2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # DISTRICT: COUNTY: CITY/TOWNSHIP: Date of Inspection: Equipment Used: Inspected By: Report Written By: Report Reviewed By: Final Report Date: 66546 2 AVE SW(MSAS 123) over CANNON RIVER District 6 Rice Faribault 05/26/2016 Owens, Garrett Garrett Owens City or Municipal Highway Agency Owner: Minnesota STATE:

BRIDGE # 2 AVE SW(MSAS 123) over CANNON RIVER · BMU Agreement ADT 9578 YEAR 2007 If Divided Structure Evaluation 6 D I M E N S I O N S + ... NBR ELEMENT NAME INSP. DATE QUANTITY

  • Upload
    vodan

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

2016 UNDERWATER

BRIDGE INSPECTION REPORT

BRIDGE #

DISTRICT: COUNTY: CITY/TOWNSHIP:

Date of Inspection:

Equipment Used:

Inspected By:

Report Written By:

Report Reviewed By:

Final Report Date:

66546

2 AVE SW(MSAS 123) over CANNON RIVER

District 6 Rice Faribault

05/26/2016

Owens, Garrett

Garrett Owens

City or Municipal Highway AgencyOwner:

MinnesotaSTATE:

UNDERWATER SUMMARY 3

UNDERWATER INSPECTION 4

UNDERWATER INSPECTION PROCEDURES 6

STRUCTURE INVENTORY 7

ELEMENTS 8

PICTURES 11

DRAWINGS 15

TABLE OF CONTENTS

PAGE NUMBER

Contractor:

(A) Monitor concrete deterioration at Pier and if the deficiencies continue to progress and the exposed reinforcing steel starts to exhibit section loss, repairs may become warranted at that time.

(B) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months.

Collins Engineers, Inc.

9687Contractor Job Number:

RECOMMENDATIONS

REPORT SUMMARY

UNDERWATER INSPECTION

The substructure unit inspected at Bridge No. 66546, Pier 1, was found to be generally in satisfactory to fair condition with no defects of structural significance observed. The concrete was typically soft and easily erodible with up to 5 inches of penetration over 50 percent of the pier face from channel bottom to 1 foot above the waterline. Random locations exhibited exposed coated reinforcing steel with no section loss present. The north and south embankment slopes were lined with an articulated concrete mat and the channel bottom material at the pier consisted of randomly displaced paving stones with sand infill.

(A) The north and south slope embankments were lined with articulated concrete mat from top of slope to 1 foot below waterline and from 10 feet upstream to 10 feet downstream of the bridge fascia.

(B) The concrete face of the north pier wall from the upstream nose to the midpoint and from the downstream quarter to the downstream consists of soft and easily erodible concrete with up to three inches of penetration from channel bottom to 1 foot above the waterline.

(C) The channel bottom consisted of randomly displaced paving stones with sandy infill.

(D) The slope protection mat had missing and displaced blocks.The most severe damage was 7 foot by 3 foot area of missing blocks at the south shore.

(E) The upstream half of the south side of the pier had heavy scaling with up to 5 inches of penetration. Exposed rebar was present.

(F) The downstream quarter of the south face of the pier exhibited heavy spalling with up to 4.5 inches of penetration. Exposed rebar was present, no section loss was present

INSPECTION FINDINGS

Page 3 of 16

The bottom of architectural cap at downstream nose of Pier 1.Water Level Reference:

WATERLINE DATUM

Waterline Elevation (feet):

The waterline was approximately 7.4 feet below reference.Description:

955.5

4.

Pier 1Substructure(s) Inspected:

SUBSTRUCTURE INSPECTION DATA

General Shape:

3.4 Maximum Water Depth at Substructure(s) Inspected (feet):

The pier consists of an oblong reinforced concrete pier wall with rounded noses. The pier wall encases 18 steel H-Piles which extend into the pier wall from the bottom of the pier wall up 7 feet.

Code:Item 62: Culvert:

5

Y 48 05/2016 Code:Item 92B: Underwater Inspection:

Code:

(Minnesota specific codes are used for 92B and 113)

NBIS CODING INFORMATION5.

Item 60: Substructure:

Item 61: Channel and Channel Protection:

6Code:

District 6District:

2 AVE SW(MSAS 123)

County:

The superstructure consists of a two span haunched slab bridge supporting a reinforced concrete deck. The bridge is supported by two reinforced concrete abutments and one reinforced concrete pier wall with steel H-Piles extending from the bottom of the wall up 7 feet.

