8/12/2019 Babrchara Bazar
1/11
Site Name : Babuchara Bazar
Address :
Zone : Chittagong
Teletalk
Department Head
Signature : Signature :
Name : Name :
Designation : Designation :
Mobile No. : Mobile No. :
Date : Date :
Contractor
Name : Md. Anisur Rahman
Designation : Sr.Project Engineer
Contract number: BEL Construction Sdn Bhd Ltd.
Date :
Prepared by System Engineering
MEASUREMENT BOOK
Site Engineer
8/12/2019 Babrchara Bazar
2/11
8/12/2019 Babrchara Bazar
3/11
1 Item DescriptionNo of
MemberLength Breadth Height Volume (Cum)
a. Exacvation Footing 4.00 6.600 3.300 2.400 209.088
Sand filling 1.00 4.050 4.050 0.600 9.842
Footing 4.00 2.900 2.900 0.450 15.138
b. Column up to PL 6.00 0.375 0.375 3.000 2.531
c Column PL to Roof slab 6.00 0.350 0.350 3.150 2.315
d Grade Beam -
e Roof Beam
Beam B1 4.00 6.500 0.350 0.450 4.095
Beam B2 4.00 6.600 0.350 0.450 4.158
g Roof slab 1.00 5.200 4.90 0.125 3.185
Floor slab 1.00 5.700 4.75 0.125 3.384
h Door lintel 2.00 5.50 0.25 0.150 0.413
i AC lintel 2.00 1.50 1.50 0.150 0.675
j AC Slab 4.00 1.50 1.50 0.125 1.125
-
2 Item Description No Length Breadth Height Volume (Cum)
a AT ______ M Level -
b Column
c Tie Beam 1 4.00 6.600 0.350 0.450 4.158
d Tie Beam 1 6.00 6.860 0.350 0.450 6.483
e Tower Beam- 1
f Tower Beam- 2
47.66Total
RCC Work
BTS Room
Tower Foundation
RCC WORKS
Sub Total 37.019
Sub Total 10.641
Teletalk Representative Contractor Representative
8/12/2019 Babrchara Bazar
4/11
3 Item DescriptionNo of
MemberLength
No of
Bar
Unit
Weight
(Kg/m)
Total
Weight (Kg)
20 mm dia Bottom Layer
20 mm dia Top layer
16 mm dia Bottom Layer 4.00 2.750 55.000 1.580 955.90
16 mm dia Top layer 4.00 2.750 45.000 1.580 782.10
20 mm dia St.bar 4.00 13.50 10.00 2.470 1333.80
20 mm dia St.bar 4.00 1.59 8.00 2.470 125.67
10mm Stirrup 4.00 1.58 96.00 0.620 376.17
1835.64
20mm dia St.bar
16mm dia St.bar
10mm Stirrup
20mm dia St.bar 16.00 4.250 6.00 2.470 1007.76
16mm dia St.bar
10mm Stirrup 16.00 1.25 45.00 0.620 558.00
1565.76
Floor Beam
d
REINFORCEMENT
BTS Room
a
b
c
Column
Footing
Grade Beam
Teletalk Representative Contractor Representative
8/12/2019 Babrchara Bazar
5/11
Item DescriptionNo of
MemberLength
No of
Bar
Unit
Weight
(Kg/m)
Total
Weight (Kg)
Long direction
10 mm dia st. bar 6.00 4.85 21.00 0.620 378.88
10 mm dia cut off 2.00 4.00 11.00 0.620 54.56
10 mm dia Ex top 4.00 1.58 18.00 0.620 70.53
10 mm dia binder
503.97
1007.95
10 mm dia st. bar 6.00 4.85 20.00 0.620 360.84
10 mm dia cut off 2.00 4.00 1.00 0.620 4.96
10 mm dia Ex top 4.00 1.58 32.00 0.620 125.39
10 mm dia binder
491.19
Short direction
Roof slab
f
g
Floor Slab
e
8/12/2019 Babrchara Bazar
6/11
Item DescriptionNo of
MemberLength
No of
Bar
Unit
Weight
(Kg/m)
Total
Weight (Kg)
