Aqueduct Main Project Modify

Embed Size (px)

Citation preview

  • 8/14/2019 Aqueduct Main Project Modify

    1/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 1

    AQUEDUCT

    Chapter 1: Introduction 3-10

    Chapter 2: Hydraulic Particulars 11

    Chapter 3: Selection of type of aqueduct 12

    Chapter 4: Design of canal trough 13

    Chapter 5: Design of drainage water way 14-15

    Chapter 6: Check for loss of head in the canal due to 16-19

    Fluming of canal water way through the

    Trough

    Chapter 7: Fixing of M.F.L of drainage 20-22

    Chapter 8: Design of side walls of canal trough 23-26

    Chapter 9: Design of bottom slab of canal trough 27-30

    Chapter 10: Design of tail channel 31-32

    Chapter 11: Design of canal transitions 33-36

    Chapter 12: Design of abutments 37-40

    Chapter 13: Design of piers 41-44

    Chapter 14: Design of wing walls 45-48

    Chapter 15: Design of return walls 49-50

    Chapter 16: Design of canal aprons 51-52

  • 8/14/2019 Aqueduct Main Project Modify

    2/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 2

    Chapter 17: Checking the depth of foundation of 53

    Drainage returns by scour depth

    Chapter 18: Design of inspection track 54

    Chapter 19: Design of pier cap 55-58

    Chapter 20: Design of pile foundation 59

    Chapter 21: Design of foundation of abutment and piers 60-61

    Chapter 22: Design of anchorage arrangements 62

    Chapter 23: Drawings 63

  • 8/14/2019 Aqueduct Main Project Modify

    3/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 3

    Chapter 1

    Introduction

    Cross Drainage Works

    Definition:

    A cross drainage work is a structure carrying the discharge from a natural stream across a canalintercepting the stream.

    Canal comes across obstructions like rivers, natural drains and other canals.

    The various types of structures that are built to carry the canal water across the above mentioned

    obstructions or vice versa are called cross drainage works.

    It is generally a very costly item and should be avoided by

    Diverting one stream into another.

    Changing the alignment of the canal so that it crosses below the junction of two streams.

    Types of cross drainage works

    Depending upon levels and discharge, it may be of the following types:

    (a) Cross drainage works carrying canal across the drainage:

    the structures that fall under this type are:

    1. An Aqueduct

    2. Siphon Aqueduct

  • 8/14/2019 Aqueduct Main Project Modify

    4/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 4

    Aqueduct:

    When the HFL of the drain is sufficiently below the bottom of the canal such that the drainagewater flows freely under gravity, the structures known as Aqueduct. An aqueduct is a water

    supply or navigable channel constructed to convey water. In modern engineering, the term is

    used for any system of pipes, ditches, canals, tunnels, and other structures used for this purpose.In a more restricted use, aqueduct (occasionally water bridge) applies to any bridge or viaduct

    that transports water instead of a path, road or railway across a gap. Large navigable aqueducts

    are used as transport links for boats or ships. Aqueducts must span a crossing at the same level asthe watercourses on each end. The word is derived from the Latinaqua ("water") and ducere ("to

    lead").

    In this, canal water is carried across the drainage in a trough supported on piers.

    Bridge carrying water

    Provided when sufficient level difference is available between the canal and natural andcanal bed is sufficiently higher than HFL.

  • 8/14/2019 Aqueduct Main Project Modify

    5/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 5

    Classification of aqueduct and siphon aqueduct:

    Depending upon the nature of the sides of the aqueduct or siphon aqueduct it

    may be classified under three headings:

    Type I:

    Sides of the aqueduct in earthen banks with complete earthen slopes. The

    length of culvert should be sufficient to accommodate both, water section of

    canal, as well as earthen banks of canal with aqueduct slope.

    Sides of the aqueduct in earthen banks, with other slopes supported by

    masonry wall. In this case, canal continues in its earthen section over the

    drainage but the outer slopes of the canal banks are replaced by retaining wall,

    reducing the length of drainage culvert.

    Type II:

    Sides of the aqueduct made of concrete or masonry. Its earthen section of the

    canal is discontinued and canal water is carried in masonry or concrete trough,

    canal is generally flumed in this section.

    Siphon Aqueduct:

    In case of the siphon Aqueduct, the HFL of the drain is much higher above the canal bed, andwater runs under siphonic action through the Aqueduct barrels.

    The drain bed is generally depressed and provided with pucci floors, on the upstream side, the

    drainage bed may be joined to the pucca floor either by a vertical drop or by glacis of 3:1. The

    downstrean rising slope should not be steeper than 5:1. When the canal is passed over thedrain, the canal remains open for inspection throughout and the damage caused by flood is rare.

    However during heavy floods, the foundations are succeptible to scour or the waterway of drain

    may get choked due to debris, tress etc.

  • 8/14/2019 Aqueduct Main Project Modify

    6/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 6

    The structures that fall under this type are:

    Super passage

    Canal siphon or called syphon only.

    Super passage:

    The hydraulic structure in which the drainage is passing over the irrigation canal is

    known as super passage. This structure is suitable when the bed level of drainage is

    above the flood surface level of the canal. The water of the canal passes clearly below thedrainage

    A super passage is similar to an aqueduct, except in this case the drain is over the canal.

    The FSL of the canal is lower than the underside of the trough carrying drainage water.Thus, the canal water runs under the gravity.

    Reverse of an aqueduct

  • 8/14/2019 Aqueduct Main Project Modify

    7/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 7

    Canal Syphon:

    If two canals cross each other and one of the canals is siphoned under the other, then the

    hydraulic structure at crossing is called canal siphon. For example, lower Jhelum canalis siphoned under the Rasul-Qadirabad (Punjab, Pakistan) link canal and the

    crossing structure is called L.J.C siphon In case of siphon the FSL of the canal is much above the bed level of the drainage trough,

    so that the canal runs under the siphonic action.

    The canal bed is lowered and a ramp is provided at the exit so that the trouble of silting is

    minimized.

    Reverse of an aqueduct siphon

    In the above two types, the inspection road cannot be provided along the canal and a

    separate bridge is required for roadway. For economy, the canal may be flumed but the

    drainage trough is never flumed.

    Selection of suitable site for cross drainage works:

    The factors which affect the selection of suitable type of cross drainage works are:

    Relative bed levels and water levels of canal and drainage

    Size of the canal and drainage.

    The following considerations are important

  • 8/14/2019 Aqueduct Main Project Modify

    8/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 8

    When the bed level of the canal is much above the HFL of the drainage, an

    aqueduct is the obvious choice.

    When the bed level of the drain is well above FSL of canal, super passage is

    provided.

    The necessary headway between the canal bed level and the drainage HFL can

    be increased by shifting the crossing to the downstream of drainage. If,

    however, it is not possible to change the canal alignment, a siphon aqueduct

    may be provided.

