Erewash Housing Strategy 2011 – 16 Forward Plan 2011-12
This Forward Plan for the Housing Strategy outlines how we plan to deliver specific areas of housing services over the next one to two years.Clearly, there are many things which we have had to consider doing differently from before - due to cuts in finance and resources, changed partnership working, possible changes to legislation and regulation etc
We have outlined delivery under headings: What the objective is The particular area of work which will assist in delivering the objective Changed/possible changes which will affect delivery (including dates these changes will/may be implemented) Impact of these changes What options we now need to consider to deliver the objectives in light of the changes (including impact on other
objectives/joint working to meet objectives) What methods of delivery we know we will be using over the next 12 months Specific actions needed over the next 1 - 2 years (The main actions are highlighted in blue, and formulate the separate
Action Plan for the next year)
The Objectives are those outlined in the Housing Strategy.The Areas of Work generally reflect those outlined in Appendix E of the Housing Strategy, but these have been subject to some amendments made in March 2011.
Page 1 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
TPPS
E.1 Understanding and responding to housing and housing-related needs
Restricted funding for research generally
Need to be selective about research
Commissioning and carrying out research which will impact on delivery
Continue with Disabled Housing
Needs Research – to be completed by end 2011.
Stock condition survey update to be completed 2011
Objective: Deliver affordable housing across the BoroughTP E.2 Deliver as much affordable
housing as possible to meet identified needs
Restricted HCA funding.
New “Affordable Rent” model
Drastic cuts in EBC Social Housing Grant
Fewer numbers of new affordable housing. HCA funded schemes and converted re-lets may not be genuinely affordable
S106 negotiations for genuinely affordable units without grant
Use of remaining EBC Social Housing Grant to encourage external
Work with Housing Association s to take a “wait and see” approach – even if this means no HCA
Advise of general “stance” on HCA funded “Affordable Rent” housing. By March 2011
Develop Tenancy Strategy to advise HAs on our broad objectives for
Page 2 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
Increased homelessness and people in debt
funding/best meet needs
HCA funding (but will be Affordable Rents
Use of agreed council land sites for affordable housing
funded new housing in the borough in the short term
“affordable” housing. Within 12 months of the Localism Bill being implemented.
Put case for increased EBC Social Housing Grant from 2012
TP E.3 Achieve the right mix, tenure and proportion of affordable housing on new developments – based on robust evidence of need
New “Affordable Rent” model
“Flexible Tenancies”
New Affordable rent model and flexible tenancies may not meet needs
Try to achieve mix based on existing evidence – counting “Affordable Rented” as “intermediate affordable housing
Accept “Affordable Rented” housing, as an adequate model to meet needs of those normally met through social rented housing
Re-do evidence of
Develop Tenancy Strategy to advise HAs on our broad objectives for “affordable” housing. Within 12 months of the Localism Bill being implemented.
Consider revising evidence base, with other local authorities
Page 3 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
need, to show need for social rented, affordable rented, shared ownership, other products etc
TP E.4 Use Council’s Capital funds and assets to meet needs and access external funding
Drastic cuts in EBC Social Housing Grant
Unlikely to allocate council-owned land for affordable in the near future
Reduced capacity to access external funding and meet needs.
Use of remaining EBC Social Housing Grant to encourage external funding/best meet needs
Use of agreed council land sites for affordable housing
Deferred payments system for council land being used for affordable housing
Part of rents used to provide revenue funding for council, in exchange
Put case for increased EBC Social Housing Grant from 2012
Put case for allocation of council land for affordable housing from 2012 onwards
Page 4 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
for landTP E.5 Work with external funders
to access funding to meet identified strategic priorities
See E2 & E4 above
TPPS
E.6 Encourage the use of empty or market properties for affordable housing
Drastic cuts in EBC Social Housing Grant
HCA proposals to fund Empty Properties Schemes
No Council funding to enable empty properties schemes as previously
Possible to get HCA funding for Empty Properties Affordable Housing schemes
Await details of HCA funding for Empty Properties
Work with Housing Associations to bid for HCA funding for Empty Properties when available
TP E.7 Use planning powers to increase the supply of affordable housing
Possible change to the overall “target” number of new homes to be delivered
Possible increase in opportunities to secure s106 units.