Bridge Description:

066 - Rice

Facility Carried:

BRIDGE DATA1.

UNDERWATER INSPECTION

Bridge #:

CANNON RIVERFeature Intersected:

66546

Underwater Visibility (feet):

Sunny, 80° FWeather Conditions:

1.0

3.

NegligibleWaterway Velocity (ft/sec):

05/26/2016

Professional Engineer/Team Leader:

INSPECTION DATA2.

Cory R. Stuber, P.E.

Date of Underwater Inspection:

Garrett R. Owens, P.E.Inspection Diver:

Page 4 of 16

Scour 1885 EA 1

892 Slopes and Slope Protection 1 1EA

61

STRUCTURAL ELEMENT CONDITION RATING

Conditions

6.

L

Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site.

Item 113: Scour Critical Bridge: Code:

No (Mark your selection with an X)Yes X

210

CS3 CS4

Reinforced Concrete Pier Wall 2081 LF

CS2ELEM # Unit CS1Element Description Quantity

Page 5 of 16

The routine underwater inspection of Bridge 66546 (MSAS 123 over the Cannon River) was completed on May 26, 2016. The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diver with a valid MnDOT Team Leader certification, a backup diver and a dive tender. Due to waterway conditions at the time of inspection, the inspection could be accomplished by wading in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location and area of scour.

The bridge elements inspected consisted of Pier 1. According to the bridge inventory or design drawings, Pier 1were founded on 18 steel H-Piles. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for foundations. The routine underwater inspection frequency is recommended to remain at a maximum of 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.

INSPECTION PROCEDURES

UNDERWATER INSPECTION

Page 6 of 16

N - Not Applicable Spec. Feat.Pier Foundation (Material/Type)

1 - CONCCantilever ID

+ W A T E R W A Y +Number of Spans Historic Status

3 - FTG PILE

Underwater Y 60Culvert Type 3 - FTG PILE

Pinned Asbly. N

05/26/2016

Barrel Length

89.2 ft. Navigation Control

Waterway Opening (sf.) 778Structure Length

ft. Year Painted

0 - No nav. control on waterwayDeck Width (Out-to-Out) 84.3

+ P A I N T +

APPR: 0 TOTAL:5 - Not eligible

MAIN: 2

Main Span Length 39.0 ft.Drainage Area (sq. mi.) 314.0

B R I D G E D A T A +Main Span Detail

N - NOT REQUIRED+ M I S C.

Appr. Span Type Structure Flared

GR Termini N - NOT REQUIRED

Appr. Guardrail

Main Span Type 2 - Concrete Continuous Median Width On Bridge

ft. Bridge Railing 1 - MEETS STANDARDS

N - NOT REQUIRED

Main Span Design 09 - Slab Span

ft. GR Transition

Skew 0

Y/N Freq Date

NAbutment Foundation (Material/Type)

1 - CONC Frac. Critical

N - No Splice

D E P T H I N S P. +Appr. Span Design

0 - No flare+ I N

Appr. Span Detail Field Conn. ID

Parallel Structure N - No parallel structure

Pier Protection

0 - Not Required

Rating Date 11/27/20135707 sq. ft. Traffic

ft. 50B. Rt 10.00Sidewalk Width 50A. Lt 8.00

Roadway Area (Curb-to-Curb)

Posted Load 0 - Not Required

PostingStructure Area (Out-to-Out) 7520 sq. ft.

DBL:VEH: SEMI:

Rt 28 ARail Type Lt 28 C N - N/AN - N/A B N - N/A

N - Not Applicable Overweight Permit CodesCurb Height Lt

ft. Horizontal 0 - Not Required

0.67 ft. Vertical0.67 ft. Rt

Wear Surf Install Year 2008

sq. ft. Nav. Vert. Lift Bridge Clear. (ft.)

L - STBL - LOW RISK

Year 2008Primer Type MN Scour Code

Painted Area

Unsound Paint % Nav. Clr. (ft.)Deck Material 1 - Concrete Cast-in-Place 0.0Wear Surf Type 4 - Low Slump Concrete

Vert. 0.0 Horiz.

S I G N S +Operating Rating 2 - HS TRUCK

1 - Epoxy Coated Reinforcing + B R I D G E

Inventory Rating 2 - HS TRUCK 25.0

49.0Deck Rebars Install Year 2008

Deck Rebars

Finish TypeWear Course/Fill Depth 0.17 ft.