    When canal bed level is much lower, but the FSL of canal is higher than the

    bed level of drainage, a canal siphon is preferred.

    When the drainage and canal cross each other practically at same level, a level

    crossing may be preferred. This type of work is avoided as far as possible.

    Factors which influence the choice / Selection of Cross Drainage Works

    1. The considerations which govern the choice between aqueduct and siphon aqueduct are:

    2. Suitable canal alignment

    3. Suitable soil available for bank connections4. Nature of available foundations

    5. Permissible head loss in canal

    6. Availibility of funds

    Compared to an aqueduct a super passage is inferior and should be avoided whenever possible.

    Siphon aqueduct is preferred over siphon unless large drop in drainage bed is required.

    Uses:

    Historically, agricultural societies have constructed aqueducts to irrigate crops. Archimedes

    invented the water screw to raise water for use in irrigation of croplands.

    Another use for aqueducts is to supply large cities with drinking water. Some of the Roman

    aqueducts still supply water to Rome today. In California, United States, three large aqueducts

  • 8/14/2019 Aqueduct Main Project Modify

    9/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 9

    supply water over hundreds of miles to the Los Angeles area. Two are from the Owens River

    area and a third is from the Colorado River.

    In more recent times, aqueducts were used for transportation purposes to allow canalbarges to

    cross ravines or valleys. During the Industrial Revolution of the 18th century, aqueducts were

    constructed as part of the boom in canal-building.

    In modern civil engineering projects, detailed study and analysis of open channel flow is

    commonly required to support flood control, irrigation systems, and large water supply systems

    when an aqueduct rather than a pipeline is the preferred solution.

    In the past, aqueducts often had channels made of earth or other porous materials but significant

    amounts of water are lost through such unlined aqueducts. As water gets increasingly scarce,

    these canals are being lined with concrete, polymers or impermeable soil. In some cases, a new

    aqueduct is built alongside the old one because it cannot be shut down during construction.

  • 8/14/2019 Aqueduct Main Project Modify

    10/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 10

    DESIGN STEPS:

    1) Hydraulic particulars of canal & Drainage

    2) Selection of type of aqueduct

    3) Design of canal trough

    4) Design of drainage water way

    5) Check for loss of head in the canal due to fluming of canal water way

    Through the trough

    6) Fixing the M.F.L of the drainage

    7) Design of side walls of canal trough

    8) Design of bottom slab of canal trough

    9) Design of tail channel

    10) Design of canal transitions

    11) Design of abutments

    12) Design of piers

    13) Design of wing walls

    14) Design of return walls

    15) Design of aprons

    16) Checking the depth of foundations of drainage returns by scour depth

    17) Design of inspection track

    18) Design of pier cap

    19) Reinforcement in pier

    20) Pier foundation

    21)Design of pier foundation

    22)Design of foundations of abutments and piers

  • 8/14/2019 Aqueduct Main Project Modify

    11/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 11

    Chapter -2

    Hydraulic particulars

    Canal:

    Discharge = 35 m3/s

    Bed width = 20 m

    Bed level = +40.00

    F.S.L = 42.00

    Ultimate bed level = 39.75

    Ultimate full supply level = 42.50

    Top width of left bank = 5m

    Top width of right bank = 2m

    T.B.L = +43.50

    Slope of canal banks = 2:1

    Drain:

    Catchment area = 8 km2

    Maximum discharge = 60 m3/s

    Bed level = 38.00

    Average ground level = +38.00

    Maximum flood level of drain at the site of crossing = +39.75

    Hard soil for foundation is available at = +37.00

  • 8/14/2019 Aqueduct Main Project Modify

    12/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 12

    Chapter-3

    Selection of type of aqueduct

    The above data of hydraulic particulars, a type-3 aqueduct is designed. It is only purely from an

    economical aspect that we go in for the type-3 aqueduct. For major drains it will beuneconomical to go in for a type-3 aqueduct as the extra cost of barrel with a large number of

    vents will be more than the cost of other works necessary for a type-3 aqueduct.

    So, whenever an aqueduct are to be actually constructed, comparative costs are to be

    worked out for a type-2 and a type-3, and whichever is economical is to be chosen and adopted.

    In the case of a type-3 aqueduct, the canal will be flumed and taken through a masonry or

    reinforced concrete trough supported on piers and abutments. The maximum velocity through the

    trough is generally taken as twice the normal velocity or 1.5m/s whichever is less.

  • 8/14/2019 Aqueduct Main Project Modify

    13/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 13

    Chapter - 4

    Design of canal trough

    Discharge, Q = 35 m3/s

    Average velocity = 0.83 m3/s

    Design velocity = 2% average velocity = 2*0.83=1.66 m/s

    But the maximum design velocity = 1.5 m/s

    Adopt design velocity = 1.5 m/s

    Q= A x v

    35= Ax1.5

    A=23.3 m2

    Depth of flow, y= F.S.D= F.S.L B.L= 42.00-40.00=2m

    Bottom level = Ultimate bed level of canal = 39.75

    Top level = Ultimate F.S.L + 0.5 = 42.50 + 0.50 = 43.00

  • 8/14/2019 Aqueduct Main Project Modify

    14/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 14

    Chapter - 5

    Design of drainage water way

    Let us provide 3 vents of 2.5 m wide length of water way, l=3X2.50=7.5 m

    Sill level of canal trough = 39.75 m (given)

    Thickness of bottom slab = 250 mm (assume)

    Thickness of wearing coat = 80 mm (assume)

    Bottom level of the canal trough = sill level- thickness of wearing coat-

    Thickness of bottom slab

    = 39.75-0.08-0.025=39.64 m

    Bottom level of slab = 39.75-0.25 = 39.50

    Average bed level of the drain = 38.00

    Since the M.F.L of the drain = ultimate bed level of the canal

    Let us adopt depressed bed level of the drain = 37.00

    Depth of water = y1 = Bottom level of the canal trough slab- depressed B.L

    Of drain=39.45-37=2.45 m

    Let the design velocity in the drain, V1= 3.25 m/s (assume)

    Discharge in the drain, Q1 = 60 m3/s

    Q1=A1 X V1,

    60= A1 X 3.25

    A1=18.46 m2

    A1=L X y

    1

    18.46 = L X 2.45

    L = 7.54 m

    Length of barrel = B+ 2X (thickness of side wall)

