ttee
Ts
Toinpreis
Water Ta
Water Alliance
Ta
Road Tro
r’s view
Tte
omer ee
TS
mmunity mmittee
TD
emorial T
Mine ultative
TD
ne mmittee
TD
ty mmittee
Ta
atre tee
TC
opment TE
Road tee
Tc
morial T
gement A)
Tp
a Day T
/2015
To work with tervice to Wee
To pursue the organisation onformation anproject strategepresentationssues impactin
To work with Cnd rights
To work with Cnd rights
To actively wooad networks
To review the erms.
To share resouShires
To ensure thatDevelopments
To participate
To ensure thatDevelopments
To ensure thatDevelopments
To ensure thatnd can assist
To actively ideCrossing Theat
To actively ideEconomics in t
To participate ompletion
To engage with
To work towarprone areas.
To engage with
Func
the medical ine Waa.
traditional obf Councils incnd intellectuagic initiatives ans to State andng Local Gove
Councils to en
Councils to en
rk towards ths
GM performa
urces and know
t Council is aws and can assis
in the selectio
t Council is aws and can assis
t Council is aws and can assis
t Council is awas a represen
ntify the fututre
ntify the fututhe Shire
in developing
h the Myall Cr
rds reducing t
h the Myall Cr
ction
ndustry to pro
bjectives of a rluding resourl property shaand political d Federal Government in thi
nsure water pr
nsure water pr
he redevelopm
ance based on
wledge throu
ware of Boggast as a represe
on of annual r
ware of Tarrawst as a represe
ware of Narrabst as a represe
ware of Santosntative.
re developme
re developme
g this project t
reek Memoria
he impacts fo
reek Memoria
ovide the best
regional ce, aring, group
vernments onis region.
reservation
reservation
ment of rural
n contracted
gh out the
bri Coal entative
recipient.
wonga Coal entative.
bri Coal entative.
s operations
ent of The
ent of
through to
al Committee
or all flood
al Committee
Delegates
Delegate: Alternate:
Delegate:
Delegate:
Delegate: Alternate:
Delegates
Delegate: Alternate:
Delegate: Alternate:
Delegate:
Delegate: Alternates
Delegate: Alternates
DelegatesAlternate:
Delegates
Delegates
Delegates
Delegate: Alternate:
Delegate:
Delegates
Page |
2014/2015 D(Alternate De
s: CrCr
:
MGeDe
M
MDiEnSe
:
MDe
s: MDeChstaco
:
CrCr
:
CrCr
M
s:
CrCrCr
s:
CrCrCr
s: :
CrCrCr
s: CrCrCr
s: CrCr
s: CrCr
:
CrCr
MDian
s: CrCrM
86
Delegateelegate)
r Boobyr Lowder
ayoreneral Manageputy Mayor
ayor
ayorrector ngineering ervices
ayoreputy Mayor
ayor (Chair), eputy Mayor,hairs of the foanding ommittees
r O’Reganr Bolton
r Collyerr Finlay
ayor
r Collyerr Finlay r Redding
r Reddingr Knox r Flower
r Toughr Redding r Booby
r Reddingr Flower r Knox
r Toughr Faber
r Mayorr Finlay
r Reddingr Knox
ayorrector Planninnd Developme
r Toughr Knox ayor
ger
ur
ng ent
Nam
Joint RPanel (
Medica
RMS RConsul
MineraWorkin
MaulesComm
Annual Rep
me of CommitOrganisation
egional Plann(JRPP)
al Taskforce
egional tative Commi
als & Energy ng Group
s Creek Coal ittee
StatemVentuHeld A
Statement o Council had
Bush F
Bush fire ha
Service. Dur
hazard redu
217
2 ha
of p
Cou
pro
Ten
gro
Rur
Pre
1 Se
For
dam
ort 2014/20
tee/
ning To p
To rthe
ittee To b
To cregi
To eComrepr
ment Ores, SyA Contr
outlined bel
d no controlli
Fire Haz
azard reduct
ring the 2014
uction:
7 fire permits
azard reduct
private prope
uncil’s existin
one areas acr
nders have b
undwork ha
ral Fire Briga
sentations, P
ection 44 de
est area. W
mage any ass
15
process and ap
review and actShire.
be aware of R
collaborate toons.
ensure that Committee develresentative.
f All Condicaterolling I
low stated u
ing interest i
zard Re
ion within N
4/2015 Finan
s were issued
tion burns w
erty, Council
ng slashing p
ross the shire
een let on th
s commence
des conduct
Parades and
claration wa
ith quick res
sets.