More time and
Robust s106 agreements
Use of Three Dragons model to assess viability
Reduction of threshold for affordable housing requirement
Agree timetable for revision of threshold for affordable housing, in accordance with the LDF. By December
Page 5 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
More challenges on grounds of viability
work to assess viability. Possible reduction in amount/tenure of affordable housing units secured on “unviable” sites
2012
TP E.8 Manage and maintain affordable housing(Housing Associations)
HAs “stock rationalisation”
“Flexible Tenancies”
Fewer HAs in the borough
Tenancies of e.g. 5 years – more turnover, review of situation; homelessness; re-lets available
HAs to advise of changes in management and maintenance
HAs to advise of changes in management and maintenance
Work together to collate information on management & maintenance arrangements, and role of Flexible Tenancies. To assist in the formulation of the Tenancy Strategy.
Objective: Increase the number of homes in the borough to provide choice and meet needsTPAR
E.9 Use local development plans to strategically plan and influence the development of housing.
LDF Core Strategy not be adopted until 2012.
Revision of development plans, planning policy
Continue to use existing saved policies and planning policy
None at present
Work with planning policy section to start to revise policies and planning policy
Page 6 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
documents will be delayed until 2012/2013 onwards
documents documents. By March 2013
Objective: Improve and renovate private housing sectorPS E.11 Make available grants to
improve and repair properties. Continue to bring properties up to Decent Homes and other standards
Withdrawal of central government funding and pressures on EBC funding
Possible withdrawal of all grant aid (not Disabled Facilities Grants)
Enforcement Equity Release
Partnerships with HAs to acquire substandard properties and re-house occupiers.
Design new service taking account of funding changes.
Identify potential partners to assist.
Monitor impact on housing standards and residents.
PS E.12 Offer advice and assistance on maintaining homes and accessing grants
See above re. grant aid
Provision of advice will be unaffected. In the absence of grant aid Equity Release may be an option. In cases of serious housing defects, enforcement will be considered
Equity Release.
Enforcement.
Working with partners
Set service standards and parameters.
Page 7 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
PS E.13 Regulate private rented sector housing via enforcement, licensing and inspection powers
Withdrawal of funding for Decent Homes Grants
Reduction of funding may mean that no grant aid can be given
Increase in the amount of enforcement action undertaken.
Using existing staff resources
Provision of access to equity release to allow owners to undertake their own maintenance etc.
PS E.14 Promote landlord accreditation schemes
Withdrawal of funding from partner organisations (i.e. DASH)
DASH will require funding from all participating authorities
Unknown at this time
Not determined
Actions will depend on final budgets
PS E.15 Deliver the Private Sector Housing Strategy
The Private Sector Housing Strategy will need to be re-drafted to take account of funding reductions
Likely change in emphasis away from grant aid
Various options currently under consideration
Not known Level of funding will need to be known before any decisions can be made. Various draft scenarios are being developed but which is adopted will depend on political decisions.
Objective: Improve the energy efficiency & reduce carbon emissions of homesPS E.16 Ensure all residents are
provided with access to clear energy and carbon emissions reduction advice
None predicted N/A Same as existing, i.e. direct contact via telephone, email or home visit. Attendance at fetes,
N/A N/A
Page 8 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
carnivals etc. Mail-outs, energy calendar etc.
PS E.17 Enable and encourage the provision of affordable warmth in private sector homes, through advice, grants, discounted measures and partnership initiatives
Introduction of Green Deal (2012).
Warm Front budget reduced
Unknown – full details of scheme yet to be published. Reduction in number of grants paid. Increased excess winter deaths.
Unknown at this time
Unknown at this time
Value of green deal will be evaluated once full details released
PS E.18 Raise awareness of fuel poverty, energy efficiency and carbon reduction measures
Introduction of Green Deal (2012).
Warm Front budget reduced
Unknown – full details of scheme yet to be published. Reduction in number of grants paid. Increased excess winter deaths.