    = 12 + 2X (0.3) =12.60 m

  • 8/14/2019 Aqueduct Main Project Modify

    15/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 15

  • 8/14/2019 Aqueduct Main Project Modify

    16/64

    Sri Sunflower College of Engineeri

    Check for loss of head

    In a type-1 or type-2 aqueduct,

    it is. Hence, there is no loss of h

    However, in case of a

    resulting in an increase in veloci

    before entry and after exit, attain

    In aqueduct of short leng

    the loss of head may be very s

    assumption is that the upstream

    extent required to drive the flow

    However, in large and longer a

    trough, we may be forced to inc

    the trough is an additional fact

    head, which will have to be p

    Structures constructed ignoring t

    In the present case, to illustrate t

    Consider section A-A

    Canal bed level =

    Full supply level =

    Average velocity, V1 =

    Velocity head =

    Design of

    g & technology

    Chapter - 6

    in the canal due to fluming of canal

    through the trough

    the canal water way is not reduced and is taken

    ad in the canal.

    type-3 aqueduct, the canal water-way is flu

    y through the trough. Unless there is a differen

    ment of increased velocity in the trough is not p

    hs, by limiting the velocity to twice the norm

    all or almost negligible and hence it is gener

    ater surface will in course of time assume a fl

    through the trough with that bit of extra velocit

    ueducts it is not so. In order to economies in

    rease the velocity through the trough. In additi

    r. These two factors combine to indicate a si

    ovided for, while formulating the canal hydr

    his aspect will not function properly.

    is aspect, the loss of head in the canal is comp

    40.00

    42.00

    .83 m/s

    12/2g = 0.83

    2/2x9.81 = 0.037 m

    Syphon Aqueduct

    16

    ater way

    over the drain as

    ed or reduced,

    e in water levels

    ossible.

    l canal velocity,

    lly ignored. The

    atter slope to the

    .

    cost of the canal

    on, the length of

    gnificant loss of

    aulic particulars.

    ted.

  • 8/14/2019 Aqueduct Main Project Modify

    17/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 17

    Total energy line at A-A = F.S.L + (V12/2g) = 42.00+0.037 = 42.037

    Consider section B-B

    Canal width = 20 m

    Depth of water, y =F.S.L- Bed level = 42.00 40.00 = 2.00

    At B-B the canal is rectangle in cross section, area of flow a= 20x2 = 40 m2

    Discharge, Q = 35 m3/s

    Velocity of flow, V2 = Q/a = 35/40 = 0.87 m/s

    Head loss from A-A to B-B due to change in the velocity V1 to V2

    Head loss = (V22-V1

    2)/2g

    = (0.8752-0.832)/2x9.81

    = 0.004

    On the U/S end the transition is abrupt and not smooth. So the entire eddy

    Loss is taken in to consideration.

    The T.E.L at B-B = T.E.L at A-A eddy loss = 42.035 0.004 = 42.031

    Section at the entrance of trough C-C

    Width of the canal = 12 m (assume)

    Depth of canal, y = 2 m

    A3 = 12x2 = 24 m2

    Velocity, V3 =

    3 =3524 = 1.46 m/s

    There is a gradual change in c/s from B-B to C-C. There is a loss of head from

    B-B to C-C due to change in velocity.

    Head loss = 0.25 x ( V32- V2

    2)/2g = 0.25 x (1.46

    2-0.875

    2)/2 x 9.81

    = 0.018

    T.E.L at C-C with reference to section B-B = 42.035 0.018 = 42.017

  • 8/14/2019 Aqueduct Main Project Modify

    18/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 18

    Consider section D-D

    From C-C to D-D, there is a uniform velocity. The loss of head in the trough is only

    friction loss which manifests itself as surface fall to sustain the velocity.

    This loss of head is calculated using mannings formula, using the value of 0.014 for n

    Length of R.C trough = (3x 2.5) + (2x1) + (2x0.5) = 10.5 m

    Sectional area in the trough A4 = 12x2 = 24 m2

    Velocity developing =3524 = 1.46 m/s

    Wetted perimeter = p = (2x2) + 12 = 16 m

    Hydraulic mean depth = R =4 =

    2416 = 1.5 m

    Mannings formula, V =1 (R)

    2/3 (S)

    1/2

    1.46 =1

    0.014 (1.5)2/3

    (S)1/2

    S =1

    4110

    Head loss = S x length =1

    4110 x 10.5 = 0.003 m

    T.E.L at D-D = T.E.L at C-C Head loss = 42.017 0.003 = 42.014 m

    Consider section E-E

    Neglecting the frictional loss in the exit transition the eddy loss in the transition is

    calculated as follows

    Q = 35 m3/s

    A5 = (B +n y) y

    Here B = 20 m, y = 2 m, n =12

    A5 = (20 +12 2) 2 = 42 m

    2

    V5 =

    5 =3542 = 0.83 m/s

    There is a gradual change in the section from D-D to E-E. There is a change in the

    velocity.

  • 8/14/2019 Aqueduct Main Project Modify

    19/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 19

    Head loss = 0.25 x (V42- V5

    2)/2g = 0.25 x (1.46

    2- 0.83

    2)/2 x 9.81= 0.018 m

    T.E.L at E-E = T.E.L at D-D Head loss = 42.014 0.018 = 41.99 m

    Velocity head = V52/2g = 0.83

    2/ 2x 9.81 = 0.0351 m/s

    T.E.L at E-E = H.F.L at TEE + Velocity head

    41.996 = HFL at TEE + 0.0351

    HFL at TEE = 41.961 m

    F.S.L at A-A = 42.00 m

    Total loss of head = loss of head from A-A to E-E

    = TEL at A-A TEL at E-E

    = 42.037 41.961 = 0.039 m

    Total head loss from A to E = 0.004 + 0.0175 + 0.003 + 0.018 = 0.0425

    The total head loss is very small. Hence it can be neglected.

  • 8/14/2019 Aqueduct Main Project Modify

    20/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 20

    Chapter - 7

    Fixing the M.F.L of the drainage

    The MFL of the drain in rear of the siphon barrel is 39.75. So, the barrel flows full under

    maximum flow conditions. The necessary afflux required to push through 60 m3/s with a velocityof 3.25 m/s is calculated by unwins inverted syphon formula,

    Afflux, d = (1+f1 +f2 )

    22

    Here v= velocity in the drain = 3.25 m/s

    g= 9.81 m/s2

    L = length of drain = 12.60 m

    C/S area = 3 x 2.5 x 2.45 = 18.375 m2

    Wetted perimeter = p = 3 x (2 x (2.5+2.45)) = 29.7 m

    R= hydraulic radius = =

    18.37529.7 = 0.62 m

    f1= 0.0505

    f2 = a (1+ 0.3) = 0.003 (1+ 0.3

    0.10.62 ) = 0.003145

    d = (1+0.505+ 0.00315

    12.600.62 ) (

    3.25 3.252 9.81 ) = 0.85 m

    M.F.L on U/S = D/S M.F.L + afflux = 39.75 + 0.85 = 40.60 m

  • 8/14/2019 Aqueduct Main Project Modify

    21/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 21

    Afflux at the drop of bed

    Bed level of drainage = 38.00

    At crossing with canal, bed level of drainage = 37.00

    Drop in the bed level = 38 37 = 1

    M.F.L of the drain = 39.75 m

    Bottom level of the canal trough = 39.45 m

    Afflux required = 39.75 39.45 = 0.3 m

    Here drop is 1 m then it is treating it as a drowned weir (submerged weir)