0 - None

Design Load 9 - HS 25 (OR GREATER)

+ C A P A C I T Y R A T I N G S +Deck Membrane

44 ° 18

Inspector Name Owens, Garrett

Latitude Control Section (TH Only) Status' 29.06 ''

2 - 2-way traffic

Routine Inspection Frequency 24

Sect., Twp., Range

0.3 MI S OF JCT TH 3 Level of Service 1 - MAINLINE

- 20W Roadway Type30 - 110N

Detour Length 1.0 mi.R A T I N G S +

Custodian 04 - City or Municipal Highway Agency

Owner 04 - City or Municipal Highway Agency

Deck 7 Unsound Deck %

C O N D I T I O N° 16 '

A - Open

Longitude 93 000+00.838 + N B I 18.91 '' Reference Point

Crew

+ I N S P E C T I O N +

Agency Br. No. 211

District 06

Bridge Match ID (TIS) 0 Userkey

2 AVE SW(MSAS 123) over CANNON RIVER

Minnesota Structure Inventory Report

Bridge ID: 66546

+ G E N E R A L + + R O A D W A Y +

Date: 08/31/2016

Sufficiency Rating 97.1Roadway Name or Description

123

City Faribault

Routine Inspection Date 05/16/2016

Desc. Loc.

Township 2 AVE NW (MSAS 123)

Number

NRoadway O/U Key Route On StructureMaint. Area Structurally Deficient

NRoute Sys 05 - MSASCounty 066 - Rice Functionally Obsolete

Lanes

Waterway Adequacy 9Max. Vert. Clear.

ft.Legislative District 26Bft.Potential ABC 2 - N/A ft.

ft.On - Off System Roadway Width 64.0 ft.

Vertical Clearance ft.1 - ON

Underclearances N

Service On 5 - Highway-pedestrian Appr. Surface Width+ S A F E T Y F E A T U R E S +

5 - Waterway Bridge Roadway Width 64.0

64.0 ft.

Service Under

ft.

64.0 ft. Approach Alignment 8Horizontal Clear.

ft.

ft.+ S T R U C T U R E + Lateral Clearance

HCADT ADTT6

Year Built 2008

MN Year Reconstructed Functional Class

%Channel 5

Substructure

0Superstructure 7

ON 5 UNDER

9578 YEAR 2007BMU Agreement ADT

Structure Evaluation 6If Divided

D I M E N S I O N S +Bridge Plan Location 4 - MUNICIPAL

Deck Geometry 4NB-EB SB-WBDate Opened to Traffic

+ R D W Y

FHWA Year Reconstructed

MN Temporary Status

16 - Urban - Minor ArterialCulvert N

A P P R A I S A L R A T I N G S +N - Not Applicable + N B I

Page 7 of 16

County:

City:

Township:

Township:Section: Range:

Span Type:

NBI Deck: Super: Sub: Chan: Culv:

Appraisal Ratings - Approach: Waterway:

Required Bridge Signs - Load Posting:

Horizntal:

Traffic:

Vertical:

MN Scour Code:

Open, Posted, Closed:

Location:

Route:

Control Section:

Local Agency Bridge Nbr.:

Ref. Pt.:

Maint. Area:

Length:

Deck Width:

Rdwy. Area/ Pct. Unsnd:

Paint Area/ Pct. Unsnd:

Culvert:

Rice

Faribault

110N30 20W

2 - Concrete Continuous 1 - Slab

7 7 6 5 N

8 9

0 - Not Required

0 - Not Required

0 - Not Required

N - Not Applicable

L - STBL - LOW RISK

0.3 MI S OF JCT TH 3

05 - MSAS 123 000+00.838

89.2

84.3

5707 sq. ft. / %

sq. ft. / %

N/A

A - Open

ft.

ft.

Postings:List:

MINNESOTA BRIDGE INSPECTION REPORT

09/09/2016

Inspector: CO Bridge

BRIDGE 66546 2 AVE SW(MSAS 123) OVER CANNON RIVER

Unofficial Structurally Deficient N

NUnofficial Functionally Obsolete

Unofficial Sufficiency Rating 97.1

ELEMNBR ELEMENT NAME INSP. DATE QUANTITY

QTYCS 1

QTYCS 2

QTYCS 3

QTYCS 4REPORT TYPE

Reinforced Concrete Slab 05/26/2016 7520 SF 7495 25 0 038 Underwater

05/16/2016 7520 SF 7495 25 0 0Routine

Notes: There are three longitudinal cracks in the underside of the deck that extend out from the abutments.[2014] - some crack have efflorescence.[2016] - 25sf of minor cracking with efflorescence

510 - Wearing Surfaces 5707 SF 5673 34 0 0

Notes: Concrete Slab with Cathodic Protection System Notes: There are no spalls, delamination's, or patches noted in the surface of the deck.[2014] - no change[2016] - 300lf of moderate sized cracks. minor spalls at top of end block along poured deck joint.

