Course Introduction SLIDE LENGTH 1 min TALKING POINTS Welcome to Cadency 105: Cadency for Entity Owners and Close Administrators Before we get started there’s some general information we want to share with you Course Introduction Proprietary and Confidential: Sony Pictures Entertainment
Citation preview
Cadency for Entity Owners and Close Administrators
Sony Pictures Entertainments Financial Close Management Tool
Content for this section of guide *Course Length: min *Instructors
Pre-course Checklist Coordinate training logistics with Training
Manager Training schedule Conference Room A/V Equipment Mobile Lab
(if needed) Review all training materials including Instructor
Guide Demonstration Scripts:
https://share.spe.sony.com/sites/fin/GlobalTrintechUnityCloseProgram/SitePages/Home.aspx?RootFolder=%2Fsites%2Ffin%2FGlobalTrintechUnityCloseProgram%2FTrintech%20Reference%20Material%2F8%20Training%2FTrainer%20Resources&FolderCTID=0x
E
BB2A84E37BD9001FA&View={AECEA70F-E560-4C1C-B389-AD0FA6949FE6}&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence
Student Exercise (located in Participant Guide) Open & Print
Out Course Demonstrations from SP Demonstration Scripts: To access
demonstration scripts go to Cadency SP Site and access the Trainer
Resources folder under Training on the Home Page. Pre-Training
Classroom Set-Up Set up classroom Make sure materials are present
A/V equipment set up Sign in sheet Level 1 evaluations Proprietary
and Confidential: Sony Pictures Entertainment Course Introduction
SLIDE LENGTH 1 min TALKING POINTS
Welcome to Cadency 105: Cadency for Entity Owners and Close
Administrators Before we get started theres some general
information we want to share with you Course Introduction
Proprietary and Confidential: Sony Pictures Entertainment Cadency
Curriculum 101 Introduction to Cadency
102 Cadency for Performers, Reviewers & Secondary Reviewers 103
Additional Functionality for Reviewers and Secondary Reviewers 104
Cadency for Entity Viewers 105 Cadency for Entity Owners and Close
Administrators 106 Additional Functionality for Close
Administrators SLIDE LENGTH: 1 min TALKING POINTS SPE offers 6
courses about Cadency Each course and its title is shown here You
are assigned courses based on the role(s) you have been assigned in
Cadency Depending on close responsibilities you maybe be assigned
more than one role All users take this course: Cadency 101
Depending on role(s) you will take an additional 1-5 courses Each
course lasts between 30 and 50 minutes Proprietary and
Confidential: Sony Pictures Entertainment Curriculum Materials
& Key
Participant Guide Cadency Site on mySPE Follow Along!Participant
Page Guide ## SLIDE LENGTH: 1 min TALKING POINTS All Cadency
courses have training materials to accompany the course.The
training materials for each course are listed on this slide
Participant Guide: you should all have your guide with you during
this course.Follow along using the page numbers listed on the book
icon.Guide contains Additional context/information Demonstration
scripts with screenshots to help you follow along Student Exercises
Cadency SharePoint Site: copies of training materials and job
aids.Additional information on Cadency, close policies and
procedures Proprietary and Confidential: Sony Pictures
Entertainment Cadency 105 Overview This training course is designed
students to prepare participants to use Cadency, SPEs financial
close management tool. Specifically targeted to Entity Owners and
Close Administrators, during this course you will learn: Monitor
the status of SPEs financial close in Cadency Viewing Entity
Set-Ups Manage Close Task Management Configure and Run Reports
Create and Generate eBinders SLIDE LENGTH: 1 min TALKING POINTS
This training course is designed to prepare students to use
Cadency, SPEs financial close management tool. Targeted for users
assigned the roles of Entity Owner and CloseAdministrator, during
this course will cover how both roles Monitor the status of SPEs
financial close in Cadency Viewing Entity Set-Ups Manage Close Task
Management Configure and Run Reports Create and Generate eBinders 4
Proprietary and Confidential: Sony Pictures Entertainment Upon
completion of this course, you should be able to:
Monitor the status of the close for your assigned entities using
the Home Page and/or Consoles View entity set-ups in Cadency Set-up
and manage Close Tasks and action plans Start ad-hoc tasks as
needed Configure and run reports Create and Generate eBinders SLIDE
LENGTH: 1 min TALKING POINTS These are the learning objectives for
this course Monitor the status of the close for your assigned
entities using the Home Page and/or Consoles View entity set-ups in
Cadency Set-up and manage Close Tasks and action plans Start ad-hoc
tasks as needed Configure and run reports Create and Generate
eBinders Proprietary and Confidential Sony Pictures Entertainment
Course Agenda Monitoring Close in Cadency Viewing Entity
Set-Ups
Close Task Management Cadency Reports eBinders in Cadency Course
Conclusion SLIDE LENGTH: 1 min TALKING POINTS There are five
chapters in this course, they are: Monitoring Close in Cadency
Viewing Entity Set-Ups Close Task Management Cadency Reports and
eBinders Course Conclusion Each chapter covers some of our learning
objectives for this course Proprietary and Confidential Sony
Pictures Entertainment Entity Owner Responsibilities Key Take
Away
Maintain entities they have been assigned Update tasks and create
new tasks as needed Manage user groups Configure and run reports
Create and generate eBinders Monitor close statusas needed via
Cadency consoles Primarily an administrative role within Trintech
they manage tasks and entities within Cadency. SLIDE LENGTH: 1 min
TALKING POINTS Before we begin lets review your role as an Entity
Owner or Close Administrator with Cadency Entity Owners are
primarily an administrative role within Trintech supporting SPE
through the management of tasks and entities within Cadency View is
limited based on the entities they have been assigned Entity Owners
have the ability to manage entities and tasks within Cadency.They
can also run and customize reports as well as generate eBinders
