ATP vs GATP

Embed Size (px)

Citation preview

  • 8/15/2019 ATP vs GATP

    1/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    Detail Comparison of Availability

    Check with SAP R/3 vs. SAP APOGlobal Available to Promise 

  • 8/15/2019 ATP vs GATP

    2/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%

    ack!ro"n#

    Overview of A$P check

    System benefits of APO %GA$P& check

    'i!h level comparison of APO GA$P vs. R/3 A$P

    Prere("isite for APO Global Available to Promise

    Prere("isite for R/3 A$P check

    Pro#"ct Availability Check Comparison APO GA$P vs. R/3 A$P check

    Gaps where R/3 short falls

    Pro#"ct Allocation Check

    Comparison APO GA$P vs. R/3 A$P check

    Gaps where R/3 short falls

    Pro#"ct S"bstit"tion Comparison APO GA$P Pro#"ct s"bstit"tion vs. R/3 )aterial #etermination

    ackor#er Processin! %OP&

    Comparison APO GA$P vs. R/3 A$P check

    Gaps where R/3 short falls

    Contents

  • 8/15/2019 ATP vs GATP

    3/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'

    Background

    Sole purpose of t*is presentation is to compare +asic Met*ods of

    aaila-ility c*ec aaila-le in /!! SD and 0O 10T, and to

    prepare a case for 10T.

    2*y !lient s*ould go for 10T een w*en t*ey are planning to

    implement only +asic Met*ods of 0aila-ility c*ec3

    "n 45 few met*od of 0T c*ec are aaila-le, -ut no new

    deelopments are taing place in t*is area, w*erein in 0O t*ese

    met*ods are continuous eoling.

  • 8/15/2019 ATP vs GATP

    4/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6

    Overview

    An A$P check is an online search "se# for verifyin! that the re("este#

    pro#"ct can be provi#e# by the company in the ("antity an# on the #atere("este# by the c"stomer 

    Availability check is the inte!ral part of the b"siness process which#etermines if the #esire# #elivery (ty can be met on the #esire# #ate. thisincl"#es sche#"lin! for pickin! an# packin! time an# the time taken topro#"ce or obtain the material as well.

    Availability checks are tri!!ere# as events in the O*$P system + either by theR/3 System or a le!acy system + an# an A$P re("est is sent to APO for allAPO relevant pro#"cts in the or#er .

    ,n many O*$P systems- A$P f"nctions are limite# or noneistent. Previo"sA$P f"nctionality as known from R/3 allowe# pro#"ct selection- sin!le

    s"bstit"tion on plant level %one item #"rin! A$P check&. ,n assembly or#erprocessin! normally infinite capacity ha# to be ass"me#- only in case of#irect !eneration of pro#"ction or#ers or pro#"ction or#er networks thecapacity check co"l# be carrie# o"t.

  • 8/15/2019 ATP vs GATP

    5/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7

    APO GATP vs. R/3 ATP check - Syste !ene"its o" APO

    System benefits

    - 8ast response t*roug* lie!ac*e9 use for 0T c*ec

    - :ig* performance een wit* a *ig* olume of data

    - 4ic*, state;of;t*e;art functionality in 0O

    9 :ig* performance, memory resident data processor to perform

    planning and optimi

  • 8/15/2019 ATP vs GATP

    6/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'

    APO GATP vs. R/3 ATP check # $igh %eve% co&arison

    A$P "sin! CC %R/3& SD- +asic aaila-ility c*ec

    - roduct allocation !*ec

    - Material Su-stitution

    - +ac Order rocessing and Order re;sc*eduling

    - Deliery sc*eduling and Transportation sc*eduling

    A$P "sin! APO GA$P- +asic aaila-ility c*ec

    - /n*anced roduct allocation c*ec

    -  0dance leel roduct Su-stitution or "nterc*angea-ility

    - /n*anced +acorder processing.

