16
75/125 Binney Street July 31, 2014 August 31, 2014

Binney Street

Embed Size (px)

DESCRIPTION

Binney Street project brochure

Citation preview

Page 1: Binney Street

75/125 Binney Street

180 New Boston StreetWoburn, MA 01801P. 781-935-6700F. 781-935-6084

SYSTEMS THAT WORK

July 31, 2014August 31, 2014

Page 2: Binney Street

EXECUTIVE TEAM

Dennis Sacco Jr.Vice President / Branch Manager

PROJECT TEAM

Tom CraneOperations Coordinator

Guy Trapeni Director of

Estimating Services

Kevin LabrecqueSenior Vice President

Frank PolitanoProject Engineer

Dana PaulinoMajor Projects

Expeditor

Dan MolloyForeman

Tony CaswellSenior Project

Manager

LIMBACH TEAM

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS OR GO TO WWW.LIMBACHINC.COM/BP-LIMBACH-TEAM

CONTACTINFO Dennis Sacco Jr.

Vice President / Branch Manager

Phone: 781-994-1320 Cell: 617-212-0086

Email: [email protected]

Page 3: Binney Street

BONDING

LIMBACH MODELING &PRODUCTION SYSTEM TEAM

Mike GouletFab Shop Manager

John GradyLead Planner

Bil SillikerPlanner

Mark PierreLead Estimator

Tim WardPresident, Limbach

Engineering & Design Services

LEDS CONTACT

Page 4: Binney Street

TEAM

PARTNER

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS

OR GO TO WWW.LIMBACHINC.COM/BP-COX-TEAM

Limbach’s Offsite mechanical systems offer tremendous benefits to the overall project. This includes: Increased Project Safety, Higher Productivity, Enhanced Quality Control, Compressed Schedule, Better Fit and Sequencing, and Minimization of Waste.

Strategic alliance with MEP Solutions

OFFSITE

SCAN QR CODE WITH YOUR SMARTPHONE TO LEARN MORE ABOUT OFFSITE

OR GO TO WWW.LIMBACHINC.COM/SERVICES/OFFSITE-CONSTRUCTION

Tom DonelanCox EngineeringOperations Manager

Joseph GermanoCox EngineeringGeneral Site Superintendent / Field Foreman

Bill PortanovaCox EngineeringField Foreman / CAD Coordinator Tom MurrayCox EngineeringSales Engineer – Project Manager

Page 5: Binney Street

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS OR GO TO WWW.LIMBACHINC.COM/COXTEAMBIOS

LEDS

LIMBACH ENGINEERING & DESIGN SERVICES

With our in-house engineering group, Limbach Engineering and Design Services (LEDS), we provide additional service for Value Management and not just a budgeting service.

• Professional Engineers to challenge the design team and bring alternative solutions

• Conceptual estimating of design alternatives

• Right-sizing of equipment for energy efficiency and cost control

• Constructability reviews from best in class project management

RELEVANT PROJECT EXPERIENCE

LIMBACHEXPERIENCE

COXEXPERIENCE

• Harvard Fogg Art Museum

• UMASS Biologics Lab

• Siemens Medical Diagnostics

• Battery Wharf

• Bristol Meyer Squibb

• Amylin Pharmaceuticals

• MIT Lincoln Labs

• Genzyme Everclear CM-BLG 51

SCAN QR CODE FOR MORE DETAILS OR GO TO

WWW.LIMBACHINC.COM/PB-EXPERIENCE

SCAN

QR

CODE

TO

LEAR

N MO

RE O

R GO

TO

WW

W.LI

MBAC

HINC

>COM

/TEA

M-CO

NSTR

UCT

Page 6: Binney Street

LEAN

To deliver innovative, smart mechanical solutions that add value to the 75/125 Binney Street Project through collaborative work practices. Our Limbach Modeling & Production System Team will work with the design team to ensure the highest value is achieved throughout the design, fabrication and installation process.

OURMISSION

IIF

We have made safety a part of the cultural fabric of our Company, where all employees are entitled to a safe and healthful work environment.