Like Entity Viewers, Entity Owners can monitor the status of the
close using Cadency Consoles Proprietary and Confidential: Sony
Pictures Entertainment Financial Close Administrator
Responsibilities Key Take Away Manage the Cadency close calendar
Open/Close periods in Cadency Manage and update Cadency set-ups
Manage tasks, entities as needed View status of close via consoles
as needed Primarily an administrative role within Trintech they
have the same abilities as an Entity Owner as well as the ability
to manage the close calendar within Cadency. SLIDE LENGTH: 1 min
TALKING POINTS Before we begin lets review your role as an Entity
Owner or Close Administration with Cadency Close Administrators
Same abilities as an Entity Owner PLUS the ability to manage the
close calendar and open/close periods See the entire hierarchy
within Cadency whereas Entity Owners can only see the hierarchy for
entities they have been assigned In this course we will focus on
features and functionality available to both Entity Owners and
Close Administers.Functionality, like Calendar Management,
available to Close Administrators only, will be covered in Cadency
106 Proprietary and Confidential: Sony Pictures Entertainment
Entity Owner Dos & Donts
SPE has placed the following governance around the role of Entity
Owner in Cadency Dos Donts Follow SPE task naming conventions for
all new tasks Use the next number in the Task ID sequence for the
new tasks Identify any close tasks important to your specific group
as Key Close Tasks Add/update/delete any entities Add/update/delete
any tasks that you/your group do not own Edit/delete the tasks
flagged withMinimum Standard ID Do not check the Critical checkbox
for any tasks other than the ones flagged as Minimum Standards
SLIDE LENGTH: 1 min TALKING POINTS We will be referencing this list
of Dos and Donts throughout todays training Keep these in mind as
we go through the Viewing Entity Set-up and Task Management
chapters. Proprietary and Confidential: Sony Pictures Entertainment
MONITORING CLOSE IN CADENCY
SLIDE LENGTH 1 min TALKING POINTS Lets get started with our first
chapter: Monitoring Close in Cadency MONITORING CLOSE IN CADENCY
Proprietary and Confidential Sony Pictures Entertainment Upon
completion of this chapter, you should be able to:
Customize your Home Tab to view status of close for assigned
entities Use consoles to monitor status of Close Tasks and
outstanding issues SLIDE LENGTH 1 min TALKING POINTS This chapter
has two objectives.Upon completion of this chapter, you will be
able to: Customize your Home Tab to view status of close task and
close task issues for assigned entities Use consoles to monitor
status of Close Tasks and outstanding issues Proprietary and
Confidential Sony Pictures Entertainment Close Tasks vs. Close
Issues
Activities necessary to complete each Close Can occur on monthly,
quarterly or annual basis Action Plan is created for every relevant
period Challenges or roadblock Close Task Performers or Reviewers
encounter when conducting close Tied to a specific Action Plan
SLIDE LENGTH 1 min TALKING POINTS Here is a quick reminder of what
Close Tasks and Close Task Issues are in Cadency Close Tasks
Activities necessary to complete each Close Can occur on monthly,
quarterly or annual basis Action Plan is created for every relevant
period EXAMPLE: Allocations, Reconciliations Close Issues
Documented challenges or roadblocks encountered by task
performers/reviewers when completing close activities Tied to a
specific action plan EXAMPLE: Data not reconciling as expected,
Data from bank not received on time, unexpected system maintenance
impacts ability to complete close task Proprietary and
Confidential: Sony Pictures Entertainment Home Page Review Home Tab
contains customizable information specialized to each user Entity
Viewers have additional windows they can use to monitor Closestatus
SLIDE LENGTH 1 min TALKING POINTS Recall from Cadency 101 the Home
Tab on Cadency contains customizable information specialized to
each user As an Entity Owner/Close Administrator you have
additional options in customizing your Home Tab Allow you to view
the overall status of Close Tasks across your assigned entities.
Lets take a look at each of these customized windows in turn. Close
Summary Close Calendar Close Task Status Close Issues My Reports My
Scheduled Reports 4 Proprietary and Confidential: Sony Pictures
Entertainment Having 2 Roles : Entity Owner & Reviewer
SLIDE LENGTH 1 min TALKING POINTS If you are assigned the role of
Entity Owner for one entity in Cadency and the role of Reviewer for
another entity you will be able to see all Action Plans assigned to
you for Review as well as the overall status of the close from your
home page This screenshot shows how that looks when you log-in 4
Proprietary and Confidential: Sony Pictures Entertainment Close
Summary Summary of the most recent open period
Completed Task will go to Task Status console Open Issues will show
list of issues for the relevant period and their status SLIDE
LENGTH 1 min TALKING POINTS Shows the summary of the most recent
open period in Cadency Clicking on completed task will bring up the
Task Status console Clicking on open issues will show a list of
issues the relevant period and their status Proprietary and
Confidential: Sony Pictures Entertainment Close Calendar Graphical
view of the current close calendar
Click on date to see all Action Plans due that day Default View =
Current Open Period SLIDE LENGTH 1 min TALKING POINTS Provides a
graphical view of the current close calendar on home page. Green
color represents due dates mapped to close days Click on date to
show all Action Plans due that day Default view is current open
period. If multiple periods are open it shows the latest period.
NOTE: The Close Calendar is maintained by the Close Administrator.
Close Administrators will learn about Calendar Management in
Cadency106 Proprietary and Confidential: Sony Pictures
Entertainment Close Task Status All Close Tasks within assigned
entities
Click on chart for list view with RYG status SLIDE LENGTH 1 min
TALKING POINTS A pie chart view of all Close Tasks for the period.
