A Review of the 4 th and the 8 th development plans With literature review about development plans failures

A Review of the 4 th and the 8 th development plans

Embed Size (px)

DESCRIPTION

A Review of the 4 th and the 8 th development plans. With literature review about development plans failures. Outline. Introduction Background 4 th Development Plan Objectives Challenges 8 th Development Plan Objectives Analysis Why do plans fail ? - PowerPoint PPT Presentation

Citation preview

A Review of the 4th and the 8th development plansWith literature review about development plans failures

Outline• Introduction

▫ Background• 4th Development Plan• Objectives• Challenges

• 8th Development Plan• Objectives

• Analysis▫ Why do plans fail ?

• How to achieve those plans (recommendations)

Introduction• Saudi National development plans are master

plans made by the ministry of economy and planning on an implementation period of 5 years .

• They cover different aspects including: Economy, Housing, Education, Transportation, Infrastructure, Education and other aspects.

Introduction

•The kingdom first established a planning agency in 1958.

•In 1965 planning was formalized in the Central Planning Organization

•In 1975 the planning organization became the ministry of planning.

•Which was later transferred to the ministry of economy and planning.

4th Development Plan

•Objectives•Challenges

4th Development Plan

•It took place from 1985 until 1990

•The 4th development plan included new objectives that weren't in the 3rd plan.

4th Development Plan

•Objectives:▫Decrease of reliance on oil as the only

income ▫Creating a more diversified economy by

focusing on Agricultural and Industrial activities.

▫Completion of developing the infrastructure of the country.

▫To develop mineral resources

4th Development Plan

•The 4th development plan faced some challenges in implementation:▫Due to Decrease in the price of oil .▫Which decreased the oil income of the

kingdom to 1/3rd

▫Which cause a fall in the expenditures▫Also the fluctuations in the private sector

8th Development Plan•Objectives•Challenges

8th Development Plan

•The eighth development plan came in with a new vision

•It was designed to satisfy economical developments the country is going through

•On of the main challenges was the kingdom joining the world trade organization.

8th Development Plan

•The plan was developed under the demand for a rise the level of services.

•One of the new objectives addressed in this development plan was women rights

8th Development Plan• Main Goals and Objectives:

▫ To improve the living quality by accelerating the development process.

▫ To diversify the economy

▫ To improve national economy and prepare it to change.

▫ To enhance private sectors participation.

▫ To achieve balance in development throughout the kingdom

▫ To protect the environment and insure a sustainable development.

Why do plans fail ?

•Not having the proper policies to guide the implementation process.

•Weak institutional frame work .

•Lack of coordination .

•Inadequate awareness programs

Why do plans fail ?

•Lack of provision on the implementation tools

•Insufficient funding which leads to delay in some projects.

•Externalities ( private sectors)

How to achieve those plans

•By Rationalizing the institutional framework.

•Streamlining legal provision to the nature of the plan

•Developing institutionalized coordination mechanism.

How to achieve those plans• Adoption of a strategy to prioritize the proposal

and implementation framework.

• Revising the laws and policies of implementation.

• Choosing the appropriate time-frame to work within.

• And finally meeting those work-frames on the right time-frame to reach implementation.