    -  0dance Transportation and s*ipment sc*eduling- !*ec "nstruction to define steps of aaila-ility c*ec (for e.g. 8irst step as

    +asic aaila-ility c*ec or roduct allocation c*ec)

    - +" 4eports on 0aila-le to romise qty, and roduct 0llocation qty, can easilydeeloped eit*er in 0O;+" or /nterprise +".

  • 8/15/2019 ATP vs GATP

    7/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'=

    Advance 'ethods o" Avai%a!i%ity Check in APO GATP

     0dance met*ods *ae clear cut edge oer 45 0T c*ec, and

    not coered in t*is presentation.- owerful new order promising functionalities deliered -y 1lo-al 0T

     4ule;-ased 0T (4+0T)

    -  0lternatie locations, consolidation locations

    !apa-le To romise (!T)

    - "ntegrated c*ec against production plan, considering finite

    constraints

    Multi leel 0T (M0T)

    -!*ec across +OM leels and confirming a cumulated aaila-ilitydate after +OM e>plosion

    !*aracteristic -ased 0T

    - !*ecing for aaila-ility of items matc*ing certain c*aracteristics

    T*ird arty Order rocessing

  • 8/15/2019 ATP vs GATP

    8/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'$

    Prere(uisite "or APO G%o!a% Avai%a!%e to Proise

    A$P check for or#ers in ("estion m"st be set to takeplace in APO

    R/3- mySAP RP- or SAP CR) as an or#ermana!ement system

    What does that mean?! 

    $ypically- in the set"p of Global Available+to+Promise %GA$P&- yo"specify %once& in the SAP APO Core ,nterface %C,0& that yo" wantyo"r A$P c"stomi1in! settin!s transferre# from R/3 %or mySAP

    RP& to SAP APO

    $hen- in another inte!ration mo#el of the C,0- yo" m"st haveselecte# the A$P check switch for the materials yo" havespecifie# in that inte!ration mo#el

  • 8/15/2019 ATP vs GATP

    9/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'?

    Prere(uisite "or APO G%o!a% Avai%a!%e to Proise

  • 8/15/2019 ATP vs GATP

    10/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''&

    Prere(uisite "or R/3 ATP Prere(uisite "or R/3 ATP

    A$P check m"st be set to occ"r in R/3

    2hat #oes that mean4

     5o"6re "sin! R/3 an# not APO for A$P checks

  • 8/15/2019 ATP vs GATP

    11/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'''

    Product Avai%a!i%ity Check )ATP check* # the Basics

    Pro#"ct Availability checkPro#"ct Availably check is #one on Available to Promise %A$P& (ty.

    $his type of check is performe# #ynamically for each transaction- takin!

    into acco"nt the relevant stock an# planne# !oo#s movements with or 

    witho"t replenishment lea# time

    2hat Pro#"ct Availability check sho"l# #o; Check a!ainst available to Promise7 wareho"se stock- the planne#

    inwar# movements of stock %pro#"ction or#ers- p"rchase or#ers-

      planne# or#ers& an# the planne# o"twar# movements of stock %sales

      or#ers- #eliveries- reservations&.

    + Consi#er Replenishment *ea# time

    8ote that both sol"tions 9 R/3 an# SAP APO 9 can satisfy

      all these items- to some etent

  • 8/15/2019 ATP vs GATP

    12/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''%

    Product Avai%a!i%ity Check in APO # +ey Ca&a!i%ities -Tie

    Series

      Pro#"ct availability check $ime series

    Checkin! hori1on

    Characteristics %A#vance )etho#&

    $ime Series T*e roduct 0aila-ility !*ec uses time series, t*at represent t*e

    incoming and outgoing moements (receipts and issues) for a specific

    product. "ndiidual time series e>ist per 0T category on t*e product,

    location, su-;location, and ersion leel.

     "n order to distinguis* -etween 0T c*ecs wit* different degrees of,

    certainty (risy s. conseratie), i.e. w*et*er or not a product will -e instoc in t*e future, a time series e>ists for eery type of @0T category.@

    8or e>ample, a conseratie aaila-ility c*ec can e>clude purc*ase

    requisitions from consideration.