Underwater 05/26/2016

5707 SF 5673 34 0 0Routine 05/16/2016

Reinforced Concrete Pier Wall 05/26/2016 81 LF 0 20 61 0210 Underwater

05/16/2016 81 LF 76 5 0 0Routine

Notes: No concrete deterioration noted.[2014] - no change[2016] - 5 leaching vertical cracks.[2016] -Underwater Inspection - The concrete face of the north pier wall from the upstream nose to the midpoint and from the downstreamquarter to the downstream consists of soft and easily erodible concrete with up to three inches of penetration from channel bottom to 1 footabove the waterline. The upstream half of the south side of the Pier had heavy scaling with up to 5 inches of penetration. Exposed rebar waspresent.

Reinforced Concrete Abutment 05/26/2016 208 LF 208 0 0 0215 Underwater

05/16/2016 208 LF 208 0 0 0Routine

Notes: South Abutment - There are 2 hairline vertical cracks in the front face of the abutment. The cracks are located between bearings 6 and7 and under bearing 4.[2014] - loose sand and fill covering the abutment. [2016] - no changeNorth Abutment - There are 3 hairline vertical cracks in the front face of the abutment. The cracks are located between bearings 5 and 6 and 6and 7 and along the east side of bearing 3.[2014, 2016] - no change

Reinforced Concrete Pier Cap 05/26/2016 80 LF 80 0 0 0234 Underwater

05/16/2016 80 LF 80 0 0 0Routine

Notes: No concrete deterioration noted.[2014, 2016] - no change

Strip Seal Expansion Joint 05/26/2016 166 LF 166 0 0 0300 Underwater

05/16/2016 166 LF 166 0 0 0Routine

Notes: South End - OK, the strip seals were full of dirt and debris; however there were no signs of leakage at the bridge seat.[2012] - the east end of the abutment is wet at this time. [2014] - Both E and W faces have water leaking down them. [2016] - no changeNorth End - OK, the strip seals were full of dirt and debris; however there were no signs of leakage at the bridge seat. [2014] - West side coverplate is missing all bolts. Also water leaking down abut. face @ E and W corners. [2016] - no change

Page 8 of 16

Pourable Joint Seal 05/26/2016 170 LF 60 0 100 10301 Underwater

05/16/2016 170 LF 60 0 100 10Routine

Notes: The pourable joints are located in the approach panels.There are large areas along both approach slabs where the joint material has lost adhesion approximately 95 linear feet.[2012] - approximately 105 LF has lost adhesion. [2014] - no change[2016] - 110lf of lost adhesion and/or missing joint material. 10lf of spalled adjacent concrete.

Reinforced Concrete Approach Slab 05/26/2016 2560 SF 2520 40 0 0321 Underwater

05/16/2016 2560 SF 2520 40 0 0Routine

Notes: South Approach - There are small cracked and delaminated area located along the end block in both lanes. There is a 3" X 36" crackedand delaminated area along the right hand lane in the south bound lane and a 3" X 12" cracked and delaminated area along the right hand laneof the north bound lane. There are 4 full length unsealed longitudinal cracks in the approach.

North Approach - There is a small 6" X 12" cracked and delaminated area located at the west end of the end block next to the curb. There are 6full length unsealed longitudinal cracks in the approach.2012 - there are now 12 full length unsealed longitudinal cracks in the approach.[2014, 2016] - no change

Metal Bridge Railing 05/26/2016 210 LF 174 36 0 0330 Underwater

05/16/2016 210 LF 174 36 0 0Routine

Notes: The railing consists of 30" high solid concrete base with a 26" high painted steel rail attached to the top of the concrete rail.[2016] - no structural defects on metal rail. anchorages are secure.

515 - Steel Protective Coating 420 SF 415 5 0 0

Notes: [2016] - a few minor paint scratches

Underwater 05/26/2016

420 SF 415 5 0 0Routine 05/16/2016

Reinforced Concrete Bridge Railing 05/26/2016 220 LF 208 12 0 0331 Underwater

05/16/2016 220 LF 208 12 0 0Routine

Notes: The railing consists of 30" high solid concrete base with a 26" high painted steel rail attached to the top of the concrete rail.