Unknown at this time
Unknown at this time
Value of green deal will be evaluated once full details released
TPRS
E.19 Encourage new homes to be as energy efficient and “eco-friendly” as possible
Higher energy efficiency levels for affordable homes not likely
Fewer ways to influence
Encouragement by planners and strategic housing officers,
None
Page 9 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
to be adopted particularly regarding measures to reduce fuel bills
Objective: Tackle empty properties and bring them back into useTPPS
E.20 Encourage Empty Properties to be brought back into use for affordable housing
See E6 above
PS E.21 Make available grants to encourage bringing empty properties back into use
Reduction in funding from central govt and EBC to enable empty properties grants
Removes ‘grants’ as an incentive to owners
Concentration on dealing with issues created and liaison with planning colleagues re. use of 215 powers
Accessing alternative sources of funding
Establish more proactive system of managing empty homes.
Liaise with partners to identify possible alternative sources of funding.
PS E.22 Use appropriate legislation to tackle problems associated with empty properties
Reduction of available funding
Removes ‘grants’ as an incentive to owners
Little prospect of offering assistance to
Concentration on dealing with issues created and liaison with planning colleagues re. use of 215 powers
Accessing alternative sources of funding
Establish more proactive system of managing empty homes.
Liaise with partners to identify possible alternative sources of
Page 10 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
owners or taking action which requires the availability of capital
Enforcement of appropriate legislation to tackle the individual impacts of the property on the local environment
funding.
Objective: Address Rural Housing NeedsTP E.23 Work with partners to meet
identified Rural Affordable Housing Needs
Reduced HCA funding/no specific allocation for rural.
Affordable Rents and Flexible Tenancies
May not get rural housing schemes funded
Possible impact on affordability & sustainability
Working with Waterloo and EMHA towards delivering the affordable housing demonstrated as needed in the Rural Housing Needs Surveys(subject to funding)
Working with Waterloo and EMHA to identify other sources of funding, if no HCA funding.
None
TP E.24 Highlight and address issues for sustainable communities in rural areas
Neighbourhood Plans/”Localism”
Local people may have more say/influence in housing and facilities in their
Where issues highlighted through rural affordable housing development –
None Monitor possible effects/implementation of Localism Bill/Neighbourhood plans
Page 11 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
villages refer and work with appropriate colleagues/agencies
TPAR
E.25 Help deliver rural affordable housing through implementation of “rural exception” planning policies
Affordable Rents
Flexible Tenancies
Possibly these will not meet criteria in Planning Policy GB7 re definitions of “Affordable in perpetuity”
Work with Housing Associations to identify and develop appropriate rural exception sites for needs identified.
Identify likely rural exception sites through Strategic Housing Land Availability Assessments
None at present
Action through Rural Housing Group:Assess impact of Affordable rents and flexible tenancies on Planning Policy GB7
Objective: Address the housing needs of people with physical disabilitiesTPPS
E.26 Increase understanding and awareness raising of physical housing needs of people with
None n/a Continue with Disabled Housing Needs Study – to be carried out with
Complete Disabled Housing Needs Study by end December 2011
Page 12 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
physical/sensory disabilities, of all ages and tenures
14 other Derbyshire and Nottinghamshire Local Authorities
TPPS
E.27 Consider and implement options for meeting these housing needs
None at present n/a As applicable dependent on findings and recommendations in the study
None
TPARRS
E.28 Encourage the building of properties to Lifetime Homes standards
Requirement for affordable and all new build properties to be to Lifetime Homes standard by 2011/2013, may not be implemented
Less opportunity to secure Lifetime Homes properties
Ensure as many as possible affordable properties which have EBC funding or land, are built to Lifetime Homes standard
None Assess impact and effectiveness of provision of Lifetime Homes
Objective: Tackle and prevent homelessnessSD E.29 Prevent Homelessness
through the provisions of good quality housing advice, appropriate support and access to homeless prevention initiatives
Increase in homeless grant funding.
Additional £10,000 CLG
Able to maintain same staffing levels in team.
Able to sustain schools
Some reduction in range of services to ensure in a position to deal with any increase in demand as economic
Monitor impact of economic situation on service.
Page 13 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
grant to fund youth projects
programme for a further year.
Provide mediation training in team.
Fund some pre-tenancy training.
situation worsens i.e. reduction in outreach, meetings attended
SDTP
E.30 Ensure good quality temporary accommodation is available where necessary
Potential increase in demand on service as economic situation worsens
Greater use of B&B as temporary acc.
Consider improving and extending existing leasing scheme to enable easier access to PRS.