    For submerged weir, q = 3.54 y2 d10.5

    + 1.77 d13/2

    y2 = depth of water = 2.60 m

    q =

    2 =6011 = 5.45 m

    2/s

    B2 = width of drainage b/w wing walls

    5.45 = 3.45 (2.60) d10.5

    + 1.77 d13/2

    5.45 = 8.97 d10.5

    + 1.77 d1 d10.5

    5.45 = d10.5

    (8.97+1.77 d1)

    5.452

    = d1 (8.97+1.77 d1)2

    29.70 = d1 (80.46+3.14 d12+31.75 d1)

    3.14 d13

    + 31.75 d12

    + 80.46 d1 29.70 = 0

    d1= 0.326

    M.F.L over the drop = U/S M.F.L + afflux = 40.60 + 0.32 = 40.92 m

  • 8/14/2019 Aqueduct Main Project Modify

    22/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 22

  • 8/14/2019 Aqueduct Main Project Modify

    23/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 23

    Chapter - 8

    Design of side walls of canal trough

    Bottom level of the side wall = bottom level of the canal trough

    Top level of the side wall = U/S F.S.L + 0.5 = 42.50 + 0.5 = 43.00

    Depth of water h = U/S F.S.L Sill level = 42.50 39.75 = 2.75 m

    Let top thickness = 2 m

    It is designed as a cantilever wall

    of water = 10 KN/m3

    Water pressure = p = x h = 10 x 2.75 = 27.5 KN/m2

    Let us consider 1 m length of side wall

    Total pressure, p= Area of pressure diagram x length of wall

    =12 x 27.5 x 2.75 x 1 = 37.81 KN

    Centre of pressure,y = 3 = 2.753 = 0.917 m

    Bending moment, m = p x y = 37.81 x 0.917 = 35KN-m

    Mu = 1.5 x 35 = 52.17 KN-m

    Adopting M-20 grade concrete & Fe-415 grade steel

  • 8/14/2019 Aqueduct Main Project Modify

    24/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 24

    = 0.48

    D = 300 mm, b = 1000 mm, d1

    = 40 mm, d = D - d1

    d = 300 40 = 260 mm

    Mu, limit = 0.36

    bd2

    fck(1 0.42

    )

    = 0.36 x 0.46 x 1000 x 2602

    (1 0.42 x 0.48)x20

    = 186.6 KN-m

    Mu< Mu, limit (O.K)

    Design of steel reinforcement

    (a) Main steel :

    1) Minimum area of steel,

    Ast, min = 0.12% of gross area

    =0.12100 x 1000 x 300

    = 360 mm2

    2) Maximum area of steel ,

    Ast, max = 4% of gross area

    =4

    100 x 1000 x 300

    = 12,000 mm2

    3) Mu1 = 0.87 fyAst d (1

    )

    52.17 x 106

    = 0.87x415x260x Ast1x

    (1-- 415

    1000 260 20)

    555.75 = Ast1- Ast12

    (7.98 x 10-6

    )

    Ast1 = 582.86 mm2

    , 11947.25 mm2

    Ast1< Ast1, max (O.K)

    Ast1 > Ast1, min (O.K)

    For Ast1 = 11947.25 mm2

    =

    0.87 0.36 =

    0.87 415 11947.250.36 20 1000 260 = 2.304

    = 0.48

    >

    (Not O.K)

  • 8/14/2019 Aqueduct Main Project Modify

    25/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 25

    For Ast1 = 583 mm2

    =

    0.87 415 5830.36 20 1000 260 = 0.112

    <

    (O.K)

    Ast1 = 583 mm2

    Let us adopt 12 mm dia bars, 1 = 12 mm

    Area of one bar, A =3.14

    4 x 122

    = 113 mm2

    Number of bars, n1 =Ast1A =

    583113 = 5.16

    Spacing, S1 =1000

    n1 = 193.8 mm

    Adopt 12 mm @ 180 mm C/C

    Check for shear design

    Nominal shear force, v =

    =37.81 1031000 260 = 0.145 N/mm

    2

    Percentage of steel provided =100

    =100 583

    1000 260 = 0.224%

    As per IS 456 2000

    For, M-20, 100 = 0.224% then c = 0.81 N/mm2

    v

  • 8/14/2019 Aqueduct Main Project Modify

    26/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 26

    2001000 =

    0.40.87 415

    Sv = 180 mm

    2) 0.75 X d = 0.75 x 260 = 195 mm

    3) 300 mm

    Sv = 180 mmAdopt 4 legd vertical stirrups @ 8 mm dia @ 150 mm C/C

    Distribution steel

    Providing steel on both faces

    1) Area of steel , Ast2 =

    2 =360

    2 = 180 mm2

    2) Let us adopt dia of bar, 2 = 8 mm

    Area of one bar, A 2 =3.14

    4 x 82

    = 50 mm2

    Number of bars, n2 =Ast2A =18050 = 3.6

    Spacing, s2 =1000

    n2 =1000

    3.6 = 277.7 mm

    Adopt 8mm dia @ 250 mm C/C

  • 8/14/2019 Aqueduct Main Project Modify

    27/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 27

    Chapter - 9

    Design of bottom slab of canal trough

    It is designed as a continuous slab.

    Let us consider 1m wide slab

    Thickness of wearing coat = 8 cm

    Weight of wearing coat =8

    100 x 24 = 1.92 KN/m2

    Thickness of slab = 25 cm

    Weight of slab =25

    100 x 25 = 6.25 KN/m2

    Depth of water = 2.75 m

    Weight of water = 2.75 x 10 = 27.5 KN/m2

    Total load on the slab = 1.92 + 6.25 + 27.5

    = 35 KN/m2

    Effective span (l) = clear water way + effective thickness of slab

    = 2.5 + 0.26 = 2.76 m

    Maximum B.M = M3 = 210 =35 2.76 2.76

    10 = 26.67 KN-m

    Mu3 = 1.5 x M1 = 40 KN-m

    Mu, limit = 0.36

    bd2

    fck(1 0.42

    )

    = 0.36x0.48x (1 0.42 x 0.48) x1000x260 x 20

    = 186.6 KN-m

    Mu3

  • 8/14/2019 Aqueduct Main Project Modify

    28/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 28

    Design reinforcement

    a) Main steel

    1) Minimum area of steel , Ast, min = 0.12% of gross area

    =0.12

    100x 1000 x 300

    = 360 mm2

    2) Maximum area of steel ,Ast, max = 4% of gross area

    =4

    100 x 1000 x 300

    = 12,000 mm2

    3) Mu3 = 0.87 fyAst d (1

    )

    40 x 106

    = 0.87 x 415 x Ast3 x 260 x (13 415

    1000 260 20)

    426.10 = Ast3- Ast32

    (7.98 x 10-5

    )

    Ast3 = 441.66 mm2

    = 12089 mm2

    Ast3 = 442 mm2

    Ast3Ast,min (O.K)

    Let us adopt 12mm dia bars, 3 = 12 mm

    Area of one bar, A 3 =3.14

    4 x 122

    = 113 mm2

    Spacing, s3 =1000

    n3 =10003.91 = 255.6 mm

    Adopt 12 mm dia bars @ 250 mm c/c

    b) Distribution steelsProviding steel on both faces

    Area of steel, Ast4 =

    2 =360

    2 = 180 mm2

    Adopt 8mm dia @ 250 mm c/c.