Functio
pprove region
tively expand
MS activities a
ensure minin
ouncil is awareopments and
orporates Or OInteres
under Clause
n any compa
eductio
arrabri Shire
ncial Year, th
d to local lan
ere conduct
and Crown
program was
e.
he new Deep
ed.
ed over 35 C
other like ev
as made for a
ponses of br
on
nal developme
the medical s
and impacts o
ng integrates w
e of Maules C can assist as
tions, POther Bst
e 217 (1) (a7)
anies during
on Repo
e is carried o
he following
ndholders in
ed by brigad
Land being h
enhanced b
p Creek Rura
Community E
vents.
a major fire t
rigades, aircr
ents
services in
on the Shire
within he
Creek Coal a
PartnerBodies I
) of the Loca
the 2014/15
ort
ut in conjunc
activities oc
the Narrabr
des througho
hazard reduc
by RFS fundin
l Fire Brigade
Education ev
that burnt in
raft and othe
Delegates: Alternate:
Delegate:
Delegates:
Delegate:
Delegate: Alternate:
rships, In Whic
l Governme
5 financial ye
ction with th
curred in rel
i Shire.
out the Shire,
ced.
ng to allow st
e Station at t
ents, includi
the Narrabr
er personnel
Page | 87
2014/2015 D(Alternate De
CCC
CDSM
M
MGD
CC
Trusts,ch Cou
nt Regulatio
ear.
he NSW Rura
ation to bus
, resulting in
trategic slash
the Airport a
ing Shows,
ri Shire Pilliga
this inciden
Delegateelegate)
Cr ReddingCr Faber Cr O’Regan
Cr BoobyDirector CorpoServices Mayor
Mayor
MayorGeneral ManaDeputy Mayor
Cr FinlayCr Tough
, Joint ncil
on, 2005:‐
al Fire
h fire
n over 50ha
hing in fire
and the
a State
t did not
orate
ger r
Annual Rep
Human
Statement oGovernmen Workforce In June 201Integrated Pworkforce w Equal Oppo In line with section acti
Ens
Rein
Com
Ens
Ens
dev
Ens
Carer’s
Statement oRecognition Council is reresource maShire Councdecisions re
We acknow
people with
we recognis
friendly wo
Statem
Statement o
Council had
ort 2014/20
n Reso
of activities nt Regulation
Plan
3 Narrabri SPlanning andwho can deli
ortunity Emp
our Equal Emvely promot
suring policie
nforcing EEO
mmunicating
suring our re
suring Counc
velopment
suring grieva
s Recog
outlined beln Act, 2010:‐
equired to coanagement pcil is compliaegarding hum
wledge that m
hin families, d
se carers’ res
rk environm
ment of
outlined bel
d no Environm
15
urces
to implemen, 2005:‐
hire Council d Reporting. ver services
ployment
mployment Oted EEO thro
es and proce
O principles t
g EEO inform
cruitment pr
cil provides a
nce procedu
gnition
low as Counc‐
omply with tpolicies and nt with this man resource
many of care
disabled fam
sponsibilities
ent. We also
f Enviro
low stated u
mental Upgr
nt the EEO m
adopted its The Plan aimand program
Opportunity ugh a variety
dures align t
through posi
mation to new
rocess promo
ll employees
ures and poli
n Act 20
cils reportin
he Carers Reprocedures,Act and takee practices.
rs’ roles exte
mily member
s through ou
o promote th
onmen
under Section
ade Agreem
managemen
Workforce Pms to providems efficiently
(EEO) Policyy of activitie
to EEO princi
tion descript
w employees
otes Council
s with equal
cies align to
010
g requireme
ecognition Ac the significaes into accou
end beyond t
s, and those
ur carers leav
he services o
nt Upgr
n 54P of the
ments in place
t plan under
Plan as part oe Narrabri Shy and effectiv
y and Manags including:
iples and leg
tions, perfor
s as part of th
as an EEO e
access to op
EEO legislat
ents under S
ct 2010 and ant role careunt the signif
those of bein
experiencin
ve provisions
f community
ade Ag
Local Gover
e in 2014/15
r Clause 217
of the Resouhire Council wvely to the co
ement Plan t
islation
rmance appr
he orientatio
mployer
pportunities f
ion
ection 8 (2) o
to recognisers play withificant role ca
ng parents a
g such issue
s, flexible wo
y organisatio
greeme
rnment Act,
financial yea
Page | 88
(1) (a9) of t
rcing Strategwith a high pommunity.
