18
AIA Final Rules Submission of Certified Foreign Priority Documents and Translations Under the AIA March 20, 2013

AIA Foreign Priority Presentation Mar-20-2013

Embed Size (px)

DESCRIPTION

 

Citation preview

  • 1. AIA Final Rules Submission of Certified Foreign PriorityDocuments and Translations Under the AIA March 20, 2013

2. Foreign Priority Documents 3. Foreign Priority Documents- Pre-AIA (Old) Certified Copy of Foreign Priority Document Needed to be filed before patent issued Filed after payment of issue fee- pay additionalfee No foreign priority claim on face of patent Required Certificate of Correction to show foreign priority Patent Document Exchange (PDX) program USPTO would automatically pull copy from participating foreign patent offices 4. Foreign Priority Documents- Pre-AIA (Old) Translation of Non-English Foreign PriorityDocument Generally, not required BUT, could be required by USPTO- e.g.,intervening prior art, interference, etc. 5. Certified Foreign Priority Doc.- Old TimingCertifiedForeignFeePriorityDoc.Filed Paid IssuedApplication Issue Fee 6. Foreign Priority Documents- AIA (New) Certified Copy of Foreign Priority DocumentNeeds to be filed within the later of: 4 Months from Actual Filing Date OR 16 Months from Foreign Filing Priority DateSee, 37 CFR 1.55(f)Note: For the examples, the slides will generallyidentify the 4 Month deadline for the sake ofbrevity. 7. Certified Foreign Priority Doc.- AIA TimingCertifiedForeignPriorityDoc. Filed Paid Issued4 Months(or 16 frompriority date)ApplicationIssueFee 8. Foreign Priority Documents- AIA (New) Exception 1- Do not need to submit certifiedcopy within 4/16 month deadline Foreign Priority Application in PDX ParticipatingPatent Office Originally filed there, OR Copy of foreign priority document filed there; AND USPTO Receives Before Patent is Granted Copy of the foreign priority application from the PDX Patent Office, OR Certified copy of foreign priority document. Current PDX Offices- EPO, JPO, KIPO, &WIPO 9. Foreign Priority Documents- AIA (New) Foreign Priority Application in PDXParticipating Patent Office Request normally not required because USPTOwill automatically request based on ADS Exception: need separate Request to Retrieve(PTO/SB/38) where foreign priority application not originally filed in PDX participating Patent Office, but a copy was later filed in a PDX participating Patent Office USPTO cant electronically retrieve DesignPatent Applications PCT applications- limited receiving offices Denmark, Finland, IB, and Sweden. 10. CertifiedCertified Foreign Priority Doc.- AIA Timing Foreign Patent Document Sure! PriorityPleaseExchange Doc. SendFiledFiled IssuedADS4 MonthsADSPriority ApplicationApp. 11. Certified Foreign Priority Doc.- AIA Timing Huh?Certified Patent DocumentZZZZForeign Exchange Priority Doc.FiledFiledIssued ADS4 Months ADSPriority ApplicationApp. 12. Foreign Priority Documents- AIA (New) Exception 2- Do not need to submit certifiedcopy within 4/16 month deadline File interim copy of original foreign applicationwithin 4/16 month deadline period, AND File certified copy before patent is granted.Note: To use interim copy exception, norequirement that applicant is unable to obtain acertified copy. Submission Need to clearly label Interim Copy Need Cover Sheet listing applicationno., country, filing date, and statement that thecopy filed is a true copy of the originalapplication as filed in the foreign country. p. 29. 13. Certified Foreign Priority Doc.- AIA Timing Oui, butOkay, send Certifiedneed more Interim Copy Sendwhat you Foreigntime!filed.CertifiedCopy Priority Doc.Filed FiledIssuedADS4 MonthsADSPriority ApplicationApp. 14. Foreign Priority Documents- AIA (New) Late Submission of Certified Copy 37 CFR 1.55(f) Requirements- before payment of Issue Fee Certified copy of foreign priority document Petition- good and sufficient cause lower standard than extraordinary situation Fee under 37 CFR 1.17(g)- $200 lower fee than $400 fee in 37 CFR 1.17(f) Requirements- after payment of Issue Fee Same as above Processing fee under 37 CFR 1.17(i) Need Certificate of Correction to add priority patent issued without priority claim 15. Certified Foreign Priority Doc.- AIA Timing Certified OOPS!Foreign ProcessingFeePriority Fee Petition Doc. FiledPaid IssuedFiled ADS 4 Months ADSPriority ApplicationApp. Issue Fee 16. Foreign Priority Documents- AIA (New) USPTO May Require Earlier Submission Interference Overcome date of reference cited by examiner Deemed necessary by examiner English Language Translation of ForeignPriority Documents Not in English Interference Overcome date of reference cited by examiner Required by examiner Requires statement that translation is accurate 17. More Information and Questions Contact: Chuck SchmalPhone: (317) 713-4954Email: [email protected] 18. AIA Final Rules Submission of Certified Foreign PriorityDocuments and Translations Under the AIA March 20, 2013 2013 Woodard, Emhardt, Moriarty, McNett & Henry LLP