    A PROJECT ON

    ANALYSIS OF THE POWER

    (ELECTRICITY) SECTOR

    IN PARTIAL FULFILLMENT OF THE REQUIREMENTS

    OF THE MASTER OF MANAGEMENT STUDIES (M.M.S.)DEGREE COURSE 2003-2005

    Submitted to

    PROJECT GUIDE

    Prof. (Ms) Ranjani

    By:

    MR. MEHERWAN KOTWAL

    M.M.S. FINANCE

    ROLL NO. 25

    K.J. SOMAIYA INSTITUTE OF MANAGEMENT STUDIES

    AND RESEARCH

    VIDYAVIHAR MUMBAI

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    2/57

    UNIVERSITY OF MUMBAI

    CERTIFICATE

    This is to certify that the project titled Analysis of the Power (Electricity

    Sector been submitted by Mr. Meherwan Kotwal, Roll No. 25, towards

    partial fulfillment of the requirements of the Master of Management

    (M.M.S.) degree course 2003-2005, has been carried out by her under

    the guidance of Prof. Ranjani, at the K.J. Somaiya Institute of

    Management Studies and Research, Mumbai 400 077, affiliated to the

    University of Mumbai.

    The matter presented in this report has not been submitted for any other purpose in this institute.

    Prof. Ranjani,

    Project Guide,

    K.J. Somaiya Institute of Management Studies and Research, Mumbai.

    15th of March 2005

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    3/57

    ACKNOWLEDGEMENTS

    I would sincerely like to thank my project guide, Prof. Ranjani for her

    valuable support, guidance and encouragement given to me during the

    course of this project.

    I am grateful to the library staff of the institute for their timely co-operation.

    I also thank the administrative staff members for providing help at various

    stages.

    I extend my heartfelt gratitude to my colleagues and other good wishers who

    contributed towards the successful completion of my project work

    Dated: March 15th 2005 Meherwan Kotwal

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    4/57

    EXECUTIVE SUMMARY

    The Power Sector in India presently experiences a deficit in the supply of electricity.

    Even the per capital consumption in India is much lower than the rest of the world.

    The Power Sector is looking ahead to exciting times after being in the stronghold of the

    Public Sector since independence.

    The Report adopts a top-down approach while dealing with the power sector. It starts off

    with the international power consumption patterns, then narrows it down to the domestic

    power scenario and finally focuses on individual companies in the domestic electricity

    generation, transmission and distribution arena.

    The Report also pays emphasis on the newly introduced Electricity Act in the year 2003

    and examines its positive implications on the entire industry.

    Issues critical and peculiar to the Indian Power Scenario are also looked into and

    explained.

    The report also tries to envisage the future of the power sector and specifies the reasons

    why the sector as such would look attractive for investments.

    Finally a closer inspection of 3 of the leading power companies in the country is carried

    out and their financial performance is examined.

    4

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    5/57

    INDEX

    The International Energy Consumption Patterns 6

    The International Coal Scenario 8The International Hydro Power Scenario 10

    International Nuclear Energy Scenario 11

    Indias Commercial Energy Consumption 12Indias Electricity Scenario 13

    Power Generation

    Indias Current Situation with respect to Coal 15Indias Thermal Energy Scenario 17

    Indias Hydel and Renewable Energy Scenario 19Nuclear Power in India 21

    Power Transmission 22

    Power Trading 24

    Power Distribution 26

    Electricity Act 2003 27

    Important Issues Relating to the Power Sector

    Pricing 31

    Tri-partite Agreement 34

    Transmission and Distribution Losses 35Open Access 36

    Captive Consumption 37

    The Future of the Power Sector 38

    Why does the Power Sector in India look attractive 40

    Company Study

    NTPC 43

    Tata Power 48Reliance Energy 52

    Bibliography 56

    5

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    6/57

    The International Energy Consumption Patterns

    The worlds total Primary Energy Consumption has shown a compounded average growth rate

    (CAGR) of 2.5% over the last 35 years. The forms of energy include coal, oil, gas, nuclear

    power, hydro and other renewable resources. If we also take into account the increase in

    population over the abovementioned time period then we see that there has been a per capita

    CAGR of around 0.7%.

    The worlds current energy mix is given below:

    The International Energy Mix

    Coal

    24%

    Oil

    39%

    Gas

    22%

    Nuclear

    7%

    Hydro

    7%

    Renewables

    1%

    6

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    7/57

    It is interesting to note that the fossil fuels i.e. hydrocarbons and coal account for 85% of the

    total energy consumed.

    The fastest growth rate in energy consumption has been seen in the Middle East followed by the

    Asia-Pacific region (excluding Japan) over the last 35 years. Eastern Europe and Russia have

    seen a negative growth rate of around 3.5% over the last 15 years due to political turmoil and

    economic changes.

    Going into the future we shall see coal maintaining its current share of the energy mix and once

    the oil and gas stocks start depleting its share could go up to 33%. This is because by the coal

    gasification and liquefaction technologies would be well developed. Given the limited fossil fuel

    resources it is expected that the share of renewable sources of energy will go upto 23% as a

    results of new discoveries and development of alternative processes for generating energy.

    7

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    8/57

    THE INTERNATIONAL COAL SCENARIO

    Coal has been one of the oldest inputs for energy production as well as for the manufacture of

    iron and steel. With the oil shocks of the 1970s coal once again started gaining its lost glory and

    retained its position as an important source of energy supply especially for power generation.

    At the turn of the century coal accounts for about 24% of the worlds Commercial Energy

    consumption. The coal consumption in the year 2004 was around 5000 tons. The share of the

    Asia-Pacific region (including Japan) was around 44% of the international consumption of coal.

    China is the worlds largest consumer of coal with a consumption of over 1100 million tons

    which accounts for nearly 22% of the total international consumption. In the 2nd place came the

    United States of America which consumed around 1050 million tons of coal or roughly 21%.

    The third largest consumer of coal in the world is India that accounts for a consumption of

    roughly 360 million tones representing 7% of in international consumption.

    8

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    9/57

    The consumption of coal has gone down drastically in the European regions because natural gas

    has substituted domestic coal in the energy mix of these countries.

    Over the next two decades, coals share of global primary energy consumption is expected to

    decline to about 22% by 2020 after which there shall be a renewed emphasis and greater

    consumption of coal.

    Following are some of the countries that account for a majority of the coal reserves in the world:

    rank country

    anthracite &

    bitumous

    sub-bitumous &

    lignite total

    percent of

    total

    1. USA 115,891 134,103 249,994 25.39%

    2. RussianFederation

    49,088 107,922 157,010 15.95%

    3. China 62,200 52,300 114,500 11.63%

    4. India 82,396 2,000 84,396 8.57%

    5. Australia 42,550 39,540 82,090 8.34%

    At the end of the year 2003 the total international coal reserves stood at around 985 billion tons.

    The reserves to production ratio of coal is around 216 years making it one of the most reliable

    and abundant energy sources in the world.