Click on chart to view list of all tasks in period for the entities
you have permissions to view Red, Green Status Dot shows tasks as
on time or overdue Proprietary and Confidential: Sony Pictures
Entertainment Close Issues All issues created within assigned
entities
Click on chart for list view of all issues SLIDE LENGTH 1 min
TALKING POINTS Pie chart view of the issues created against your
assigned entities for this period. Click on pie chart to view all
issue Action Plans for the current period Issue management and
resolutions is an important part of financial close management at
SPE As an Entity Owner you have the ability to view issues created
for the entities you have been assigned. As close Administrator you
would see the issues created for all entities Proprietary and
Confidential: Sony Pictures Entertainment My Reports Lists reports
you have configured in Cadency
Learn report configuration in upcoming chapter SLIDE LENGTH 1 min
TALKING POINTS Easy access to reports you have configured Learn to
configure reports later in this course Proprietary and
Confidential: Sony Pictures Entertainment Scheduled Reports Lists
reports you have scheduled to run automatically Reports delivered
to Inbox Learn to schedule in upcoming Chapter SLIDE LENGTH 1 min
TALKING POINTS Lists the reports you have schedule to run
automatically and their next run will take place Reports will be
delivered to your Inbox You will learn to schedule reports later in
this lesson Proprietary and Confidential: Sony Pictures
Entertainment Cadency Consoles Viewing dependent tasks in an Action
Plan Delegating tasks in Cadency Viewing tasks delegated to you in
Cadency Reviewing proxies in Cadency Consoles are an additional
tool for monitoring status of Close Filter and drill down to show
detailed information Bookmark for easy return to information
Chapter XX, pp. ##-## 3 Consoles Available: Task Status Task list
Dependencies SLIDE LENGTH TALKING POINTS Along with the Home page
Sub Tab, Entity Owners can monitor the status of the close for
their assigned entities using the Consoles tab. Consoles allow you
to filter and drill down to detailed information on Close Tasks You
can set bookmarks to return to the Consoles quickly and easily
Proprietary and Confidential: Sony Pictures Entertainment Task
Status Console Real-time monitoring of all Action Plans for
assigned entities Shows issues for related Close Tasks as well
SLIDE LENGTH 1 min TALKING POINTS Provides real time monitoring of
the status of all Action Plans Entity Owners see Action Plans for
entities they have been assigned Close Administrators see all
Action Plans for current period. Useful for viewing the status of
all task types across your assigned entities and drilling down to
look at the status of close across a specific entity or period.
Also shows the status of all issues associated with Close Tasks for
your assigned entities. Proprietary and Confidential: Sony Pictures
Entertainment Tasklist Console Tasks grouped by due day Quick view
of status
Can start ad-hoc tasks from here SLIDE LENGTH 1 min TALKING POINTS
Shows tasks grouped by due day and provides a quick view of their
status, dependent and critical tasks. Can also be filtered to show
specific information Useful console because you can start an Ad
Hoctask from this console You will learn to start an Ad Hoc task
later in this course OUTLINE NOTES Proprietary and Confidential:
Sony Pictures Entertainment Dependency Console Status and
Relationship between all dependent Action Plans for assigned
entities Filter by Period and Task Name SLIDE LENGTH 1 min TALKING
POINTS Shows the status and relationship between all dependent
tasks REMINDER: Dependent tasks require another tasks Action Plan
be completed before its Action Plan can be submitted in Cadency
Dependent tasks help to insure proper flow of Close Tasks during
the close Dependencies can exist between Close Tasks within an
entity or across entities Can also be filtered to show specific
information Dependency console you can access tasks directly if
needed. Proprietary and Confidential: Sony Pictures Entertainment
Demonstration #1 5 Demonstration Topics To Follow Along
Monitoring Close from Cadency Home Page Three Cadency Consoles:
Close Task Status, Dependency and Tasklist Bookmarking Consoles 5
SLIDE LENGTH 1 min TALKING POINTS Lets take a look at all this in
Cadency.The upcoming demonstration will cover Customizing Home Page
to show close status/reporting information Three Cadency Consoles:
Status, Dependency and Tasklist Bookmarking Consoles You can follow
along with this demonstration in your participant guide 5
Proprietary and Confidential: Sony Pictures Entertainment
Monitoring Close in Cadency
Demonstration #1 Monitoring Close in Cadency LINK TO CADENCY SLIDE
LENGTH 1 min TALKING POINTS Get demonstration from Cadency
Sharepoint Site Trainer Resources Folder under Training on Home
Page Proprietary and Confidential: Sony Pictures Entertainment
Demonstration #1 Recap Demonstration Topics
Monitoring Close from Cadency Home Page Three Cadency Consoles:
Status, Dependency and Tasklist Bookmarking Consoles SLIDE LENGTH 1
min TALKING POINTS Review the list of topics covered Query audience
for questions etc. Proprietary and Confidential: Sony Pictures
Entertainment You have reached the end of the chapter. You should
now be able to:
Customize your Home Tab to view status of close for assigned
entities Use consoles to monitor status of Close Tasks and
outstanding issues SLIDE LENGTH 1 min TALKING POINTS You have
reached the end of this chapter.You should now be able to : Use
consoles to monitor status of Close Tasks and outstanding issues
Customize your Home Tab to view status of close for assigned
entities Proprietary and Confidential Sony Pictures Entertainment
VIEWING ENTITY Set-ups
SLIDE LENGTH 1 min TALKING POINTS Lets begin our next chapter
Viewing Entity Set-ups & Managing Tasks VIEWING ENTITY Set-ups
Proprietary and Confidential Sony Pictures Entertainment Upon
completion of this chapter, you should be able to:
Understand the Entity Hierarchy and how it is used to organize data
Search for entities in Cadency View entity set-ups in Cadency SLIDE
LENGTH 1 min TALKING POINTS This chapter has three objectives.Upon
completion of this chapter, you will be able to: Understand the
Entity Hierarchy and how it is used to organize data Search for
entities in Cadency View entity set-ups in Cadency Proprietary and
Confidential Sony Pictures Entertainment Entities & Entity
Hierarchy Overview
Entities represents various business units, functions and
territories Organized into a hierarchy for status management and
reporting Each entity serves as a repository of Close Tasks and
their assigned Action Plans SLIDE LENGTH: 1 min TALKING POINTS In
Cadency 101 we introduced, Entities and the Entity Hierarchy.Lets
quickly review this content before moving on. Entities = represents
the various business units, functions and territories that
participate in the financial close at SPE.Each entity serves as a
repository of Close Tasks and their respective Action Plans.
