28
Between Action and Critique Nitzan Zilberman

Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

Embed Size (px)

Citation preview

Page 1: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

Between Action and CritiqueNitzan Zilberman

Page 2: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

4 5

ACTION

1 - Sites Arrange Structures p. 6-13

3 - Nanoscience and Nanotechnology Building p. 22-27

10 - Jerusalem Courthouse p. 52-55

9 - Vertical Living p. 48-51

4 - Lay of the Land: The Israeli Pavilion, Habitat III International Convention p. 30-33

CRITIQUE7 - The Lifta Train-Inn p. 36-41

2 - Society Jam p. 14-21

6 - St. Peter's Basilica Study Models p. 34-35

8 - A Tokyo Screen p. 42-47

5 - Objective, Subjective: Video Installation p. 28-29

Page 3: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

6 7

SITES ARRANGE STRUCTURES

Academic / Professional: Third year studio project (In collaboration with Nir Leshem)

Studio Instructor's: Dan Handel, Daniel Zarhy

Program: Office building

Location: Northern Israel

ACTION

An office building planned to naturally suit the

steep terrain of the site and the specific needs of

the four department company inhabiting it. The

research focused on studying the employee’s daily

schedules, calculating travel time and walking

distances within the premises, and mapping the

specific spaces where each of the company’s

units spends most of their time. Through the

findings exhibited in the documents, we created

a building that allows employees both to "take

their time" and be efficient. We envisioned these

contradicting values as a foundation to forming a

healthier work environment. The project, dipped

in greenery and inner courtyards, includes ramps

that stitch together the four single-story buildings,

and offer a long walk around the site, as well as

stairs and a diagonal elevator for a quick transition

between the departments.

Page 4: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

8 9

Superposition of all plansRoof plan

1:200

0

N

10m

1:500

0

20m1:250

0

10m

1:10000

40m

1:20000

50m

1:40000

100m

1:50000

100m

0 10 m

1:200

0

N

10m

1:500

0

20m1:250

0

10m

1:10000

40m

1:20000

50m

1:40000

100m

1:50000

100m

0 10 m

Page 5: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

10 11

1. View from neighbour building 2. View towards office space 3. Shade study

4

3

2

1

0

Circulation diagram

Page 6: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

12 13

Cross sectionBack elevation

Front elevation

Diagrams mapping workers schedules and daily routinesDiagrams showing the different layout possibilities of the program Diagram showing the fast and slow circulation

0 10 m 0 10 m

Page 7: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

14 15

ACTION

SOCIETY JAM

Academic / Professional: Final thesis project

Studio Instructor's: Erez Ella, Osnat Tadmor, Iddo Ginat

Program: Municipality building

Location: Raanana, Israel

My thesis project is a response to the growing

amount of commercial spaces in public and

cultural buildings as a result of privatization-

with emphasis on BOT projects. The foundations

for this project is Rem Koolhaas’s book “Harvard

Design School Guide to Shopping” and Tony

Benett’s book “The Birth of the Museum”. While

Koolhaas believes that “Shopping is arguably the

last remaining form of public activity”, Benett

compares the museum to the department store

at the end of the 18th century and acknowledges

that they have much in common. Finding the

common factors between the commercial and

the cultural space enables us to set aside terms

like “high culture” and “low culture” and refer to

them as equals. Therefore the heart of the project

is the organization of the space according to the

activity taking place in it. In this way- the project

does not differentiate the display of art pieces

in the museum from the display of products in

a store window. Watching art in a gallery and

window shopping involve the same essential

activity, therefore instead of an art gallery and a

shop- there can be one space- a display room.

The disassembly of the commercial and cultural

spaces into the activities that build them enables

us to create a new public space where the mall,

library, art gallery, and municipality collide and

form a somewhat harmonic, somewhat irritating

space. In this way the building is neither a negative,

positive or extreme representation of this hybrid

but a mirror to the “Society Jam” we are all part of.

CRITIQUE

Page 8: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

16 17

Display space Watching room

Sitting zone Choosing hall

Page 9: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

18 19

First floor planGround floor plan

1:200

0

N

10m1:500

0

20m

1:250

0

10m

1:10000

40m1:20000

50m

1:40000

100m1:50000

100m

0 10 m

1:200

0

N

10m1:500

0

20m

1:250

0

10m

1:10000

40m1:20000

50m

1:40000

100m1:50000

100m

0 10 m

Page 10: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

20 21

Building diagram Catalog of objects for display Commidity ArtView to the building's roof

Storage space isometry

Plans of sitting zone's

Auditorium isometry

Page 11: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

22 23

ACTION

Nanoscience and Nanotechnology Building

Academic / Professional: Studio PEZ (Part of a three-member team)

Status: International Competition, Finalist

Program: Laboratories, Clean Rooms, Public Program, Researchers

Location: Tel Aviv University Campus, Israel

A laboratory building that is unique but also

functional, iconic yet integrates with the campus,

specific but also flexible and modular. The

suggested Nanocenter building redefines the

paradigm of the laboratory building. It challenges

the typology’s conventions and creates flexible

and modular laboratories in addition to a generous

interaction space, a place for communication and

collaboration which lead to scientific innovation.