    For the Asia-Pacific region especially for India and China large increase in coal consumption is

    forecasted. This is because these economies not only have large exploitable coal reserves but are

    also on the fast track and are showing phenomenal industrial and GDP growth. These economies

    9

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    10/57

    are expected to keep growing at the same pace for atleast a few more years that would put great

    pressure on the energy resources and thus would culminate into an increased usage of coal to

    supply the industries with more and more power. Japan would continue to import coal and more

    that 50% of its coal consumed would be utilized by the countrys steel industry.

    THE INTERNATIONAL HYDROPOWER SCENARIO

    The worlds theoretical hydropower potential is estimated to be around 40000 Tera Watt hours,

    the technical potential at around 14000 Tera Watt hours and the economic potential at around

    8000 Tera Watt hours. As against this only one third of the economic potential has yet been

    developed. The US and Western Europe has estimated to have already developed 76% and 65%

    of their potential. However in regions like Africa and Asia less than 20% of the potential is in

    use today.

    The worlds installed hydro capacity stands at around 700 GW. The largest producers of hydro-

    electricity in the world are Canada, US, Brazil, China and Russia

    Hydropower has cerain advantages, the principle among them being the ability to start and stop

    quickly and instantaneous load acceptance and rejection. The other benefits offered by

    hydropower plants are the long life of the plant, the renewable nature of the of the energy source,

    very low operating and maintenance costs and absence of inflationary pressures experienced by

    fossil fuels.

    10

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    11/57

    Worldwide about 125 GW of hydro capacity is under construction bulk of which is in the

    developing countries.

    INTERNATIONAL NUCLEAR ENERGY SCENARARIO

    Nuclear Energy has seen a phenomenal growth from just 12 GW capacity in the year 1960 to

    around 349 GW at the turn of this century accounting for around 12% of the worldwide capacity

    and around 16% of the generation.

    Following table summarizes the international nuclear energy situation:

    Particulars

    Number of generating countries 31

    Number of nuclear units in operation 434

    Nuclear Capacity 349 GW

    Nuclear Energy Generation 2407 TWh

    Nuclear Energy Share in Generation 16%

    Uranium Requirements 60000 tons

    Nuclear energy has help economies engaged in its production to achieve Energy Security and

    helped them reduce their CO2 emissions since it is a carbon free energy resource.

    However there are concerns about the safety of using such a resource for energy production

    because of a few disasters that have occurred while nuclear power has been generated.

    The following countries are the largest generators of nuclear power in the world today.

    11

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    12/57

    Name of Country Billion KWh

    USA 769

    France 401

    Japan 322

    Germany 162

    Russia 125

    INDIAS COMMERCIAL ENERGY CONSUMPTION

    The Following table given below summarizes the current consumption patterns within our

    country:

    315 Million Tons of Oil Equivalent

    OIL

    COAL

    NUCLEAR

    NATURAL GAS

    HYDRO / RENEWABLES

    Thus we see that India depends for around 93% of its energy consumption on hydrocarbons viz.

    oil, coal and natural gas. With the discovery of gas its proportion in the pie shall slowly move up.

    12

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    13/57

    But India has got a vast pool of unutilized renewable sources of energy that needs to be exploited

    further for better energy security and sustainable development.

    INDIAS ELECTRICITY SCENARIO

    There had been a complete shift in the ownership of utility companies since independence. At the

    time of independence private sector utilities and licenses provided over 80% of the total

    electricity supply in India. However after independence there was a gradual reversal of

    ownership. State Electricity Boards took over most private licensees when their licenses expirted

    and after 1956 no new licneses were granted. In the same year the government decided that the

    generation and transmission of electricity would be reserved exclusively for the public sector.

    The total generation capacity available to the grid was 112,058 MW as on 31st March 2004

    consisting of 31,370 MW hydro, 77,968 MW thermal, 2,720 MW nuclear and 1,617 MW wind.

    Of the total capacity the SEBs own 57% of the total installed capacity, while the private and

    the central sector own 8% and 35% respectively.

    13

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    14/57

    The following chart illustrates the current breakup of electricity generation in the country.

    The electricity consumption has grown at an average rate of 7.0% (CAGR) during the period

    1970-2002. However the growth has been uneven among the various consumer categories.

    The share of domestic and agricultural sectors in the total sales increased from

    19% in 1970-71 to nearly 50% in 2001-02 while that of industry declined from over 68% to

    about 29% during the corresponding period.

    The per capita electricity consumption increased from 178 kWh in 1985-86 to 355 kWh in 1999-

    2000 i.e. an increase of about 5.1% per annum. The regional share of power consumption has

    also changed marginally, the western region leads in power consumption with a 35% share in

    1999-2000 from 29% in 1980-81, followed by the Northern region .

    14

    HYDRO

    27%

    THERMAL

    70%

    WIND

    1%

    NUCLEAR

    2%

    HYDRO

    THERMAL

    WIND

    NUCLEAR

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    15/57

    The fastest growth in power consumption has taken place in agriculture. This is mainly because

    of the increased use of irrigation pump sets. Also the government has been laying stress on rural

    electrification and as a result of this there has been a substantial increase in demand for

    electricity for agriculture.

    The Electricity Sector in India can be distinctively divided on the basis of the stages of the

    electricity cycle into the following categories:

    A] GENERATION

    B] TRANSMISSION

    C] DISTRIBUTION

    Let us take a look at GENERATION first.

    INDIAS CURRENT SITUATION WITH RESPECT TO COAL

    Commercial coal mining in India has a history that spans beyond 2 centuries. At the beginning of

    the first 5-year Plan the coal production was 33 million tons and as time progressed this limited

    production proved to be inadequate for meeting the needs of the growing demand. The

    government was of the view that since this industry was highly capital intensive adequate finance

    was not coming from the private sector. Besides the mining practices adopted by the mine

    owners and the working conditions that were offered to the labourers were highly sub-optimal.

    On account of this the government decided to nationalize the private coalmines. The

    nationalization was done in two phases, the first with the coking coal mines in 1971-72 and then

    15

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    16/57

    with the non-coking coal mines in the year 1973. In 1975 the nationalized coal industry was

    brought under the aegis of Coal India Limited. The government had passed an order not allowing

    private players to mine coal unless if it were for captive plants for iron and steel industry.

    Coal is the most abundant energy resource available in India and hence has found maximum use

    in whichever industry in which it can be used as an alternative.

    Following are some macro facts about coal in India:

    Reserves -- 220 billion tons

    Proven Reserves -- 80 billion tons

    Current Consumption -- 335 million tons/year

    In India more than 2/3rds of coal consumption is taken up by the Power (Electricity) Sector and a

    majority of the remaining part gets taken up by sectors such as steel and cement.

    The coal reserves are mainly concentrated in the eastern parts of the country. The following are

    the states accounting for the largest coal reserves in the nation.

    State Total Reserves Percentage of Total

    Jharkhand 69175 million tons 31%

    Orissa 51571 million tons 23%

    Madhya Pradesh 49543 million tons 22%West Bengal 25919 million tons 12%

    Out of the 220 billion tons of reserves 190 billion tons are of the non-coking type.

    16

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    17/57

    The lignite reserves are currently place at around 35 million tons most of which occur in Tamil

    Nadu. Other states where lignite reserves are found are Rajasthan, Gujarat, Kerela, Jammu and

    Kahmir and Union Territory of Pondicherry.

