Demolition Permits January 2009 Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo” permit to provide for the removal of a structure from a property. Policy: A Building Permit Application is required. (On the application under ‘what are you applying for’, demolition would be selected.) The cost of a demolition permit is $150. A demolition permit includes the structure above grade and the foundation. An inspection must be called after the work is deemed to be complete. Prior to the issuance of a demo permit the owner should sign the “Notice to Applicants” and that document should be saved with the file. If the owner believes that the land was used for industrial or commercial purposes then the applicant must fill out the full Schedule 1, (Contaminated Site Profile). We should also include the archaeological handout with every demo permit and make a note on the permit that the arch handout was given. All demo permits should be signed by a building inspector and the owner. The following items should be considered when issuing the building permit: The safe termination of services such as water, sanitary, and storm connections as well as gas and electrical utilities. Is the demo within a development permit area? Planning department should look at demolition permits (Continued next page)

Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Demolition Permits January 2009

Building Information SCRD Building Department

“Demolition Permits”

Subject: Issuance of a “demo” permit to provide for the removal of a structure from a property.

Policy: A Building Permit Application is required. (On the application under ‘what are you applying for’, demolition would be selected.)

The cost of a demolition permit is $150.

A demolition permit includes the structure above grade and the foundation.

An inspection must be called after the work is deemed to be complete.

Prior to the issuance of a demo permit the owner should sign the “Notice to Applicants” and that document should be saved with the file. If the owner believes that the land was used for industrial or commercial purposes then the applicant must fill out the full Schedule 1, (Contaminated Site Profile).

We should also include the archaeological handout with every demo permit and make a note on the permit that the arch handout was given.

All demo permits should be signed by a building inspector and the owner.

The following items should be considered when issuing the building permit:

• The safe termination of services such as water, sanitary, and storm connections as well as gas and electrical utilities.

• Is the demo within a development permit area? Planning department should look at demolition permits

(Continued next page)

Page 2: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Demolition Permits January 2009

“Demolition Permits ” continued

• Hazardous material (asbestos, chemicals, etc.) to be removed as per Ministry of Environment

requirements.

• The contractor is responsible for all permits including arrangements for street closures if necessary.

Reason: Utility charges would continue and the building will remain on the tax roles until a demo permit has been issued.

Page 3: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Building Department Permit Application.

PLEASE PRINT AND COMPLETE THIS FORM CAREFULLY. INSUFFICIENT INFORMATION WILL DELAY THE PROCESSING OF THIS APPLICATION.

LEGAL DESCRIPTION: House Number: (If assigned)

Road Name:

OWNER Primary contact

Name(s):

Mailing Address: City/Prov: Postal Code:

Tel: Cell: email:

AGENT Primary contact

Name(s):

Mailing Address: City/Prov: Postal Code:

Tel: Cell: email:

CONSTRUCTOR Primary contact

Name(s):

Company name:

Mailing Address: City/Prov: Postal Code:

Tel: Cell: email:

HAVE YOU PROVIDED THE FOLLOWING: Certificate of Title (dated within 2 days of application, including copies of registered covenants, easements and right of ways) (C of T can be obtained by SCRD for a fee of $20.00, covenants, easements and r/w’s for a fee of $50.00 each)

Yes No

Sewerage Filing or registered practitioner’s (ROWP) report, as applicable. Yes No

Highways access approval (for properties accessing a numbered highway and all commercial properties) Yes No

Owner’s Acknowledgement of Responsibility and Undertakings form (copy attached) Yes No

BC Building Code Letters of Assurance complete with proof of liability insurance from Professional Engineer(s). Yes No

Residential builder “HPO Registration Form” or owner builder “New Home Registration Form” (for new dwellings) Yes No

Construction plans – 3 sets of drawings (sealed by P Eng if applicable), including truss layout c/w concentrated loads 4 sets of drawings are required for applications within the Island Trust area.

Yes No

Site Plan, complete with all buildings, measurements & setbacks Yes No

Manufacturer’s specification sheet, for mobile or modular home Yes No If mobile or modular home: Provide #

CSA Z240 CSA A277 CSA Z241

Page 4: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Building Department Permit Application.