  • 8/15/2019 ATP vs GATP

    13/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''

    Product Avai%a!i%ity Check in APO # +ey Ca&a!i%ities -Tie

    Series

  • 8/15/2019 ATP vs GATP

    14/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''6

    Product Avai%a!i%ity Check in APO - +ey Ca&a!i%ities #

    Checking $ori,on Checkin! hori1on7 

    A metho# to check a!ainst replenishment lea# time 

    Checking horizon, defines a time interal (c*ecing date A period) in w*ic*a product aaila-ility c*ec can -e carried out.

      :& 8o checkin! hori1onB T*e product aaila-ility c*ec considers all receipt

    elements and requirements elements wit*in t*e scope of c*ec.

      ;& Confirmation in checkin! hori1on B 0 irtual, infinitely large requirementin t*e c*ecing *ori

  • 8/15/2019 ATP vs GATP

    15/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''7

    Product Avai%a!i%ity Check in APO - +ey Ca&a!i%ities #

    Checking $ori,on

  • 8/15/2019 ATP vs GATP

    16/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''

    Product Avai%a!i%ity Check in R/3 - +ey Ca&a!i%ities #

    Checking $ori,on Pro#"ct Availability check 

    Check on the asis of the A$P

  • 8/15/2019 ATP vs GATP

    17/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''=

    Product Avai%a!i%ity Check - Co&arison APO vs. R/3

    R/3 an# mySAP RP 8ormal #atabase- re#"ce#

    performance 

    Replenishment lea# time

      % options aaila-le i) Dont include 4CT

     "i) "nclude 4CT

    8o new #evelopment in R/3

    APO $ime series- %0ast response thro"!h

    liveCache= "se for A$P check)

    Check 'ori1on

      options 0aila-le

    i) Eo !*ec

    "i) !onsider !*ecing *ori

  • 8/15/2019 ATP vs GATP

    18/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''$

    Product Avai%a!i%ity Check Ga&s where R/3 "a%%s short

    A#vanta!es of APO

    $ime Series

    Check 'ori1on with Calen#ar 

    8ew 0eat"res in APO

    Parameter+Depen#ent Safety Stock %PASS&

    Characteristic ase# Plannin! %A#vance )etho#&

    8o new #evelopments in R/3

  • 8/15/2019 ATP vs GATP

    19/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''?

    Product Avai%a!i%ity Check Ga&s where R/3 "a%%s short

    ) cont.*

    "siness re("irement for PASS7

    Safety stock ("antity will be calc"late# #ynamically

    F Calc"lation of PASS #epen#s on c"stomer master #ata

    F Calc"lation #epen#s on parameters of the fiel# catalo!

  • 8/15/2019 ATP vs GATP

    20/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%&

    Product A%%ocations - the Basics

    2hen to !o for Pro#"ct allocation Pro#"ct allocation allows yo" to mana!e the s"pply of scarce

     pro#"cts to c"stomers so that each c"stomer receives an allocate#

     amo"nt

    2hat Pro#"ct allocation check #oes Allows to confirm Sales Or#er to the etent that partic"lar c"stomer has

    an allocation. >sin! pro#"ct allocations in sit"ations in which a pro#"ct is in short

    s"pply- yo" can avoi# allocatin! the entire available ("antity to the firstc"stomer 

    2ork only on selecte# pro#"ct/ material where it is #efie# in master#ata.

    Allow to perform Allocation check on )aterial Availability #ate-

    Re("este# #elivery #ate etc. 0ollows allocation proce#"re- which can be #efine# as per clients

    re("irement

    8ote that both sol"tions 9 R/3 an# SAP APO 9 can satisfyall these items- to some etent

  • 8/15/2019 ATP vs GATP

    21/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%'

    Product A%%ocations in APO

    Pro#"ct allocation f"nctionality 

    ,t allows yo" to mana!e the s"pply of scarce pro#"cts to c"stomers sothat each c"stomer receives an allocate# amo"nt.  