    Check for shear design

    Shear force, V =2 =

    35 2.762 = 48.3 KN

    Nominal shear force, v =

    =48.3 10 10 10

    10 1010260

    = 0.185 N/mm2

    As per IS-456-2000, for M-20 grade , c, max =2.8 N/mm2

    v

  • 8/14/2019 Aqueduct Main Project Modify

    29/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 29

    As per IS-456-2000, for M-20 grade,100

    = 0.17% then

    c = 0.3 N/mm2

    v

  • 8/14/2019 Aqueduct Main Project Modify

    30/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 30

  • 8/14/2019 Aqueduct Main Project Modify

    31/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 31

    Chapter -10

    Design of tail channel

    Tail channel will be always straight, its length will be 50 to 60m on either side of roads

    Top level = M.F.L of drain

    = 39.75m

    Bottom level = bed level of the drain at crossing = 37.00m

    Depth of flow, Y3 = 39.75-37.00 = 2.75m

    Let us assume velocity of flow, V = 1.5m/sec

    Q = AV

    60 =1.5A

    A = 40m2

    Slope =12H: 1V (assume)

    A = (B+ny) y

    40 = (B+0.52.75)2.75

    B = 13.17m

    Adopt B = 14m

    Slope of channel,

    Mannings formula, V =1 (R)

    2/3(S)

    1/2

    Here, V = 1.5m/sec, N = 0.015 (assume)

    A = (B+ny)y

    = (14+0.52.75)

    A = 42.3m2

    Wetted perimeter, P = B+2(2 + ) .y

    = 14+2((.)2 + )2.75

  • 8/14/2019 Aqueduct Main Project Modify

    32/64

    Sri Sunflower College of Engineeri

    = 20.15m

    R = = = 2.1m

    V = (R)2/3

    (S)1/2

    1.5 = (2.1)2/3

    (S)1/2

    S =

    Design of

    g & technology

    Syphon Aqueduct

    32

  • 8/14/2019 Aqueduct Main Project Modify

    33/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 33

    Chapter - 11

    Design of canal transitions

    Transitions are wing walls

    Upstream side transitions for canal:

    The bottom of foundation is same as that of the abutments. Assuming 60cm depth of concrete

    foundation. The top of foundation is kept at 37.00m

    Top level = ultimate full supply level + 0.5m

    = 42.50 + 0.50 = 43.00m

    Bottom level = hard soil level = 37.00m

    Height of the wall = 43.00 37.00

    = 6.00m

    Thickness of foundation = 0.6m

    Top thickness = 0.5m

    From top level to the ultimate bed level of the canal the front face is vertical

    Height of wing wall from ultimate bed level=43.00-39.75=3.25m.

    Width of wing wall @ ultimate bed level=0.4Xheight

    =0.4X3.25

    =1.3m

    Let us provide width ofwing wall @ ultimate bed level=1.75m

  • 8/14/2019 Aqueduct Main Project Modify

    34/64

    Sri Sunflower College of Engineeri

    From ultimate bed level to t

    Height=top level-bottom lev

    =43.00-37.00

    =6.00m

    Bottom width=0.4Xheight

    =0.4X6

    =2.4m

    Let us provide widt

    Design of

    g & technology

    p of foundation is vertical on earth phase

    el

    of wing wall=2.5m

    Syphon Aqueduct

    34

  • 8/14/2019 Aqueduct Main Project Modify

    35/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 35

    Downstream side transition for canal:

    In order to minimize the eddy losses, a suitable exit transition is necessary after the R.C trough

    Top level = ultimate F.S.L + 0.5m

    = 42.50m + 0.5m

    = 43.00m

    Bottom level = 37.00m

    Thickness of foundation = 0.6m

    Bottom level of foundation = 37.00 0.6

    = 36.40m

    Height = top level bottom level

    = 43 37

    = 6m

    Top width = 0.50m

    The downstream side wing wall is sloping at12 : 1 up to the bed level, then it is vertical

    Height of wing wall from ultimate bed level=43.00-39.75=3.25m.

    Width of wing wall @ ultimate bed level=0.4Xheight

    =0.4X3.25

    =1.3m

    Let us provide width ofwing wall @ ultimate bed level=2.125m

    From ultimate bed level to top of foundation is vertical on earth phase

    Height=top level-bottom level

    =43.00-37.00

    =6.00m

    Bottom width=0.4Xheight

    =0.4X6

  • 8/14/2019 Aqueduct Main Project Modify

    36/64

    Sri Sunflower College of Engineeri

    =2.4m

    Let us provide width ofwing wal

    Design of

    g & technology

    l=2.125m

    Syphon Aqueduct

    36

  • 8/14/2019 Aqueduct Main Project Modify

    37/64

    Sri Sunflower College of Engineeri

    Top level = bottom level of cent

    Bottom level = hard soil level =

    Bearing of canal tough = 0.5m

    Top width = 2 length of bearin

    = 2 0.5 = 1m

    Height of wall = top level bott

    = 39.42 37.00

    = 2.42m

    Bottom width = 0.4 height

    = 0.4 2.42

    = 0.968m

    Adopt bottom width = 2m

    Front batter = 1 in 8

    Design of

    g & technology

    Chapter -12

    Design of abutments

    al tough = 39.42m

    7.00m

    m level

    Syphon Aqueduct

    37

  • 8/14/2019 Aqueduct Main Project Modify

    38/64

    Sri Sunflower College of Engineeri

    Check for stability of abut

    Let us consider 1m length of wal

    Unit weight of RCC = 24 KN/m

    Weigh of triangular portion 1, V

    X1 = ( + 0.5) = 0.2m from point

    M1 = V1X1 = 8.71 0.2 = 1.74

    Weigh of triangular portion 2, V

    Design of

    g & technology

    ment:

    l

    1 = unit weight volume

    = 24 (0.5bhl)

    = 24 (0.50.32.421)

    = 8.71KN

    B

    KN-m

    = unit weight volume

    = 24 (bhl)

    = 24 (12.421)

