Upload
virgil-magnus-lindsey
View
219
Download
1
Tags:
Embed Size (px)
Citation preview
An Introduction to
PPP in Infrastructure Resource Center for Contracts, Laws and Regulation (PPPIRC)
www.worldbank.org/ppp
Sara SigristLegal Program Manager, PPPIRCFinance, Private Sector Development & InfrastructureLegal Vice Presidency
2
The PPP Infrastructure Resource Center
A web-based knowledge management tool, jointly funded by the World Bank and the Public-Private Infrastructure Advisory Facility (PPIAF), designed to provide guidance on legal and contractual issues relating to infrastructure projects
Includes practice notes and checklists, together with sample agreements and clauses, sample legislation and regulatory instruments, and sample terms of reference for appointing advisors
There are links to websites and materials produced by government agencies and PPP units from around the world, such as standardized bidding documents
The website includes documents in English, French, Spanish, Portuguese, Arabic and in the near future Mandarin Chinese
Material is sourced from Bank-funded projects, as well as publicly available documentation
3
The PPP Infrastructure Resource Center
The website is designed to take users through the project development process, starting with Government Objectives, then moving on to Legal and Regulatory Frameworks, and then Agreements.
4
The PPP Infrastructure Resource Center
5
The PPP Infrastructure Resource Center
6
Checklist of Issues for ToRs and Agreements with Advisors
The website contains a general checklist of issues to be considered when drafting Terms of Reference for transaction advisors, and for entering into Agreements with those advisers
7
The PPP Infrastructure Resource Center
8
The PPP Infrastructure Resource Center
Agreements posted on the website are intended as samples and NOT models.
Agreements that are not already in the public domain have been ‘sanitized’ to preserve confidentiality.
The sample agreements have been annotated to indicate provisions that are noteworthy, unusual, or applicable only in special circumstances.
Each model agreement is accompanied by a summary.
9
The PPP Infrastructure Resource Center
10
The PPPIRC Addresses and Contacts
www.worldbank.org/ppp• Task Team Leader: Mark M. Moseley
• Senior Counsel, David SatolaICT: [email protected]
• Legal Project Manager: Sara Sigrist [email protected]