INCIDENT & INJURY FREE

Page 7: Binney Street

OR GO TO WWW.LIMBACHINC.COM/COXTEAMBIOS

LEAN

• The effective design of work practices to ensure that our time is spent engaged in activities that add value rather than searching for information, tools or materials

• Project planning for material storage and handling that seeks to maintain jobsite crew productivity and workflow - including offsite fabrication

• Defining and delivering on commitments as a collaborative participant in the construction process

• Peer Reviewed project plans to leverage the collective knowledge of the entire Limbach organization

• Supporting or leading, where necessary, the implementation of LEAN project delivery systems through in-house facilitation

• Establishment of collaborative pull planning sessions, weekly planning and daily huddles to ensure the levels of communication remain high and obstacles are removed from the path of the installation crews

HIGHLIGHTS OF LIMBACH’S LEAN STRATEGIES INCLUDE:

COLLABORATIVEENVIRONMENTS

WE UNDERSTAND

• The importance of first building a collaborative environment where potential solutions are evaluated by a cross functional team for their merit in delivering value to the project overall

• How to establish a highly functioning “colo” team by ensuring fundamental project management principles are defined and set in place by a BIM Implementation Plan. Limbach New England’s recent experience on the Harvard Fogg Museum of Art has provided a wealth of lessons learned on those principles.

• That beyond simply “making things fit”, the “colo” coordination process is the opportunity to hone in on the sequence of installation that minimizes waste in the field and exposes opportunities to improve upon the project schedule

• That field installation experience at the “colo” table is critical to its success

Page 8: Binney Street

Limbach Modeling & Production System is “where the model lives” from engineering concept, through estimating and planning, into fabrication and installation and throughout the life of the building in facilities management, a common database across all elements ensures delivery of the right information in the model at the right time

Through the implementation of a model based cost and labor estimating system, Limbach is armed with the data necessary to explore more design options and make decisions early in the design process that reflect with accuracy the impact on construction process

Integration of “Systems That Work” enable Limbach Project Managers to focus the team on proactive issue resolution

LMPS

75 Binney Street

125 Binney Street125 Binney StreetPenthouse MER

75/125 Binney StreetLevel B2 Chiller Room

SCAN QR CODE TO LEARN MORE OR GO TO

WWW.LIMBACHINC.COM/BP-LMPS

Page 9: Binney Street

Limbach Modeling & Production System is “where the model lives” from engineering concept, through estimating and planning, into fabrication and installation and throughout the life of the building in facilities management, a common database across all elements ensures delivery of the right information in the model at the right time

Through the implementation of a model based cost and labor estimating system, Limbach is armed with the data necessary to explore more design options and make decisions early in the design process that reflect with accuracy the impact on construction process

Integration of “Systems That Work” enable Limbach Project Managers to focus the team on proactive issue resolution

LMPS

75 Binney Street

125 Binney Street125 Binney StreetPenthouse MER

75/125 Binney StreetLevel B2 Chiller Room

Page 10: Binney Street

OR GO TO WWW.LIMBACHINC.COM/COXTEAMBIOS

LEAN

• The effective design of work practices to ensure that our time is spent engaged in activities that add value rather than searching for information, tools or materials

• Project planning for material storage and handling that seeks to maintain jobsite crew productivity and workflow - including offsite fabrication

• Defining and delivering on commitments as a collaborative participant in the construction process

• Peer Reviewed project plans to leverage the collective knowledge of the entire Limbach organization

• Supporting or leading, where necessary, the implementation of LEAN project delivery systems through in-house facilitation

• Establishment of collaborative pull planning sessions, weekly planning and daily huddles to ensure the levels of communication remain high and obstacles are removed from the path of the installation crews

HIGHLIGHTS OF LIMBACH’S LEAN STRATEGIES INCLUDE:

COLLABORATIVEENVIRONMENTS

WE UNDERSTAND

• The importance of first building a collaborative environment where potential solutions are evaluated by a cross functional team for their merit in delivering value to the project overall

• How to establish a highly functioning “colo” team by ensuring fundamental project management principles are defined and set in place by a BIM Implementation Plan. Limbach New England’s recent experience on the Harvard Fogg Museum of Art has provided a wealth of lessons learned on those principles.

