SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
SCRCOG MEETING NOTICE & AGENDA March 26, 2014 – 10:00 A.M.
Location: 127 Washington Avenue, 4th Floor West North Haven, CT 06473
Full agenda materials can be found at our website – www.scrcog.org
The agenda and attachments for this meeting are available on our website at www.scrcog.org. Please contact SCRCOG for copy of agenda in a language other than English. Auxiliary aids/services and limited English proficiency translators will be provided with two week’s notice. "Necesidades especiales: Audio de circuito cerrado para personas con deficiencia audita y/o intérprete de lenguaje de signos y traductor para personas con dominio limitado del inglés; son proporcionados por aviso a dos semanas de anticipación. Agenda puede solicitarse en un idioma distinto al inglés contactando a SCRCOG."
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
1. Call to Order and Introductions – Mayor Scott Jackson, Chairman
2. Presentation: I-95 Corridor Record of Decision Report – Mark Rolfe, District Engineer, Attached
CDOT and Brian Mercure, Assistant District 3A Engineer, CDOT
3. Adoption of 2/26/14 SCRCOG Minutes – First Selectman Fillmore McPherson, Secretary Pages 2-5
4. Treasurer’s Report for month ending 2/28/14 – Mayor Benjamin Blake, Treasurer Pages 6, 7
5. Transportation Committee Report – Mayor William Dickinson, Chairman Pages 8-26
a. Adopt Resolution to approve 2012-2015 TIP Amendment Twenty Three Pages 25, 26 b. Update on Local Transportation Capital Improvement Program (LOTCIP)
6. New SCRCOG Committee Descriptions Pages 27, 28 7. Title VI Public Participation Outreach Page 29 8. Adopt Resolution authorizing the Executive Director to partner with The Nature Conservancy Page 30
for Grant Application to develop a Greater New Haven Regional Coastal Resiliency Plan (will include up to $30,000 in-kind match over two years)
9. Appointment of Mayor Toni Harp to the Workforce Alliance CEO Executive Committee
10. Update on SCRCOG Shared Services Study – Carl Amento, Executive Director
11. Congressional Report – Louis Mangini, Legislative Aide to U.S. Rep. Rosa DeLauro and
Riju Das, Aide to Senator Richard Blumenthal
12. State Legislative Report – Carl Amento, Executive Director
13. SCRCOG Executive Director’s Report – Carl Amento, Executive Director
14. REX Development Report – Barbara Malmberg, REX Development Page 31
15. DESPP/ DEMHS Report – John B. Field, Jr., Region 2 Coordinator Pages 32-34
16. RPC Action Table for March Page 35 17. Regional Cooperation / Other Business 18. Adjournment
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
TO: SCRCOG Board FROM: First Selectman Fillmore McPherson, Secretary DATE: March 19, 2014 SUBJECT: SCRCOG Minutes of February 26, 2014 Present: Bethany First Selectwoman Derrylyn Gorski Branford First Selectman James Cosgrove Hamden Mayor Scott Jackson – Chairman Guilford First Selectman Joseph Mazza Madison First Selectman Fillmore McPherson – Secretary Milford Mayor Benjamin Blake – Treasurer New Haven Mayor Toni Harp North Haven First Selectman Michael Freda – Vice-Chairman Orange First Selectman James Zeoli Wallingford Mayor William Dickinson Woodbridge First Selectwoman Ellen Scalettar SCRCOG Staff: Carl Amento – Executive Director, Stephen Dudley, Jim Rode, Al Ruggiero, Eugene Livshits, Chris Rappa Other Guests: State Comptroller Kevin Lembo; Josh Woijcik, Office of the State Comptroller; Donna Carter and Mary Bigelow, Greater New Haven Transit District; Ginny Kozlowski and Barbara Malmberg, REX Development; Shelly Saczynski and Tom Cariglio, United Illuminating; Michael Piscitelli, City of New Haven; Betsy Yagla, Town of Woodbridge; Robert Fort, Workforce Alliance; John Field, DESSP; Pam Hypolite, CTRides; Atty. Nan Birdwhistell, Murtha Cullina; Riju Das, Legislative Aide to Senator Richard Blumenthal
1. Call to order and Introductions: Chairman Scott Jackson called the meeting to order at 10:07 a.m. All present introduced themselves.
2. Presentation: Report from the State Comptroller’s Office:
State Comptroller Kevin Lembo’s presentation included comments on the Partnership Plan for health insurance, electronic transfer for state payments, the Open CT data initiative, and this year’s budget surplus.
3. Adoption of January 22, 2014 SCRCOG meeting minutes: First Selectman McPherson presented the minutes as shown on pages 2-5 of the agenda packet. First Selectman McPherson moved that the minutes be approved. First Selectman Mazza seconded the motion. It was approved by all.
2
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
4. Treasurer’s Report for month ending January 31, 2014: Mayor Blake presented the Treasurer’s Report which is on pages 6-7 of the agenda packet. The balance sheet shows that we have $425,819 in cash and investments and $262,854 due from CDOT for transportation planning. Expenses seemed appropriate for the month. First Selectman Freda moved for acceptance of the Treasurer’s Report. First Selectwoman Gorski seconded the motion, which carried unanimously.
5. Transportation Committee Report:
Mayor Dickinson presented the Transportation Committee Report contained on pages 8-11 of the agenda packet. Mayor Dickinson moved for the approval of 2012-2015 TIP Amendment Twenty Two. The resolution is found on pages 10-11 of the agenda packet. First Selectman Cosgrove seconded the motion. It passed unanimously. Mayor Dickinson reported on CDOT’s Local Transportation Capital Improvement Program (LOTCIP). Mayor Dickinson, First Selectman Freda and Senior Transportation Planner Stephen Dudley reviewed their continued efforts, working with the SCRCOG Transportation Committee, to seek simplification of the LOTCIP process. Pursuant to the DOT Commissioner’s suggestion, SCRCOG submitted two pilot projects utilizing a simpler application than that detailed in the LOTCIP guidelines. The project from Wallingford was accepted as it had previously been approved under the local bridge program. The project from Guilford was rejected, but a meeting with CDOT was offered to work further on it. SCRCOG is soliciting projects from the member municipalities for consideration under the LOTCIP program.
6. Annual Self-Certification: The resolution is found on page 12 of the agenda packet. Mayor Jackson moved for adoption of the resolution. First Selectwoman Scalettar seconded the motion. It was approved unanimously.
7. Adoption of Affirmative Action Policy Resolution (renewed annually): The resolution is found on pages 13-16 of the agenda packet. First Selectman McPherson moved for its adoption. First Selectman Freda seconded. It was approved unanimously.
8. Proposed SCRCOG Committee Structure: Executive Director Amento reviewed the proposed new committee structure, which is found on Pages 17-19 of the agenda packet. After discussion, Mayor Jackson moved for approval. First Selectwoman Scalettar seconded. The motion was approved unanimously.
9. FY 2014 Budget Amendment #2: The resolution is found on Page 26 of the agenda packet. First Selectman Zeoli moved for adoption of the resolution. First Selectman Cosgrove seconded the motion, which was approved unanimously.
10. Update on SCRCOG Shared Services Study: Executive Director Amento reported that he is close to completing the written report on SCRCOG’s Shared Services Study. The Regional Purchasing Advisory Council, consisting of the purchasing agents
3
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
from the SCRCOG cities and towns, has met twice and is investigating consortium purchasing arrangements, electronic purchasing systems and a “buy local” initiative. SCRCOG is coordinating its work in the shared services area with CRCOG which recently released a Back Office Service Sharing Study (a summary of that study was distributed).
11. Congressional Report: Riju Das from Senator Blumenthal’s Office reported that Senator Blumenthal sits on the House Transportation Committee and has been very involved in efforts to promote greater safety measures to be implemented on the Metro North rail line. As a result, Metro North has appointed a Chief Safety Officer and has embarked on a 100-day plan to identify and implement needed safety improvements. The Senator was also involved in a federal minimum wage increase roundtable discussion last week in Connecticut.
12. State Legislative Report: Executive Director Amento distributed a 16-page report on General Assembly bills of interest to municipalities and the region as of February 25, 2014. The report also included a guide to the legislative process and legislative committee deadlines.
13. SCROG Executive Director’s Report: Executive Director Amento noted that some members still needed to submit resolutions of approval from their cities and towns for the SCRCOG application for a state Regional Performance Grant for further development of the Regional GIS Program. The forms need to be submitted by the end of March. Executive Director Amento thanked the mayors and first selectmen of the 7 coastal communities for submitting letters of support for the Hurricane Sandy Coastal Resilience Grant application which was submitted to the National Fish and Wildlife Foundation on January 31, 2014. SCRCOG is partnering with the Greater Bridgeport Regional Council and The Nature Conservancy on that grant application.
Executive Director Amento reported that he was asked to determine if SCRCOG member communities would like to host meetings for rail commuters to discuss issues with CDOT and Metro North officials. There was great interest expressed in hosting such meetings.
14. REX Development Report: Executive Director Ginny Kozlowski referred to her written report on page 23 of the agenda packet. The Brownfield Inventory Grant that was recently received will result in a searchable database of brownfields in the region.
15. DESPP/ DEMHS Report: John Field, Region 2 Coordinator, reported that DESPP has a new Commissioner, Dora Schriro. A big issue, of course, has been road salt shortages. Hazard Mitigation grants for Hurricane Sandy damage are still in process. There will be a statewide exercise on June 21 and June 23. Cities and towns should choose one of the two dates.
4
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
16. CTRides Report: Pam Hypolite reviewed the 4th Quarter Report which was attached to the agenda packet.
17. Regional Cooperation/ Other Business: First Selectwoman Gorski requested advice on how other towns handle public skating on municipally-owned lakes and ponds. Various responses were given ranging from no municipal involvement to park and recreation or public works posting of warning or “skate at your own risk” signs. Mayor Jackson asked if the date of the next SCRCOG meeting, March 26th, which is the same date as “CCM’s Day on the Hill” would cause a conflict for anyone. No one reported a conflict.
