W2.0 132 LFF-5 2 EAF-4 6 EAPier 1 7 EASOG 1,383 SFFooting Steps 9 EAMAT 86 SF14" CMU Wall 140 LF8" CMU 5 LFIsolation Joints 20 LFControl Joints 52 LF
Oriole Park (23) (176% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:33 AM
Concrete Pad over Roof Membrane 1,329 SF
Oriole Park (14) (147% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:34 AM
Footings ‐ W2.0 Typical
Description Length Width Hieght SFCA Forms Waste %Footing 132 2 1 264 10 CY 5% 10.3 CY
Formwork None, Using EarthKey Way None
Description Length Width Hieght SFCA Forms Waste %14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY14" CMU approx QTY 473 ea8" CMU approx QTY 20 ea
Description Length Rbar Size # of Rbars Rbar Mult. Waste %3 #5 contin. 154 #5 3 1.043 462 LF 10% 0.27 Tons 508 Length
Doweling (old to new) detail 2 #5 4 1.043 8 LF 0% 0.0 Tons 8 Length
Description Length @ (ft) Rbar Size Rbar Mult. Waste %#4 @ 48" O.C 1.5 4 #4 0.668 50 LF 10% 0.02 Tons 36 Pieces
Wall FTG Corner 24x24 2 6 #5 1.048 12 LF 0% 0.01 Tons 6 Pieces
Description Length Width Hieght SFCA Forms Waste %14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY14" CMU approx QTY 473 ea8" CMU approx QTY 20 ea
Description Length @ (ft) Rbar Size Rbar Mult. Waste %#4 @ 48" O.C 3.5 2.67 #5 1.043 190 LF 10% 0.11 Tons 78 Pieces
NOTE: Budget for 9 Step Footings 71836
100.29
FootingQTY Total
TOTAL Airentrained Concrete (3000 psi) CY
QTY
Total Rbar #4 Length
CMU WallQTY Total
TOTAL Rbar Tons
Horizontal Rebars (continuous)QTY Total
Rbar TiesTotal
Total Rbar #5 Length
CMU WallQTY Total
RebarQTY Total
Column Footing
Footing Type QTY Length Width Hieght CY Waste % Total CY SFCA Size Qty Length Waste % Total Length TonsF4 9 4 4 1 5.33 5% 5.60 16 #5 8 576 0% 576 0.30
Top of FTG 9 3.25 3.25 0.67 2.36 5% 2.48 13 ‐ ‐ ‐ ‐ ‐ ‐F5 2 5 5 1 1.85 5% 1.94 20 #5 10 200 0% 200 0.10
Top of FTG 2 4.25 4.25 0.67 0.90 5% 0.94 17 ‐ ‐ ‐ ‐ ‐ ‐
Matt Foundation
Footing Type QTY Length Width Hieght CY Waste % Total CY SFCA Size Qty Length Waste % Total Length TonsMAT1 1 11 9.25 1 3.77 5% 3.96 40.5 #5 42 850.5 0% 851 0.44
Key Way 33 LF
14.92 16270.85
Total 4000 psi Conc. Total Rbar #5 LengthTOTAL Rbar Tons
Pier ‐ P1
Description Length Width Hieght SFCA Forms Waste %Footing (7 ea) 1.34 1.67 1.67 63 1 CY 5% 1.3 CYFormwork 81 SFCA
Description Length Rbar Size # of Rbars Rbar Mult. Waste %(8) #6 Vert. 1.34 #6 8 1.502 75 LF 10% 0.06 Tons 83 Length(8) #6 Vert. 2.25 #6 4 1.502 63 LF 110% 0.10 Tons 132 Length
Description Length @ (ft) Rbar Size Rbar Mult. Waste %#3 Collar Ties 8" O.C 6 0.67 #3 0.376 84 LF 10% 0.02 Tons 2 Pieces
21592
1
0.18
FootingQTY Total
Virticle RebarsQTY Total
TOTAL Airentrained Concrete (3000 psi) CY
TOTAL Rbar Tons
Rbar TiesQTY Total
Total Rbar #6 LengthTotal Rbar #3 Length
Description Length Hieght SF Waste %Concrete 3000 PSI, Broom Finish ‐ 0.34 1383 17 CY 5% 18 CY
WWF,6x6 w2.1 x 2.1w ‐ ‐ 1383 1383 SF 10% 1521 SF10 Mil Vapor Barrier ‐ ‐ 1383 1383 SF 10% 1521 SF
4" Compacted Stone Base ‐ 0.34 1383 17 CY 10% 19 CYIsolation Joints 20 ‐ ‐ 20 LF 0% 20 LF
Control & Construction Joints 52 ‐ ‐ 52 LF 0% 52 LF
Description Length Hieght SF Waste %2" Light Weight Conc. ‐ 0.17 717 5 CY 5% 5 CY2" Concrete Topping ‐ 0.17 717 5 CY 5% 5 CY
Description Length Hieght SF Waste %2" Light Weight Conc. ‐ 0.17 613 4 CY 5% 4 CY2" Concrete Topping ‐ 0.17 613 4 CY 5% 4 CY
Styrofoam High Load Insulation ‐ 4.5 613 613 SF 5% 644 SF1/2" Cement Board ‐ 0.5 613 613 SF 5% 644 SF
QTY Total
Slab on Grade
Slab on Grade (On Roof) Low SideQTY Total
Slab on Grade (On Roof) High Side
QTY Total
Concrete Wall Foundation (Elevator)
Description Length Width Hieght SFCA Forms Waste %Concrete 24.75 0.67 4 0 2 CY 5% 2.6 CYConcrete 8.25 0.83 4 0 1 CY 5% 1.1 CYFormwork 264 SFCA
Description Length Rbar Size # of Rbars Rbar Mult. Waste %#5 @ 12" O.C 24.75 #5 4 1.043 99 LF 10% 0.06 Tons 109 Length#5 @ 12" O.C 8.25 #5 4 1.043 33 LF 10% 0.02 Tons 36 Length
Description Length @ (ft) Rbar Size Rbar Mult. Waste %Dowels ‐ #5 @ 12" O.C 6.34 1 #5 1.043 157 LF 10% 0.09 Tons 27 Pieces
3180.152644Total CY Airentrained 3500 psi Conc.
Total FormWK (SFCA)
Total Rbar #5 LengthTotal Rbar Tons
Rbar TiesQTY Total
Wall FoundationQTY Total
Horizontal Rebars (continuous)QTY Total