    India today is the 3rd largest producer of coal in the world just behind USA and China.

    Till the year 1978 India was self-sufficient with respect to coal. But from the year 1979 the

    country has started importing coal and today imports about 22 million tones. The imports have

    increased because as per the current import policy coal can be freely imported under Open

    License. Coking coal is imported by domestic companies such as SAIL to improve quality of the

    overall blend due to technological reasons.

    Power Sector today is the single largest user of coal. Its share in coal consumption has gone up

    from 24% at the beginning of the 1970s to over 70% at the present moment. The share of the

    power sector in this regard is expected to grow further in the times to come.

    The working group on Coal and Lignite for the formulation of the 10 th 5-Year plan has assessed

    the countrys demand in 2006-07 will be around 453 million tones. As against this the production

    will be around 405 million tones and the balance shall need to be imported.

    INDIAS THERMAL ENERGY SCENARIO

    India gets majority of its electricity requirements from this source due to the abundance of coal

    as a natural resource in the country. Though the thermal energy sector accounts for 36% of the

    17

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    18/57

    capacity utilization it accounts for 39% of the power generated. This is on account of the higher

    operating efficiencies that it enjoys.

    The following chart depicts the shares of the current major players in the thermal electricity

    generation field:

    Capacity(MW) % Share

    Electricity Generation(GwH) % Share

    Central 27629 36 182887 39.2

    State 40849 53.3 237432 50.9

    Private 8191 10.7 46229 9.9

    Total 28925.2 100 466618 100

    Amongst the Central Utilities NTPC has got the largest share accounting for a production of

    close to 85% of the centers share of thermal power generation. Besides NTPC, there are other

    central power generating authorities such as Neyveli Lignite, NEEPCO that account for the

    balance production of the center.

    Amongst the private Sector the largest thermal power generating company is Tata Power which

    accounts for around 9300 GWh of electricity production. It is followed by Calcutta Electricity

    Supply Company (6685 GWh) and Reliance Energy (6555 GWh).

    The installed capacities of these 3 largest players are as follows:

    Tata Power -- 1411 MW

    CESC -- 1065 MW

    Reliance Energy -- 894 MW

    18

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    19/57

    INDIAS HYDRO AND RENEWABLES ENERGY SCENARIO

    India seems to be ignoring the potential energy that can be generated via renewable energy

    sources even though it has a separate ministry dealing with new and renewable energy sources.

    The following table will illustrate the current situation:

    Potential Achievement

    Biogas Plants 120 lakh 32.75 lakh

    Wind 45000 MW 1507 MW

    Solar Energy 20 MW / sq. km 82 MWWaste to Energy 1700 MW 17.1 MW

    Solar Water Heating 1400 lakh sq. m 600000 lakh sq. m

    19

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    20/57

    Indias current capacity from renewables (other than Hydro) stands at about 3400 MW or over

    3% of the energy generated in the country. For the year 2012 a target of 10000 MW of power

    from renewables has been envision by the countrys policy planners.

    As far as hydro-electricity generation goes the share of the total pie has gone down over the last

    25 years. A lot of unexplored potential lies in generating power in this manner. The total

    potential is summarized as under.

    Basins / Rivers Potential Load at 60% Load Factor (MW)

    Indus 19988Ganga 10715

    Central Indian Rivers 2740

    West-flowing rivers 6149

    East-flowing rivers 9532

    Bhramaputra 34920

    The total potential at 60% plant load factor is estimated to be around 84,044 MW. Thus this will

    require an installed capacity of 148,701 MW. The cost of developing this untapped potential in

    the country has been estimated to be about Rs 5,00,000 crores at current price levels.

    The Ministry of Power has taken several measures like higher budgetary allocation, improving

    tariff dispensation and so on as the actual installed capacity is only about 15000 MW in the

    country. Another 6000 MW of hydel power is under development.

    The following are the market shares of the respective players vis--vis hydro-electricity:

    Capacity

    (MW) % Share

    Electricity Generation

    (GwH) % Share

    Central 7754 26.8 26114 35.5

    State 20294 70.2 44678 60.5

    Private 877.2 3 2974 4

    Total 28925.2 100 73796 100

    20

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    21/57

    NHPC is the largest hydro power generating corporation in the country. With

    a total installed based of 2175 MW, the corporation has eight operational projects located in

    the northern, eastern and northeastern regions of the country. The company aims to add

    4357 MW by 2007 and 14,432 MW by the end of the eleventh plan period.

    NUCLEAR POWER IN INDIA

    India at present has 14 nuclear power plants with a total installed capacity of 2720 MW. Nuclear

    Power Corporation of India, a wholly owned enterprise of the Government of India operates

    these plants. India has sufficient Uranium reserves to support a program of 10000MW power

    generation based on Pressurised Heavy Water Reactors.

    The Department of Atomic Energy plans to ramp up the installed capacity of nuclear power

    within the country to 20000MW by the year 2020. For this purpose energy would have to be

    generated using plutonium first. In the next step Uranium 233 would have to be extracted from

    Thorium to achieve the energy production targets. India has vast reserves of Thorium and these

    should come in handy to the Department of Atomic Energy.

    The following table below summarizes Indias Current Nuclear Power Generating Capacity

    Plant No. of Plants Total Capacity

    Tarapur 2 320

    Rawatbhata 4 740

    Kalpakkam 2 340

    Narora 2 440

    21

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    22/57

    Karkrapara 2 440

    Kaiga 2 440

    TOTAL 14 2720

    New capacity in nuclear power is also coming up as under:

    Location No. of Plants Total Capacity

    Tarapur 2 1080

    Kaiga 2 440

    Rajasthan 2 440

    Kundankulam 2 2000

    TOTAL 8 3960

    POWER TRANSMISSION

    The Regional Power Grids in North, West, South, East and North-East have been established for

    optimum utilization of the unevenly distributed resources in the country by facilitating inter-

    regional and intra-regional power exchanges.

    Power Grid Corporation of India limited (PGCIL) was incorporated on October 23, 1989 as a

    public limited company, wholly owned by the Government of India. PGCIL started functioning

    on management basis with effect from August, 1991 and it took over transmission assets from

    NTPC, NHPC, NEEPCO and other Central/Joint Sector Organisations during 1992-93 in a

    phased manner. In addition to this, it also took over the operation of existing Regional Load

    Despatch Centres from CEA in a phased manner, which are now being upgraded with State of-

    the-art Unified Load Despatch and Communication (ULDC) schemes. According to its mandate,

    the Corporation, apart from providing transmission system for evacuation of central sector

    power, is also responsible for Establishment and Operation of Regional and National Power

    22

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    23/57

    Grids to facilitate transfer of power within and across the Regions with Reliability, Security and

    Economy on sound commercial principles. Currently, it owns majority of inter state transmission

    assets.

    Private investment has been allowed in power transmission either through 100% equity or

    joint venture with PGCIL. In case of latter, the PGCIL will hold only 26% stake and the rest

    would be held by private party.