Review of existing leasing scheme.
SD E.31 Enable and encourage people to access private rented accommodation
New guidance on use of DHP for other housing related costs including rent in advance, bond, removals etc.
Potential
Other options to enable access to PRS.
Work with Housing Benefits to agree use of DHP.
Work with Landlords or offer incentives to get one year
Use of DHP arrangements in place.
Page 14 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
change to legislation to allow discharge of homeless duty to PRS if one year tenancy.
tenancies.
SDTP
E.32 Ensure appropriate emergency and supported accommodation is available for vulnerable people
Possible cuts to Supporting People funding for supported accommodation
Closure/Reduction in supported accommodation available
No planned increases or developments
Monitor impact of possible Supporting People cuts
Review appropriateness of referrals to supported accommodation to make best use of resources
SDTP
E.33 Ensure timely move-on is available from supported and temporary accommodation
Reduction in funding and opportunities for new affordable accommodation
Increase in homelessness
Fewer affordable units for single people available for let/relet
No great impact
Continue to promote R2M form. Provide regular training on HO system.
Page 15 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
Potential loss of Derbyshire move-on post.
anticipated
SD E.34 Enable financial inclusion. Loss of DWP Financial Inclusion Champions Team.
Loss of pfeg working with school age children.
Loss of regional Illegal Money Lending Team.
Lack of funding leading to reduced capacity for free debt advice and all forms of FI
Greater numbers of the community experiencing serious debt issues, leading to repossessions and evictions.
Also clear links from this to affected physical and mental health due to stress.
Potential for financial education (capability) to significantly reduce for both
Continue to work with partners to secure funding for various FI initiatives.
continue to raise public awareness of all partners and agencies who can provide FI/money advice/support services.
Work with Financial Inclusion Derbyshire and all other partners to maximise FI resources and funding opportunities.
Page 16 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
activity from all appropriate agencies.
adults and children, leading to longer, ongoing money management/debt problems. Particularly a problem in light of the current economic climate, reduction in benefits, redundancies etc.
Increase in the activity of illegal money lending potentially causing homelessness due to fleeing violence and
Page 17 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
knock on effects on the local community, both social and economic.
Ensure Vulnerable People have access to suitable housing and supportTPSD
E.35 Ensure appropriate supported accommodation is available for vulnerable people to meet needs identified
See E32
TPSD
E.36 Ensure Floating Support is available for vulnerable people to meet needs identified
Increase in Floating Support Schemes over last 2 years
May be now sufficient Floating Support schemes to meet needs
Continue to support and monitor floating support schemes
None None
TP E.37 Ensure suitable provision of support and accommodation for high risk/high needs individuals
Possible/actual cuts in Supporting People funding
Existing supported accommodation providers unable to cope with needs
Unlikely to deliver new schemes over next 12 months
None Monitor need for more support and accommodation for high risk/high needs individuals
PS E.38 Private Sector Housing Withdrawal of Reduction or To be confirmed. Not known Strategy to be
Page 18 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
Strategy focussed to deliver assistance to vulnerable households
external funding for decent homes programme
termination of decent homes grant programme
One option being considered is Equity Release
revised once budget finalised.
PS E.39 Make available grants for disabled people to enable them to remain independent in their own homes
Possible reduction in funding
Increase proportion of budget spent on administration
To be confirmed once decisions on service delivery have been finalised
Final decisions on future service design will be made once budgets are finalised
TP E.40 Ensure provision of integrated services, equipment and devices, (MEDIQUIP/TELECARE)
Tessa to check with DCC and TVH
SD E.41 Enable financial inclusion See E34 above
Objective: Make Neighbourhoods SaferKT E.43 Ensure Landlords and
residents in all tenures have access to anti-social behaviour advice and support
Lack of staffing and funding could impact on availability of staff time
Availability of staff time would impact on ability to carry out action.
Various events and projects run at key times with key partners to promote services
Contained within Erewash Community Safety Partnership Plan 2011-2014
KT E.44 Widely disseminate information and raise public awareness on tackling anti-social behaviour and noise
Lack of staffing and funding could impact on availability of staff time
Availability of staff time would impact on ability to carry out action.