Entities are organized in a hierarchy that allows SPE to roll data
up under one corporate umbrella for status monitoring and reporting
9 Proprietary and Confidential: Sony Pictures Entertainment Entity
Hierarchy Samples
Level 1 SPE SPE SPE Management Reporting View Level 2 LOB MP MP
Level 3 Profit Center Group DOM INT Level 4 Sub-Profit Center COL
EMEA SLIDE LENGTH2 min TALKING POINTS Slide shows the generic
entity hierarchy and two samples from SPEs complete hierarchy
Allows data to roll up from Level 7 up to Level 1 for reporting
proposes Hierarchies were created with financial close subject
matter experts Managed by the Close Administrator and can be
updated if there is a change to SPEs financial reporting structure
Level 5 Territory US AT Close Tasks Within These Entities Level 6
Function AMT COS 10 Level 7 SSC/ITF ITF SSC Proprietary and
Confidential Sony Pictures Entertainment Entity Management
Governance
Entity Owners should not make any changes to the entities or entity
hierarchy in Cadency. All updates/additions/deletions to the
entities or entity hierarchy should be made by Close Administrators
or System Administrators ONLY SLIDE LENGTH 1-5 min TALKING POINTS
Entity Owners should not make any changes to the entities or entity
hierarchy in Cadency. All updates/additions/deletions to the
entities or entity hierarchy should be made by Close
Administratiors or System Administrators 11 Proprietary and
Confidential: Sony Pictures Entertainment Viewing the Entity
Hierarchy
Entity Owner can only view entities you have been assigned in the
hierarchy Tree View is most common Tasks appear under lowest level
in hierarchy SLIDE LENGTH: 1 min TALKING POINTS Entity Hierarchy is
often shown as a tree Allows you to view the entity hierarchy by
expanding and contracting the levels shown. Tasks for each entity
appear under the lowest level in that hierarchy Remember: Entity
Owners can can only view the entities you have been assigned.
.Close Administrators can see the entire hierarchy Remember: You
should not make any changes to the hierarchy.To make changes,
contact your Close Administrator. Technically as Entity Owner you
will see buttons to Add or Edit an Entity.Per SPE Goverannce,
Entity Owners should not use these buttons, instead they should
contract support Proprietary and Confidential: Sony Pictures
Entertainment Demonstration #2 12 Demonstration Topics To Follow
Along
Viewing the Entity Hierarchy Accessing the Entity Details Page
Running an Audit Report for an Entity SLIDE LENGTH 1 min TALKING
POINTS Lets take a look at all of this in the actual tool. The
upcoming demonstration will show you how to view Entity Hierarchies
and Close Tasks set-ups in Cadency.Specifically this demonstration
will cover Viewing the Entity Hierarchy Accessing the Entity
Details Page Running an Audit Report for an Entity You can follow
along with this demonstration in your participant guide Proprietary
and Confidential: Sony Pictures Entertainment Viewing Entity and
Close Task Setups
Demonstration #2 Viewing Entity and Close Task Setups LINK TO
CADENCY SLIDE LENGTH 10 min DEMONSTRATION SCRIPT Get demonstration
from Cadency Sharepoint Site Trainer Resources Folder under
Training on Home Page Proprietary and Confidential: Sony Pictures
Entertainment Demonstration #2 Recap Demonstration Topics
Viewing the Entity Hierarchy Accessing the Entity Details Page
Running an Audit Report for an Entity SLIDE LENGTH 1-5 min TALKING
POINTS Review the list of topics covered Query audience for
questions etc. Proprietary and Confidential: Sony Pictures
Entertainment Viewing Entity Set-ups Helpful Hints
Use trees and breadcrumb trains to quickly move through the entity
hierarchy Bookmark entities or hierarchies youmight need to revisit
Use the Console to viewthe entity hierarchy sorted by entity and
task numbers Contact support to request changes: SLIDE LENGTH 1-5
min TALKING POINTS Here are some helpful hints to help when
managing entities in Cadency Use trees and breadcrumb trains to
quickly move through the entity Bookmark entities or hierarchies
youmight need to revisit Use the Console to view the entity
hierarchy sorted by entity and task numbers 16 Proprietary and
Confidential: Sony Pictures Entertainment Upon completion of this
chapter, you should be able to:
Understand the Entity Hierarchy and how it is used to organize data
Search for entities in Cadency View entity set-ups in Cadency SLIDE
LENGTH 1 min TALKING POINTS This chapter has four objectives.Upon
completion of this chapter, you will be able to: Understand the
Entity Hierarchy and how it is used to organize data Search for
entities in Cadency View entity set-ups in Cadency Proprietary and
Confidential Sony Pictures Entertainment TASK MANAGEMENT SLIDE
LENGTH 1 min TALKING POINTS
Lets begin our next chapter Task Management TASK MANAGEMENT
Proprietary and Confidential Sony Pictures Entertainment Upon
completion of this chapter, you should be able to:
Understand how Close Tasks are managed within Cadency View, Add,
Edit Close Tasks Maintain Tasks by updating references, fields and
assignments View and manage task dependencies Start Ad Hoc Tasks
SLIDE LENGTH 1 min TALKING POINTS This chapter has five
objectives.Upon completion of this chapter, you will be able to:
Understand how Close Tasks are managed within Cadency View, Add,
Edit Close Tasks Maintain Tasks by updating task profiles,
references and assignments View and Manage task dependencies Start
Ad Hoc Tasks Proprietary and Confidential Sony Pictures
Entertainment Close Tasks Overview Specific tasks that comprise
financial close at SPE Cadency collects variety of information on
each task Each close task will have an Action Plan for every
relevant period SLIDE LENGTH: 1 min TALKING POINTS Review of Close
Tasks from Cadency 101 Each close task will have an Action Plan for
each relevant period in Cadency. Ex. A monthly close task will have
12 Action Plans at the end of the year (1 for each period the close
task needs to be completed) A submitted Action Plan indicates that
the close task has been completed for that period. 17 Proprietary
and Confidential: Sony Pictures Entertainment Task Management
Overview
Creating new tasks Assigning Users to Close Tasks Tells Cadency
where to send Action Plans Manage Dependent Tasks Start Ad-Hoc
Tasks SLIDE LENGTH: 1 min TALKING POINTS Task Management is the
administrative management of Close Tasks and Action Plans within
Cadency. Updating Action Plan content, required fields and
dependencies are all part of task management. As an Entity Owner
and Close Administrator you have the ability to create and update
the Close Tasks that comprise SPEs financial close process.