    Based on envisaged generation capacity addition program, it is expected that Eastern and North-

    Eastern regions would be a major source of additional power over the next decade and North,

    West and Sourth regions would be the major recipients of this power. To cope up transmission

    capacity is expected to reach 30000 MW by 2012.

    Name of Link Capacity

    HVDC LINKS

    Vidyanchal 500

    Chandrapur 1000

    Gazukawa 500

    AC LINKS

    Balimela-Seleru 200

    Kolhapur-Belgaum 300Seleru-Burgur 100

    Karmnasa-Sahupur 200

    Biharsharrif-Sarnath 500

    Bipora-Sulakoti 100

    Auraiya-Malanpur 200

    Bongaigaon-Malda 800

    Kobra-Buddhipadar 450

    TOTAL 4850

    23

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    24/57

    POWER TRADING

    Power trading inherently means a transaction where the price of power is negotiable and options

    exist about whom to trade with and for what quantum.In India, power trading is in an evolving

    stage and the volumes of exchange are not huge. All ultimate consumers of electricity are largely

    served by their respective State Electricity Boards or their successor entities, Power

    Departments, private licencees etc. and their relationship is primarily that of captive customers

    versus monopoly suppliers. In India, the generators of electricity like Central Generating Stations

    (CGSs), Independent Power Producers (IPPs) and State Electricity Boards (SEBs) have all their

    capacities tied up. Each SEB has an allocated share in central sector/ jointly owned projects and

    is expected to draw its share without much say about the price. In other words, the suppliers of

    electricity have little choice about whom to sell the power and the buyers have no choice about

    whom to purchase their power from.

    India being a predominantly agrarian economy, power demand is seasonal, weather sensitive and

    there exists substantial difference in demand of power during different hours of the day with

    variations during peak hours and off peak hours. Further, the geographical spread of India is very

    large and different parts of the country face different types of climate and different types of

    loads.

    Power demand during the rainy seasons is low in the States of Karnataka and Andhra Pradesh

    and high in Delhi and Punjab. Whereas many of the States face high demand during evening

    24

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    25/57

    peak hours, cities like Mumbai face high demand during office hours. The Eastern Region has a

    significant surplus round the clock, and even normally power deficit states with very low

    agricultural loads like Delhi have surpluses at night. This situation indicates enough

    opportunities for trading of power. This would improve utilization of existing capacities and

    reduce the average cost of power to power utilities and consumers.

    In view of high fixed charges, average tariff becomes sensitive to PLF. Trading of power from

    surplus State Utilities to deficit ones, through marginal investmentI in removing grid constraints,

    could help in deferring or reducing investment for additional generation capacity, in increasing

    PLF and reducing average cost of energy. Over and above this, the Scheduled exchange of power

    will increase and un-scheduled exchange will reduce bringing in grid discipline, a familiar

    problem.

    PTC India Ltd. (PTC, formerly power trading corporation), is the leading provider of Power

    Trading services, and has been trading power on a sustained basis since FY 2002 through

    purchase from surplus utilities and sales to deficit ones at an economical price, providing best

    value to both the buyers and sellers and ensuring that the resources are utilized optimally.

    25

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    26/57

    POWER DISTRIBUTION

    The Central Government has got as negligible share in the distribution of power throughout the

    country. The bulk of the power generation is carried out by the State Governments via their state

    electricity boards within their respective states. The private sector also operates in a limited

    capacity as distributors of electricity. The players procure energy from their own generating

    plants, the Central Government plants and the independent producing plants and then supply the

    electricity to the end consumer.

    Distribution reforms have been identified as the key area of reforms in the power sector. The

    reforms aim at boosting private sector participation in the distribution of electricity and

    restructuring of the State Electricity Boards.

    Under the ongoing reforms programme, distribution has been privatized in Orissa and Delhi.

    While in Orissa, the power distribution is divided into four zones of which three are owned by

    Reliance Group Companies. The other zone was privatised in favour of AES Group, . The Delhi

    state was privatised by distributing city in three zones with two of the zones going in favour of

    Reliance Group and the remaining in favour of Tata group.

    The following are a few private companies that are engaged in distribution:

    Name of Company Location

    CESC Kolkatta

    Ahmedabad Electricity Gujarat

    Tata Power MumbaiReliance Energy Mumbai

    Surat Electriciy Surat

    NESCO Orissa

    WESCO Orissa

    SOUTHCO Orissa

    CESCO Orissa

    26

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    27/57

    BSES Rajdhani New Delhi

    BSES Yamuna New Delhi

    NOIDA Power Company Uttar Pradesh

    ELECTRICITY ACT 2003

    Electricity Act 2003 was need to bridge the discrepancy between the future needs and actual

    capacity in the Indian electricity sector. Only 55% of households in India have access to

    electricity, and many of these do not get uninterrupted reliable supply. Moreover, tariffs for the

    electricity provided are among the highest in the world. Just over half of the capacity additions

    planned during the 8th and 9th plans (1992-2002) was actually added. Ambitions for future

    development, however, have not faltered. The Act aims to fulfill the governments plan to

    provide electricity for all villages (about 80,000 more than currently covered) by 2007 and all

    households by 2012. As discussed in the introduction the Ministry of Power estimates that over

    100,000 MW of additional capacity will be required to meet these goals. The Government of

    India also plans to augment inter-regional transfer capacity from the current 8000 MW to 23,500

    MW by the end of the 10th Plan in 2007.

    The following are the features of EA 2003:-

    The act eases requirements for private entry into generation: It reduces licensing

    requirements for generation, except hydropower (which still needs clearance from the Central

    Electricity Authority as it uses the states resources). Captive generation is freely permitted, as

    are dedicated transmission lines . Captive power plants are also exempted from surcharges for

    access to the grid. The act encourages creation of nonprofit societies, user associations, and other

    arrangements in rural areas these will be allowed to buy bulk power and bypass SEBs.

    27

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    28/57

    1) It also opens transmission and distribution to private participation, though participants

    still require licenses: Private participation in operating and maintaining transmission networks

    had been allowed previously, but EA 2003 allows private

    companies to potentially set up parallel transmission networks. The policy creates some threat of

    competition for existing transmission networks, but has the disadvantage that costly parallel

    networks may be built if the state-owned transmission utilities do not or cannot invest enough to

    improve their transmission reliability. Existing distribution companies are free to undertake

    generation, while generation companies could also engage in distribution.

    Multiple distribution licenses may be issued for any particular area.

    EA 2003 also requires that all transmission utilities provide non-discriminatory open access to

    their system from the outset. Open access in distribution will be phased in as soon as

    arrangements for cross-subsidy surcharges can be worked out.

    In addition to accepting private participation and planning for open access, EA 2003 proposes a

    new tariff framework based on competitive bidding to form the basis for generation,

    transmission, distribution, and retail supply for electricity.

    The combination of lower barriers to private sector participation and open access to transmission

    and later distribution are steps toward facilitating national power trading in addition to the

    contracts determined by competitive bidding. Transmission utilities are barred from trading, but

    distribution companies will be allowed to trade without separate licenses, and generation

    companies can sell to any users as soon as regulations are developed. CERC has set out licensing

    28

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    29/57

    requirements, including capital adequacy and human capital requirements for other companies

    wishing to act as intermediaries between

    generators and distributors of energy.