Various events and projects run at key times with key partners to promote services
Contained within Erewash Community Safety Partnership Plan 2011-2014
Page 19 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
nuisance to all residents.SDKT
E.45 Work with private landlords and Housing Associations to intervene at an early stage to try and prevent homelessness in cases of anti-social behaviour
Lack of staffing and funding could impact on availability of staff time
Availability of staff time would impact on ability to carry out action.
Partnership working continued to be promoted to ensure consistent working practices.
Contained within Erewash Community Safety Partnership Plan 2011-2014
KTPS
E.46 Provide advice and security measures for communities to reduce acquisitive crime, including supporting vulnerable people
Lack of staffing and funding could impact on availability of staff time and ability to purchase equipment
Residents would only receive advice on how to protect themselves and property and not necessarily any equipment.
Various events and projects run at key times with key partners
Contained within Erewash Community Safety Partnership Plan 2011-2014
KT E.47 Provide appropriate support and response to reports or fears of crime and anti-social behaviour
Lack of staffing and funding could impact on availability of staff time
Availability of staff time would impact on ability to carry out action.
Various events and projects run at key times with key partners
Contained within Erewash Community Safety Partnership Plan 2011-2014
KT E.48 Work to reduce the incidence of burglaries in new buildings by influencing design through
Changes to LDF process and timing
May not be a separate Supplementary Planning
Encourage through planning and pre-application discussions
Consider whether can do a Supplementary Planning Document
Page 20 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
the LDF and development control process
Document re Design Include broad
encouragement in the LDF
Objective: Provide and sustain employment and training opportunities through housing projects
TP E.49 Encourage and monitor the use of local suppliers and companies in delivering housing and housing related services
None None In Council & housing partners contracts and sub-contracts, conditions re use of local suppliers etc.
TP E.50 Work with housing partners to employ local staff and to provide training and apprenticeship opportunities
Cuts in funding for Council and Housing Partners
Less opportunity for employing new staff and training & apprenticeship opportunities
In Council & housing partners contracts and sub-contracts, conditions re use employment and training of local people.
Implement affordable housing partners training scheme
TP E.51 Prioritise housing and regeneration developments which will sustain local employment and businesses
Cuts in funding and opportunities for housing and
Other priorities may take precedent
Where possible, prioritise in council and housing partners
None None
Page 21 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
regeneration developments
developments.
Objective: Support wider plans to create sustainable communities through Housing and Regeneration initiatives
TPPSSD
E.52 Ensuring housing and regeneration initiatives contribute positively to health, employment, education, economic development, social inclusion and transport issues
Structural and funding changes to partner organisations in health, employment, education, economic development etc
Possible disruption to partnership working for a while
Consider health, employment, education, economic development, social inclusion and transport issues on all housing developments.Work in partnership, where possible, to deliver holistically
None
Objective: Provide a mix of housing tenures, types and sizes in order to create mixed and balanced communities
TPSDPS
E.53 Provide robust evidence and understanding of housing tenures, types and sizes required to meet the needs of communities
None n/a Continue with Older People Research & Disabled Housing Needs Research.
Assess whether/when evidence to be updated
Page 22 of 24
At April 2011
By Ref Area of Work What changes/possible changes
Impact Methods of delivery will be using over next 12 months
Other options to consider
Specific actions needed over next 1 – 2 years
Use existing evidence from Dwelling Size, Housing Needs, Housing Market Area, Rural Housing Needs, Private sector housing research/studies
TPSDPS
E.54 Avoid “ghettos” of specific tenure, types and sizes of property in one area
None n/a Pepperpotting of affordable housing on s106 sites
Work with planners to develop larger mixed community sites
None None
The Forward Plan will be reviewed by June 2012
Page 23 of 24
At April 2011
Abbreviations used
B & B Bed and Breakfast Accommodation EBC Erewash Borough Council pfeg Personal Finance Education Group
CLG (Dept of) Communities and Local Government
FI Financial Inclusion PRS Private rented sector
DASH Decent and Safe Homes HA (s)
Housing Association (s) R2M
Ready to Move form
DCC Derbyshire County Council HCA Homes and Communities Agency
S106
Section 106 – (planning agreement)
DHP Discretionary Housing Payment HO Housing Options TVH
Three Valleys Housing
DWP Department of Works and Pensions LDF Local Development Framework