    'ow is it "se# 

    A pro#"ct allocations check can act as a secon#ary check a!ainst the

    sales or#er re("este# ("antity. At first a basic A$P check a!ainst stock

    an# s"pply- can be performe#- possibly res"ltin! in a lower confirme#

    ("antity #"e to ina#e("ate stock. $his confirme# ("antity can then be

    checke# a!ainst the allocation ("ota- f"rther re#"cin! the confirme#

    ("antity.

  • 8/15/2019 ATP vs GATP

    22/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    %%

    Product A%%ocations in APO # ie%d Cata%ogue and Product

    A%%ocation O!ect 0iel# Catalo!"e 

    $he fiel# catalo! contains the fiel#s that are can be "se# for pro#"ctallocations an# r"les+base# availability check.

    0or e.!. Pro#"ct 'ierarchy- Sales District etc.

    Pro#"ct Allocation Ob?ect  $he reason for allocatin! pro#"cts in the characteristics combination.

    $he pro#"ct allocations ob?ect can be chan!e# by the pro#"ct

    allocations control to reflect a chan!e in the reason for allocatin!

    pro#"cts.

    $he pro#"ct allocation ob?ect is assi!ne# to a pro#"ct allocation

    proce#"re in the pro#"ct allocations control. $his assi!nment is aprere("isite for pro#"ct allocations.

  • 8/15/2019 ATP vs GATP

    23/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    %

    Product A%%ocations in APO # +ey ca&a!i%ities - PAG

  • 8/15/2019 ATP vs GATP

    24/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%6

    Product A%%ocations in APO # +ey ca&a!i%ities - PAG

    $he pro#"ct allocations f"nctionality combines plannin! tools with real+time

    A$P f"nctionality. $he info str"ct"re %"se# in R/3& has been partially replace#by the pro#"ct allocation !ro"p %,n APO&.

    $he pro#"ct allocation !ro"p #efines a !ro"p of characteristics an# is "se#

    for savin! pro#"ct allocation ("antities with their assi!nments.

    2ithin the pro#"ct allocation !ro"p- the plannin! hierarchy is replace# by

    the characteristics combination. $he characteristics combination contains

    the val"es of the characteristics from the c"rrent sales or#er- an#- as s"ch-

    correspon#s to the lowest level of the plannin! hierarchy in which all

    characteristics are assi!ne#.

    >sin! a characteristics combination in pro#"ct allocation- a pro#"ct

    allocation time series is chosen. $he check is then carrie# o"t a!ainst this

    time series.

  • 8/15/2019 ATP vs GATP

    25/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%7

    Product A%%ocations in APO # +ey ca&a!i%ities # Product

    A%%ocation Procedure

     Pro#"ct allocation proce#"res are #efine# as m"ltiple steps of pro#"ct

    allocations !ro"ps.

     2hen a new or#er is checke#- each step %pro#"ct allocation !ro"p& is eval"ate#

    se("entially. $he res"lt of the prece#in! step is applie# to the s"bse("ent step.

  • 8/15/2019 ATP vs GATP

    26/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%

    Product A%%ocations in APO # +ey ca&a!i%ities # Product

    A%%ocation Se(uence

  • 8/15/2019 ATP vs GATP

    27/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%=

    Product A%%ocations in APO # +ey ca&a!i%ities # Product

    A%%ocation Se(uence )contd.*  $he remainin! open ("antity of the previo"s check of the pro#"ct

      allocation proce#"re is c"m"late# to the net entry in the se("ence of 

      pro#"ct allocations proce#"res.

      $he system i!nores the entry for the pro#"ct allocation proce#"re in

      the pro#"ct master if it is also incl"#e# in the se("ence of pro#"ct

      allocation proce#"res.  $he final res"lt of the allocation check in the pro#"ct allocation

      proce#"re is calc"late# as the lo!ical @OR offere# by each of the

      pro#"ct allocation proce#"res.

  • 8/15/2019 ATP vs GATP

    28/55

  • 8/15/2019 ATP vs GATP

    29/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'%?