    = 58.08 KN

    Syphon Aqueduct

    38

  • 8/14/2019 Aqueduct Main Project Modify

    39/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 39

    X2 = (0.3 + 0.5) = 0.8m from point B

    M2 = V2X2 = 58.08 0.8 = 46.46 KN-m

    Weigh of triangular portion 3, V3 = unit weight volume

    = 24 (0.5bhl)

    = 24 (0.50.72.421)

    = 20.32 KN

    X3 = (0.3+1+13 .) = 1.53m from point B

    M3 = V3X3 = 20.32 1.53 = 31.15 KN-m

    Reaction from canal tough, V4 =

    2=

    35.62.5

    2 = 44.58 KN

    X4 = (0.3+12 .) = 0.55m from point B

    M4 = V4X4 = 44.58 0.55 = 24.51 KN-m

    Total vertical force, V = V1+V2+V3+V4

    = 8.71+58.08+20.32+44.58

    = 131.69KN

    Earth pressure, p = KaH

    Ka =13, of earth = 20 KN/m

    3

    p =13 202.42 = 16.13 KN/m

    2

    Total pressure P = area of pressure diagram length

    = (12 16.13 2.42 1)

    = 19.51KN

    Y =13 2.42 = 0.81m

    M5 = P Y

  • 8/14/2019 Aqueduct Main Project Modify

    40/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 40

    = 19.51 0.81

    = 15.8 KN-m

    Overturning moment, Mo = 15.8 KN-m

    Net moment, M = MR MO = 103.86 15.8 = 88.06 KN-m

    Lever arm, a =MV =

    88.06131.69 = 0.66m

    Eccentricity, e = (b2 - a ) = (

    22 0.66 ) = 0.34m

    Max stress, max =VB ( 1 +

    6eB )

    =131.69

    2 ( 1 +60.34

    2 )

    = 133 KN/m2

    Min stress, min =VB ( 1 +

    6eB )

    =131.69

    2 ( 1 -60.34

    2 )

    = -1.31N/mm2

    (tension occurs)

    Factor of safety against overturning =MrMo =

    103.8615.8

    = 6.57 > 1.5 ( ok )

    Factor of safety against sliding =VP =

    0.6131.6919.51 = 4.04 > 1 ( ok )

    Allowable compressive stress in foundation concrete = 4 N/mm2

    (for M-15 grade)

    = 4000 KN/m2

    maxis less than 4000 KN/m2

    ( ok )

  • 8/14/2019 Aqueduct Main Project Modify

    41/64

    Sri Sunflower College of Engineeri

    Top level = bottom level of cent

    Bottom level = hard soil level =

    Bearing of canal tough = 0.5m

    Top width = 2 length of bearin

    = 2 0.5 = 1m

    Thickness of foundation = 0.6m

    Height of wall = top level bott

    = 39.42 37.00

    = 2.42m

    Bottom width = 0.4 height

    = 0.4 2.42

    = 0.968m

    Adopt bottom width = 2m

    Front batter = 1 in 8

    Design of

    g & technology

    Chapter -13

    Design of piers

    al tough = 39.42m

    7.00m

    m level

    Syphon Aqueduct

    41

  • 8/14/2019 Aqueduct Main Project Modify

    42/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 42

    Check for stability of piers:

    Width of pier = 1m

    Length of pier = width of canal tough = 12m

    Clear spacing between piers = 2.5m

    Length of canal tough on one pier = 2.5 + 1 = 3.5m

    On pier there is water pressure from 3.5m wide.

    Weight of pier, V1 = unit weight volume

    = (24122.421)

    = 696.96 KN

    It is acting at a distance, X1 = 0.5 12 = 6m from D

    M1=V1X1 = 696.96 6 = 4181.76 KN-m

    Weight of canal tough, V2 = Wwidth of canal toughlength of canal trough in consideration

    = 35.67123.5

    = 1498.14 KN

    It is acting at a distance, X2 = 0.5 12 = 6m from D

  • 8/14/2019 Aqueduct Main Project Modify

    43/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 43

    M1=V2X2 = 1498.14 6 = 8988.84 KN-m

    Total vertical force, V = V1 + V2

    = 696.96 + 1498.14

    = 2195.11 KN

    Resisting moment, MR= M1 + M2 = 4181.76 + 8988.84

    = 13170.6 KN-m

    Weight of water =w = 10KN/m3

    Water pressure, p =H =102.42 = 24.2 KN/m2

    Total pressure, P = area of pressure diagram width of water way

    = (12 24.22.42) (3.5)

    = 102.5 KN

    It is acting at a distance = 13 .

    = .

    M3 = = . . =

    Overturning moment, mo= m3= Net moment , m = ( mr mo) = 13170.6 83

    = 13087.6 KN-M

    Lever arm, a = =

    13087.62195.1 = 5.9 m

    Eccentricity, e = ( 2 ) = 122 . = .

    max = +

    6 =

    2195.1121 +

    60.112

    = . / 2

    min = 6 =

    2195.112

    60.112 = . /

    2

    Factor of safety against over turning = =13170.6

    83

  • 8/14/2019 Aqueduct Main Project Modify

    44/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 44

    = . ()

    Factor of safety against sliding = =0.62195.1

    102.5

    =.()

    Allowable compressive stress in foundation concrete = / 2

    = / 2

    max < 4000 KN/m2,

    min >0 (ok)

  • 8/14/2019 Aqueduct Main Project Modify

    45/64

    Sri Sunflower College of Engineeri

    DESIG

    U/S Wing wall :

    The wing wall as two portions

    1) Slopping wing wall

    2) Level wing wall

    The slopping wing wall is sloppi

    Let us assume M.F.L of drain =

    1) Slopping wing wall :

    a) Wing wall at junctioTop of wing wall (or)

    Top of foundation (o

    Height = top level

    = 43 - 37 = 6

    Thickness of foundati

    Bottom level of foun

    Top width = 0.5 m

    Bottom thickness

    Front batten

    Design of

    g & technology

    Chapter 14

    OF DRAINAGE WING WALL

    ng from top of wing wall for canal to the level

    1.50 m

    of trough : top level = 43.00

    ) bottom level = 37.00

    ottom level

    on = 0.6 m

    ation = 37.00 - 0.6

    = 36.40 m

    Syphon Aqueduct

    45

    f M.F.L.

  • 8/14/2019 Aqueduct Main Project Modify

    46/64

    Sri Sunflower College of Engineeri

    b) Wing wall at + 41.50

    Top level = 41.50

    Bottom level = 37.00

    Thickness of foundatiBottom level of foun

    Height = top level

    = 41.50 37.

    = 4.50 m

    Top width = 0.5 m

    Bottom width

    Front batten

    2) Level wing wall :

    Top level =

    Bottom level = 37.00

    Thickness of foundatiBottom level of foun

    Height = top level

    = 41.50 37.