    2) Restructuring of SEBs: The Act provides general guidelines for restructuring of SEBs,

    including vesting of assets in state governments, provisions for sale of parts of the Board to

    private companies, and division of the SEBS into separate generation, transmission, and

    distribution companies

    3) Reduction of Transmission and Distribution Losses:

    EA 2003 also contains several provisions aimed at reducing transmission and distribution losses.

    It requires universal metering and permits state governments to set up special courts to provide

    quick trials in cases of theft. Punishments for theft include up to three years of imprisonment as

    well as fines.

    4) Consumer Protection:

    EA 2003 increases consumer protection by mandating that distribution licensees set up a forum

    for addressing consumer complaints in accordance with guidelines to be specified by the state

    regulatory commissions. Each SERC must appoint an ombudsman to hear complaints that are not

    redressed by the distribution licensees. Regulators are explicitly prohibited from setting tariffs

    that discriminate among consumers of electricity except on technical grounds such as load factor,

    time and size of consumption, etc. An appellate tribunal provides an avenue for consumers to

    protest other regulatory decisions EA 2003 requires advance approval for sales, mergers,

    29

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    30/57

    takeovers of entities within the same state, and states that no licenses would be exclusive within

    a region.

    These provisions may limit monopoly powers, though much will still depend on the development

    of regulation to prevent abuse of market power. There is currently no limit in the percent of

    generation capacity that can be owned by a single company.

    5) Puts Central Government in the Drivers Sear:

    Finally, EA 2003 establishes the Central governments leadership though not explicit control

    in developing a common national energy policy, accounting and regulatory norms, as well as

    tariff frameworks and arrangements for making subsidies more transparent. The Act empowers

    the Central Government to prepare a National Electricity Policy in consultation with State

    Governments, while it reiterates the supervising role of the Central Electricity Authority in

    advising the central government in the National Electricity Policy, specifying technical and

    safety standards for new projects, specifying grid standards for new transmission lines, carrying

    out research, and advising all levels of government as well as private licensees.

    30

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    31/57

    IMPORTANT ISSUES RELATED TO THE POWER

    SECTOR

    PRICING

    The transition to market-based tariffs appears to be closer for generation

    than

    transmission or distribution. Transmission pricing is complicated by the need

    to

    coordinate state and central policies to ensure prices reflect grid conditions.

    Distribution and retail pricing is complicated by the inevitable interface with

    consumers, many of whom have been conferred political protection vis--vis

    prices.

    Generation

    The CERCs new tariff guidelines for generation and inter-state transmission

    fill in the

    gap between the previous system of two-part tariffs and future pricing based

    on

    competitive bidding. The two-part structure is similar to before, with fixed

    costs based on depreciation, interest on working capital, income taxes, etc.

    31

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    32/57

    The key difference is that the tariffs provide a ceiling of 14% return on

    equity, as opposed to a floor of 16% under past regimes. The main reason for

    this that inflation has fallen down from higher levels to much lower levels as

    of now.

    Working capital allowances and operations and maintenance costs, transit

    and handling losses of coal, and other operating parameters are set at

    normative rather than actual levels, so that companies can only make this

    rate of return by performing at relatively high benchmark levels. The

    regulations also clearly specify applicable interest rates, income tax

    assessments and depreciation rates, limiting the potential areas for clever

    accounting. The debt-equity ratio applicable for calculating rate of return on

    equity has also been increased from 50:50 to 70:30.

    The new regulations are an advance over past pricing policies in several

    ways. They

    reduce the windfalls that generating companies had accumulated in the

    past, and reward

    generating plants for more efficient operation

    The new regulations also increase the rewards for higher plant load factors.

    32

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    33/57

    Transmission

    The new guidelines for long-transmission tariffs are similar to those for

    generation in

    several ways. As in generation, the recovery of annual transmission charges

    is based on

    normative rather than actual costs of operations and maintenance and

    auxiliary power,

    allowances for working capital, and other operating parameters. The ceiling

    of return on

    equity is lowered to 14%, and the debt-equity ratio is also increased to 70:30

    as in

    generation tariffs. The precise rules for calculating depreciation, interest on

    working

    capital, are also clarified in the regulations.

    Target availability of transmission capacity is the main performance measure

    embedded

    in the regulations for longer-term contracts it is set at 98% for an AC system

    and 95%

    for HVDC systems. Recovery of fixed charges is reduced for lower

    availability. Rules for

    33

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    34/57

    open access also provide an incentive to maintain transmission lines at high

    capacity, as

    transmission licensees can keep a quarter of the charges earned from

    providing

    transmission to short-term customers while returning the balance to long-

    term customers

    through tariff reductions.

    The regulations basic floor for pricing, in Rs per MW per day, is backward-

    looking. The

    short-term rate based on the average transmission charges over the past

    year divided by

    average capacity served over the last year. Transmission utilities are

    expected to

    announce a rate in Rs per MW per day at the beginning of the year, which

    remains in

    effect for a year..

    If requests for access are higher than capacity, snap bids are solicited by the

    Regional

    Load Dispatch Center. Bidders bid in terms of percentage points above floor

    price and

    34

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    35/57

    reservation of trading capacity made in decreasing order of price quoted.

    Everybody pays

    the lowest price bid. Transmission customers bear the costs of transmission

    losses on the basis of average losses in the national transmission system,

    calculated ex-post based on actual flows. It would be worthwhile to consider

    changing this regime to one in which transmission companies bear the

    burden of these losses, as this would create a greater incentive to mitigate

    losses.

    Distribution

    The state electricity boards have been providing subsidised power to the agricultural and the

    domestic sector with the subsidy to be recovered from the state Government and the other

    customers like industrial and commercial which are supplied power at surcharged rates. Thus the

    distribution gets priced at rates that are cross-subsidized. A higher rate is charged to industrial

    users to compensate for the lower rate charged to the domestic consumers of electricity and the

    close to zero rate charged to the agricultural consumers.

    TRI PARTITE AGREEMENT

    35

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    36/57

    All the 28 State Governments signed the tripartite agreements with the Central Government and

    Reserve Bank of India to wipe out the outstanding dues of the SEBs to the CPSUs. 26 states

    issued bonds amounting to Rs289.8bn as of March 2004.

    60% of accumulated interest and surcharge was waived and the balance interest/ surcharge along

    with the principle amount was securitised.

    The States have issued 15 years State Government guaranteed tax-free bonds (with an interest

    rate of 8.5%).

    Besides, the penal provisions on non/delayed payment by SEBs, a provision for cash incentive

    was also built in.

    SEBs were required to establish a Letter of Credit for 105% of their average future monthly

    billing with a view to ensuring payment to CPSUs for their future supply of power.

    TRANSMISSION AND DISTRIBUTION LOSSES

    Some amount of transmission & distribution losses (T&D losses) occur in a power distribution

    system on account of inherent electrical resistance of the transmission cables. Internationally,

    about 10% T&D losses occur in a power transmission system.