18. Adjournment: First Selectman Mazza moved for adjournment. First Selectman Zeoli seconded the motion and all approved. The meeting adjourned at 11:15 a.m.
Respectfully submitted,
First Selectman Fillmore McPherson, Secretary
5
BALANCE SHEET - February, 2014
ASSETS
Cash and InvestmentsFirst Niagara Bank 314,357Connecticut Short-Term Investment Fund - SCRCOG 155,405Start Bank 100,000Total Cash and Investments 569,763
Accounts ReceivableMunicipal Dues - FY 13/14 15,000Connecticut Department of Transportation 124,101Connecticut Office of Policy & Management 62,500RPA - Sustainable Communities 3,477OPM - RPI Grants 9,851CT DEEP - Regional Hazard Mitigation Plan 0Amount for Accrued Leave 12,815Pre-Paid Expense & Other Receivables 18,538Total Accounts Receivable 246,281
Property and EquipmentCOG Equipment 34,468Total Property & Equipment 34,468
TOTAL ASSETS 850,512
LIABILITIES AND FUND BALANCE
LiabilitiesAccounts Payable 1,656Deferred Revenue - Municipal 51,233Deferred Revenue - GIA 107,050RPI Grant - GIS Project 2,282RPI Grant - Shared Services -14,855Total Current Liabilities 147,366
Fund BalanceFund Balance - July 1, 2013 691,817Amount for Accrued Leave 12,815Investment in Equipment 34,468Change in Fund Balance -35,954Fund Balance - February, 2014 703,145
TOTAL LIABILITIES AND FUND BALANCE 850,512
6
Statement of Resources and Expenditures - February, 2014
Resources FY 14 Budget To Date
Municipal Contribution 153,700 12,808 102,467SCRCOG Reserves - FY12/13 Transportation Match 11,810SCRCOG Reserves - (for ROOF) 10,000 0 10,000
ConnDOT - Transportation PlanningU.S. Dept of Transportation 909,015 57,519 441,086U.S. Dept of Transportation - FY12/13 94,480 0Connecticut Dept of Transportation 113,627 7,190 55,136Connecticut Dept of Transportation - FY12/13 11,810 0
Connecticut Office of Policy & ManagementRegional Planning 125,000 10,950 17,950RPI Grant - GIS Project 374,800 8,978 61,292RPI Grant - Shared Services 40,923 0 42,856
Federal Emergency Management AgencyHazard Mitigation Plan 60,400 0 19,779Municipal - In-Kind Contribution 7,177 0 0
Sustainable Communities GrantSustainable Communities Reg Planning Grant 21,100 766 11,758
Interest 1,200 19 166
TOTAL 1,935,042 98,229 762,490
Expenses FY 14 Budget To DateTotal Labor - Salaries & Benefits 638,683 421,337
Salaries 33,725 297,927Fringe Benefits 24,969 123,411
Travel 8,300 940 5,381Data Process 45,400 1,225 14,253General Operations 171,085 106,512
Rent 8,596 76,019Postage & Telephone 254 2,317Office Supplies 37 696Equipment Maintenance 733 11,365Publications 175 1,811Insurance & Professional Services 0 8,906Meeting Expenses & Advertising 406 4,715Miscellaneous & Equipment Use 0 637
Transportion Consultants 520,100 19,483 143,933FEMA - PreDisaster Mitigation Plan 35,000 0 32,835ROOF - Regional Foreclosure Protection 10,000 0 10,000Regional GIS Program 194,300 8,690 32,534Regional GIS Program - Orthoimagery 42,907 0 0Shard Services Study 30,000 1,530 21,070Regional Plan Assoc. - Envision Greater New Haven 80,000 0 0Regional Jobs Access Study 12,000 0 0Municipal Shared Services - Operations Study 19,000 0 0Contingencies 128,268 0 0TOTAL 1,935,042 100,763 787,856
Month of Feb, 2014
Month of Feb, 2014
7
South Central Regional Council of Governments 2012-2015 TRANSPORTATION IMPROVEMENT PROGRAM Amendment Number 23
Project 0014-0177 2011-A21-1 Replace Bridge 02675 over Sybil Creek Changes Amendment 23 adjusts schedule and funding amounts for ROW.
Reason Rights of Way is increased based on final estimate. Construction phase is moved to FY15 based on revised schedule
Project 0014-0184 2012-A11-1 Shoreline Greenway Branford Changes Amendment 23 adjusts schedule and funding amounts Reason Final Design is moved from FY13 to FY14 and costs are increased to adequately fund the
design fees. Construction phase is moved and Federal Share decreased to offset design fee increase.
Project 0014-0185 2014-A23-1 Replace Bridge 00196 which carries I95 over Rte 1 Changes Amendment 23 adds a new project
Reason Project is for the full replacement of Bridge #00196 which carries I-95 over Rte 1. This bridge is rated in poor condition and is functionally obsolete due to piers being too close to the Route 1 travel lanes. Project will utilize NHPP-BRX funding.
Project 0043-0128 2013-A13-1 Replace Bridge 01665 O/ Farm River Changes Amendment 23 adds CON phase Reason Action is necessary to add funding for the construction phase of the project. Project will utilize
STPA-BRX funding.
Project 0059-0157 2011-A21-2 Replace Bridge 02677 over Stream Changes Amendment 23 moves ROW to FY14
Reason Rights of Way phase is moved from FY13 to FY14 based on revised schedule
Project 0059-0161 2012-A27-1 Long Hill Rd Reconstruction Changes Amendment 23 adds FD and ROW phases Reason Action is necessary to add funding for the Final Design and Rights of Way phases for the
project. Project to be funded under the STP-Urban program
Project 0059-0163 2014-A23-3 Culvert Rehab I95 o/Spinning Mill Brook Changes Amendment 23 adds a new project Reason Project for the rehab of a culvert carrying I-95 over Spinning Mill Brook in Guilford.
This job was part of 170-2875 but was removed due to delays in permitting
8
South Central Regional Council of Governments 2012-2015 TRANSPORTATION IMPROVEMENT PROGRAM Amendment Number 23
Project 0083-0262 2011-A15-3 Naugatuck Avenue Drainage Changes Amendment 23 moves CON to FY14 and increases funding Reason Construction funds are increased based on final estimate. And in order for funds to be obligated
they must be shown in the appropriate fiscal year.
Project 0083-0263 2013-A18-8 Replace BR 06755 Rte 162 over Turtle Creek Changes Amendment 23 adds a new project Reason Project is for the full replacement of bridge #06755 which carries Rte 162 over Turtle Creek.
Bridge is structurally deficient due to condition of existing corrugated metal pipes. Original request was to use STP-Urban funds but now the project will utilize STPA-BRX funding.
Project 0092-0627 2010-001 I-95 Corridor Improvement Project- contract B2 Changes Amendment 23 moves funding from FY15 to FY14
Reason Action is necessary to maintain schedule and cover costs of the project. In order for funds to be obligated they must be shown in the appropriate fiscal year.
Project 0092-0666 2012-A10-4 Traffic Signal Upgrade @ 15 Locations Changes Amendment 23 adds FD and moves CON to FY15 Reason Action is necessary to add the Final Design Phase to the project with funding from the CMAQ
program. Construction phase is moved out one year based on revised schedule
Project 0138-0221 2001-025 I-95: Housatonic River Bridge Replacement Changes Amendment 23 adds STPA-BRX funds to FY14.
Reason Action is necessary to utilize funds which were programmed but not obligated in FY13. The funding is a combination of I-M, BRX, & NHS program funds.
Project 0170-3163 2012-A27-3 CE Bridge Inspection - Underwater on/off FY12-14 Changes Amendment 23 changes funding source from BRXZ to NHPP-BRX for FY14
Reason Under MAP-21, the On/Off System Bridges program (BRXZ), is now part of the National Highway Performance Program (NPHH-BRX). Action is necessary to reflect this change for FY14
Project 0170-3303 2014-A23-2 Replace Overhead Sign Supports Changes Amendment 23 adds project Reason Project is for the continued replacement of overhead sign supports (Statewide) due to
deterioration and exceeding useful life. Locations TBD based on priority list from Bridge Safety.
9
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2011-A21-1State Project 0014-0177Municipality Branford
Project Name Replace Bridge 02675 over Sybil Creek
Description Project for the Replacement of Bridge 02675 which carries Rte 146 over Sybil Creek. Only ROW phase at this time
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY10 TIP Amend 21 introduces new project. FY12 TIP Amendment 5 increases ROW funds. FY12 Amend 10 moves ROW to FY13. FY12 TIP Amend 14 changes STPA to STPNH. FY TIP Amend 23 moves out project schedule out one year and increases ROW funds.
