7
US Army Corps of Engineers BUILDING STRONG ® Regional Update to Mitigation and Monitoring Guidelines and Regional Mitigation Ratios and Performance Standards Effort Presentation for Regulatory Information Forum 26 August 2010

Army Corps 2011 Mitigation Intro

Embed Size (px)

Citation preview

Page 1: Army Corps 2011 Mitigation Intro

US Army Corps of Engineers

BUILDING STRONG®

Regional Update to Mitigation and Monitoring Guidelines andRegional Mitigation Ratios and Performance Standards EffortPresentation for Regulatory Information Forum

26 August 2010

Page 2: Army Corps 2011 Mitigation Intro

BUILDING STRONG®2

Regional Update to Corps Mitigation and Monitoring Guidelines

Purpose: ► Establish regional mitigation and monitoring policy► Ensure guidelines reflect 2008 joint EPA and Corps "mitigation rule"

regulations► Make programmatic changes to improve mitigation-related procedures

Regional effort:► Representatives from all four Corps districts in SPD (San Francisco,

Sacramento, Albuquerque, Los Angeles) covering Arizona, California, Nevada, Utah, New Mexico, and parts of Colorado and Texas

► Representative from South Pacific Division (SPD, Corps regional headquarters in California)

Goal: Provide guidance to the regulated community and Corps Regulatory project managers

► Expectations related to mitigation► Technical information (e.g., aquatic resource impact assessment, mitigation

plan preparation, mitigation monitoring requirements and procedures)

Page 3: Army Corps 2011 Mitigation Intro

BUILDING STRONG®3

Implementation

Potential Programmatic Changes:► Information management: synchronized submittal of monitoring reports► Emphasize Mitigation Ratio-setting concepts► Emphasize Expanded Performance standards► Minimum monitoring period may be expanded beyond 5 years► Map and drawing standards

Estimated Timeline: ► Draft expected completion summer 2010► Internal Corps coordination fall 2010► Revised draft out for formal interagency coordination winter 2010/2011► Public review winter 2010/2011► Final Implementation Spring 2011

Page 4: Army Corps 2011 Mitigation Intro

BUILDING STRONG®4

Mitigation Ratios and Performance Standards Effort

Goals: ► Establish regional procedure for setting mitigation ratios► Establish regional, uniform mitigation performance standard language (not targets)

Non-Corps Participants:► Dr. Richard Ambrose, UCLA► Dr. Eric Stein, SCCWRP

Regional effort:► Representatives from all four Corps districts in SPD (San Francisco, Sacramento,

Albuquerque, Los Angeles) covering Arizona, California, Nevada, Utah, New Mexico, and parts of Colorado and Texas

► Representative from South Pacific Division (SPD, Corps regional headquarters in California)

Expect completion of draft products:► Mitigation ratio-setting procedure: submitted to SPD► Uniform performance standards: Jan 2011

Interagency coordination prior to finalization

Page 5: Army Corps 2011 Mitigation Intro

BUILDING STRONG®5

Mitigation Ratio-Setting Procedure

Benefits:

► Would provide structured decision-making procedure while retaining flexibility

► Allows for qualitative or quantitative assessments of impacts & mitigation

► Would create written rationale (decision document) for each ratio determination

► Would be accompanied by guidance for each step of checklist

► Greater efficiency

Will allow incorporation of functional/condition assessments

Page 6: Army Corps 2011 Mitigation Intro

BUILDING STRONG®6

Uniform Performance Standards Benefits:

► Better predictability for regulated community► Increased ability of Regulatory agencies to ensure compliance► Better gauge of long-term ecological viability of mitigation sites► Allow improved scientific comparison between mitigation sites

Focus:► Ecological performance standards (not water treatment)► Incorporation of reference sites► Incorporation of functional/condition assessments

Overall goals: ► Uniform PS language, not specific targets

• Why? Specific targets would require substantial research• Different aquatic resources and ecoregions throughout four Districts• Good goal for future, funded effort by region

► Expand beyond flora-based PS• Why? Flora-based PS do not represent full suite of ecological functions provided by

impacted and mitigation sites

Page 7: Army Corps 2011 Mitigation Intro

BUILDING STRONG®7

Questions?