During the planning process, we imagined

the building as a gradient from an object to

the campus, from maximum laboratory layout

flexibility to maximum human interactivity, from

individual concentration to group communication.

Page 12: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

24 25

Elevation Cross section

Building diagram

View to main Hall View to main hall

Page 13: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

26 27

Ground and second floor plans

Facade study

Facade details

View to lab area

0 10 m

Page 14: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

28 29

CRITIQUE

OBJECTIVE, SUBJECTIVE:VIDEO INSTALLATION

Academic / Professional: First Year project

(In collaboration with Noam Levy)

Studio Instructor: Oren Sagiv

Page 15: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

30 31

CRITIQUE

Throughout its 68 years of existence, the State

of Israel has faced an ever increasing demand

for housing, due to large waves of immigration.

Yet from 2008, and even more so after the 2011

social protests that shifted political focus, the

country has been dealing with a highly debated

housing crisis that has led to an unprecedented

scope of planning. Whilst both concrete planning

and public attention are centered on producing

residential units, this outstanding planning and

building surge offers a unique opportunity to

explore the spaces it creates in-between - the

chance for a hands-on transformation of the

Israeli urban environment. The Israeli pavilion

at Habitat III sought to gather the wide range

of Israeli urban initiatives - from policy making

to the actions of young grassroots leaders, from

advanced infrastructures to revitalizing markets,

and from sustainable environmental enterprises

to social and community building. The pavilion

offered a fresh look at these different urban

enterprises by placing them along two axis: one

between the poles of research and action, the

other between bottom-up and top-down needs.

We sought to assemble and synchronize the

diverse initiatives into an urban layer which can

then be put on the map” and serve as a tool for

planners, researchers, artists and policy makers;

allowing an understanding of the lay of the land

both in terms of its built manifestations and

in terms of the means for producing a varied

and high-quality public sphere, vibrant with

human activity. Such means will drive future

planning to take into consideration not only

buildings but also the people inhabiting them.

ACTION

LAY OF THE LAND: THE ISRAELI PAVILION, HABITAT III INTERNATIONAL CONVENTION

Academic / Professional: HQ Architects (Team leader)

Status: Built

Program: 50 sqm national pavilion

Location: Quito, Ecuador

Page 16: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

32 33

Page 17: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

34 35

CRITIQUE

Mass Line

ST. PETER'S BASILICA STUDY MODELS

Academic / Professional: First year basic design course

Course Instructor: Nilly R. Harag

The models research three different aspects of

St. Peter's Basilica in Rome, each time using a

different material. The first model studies "mass"

and uses perspex and wood, the second studies

"line" and uses iron rods , and the third, using

cardboard, offers a personal interpretation to the

building through the concept of "scaffold".

Scaffold

Page 18: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

36 37

50 m

CRITIQUE

Site Plan

1:200 0

N

10m

1:500 0 20m

1:250 0 10m

1:1000 0 40m

1:2000 0 50m

1:4000 0 100m

1:5000 0 100m

THE LIFTA TRAIN - INN

Academic / Professional: Fourth year studio project

Studio Instructor: Nilly R. Harag

Program: Hotel

Location: Lifta village, at the outskirts of Jerusalem, Israel

In Israel, a country ruled without separation of

religion and state, public transportation is not

allowed to run during weekends and holidays.

This interval in time allows for a full appreciation

of the vast space of the tunnel, the outstanding

acoustics, and its unusual chiaroscuro as a site

for planning. The "Lifta Train-Inn" offers weekend

long accommodation in one of Israel's most

controversial sites. Lifta- a Palestinian Arab village

whose population was driven out during the Arab-

Jewish hostilities of 1948. The hotel is situated

inside the tunnels and does not interfere with the

rare remains of the classical Arab houses. Guests

are not permitted to leave the tunnel and enter

the deserted village, but only to observe it. The

silent beauty of the valley holds a complex history

of Israeli-Palestinian conflict and hopefully makes

the visitor's weekend an eye opening one.