Important to keep Close Tasks up to date because content from the
Close Task populates the Action Plan and ensures all Close Tasks
are completed correctly and on-time. Proprietary and Confidential:
Sony Pictures Entertainment Close Task Fields Task Name
Dependencies Task Number Instructions
Task Description Task Performer, Reviewer (if needed), Secondary
Reviewer (if needed) Task Type Frequency Start and Due Date Links
to support docs SLIDE LENGTH: 1 min TALKING POINTS Cadency collects
the following information on each of SPEs Close Tasks. Task Name
Task Number Task Description Task Type Frequency Start and Due Date
Dependencies Instructions Task Performer, Reviewer (if needed),
Secondary Reviewer (if needed) Links to support documentation As
part of Task Management you will need to maintain these fields
within Cadency.When creating a new close task you need to have at
least this much information available to create the new task
Proprietary and Confidential: Sony Pictures Entertainment Task
Management Governance
SPE has determined the following governance for Task Management in
Cadency. Always follow Close Task Naming Convention
TASKNAME-TASKID-COMPANYCODE Use the next number in the Task ID
sequence for new tasks Identify close tasks important to your group
as Key Close Tasks Do not edit/delete any task marked as Minimum
Standard ID Only check the Critical box for close tasks flagged as
a minimum standard task SLIDE LENGTH 1-5 min TALKING POINTS SPE has
set up the following governance for Task Management.As Entity
Owners and Close Administrators you must follow this guidance when
managing tasks in Cadency. Always follow Close Task Naming
Convention TASKNAME-TaskID-COMPANY CODE i.e. VAT Management-T Use
the next number in the Task ID sequence for new tasks Identify
close tasks important to your group as Key Close Tasks Do not
edit/delete any task marked as Minimum Standard ID Only check the
Critical box for close tasks flagged as a minimum standard task 17
Proprietary and Confidential: Sony Pictures Entertainment 3 Ways to
Creating New Tasks
New Close Task Button Copy an Existing Task Import Manager Upload
Opens a template Good for 1-off, new close task entry Not good for
creating multiple updates Copies existing task and creates a new
task using information in the existing task Good for 1-off task
creation where information is consistent between tasks Uses an
excel spreadsheet to upload multiple tasks at once Good for mass
additions and updates to Cadency Entity Owners & Close
Administrators System Admin ONLY SLIDE LENGTH: 1 min TALKING POINTS
There are three ways to create new tasks in Cadency.Each method is
listed below along with a description of when to consider using
each method As Entity Owners and Close Administrators you have the
ability to create new tasks either via The New Close Task button
Copy an Existing Task You cannot use Import Manager but it is
important to know about so you can contact a System Administrator
to help you with bulk changes. Lets take a look at the two options
available to you Click New Close Task Opens a template for creating
a new close task Good for 1-off, new close task entry Not good for
creating multiple updates Copies existing task and creates a new
task using the information populated in the existing task Good for
1-off task creation where information is consistent between tasks
Proprietary and Confidential: Sony Pictures Entertainment Assigning
Users Specific User Group Queue
Specific user is assigned the task as Performer, Reviewer or
Secondary Reviewer They can proxy the task to another person in
light of a planned or unplanned absence Each group member gets
their own action plan in their inbox Only available for Performers
Minimizes maintenance of task definitions. A single action plan is
sent to the queue Only one member of the queue needs to work on the
task Available for performer and reviewer Key usage is for SSC
SLIDE LENGTH: 1 min TALKING POINTS Part of task management is
assign the user who will perform/review the close task/Action Plan
in Cadency When creating or updating a task you can assign a user
in one of three ways Assign a specific user Assign a group to
complete the task Assign a queue to complete the task Specific User
Assign a specific individual to performer or review task Group Each
group member must perform the task Each group member gets their own
action plan, data is pulled together into a single action plan for
review Cannot assign a group as a Reviewer/Secondary Reviewer only
as a Performer Queue A single action plan is sent to queue Each
queue contains a list of users who can complete the Action Plan
Only one member of the queue needs to work on the task Queues can
be used for Performer, Review or Secondary Reviewer assignments
Example for a Queue: GBS where several people are able to complete
Close Tasks or when work is managed on a first come first serve
basis. Proprietary and Confidential: Sony Pictures Entertainment
Dependent Tasks Some Close Tasks are dependent on another task
being completed first Dependencies can exist between tasks in the
same hierarchy and tasks across hierarchies. Cannot make monthly
tasks dependent on quarterly or annual tasks SLIDE LENGTH: 1 min
TALKING POINTS As an Entity Owner or Close Administrator you can
create or remove task dependencies. When a task is dependent on
another task, its Action Plan cannot be submitted until the
preceding task has been submitted. NOTE: Task Frequency is an
important factor in setting up Task Dependencies A monthly task
cannot be dependent on a quarterly task because the quarterly task
does not happen every month A quarterly task can be dependent on a
monthly task because the monthly task happens before/during each
quarter end close A close task can never be dependent on an Ad Hoc
Task.This is because ad-hoc or as needed tasks do not occur on a
regular basis Proprietary and Confidential: Sony Pictures
Entertainment Ad Hoc Tasks Infrequent or on-demand tasks that need
to be completed as part of the close from time to time Create an As
Needed Task in the system and it will stay in the system until it
is initiated and a start and due day is assigned to the task. Once
assigned the task will move through the Cadency workflow SLIDE
LENGTH: 1 min TALKING POINTS Also called As Needed Tasks.
Infrequent or on-demand tasks that need to be completed as part of
the close from time to time. Entity Owners and Close Administrators
can create an As Needed Task in the system and it will stay in the
system until a start and due day is assigned to the task for the
current period Once assigned the task will move through the Cadency
workflow the same as any other task. Use the Close Hierarchy Page
to start these Ad-Hoc Tasks Proprietary and Confidential: Sony
Pictures Entertainment Viewing Updates in Cadency
Changes Appear Immediately Changes Appear in Next Period Task has
not yet launched (the start date has not passed) The current period
if open but the task has not been launched The task has already
launched or been started by a user. SLIDE LENGTH: 1 min TALKING
POINTS Depending on when you make changes to a task the changes may
not appear right away in the systemThe grid above outlines the
circumstances that impact when updates populate in Cadency Changes
to tasks will be reflected if Task has not yet launched (the start
date has not passed) The current period if open but the task has
not been launched Changes to the task will appear in the next
period if The task has already launched or been started by a user.