    = 4.50 m

    Top width = 0.5 m

    Design of

    g & technology

    level :

    on = 0.6 ation = 37 0.6

    = 36.40 m

    ottom level

    00

    41.50

    on = 0.6 ation = 37 0.6

    = 36.40 m

    ottom level

    00

    Syphon Aqueduct

    46

  • 8/14/2019 Aqueduct Main Project Modify

    47/64

    Sri Sunflower College of Engineeri

    Bottom width

    Front batten

    D/S Wing wall :

    The sloping wing wall is slop

    1) Slopping wing wall :

    a) Wing wall at junction

    Top of wing wall

    Top of foundation (o

    Height = top level

    = 43 - 37 = 6

    Thickness of foundati

    Bottom level of foun

    Top width = 0.5 m

    Bottom thickness

    Front batten

    Design of

    g & technology

    ping from top of wing wall for canal to level of

    f trough

    (or) top level = 43.00

    ) bottom level = 37.00

    ottom level

    on = 0.6 m

    ation = 37.00 - 0.6

    = 36.40 m

    Syphon Aqueduct

    47

    40.50 m

  • 8/14/2019 Aqueduct Main Project Modify

    48/64

    Sri Sunflower College of Engineeri

    2) Level wing wall :

    Top wing wall = 40.50 m

    Bottom level = 37.00 m

    Height of wall = 3.50 m

    Thickness of foundation =

    Top width = 0.5 m

    Bottom width

    Front batten = 1 in 8

    Design of

    g & technology

    0.60 m

    Syphon Aqueduct

    48

  • 8/14/2019 Aqueduct Main Project Modify

    49/64

    Sri Sunflower College of Engineeri

    U/S Return wall :

    Top level = 41.50

    Bottom level = 37.00

    Thickness of foundati

    Bottom level of foun

    Height = top level

    = 41.50 37.

    = 4.50 m

    Top width = 0.5 m

    Bottom width

    Front batten

    Design of

    g & technology

    Chapter -15

    Design of return wall

    on = 0.6

    ation = 37 0.6

    = 36.40 m

    ottom level

    00

    Syphon Aqueduct

    49

  • 8/14/2019 Aqueduct Main Project Modify

    50/64

    Sri Sunflower College of Engineeri

    D/S return wall :

    Top wing wall =

    Bottom level =

    Height of wall =

    Thickness of foTop width = 0.5

    Bottom width

    Front batten = 1

    Design of

    g & technology

    40.50 m

    7.00 m

    3.50 m

    ndation = 0.60 m m

    in 8

    Syphon Aqueduct

    50

  • 8/14/2019 Aqueduct Main Project Modify

    51/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 51

    Chapter -16

    Design of canal apron

    In between the canal wings, concrete is laid as a apron to prevent water percolating by the side

    of the abutment exert pressure under the drainage apron. The uplift is maximum when the canalis full and drainage is empty.

    In this case, the gross head causing uplift at F.S.L

    Before the water creeps to the bottom of the drainage aprons, some head is lost .assuming that

    the canal apron is laid sloping from the top of trough slab +39.75 to a level +38.00 (ground level

    ) for a length of L meters, as shown in fig the vertical creep is neglected.

    The canal wing upstream and downstream will be splayed such that by the time the end of apron

    is reached, the distance between their faces is equal to the theoretical bed width of

    canal,i.e.,20.00 meters. This decides the splay of canal wings.

    The apron is to be laid from canal sill level to natural ground level

    Gross uplift head = canal F.S.L-foundation level

    = 42.00-37.00

    = 5m

    Let us provide the canal apron sloping from top of the trough slab +39.75 to a level (ground

    level) = 38.00

  • 8/14/2019 Aqueduct Main Project Modify

    52/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 52

    Let us provide 60cm thick mass concrete for drainage floor

    Thickness = residual head/(P-1)

    0.6 = residual head/(2.40-1)

    Residual head =0.84m

    Net uplift head = gross uplift head -residual head

    = 5.0-0.84

    = 4.16

    Let us assume exit gradient

    GE= 1 in 4 = =

    14

    4.16 =

    14

    Therefore L = 17m

    Length of apron(L)=17m.

  • 8/14/2019 Aqueduct Main Project Modify

    53/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 53

    Chapter -17

    Checking the depth of foundation of drainage returns by scour depth

    Upstream side

    Maximum flood discharge = 60 m3/sec

    Maximum flood level = 40.94m

    Length of apron retaining wall = 14m (assume)

    Discharge per meter length of apron retaining wall

    q = 60/14 = 4.3m2/sec

    Depth of scour = 1.374 (q2/f)1/3

    = 1.374 ((4.3)2/1)

    1/3

    = 3.562m

    The foundations of returns and apron retaining wall are to be taken down to 40.36-3.56

    = 37.38

    However the foundations have been taken down to +36.40 and are quite safe.

    On D/s side also, the foundations are taken down to +36.40 and as the distance between the

    returns is also more or less same . The foundations adopted are safe.

  • 8/14/2019 Aqueduct Main Project Modify

    54/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 54

    Chapter -18

    INSPECTION TRACK

    The inspection track on the left embankment of canal also has to be taken across the drain by

    means of a bridge just by the side of the canal trough.

    The width of roadway between kerbs may be kept large enough to meet the demands of traffic

    proposed on the canal banks. In this case, it is kept as 3.65 meters (12 feet wide). Depending on

    the traffic, the road bridge may be designed. In the present case, the roadway is carried over plain

    concrete arches since there is enough headroom above water level. The springings of arches are

    kept above water level in the drain.

    Semi-circular arches or reinforced concrete deck slabs can be adopted.

    In this case the thickness of 50 cms adopted for the arches is quite enough and the detailed

    design of arch is not attempted.

    Keep the springing level of arches a little above the rear M.F.L., i.e., +40.00.

    Bottom level of arch (intrados) is 40.00 +.

    =..

    Thickness of arch = 0.50 m.

    Therefore, top of arch (extrados) = 41.75.

    This top level of road surface may be kept at +43.00. The space in between the road level and

    top of arch is covered with earth to act as cushion over the arches.

    The road width between kerbs is kept at 3.65 meters with suitable parapets. The inspection

    track over the arches is suitably connected to the canal banks by canal transitions.