    Further, there can be theft which can increase the losses. All of this electrical energy lost

    36

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    37/57

    results in loss of revenue for the power utilities thereby reducing their overall income from the

    electricity generated. However, in India, the state electricity boards which are the primary

    agencies for distribution of the power sector have T&D losses including theft at a level of around

    45%. The SEBs previously had been reporting lower Transmission and Distribution losses since

    the quite a few of the power thefts were clubbed with agricultural power consumption this

    resulting into a misleading figure of T&D losses. However with the unbundling the truth has

    come out. This has resulted in severely straining the financial position of the state electricity

    boards.

    OPEN ACCESS

    CERC has formulated the policy of allowing open access through transmission lines, which are

    inter-state in nature. The customers would be categorised as long term customers, those who

    want to use the transmission lines for more than 25 years or the existing beneficiaries of the

    regional transmission utilities; and short term customers, those not covered in earlier. Allotment

    priority would be higher for a long-term customer. The access would be allowedbased upon

    stipulations in grid code (for long term customers); and design margins on account of design,

    variation in power flows and inbuilt spare transmission capacity (for short term customers). A

    long term customer would have to enter into a bulk power transmission agreement with the

    transmission licensee. Under the policy, the total costs of power transmission utility (as approved

    by CERC) would be shared between its customers.

    37

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    38/57

    Open Access will enable the end power user to chose which electricity generating company he

    wants to get his power supplied from and completely circumvent the State Electricity Boards

    through whom it is compulsory to acquire power and deal directly with the power producing

    company.

    The Open Access policy however would come up with the problem of the private sector coming

    up with transmission lines parallel to the public sector lines. This would result into a fall in

    revenue for the public sector and funds that get blocked in the duplication of the governments

    efforts. These funds could be channeled to the generation and distribution areas instead for their

    more effective use.

    CAPTIVE CONSUMPTION

    The power supplied by the public sector undertakings is insufficient for meeting the needs of

    some industrial establishments especially in the rural parts of the country where these plants are

    located. In addition to this the power supply is erratic and the power generating companies resort

    to load shedding. During this time period there is no electricity supply to the plant that would

    result in a waste of the facilities and time. Thus to overcome this shortcoming of the electricity

    sector in the country, some of the companies have come up with captive power generating plants

    near their factories to cater to their power requirements. The sizes of the captive power

    producing plants range all the way to 300 MW.

    However this act of switching over to captive power plants adversely affects the fortune of the

    State Electricity Boards. This is because they are deprived of the higher revenue from these

    industrial undertakings and their customer mix gets more skewed towards agricultural customers

    38

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    39/57

    to whom electricity at times is provided free or at a very negligible cost. The price at which

    electricity is provided to the farmers is anyways way below the cost of generating it, thus

    resulting into heavier losses for the State Electricity Boards.

    THE FUTURE OF THE POWER SECTOR

    There is a ready market for power that can be supplied to the companies in the power sector and

    hence there is tremendous potential for these companies to increase their sales. However the

    investments that are required to be made in the power sector are highly capital intensive and also

    have a long gestation period. Hence the growth of the power sector will be a combined effort of

    both the public as well as the private sectors of the economy.

    The Sector faces the problem of the sick State Electricity Boards. The Electricity Act of 2003 has

    provided a certain amount of relief to the debtors of the SEBs and memorandums of

    understanding that have been signed would give the electricity generating companies more

    confidence to deal with these institutions.

    39

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    40/57

    Further progress in the reforms process would help reduce the gap between the cost of supply

    and revenue realized for the electricity that is generated.

    A comprehensive Blue Print for the power sector development has been prepared envisaging the

    robust development of this sector to serve the needs of the nation in the future. A capacity

    addition target of 46500 MW in the Central Public Sector Undertakings and 41800 MW by the

    State Electricity Boards, State Utilities and the Private Sector has been planned for the 10 th and

    11th 5-Year plan combined.

    The capacity addition for nuclear power is envisioned at 6400 MW and that for non-conventional

    sources at 10700 MW for the period upto the year 2012.

    For the immediate 10th Plan the Working Group on Power has estimated a feasible capacity

    addition of 46939 MW out of which 24405 MW will be contributed by the Public Sector, 12033

    MW by the States and 10501 MW will be contributed by the Private Sector. The estimated funds

    for these investments would aggregate to an amount above Rs 500000 crores.

    The Energy Requirement is expected to increase as follows:

    Year Energy Requirement Peak Load Demand

    10th Plan 2007 720 Billion KWh 115645 MW

    11th Plan 2012 975 Billion KWh 157107 MW

    12th Plan 2017 1319 Billion KWh 212577 MW

    The implicit growth rate of energy consumption in the country over the next 15 years is

    estimated to be in the range of 6.5% - 7% per annum.

    The North-East, North and Western regions of the country would account for the fastest growth

    in the energy consumed over the abovementioned time period.

    40

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    41/57

    WHY DOES THE POWER SECTOR IN INDIA LOOK

    ATTRACTIVE?

    India is the second most populated economy of the world. However if you take a look at its per

    capita power consumption it is in line with the African Developing Countries. The government

    has realized the anomaly and is working towards a solution. It has decided to unbundled the

    components of this sector and throw it open to private competition. The private players would be

    required to make large investments in the power generation, distribution and transmission fields.

    The projects would tend to be capital intensive and have long gestation periods. Yet there is

    bound to be substantial interest shown by the big ticket private sector players. Following are

    some of the main reasons why:

    A] Current Deficit in power supply in the country:

    41

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    42/57

    There is ample room to absorb more production since the current scenario within the power

    sector is that of deficit in electric supplies. The industries across the board would be more than

    happy to have a stable and continuous electricity supply for meeting their manufacturing needs.

    B] Anticipated strong growth in consumption:

    Over the last 15 years the electricity consumption has grown at a Compounded Annual Growth

    Rate (CAGR) of 7%. The growth in consumption is expected to continue at roughly the same

    rate in the couple of decades to come. This would offer the private players a vast unexplored

    market that is growing in size.

    C] Reform Measures Initiated:

    With the passing of the Electricity Act of 2003 a lot of maladies faced by the power sector have

    been remedied. The government has unbundled the sector and made entry more feasible for the

    private sector. The Act also offers all the current private as well as public companies a host of

    benefits (covered previously under the title the Electricity Act 2003).

    D] Fiscal Benefits offered by the government:

    Several fiscal incentives designed to attract investment in the power sector have already been

    implemented. The policy of zero customs duty to selected mega power projects, that serve

    multiple states has been liberalized to extend these benefits to all thermal power projects of

    1,000-MW and above and all hydel projects of 500 MW and above.

    Second, customs duty on equipment for high voltage transmission projects has been reduced

    from 25 percent to 5 percent in the 2003-4 budget and basic customs duties on other power

    42

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    43/57

    transmission and distribution projects were reduced from 25% to 10% in the interim 2004-5

    budget. Special additional duty of 4% was removed. The 2004-5 interim budget also proposes a

    reduction of customs duty on electricity meters from 25% to 15% and a reduction of customs

    duty on coal from 25% to 15%.20 The interim 2004-5 budget also extends fiscal benefits

    (including 100% tax deduction for profits from new power generators) to 2012, instead of 2006

    as had previously been the policy. These benefits will apply to companies that take parts of State

    Electricity Boards assets as well as new investors.