the Human
raisals and tr
on process
for training a
of the Carer
e, through itsin our societyarers make w
nd include c
s as family v
ork practises
ons that supp
ents
1993:‐
ar.
he Local
gy for the performing
Resources
aining
and
r’s
s human y. Narrabri when making
are of elder
iolence; and
and family‐
port carers.
g
d
Annual Rep
Compa
Statement oGovernmenAct:‐
Statement oRegulation. Council lodgShire had 5 Departmen Council durat the saleyrehoused wduring the 2are broken
Expenses
Salaries
Operationa
Pound Main
TOTAL
Revenue re
Income
Impounding
Grant Comp
Sundry Inco
TOTAL
Councils pecover Coun Known probeen the sotype dogs oof owners c Council willtargeted su
ort 2014/20
anion A
outlined belnt Regulation
of activities
ged its 2014 reports of dt of Local Go
ing the 2014yards in Narrwith new ow2014/2015 fdown as foll
l Expenditur
ntenance and
ceived as a r
g Fees
panion Anim
ome
ermanent fucils compani
blem areas ource of numopportunitiesclaiming anim
be applyingbsidised des
15
Animal
low as Councn, 2005 and
relating to e
4/2015 Survedog attacks fovernment.
4/2015 finanrabri. Of thewners and reinancial yearows:‐
e (incl. vets,
d Repairs
result of the
als
ll time Rangion animal se
were targetmerous coms for rehousimals and pay
g for grant fusexing/regist
s
cils reportinGuidelines o
enforcing an
ey of Councifor the 2014/
cial year impese animals emaining anir Council spe
contractors,
pound activi
ger resignedervices over
ed where hmplaints. As ng are limiteying the asso
unding in theration and m
g requiremeon the Exerc
nd ensuring c
il Seizure of /2015 financ
pounded 231approximatimals euthanent a total of
, consumabl
ities was bro
d in early 20the remaind
igh numbersthe majorit
ed. Unfortunciated impo
e next financmicrochippin
ents under Ccise of Functi
compliance w
Cats and Docial year. Th
1 dogs in its ely 31% wernized by thef $134,509 o
es)
oken up as fo
015 necessitader of the yea
s of completty of animalsnately due tounding/regis
ial year to heg.
lause 217 (1ions Under t
with the Com
ogs report inhese attacks
existing impre returned te local veteron companio
ollows:‐
ating the usar.
te unregistes impoundedo the ease ofstration/micr
elp address t
Page | 89
1) (f) of the Lthe Compan
mpanion An
n August, 20were notifie
poundment fto their ownrinary serviceon animal act
Amount
Amount
se of contra
ered roamingd were “hunf replacemenrochipping c
this situation
Local ion Animals
imals Act an
015. Narrabed to the NSW
acility locateners, 5% were. Financialtivities. Thes
$ 55228
$ 77960
$ 1321
$134509
$ 4845
$ 9718
$ 427
$14990
ct Rangers t
g animals hanting/piggingnt the numbeosts is low.
n by providin
nd
bri W
ed re ly se
to
ad g” er
ng
Annual Rep
Off‐Leash A Off‐leash ar
NarrabrbetweenBelar StCorner) Cooma ONarrabr
Narrabri between and the Nbetween the railwa
ort 2014/20
Areas
reas are prov
ri Area 1: Then Ugoa Streereet (Coomabounded byOval and thei Showgroun
Area 2: The Maitland StNarrabri CreeViolet Streeay viaduct.
15
vided in the f
e area et and a Road y e nds.
area reet ek bank t and
following areeas:
Page | 90
Annual Rep
BoggabrEncompOval, JunField andoval. BoggabrDavid GrBoggabr
Laidlaw
Boston S
Wee Waathat is serbounded beast, Mitcand Charle
ort 2014/20
ri Area 1: passes Jubileenior League d the cricket
ri Area 2: rover Park. ri Area 3:
St between
St and Finche
: Educationaviced by Couby Church Stchell St to thees St to the w
15
e
t
es
al block uncil t to the e south west.
