Baltic ClimateTransnational seminar 1
11.6-12.6. Gävle Sustainable development and Climate Change in land use
Pirjo Hokkanen
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
• Something about planning organisations in Finland
• How the climate chance is considered in legistlation in Finland in different levels
• Some data of the finnish development area Jämsä-Jyväskylä-Äänekoski
• Some ideas
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
LAND USE SYSTEM IN FINLAND
• NATIONAL LAND USE OBJECTIVES (guidelines) Approved by Council of State
•REGIONAL LAND USE PLAN Approved by Regional Council Guided by Ministry of Environment
•LOCAL MASTER (GENERAL) PLAN Approved by local authority Guided by Regional Environment Centre
•LOCAL DETAILED PLAN Approved by local authority Guided by Regional Environment Centre
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Environmental AdministrationRegional Administration
Regional Environment Centres 1 Uusimaa 2 Southwest Finland 3 Häme 4 Pirkanmaa 5 Southeast Finland 6 South Savo 7 North Savo 8 North Karelia 9 Central Finland10 West Finland11 North Ostrobothnia12 Kainuu13 Lapland
•
1 2
1 1
1 0
9
8
4
6
3
5
1
1 3
2
7
I II
I I I
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
The Role of the Regional Environment Centre
• Guiding the planning (General plans, detail plans) in Central Finland
Development negotiations, planning negotiations, statements, appeals• Steering of building activity
•Statements, seminars•Deviation
(special permits mainly on shores without plan)•Water supply and sewrage
•Strategic planning, sussidies for buiding
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Finnish Environmental LegislationLand use and building Act(2000)Climate change, what are the main points?
Spatial Structure Traffic Energy Flood
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Functional Spatial Structure-new areas near existing structure-new areas integrated into existing built areas-city centres developed for diversified functions: services, jobs, living,
recreation- planning must consider climate change adaptation
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Traffic- areas must be planned so that they causes less private traffic possible-connetions for pedestrians and cyclists
must covered whole spatial structure and beeasily connected to stations and bus stops
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Energy-planning should improve or contribute to saving energy and using renewable energysorces.
Flood-studies of flood areas,-flood areas cannot be build
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Otsikkoa tähän
• tänne vois laittaa jotain sisältöä
• jne.
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Otsikkoa tähän
• tänne vois laittaa jotain sisältöä
• jne.
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Development corridor
216000 inhab.(270 000)
89 000 jobs(110 000)
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Some examples of illustration of strategic planningProgramme of Central Finland 2030
- Structure modelRegional Plan of Central FinlandStructure general plan of Äänekoski
- options for structure modelThe Study on land use of Korpilahti
- analyses and proposals for development
11.04.23 Pirjo Hokkanen
The model of Central Finland
2030
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Demograf changes 1980-2004…2040
267 900 (2005)275 000 (2015)
Red=Increas.pop.continue but slowing
Gray=Decreas.pop. Turning into growth
Green=Decreas.pop. Still decreasing but slow
Blue=Decreas. Pop. Still decrasing strongly
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Otsikkoa tähän
• tänne vois laittaa jotain sisältöä
• jne.
11.04.23 Pirjo Hokkanen
Äänekoskimodel
options
”The Lights of the city”
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Äänekoski model
options
”On the rocks and
hills”
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Äänekoskimodel options
”The highway is hot”
Part-financed by the European Union
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
lllKorpilahti village
Land useAnalises
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
What tools we have now?
*Plans (regional, general, detail)*Development discussions with municipalities*Buiding orders (criterias for buiding in scattered areas)*Buiding permits (conditions for buiding)
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Some thinking/Scattered settlements 1FAMILY 4 PERSONS 2 KIDS (school)-A lot is cheaper than in cities or villages-The price of the house is the same, but if you have to sell the house you get less money-Electricity nets may cost a lot- No water pipes or seweredge pipes, consentrated systems, more costs
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Some thinking/Scattered settlements 2-Two cars…long way to work, more emissions…more petroil…more costs-Schooltaxi for 2 children (first 3 classes) costs for municipality, costs after for family -Long way to services: shops, helth care, etc…more costs…more petroil- The roads in springtime in bad conditions, can the fire truck or ambulance reach the family in case of emergency?
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
Some thinking continues
-can we influenze by land use climate chance enough?- In scattered area we have in Finland the basic buiding right (excluding shores)- State gives tax-facilitations for transport-to-work expenses
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
What other tools we could create?
•Tools which could change peoples attitude? (Internet games etc.?)• Tools for develop planning?(Energy plans, flexible or removable housing and services)
11.04.23 Pirjo Hokkanen
Part-financed by the European Union
I think there is no exact answer yet…maybe some day during these three years of this project ….