• That beyond simply “making things fit”, the “colo” coordination process is the opportunity to hone in on the sequence of installation that minimizes waste in the field and exposes opportunities to improve upon the project schedule

• That field installation experience at the “colo” table is critical to its success

Page 11: Binney Street

LEAN

To deliver innovative, smart mechanical solutions that add value to the 75/125 Binney Street Project through collaborative work practices. Our Limbach Modeling & Production System Team will work with the design team to ensure the highest value is achieved throughout the design, fabrication and installation process.

OURMISSION

IIF

We have made safety a part of the cultural fabric of our Company, where all employees are entitled to a safe and healthful work environment.

INCIDENT & INJURY FREE

SCAN QR CODE TO LEARN MORE OR GO TOwww.propertycasualty360.com/2012/08/20/safety-zealot

www.

limba

chinc

.com/

abou

t/safe

ty

Page 12: Binney Street

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS OR GO TO WWW.LIMBACHINC.COM/COXTEAMBIOS

LEDS

LIMBACH ENGINEERING & DESIGN SERVICES

With our in-house engineering group, Limbach Engineering and Design Services (LEDS), we provide additional service for Value Management and not just a budgeting service.

• Professional Engineers to challenge the design team and bring alternative solutions

• Conceptual estimating of design alternatives

• Right-sizing of equipment for energy efficiency and cost control

• Constructability reviews from best in class project management

RELEVANT PROJECT EXPERIENCE

LIMBACHEXPERIENCE

COXEXPERIENCE

• Harvard Fogg Art Museum

• UMASS Biologics Lab

• Siemens Medical Diagnostics

• Battery Wharf

• Bristol Meyer Squibb

• Amylin Pharmaceuticals

• MIT Lincoln Labs

• Genzyme Everclear CM-BLG 51

SCAN QR CODE FOR MORE DETAILS OR GO TO

WWW.LIMBACHINC.COM/PB-EXPERIENCE

SCAN

QR

CODE

TO

LEAR

N MO

RE O

R GO

TO

WW

W.LI

MBAC

HINC

>COM

/TEA

M-CO

NSTR

UCT

Page 13: Binney Street

TEAM

PARTNER

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS

OR GO TO WWW.LIMBACHINC.COM/BP-COX-TEAM

Limbach’s Offsite mechanical systems offer tremendous benefits to the overall project. This includes: Increased Project Safety, Higher Productivity, Enhanced Quality Control, Compressed Schedule, Better Fit and Sequencing, and Minimization of Waste.

Strategic alliance with MEP Solutions

OFFSITE

SCAN QR CODE WITH YOUR SMARTPHONE TO LEARN MORE ABOUT OFFSITE

OR GO TO WWW.LIMBACHINC.COM/SERVICES/OFFSITE-CONSTRUCTION

Tom DonelanCox EngineeringOperations Manager

Joseph GermanoCox EngineeringGeneral Site Superintendent / Field Foreman

Bill PortanovaCox EngineeringField Foreman / CAD Coordinator Tom MurrayCox EngineeringSales Engineer – Project Manager

Page 14: Binney Street

BONDING

LIMBACH MODELING &PRODUCTION SYSTEM TEAM

Mike GouletFab Shop Manager

John GradyLead Planner

Bil SillikerPlanner

Mark PierreLead Estimator

Tim WardPresident, Limbach

Engineering & Design Services

LEDS CONTACT

Page 15: Binney Street

EXECUTIVE TEAM

Dennis Sacco Jr.Vice President / Branch Manager

PROJECT TEAM

Tom CraneOperations Coordinator

Guy Trapeni Director of

Estimating Services

Kevin LabrecqueSenior Vice President

Frank PolitanoProject Engineer

Dana PaulinoMajor Projects

Expeditor

Dan MolloyForeman

Tony CaswellSenior Project

Manager

LIMBACH TEAM

SCAN QR CODE WITH YOUR SMARTPHONE TO VIEW TEAM BIOS OR GO TO WWW.LIMBACHINC.COM/BP-LIMBACH-TEAM

CONTACTINFO Dennis Sacco Jr.

Vice President / Branch Manager

Phone: 781-994-1320 Cell: 617-212-0086

Email: [email protected]

Page 16: Binney Street

75/125 Binney Street

180 New Boston StreetWoburn, MA 01801P. 781-935-6700F. 781-935-6084

SYSTEMS THAT WORK

July 31, 2014August 31, 2014

www.limbachinc.com