Page | 91
Me
MePa
Prbu
Noorgor gro
Meth(aplegrep
Meth(ot
To
Annual Rep
Gover
Statement oInformationRegulation: The Governinformationother publicagainst a derequired to Details of ththeir outcom During the rapplicationsapplicationsSchedule 1
edia
embers of arliament
ivate sector usiness
ot for profit ganisations community oups
embers of e public pplication by gal presentative)
embers of e public ther)
otal
*More than oin relation to
ort 2014/20
nment
outlined beln (Public Acc:‐
nment Informn held as recoc bodies, reqecision not toreport on al
he number omes and pro
reporting pes but not invs either whoto the GIPA
T
Access granted in full
0
0
1
0
)
2
3
6
one decision co each such de
15
Inform
low as Counccess) Act, 20
mation (Publiords by Statequest amendo grant accesll Governme
of Governmeocessing time
eriod, our agevalid applicatolly or in partAct.
Table A: Num
Access granted in part
Arei
0
0
0
0
0
0
0
can be made inecision. This a
mation
cils reportin09 and Claus
ic Access) Ace Governmements to recss to informant Informatio
nt Informaties provided i
ency receivetions). Duringt because the
mber of applic
Access efused in full
Infono
0
0
0
0
0
0
0
n respect of aalso applies to
(Public
g requiremese 7 of the G
ct, 2009 givesnt Agencies,cords of a peation or to aon (Public Ac
on (Public An the follow
ed a total of 9g the reportie informatio
cations by typ
ormation ot held
In
0
0
0
0
1
2
3
a particular aco Table B.
c Acces
ents under SGovernment
s individuals a Governmeersonal natumend persoccess) Act, 2
ccess) Act, 2ing tables.
9 formal acceing period, on requested
e of applicant
nformation already available
0
0
0
0
0
0
0
ccess applicat
ss) Act,
ection 125(1Information
the right to;ent Minister,re that are innal records. 009 Access A
009 Access A
ess applicatioour agency rewas informa
t and outcom
Refuse to deal with application
0
0
0
0
0
0
0
ion. If so, a re
Page | 92
2009
1) of Governn (Public Acc
; obtain acce, local governaccurate, aUnder this AApplications
Applications
ons (includinefused a totaation referre
me*
Refuse tconfirm/de
whetheinformatio
held
ecording must
ment cess)
ess to nment and nd appeal Act, Council i
received,
ng withdrawal of 0 accessed to in
o eny r on is
Applicawithdr
0
0
0
0
0
0
0
t be made
s
n s
ation rawn
0
0
0
0
0
0
0
Peinap
Acap(opeinap
Acapthpeinappa
R
AA
A
A
T
In
Ov
Ca
Ex
Co
Le
Ex
Do
Tr
Ad
Ca
M
Ab
Annual R
ersonal formation pplications*
ccess pplications other than ersonal formation pplications)
ccess pplications hat are partly ersonal formation pplications anartly other
Reason for inv
Application doAct)
Application is
Application co
Total number
nvalid applica
verriding secr
abinet inform
xecutive Coun
ontempt
egal professio
xcluded inform
ocuments aff
ransport safet
doption
are and prote
Ministerial cod
boriginal and
Report 2014
T
Access granted in full
0
6
nd
0
validity
oes not compl
for excluded
ontravenes res
of invalid app
ations that su
Table D
recy laws
mation
ncil informatio
onal privilege
mation
fecting law en
ty
ection of child
de of conduct
environment
/2015
able B: Numb
Access granted in part
r
0
0
0
ly with forma
information o
straint order
plications rece
bsequently b
D: Conclusive p
on
nforcement an
dren
tal heritage
ber of applicat
Access refused in full
Infono
0
0
0
Table C
al requiremen
of the agency
(section 110 o
eived
ecame valid a
presumption
matters liste
nd public safe
tions by type
ormation ot held
In
0
3
0
C: Invalid app
nts (section 41
y (section 43 o
of the Act)
applications
of overriding
ed in Schedule
ety
of applicatio
nformation already available
0
0
0
lications
1 of the
of the Act)
g public intere
e 1 of the Act
N
n and outcom
Refuse to deal with application
0
0
0
Num
est against dis
Number of tim
Page |
me
Refuse to confirm/den
whether information
is held
mber of applic
sclosure:
mes considera
93
ny
n
Applicatiwithdraw
0
0
0
cations
ation used*
ion wn
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Annu
*More
conside
Responsible
Law enforce
Individual r
Business int
Environmen
Secrecy pro
Exempt doclegislation
Decided wiextensions
Decided aft
Not decide
Tab
Internal rev
Review by I
Internal rev
Review by A
*The In
to the
origina
Application
Applicationapplication
ual Report 20
than one public i
eration is to be re
e and effectiv
ement and se
rights, judicial
terests of age
nt, culture, ec
ovisions
cuments unde
ithin the statu)
ter 35 days (b
ed within time
ble G: Number
view
Information C
view followin
ADT
nformation Com
original decisio
al decision has
Table
ns by access a
ns by persons relates (see s
014/2015
interest considera
ecorded (but only
Table E: Oth
ma
ve governmen
ecurity
l processes an
encies and oth
conomy and g
er interstate F
utory timefra
by agreement
e (deemed ref
r of applicatio
Commissioner
g recommend
mmissioner doe
on‐maker. The d
been made.