Proposed construction:

New Addition Alteration Repair Demolition Move

DWELLING MANUFACTURED HOME MOBILE HOME ACCESSORY BLDG COMMERCIAL BLDG OTHER

Describe the scope of work:

Number of stories:

Estimated value of construction:

Type of Heating system:

Number of bedrooms: Existing: New: Total:

Project Details (*must be shown on plans)

Woodstove * Factory fireplace * Masonry fireplace * Gas fireplaces * Gas appliances * Masonry chimney * Factory Built chimney * Not applicable

Electrical Plumbing Gas Heating Not applicable

Garage * Carport * Verandahs * Decks * Not applicable

Slab * Crawl space * Finished Basement * Unfinished Basement * Other * Not applicable

Demolition, Addition, Alteration or Repair of a structure built prior to 1990? Yes No

Has or will fill be placed on site? Yes No

PLEASE ANSWER THE FOLLOWING:

Is the property in a water service area? Which area? __________________________________________ Yes No

Is the property adjacent to and/or contain: the sea, a lake, river, stream, creek, cliff, bank, ravine, or escarpment? Yes No

Are there any existing structures on the property? (If yes, must be indicated on site drawing) Yes No

SITE INFORMATION: Notes: Where 2 lot lines adjoin a public road the front is deemed to be the shortest line adjoining a road. Height is measured from the average natural grade of the building footprint to the highest part of the roof surface.

To Front Lot Line (metres)

To Rear Lot Line (metres)

To Left Side Lot Line (metres)

To Right Side Lot Line (metres)

Height (metres) Building Separation (metres)

Signature of Owner or Authorized Agent:

Date:

Date Rec’d: Rec’d by:

PID: Folio:

Page 5: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Sunshine Coast Regional District Building Bylaw No. 687, 2014.

I/we ________________________________________________________(print name) Being the owner, or the signing authority for the corporate owner of the following property: Legal Description: _______________________________________________________ Street Address: _________________________________________________________ Building Permit Number: ____________________ Understand, acknowledge and agree as follows; (Owner or Signing Authority to Initial Each Box)

1. I/We have checked the Certificate of Title for covenants, building schemes,

easements, etc. and I/we understand that these matters are not enforced by the Regional District or the local Jurisdiction;

2. I/We recognize that there are areas of ‘problem soils’ within the Regional District which are widely distributed as to location, I/we hereby acknowledge that it is my/our responsibility as owner of the parcel to identify site conditions generally and ‘problem soils’ in particular on which the construction cited in my application is to be placed and I/we will take all action required to ensure adequacy of foundation works;

3. I/We hereby acknowledge that if granted a permit pursuant to my/our application, that it is my responsibility to ensure compliance with the Building Code, Building Bylaw and any other applicable enactment, code, regulation or standard relating to the work in respect of which the permit is issued, whether or not said work is undertaken by me/us or by those whom I/we retain or employ to provide design and/or construction services;

4. I/We hereby acknowledge that neither the issuance of a permit; nor the acceptance and review of plans, specifications, drawings, or supporting documents; nor inspections made by or on behalf of the Regional District constitute a representation, warranty, assurance or statement that the Building Code, Building Bylaw or any other applicable enactment, code, regulation or standard has been complied with;

SCHEDULE E

OWNER’S RESPONSIBILITIES

_____

_____

_____

_____

Page 6: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

5. I/We understand that Environmental Health Officers will no longer be expected to review referrals for building additions, alterations to buildings, decks, private pools, auxiliary buildings, etc. for the purpose of on-site sewage disposal assessment. I/We further understand it is my/our responsibility to retain an “authorized person” to carry out these assessments.

6. I/We acknowledge that where the Regional District requires that Letter of Assurance be provided by a Registered Professional in accordance with this Building Bylaw, I/We confirm that I/we have been advised in writing by the Regional District that it relied exclusively on the Letters of Assurance in respect of the review of the plans, drawings, specifications and supporting documents submitted for a building permit.

7. I/We further acknowledge that I/We have relied only on the Registered Professional for the adequacy of plans, drawings, specifications and supporting documents submitted in the application for a building permit.