West Railing - the concrete portion has 5 railing section with 1 to 4 vertical cracks per section with some staining or leaching.[2016] - no change

East Railing - the concrete portion has 3 railing section with 1 to 2 vertical cracks per section with some staining or leaching.[2012] - there are 4 railing sections with cracking.[2014] - no change

Critical Deficiencies or Safety Hazards 05/26/2016 1 EA 1 0 0 0800 Underwater

05/16/2016 1 EA 1 0 0 0Routine

Notes: [2014, 2016] - No critical finding were noted at the time of this inspection.

Concrete Decks - Cracking & Sealing 05/26/2016 1050 LF 750 300 0 0810 Underwater

05/16/2016 1050 LF 750 300 0 0Routine

Notes: There is an unsealed transverse crack over the pier and two full length unsealed cold joint cracks.[2016] - 1050lf of cracking. approx. 300lf unsealed.

Scour 05/26/2016 1 EA 1 0 0 0885 Underwater

Slopes & Slope Protection 05/26/2016 1 EA 0 1 0 0892 Underwater

05/16/2016 1 EA 0 1 0 0Routine

Notes: The slopes are in stable condition.South Slope - vandals have remodeled one of the 3' X 10' concrete slope protection blocks located near the center line.[2014] - There are scattered area of blocks that have heaved or have been patched.[2016] - no change

ELEMNBR ELEMENT NAME INSP. DATE QUANTITY

QTYCS 1

QTYCS 2

QTYCS 3

QTYCS 4

BRIDGE 66546 2 AVE SW(MSAS 123) OVER CANNON RIVER

REPORT TYPE

Page 9 of 16

Deck & Approach Drainage 05/26/2016 1 EA 1 0 0 0894 Underwater

05/16/2016 1 EA 1 0 0 0Routine

Notes: [2016] - no drainage issues noted

Sidewalk, Curb, & Median 05/26/2016 1 EA 0 0 1 0895 Underwater

05/16/2016 1 EA 0 0 1 0Routine

Notes: There is 60' of unsealed cracks in the sidewalk. All of the curb sections are intact.[2012] - there is 150' of unsealed cracks in the sidewalk. [2014] - There is a 2'x16" area of cracked and delam concrete at the expansion plateSE end. West sidewalk N end expansion plate has shifted and all bolts are missing. [2016] - no change

Miscellaneous Items 05/26/2016 1 EA 1 0 0 0899 Underwater

05/16/2016 1 EA 1 0 0 0Routine

Notes: There are some areas of graffiti painted along the north abutment and the north slope.There are 4 light poles on the bridge that are in good condition.There is a concrete walkway and steel railing in front of the north abutment. The walkway and railing are in good condition.

Protected Species 05/26/2016 1 EA 0 1 0 0900 Underwater

05/16/2016 1 EA 0 1 0 0Routine

Notes: [2016] - swallow nests are present.

General Notes:

Inspector's Signature Reviewer's Signature

Garrett Owens

Inventory Notes:

Bridge 66546

NOTE: Bridge was built in 2008 it replaced Bridge 3578.[2010] - inspected by Brian Haugen.After the flooding of September 2010, BR#66546 was inspected for evidence of scour, flood related damage and/or timberdebris accumulation. No significant flood related issues were found.[2012] - inspected by Gary Waletzki and Aaron Forthun[2014] - inspected by Gary Waletzki and Aaron Forthun.[2016] - inspected by Robert Pyfferoen

Channel - NBI 8 The banks are in stable condition.

58. Deck NBI:

36A. Brdg Railings NBI:

36B. Transitions NBI:

36C. Appr Guardrail NBI:

36D. Appr GuardrailTerminal NBI:

59. Superstructure NBI:

60. Substructure NBI:

61. Channel NBI:

62. Culvert NBI:

71. Waterway Adeq NBI:

72. Appr RoadwayAlignment NBI:

2014 Minor deterioration.

2014 Isolated deterioration.

2014 Isolated deterioration.

2014 Well vegetated.

2014 Chance of over topping is remote

2014 No speed reduction required.

ELEMNBR ELEMENT NAME INSP. DATE QUANTITY

QTYCS 1

QTYCS 2

QTYCS 3

QTYCS 4

BRIDGE 66546 2 AVE SW(MSAS 123) OVER CANNON RIVER

REPORT TYPE

Page 10 of 16

Photo 1 - East Elevation, Looking West

Photo 2 - West Elevation, Looking East

Pictures

Page 11 of 16

Pictures

Photo 3 - Typical View of Pier and South Shore, Looking North

Photo 4 - Typical View of Pier, Looking South

Page 12 of 16

Pictures

Photo 5 - Typical View of South Shoreline, Looking South

Photo 6 - View of Heavy Damage to South Slope Mat, Looking West

Page 13 of 16

Pictures

Photo 7 - Exposed Rebar on the South Face, Looking North

Photo 8 - Typical Spall and Scaling on Pier, Looking South

Page 14 of 16

Figure No.: 1

Legend

N

UNDERWATER BRIDGE INSPECTION

DEPARTMENT OF TRANSPORTATION

MINNESOTA

INSPECTION AND SOUNDING PLAN

Flo

w

1

Inspection Note Number

Refer to Figure 2 for Inspection Notes.

Note:

(Typ.)

Shoreline

TYPICAL END VIEW OF TOWERS

SOUNDING PLAN

42'-0"42'-0"

SOUTH ABUTMENT NORTH ABUTMENT

PIER

84'-

4"

Project: 63-9687

-1.2-1.9 -0.4

-2.7-2.5

-2.1 -3.2

-0.8-3.0

-2.2-2.3

-2.4

1

1

Drawn By: BGDO Date: JUNE 2016

Checked By: BRL

-18.0 Sounding Depth from Waterline (9/13/12)

River

CA

NN

ON

3

12x74 Steel H-Pile

CITY OF FARIBAULT, RICE COUNTY

OVER THE CANNON RIVER

STRUCTURE NO. 66546

Scale: N.T.S.

-2.3 -2.4 -0.9

-2.5-3.0

-3.4-2.7

-1.3 -3.1

-1.0-2.0 -2.7

Sounding Depth from Waterline (5/26/16)-18.0

measured in feet. Soundings indicate the water depth at the time of inspection and are3

waterline elevation of 955.5 feet.pier cap at downstream nose of the pier. This corresponds with a was located approximately 7.4 feet below bottom of architectural At the time of inspection on May 26, 2016 the waterline 2.

The concrete pier was inspected during the underwater inspection.1.

General Notes:

www.collinsengr.com

(651) 646-8502

St. Paul, MN, 55104

Suite 206

1599 Selby Avenue

6

5

2

4

4

2

Pedestria

n Trail

Exposed rebar was present, no section loss was present.exhibited heavy spalling with up to 4.5 inches of penetration.The downstream quarter of the south face of the pier6

rebar was present.heavy scaling with up to 5 inches of penetration. Exposed The upstream half of the south side of the pier had5

missing blocks at the south shore.The most severe damage was 7 foot by 3 foot area of The slope protection mat had missing and displaced blocks.4

stones with sandy infill. The channel bottom consisted of randomly displaced paving3

bottom to 1 foot above the waterline. concrete with up to 3 inches of penetration from channelface of the pier wall exhibited soft and easily erodableThe upstream half and downstream quarter of the north2

to 10 feet downstream of the bridge fascia. 1 foot below waterline and from 10 feet upstreamarticulated concrete mat from top of slope toThe north and south slope embankments were lined with1

Inspection Notes:

Page 15 of 16

UNDERWATER BRIDGE INSPECTION

DEPARTMENT OF TRANSPORTATION

MINNESOTA

UPSTREAM AND DOWNSTREAMFASCIA PROFILES

Refer to Figure 1 for General Notes.

Note:

Figure No.: 2

940

960

980

940

960

980

UPSTREAM FASCIA PROFILE

42'-0"42'-0"

ShorelineShoreline

940

960

980

940

960

980

42'-0"42'-0"

ShorelineShoreline

DOWNSTREAM FASCIA PROFILE

Project: 63-9687

W.L. El. 955.5

W.L. El. 955.5

on 9/13/12

Channel Bottom

on 9/13/12

Channel Bottom

Drawn By: BGDO Date: JUNE 2016

Checked By: BRL

EL. 950.5

B/Pier Wall

EL. 950.5

B/Pier Wall

CITY OF FARIBAULT, RICE COUNTY

OVER THE CANNON RIVER

STRUCTURE NO. 66546

Scale: 1"=20'

on 5/26/16

Channel Bottom

on 9/13/12

Channel Bottom

www.collinsengr.com

(651) 646-8502

St. Paul, MN, 55104

Suite 206

1599 Selby Avenue

PIER N. AbutmentS. Abutment

S. Abutment N. AbutmentPIER

Pedestrian Trail

Pedestrian Trail

Page 16 of 16