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
60ROW FederalSTPNH
15State
2,240CON FederalSTPA
560State
7500Total Cost $2,875 2,800 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
66ROW FederalSTPNH
16State
2,240CON FederalSTPA-BRX
560State
00TIP Funds $2,882 02,800820
10
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2012-A11-1State Project 0014-0184Municipality Branford
Project Name Shoreline Greenway Branford
Description Project for the construction of a 3,000 ft trail in Branford to run from Young's Pond Park to existing trail adjacent to Tilicon Rd
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY 12 TIP Amend 11 adds new Project. FY12 TIP Amend 23 Adjusts schedule and funding amounts
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
60PD FederalHPP
15Local
40FD Federal
10Local
404CON Federal
196Local
12500Total Cost $725 600 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
60PD FederalHPP
15Local
70FD Federal
18Local
364CON Federal
236Local
00TIP Funds $763 06008875
11
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2014-A23-1State Project 0014-0185Municipality Branford
Project Name Replace Bridge 00196 which carries I95 Over Rte 1
Description Full replacement of Bridge #00196 which carries I-95 over Rte 1. Bridge is rated poor and is functionally obsolete due to piers being too close to the Route 1 travel lanes
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY 12 TIP Amend 23 adds project
Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase
180PD FederalNHPP-BRX
20State
540FD Federal
60State
45ROW Federal
5State
6,300CON Federal
700State
00TIP Funds $7,850 7,0006502000
12
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2013-A13-1State Project 0043-0128Municipality East Haven
Project Name Replace Bridge 01665 O/ Farm Riv
Description Replacement of bridge 01665 which carries Route 100 over the Farm River in East Haven
Current TIP Funding (In Thousands)
Proposed
Amendment NotesAmendment 14 introduces project. FY12 TIP Amend 23 adds CON phase
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
160ROW FederalSTPNH
40State
20000Total Cost $200 0 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
160ROW FederalSTPNH
40State
2,560CON FederalSTPA-BRX
640State
00TIP Funds $3,400 03,2000200
13
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2011-A21-2State Project 0059-0157Municipality Guilford
Project Name Replace Bridge 02677 over Stream
Description Project for the Replacement of Bridge 02677 which carries Rte 146 over an un-named Stream. Only ROW phase at this time
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY10 TIP Amend 21 introduces new project. FY12 TIP Amend 14 moves ROW to FY13 and replaces STPA with STPNH.FY 12 TIP Amend 23 moves ROW to FY14
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
40ROW FederalSTPNH
10State
1,920CON FederalSTPA
480State
5000Total Cost $2,450 2,400 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
40ROW FederalSTPNH
10State
1,920CON FederalSTPA
480State
00TIP Funds $2,450 002,4500
14
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2012-A27-1State Project 0059-0161Municipality Guilford
Project Name Long Hill Rd Reconstruction
Description 3600' of Long Hill Rd will be widened to 30', a new culvert installed @ Spinning Mill Brook and Right turn radius at Route 1 will be improved.
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFy 10 TIP Amend introduces new project. FY12 TIP Amend 23 adds FD and ROW phases
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
200PD FederalSTPNH
25Local
25State
02500Total Cost $250 0 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
200PD FederalSTPNH
25Local
25State
200FD Federal
25Local
25State
80ROW Federal
10Local
10State
2500TIP Funds $600 003500
15
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2014-A23-3State Project 0059-0163Municipality Guilford
Project Name Culvert Rehab I95 o/Spinning Mill Brook
Description Project for the rehab of a culvert carrying I-95 over Spinning Mill Brook in Guilford. This job was part of 170-2875 but was removed due to delays in permitting
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY12 TIP Amend 23 adds a new project
Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase
1,305CON FederalNHPP-BRX
145State
00TIP Funds $1,450 1,450000
16
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2011-A15-3State Project 0083-0262Municipality Milford
Project Name Naugatuck Avenue Drainage
Description Project is for improvements to the city owned and maintained Naugatuck Ave storm drainage system
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY 10 TIP Amend 15 introduces a new project. FY12 TIP includes ongoing project, FY12 TIP Amend 9 moves ROW to FY13. FY12 TIP Amend 23 moves CON to FY14 and increases cost.
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
376ENG FederalSTPBS
47Local
47State
40ROW Federal
5Local
5State
3,040CON Federal
380Local
380State
3,8500470Total Cost $4,320 0 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
376ENG FederalSTPBS
47Local
47State
40ROW Federal
5Local
5State
3,528CON Federal
441Local
441State
0470TIP Funds $4,930 004,41050
17
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2013-A18-8State Project 0083-0263Municipality Milford
Project Name Replace BR 06755 Rte 162 over Turtle Creek
Description Replacement of bridge #06755 which carries State Route 162 over Turtle Creek. Bridge is Structurally deficient due to Serious condition of existing metal pipe arches
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY 12 TIP Amend 23 adds project to be funded with STPA-BRX funding rather than STP-Urban
Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase
60PD FederalSTPA-BRX
15State
60FD Federal
15State
256ROW Federal
64State
1,280CON Federal
320State
00TIP Funds $2,070 1,600395750
18
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2010-001State Project 0092-0627Municipality New Haven
Project Name I-95 Corridor Improvement Project- contract B2
Description Project No. 92-627, Contract B2, involves the construction of the I-95 SB West approach and river piers to the new Pearl Harbor Memorial Bridge. This project will be advertised with Project No. 92-531 Contract E,
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY10 TIP introduces new project. FY10 TIP Amend 5 adds NHS funds, FY10 TIP Amend 9 moves funds into FFY10. FY12 TIP includes ongoing project. FY12 TIP Amend 7 moves funds from FY13 to FY12. FY12 TIP Amend 16 changes funding source to NHPP-BRX. FY12 TIP Amend 23 moves $6.5 M FED from FY15 to FY14
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
20,200CON FederalBRXZ
3,018State
31,197 25,230 12,000FederalNHPP-BRX
4,041 2,803 1,333State
35,23823,2180Total Cost $99,822 28,033 13,333 0
2012 2013 2014 2015 FYI PriorFunding Phase
20,200CON FederalBRXZ
3,018State
31,197 31,730 5,500FederalNHPP-BRX
4,041 3,526 611State
23,2180TIP Funds $99,823 06,11135,25635,238
19
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2012-A10-4State Project 0092-0666Municipality New Haven
Project Name Traffic Signal Upgrade @ 15 Locations
Description Project is for the upgrade of substandard and antiquated traffic signal in New Haven for compatability with the City's Central Operating System
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY12 Amend 10 introduces new project. FY12 TIP Amend 23 adds FD and moves CON to FY15
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
310PD FederalCMAQ
2,525CON Federal
31000Total Cost $2,835 2,525 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
310PD FederalCMAQ
140FD Federal
2,525CON Federal
00TIP Funds $2,975 02,525140310
20
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2001-025State Project 0138-0221Municipality Regional
Project Name I-95: Housatonic River Bridge Replacement
Description Replace the current six-lane bridge with a new structure to the north (west) of the existing bridge though complicated by proximity to Metro North. FY02 includes $500,000 (total) ROW. Approximately four year construction period.
Current TIP Funding (In Thousands)
Proposed
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
0CON AC-EntryBRXZ
26,000 26,000Federal
2,889 2,889State
0AC-EntryI-M
20,000 11,500Federal
2,222 1,278State
950FederalI-MD
39,500FederalNHPP-BRX
4,389State
0AC-EntryNHS
9,000Federal
1,000State
0AC-EntrySTPBS
4,000Federal
444State
100,00052,0610Total Cost $152,061 0 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
0CON AC-EntryBRXZ
26,000 26,000Federal
2,889 2,889State
0AC-EntryI-M
20,000 11,500Federal
2,222 1,278State
950FederalI-MD
39,500FederalNHPP-BRX
4,389State
0AC-EntryNHS21
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
Amendment Notes FY07 TIP Amend 19 increases cost 18%. Region instructed to update TIP. FY10 TIP Amend 12 moves this project into the current TIPFY10 TIP 18 moves BRXZ funds from FY12 to FY11. FY10 TIP Amend 19 moves IMD to FY2012, FY10 TIP Amend 20 moves I-M from FY2013 to FY2011, FY10 TIP Amend 21 adjusts funding for FY12, FY12 amend 4 adjusts funding for fy12, FY12 TIP Amend 6 moves funds from FY13 to FY12. FY12 TIP Amend 11 adds NHPP eliminates IM and BRX for FY13. FY12 TIP Amend 12 add IM and BRX funds for FY13. FY12 TIP Amend 16 changes sources of funding. FY12 TIP Amend 23 add STPA-BRX funds to FY14. This funding is a combination of I-M, BRX, & NHS funds, programmed but not obligated in FY13.
9,000Federal
1,000State
20,000FederalSTPA-BRX
2,222State
0AC-EntrySTPBS
4,000Federal
444State
52,0610TIP Funds $174,283 0022,222100,000
22
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2012-A27-3State Project 0170-3163Municipality Statewide
Project Name CE Bridge Inspection - Underwater on/off FY12-FY14
Description Project will provide for the underwater inspection of bridges statewide for Fiscal years 2012 -2014. replace project 170-2868 which expires 6/30/2012
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY10 TIP Amend 27 introduces new project FY12 TIP Amend 23 changes funding source for FY14
Proposed TIP Funding (In Thousands)
2012 2013 2014 2015 FYIPriorFunding Phase
0OTH AC-EntryBRXZ
880 880 880Federal
220 220 220State
1,1001,1000Total Cost $3,300 1,100 0 0
2012 2013 2014 2015 FYI PriorFunding Phase
0OTH AC-EntryBRXZ
880 880Federal
220 220State
880FederalNHPP-BRX
220State
1,1000TIP Funds $3,300 001,1001,100
23
FFY2012-FFY2015 Transportation Improvement Program23
South Central Regional Council of Governments
Amendment
SCRCOG # 2014-A23-2State Project 0170-3303Municipality Statewide
Project Name Replace Overhead Sign Supports
Description Project is for the continued replacement of overhead sign supports(Statewide) due to deterioration and exceeding useful life. Locations TBD based on priority list from Bridge Safety.
Current TIP Funding (In Thousands)
Proposed
Amendment NotesFY 12 TIP Amend 23 adds project
Proposed TIP Funding (In Thousands)2012 2013 2014 2015 FYI PriorFunding Phase
152PD FederalNHPP
38State
8FD Federal
2State
3,200CON Federal
800State
00TIP Funds $4,200 04,0101900
24
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
Resolution Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program Amendment Twenty Three Whereas: U.S. Department of Transportation “Metropolitan Planning Regulations” (23 CFR
450) prescribe that each metropolitan planning organization maintain a financially constrained multi-modal transportation improvement program consistent with a State Implementation Plan for Air Quality (SIP) conforming to both U.S. Environmental Protection Administration-established air quality guidelines and SIP-established mobile source emissions budgets; and
Whereas: The Council, per 23 CFR 450.324 and in cooperation with the Connecticut
Department of Transportation (ConnDOT) and public transit operators and relying upon financial constraints offered by ConnDOT, adopted a Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program on January 25, 2012, after finding the Program conforming per U.S. Environmental Protection Administration (U.S. EPA) final conformity rule (40 CFR 51 and 93) and relevant Connecticut Department of Transportation air quality conformity determinations: Air Quality Conformity Reports: Fiscal Year 2012-2015 Transportation Improvement Program and the Region’s Long-Range Transportation Plans—2011 to 2040, (April, 2011); and
Whereas: The Council, on January 25, 2012, indicated that periodic Program adjustment or
amendment was possible; and Whereas: Projects referenced in the Program amendment (below) are consistent with the
region’s long-range transportation plan (South Central Regional Long Range Transportation Plan—2011 to 2040, (April, 2011)); and
Whereas: Council Public Participation Guidelines: Transportation Planning have been
observed during the development of the proposed Program amendment (below); and Whereas: By agreement between the Council and the Connecticut Department of
Transportation, public involvement activities carried out by the South Central Regional Council of Governments in response to U.S. Department of Transportation metropolitan planning requirements are intended to satisfy the requirements associated with development of a Statewide Transportation Improvement Program and/or its amendment; and
Whereas: Council of Governments’ review of transportation goals, projects and opportunities
may result in further adjustment or amendment of the Program.