0

Page 19: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

38 39

Page 20: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

40 41

View through air tunnel Plans of three escape tunnels

Page 21: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

42 43

CRITIQUE

A TOKYO SCREEN

Academic / Professional: Third year studio project (In collaboraion with Dana Lieber)

Studio Instructor: Erez Golani Solomon

Program: Animated film

Location: Tokyo, Japan

A six-week long studio based in Tokyo, Japan.

The studio's aim was to create a flash-animated

film about the concept of "time", influenced

by experiences and thoughts that arose while

travelling and searching the new city. The film

deals with the giant screens scattered around

Tokyo. These screens function as electronic

billboards that represent architectural elements,

and use information to create an infinite

alternating sequence. The screen is a "source

of authority" that can influence the viewer's

perception of time. Spreading the giant screens

in public spaces, that are open and have limited

control, tempts pedestrians to stop and watch. For

this reason, the presence of screens influences the

movement, pace and processes of the city. "Studio

Alta" screen, the first giant screen in Tokyo, is the

site of the film and becomes a bridge between the

external environment and that of the screen. We

cross the screen and through the single abstract

pixel we pass to a new reality, where dimensions

of time and space become misty and illogic, and

the architectural and geometric rules change.

Page 22: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

44 45

Page 23: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

46 47

Page 24: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

48 49

ACTION

VERTICAL LIVING

Academic / Professional: Second year studio project

Studio Instructor: Anat Almog

Program: Residental building

Location: Jerusalem, Israel

When examining the typology of housing projects

in a specific area in Jerusalem, one of the most

dominant characteristics was the constant

horizontal split of the apartments. Having that

in mind, the concept of the project was to split

the buildings differently - vertically instead of

horizontally. The building was split into 14 units,

creating a 5-meter-wide housing that spreads out

on four floors. These tall houses refer to residential

buildings in Tokyo and Amsterdam and break the

constant pattern of residential buildings in Israel.

Apart from a new way of living, these houses offer

private entrances for each resident and a private

roof balcony. These added values, together with

the fact that building narrow and high economizes

space, form a new way of looking at residential

housing.

Page 25: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

50 51

Isometry Study Models

Page 26: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

52 53

ACTION

JERUSALEM COURTHOUSE

Academic / Professional: Studio PEZ

Status: International competition, First prize, In progress

Program: Courthouse halls, judges chambers, secretariats, public areas and parking

Location: Jerusalem, Israel

The Courthouse is composed of two main parts:

the plinth - containing the communal public

functions, and the different courthouse buildings

stemming from it. The plinth forms a continuous

facade to the street and creates a sense of

transparency. It contains the main entrance,

communal public functions and integrates the

courthouse into the city. Above it the various

courthouses “grow”. It is characterized by a clear

circulation scheme which leads to easy orientation

and a sense of place. The different functions are

organized around a central “street”, penetrated

by a spacious void that connects the three

plinth levels and the vertical circulation systems

are located in a prominent location creating a

feeling that the building is welcoming and clear.

The New Jerusalem Courthouse integrates into

the city’s context and to the new master plan

for the entrance quarter to the city. The delicate

balance between the “building blocks” challenges

the monolithic image of justice and creates an

iconic building with a modest, human scale.

Page 27: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay

54 55

Ground and first floor plans

Glare analysis Natural light in courthouses

View to corridor

¥¨¥¨°�¥¢¡£ª�µ�ª¥��¶¡ª¨¡�������

¥¢¡£ª�µ�ª¥��¶¡§µ¨����

 �¡�®¨�¥´¡¢��«¥��¶¥��¶¡ª¨¡�����

 �¡�®¨�¥´¡¢��«¥��¶¥��¶¡§µ¨����

¥£´¢��©¡¨µ�µ�ª¥��¶¡ª¨¡�������

¥£´¢��©¡¨µ�µ�ª¥��¶¡§µ¨����

 £°µª�¥¬¥¥¬®�µ�ª¥��¶¡ª¨¡�����

 £°µª�¥¬¥¥¬®�µ�ª¥��¶¡§µ¨����

´®¡¬�µ�ª¥��¶¡§µ¨����

´®¡¬�µ�ª¥��¶¡ª¨¡�����

¥¨¥¨°�©¡¨µ�µ�ª¥��¶¡ª¨¡�������

©¡¨µ�µ�ª¥��¶¡§µ¨����

Cross section

View towards main hall

Facade detailN

0 50 m

Page 28: Between Action and Critique - MIT Architecture floor plan First floor plan 1:200 0 N 10m 1:500 0 20m 1:250 0 10m 1:1000 0 40m 1:2000 0 50m ... allowing an understanding of the lay