12 mm St 2.00 4.20 4.00 1.580 53.09
8 mm Stirrup 2.00 0.85 14.00 0.620 14.76
12 mm St
8 mm Stirrup
4 Item Description No of Member Length No of Bar Unit Wt.
(kg/Meter)
Total Weight
( Kg)
AT --------M LEVEL
Column
20mm dia St.bar
16mm dia St.bar
10mm Stirrup
-
Tie Beam
20mm dia St.bar
16mm dia St.bar
12mm Stirrup
10mm Stirrup
Tower F. Beam ( -------M Level)
20mm dia St.bar
16mm dia St.bar
12mm Stirrup
10mm Stirrup
4968.38Net Total
c
Door lintel
AC lintel
h
Tower Foundation
a
b
67.84Net Total
8/12/2019 Babrchara Bazar
7/11
5 Item Description No Length Breadth Height Volume (cu-m)
BTS Long Wall 1.000 15.400 0.380 0.300 1.76
BTS Short Wall 1.000 14.300 0.250 0.600 2.15
Staircase 1.000 2.600 0.500 0.150 0.20
Deducation For AC 2.00 0.75 0.68 1.020
Deducation For Door 1.00 1.00 46.00 2.10 2.100
6 Item Description No Length Breadth Height Area (sq-m)
BTS Long Wall 4.00 3.33 2.88 38.362
BTS Short Wall
Parapet wall (Long) 1.00 19.10 0.15 2.865
Parapet wall (Short)
41.23
BRICK WORKS
b
38.11Gross Total (c-b)
3.12
a
10" Brick wall
(5") Brick Work
a
Sub-Total (b)
4.10Sub-Total (a)
Sub Total
Teletalk Representative Contractor Representative
8/12/2019 Babrchara Bazar
8/11
7
Item Description No Length Breadth HeightArea
(sq-m)
BTS Slab 1.00 5.000 5.02 25.100
BTS Slab Carnish 1.00 15.50 0.15 2.325
Out Side wall (Long direction) 1.00 12.00 3.00 36.000
Out Side wall (Short direction) -
Bottom of Caurnice Long +side -
Bottom of Caurnice shot side -
Parapet wall- Long Direction 2.00 19.40 0.15 5.820
Parapet wall-Top 4.00 3.35 0.70 9.380
Coloum 4.00 1.40 9.00 50.400
Beam B1 4.00 3.35 0.70 9.380
Beam B2 4.00 3.35 1.05 14.070
TB 4.00 2.98 1.40 16.688
TB 4.00 3.40 1.400 19.040
Brick wall 1.00 16.20 0.700 11.340
Staircase top 1 1.100 1.40 1.540
Staircase outside 2 0.600 0.30 0.360
AC Gap
-
-
-
Deduction
Deducation For Door 1.00 1.10 2.10 2.310
Deducation For AC
8
OTHER WORKS
Plaster works
Floor Tiles (Homogenious Floor Tiles R.A.K)
201.44Sub- Total
a
b
2.31Sub- Total
199.13Gross Total (a-b)
Teletalk Representative Contractor Representative
8/12/2019 Babrchara Bazar
9/11
BTS Room 1.00 3.350 3.350 11.22
BTS Door Sill
11.22Net Total
8/12/2019 Babrchara Bazar
10/11
9
Item Description No Length Breadth HeightArea (sq
m)
BTS Wall ( Long Direction) 4.00 3.570 2.700 38.56
BTS Wall (Short Direction)
Door Offset Long
Door Offset Short
Deduction
Deducation For Door 1.00 1.100 2.100 2.31
Deducation For AC
10
Roofing compound No Length Breadth Height Area (sq-m)
Roof Slab 1.00 4.800 4.380 21.024
Fillet 1 1.100 0.150 0.165
CC Pedestal outside BTS
CC Pedestal outside Dor 1 1.110 1.000 1.110
Roof Top 1 3.250 3.250 10.563
Roof Top 1 3.350 3.350 11.223
11
BTS floor 60 mm 1 5.100 2.210 11.271
Roof Top 75 mm 1 6.330 3.710 23.484
34.76
12
Sub-Total
Wall Tiles (Glazed and Colour Wall Tiles R.A.K)
32.86Net Total
Roofing compound
Patent Stone work
a
b
2.31
36.25
Sub- Total
Gross- Total (a-b)
38.56
Teletalk Representative Contractor Representative
8/12/2019 Babrchara Bazar
11/11
13 Item Description No Length Breadth Rate Amount
Rain Water Down pipe 6 560.690 3,364.140
14 Steel Door as per Design Pcs 1 12,939.000 12,939.000
15 Abloy Lock pcs 1 9,919.000 9,919.000
16 Indoor BTS Ladder m 15.58 645.150 10,051.44
16 Steel Bracket Arm No
18 Wave guide ladder m 6.00 1,376.320 8,257.92
19 Stair Rm 4.50
20 Folding Ladder nos. 1.00 3,500.000 3,500.00
21 Other Items
Net Total
Teletalk Representative Contractor Representative