8. I/We acknowledge that I/we have been advised to obtain independent legal advice in respect of the responsibilities I/we am assuming upon granting of a permit by the Regional District pursuant to my/our application and in respect of the execution of this document.

9. I/We am authorized to give these representations, warranties, assurance and indemnities to the Regional District.

10. I/We understand that although the value of construction has been determined at time of permit issuance, the Regional District reserves the right to revise the value at or near the final inspection stage and invoice accordingly for the balance

I have read the above acknowledgement, undertaking, release and indemnity and understand it. Signature: _____________________________________ Date: _____________________________________ Company Name: _____________________________________

(if owner is a corporation) N:\Assets & Procurement\1110 Forms & Templates\1110-20 Forms & Templates\Building\2014 SCRD Schedule E.docx Issue 1

_____

_____

_____

_____

_____

_____

Page 7: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

NOTICE TO APPLICANTS This notice is to applicants for Demolition Permits, Development Variance Permits, Demolition Permits, Soil Removal Permits and Zoning Bylaw Amendments. Under the Environmental Management Act, you are required to complete the attached Site Profile (Schedule 1) only if you know, or reasonably should know, that the land under application is or was used for industrial or commercial purposes or activity. Please refer to Schedule 2 of the Contaminated Sites Regulation for a list of industrial and commercial purposes and activities. You must submit the completed profile along with your application to the Sunshine Coast Regional District. If in completing Schedule 1 you answer “yes” to any questions listed in sections IV to IX, the Regional District upon receiving your completed site profile will forward it to the Ministry of Water, Land and Air Protection (Surrey Regional Office) for further investigation and follow-up. If in completing schedule 1 you answer “no” to the questions listed in sections IV to IX, the Regional District upon receiving your completed site profile will forward it to the Ministry of Water, Land and Air Protection (Victoria Office) for inclusion within its registry. Failure to satisfactorily complete Schedule 1, if required, may result in delays in processing your application to the Regional District. If you have any questions or require further information concerning the Contaminated Sites Profile (Schedule 1) or Schedule 2 of the Contaminated Sites Regulation, please contact:

Ministry of Water, Land and Air Protection Environmental Management Branch

10470 152nd Street Surrey, British Columbia

V3R 0R3 Tel: 604-582-5200 Fax: 604-582-5334

Please check one below:

o To the best of my/our knowledge, the land under application has never been used for industrial or commercial purposes (no need to complete Schedule 1)

o We acknowledge the land under application is currently used or has been used for industrial or

commercial purposes, the details of which are provide in attached Schedule 1 I/we acknowledge that I/we have read and understand the information outlined above and I agree to comply with the requirements of the Waste Management Act and Contaminated Sites Regulation for completing a Site Profile.

_______________________ _______________________ ____________

Applicant Name Applicant Signature Date

Applicant Declarion:

Page 8: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

GYPSUM BOARD DISPOSAL Beginning June 1, 2012 at SCRD landfill sites

Until the 1980’s the tape and joint compound used to seal seams, and fill gaps and corners

between gypsum boards may have contained asbestos. Asbestos containing material is safe if it

is left intact. When it is disturbed or damaged asbestos fibers are released in the air and when

inhaled can lead to asbestos-related disease such as asbestosis and mesothelioma. Asbestos

related diseases usually develop many years after the person has been exposed to asbestos.

If the tape and joint compound contains asbestos, then you must wear appropriate protective

equipment and precautions must be taken to contain the release of asbestos into the air when

disturbed. Before you begin your renovation or demolition project:

Contact a qualified professional to sample the joint compound and have it tested for

asbestos (see list of Testing Providers);

If the lab results show no asbestos, then you can take the gypsum to SCRD

landfill sites with your lab results and completed form (see reverse); without

lab results the gypsum will not be accepted.

If positive for asbestos content (0.5% or greater) contact a certified Asbestos

Abatement and Disposal company regarding its safe removal and disposal.

SCRD landfill sites will not accept this material.

Testing Providers

• Information regarding competent testing providers can be obtained by contacting

WorkSafe BC at 604-276-3100.