    E] Financial Benefits offered by the government:

    In the interest of obtaining a greater flow of funds to the electricity sector,

    100% foreign

    equity in hydro-electric, coal/lignite based, and oil/gas based thermal power

    plants is now

    automatically approved.

    Other financial incentives being discussed are:

    1) Bonds issued by these companies can be used by the banks to meet their SLR

    requirements.

    2) Raise cap on interest rates on External Commercial Borrowings to attract investors.

    3) Designation of rural electrification, transmission and distribution as priority sectors for

    Bank lending.

    F] Unexplored Domestic Energy Generating Resources:

    Irrespective of whichever way in which electricity is produced, the truth remains that India has

    got a lot of unexplored potential energy generating resources that have remained unutilized. The

    43

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    44/57

    energy generated with the help of Hydel power can be easily doubled. Private investors

    definitely would be tempted by such opportunities and would assist them in accepting the

    proposals for investment.

    The attractiveness of the sector is evident from the abovementioned facts. Now let us briefly take

    a look at few of the leading players that are currently operating in this market.

    National Thermal Power Corporation (NTPC)

    National Thermal Power Corporation Limited (NTPC) is the largest thermal power generating

    company of India. A public sector company incorporated in the year 1975 to accelerate power

    development in the country as a wholly owned company of the Government of India

    Today NTPC is the 6th largest in terms of thermal power generation and the second most

    efficient in terms of capacity utilisation amongst the thermal utilities in the world.

    The following are the details of NTPCs installed capacity:

    44

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    45/57

    Coal Based Projects 18480 MW

    Gas Based Projects 3855 MW

    Joint Venture Projects 314 MW

    TOTAL CAPACITY 22794 MW

    NTPCs share on 31 Mar 2004 in the total installed capacity of the country was 19.4% and it

    contributed 27.1% of the total power generation of the country during 2003-04.

    The following are the main business areas of NTPC:-

    1) Generating Electriciy

    2) Consultancy Services (Power Sector Related)

    3) Renovation and Modernization of power plants

    It is providing power at the cheapest average tariff in the country.

    NTPC held its public issue on 5th November 2004 where the government divested 10.5% of its

    stake to FIIs, FIs and the general public. The offer price of the issue was at Rs 62.50 per share.

    The issue got oversubscribed a number of times.

    The following are some of the positive associated with the company leading to the good response

    to the issue:

    45

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    46/57

    1) 80% capacity expansion over next seven years to drive earnings

    NTPC has already taken steps to increase its capacity by 49% by FY09 and plans to further raise

    its capacity to 39,000MW by FY12 end. Even with these additions, Indias power shortage looks

    likely to rise from current level of 7%, implying that NTPCs new capacity can be easily

    absorbed.

    2) Power Sector Reforms offer great growth opportunities

    (Covered in the earlier sections of this report)

    3) Stellar past performance vis--vis capacity addition and power generation

    From the above chart we see that NTPC has increased its capacity for electricity generation 10

    times over the last 20 years.

    46

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    47/57

    It has also shown an improvement in efficiency and has improved the ratio between the number

    of units generated and the capacity installed.

    4) Robust growth plans in place

    NTPC has drawn up a detailed Corporate Plan for the period 1997-2012 which represents the

    company's collective optimism and enthusiasm, inspired by a glorious past, a vibrant present and

    a brilliant future.

    The capacity addition plans that we have drawn up for the fifteen-year period using all the above

    strategies to enable the corporation to become a 40,000 MW company by 2012 A.D.

    In addition to the above, NTPC also has plans to venture into the following areas:

    Renovation & Modernization of old power stations through a separate joint venture company;

    Investment in LNG terminal;

    Investment in coal mining and washeries;

    Setting up of power plants abroad;

    Joint ventures for ash-based industries;

    Setting up of small pilot plants using renewable energy sources;

    Setting up of hydel power plants to facilitate techno-economic operation of thermal-

    hydro mix of NTPC stations;

    Setting up of associated extra high voltage transmission lines / inter-regional EHV

    transmission lines so as to ensure evacuation of power from NTPC stations.

    47

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    48/57

    FINANCIAL PERFORMANCE

    As compared to its physical performance its financial performance also has kept pace and the

    company has done well over the years. For the year ended 31st

    March 2004, the total income

    stood at Rs 25964.2 crores showing a 51% increase over a four year period. The total

    expenses were placed at Rs 20056.2 crores showing a 49% increase in the four year period.

    The Net Profit After Tax as on 31st March 2004 stood at Rs 5260.8 crores showing a 43%

    increase over a four year period.

    The earnings of the company have been relatively stable and investment in this company

    could be looked upon an investment in a bond providing marginally increasing returns year

    after year.

    The following has been the performance of the stock after its listing:

    48

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    49/57

    Though the issue price of the stock was Rs 62.5 it opened trading at Rs 75 and since then has

    moved on to range of above Rs 90 per share. The company has also declared a 12% interim

    dividend in February. 10th March 2005 was the record date for the same.

    Based on its projected EPS of Rs 5.9 for the year ending March 2005, its PE Ratio, as compared

    to the other players in the industry, is steep at 15. However the company commands a premium

    over the other players in the sector since it is the largest and the most efficient producer of

    electricity in the country.

    TATA POWER

    Incorporated in 1919, Tata Power Company Limited (TPL) was promoted by the Tatas. It has

    worked in tandem with its sister companies (now merged with itself), the Tata Hydro Electric

    Power Company (Tata Hydro) and the Andhra Valley Power Supply Company (Andhra Valley).

    TPL pioneered the generation of electricity in India nine decades ago.

    Today, it is the country's largest private power generating utility, established as a licensee in

    Mumbai and with ambitious expansion plans from being essentially Mumbai-centric to a major

    national player, not only in the fields of Power but also in Energy and Broadband

    Communication.

    The Company has got thermal, hydro, gas and even wind power based producing units. The

    details of its capacities is given as under:

    49

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    50/57

    Location

    Total

    Capacity(MW) Fuel

    Khopoli 72 Hydro

    Bhivpuri 76 Hydro

    Bhira 150 Hydro

    Bhira 150 Hydro

    Trombay, Maharashtra

    Unit 4 150 Gas / Oil

    Unit 5 500 Gas / Oil

    Unit 6 500 Gas / Oil

    Unit 7 180 Gas

    Jojobera 67.5 Coal

    Wadi 75 Coal

    Jojobera 120 Coal

    Belgaum 81.3 Diesel OilAhmednagar 17 Wind

    Jojobera 120 Coal

    The company today has got a combined capacity of 2258.8 MW.

    Besides Tata Power also offers its expertise for the following activities:

    Setting up Independent Power Plants (IPP)

    Setting up Captive Power Plants (CPP)

    Power Transmission and Distribution Projects

    Operation and Maintenance Services (O&M Services)

    Remnant Life Assessment (RLA) and Performance Evaluation Services of Power Plant

    Equipment

    Overseas projects : Erection, Testing, Commissioning & Trial operationsPower

    Plant/Utility Operations Management and Plant Operators Training

    POSITIVES FOR THE COMPANY:

    50

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    51/57

    1) The company will get benefited by the governments move towards encouraging greater

    private participation in the private sector and can now look at even alternative expansion plans in

    transmission and power trading since these have been opened to participation to the private

    sector.