    Product A%%ocations in R/3 )cont.*

    3. ,n the pro#"ct allocation hierarchy- an info str"ct"re is assi!ne# to

    the pro#"ct allocation #etermination proce#"re. $his info str"ct"reinfl"ences the criteria which #etermine how the pro#"ct allocations are

    store# in the plannin! hierarchy.

    B. ,n the Control pro#"ct allocation no#e- one or more pro#"ct

    allocation ob?ects are assi!ne# to the pro#"ct allocation #etermination

    proce#"re. very ob?ect has its own vali#ity perio#.D"rin! the availability check- the relevant ob?ect is #etermine# "sin! the

    #elivery #ate from the or#er. $he ob?ect an# the info str"ct"re from the

    pro#"ct allocation hierarchy are "se# to #etermine the plannin!

    hierarchy in which the pro#"ct allocations %bein! checke# a!ainst& are

    store#.

    . Similar to the availability check a!ainst A$P ("antities- yo" m"st

    specify whether a pro#"ct allocation check is to be carrie# o"t at

    re("irements class level an# sche#"le line level or not.

  • 8/15/2019 ATP vs GATP

    30/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'&

    Product A%%ocations Co&arison APO vs. R/3

    APO

    Define Pro#"ct Allocation !loballyor *ocation specific

    Pro#"ct Allocation Check at#ifferent #ate %)aterial Availability

    Date- Re("este# Delivery #ate orGoo#s ,ss"e #ate&

    Pro#"ct Allocation Se("ence isavailable.

    >sereits are available to fine t"neclients re("irements

    Allocation can be easily mana!e#/viewe# in DP Plannin! ook

    R/3 an# mySAP RP

    Once Pro#"ct Allocation is #efine#in )ater )aster- its applicable for all

    plants.

    Only Re("este# Delivery #ate

    option is available

    *,S ,nfo str"ct"re are "se# to store

    allocations

  • 8/15/2019 ATP vs GATP

    31/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&''

    Product A%%ocations Ga&s where R/3 shorts "a%%

    A#vanta!es of APO

      option to carry o"t pro#"ct allocation for a material only in selecte#plants.

      lant;specific use of product allocation is a standard function, in t*e 45System it is EOT. "n /!! t*e product allocation determination procedure isentered in t*e -asic data for t*e material master and applies to all plants fort*e material, w*ere in 0O allocation procedure can -e define at plant leel

    or glo-al leel. Goss note &=&H

    option to carry o"t pro#"ct allocation check on #ifferent #ates

      "n 0O, roduct allocation c*ec can -e performed at Material 0aila-ilityDate, Deliery Date or 1ood "ssue date of sales order, w*ere as in /!! itsonly Delier date.

    option to "se se("ence of steps for allocation check

      "n 0O, roduct allocation sequence can -e defined so t*at multiple steps ofroduct allocation procedure can -e performed. "n /!! only one roduct

    allocation procedure can -e defined.

  • 8/15/2019 ATP vs GATP

    32/55

  • 8/15/2019 ATP vs GATP

    33/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'

    Product Su!stitution # the Basics

    2hen is Pro#"ct S"bstit"tion is "se# Pro#"ct s"bstit"tion is "se# for checkin! for alternative pro#"cts-

    when ori!inally or#ere# pro#"ct is not available.

    2hat sho"l# a Pro#"ct S"bstation sol"tion #o *ook for alternate Pro#"ct.

    Pro#"ct ,nterchan!eability

    8ote that both sol"tions 9 R/3 an# SAP APO 9 can satisfy

    all these items- to some etent- b"t in R/3 has very limite#

    f"nctionality as compare# to APO

  • 8/15/2019 ATP vs GATP

    34/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6

    Product Su!stitution )RBA* in APO # key Ca&a!i%ities

    Pro#"ct Determination Proce#"re

    or ,nterchan!eability )aster Data

    R"le Control

    Calc"lation Profile

  • 8/15/2019 ATP vs GATP

    35/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7

    Product Su!stitution in APO # key Ca&a!i%ities- Product

    Su!stitution &rocedure

  • 8/15/2019 ATP vs GATP

    36/55

  • 8/15/2019 ATP vs GATP

    37/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'=

    Product Su!stitution in APO # key Ca&a!i%ities- Ru%e

    Contro% # Access Strategy

  • 8/15/2019 ATP vs GATP

    38/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'$

    Product Su!stitution in APO # key Ca&a!i%ities- Ca%cu%ation

    Pro"i%e

  • 8/15/2019 ATP vs GATP

    39/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'?