• Solution Based Construction 604-741-3999

• Pacific Environmental Consulting 604-980-3577

• ACM Environmental Corporation 604-873-8599

• Astech Environmental 604-575-1122

• Sure Hazmat 604-724-2341

• PHH Arc Environmental Ltd 604-244-8101

Asbestos Abatement/Disposal Companies

• Solution Based Construction 604-741-3999

• ACM Environmental Corporation 604-873-8599

• PHH Arc Environmental Ltd 604-244-8101

• Actes Environmental 604-990-4258

Page 9: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

SCRD LANDFILL - GYPSUM BOARD DISPOSAL PROCEDURE

Accepted Material:

• Clean Gypsum Board off-cuts from new construction.

• Gypsum Board that is painted or with attached tape, joint compound, textured finish or

mud) accompanied by documentation verifying the material has been sampled and tested

at a certified laboratory and found to be less than 0.5% asbestos containing in compliance

with WorkSafeBC requirements.

Banned Material:

• Gypsum board that is not clean and is not accompanied by documentation verifying the

material has been sampled and tested at a certified laboratory.

• Gypsum board that has been tested and found to contain asbestos in quantities greater

than the WorksafeBC requirements.

Please fill out before arriving at SCRD Landfill site:

Sampling Information

Name of Sampler:

Company Name:

Contact No.:

Disposal Information

Hauler name:

Location of Origin:

License No.:

Scale Ticket No. (Landfill staff will complete):

Page 10: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Asbestos hazards in demolition, renovation, and salvage

Asbestos is responsible for more worker deaths than any other workplace disease.

• Whatconstitutesacompliantasbestosinspection• Arrangingforandconfirmingthesafeabatementof

asbestos• Whattodoifmorematerialssuspectedtocontainasbestos

areencounteredduringdemolitionorsalvageworkTheemployer,owner/builder,agent,orpropertymanagermusthaveaqualifiedpersoninspectthesitetoidentifyanyasbestosthatmaybehandled,disturbed,orremoved.OHSGuidelineG6.6-3outlinestheacceptablequalificationsforpersonsconductingasbestoshazardassessments.

What should I do if I find asbestos-containing material (ACM)?1. AllACMmustbeproperlyremovedanddisposedofby

trainedandqualifiedasbestosremovalworkersbeforedemolition,renovation,orsalvageworkbegins.

2. Anoticeofprojectforasbestos(NOPA)mustbesubmittedtoWorkSafeBCatleast24hoursbeforeasbestosremoval,demolition,renovation,orsalvageworkbegins.

3. Aftertheasbestosremoval,theowneroremployershouldreceivewrittenconfirmationthattheasbestosspecifiedforremovalontheNOPAhasbeenproperlyremoved.

AsbestossurveyandremovalcompaniescanbefoundintheYellowPagesunderAsbestosAbatement&Removal,Health&SafetyConsultants,orEnvironmentalConsultants.Ifasbestos-containingmaterialsthatwerenotidentifiedduringtheinspectionarefoundduringworkactivities,stop work immediately!Havetrainedandqualifiedworkersremovethesematerialsbeforeresumingwork.

Where can I find additional information about asbestos and NOPA forms?WorkSafeBC.comoffersthefollowingresources:• ThebookletSafe Work Practices for Handling Asbestos• SafetyatWorkcentreforConstruction• OHSGuidelineG6.8:Proceduresforabatementof

asbestos-containingmaterialduringhouseandbuildingdemolition/renovation

• NoticeofProjectFormforAsbestosorLead phone:1866319-9704 fax:604232-9703,toll-freefax1888232-9714 e-mail:[email protected]

Page 1 of 2

Asbestosisahazardousmaterial.Demolitionorrenovationofhousescontainingasbestosproductscanreleaseasbestosfibres,whichareextremelyfineandcanstayintheairforhours.Unprotectedworkersexposedtoasbestos-contaminatedaircanbreatheinthefibres.Thismaycauseserioushealthproblems—includinglung diseaseandcancer.

What is asbestos?Asbestosisastrong,fire-resistantmineralfibre.Inthepast,asbestoswasusedasinsulationagainstheatornoiseandforfireprotection.Itwasalsoaddedtomaterialssuchascementandplastertogivethemmorestructuralstrength.