25
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
Resolution Fiscal Year 2012-Fiscal Year 2015 Transportation Improvement Program Amendment Twenty Three (continued) Now, Therefore, Be It Resolved By the Council of Governments:
The Program Amendment Twenty Three shall be transmitted to the Connecticut Department of Transportation, for inclusion in the State Transportation Improvement Program
The undersigned duly qualified and acting Secretary of the South Central Regional Council of Governments certifies that the foregoing is a true and correct copy of a resolution adopted at a legally convened meeting of the South Central Regional Council of Governments on March 26, 2014
Date: March 26, 2014. By: ____________________________________ First Selectman Fillmore McPherson, Secretary South Central Regional Council of Governments
26
Descriptions of New SCRCOG Committees
Background:
• At the March meeting, the SCRCOG Board approved a new committee structure going forward.
• The Executive Committee and the Transportation Committee will remain the same. • The Open Space Committee and the Public Safety/ Domestic Preparedness Committee
will cease to exist. • It is recommended that the three new committees (Emergency Management/ Hazard
Mitigation; Land Use & Environment; and Municipal Services) and the new Subcommittee of the Executive Committee (Administrative & Personnel) be organized and constituted for the next fiscal year beginning July 1, 2014.
• The Nominating Committee can solicit nominations for the new committees, and SCRCOG members can express their interest in serving on the new committees to the Nominating Committee.
Committee Descriptions:
• Emergency Management/Hazard Mitigation Committee This Committee will advise SCRCOG staff and make recommendations to the Executive Committee or the SCRCOG Board in the areas of Emergency Management and Hazard Mitigation. In particular, the Committee can serve as a means for issues and problems involving emergency management and arising at the municipal level to be discussed and resolved. Also, in the emergency management area, the committee can meet with state and regional emergency management officials and discuss issues of preparedness, resources, grants, and training. Regarding the Hazard Mitigation portion of the Committee’s charge, the Committee can help coordinate the recently completed Multi-Jurisdiction Hazard Mitigation Plan with the five individual municipal plans with an eye towards updating all or most of the plans at the same time. All of the Hazard Mitigation Plans contain specific projects identified for implementation. The Committee can work with SCRCOG staff and state DEEP and FEMA officials to ensure that the region obtains maximum advantage in funding and resources for project implementation. The Committee will provide input to SCRCOG staff regarding priorities for grant applications which can be pursued on a regional or multi-town basis to prevent flooding and storm damage and to promote resilience especially along the coastline.
27
• Land Use & Environment Committee This Committee will advise SCRCOG staff and make recommendations to the Executive Committee or the SCRCOG Board in the areas of Land Use and Environmental Protection. In particular, the Committee can support the regional Land Use planning efforts of SCRCOG with regard to the Regional Plan of Conservation and Development, model zoning regulations to address specific issues, Transit-Oriented Development planning, affordable housing plans. The Committee can ensure that SCRCOG is responsive in the areas of Land Use Planning and Environmental Protection to the issues confronting the municipalities. The Committee can meet with state DEEP officials and state and regional planners, or legislators to discuss issues of development, conservation, watershed protection, storm water and green infrastructure planning, vegetation management, clean water funding and priorities for the development of data layers on the Regional GIS program. The Committee will provide input to SCRCOG staff regarding priorities for grant applications which can be pursued on a regional or multi-town basis.
• Municipal Services Committee This Committee will advise SCRCOG staff and make recommendations to the SCRCOG Board in the areas of municipal shared services and regional services. The State has increased funding significantly for COGs to encourage municipalities to share services and operations and to provide such services in a cost-effective and higher quality manner on a multi-town or regional basis. The first such effort by SCRCOG was the 10-municipality Hazard Mitigation Plan which was funded by a grant to the region and resulted in a multi-jurisdictional plan which serves as the precondition for implementation grants to mitigate identified hazards. Next, SCRCOG has embarked on a region-wide GIS program, also funded by a state grant, which will assist all the SCRCOG member municipalities in increasing their GIS capabilities. The grant-funded SCRCOG Shared Services Study will identify opportunities for the region or groups of municipalities in the region to provide services on a shared or regional basis. The Committee will help determine the priorities for funding and implementation of such projects.
• Administrative & Personnel Subcommittee This Subcommittee of the Executive Committee will make recommendations to the Executive Committee on administrative and personnel issues internal to SCRCOG’s operations. The Committee will advise SCRCOG staff and make recommendations to the SCRCOG Executive Committee in the areas of SCRCOG administration, operation, and personnel issues. Specifically, the Committee will review SCRCOG’s internal organization, leadership, functions, personnel policies, benefit structure, employee performance evaluations, and salary structure.
28
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
MEMORANDUM
To: SCRCOG Mayors and First Selectmen From: Christopher Rappa Re: Community Contacts Date: March 19, 2014 SCRCOG regularly reviews its public participation and outreach efforts to improve effectiveness in reaching those portions of the region’s population that might not normally participate in transportation planning efforts. We would appreciate your help in identifying those organizations in your municipality which could be utilized to expand outreach to all segments of your communities. Please provide a list of the organizations and contact persons which represent various segments of your communities. We will incorporate these contacts into our distribution lists as part of our ongoing efforts to solicit increased public participation in the transportation planning process. Thank you for your assistance in this matter. If you have any questions, please contact me at 203-466-8610 or [email protected].
29
SOUTH CENTRAL REGIONAL COUNCIL OF GOVERNMENTS Planning for Our Region’s Future
Bethany Branford East Haven Guilford Hamden Madison Meriden Milford New Haven North Branford North Haven Orange Wallingford West Haven Woodbridge
Carl J. Amento, Executive Director
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
Resolution Authorizing Partnership with The Nature Conservancy for Grant Application
to develop a Greater New Haven Regional Coastal Resiliency Plan Whereas: The Community Foundation for Greater New Haven is sponsoring a competitive solicitation for Responsive Grants for organizational support and projects that serve its region; Whereas: The Nature Conservancy has requested the South Central Regional Council of Governments to partner with them to apply for a $100,000 grant, which will include up to $30,000 of in-kind SCRCOG contribution and would enable the two organizations to develop a Greater New Haven Regional Coastal Resiliency Plan; Whereas: The Nature Conservancy will be the lead applicant/fiduciary for the grant; Whereas: The South Central Regional Council of Governments will expend up to $30,000 in in-kind contribution (from FY 2014-2015 and FY 2015-2016 State Grant-in-Aid) over a two-year period; Whereas: The South Central Regional Council of Governments is in support of: (1) the partnership with The Nature Conservancy; (2) the application for a grant from the Community Foundation for Greater New Haven; (3) the in-kind match; and (4) the goal of creating a Greater New Haven Regional Coastal Resiliency Plan; Now, Therefore, Be It Resolved By the Council of Governments The South Central Regional Council of Governments’ Executive Director is hereby authorized to be a partner with the Nature Conservancy for a $100,000 grant to fund the costs of developing a Greater New Haven Regional Coastal Resiliency Plan; Be It Further Resolved By the Council of Governments Its Executive Director is authorized to provide in-kind contribution match from FY 2014-2015 and FY 2015-2016 State Grant-in-Aid in a combined total not to exceed $30,000 over the two-year lifespan of the grant. Certificate The undersigned duly qualified and acting Secretary of the South Central Regional Council of Governments certifies that the foregoing is true and correct copy of a resolution adopted at a legally convened meeting of the Council of Governments on March 26, 2014. Date: March 26, 2014. By: _______________________________________ First Selectman Fillmore McPherson, Secretary South Central Regional Council of Governments
30
195 Church Street, 14th Floor, New Haven, CT 06510 T 203 821 3682 F 203 821 3683 www.rexdevelopment.org
BETHANY BRANFORD EAST HAVEN GUILFORD HAMDEN MADISON MERIDEN MILFORD
NEW HAVEN NORTH BRANFORD NORTH HAVEN ORANGE WALLINGFORD WEST HAVEN WOODBRIDGE
Executive Director’s Report – March 19, 2014 Ginny Kozlowski
Brownfield Projects • Executed Grant Agreement on Hamden Incubator Site • 43 Atwater Assessment, Bethany – Submitted Grant Request to DECD for Assessment Funding • Developing Regional Brownfield Site Inventory for future EPA funding Business Development – Retention/Attraction • Executing Memoranda of Understanding with Team Leaders for the Regional Action Agenda – on-going • Continuing to work with a number of bioscience/life science companies looking to locate/expand in the
region • Moving forward on the establishment of a New Market Tax Credit and EB-5 programs • Regional Performance Incentive Grant Study – Final Stages of Next Street Buy Local Study launched in
December – on-going • Continuing work with the Regional Purchasing Council in conjunction with COG • Co-hosting a Regional Housing Group Summit with David Fink, Policy Director, Partnership for Strong
Communities, UIL Holdings and The Greater New Haven Community Loan Fund – April 3 • Preparing for Envision Greater New Haven project
Marketing • Attending BioMed Boston Trade Show • Attending MDM 2014 Trade Shoe - June • Hosting 14 German Travel Operators – May 17 • Executive Summary of the 2013 CEDS • Completing 2014-15 Cultural & Visitor Guide • Updated the downtown New Haven map • Created new Grid New Haven website • Collaborating with Market New Haven for video screen advertising at Tweed New Haven Regional Airport • Collaborating with Market New Haven and Park New Haven to promote art/museums in Crown & Temple