    'ateria% 0eterination in R/3 # key Ca&a!i%ities

    ,n SAP R.3 only )aterial #etermination/ Pro#"ct selection is

    available- which is approimation of Pro#"ct s"bstit"tionf"nctionality of APO.

    )aterial #etermination enables the a"tomatic s"bstit"tion of

    materials in sales #oc"ments #"rin! sales or#er processin!. 0or

    e.!. if a pro#"ct is phase# o"t an# replace# by its s"ccessorpro#"ct. ,n sales Or#er- system will replace s"ccessor pro#"ct if

    pre#ecessor pro#"ct is o"t of inventory

  • 8/15/2019 ATP vs GATP

    40/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6&

    Product Su!stitution Co&arison APO vs. R/3

    APO

    Global+m"lti location an# systemcheck

    R"les+base# % alternative pro#"cts-

    calc"lation r"les&

    R"le Control7

    Comple Access Strate!y

    available F for e.!. 2ork

    forwar#- 2ork backwar# etc.

    Calc"lation Profile Allowe# Delay 

    Allowe# early confirmation

    cons"mption limit7

    n"mber of partial #eliveries

    R/3 an# mySAP RP

    Sin!le *ocation Check

    )an"al )"lti+plant availability view

    )aterial Determination %Pro#"ct

    S"bstit"tion only&

    2orks in One #irection only

  • 8/15/2019 ATP vs GATP

    41/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6'

    Product Su!stitution Co&arison APO vs. R/3 )contd.*

    2e have presente# another paper on this topic

    *ttpB55w.i-m.com5serices5-cs5m5nowledgeiewportal5feSerlets5display

    Document.wss3synt*eticIeyJ:%&67'%T%''??:=6

  • 8/15/2019 ATP vs GATP

    42/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6%

    Backorder Processing )BOP* # the Basics

    2hen is an or#er a backor#er 2hen a sche#"le line #oesn6t have a confirme# ("antity.

    2hat sho"l# a backor#er processin! sol"tion #o Sim"late res"lts.

    *en# visibility to the sit"ation

    R"n in a reasonable amo"nt of time

    Allow selection of or#ers base# on b"siness re("irements

    Allocate pro#"ct in a prioriti1e# way

    Allow res"lts to be sorte# in a meanin!f"l way

    8ote that both sol"tions 9 R/3 an# SAP APO 9 can satisfy

    all these items- to some etent

  • 8/15/2019 ATP vs GATP

    43/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6

    BOP in APO # key ca&a!i%ities

    )"ltiple Operatin! )o#es

    - atch

    - ,nteractive

    - Sim"lative

    0ilter 

    Sorter 

    S"pport for Pro#"ct Allocations

  • 8/15/2019 ATP vs GATP

    44/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'66

    BOP in APO # Batch Backorder Processing - key

    ca&a!i%ities ; mo#es7

    Direct "p#ate of batch backor#er processin! OP r"ns an# imme#iately "p#ates the res"lts to the #atabase witho"t

    an interme#iate step

    atch backor#er processin! with post processin! OP r"ns- saves the res"lts to a b"ffer- an# protects the assi!ne#

    ("antities with temporary ("antity assi!nments

    $he res"lts can be "p#ate# or re?ecte#. ,f re?ecte#- the temporary

    ("antity assi!nments are #elete#

  • 8/15/2019 ATP vs GATP

    45/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'67

    BOP in APO # 1nteractive Backorder Processing # key

    ca&a!i%ities

    Similar to batch backor#er processin! with postprocessin!-

    ecept for the a##ition of a pre+confi!"re# worklist

    ,t can be accesse# #irectly from the men" str"ct"re within

    SAP APO- or "se# as a postprocessin! f"nction of atchbackor#er processin!