Where was asbestos used in older homes?Untilthelate1980s,morethan3,000productscontainingasbestoswereusedinhouseconstruction.Thedrawingonthebackofthispageshowspotentialsourcesofasbestosoncecommonlyusedinresidentialconstruction.Whendemolishingolderhouses,thereisahighprobabilityofencounteringasbestos-containingmaterials,whichmayreleaseasbestosfibres.

What are my responsibilities as an employer or owner/builder?Employersandowner/buildersareresponsibleforensuringthehealthandsafetyofallworkersworkingfortheemployerandofanyotherworkerspresentattheworkplace.Theyarealsoresponsibleforprotectingthepublic.WorkSafeBChasspecificregulationsthatmustbefollowedcovering:• Demolition(Part20OccupationalHealthandSafety

Regulation)• Asbestos(Part6OccupationalHealthandSafety

Regulation)

What do I have to do before work begins on the demolition, renovation, or salvage of buildings or structures?WorkSafeBCOHSGuidelineG20.112explainsthehazardsassociatedwiththeuncontrolledreleaseofasbestos.Italsoprovidesinformationforowners,employers,consultants,workers,andotherinvolvedpersonson:

WorkSafe Bulletin

Workers’ Compensation Board of B.C.

!

Page 11: Building Information - SCRD Demolition F… · Demolition Permits January 2009 . Building Information SCRD Building Department “Demolition Permits” Subject: Issuance of a “demo”

Wor

kSaf

eBC

Pre

vent

ion

Info

rmat

ion

Line

: 604

276

-310

0 or

toll-

free

1 88

8 62

1-SA

FE (7

233)

Revis

ed M

arch 2

011

WS 03

-03Pa

ge 2

of 2

Pote

nti

al s

ou

rces

of

asb

esto

s

in

th

e h

om

e

Ple

ase

no

te: T

his

floor

pla

n de

pict

s a

typi

cal o

lder

hom

e. A

sbes

tos

use

has

decl

ined

sig

nific

antly

; hom

es b

uilt

befo

re 1

990

are

mor

e lik

ely

to c

onta

in a

sbes

tos

prod

ucts

.

Roof

gut

ters

ca

n be

mad

e of

asb

esto

s ce

men

t

Roof

felt

an

d sh

ingl

es

Asbe

stos

ce

men

t (tra

nsite

) bo

ard

sidi

ng &

un

ders

heet

ing

Soffi

t boa

rds

can

be m

ade

of

asbe

stos

cem

ent

or a

sbes

tos

insu

latin

g bo

ard

Mai

n pa

nel &

fuse

bo

x; e

ach

fuse

wire

ha

s an

indi

vidu

al

asbe

stos

flas

h gu

ard

Back

ing

behi

nd

rece

ssed

ligh

ting Gy

psum

boa

rd

fillin

g co

mpo

und,

an

d pa

tchi

ng &

join

t co

mpo

und

for w

alls

&

cei

lings

Asbe

stos

can

be

foun

d in

stu

cco

Loos

e, b

low

n-in

in

sula

tion,

suc

h as

ver

mic

ulite

Deck

und

er-

shee

ting

Dow

npip

es

can

be m

ade

of a

sbes

tos

cem

ent

Win

dow

pu

ttyDo

or a

nd

gask

et c

over

s

Heat

refle

ctor

fo

r woo

d st

ove

Insu

latio

n on

el

ectri

cal w

ires

Furn

ace

du

ct ta

pe

Floo

ring:

vin

yl ti

les

& li

nole

um

shee

t flo

orin

g; fl

oorin

g ad

hesi

veBo

iler a

nd fu

rnac

e in

sula

tion

Acou

stic

til

es

Pipe

insu

latio

n

Text

ured

or

stip

ple-

coat

ed

wal

ls &

cei

lings

Outle

ts &

sw

itche

s

Inca

ndes

cent

ligh

t fix

ture

bac

king

Artif

icia

l fire

plac

e lo

gs &

ash

es

Asbe

stos

pad

und

er

the

firep

lace

hea

rth