St. garages • Created B&B website for CLA • Created Bike, B&B Trail through CLA with Kip Bergstrom
Media Hits: • Hartford Business Journal
Media Inquiries: • AAA • Cars, Travel, Food Blog • Visit New England • Fox61 • Arrive Magazine
31
STATE OF CONNECTICUT DEPARTMENT OF EMERGENCY SERVICES & PUBLIC PROTECTION
DIVISION OF EMERGENCY MANAGEMENT & HOMELAND SECURITY
25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815
An Affirmative Action/Equal Employment Opportunity Employer
DEMHS Region 2 Area Coordinator John B. Field Jr. Re: March 2014 COG Report Planning/Preparedness Local Emergency Operations Plans (LEOP): The Region 2 Office continues to perform reviews of the 2013 LEOP for each of their communities. Unfortunately we have only received twelve (12) out of thirty (30) communities LEOPs for review. It is required for certain grants that we review these plans annually. So please encourage your emergency managers to submit their LEOPs for review if they have not yet done so. Training/Exercises: The Region 2 Office is working on multiple exercise and training initiatives. Region 2 animal control officers and emergency managers held a tabletop exercise on February 25th in Seymour. It was well attended and a after-action report is currently being developed. Region 2 personnel participated in the Annual Millstone exercise held on March 12th in Waterford. Representatives from local, state and federal agencies participated in a hostile invasion of the Millstone facility. The City of New Haven serves as a host community for people evacuated within the planning/evacuation zone. A after-action report is currently being developed. Region 2 personnel will be participating in next week’s four (4) day Mass Casualty Incident Training/Exercise involving the Yale University and the City of New Haven. More information may be provided next month. The Governor’s 2014 Exercise Preparedness Planning Initiative (EPPI) will be held June 21st and 23rd. Communities are requested to participate on one of the planned two days. Documents pertaining to the details of the exercise have and will continue to be forwarded. If you are not receiving the related information please feel free to contact the Region 2 Office. DEMHS is performing its first presentation of the CT School Emergency Planning Training Program. This Program will be offered in all five (5) regions within the next couple of months. The Program will provide guidance to community representatives who will be working on developing the All-Hazards School Emergency response Plan which will be required under State Statute. The Annual DEMHS/CCM Emergency Management Conference will be held May 6th. The event is being held at the Crown Plaza Hotel in Cromwell. Sign up to attend utilizing the CCM website. http://programs.ccm-ct.org/Calendar/events-training.aspx/Events%20and%20Training/2014/5/6/5213
32
25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815
An Affirmative Action/Equal Opportunity Employer
Grants: The 2010/2011 Emergency Management Grant Program (EMPG) has been closed as of March 20th. Region 2 personnel will be working with the communities to begin completion of reimbursements for the 2011/2012 FY Grant. We will also continue to provide visits to communities needing assistance with the EMPG Grant Program. The focus is to have every community participate and receive funds identified for the community. Please do not hesitate to contact the Region 2 Office if your community is not participating and would like to start. Sheltering/Evacuation: Pack-N-Plays (Play pens) are being distributed to designated communities. These items will be utilized in your shelters when infants are present. If your community was designated to receive these items and have not done so yet please contact the Region 2 Office for guidance. Shoreline community evacuation maps have been updated and draft copies were distributed for review and comment. The evacuation maps are now being finalized based on the comments received. The Technical Advisory Sub-Committee of the State Innerops Committee has reviewed the three (3) proposals for the Region 2 communications equipment returned to the State following lack of assignment by the Region 2 REPT. The Technical Advisory Committee provided each party submitting a proposal an opportunity to present the details of their proposals. Committee members then scored each presentation on its merit and regional utilization, then providing a recommendation to the Deputy Commissioner for final approval. We are awaiting the Deputy Commissioner’s final decision on the communication equipment allocation. Response: Region 2 personnel provided assistance with the recent salt shortage. Serving as a liaison for CT DOT we provided guidance to acquiring the needed salt. DEMHS is developing CEO and EMD list serves to be utilized by State representatives when extending important information. These list serves will enhance important communications when needed. Mitigation/Recovery FEMA and CT continue to work on Public Assistance reimbursement of funds with communities affected by most recent disasters. Milford Deputy EMD Bill Richards has been appointed the Regional Long-Term Recovery Coordinator for DEMHS Region 2. DEMHS and the communities continue to work on Hazard Mitigation Grant Program applications. The State’s Interagency Hazard Mitigation Grant Review Committee had identified mitigation projects but were asked by the Governor to reassess their initial decision based on the needs of homeowners attempting to reoccupy their homes. At that time the communities were asked to assist in prioritization of the projects from their community. The deadline for the grant applications is March 29, 2014.
33
25 Sigourney Street, 6th floor, Hartford, CT 06106 Phone: 860.256.0800 / Fax: 860.256.0815
An Affirmative Action/Equal Opportunity Employer
Application submittals for the 1st tranche of Community Development Block Grant (CDBG) for Disaster Recovery funds are currently being accepted. This tranche of funds was designated for critical infrastructure and public facilities damaged during Hurricane Sandy in Fairfield, New Haven, New London and Middlesex counties. The deadline for these applications is April 28th. There will be a 2nd tranche of CDBG funds coming in the future. Region 2 personnel continue to provide assistance as needed. Please do not hesitate to contact the Region 2 Office at any time. Respectfully submitted: John B. Field Jr. DEMHS Region 2 Emergency Management Area Coordinator P.O. Box 2794 1111 Country Club Road Middletown, CT 06457 (860)685-8105 Office (860)685-8366 Fax (860)250-3453 Cell (860)708-0748 24-Hour Pager [email protected]
34
SOUTH CENTRAL CONNECTICUT
Regional Planning Commission
127 Washington Avenue, 4th Floor West, North Haven, CT 06473
www.scrcog.org T (203) 234-7555 F (203) 234-9850 [email protected]
March 2014 Action Table
Ref. # Received Description Adjacent RPC Towns Abridged RPC Action
2.1 02/27/2014
Town of Clinton: Proposed Zoning Regulation Amendments pertaining to Farms and Farming Operations, specifically Section 1.4, Section 3, Section 26.4, and Schedule 24
Madison
By resolution, the RPC has determined that the Proposed Zoning Regulation Amendments do not appear to cause any negative inter-municipal impacts to the towns in the South Central Region. There is potential for negative impacts to the habitat or ecosystem of the Long Island Sound due to the limitation of the setback requirement in Section 26.4.6 (2) to only water bodies from which water is taken for human consumption. Please consider making the 100’ setback requirement to be applicable to any body of water which flows into the Long Island Sound.
2.2 02/27/2014 Town of Branford: Small Cities Grant Application
East Haven, Guilford, North Branford
By resolution, the RPC recommends that the Department of Community and Economic Development award the Town of Branford a grant to fund renovations and improvements to Parkside Village I and II. The proposal is consistent with and meets important housing goals identified in the South Central Regional Plan of Conservation and Development of providing a diverse and affordable housing stock.
2.3 03/06/2014
Town of Hamden: Proposed Zoning Regulation Amendment: Section 670.5 – Temporary Moratorium on the Issuance of Zoning Permits for Student Housing
Bethany, New Haven, North Haven, Wallingford, Woodbridge
By resolution, the RPC has determined that the Proposed Zoning Regulation Amendment does not appear to cause any negative inter-municipal impacts to the towns in the South Central Region nor do there appear to be any impacts to the habitat or ecosystem of the Long Island Sound.
3.1 2014 Officers and Executive Committee Members
Chairman: Kevin DiAdamo, New Haven Vice Chair: Douglas Combs, North Branford Secretary: James Giulietti, North Haven Executive Committee: Kevin DiAdamo, New Haven Douglas Combs, North Branford James Giulietti, North Haven Charles Andres, Branford Peggy Rubens-Duhl, Woodbridge Christopher Traugh, Madison Christopher Suggs, West Haven
35
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM
NEW HAVEN - EAST HAVEN - BRANFORD, CT
STATE PROJECT NO. 92-505
Record of Decision Transit and Transportation System Management (TSM) Components
Summary Report January 2012 – December 2013
Prepared For:
Submitted By:
Connecticut Department of Transportation 2800 Berlin Turnpike Newington, Connecticut 06111
Parsons Brinckerhoff 500 Winding Brook Drive Glastonbury, CT 06033
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford
ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013
i
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM
NEW HAVEN – EAST HAVEN – BRANFORD, CT
Record of Decision
Transit and Transportation System Management (TSM) Components Summary Report
January 2012 – December 2013 The I-95 New Haven Harbor Crossing (NHHC) Corridor Improvement Program (‘Program’) is one of Connecticut’s largest multi-modal transportation improvement initiatives. The program includes operational, safety and capacity improvements to over 7 miles of Interstate 95, including a new signature bridge over New Haven Harbor. In addition to new and upgraded Shore Line East commuter rail stations, there are numerous Transit and Transportation System Management (TSM) components included as part of the program.
The Federal Highway Administration Record of Decision for Interstate 95 New Haven Harbor Crossing Pearl Harbor Memorial Bridge (Q-Bridge) (‘ROD’), dated August 1999, (Section 1.2 (pp. 3-4)), documents the Transit and TSM commitments.
This report summarizes the current status of the implementation of the Transit and TSM components.
A report from the Program Commitment Database with commitments of regional interest that have been implemented throughout the construction of the various Program Projects is also included. They are as follows:
• Considerations to pedestrians and bicyclists • Construction of permanent roadside noise barriers • Minimizing construction noise levels • Coordination with municipalities, neighborhoods and other stakeholders • Providing alternate travel routes • Protection of the traveling public through the use of detailed maintenance and protection of traffic
plans during construction.