    2) The company has shown a very decent performance in its Delhi operations. The Transmission

    Losses in Delhi are down to 36.4% in September 2004 as compared to 55% in July 2002.

    3) Value of Investment works out to around Rs 137 per share.

    Investment Total Value Value per share

    Tata Telecom Rs 1450 cr 73

    Tata Sons / TCS Rs 870 cr 44

    Tata Petrodyne Rs 320 cr 16

    Others Rs 90 cr 4

    4) Steady nature of revenues make its business like a cash cow.

    FINANCIAL PERFORMANCE

    Description 2002-03 2003-04

    Net Sales 43,005.00 42,390.80

    Other Income 1,520.30 1,599.90

    Total Income 44,525.30 43,990.70

    Expenditure -31,163.40 -30,471.30

    Operating Profit 13,361.90 13,519.40

    Interest -3,412.10 -2,837.20

    Gross Profit 9,949.80 10,682.20

    Depreciation -3,180.40 -3,339.50

    Profit before

    Tax 6,769.40 7,342.70

    51

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    52/57

    Tax -1,570.20 -2,251.90

    Profit after Tax 5,199.20 5,090.80

    Net Profit 5,199.20 5,090.80

    Equity Capital 1,979.10 1,979.20

    Reserves 39,594.60 42,779.80

    EPS 26.27 25.72

    Thus we see that at the current price of Rs 400 the company trades at a PE Multiple of 15.55.

    However if we subtract the value of the investments we would get an adjusted PE of 10.2.

    Thus the valuations at the present moment seem to be reasonable. The company is in a position

    to take advantage of the investments it has and generate free cash flow that can be utilized for its

    expansion plans in the future.

    52

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    53/57

    We see that the stock price of the company is in an upward range over the last 2 years in line

    with the positive developments taking place in the power sector.

    However the company is subjected to regulatory changes and any adverse developments on this

    front can have negative implications for the stocks performance.

    RELIANCE ENERGY LTD.

    Reliance Energy is Indias largest integrated private sector power utility company. The company

    is into generation, transmission, distribution and trading of power. It distributes over 5,000 MW

    of power - the largest in the country. Reliance Energy powers 2 out of 3 homes in Mumbai and 1

    out 2 in Delhi and has a consumer base of 2.5 crore in Mumbai, Delhi and Orissa.

    The company formerly known as BSES Ltd. was taken over by the Reliance group in the year

    2003 and subsequently its name was changed to what it is now. The takeover was completed on

    18th Jan 2003 at an offer price of Rs 230 per share.

    The 940.59 MW Generation capacity of the Company comes from five projects:

    Dahanu TPS the 2x250 MW multi fuel based thermal power station at Dahanu near

    Mumbai.

    7.59 MW Wind Farm Project at Jogimatti in the district of Chitradurga in Karnataka.

    BSES Kerala Limited: The 165 MW combined cycle power station at Kochi, Kerala.

    BSES Andhra Power Limited: The 220 MW combined cycle power plant at Samalkot

    in Andhra Pradesh

    Goa Power Station : The 48 MW naptha based combined cycle power plant at Goa.

    53

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    54/57

    Extensive Distribution Network:

    Seven decades of experience and continuous investment in modernizing its distribution

    infrastructure have helped the company achieve the enviable distinction of operating its network

    with 99.99% reliability.

    Reliance Energy Ltd. has established 4124 distribution sub-stations, 2912 km of high tension

    (HT), 2966 kms of low tension (LT) cable and 2466 kms of streetlight cable. The company has

    an installed distribution transformer capacity of about 2422 MVA. During the last five years

    (1998-2003) the installed capacity of power transformers has increased from 1502 MVA to 1752

    MVA. The present maximum demand for the area is around 1226 MVA. The ratio of installed

    capacity to maximum demand is 1.43. The ratio of distribution transformer capacity to the

    maximum demand has gone up from 1.82 to 1.98.The efforts made towards achieving higher

    levels of efficiency have reduced distribution losses to 13.4% - which is perhaps the lowest in the

    country.

    Today the company caters to 5 million customers.

    Reliance Energy Limiteds Mumbai operations cover a population of 9.0 million within an area

    of about 384 sq. kilometers. The Distribution network handled and sold 5,879.66 MUs in the

    year 2002-2003.

    Besides Reliance Energy has got the following subsidiaries in different states:

    New Delhi: BSES Rajdhani Power Ltd

    BSES Yamuna Power Ltd

    Orissa: WESCO

    NESCO

    54

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    55/57

    SOUTHCO

    POSITIVES FOR THE COMPANY:

    1) It has been able to bring down the AT&C Losses to around 13.5% as mentioned before.

    With every 1% reduction in the AT&C Losses the net profit of the company will grow by

    Rs 28 crores.

    2) Reliance Energy holds an exclusive licence to supply energy to suburban Mumbai upto

    the year 2012.

    3) It has ready availability of power supply from its own plant and Dahanu and the balance

    from Tata Power Company for its Mumbai distribution operations.

    4) It has issues FCCBs that can be converted into shares at Rs 245 per share at any time

    between Dec 2002 and Dec 2007. These FCCBs are deeply in the money. Upon their

    conversion into equity shares Reliance Energy would be able to raise Rs 2700 crores as

    long-term debt while maintaining the debt-equity ratio at 1:1.

    FINANCIAL PERFORMANCE

    Description 2002-03 2003-04

    Net Sales 26,918.50 33,995.10

    Other Income 848.5 1,832.70

    Total Income 27,767.00 35,827.80

    Expenditure -22,879.00

    -

    27,767.70

    Operating Profit 4,888.00 8,060.10Interest -763.5 -699.3

    Gross Profit 4,124.50 7,360.80

    Depreciation -2,598.10 -3,187.20

    Profit before Tax 1,526.40 4,173.60

    Tax 96.9 -431.4

    55

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    56/57

    Profit after Tax 1,623.30 3,742.20

    Reserves 24,006.70 1,752.60

    EPS 8.85 25.86

    We see that the EPS has almost trippled for the stock in the between 2003 and 2004.

    At the current price of Rs 560 the stock trades at a PE multiple of 21. The stock may seem a bit

    expensive but the company had come up with announcements in between to pick up the stock all

    the way down to Rs 520. Hence the stock has remained at these high levels.

    Like the other stocks in the power sector even Reliance Energy is seen in an uptrend following

    positive developments on the power sector front for the entire power industry.

    56

  • 7/29/2019 Analysis of the Power (Electricity) Sector

    57/57

    BIBLIOGRAPHY

    PUBLICATIONS:

    Argus Global Markets

    Asia Pacific Energy Research Institute

    International Energy Agency Bulletin

    Economic Times

    Business Line

    WEBSITES:

    Powermin.nic.in

    Cerc.nic.in

    Ntpc.co.in

    Yahoo India Finance

    www.indiainfoline.com