H: Applicatio
pplicants
to whom infosection 54 of
ation may apply i
y once per applica
her public inte
atters listed in
nt
nd natural jus
her persons
general matte
Freedom of In
Tab
me (20 days p
t with applica
fusal)
ons reviewed
r*
dation under
es not have the
data in this case
ons for review
ormation the the Act)
in relation to a pa
ation). This also a
erest consider
n table to sect
stice
ers
nformation
ble F: Timelin
plus any
nt)
To
under Part 5
section 93 of
authority to va
e indicates that
w under Part 5
subject of ac
articular access a
applies in relation
rations agains
tion 14 of the
Numb
ness
otal
of the Act (by
Dev
Act
Total
ary decisions, b
t a recommend
5 of the Act (b
N
cess
application and, if
to Table E.
st disclosure:
Act
ber of occasiosu
Number o
y type of revie
ecision varied
Decuph
0
0
0
0
0
ut can make rec
dation to vary or
by type of app
Number of ap
Pag
f so, each such
ons when appccessful
of application
ew and outco
ision held
0
0
0
0
0
ecommendation
r uphold the
plicant)
pplications for
e | 94
lication not
0
0
0
0
0
0
0
ns
9
0
0
9
ome)
Total
0
0
0
0
0
n
r review
0
0
Annu
Env
StateEnvir Particforce Narradurin NarraCoal
NarraWhite
NarraWhite
Narra
Conc
of:
ual Report 20
vironm
ement outlinronmental P
culars of come during the y
abri Shire Cong the 2014/
abri Shire CoPty Ltd for th
4.3 millio
associate
abri Shire Coehaven Coal
$1.5 milli
Therribri
$1 million
$200,000
$68,750 f
$500,000
abri Shire Coehaven Coal
$400,000
abri Shire Co
rete and Lan
$1.12 perof part of
$0.20 perthe ongo
014/2015
mental P
ned below aslanning and
mpliance wityear.
ouncil has fou15 financial y
ouncil has a Phe provision
on for the rep
ed road work
ouncil has a P (Maules Cre
on for the u
Road and Ta
n for the upg
0 for projects
for the Maul
0 for Narrabr
ouncil has a P (Tarrawong
0 to construc
ouncil has a P
ndscape Supp
r tonne of prf Wave Hill R
r tonne of pring maintena
Plannin
s Councils reAssessment
h effect of p
ur Planning Ayear.
Planning Agreof
placement of
ks.
Planning Agreeek) for the p
pgrade of inf
arrioro Bridg
grade of Narr
s in Boggabri
es Creek com
ri CBD upgrad
Planning Agrea Extension)
ct and seal ro
Planning Agre
plies Pty Lim
roduct for CRoad
roduct for Coance of Wav
ng and
eporting requt Act, 1979:‐
lanning agre
Agreements
eement with
f Harparary
eement withprovision of
frastructure
ge.
rabri Airport
i and surroun
mmunity.
des.
eement with) for the prov
oads around
eement with
ited for the
ouncil Work
ouncil Worksve Hill Road.
Assess
uirements u
eements in
in place
h Boggabri
Bridge and
h
including
t.
nds.
h vision of
the mine.
h Johnstone
provision
s upgrading
s towards
sment A
nder Section
Pag
Act 197
n 93G(5) of t
e | 95
79
the