Proprietary and Confidential: Sony Pictures Entertainment
Demonstration #3 19 Demonstration Topics To Follow Along
Creating new Close Tasks in Cadency Completing the close task
details Viewing and updating close task dependencies Starting ad
hoc tasks 19 SLIDE LENGTH 1 min TALKING POINTS Lets take a look at
all of this in the actual tool. The upcoming demonstration will
show you how to: Creating new Close Tasks in Cadency Completing the
close task details Viewing and updating close task dependencies
Starting ad hoc tasks You can follow along with this demonstration
in your participant guide (Chapter XX, pp. ##-##) Proprietary and
Confidential: Sony Pictures Entertainment Task Management in
Cadency
Demonstration #3 Task Management in Cadency LINK TO CADENCY SLIDE
LENGTH 10 min DEMONSTRATION SCRIPT Get demonstration from Cadency
Sharepoint Site Trainer Resources Folder under Training on Home
Page Proprietary and Confidential: Sony Pictures Entertainment
Demonstration #3 Recap Demonstration Topics
Creating new Close Tasks in Cadency Completing the close task
details Viewing and updating close task dependencies Starting ad
hoc tasks SLIDE LENGTH 1-5 min TALKING POINTS Review the list of
topics covered Query audience for questions etc. Proprietary and
Confidential: Sony Pictures Entertainment Step By Step
Instructions
Student Exercise #1 Exercise Activities Step By StepInstructions
Find and Update Tasks Add a New Task 26 SLIDE LENGTH 2 min TALKING
POINTS Turn to page 26 in your participant guide for the Task
Management exercise. You must follow the script exactly we have
chosen data sets that highlight this chapters learning
objectives.You will have an opportunity to ask questions related to
your specific line of business following the exercise. Proprietary
and Confidential: Sony Pictures Entertainment Find and Update
Entities Find and Update Tasks Add a New Task
Task Management in Cadency Find and Update Entities Find and Update
Tasks Add a New Task SLIDE LENGTH 10 min TALKING POINTS You must
follow the script exactly we have chosen data sets that highlight
this chapters learning objectives. You will have an opportunity to
ask questions related to your specific line of business following
the exercise. To begin your exercise, click on Task Management in
Cadency link in the mySPE Cadency Training page Proprietary and
Confidential: Sony Pictures Entertainment Student Exercise
Debrief
Exercise Activities Find and Update Tasks Add a New Task SLIDE
LENGTH 1-5 min TALKING POINTS Query audience for experience with
Student Exercise How did you do? Were you able to complete the
exercise? What questions do you have from the exercise? Proprietary
and Confidential: Sony Pictures Entertainment You have reached the
end of the chapter. You should now be able to:
Understand how Close Tasks are managed within Cadency View, Add,
Edit Close Tasks Maintain Tasks by updating references, fields and
assignments View and Manage task dependencies Start Ad Hoc Tasks
SLIDE LENGTH 1 min TALKING POINTS You have reached the end of the
chapter. You should now be able to: Understand how Close Tasks are
managed within Cadency View, Add, Edit Close Tasks Maintain Tacks
by updating their profiles, references and assignments View and
Manage task dependencies Delegate tasks and view proxies assigned
to a given user Start Ad Hoc Tasks Proprietary and Confidential
Sony Pictures Entertainment Reports in Cadency SLIDE LENGTH 1 min
TALKING POINTS
Our final chapter is Reports and eBinders in Cadency Reports in
Cadency Proprietary and Confidential Sony Pictures Entertainment
Upon completion of this chapter, you should be able to:
Identify the three types of report types available in Cadency
Configure and run reports in Cadency Schedule reports to run
automatically in Cadency SLIDE LENGTH 1 min TALKING POINTS This
chapter has five objectives.Upon completion of this chapter, you
will be able to: Identify the three types of report types available
in Cadency Configure and run reports in Cadency Add graphics to
your reports Schedule reports to run automatically in Cadency
Generate eBinders Proprietary and Confidential Sony Pictures
Entertainment Reports & eBinders Overview
Shared Features Run by individuals for your own reporting purposes
Filterable and customizable Scheduled to run automatically Publish
in HTML, Excel, .csv or PDF Created/Maintained by Entity Owners
& Close Administrators Contain all Action Plans and support
documentation for a given period Exportable for offline user
Accessible from home page Entity permissions determine data shown
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## SLIDE LENGTH TALKING POINTS
Cadency offers two options for reporting: Reports and eBinders
Table provides and overview of each option and lists the common
features they share In general Reports are: Run by individuals for
their own reporting/informational purposes Filterable and
customizable to show information in a variety of layouts and levels
Can be scheduled to run automatically Published in HTML, Excel,
.csv, Word or PDF file formats In general eBinders are: Pre-set
binders that contain all In Progress or Completed Action Plans for
Close Tasks assignedto the binders Generated on demand by Entity
Viewers, Entity Owners and Close Administrators Exportable for
offline use; output format is .zip Created and maintained by Entity
Owners and Close Administrators Cover eBinders in the next chapter
Both reports and eBinders Limit data shown in report or eBinder
based on the entities you are assigned in Cadency Proprietary and
Confidential: Sony Pictures Entertainment 29 3 Report Types Chapter
XX, pp. ##-## Framework & Setup Results
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## Framework & Setup Results
Analytics Provides set-up and descriptive information on the
Cadency tool Provides detailed information contained in task Action
Plans or issue Action Plans Provides analytical information on
dependent tasks and close task issues Audit Trail Report Task
Questions Report Task Issues Report Task Information Export Task
Analytics SLIDE LENGTH TALKING POINTS Lets look at Reports in
particular 3 types of reports you can run Framework & Set-up
Provides set-up and descriptive information Sample of Reports Audit
Trail Report highlights changes made to Close Task set-ups overtime
Task Questions Report provides information about task definitions
and related questions (if included) Results Provides detailed
information contained in Close Task Action Plans or Close Issue
Action Plans Sample Reports Task Issues Status and related
information related to Issues Action Plans created from tasks Task
Responses Answers to task questions if applicable Analytics
Provides analytical information on dependent tasks within Cadency
as well as issues created within an Action Plan by a Performer,
Reviewer or Secondary Reviewer. Task Analytics results of Action
Plans and related dependent tasks 29 Proprietary and Confidential:
Sony Pictures Entertainment Configuring Reports Standard report
customizations include:
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## Standard report customizations
include: Adding/removing fields Defining report filters Perform
groupings Add totaling Sort data Define highlights Adding graphics
SLIDE LENGTH TALKING POINTS You can configure your reports to show
information more pertinent to use Heres a list of the
configurations available to you.We will be demonstrating them in
the tool shortly Adding/removing fields Defining report filters
Perform groupings Add totaling Sort data Define highlights Adding
graphics Proprietary and Confidential: Sony Pictures Entertainment
Report Graphics Matrices Charts Tables of data Placed at end of
report
User defined row/column/summary fields Graphically represents data
Placed at beginning of the report User defined fields in charts
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## SLIDE LENGTH TALKING POINTS
Cadency lets you add graphics to your reports There are two types
of graphics you can add: Matrices and Charts Matrices are: Tables
of data Located at end of report You define row/column and summary
fields Charts are: Graphic representations of data (i.e. bar, line,
pie) Located at the start of report You define row/column/summary
fields Proprietary and Confidential: Sony Pictures Entertainment 30
Scheduling Reports Run reports automatically
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## Run reports automatically
Delivered to Cadency inbox Ability to not run report if not new
data exists SLIDE LENGTH TALKING POINTS Can schedule the reports
you customize to run automatically Will deliver reports to your
Cadency Inbox as scheduled You can also set the report not to run
if no new data exists For example: you customize a report to show
overdue tasks for a specific entity each week.If there are no
overdue tasks for a week the report will not run as schedule 30
Proprietary and Confidential: Sony Pictures Entertainment 30
Demonstration #4 Demonstration Topics To Follow Along
Running a report Configuring reports Scheduling Reports 30 SLIDE
LENGTH 1 min TALKING POINTS Lets take a look at all this in
Cadency.The upcoming demonstration will cover Running a report
Configuring reports Scheduling Reports You can follow along with
this demonstration in your participant guide Proprietary and
Confidential: Sony Pictures Entertainment Reports & eBinders in
Cadency
Demonstration #4 Reports & eBinders in Cadency LINK TO CADENCY
Get demonstration from Cadency SharePointSite Trainer Resources
Folder under Trainingon Home Page SLIDE LENGTH 1 min TALKING POINTS
Demonstration Script can be found in SharePoint Proprietary and
Confidential: Sony Pictures Entertainment Demonstration #4
Demonstration Topics Running a report
Configuring reports Scheduling Reports SLIDE LENGTH 1 min TALKING
POINTS Review the list of topics covered Key Takeaways on Reports
Formats to show most relevant information Consider multiple page
view for reporting on large amounts of data Add/remove fields and
set filters to show only the pertinent data Matrices and
Graphs/Charts can be added to any report and filtered to show
useful data Data shown is limited by your permissions and assigned
entities Query audience for questions etc. Proprietary and
Confidential: Sony Pictures Entertainment Step By Step
Instructions
Student Exercise #2 Exercise Activities Step By StepInstructions
Run & customize reports in Cadency Schedule reports 35 SLIDE
LENGTH 2 min TALKING POINTS Turn to page 38 in your participant
guide for the Cadency Reports exercise. You must follow the script
exactly we have chosen data sets that highlight this chapters
learning objectives.You will have an opportunity to ask questions
related to your specific line of business following the exercise.
Proprietary and Confidential: Sony Pictures Entertainment Run &
Customize Reports Schedule Reports Generate eBinders
Reports in Cadency Run & Customize Reports Schedule Reports
Generate eBinders SLIDE LENGTH 10 min TALKING POINTS You must
follow the script exactly we have chosen data sets that highlight
this chapters learning objectives. You will have an opportunity to
ask questions related to your specific line of business following
the exercise. To begin your exercise, click on Reports and eBinders
in Cadency link in the mySPE Cadency Training page Proprietary and
Confidential: Sony Pictures Entertainment Student Exercise
Debrief
Exercise Activities Run & customize reports in Cadency Schedule
reports SLIDE LENGTH 1-5 min TALKING POINTS Query audience for
experience with Student Exercise How did you do? Were you able to
complete the exercise? What questions do you have from the
exercise? Proprietary and Confidential: Sony Pictures Entertainment
Identify the three types of report types available in Cadency
You have now reached the end of the chapter. You should now be able
to: Identify the three types of report types available in Cadency
Configure and run reports in Cadency Add graphics to your reports
Schedule reports to run automatically in Cadency SLIDE LENGTH 1 min
TALKING POINTS You have reached the end of the chapter. You should
now be able to: Identify the three types of report types available
in Cadency Configure and run reports in Cadency Add graphics to
your reports Schedule reports to run automatically in Cadency
Proprietary and Confidential Sony Pictures Entertainment Creating
e-binders SLIDE LENGTH 1 min TALKING POINTS
Lets get started with our first chapter: Creating eBinders Creating
e-binders Proprietary and Confidential Sony Pictures Entertainment
Upon completion of this chapter, you should be able to:
Define the attributes of an e-Binder Create e-Binders from eBinder
Setup Page Add close tasks to existing e-Binders SLIDE LENGTH 1 min
TALKING POINTS This chapter has four objectives.At the end of this
chapter you should be able to: Define the attributes of an e-Binder
Create e-Binders from eBinder Setup Page Add close tasks to
existing e-Binders Proprietary and Confidential Sony Pictures
Entertainment eBinders Review Created by Close Administrators
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Created by Close Administrators Maintained by Close
Administrators and Entity Owners Contain all Action Plans and
support documentation for a given period Exportable for offline
user Chapter XX, pp. ##-## SLIDE LENGTH TALKING POINTS Review what
we learned about e-Binders from Cadency 105 Exportable binders of
all action plans and supporting documentation for a given period
Downloads as a .zip file Action Plans are in PDF format Supporting
documentation is in original format Proprietary and Confidential:
Sony Pictures Entertainment eBinder Management Viewing dependent
tasks in an Action Plan Delegating tasks in Cadency Viewing tasks
delegated to you in Cadency Reviewing proxies in Cadency Create
