Budget Functionality inProject System

HI Team, Several times we will have budget issues in project system. I am givingsome examples how the Project System availability control behaves & itsconseuences.

!ote" In this case I am ta#ing example o$ direct %I Posting to the 'S(lements Step )* +reation o$ 'S elements $or Testing

 Step -* ssigning & releasing budget $or the speci/c 'udget H011-)0 Here I enter 2s.)11130 as a 'udget & released 2s.41130 only. The same youcan get it in the PS 'udget 2eport +56- 

!ote the 'udget is allocated only in the higher 'S (lement i.e., H01-) only

Page 2: Budget Functionality in SAP Project System

7/23/2019 Budget Functionality in SAP Project System

http://slidepdf.com/reader/full/budget-functionality-in-sap-project-system 2/4

 Step 6 * 'oo#ing the expenses using %'71 $or the th level 'S element H0

11-)01, even though the budget allocated at Higher 'S (lement. Heresystem will allow to post expenses or not..8 let see..9 

Its saving without giving any error message & it consider the 'udget $romthe top level 'S (lement. Isn:t it..8 Step * +hec# the 'udget 2eport"  ;ou can observe in the th line item, availability as )11 0ve value & theactual and assigned value as )1130. It is because we have done somepostings to the th level 'S (lement. In the top level 'S (lement, +urrent budget is )11130, 2eleased is41130, ctual cost is )1130 <This is th =evel 'S (lement ctual amount*,/nally it is showing that vailable 'udget as >11.

Page 3: Budget Functionality in SAP Project System

7/23/2019 Budget Functionality in SAP Project System

http://slidepdf.com/reader/full/budget-functionality-in-sap-project-system 3/4

 Step 7* !ow, I distributed budget amount -1130 to the th level 'S (lement Here it shows that available or remaining -1130 at th 'S (lement. I$ youare trying to post )11 then, will the system allow you to post..8 =et:s see...9

 Step ?* Trying to post -7130 to the th level 'S. s per the standard reportit should allow up to -11 since its showing $or -1130, but here the li$e haschanged to error message...9

 

Page 4: Budget Functionality in SAP Project System

7/23/2019 Budget Functionality in SAP Project System

http://slidepdf.com/reader/full/budget-functionality-in-sap-project-system 4/4

 It:s giving the error message $or )7130 even through -1130 available in thespeci/c 'S (lement budget. 2eason" System behavior is, a$ter distribution to the th 'S system willconsider )1130 already consumed with 0ve value. $ter assigning that it willconsume the /rst & remain value would be )1130 & the invoicing amountwould -7130 that is the reason, error triggered $or )71. 'ut the budget report it shows availability $or -1130. max time business havea con$using since it showing in budget available, even though system will notallow you to process $urther due to the above error. 

2egards 2aj"