  • 8/14/2019 Aqueduct Main Project Modify

    55/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 55

    Chapter -19

    Design of pier-cap

    i. Thickness of cap = 600mm (assume)

    ii. Projection on each side = 600mm (assume)

    Reinforcement detailing

    1. Minimumarea of steel, ast1min =0.12% gross area

    = (0.12/100)*600*1000

    = 720mm2

    2. Maximum area of steel, ast1max = 4% of gross area

    = (4/100)*600*1000

    = 24,000mm2

    Load on the pier V =2195.11 KN

    Number of pier = 2

    Load on each pile = 2195/2

    V= 1097.5 KN

  • 8/14/2019 Aqueduct Main Project Modify

    56/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 56

    Shear force v = 2 1097.5 =

    1.82

    W = 1220 KN/m

    Here the beam is considerd as a continuous beam

    Max bending moment =212

    =1220 1.8 1.8

    12

    = 329.25 KN-m

    Factored moment = Mu = 1.5 X M = 1.5 X 329.25 = 493.875 KN-m

    Check for thickness

    Mu, limit = 0.36

    bd2

    fck(1 0.42

    )

    for Fe-415 grade steel

    = 0.48

    Here b= 1000 mm

    D= 600 mm

    d1= 50 mm

    d = D - d1

    = 600 50 = 550 mm

    fck= 20 N/mm2

    Mu, limit = 0.36 X 0.48 X 1000 X 5502 X 20 (1 0.42 X 0.48)

  • 8/14/2019 Aqueduct Main Project Modify

    57/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 57

    = 834 KN-m

    Mu < Mu, limit (O.K)

    Thickness is satisfied.

    (a)Main steel

    Mu= 438 KNm

    Mu=0.87fyastd (1- (Ast fy/ b d f c k ) )

    = .

    = . ((()/()))

    = 2(. )

    Ast = 6396 mm2

    Ast = 20109 mm2

    Adopt Ast = 6396 mm2

    Xu/d = 0.87fyAst/0.36fckbd = 0.42 ;

    (xumax/d) > (xu/d) (ok)

    Ast = 20109 mm2

    Xu/d =2.96 (not ok)

    Ast = 6396 mm2

    Let us adopt =16 mm

    A =

    4 * 162

    = 201mm2

    = AstA==2240201 =

    = = .

    Adopt 16mm @75mm c/c on both sides

    (b)Distribution steel:-

    Ast= Ast1in2 =760

    2 = 380mm2

  • 8/14/2019 Aqueduct Main Project Modify

    58/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 58

    Adopt = 10mm

    A =

    4 * 102

    = 78.53mm2

    = Ast

    A

    == 380

    78.53

    = .8

    s = 206mm

    Adopt 10mm @ 200mm c/c on both sides

  • 8/14/2019 Aqueduct Main Project Modify

    59/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 59

    Chapter -20

    Design of pile foundation

    Pier cap size 2.4 wide *4.2m length

    Adopt 6 numbers 450mm piles

    Pier cap thickness 1.2m

    20 mm dia @ 150mm c/c in top and bottom

  • 8/14/2019 Aqueduct Main Project Modify

    60/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 60

    Chapter -21

    Design of foundation of abutment and piers

    Foundation of piers and abutments are to be taken down to hard ground. As per data, hard

    ground is available below +37.00.

    So the foundation of piers level of foundation is +37.00.

    As seen in the plan the drainage sill is kept at +37.00 and with a depth of drainage floor as 60

    cms, the bottom level of the drainage apron also is at +36.40.

    So, the drainage apron, foundation of piers and abutments will all be laid as one block of

    concrete of 60 cms. thick (for the drainage barrel portion) as shown in the plan.

    This distributes the load of the structure evenly on the soil below and drainage apron will also be

    capable of acting as an inverted arch to take care of the extra uplift pressure.

    Where the soil of enough bearing capacity is met with at a deeper level, the foundation will be

    taken deeper and the drainage apron will be at higher levels. in such cases, the actual pressure

    under the foundation of abutments will have to be checked and verified so that they do not

    exceed the safe bearing capacity.

    The drainage apron in such cases, not being monolithic with the foundation of the abutments and

    piers will not be able to take care of the any uplift pressure by arch action. The uplift pressure

    that can be resisted is only due to the weight of the concrete apron.

    In the present case, for safety the thickness of the pier adopted is 1.00 meter. Abutment under the

    road arches has a bottom width of 1.75 meters and top width of 1.00 meter .the abutment under

    the road arches has a bottom width of 2.25 meters and a top width of 1.25 meters. The abutment

    has a uniform face better 1 in 8.

    These abutments, in actual construction, will have to be carefully checked for the stability taking

    into account the earth pressures, surcharge, etc. acting on them. The maximum pressures on the

    soil have to be checked so that they do not exceed the safe bearing pressure on the foundation

    soil.

  • 8/14/2019 Aqueduct Main Project Modify

    61/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 61

    Arc lengths to fix the lengths of drainage wings

    Downstream side of drain:

    Canal F.S.L +42.00

    Drainage bed +37.00

    Difference +5.00 m

    Arc length =5 meters.

    Upstream of drain:

    Canal F.S.L +42.00

    Drainage bed +38.00

    Difference +4.00 m

    Arc length along which creep may occur =4X4=16 meters.

    Since the downstream transitions of canal will be lined with masonry even beyond the canal

    wings, the creep length is fixed from the end of canal aprons upstream and the arch length along

    which creep occurs is shown in the plan.

    In the drawing, keeping the distance between the returns as 14 meters both upstream anddownstream and keeping the lengths till the hydraulic gradient cuts the proposed drain bed level,

    the actual arc lengths along which the creep occurs are more than the required. Hence the

    proposed splays as in the drawing are adopted.

    Solid apron in the drainage bed will be provided up to the end of the end of the drainage wings.

    The length of the drainage wings is limited by a hydraulic gradient as shown in dotted line in the

    drawing.

  • 8/14/2019 Aqueduct Main Project Modify

    62/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 62

    Chapter -22

    Design of anchorage arrangements

    Since the barrel is flowing full and the drain M.L.F. on both sides is above the bottom level of

    the roof slab there will be an upward thrust acting on the roof slab there will be an upward thrustacting on the roof slab.so the roof slab have to be well anchored to the piers and abutments to

    prevent the upward movement of the R.C. slab.

    The uplift is maximum when the barrel is full and canal empty. The worst condition is at

    upstream end of roof slab. M.F.L. just upstream of R.C. trough

    Bottom level of the trough

    Difference =1.14

    Thickness of roof slab

    Roof slab will counteract

    meters of uplift head

    Net uplift head

    Say 0.50 meters.

    So, necessary anchoring arrangements are provided as holding-down bolts fixed on the piers

    through R.C slab.

    Design of anchor bolts:

    Clear span of the slab =2.50m

    Upward thrust acting on one span along the entire width of slab

    = 2.5 X 12.60 X 0.5 X 1000 = 15750 kg.

    Assuming 20 mm dia.rod, the thrust that can be registered by one holding-down bolt

    = 1260 X 3.14 = 3956 kg.

    No bolts required =157503956 = 4 Nos (approx.)

    So provide 4 holding-down bolts on each pier.it is enough to provide half the number on the

    abutment, but in this case provide 3 bolts, one at each end of trough and one in the middle.

  • 8/14/2019 Aqueduct Main Project Modify

    63/64

    Design of Syphon Aqueduct

    Sri Sunflower College of Engineering & technology 63

    DRAWINGS