eBinders by mapping entities and assigning tasks to eBinder Define
eBinder attributes Update eBinders Add close tasks Add documents
Chapter XX, pp. ##-## SLIDE LENGTH TALKING POINTS As Close
Administrator you will be responsible for creating eBinders in
Cadency and updating them within Cadency Proprietary and
Confidential: Sony Pictures Entertainment Creating New eBinders 37
Chapter XX, pp. ##-##
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## Create new eBinder Assign entities
to eBinder Map close tasks to eBinder for those entitles Select
attributes for eBinder Save eBinder SLIDE LENGTH TALKING POINTS
This slide shows the workflow for creating an eBinder in Cadency
Attributes are the supporting documentation that go into the
eBinder.Attributes are: Documents Issues References Attachments
Comments In Progress 37 Proprietary and Confidential: Sony Pictures
Entertainment eBinder Attributes Chapter XX, pp. ##-##
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Attribute Description Documents Documents attached for a
given period Issues Non-close task issues are placed in a single
folder Close task issues are placed in sub-folder within relevant
Action Plan References Documents listed in References Tab
Attachments Documents attached to an Action Plan Comments Feedback
listed in Comments Tab In Progress Select to include In Progress
Action Plan in eBinder Chapter XX, pp. ##-## SLIDE LENGTH TALKING
POINTS Heres some additional information on the eBinder attributes
When you select one of these attributes, Cadency will include the
following information in the eBinder each time a user generates
that eBinder Proprietary and Confidential: Sony Pictures
Entertainment Update eBinder Content
Viewing dependent tasks in an Action Plan Delegating tasks in
Cadency Viewing tasks delegated to you in Cadency Reviewing proxies
in Cadency Chapter XX, pp. ##-## Update Location Update Description
Mass or Single Close Binder Setup Page Update name, description and
attribute included in eBinder.Mass select entities to be included
in a specific binder Mass Close Task Details Page Update eBinders
that a specific Close Task is included in from Details page Single
Task Manager Entities Mass update the entities assigned to one or
more eBinders Task Manager Tasks Mass update the tasks assigned to
one or more eBinders SLIDE LENGTH TALKING POINTS Once an eBinder
has been created, you can update the eBinders content from several
locations in Cadency.Each location has its advantages for use based
on the kind of update you want to make. Proprietary and
Confidential: Sony Pictures Entertainment Demonstration #5 38
Demonstration Topics To Follow Along
Creating an eBinder Adding a close task to an existing eBinder
Updating eBinders Deleting eBinders Generating an eBinder SLIDE
LENGTH 1 min TALKING POINTS Lets take a look at all of this in the
actual tool. The upcoming demonstration will show you how to create
eBinders.Specifically this demonstration will cover Creating an
eBinder Adding a close task to an existing eBinder Updating
multiple eBinders at the same time You can follow along with this
demonstration in your participant guide Proprietary and
Confidential: Sony Pictures Entertainment Creating eBinders in
Cadency
Demonstration #5 Creating eBinders in Cadency LINK TO CADENCY SLIDE
LENGTH 10 min DEMONSTRATION SCRIPT Get demonstration from Cadency
Sharepoint Site Trainer Resources Folder under Training on Home
Page Proprietary and Confidential: Sony Pictures Entertainment
Demonstration #5 Recap Demonstration Topics Creating an
eBinder
Adding a close task to an existing eBinder Updating eBinders
Deleting eBinders Generating an eBinder SLIDE LENGTH 1-5 min
TALKING POINTS Review the list of topics covered Query audience for
questions etc. Proprietary and Confidential: Sony Pictures
Entertainment You have reached the end of the chapter. You should
now be able to:
Define the attributes of an e-Binder Create e-Binders from eBinder
Setup Page Add close tasks to existing e-Binders SLIDE LENGTH 1 min
TALKING POINTS This chapter has four objectives.At the end of this
chapter you should be able to: Define the attributes of an e-Binder
Create e-Binders from eBinder Setup Page Add close tasks to
existing e-Binders Proprietary and Confidential Sony Pictures
Entertainment Course Conclusion SLIDE LENGTH 1 min TALKING
POINTS
Weve reached the end of the course Course Conclusion Proprietary
and Confidential Sony Pictures Entertainment Course Key Takeaways
Entity Owners and Close Administrators can view and monitor the
status of the close from their Home Tab or via Consoles Entity
Owners should only view Entity Set-ups in Cadency.Close
Administrators handle all Entity Management in Cadency Task
Management is the shared responsibility of Entity Owners and Close
Administrators Reports can be customized and run by Entity Owners
and Close Administrators eBinders can be created and generated by
both Entity Owners and Close Administrators SLIDE LENGTH TALKING
POINTS Now that we have completed all the chapters in this course,
lets review some of the key takeaways Entity Owners and Close
Administrators can view and monitor the status of the close from
their Home Tab or via Consoles Task Management are the shared
responsibility of Entity Owners and Close Administrators Reports
and eBinders can be customized and run by Entity Owners and Close
Administrators Proprietary and Confidential: Sony Pictures
Entertainment Additional Resources Here are some additional
resources to help you use Cadency upon returning to work. Task
Management Simulation Reports Simulation Cadency Help Button (in
the tool) SPE Close Calendar List of Abbreviations, Task Type, Task
Functions, Key Definitions Time Conversion Chart List of Minimum
Standard Tasks All resources can be found on the Cadency SharePoint
site and you can contact support directly at SLIDE LENGTH TALKING
POINTS Here are some additional resources to help you in your role
as an Entity Owner or Close Administrator upon returning to work.
Proprietary and Confidential: Sony Pictures Entertainment You have
reached the end of the course. You should now be able to:
Monitor the status of the close for your assigned entities using
the Home Page and/or Consoles View entity set-ups in Cadency Set-up
and manage Close Tasks and action plans Start ad-hoc tasks as
needed Configure and run reports Create and Generate eBinders SLIDE
LENGTH TALKING POINTS You have reached the end of the course. You
should now be able to: Monitor the status of the close for your
assigned entities using the Home Page and/or Consoles View entity
set-ups in Cadency Set-up and manage Close Tasks and action plans
Start ad-hoc tasks as needed Configure and run reports Generate
eBinders Proprietary and Confidential Sony Pictures Entertainment
THANK YOU FOR ATTENDING OUR TRAINING!
Please take the End of Course Survey SLIDE LENGTH TALKING POINTS
Proprietary and Confidential Sony Pictures Entertainment