Also included is a NuRide Report for people who commute into and out of New Haven County. NuRide is an online ridematching and recording system that allows users to earn rewards for sharing rides. A reward can be earned whenever ride is shared or traffic on the roads is reduce, by way of - transit, vanpooling, carpooling, bike or walk – or even telecommuting or using a compressed work week schedule. The report counts the cumulative effort of people that are recording their rides in order to earn rewards, not the actual overall ridership, which is nearly impossible to count for some modes of travel.
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford
ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013
ii
Summary of ROD Requirement Findings The following is an overview and analysis, where possible, of the data related to the Transit and TSM Commitments. It accompanies the following charts and graphs and details ridership and related data as well as changes in ridership over time and changes in service that have been implemented to accommodate the changes, and some service changes that have resulted in increased ridership.
Shore Line East – Total # of Riders by Year
Since 2001, there have been numerous changes in service as a result of increased ridership and resulting in increased ridership: Expanded service on weekends and holidays (Summer 2008); Service to Stamford including Metro-North New Haven Line stops (SLE Express - one-seat/one-ride) (2002); Expanded midday weekday service; and Weekday service to New London was recently added.
An additional 136 SLE passengers took the bus from Union Station eastbound in summer of 2010 due to track construction.
Total number of riders per year does not include State Street Rail Station riders. Shore Line East service into State Street Station commenced in June 2002 (see ROD Requirement: Commuter Rail Station at State Street for additional station related statistics).
Shore Line East – Total # of Riders by Month for Weekend & Holiday Service
The spike in July ridership is due to Independence Day travel and Sailfest activities in the New London area in 2012. Additional trains have been scheduled during July to accommodate the increased ridership.
Shore Line East – Average # of Daily Riders for Weekday and Weekend & Holiday Service
The spike in July ridership is due to Independence Day travel and Sailfest activities in the New London area in 2012. Additional trains have been scheduled during July to accommodate the increased ridership.
Shore Line East – State Street Station – Average # of Daily Riders by Quarter
Shore Line East service into State Street Station commenced June 2002.
Shore Line East – State Street Station – Average # of Daily Riders by Month
The Union Station Shuttle, which started in December 2010, is a free weekday service connecting rail passengers using Union Station to additional off-site parking locations, including the Temple Street Garage and the parking lot at the former Coliseum site. All shuttle trips extend to the New Haven Green, creating easy connections to all other CTTRANSIT local bus routes in New Haven. The Union Station Shuttle runs continuously every 20 minutes, from 6:05 AM until 10:15 PM, Monday through Friday.
CTTransit – “S” Route – Monthly Ridership and Average Daily Riders
The ‘S’ Route was once operated by DATTCO and “interlined” with their Old Saybrook to Hartford express bus service (interlining is when a bus would run as the “S” to Old Saybrook, and then make the run up to Hartford as the express, and only be available to run the reverse route on the S when it returned – thus constraining the schedule). At some point in the past, this interlining no longer made sense and since around 2010 the route is operated by CTTRANSIT NH Division. Because the interlining no longer exists, there was more flexibility to change the scheduling and better align it with connecting services which may explain some of the ridership gains.
CTTransit – “F” and “G” Routes – Average Daily Riders
A major winter storm in February 2013 resulted in a drop in ridership.
Improved Transit and Carpool/Vanpool Marketing
Recent changes in the State’s Vanpool service providers have created a discrepancy in the most recent (2013) Vanpool data. New service providers are no longer required to give exact statistics for detailed Vanpool data such as a breakdown of the number of Vanpool Riders in the Corridor or the number of Vanpool seats.
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven – East Haven – Branford
ROD Transit and Transportation System Management (TSM) Requirements January 2012 – December 2013
iii
Improved Access to Transit Information – Schedules and Brochures
The Total Number of Announcements Sent represents announcements which are sent out to the Program-maintained distribution list for weekly construction activities, holiday construction notifications, event notifications, and additional special announcements as needed. In addition to Program Announcements, the Program responds to any questions or comments received from the public. This statistic is the Number of Inquiry Responses sent out by the Program through email.
Improved Access to Transit Information – Website Visits
CTTransit data represents average monthly visits to the routes and the schedule listing pages of website only. The apparent large drop in website visitors between 2012 (5,923/mo) and 2013 (1,305/mo) is most likely the result of a technological data tracking issue rather than an actual drop in website visitors.
CTTransit has indicated that their overall site traffic has actually increased quite a bit, yet most visitors access the site using their mobile devices and the website is not able to track these visitors. Mobile technology has also provided visitors with alternatives to CTTransit’s online PDF format timetables, such as Trip Planner and Google Transit, along with other similar mobile apps.
The drop in CTRides website visits beginning in July 2013 was due to the end of advertising.
Improved Access to Transit Information – Phone Calls
In July 2013, SLE switched to a new phone service that is no longer able to distinguish between after-hours calls for Shore Line East and calls for CTRides.
The spike in CTRides calls in February 2012 is a result of the beginning of the campaign as well as a number of inclement winter weather days. Phone data for CTRides for the months of March-May and September-December of 2013 is unavailable due to changes in the data that AT&T provides.
CTTransit no longer supports the means to accurately determine the number of calls to Customer Service.
Optimized Flextime/Voluntary Rideshare (HOV) Preferential Parking/Guaranteed Ride Home
Employers were contacted and presented with a marketing information program for all options. The Program is presented to the clients as a comprehensive overview that covers the following related programs/options:
• Optimized flextime/telecommuting
• Voluntary Rideshare Programs
• Guaranteed Ride Program
• NuRide Program
Therefore, the data reflected in the ROD Requirement for each of these aspects is the same figure since an individual break out of each is not possible.
The large discrepancy between the 2012 and 2013 figures is due to change in what types of data are collected. The 2012 figure represents the total number of meetings, calls, and drop in’s. The 2013 figure represents the total number of meetings and presentations conducted, as call data is no longer being collected due to new changes in CTRides’ tracking procedures.
In 2012 there were 433 new employee meetings. In 2013 there were 200 new employee meetings.
Insurance Breaks ($40) for Rideshare (HOV)/Transit
The Insurance contacted were companies licensed to write auto insurance policies in the state.
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
298,829
345,206
385,501405,436
423,470
458,070483,578
568,144 557,497584,524
603,297 605,102631,534
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Shore Line East Total # of Riders by Year
2001 2002 2003 2004 2005 2006 2007 2008 2009 *2010 2011 2012 2013Total Riders 298,829 345,206 385,501 405,436 423,470 458,070 483,578 568,144 557,497 584,524 603,297 605,102 631,534Difference 15.5% 11.7% 5.2% 4.4% 8.2% 5.6% 17.5% -1.9% 4.8% 3.2% 0.3% 4.4%
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
298,829
345,206
385,501405,436
423,470
458,070483,578
568,144 557,497584,524
603,297 605,102631,534
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Shore Line East Total # of Riders by Year
1
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 20 20 21 19 20 19 23 22 21 21 21 22Total Weekday Riders
35,563 42,547 44,503 36,140 41,033 38,233 46,505 45,332 46,599 44,457 43,895 47,578
2011 - 2012 Diff.2012 - 2013 Diff.
19.6% -1.3%-2.5%13.5%
January February March April
4.6% -6.8% 2.8% 8.4%
May June July August
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
35,56336,140
46,50544,457
47,01549,576
44,684 46,53545,939
47,76144,850
41,82942,547
41,033
45,332 43,89544,639
45,242
47,647 48,794
41,941
44,06541,557
36,803
44,503
38,233
46,59947,578
45,868
45,742
47,350
51,896
44,186
49,473
41,64644,654
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Total # of Riders by Month for Weekday Service2011 Weekday Riders by Month 2012 Weekday Riders by Month 2013 Weekday Riders by Month
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 22 22 22 21 20 20 21 21 22 23 22Total Weekday Riders
47,015 44,639 45,868 49,576 45,242 45,742 44,684 47,647 47,350 46,535 48,794 51,896
2011 - 2012 Diff.2012 - 2013 Diff.
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 19 20 21 20 23 20 20 19 21 18 21Total Weekday Riders
45,939 41,941 44,186 47,761 44,065 49,473 44,850 41,557 41,646 41,829 36,803 44,654
2011 - 2012 Diff.2012 - 2013 Diff.
YearDays of Service
2011 - 2012 Difference2012 - 2013 Difference
-5.1% -8.7% 6.6%
Jan-Dec Totals2011 2012 2013253 247 252
-8.7%5.4%
-7.7%12.3%
Total Weekday Riders
4.6%
530,854 523,495 547,728-1.4%
December
-12.0%
November
2.8% 1.1%
May June July August
September October
4.9%
-7.3%
-0.6% 6.4%
0.2% 21.3%
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
35,56336,140
46,50544,457
47,01549,576
44,684 46,53545,939
47,76144,850
41,82942,547
41,033
45,332 43,89544,639
45,242
47,647 48,794
41,941
44,06541,557
36,803
44,503
38,233
46,59947,578
45,868
45,742
47,350
51,896
44,186
49,473
41,64644,654
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Total # of Riders by Month for Weekday Service2011 Weekday Riders by Month 2012 Weekday Riders by Month 2013 Weekday Riders by Month
2
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 11 11 10 9 9 7 8 9 10 9 9 8Total Weekend & Holiday Riders
5,576 6,034 5,860 5,095 5,336 4,144 4,505 5,231 6,128 5,263 5,986 4,721
2011 - 2012 Diff.2012 - 2013 Diff.