    0ilters an# sorts are available to both operatin! mo#es

  • 8/15/2019 ATP vs GATP

    46/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6

    BOP in APO # 1nteractive Backorder Processing with a

    work%ist# key ca&a!i%ities

  • 8/15/2019 ATP vs GATP

    47/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6=

    BOP in APO # 1nteractive Backorder Processing without a

    work%ist# key ca&a!i%ities

  • 8/15/2019 ATP vs GATP

    48/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6$

    BOP in APO # Siu%ative Backorder Processing # key

    ca&a!i%ities

    8o temporary ("antity assi!nments are written to liveCache

    8o or#ers are "p#ate# in R/3

    $he res"lts can be viewe# in a lo! b"t cannot be"p#ate# interactively

    $he res"lts can be save# in the b"ffer or #elete#

  • 8/15/2019 ATP vs GATP

    49/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'6?

    BOP in APO # BOP i%ter # key ca&a!i%ities

    Pl"s a >sereit4

  • 8/15/2019 ATP vs GATP

    50/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7&

    BOP in APO # BOP Sort # key ca&a!i%ities

    Pl"s a >sereit4

  • 8/15/2019 ATP vs GATP

    51/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7'

    BOP in R/3 # key ca&a!i%ities - The se%ection screen

  • 8/15/2019 ATP vs GATP

    52/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7%

    BOP in R/3 # key ca&a!i%ities - The Resu%t

  • 8/15/2019 ATP vs GATP

    53/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'7

    BOP - o&arison APO vs. R/3

    APO

    Re#istrib"tion fla!

    Re#istrib"tion for each basic

     metho#

    0ilter has ; fiel#s pl"s "sereit

    Sorter has ; fiel#s pl"s

    "sereit 

    Able to confirm new res"lts

    with ol# prior to #atabase

    commit

    R/3 an# mySAP RP

    8o re#istrib"tion fla! F releases allor#ers6 assi!ne# ("antities- then

    rechecks them if they #i#n6t have a

    check before

    8o re#istrib"tion

    0ie# filter with H:I fiel#s

    0ie# sorter 

    Chan!es are committe# to

     #atabase with no comparison

  • 8/15/2019 ATP vs GATP

    54/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    resentation Title | !onfidential | Document "D | #un $, %&'76

    BOP- o&arison APO vs. R/3 )cont.*

    APO

    Sche#"le line check availablefor all #oc"ments

    Date confi!"ration F material

     availability or !oo#s ,ss"e

    Possible to preserve the lesser 

     ("antity that has been a!ree#

     "pon witho"t !ivin! more

    Possible to improve an# not

     #e!ra#e confirmations

    Cancellation of c"rrent

    confirmations

    R/3 an# mySAP RP

    Sche#"le line checks for stock

     transport or#ers only

    Date confi!"ration F 8o

    option %material availability #ate

     is "se#& R/3 an# mySAP RP #o not

     #ifferentiate between confirme#

     ("antity an# re("este# ("antity

    8o opport"nity to preserve

    what

     was #one previo"sly

  • 8/15/2019 ATP vs GATP

    55/55

    Disclaimer (Optional location for any required disclaimer copy.

    To set disclaimer, or delete, go to View | Master | Slide Master)

    BOP - Ga&s where R/3 shorts "a%%

    A#vanta!es of APO  option to carry o"t selections criterion to select an# sort or#ers for

    OP.

    45 and myS0 /4 *ae limited sort and filter fields, 2it* no user e>itsaaila-le to e>pand t*e selection

    R/3 an# mySAP RP are not as fleible as SC) APO

    Dates arenKt configura-le

    Operating modes are selecta-le

    Sc*edule line c*ecs are limited to one document type.

    option to "se *o!s of OP to analy1e# res"lts of OP

      Eo way to presere preious c*ec. option to analy1e r"n time of OP 

    "n 0O, +O run time can -e analy