8.2% 4.7% 16.1% 13.7%-2.9%
January April
-22.3% 17.1% -21.1%
February March
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
5,576 5,095 4,5055,263
6,941
5,969
8,578
5,035
5,3465,900
7,4826,753
6,0345,336 5,231
5,986
6,201
6,549
11,226
5,815
8,407
5,161
6,640
9,021
5,860 4,144
6,128
4,721
5,127
7,751
10,9198,804
7,879
5,489
8,8298,155
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Total # of Riders by Month for Weekend & Holiday Service
2011 Total Riders 2012 Total Riders 2013 Total Riders
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 10 9 9 8 9 10 10 10 10 8 8 9Total Weekend & Holiday Riders
6,941 6,201 5,127 5,969 6,549 7,751 8,578 11,226 10,919 5,035 5,815 8,804
2011 - 2012 Diff.2012 - 2013 Diff.
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 9 11 10 10 8 8 10 10 11 10 13 10Total Weekend & Holiday Riders
5,346 8,407 7,879 5,900 5,161 5,489 7,482 6,640 8,829 6,753 9,021 8,155
2011 - 2012 Diff.2012 - 2013 Diff.
YearDays of ServiceTotal Riders2011 - 2012 Difference2012 - 2013 Difference
-2.7%18.4%15.5%
August
9.7%-10.7%
July
30.9%
JuneMay
-17.3%
112 116 11272,443 81,607 83,806
51.4%
December
33.6%
November
-11.3%
12.6%2.7%
September October
57.3% -12.5%-6.3% 6.4%
2011 2012 2013Jan-Dec Totals
-9.6%33.0%
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
5,576 5,095 4,5055,263
6,941
5,969
8,578
5,035
5,3465,900
7,4826,753
6,0345,336 5,231
5,986
6,201
6,549
11,226
5,815
8,407
5,161
6,640
9,021
5,860 4,144
6,128
4,721
5,127
7,751
10,9198,804
7,879
5,489
8,8298,155
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Total # of Riders by Month for Weekend & Holiday Service
2011 Total Riders 2012 Total Riders 2013 Total Riders
3
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
1,901 1,967 2,040
2,198
2,3562,316
2,356 2,180
2,267 2,3422,348
2,131
2,128 2,061
2,0822,108
2,043 2,217
2,525
2,207
2,220
2,245 2,215
2,115
2,120 2,037
2,220
2,165
2,1212,315 2,336
2,416
2,203
2,1372,258
2,145
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Average # of Daily Riders for Weekday Service2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders for
2,295
Shore Line East Average # of Daily Riders for Weekend & Holiday Service
2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders
ROD Requirement: Shore Line EastContinue to provide Shore Line East rail passenger service between New Haven and New London. Service levels in operation at the time of the start of construction will be continued. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
1,901 1,967 2,040
2,198
2,3562,316
2,356 2,180
2,267 2,3422,348
2,131
2,128 2,061
2,0822,108
2,043 2,217
2,525
2,207
2,220
2,245 2,215
2,115
2,120 2,037
2,220
2,165
2,1212,315 2,336
2,416
2,203
2,1372,258
2,145
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Average # of Daily Riders for Weekday Service2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders for
724842
563
584694
746 780
694596 590
906
819
772
970
580
665 700
727
2,295
727
765649
794
859
761883
678
589 583709
1,433
839
675644
862
752
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Shore Line East Average # of Daily Riders for Weekend & Holiday Service
2011 Average Daily Riders 2012 Average Daily Riders 2013 Average Daily Riders
4
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).
RIDERSHIP WILL CONTINUE TO BE MONITORED.
254223
272
219
226
268 271
374
231
161187
173 176
240
265
206
144179
258
185
297
368
285
436
253226
261248
187
255
235
248
Q1‐10 Q2‐10 Q3‐10 Q4‐10 Q1‐11 Q2‐11 Q3‐11 Q4‐11 Q1‐12 Q2‐12 Q3‐12 Q4‐12 Q1‐13 Q2‐13 Q3‐13 Q4‐13
State Street Commuter Rail StationShore Line East Average # of Daily Riders by Quarter
Average Daily Riders Westbound Average Daily Riders Eastbound
ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).
RIDERSHIP WILL CONTINUE TO BE MONITORED.
254223
272
219
226
268 271
374
231
161187
173 176
240
265
206
144179
258
185
297
368
285
436
253226
261248
187
255
235
248
Q1‐10 Q2‐10 Q3‐10 Q4‐10 Q1‐11 Q2‐11 Q3‐11 Q4‐11 Q1‐12 Q2‐12 Q3‐12 Q4‐12 Q1‐13 Q2‐13 Q3‐13 Q4‐13
State Street Commuter Rail StationShore Line East Average # of Daily Riders by Quarter
Average Daily Riders Westbound Average Daily Riders Eastbound
5
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).
RIDERSHIP WILL CONTINUE TO BE MONITORED.
234238
222
181
137
166
211
182 167 178161
179
249 249 262231
225
222
267
245
270280
240
223
177187
163
208 221
292
262276
256 245210
164
198
186
177
242 274
249
225
225
256254
243
248
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
State Street Commuter Railroad StationShore Line East Average # of Daily Riders by Month
2012 Avg Daily Riders Westbound 2012 Avg Daily Riders Eastbound
2013 Avg Daily Riders Westbound 2013 Avg Daily Riders Eastbound
ROD Requirement: Commuter Rail Station at State Street - CONSTRUCTION COMPLETEDConstruct a new commuter rail passenger station stop on State Street, between Court and Chapel Streets in New Haven. This station will serve rail commuters who desire more direct access to downtown New Haven. The new State Street station stop would be in addition to stops currently served by the Shore Line East commuter rail service (New Haven to New London).
RIDERSHIP WILL CONTINUE TO BE MONITORED.
234238
222
181
137
166
211
182 167 178161
179
249 249 262231
225
222
267
245
270280
240
223
177187
163
208 221
292
262276
256 245210
164
198
186
177
242 274
249
225
225
256254
243
248
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
State Street Commuter Railroad StationShore Line East Average # of Daily Riders by Month
2012 Avg Daily Riders Westbound 2012 Avg Daily Riders Eastbound
2013 Avg Daily Riders Westbound 2013 Avg Daily Riders Eastbound
Commuter Connection buses pick up at State Street in the morning and drop off at Union Station in the afternoon/evening.
6
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
378 397
346 378 378361
397346
378 378 378318331
389
415
423 395
470437 461 456 447 454
375390 379
391
433 434389
410 421 395432
381 360
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit "S" Route Average ‐ Daily Riders2011 2012 2013
7,7337,365
8,470 7,733 7,733 8,1027,365
8,4707,733 7,733 7,733 9,206
8,2779,729
11,216
10,576 10,270
12,21610,925
12,44210,940
11,185
10,4339,381
10,144
8,33310,170
11,263 11,2869,719
10,666 11,3639,488
11,668
9,525 9,010
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit "S" Route ‐Monthly Ridership2011 2012 2013
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 25 26 20 25 22 23 27 26 21 25 26Total Riders 7,733 8,277 10,144 7,365 9,729 8,333 8,470 11,216 10,170 7,733 10,576 11,263
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 26 26 22 26 25 20 25 26 23 27 27Total Riders 7,733 10,270 11,286 8,102 12,216 9,719 7,365 10,925 10,666 8,470 12,442 11,363
Year 2011 2012 2013 2011 2012 2013 2011 2012 2013 2011 2012 2013Days of Service 21 24 24 21 25 27 21 23 25 25 25 25Total Riders 7,733 10,940 9,488 7,733 11,185 11,668 7,733 10,433 9,525 9,206 9,381 9,010
YearDays of ServiceTotal Riders
Jan-Dec Totals
May
April
July AugustJune
January February March
DecemberNovemberSeptember October
2011 2012 2013259 303 305
95,377 127,590 122,635
ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
378 397
346 378 378361
397346
378 378 378318331
389
415
423 395
470437 461 456 447 454
375390 379
391
433 434389
410 421 395432
381 360
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit "S" Route Average ‐ Daily Riders2011 2012 2013
7,7337,365
8,470 7,733 7,733 8,1027,365
8,4707,733 7,733 7,733 9,206
8,2779,729
11,216
10,576 10,270
12,21610,925
12,44210,940
11,185
10,4339,381
10,144
8,33310,170
11,263 11,2869,719
10,666 11,3639,488
11,668
9,525 9,010
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit "S" Route ‐Monthly Ridership2011 2012 2013
7
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
865
794724
683
706
904
804876
928 965 1,001955
736
809 728
766
723792 770
907
895831
763
768
821
500
658
803829
802 791700
841
836
682
808
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit F Route ‐ Average Daily Riders(2nd Tuesday of Month)
2011 2012 2013
950
CTTransit G Route ‐ Average Daily Riders(2nd Tuesday of Month)
2011 2012 2013
ROD Requirement: Bus ServiceContinue to provide bus service between Branford and New Haven via the Tomlinson (Route 1) Bridge at service levels in operation at the time of the start of construction. This will include service on Connecticut Transit Routes F & G. Ridership and service frequencies will be monitored regularly to determine the need for service modifications.
865
794724
683
706
904
804876
928 965 1,001955
736
809 728
766
723792 770
907
895831
763
768
821
500
658
803829
802 791700
841
836
682
808
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit F Route ‐ Average Daily Riders(2nd Tuesday of Month)
2011 2012 2013
494
556
769
581
717
923
805
567
704
746
732
686
667
950
667
761
695
729 714647
693
790
580
791721
300
532
709666
718 715550
588
712
579 457
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
CTTransit G Route ‐ Average Daily Riders(2nd Tuesday of Month)
2011 2012 2013
8
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
Year
20122013
Year
20122013
Year20122013
Distribution of I-95 Brochures
1,200
# of Vanpool Riders in Corridor # of Vanpool Seats
Total # of New Brochures:
# of Vans in Corridor11 31
Distribution of SLE Schedules
Total # of Announcements Sent:
Total # of Inquiries Responded to:
Total # of Presentations:
Total # of Regular Schedules Distributed:
220,000210,000
Total # of Sailfest Schedules Distributed:
25,00018,000
1,7931,435
Van Service
75,884122,654
3248
1984
(Data Unavailable) (Data Unavailable)
2528
I-95 Webletters Public Information Presentations
Total # of Attendees:
2,500
ROD Requirement: Improved Transit and Carpool/Vanpool MarketingMarketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
ROD Requirement: Improved Transit and Carpool/Vanpool MarketingMarketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
9
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
52,687 52,01154,858
51,680
66,10867,436
84,955
78,452
56,323 51,01956,157
60,249
43,38241,722
45,244
54,67962,841
75,132
66,897 67,822
53,187
57,144
64,978
62,059
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan FebMar AprMay Jun Jul Aug Sep Oct Nov Dec
Website Visits2012 I‐95 NHHCCI Program 2013 I‐95 NHHCCI Program 2012 CTTransit 2012 CTRides
2012 Shore Line East 2013 CTTransit 2013 CTRides 2013 Shore Line East
Year 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013Shore Line East 31,743 37,307 30,342 38,407 32,943 41,143 36,704 36,744 41,028 45,760 47,820 53,413CTRides 3,882 12,713 3,736 10,941 4,351 10,699 9,013 11,386 12,492 14,030 11,697 10,706CTTransit 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305I-95 NHHCIP 1,834 1,362 1,721 1,358 2,027 1,711 3,039 2,245 3,398 5,013 9,692 2,012Monthly Totals 43,382 52,687 41,722 52,011 45,244 54,858 54,679 51,680 62,841 66,108 75,132 67,436
Year 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013Shore Line East 52,282 68,920 53,660 67,020 39,783 47,022 40,019 42,120 45,242 47,775 44,613 52,502CTRides 5,895 5,829 6,174 7,406 5,886 6,287 7,819 5,924 12,333 5,302 10,278 5,276CTTransit 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305 5,923 1,305I-95 NHHCIP 2,797 8,901 2,065 2,721 1,595 1,709 3,383 1,670 1,480 1,775 1,245 1,166Monthly Totals 66,897 84,955 67,822 78,452 53,187 56,323 57,144 51,019 64,978 56,157 62,059 60,249
2012 Total Yearly Website Visits:2013 Total Yearly Website Visits:
JunJan Feb Mar Apr May
DecNov OctSepAugJul
695,091731,930
ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
52,687 52,01154,858
51,680
66,10867,436
84,955
78,452
56,323 51,01956,157
60,249
43,38241,722
45,244
54,67962,841
75,132
66,897 67,822
53,187
57,144
64,978
62,059
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan FebMar AprMay Jun Jul Aug Sep Oct Nov Dec
Website Visits2012 I‐95 NHHCCI Program 2013 I‐95 NHHCCI Program 2012 CTTransit 2012 CTRides
2012 Shore Line East 2013 CTTransit 2013 CTRides 2013 Shore Line East
10
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
2,923
2,402
855 835 841
3,406
3,030
3,621
574 653 537 610
1,294
5,181
2,170
2,631
3,195 3,076
3,167 3,483
3,0542,876
3,850
2,668
J F b M A M J J l A S O t N D
Jan FebMar AprMay Jun Jul Aug Sep Oct NovDec
Phone Calls
2012 CTRides 2012 Shore Line East 2013 CTRides 2013 Shore Line East
Phone CallsYear 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013
Shore Line East 1,242 930 717 1,028 684 855 817 835 923 841 1,024 1,216CTRides 52 1,993 4,464 1,374 1,486 0 1,814 0 2,272 0 2,052 2,190Monthly Totals 1,294 2,923 5,181 2,402 2,170 855 2,631 835 3,195 841 3,076 3,406
Phone CallsYear 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013 2012 2013
Shore Line East 1,038 790 1,063 736 812 574 1,107 653 1,064 537 826 610CTRides 2,129 2,240 2,420 2,885 2,242 0 1,769 0 2,786 0 1,842 0Monthly Totals 3,167 3,030 3,483 3,621 3,054 574 2,876 653 3,850 537 2,668 610
36,64520,287
2012 Total Yearly Phone Calls:
Jan Feb
2013 Total Yearly Phone Calls:
AugJul DecNov OctSep
MayMar Apr Jun
ROD Requirement: Improved Transit and Carpool/Vanpool Marketing Marketing measures can include direct mail, newspaper advertisements and television spots and more frequent distribution of improved schedules.
ROD Requirement: Improved Access to Transit InformationUp-to-date schedules will be maintained at each transit stop and the transit information telephone line will be improved to minimize “busy” signals.
2,923
2,402
855 835 841
3,406
3,030
3,621
574 653 537 610
1,294
5,181
2,170
2,631
3,195 3,076
3,167 3,483
3,0542,876
3,850
2,668
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Jan FebMar AprMay Jun Jul Aug Sep Oct NovDec
Phone Calls
2012 CTRides 2012 Shore Line East 2013 CTRides 2013 Shore Line East
11
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
ROD Requirement: Optimized FlextimeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing flextime work schedules. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.
ROD Requirement: Voluntary Rideshare (HOV) Preferential ParkingEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing preferential parking for rideshare (HOV) participants. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.
ROD Requirement: Guaranteed Ride HomeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) to set up a program in which the employer would voluntarily provide for documented rideshare (HOV/transit) riders taxi or equivalent service to the home from the workplace in the event of certain unusual or emergency conditions comprising up to one percent of workdays.
5,041 5,041 5,041
996 996 996
Total Employers Contacted2012 2013
ROD Requirement: Optimized FlextimeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing flextime work schedules. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.
ROD Requirement: Voluntary Rideshare (HOV) Preferential ParkingEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) with a marketing information program about the employer voluntarily providing preferential parking for rideshare (HOV) participants. Ongoing or periodic reviews and surveys will be made to ascertain the level of participation; adjustments to the program will be made to concentrate on the most productive types of employees.
ROD Requirement: Guaranteed Ride HomeEmployers in the region will be approached by ConnDOT or its representative (e.g., rideshare brokerage firm) to set up a program in which the employer would voluntarily provide for documented rideshare (HOV/transit) riders taxi or equivalent service to the home from the workplace in the event of certain unusual or emergency conditions comprising up to one percent of workdays.
Optimized Flextime/Telecommuting Voluntary Rideshare (HOV)/Preferential Parking
Guaranteed Ride Program
5,041 5,041 5,041
996 996 996
Total Employers Contacted2012 2013
12
I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAMNew Haven - East Haven - Branford
ROD Transit and Transportation System Management (TSM) RequirementsJanuary 2012 - December 2013
467 Companies were contacted between June 2002 and
December 2002
# of Insurance Companies Contacted
THIS COMMITMENT HAS BEEN FULFILLED
ROD Requirement: Insurance Breaks ($40) for Rideshare (HOV)/TransitAll insurance providers serving the region will be approached by ConnDOT or its representative to set up a program in which the insurance company would voluntarily provide an annual rebate to auto insurance policy holders who could document regular transit or HOV use.
13
New
Hav
en -
Eas
t Hav
en -
Bra
nfo
rdM
ITIG
AT
ION
ME
AS
UR
ES
AN
D P
RO
GR
AM
C
OM
MIT
ME
NT
DA
TA
BA
SE
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
3/18
/201
4O
VE
RV
IEW
The
Rec
ord
of D
ecis
ion
(Aug
ust
, 199
9) fo
r the
I-95
New
Hav
en H
arbo
r Cro
ssin
g (P
age
35; S
ectio
n 6.
Mon
itorin
g an
d En
forc
emen
t) st
ipul
ates
that
to a
ssur
e co
mm
itmen
ts m
ade
in th
e FE
IS/4
(f) a
nd th
e R
OD
are
inco
rpor
ated
into
fina
l des
ign
plan
s and
con
stru
ctio
n, a
des
ign
and
cons
truc
tion
man
agem
ent c
onsu
ltant
has
bee
n re
tain
ed b
y C
onnD
OT
. D
esig
n re
finem
ents
w
ill a
lso
be re
view
ed fo
r env
ironm
enta
l sen
sitiv
ity.
Spec
ific
miti
gatio
n co
mm
itmen
ts a
re m
ade
in th
e FE
IS/4
(f),
Cha
pter
4 f
ollo
win
g th
e di
scus
sion
of e
ach
impa
ct.
The
se c
omm
itmen
ts
are
sum
mar
ized
in th
e FE
IS/4
(f) E
xecu
tive
Sum
mar
y. M
itiga
tion
to c
ultu
ral r
esou
rces
is a
lso
cont
aine
d in
the
M.O
.A. c
onta
ined
in A
ppen
dix
B o
f the
FIE
S/4(
f). T
raff
ic n
oise
m
itiga
tion
will
be
prov
ided
in a
ccor
danc
e w
ith c
ondi
tions
as
desc
ribed
in th
e FE
IS/4
(f) (
Cha
pter
4, p
ages
4-9
5 th
roug
h 4-
106)
. All
cons
truc
tion
activ
ities
will
be
cont
inuo
usly
mon
itore
d by
the
FHW
A, C
onnD
OT
, and
DEP
. C
onst
ruct
ion
activ
ities
will
be
cond
ucte
d in
acc
orda
nce
with
regu
lato
ry p
erm
it st
ipul
atio
ns a
nd B
est M
anag
emen
t Pra
ctic
es f
or th
e pr
otec
tion
of th
e en
viro
nmen
t. Th
e pu
rpos
e of
this
Co
mm
itm
ent D
atab
ase
is to
satis
fy th
e m
onito
ring
and
enfo
rcem
ent s
ectio
n of
the
ROD
by
track
ing,
on
a pe
r con
trac
t bas
is, a
ll of
the
com
mitm
ents
iden
tifie
d in
the
FEIS
/RO
D.
Seve
ral a
dditi
onal
cat
egor
ies
of c
omm
itm
ents
, suc
h as
“C
ity o
f New
Hav
en”
com
mitm
ents
, are
als
o tra
cked
in th
e da
taba
se.
The
data
base
con
tain
s, fo
r eac
h co
mm
itm
ent,
a de
scrip
tion
of th
e co
mm
itmen
t, a
uniq
ue ID
num
ber,
the
refe
renc
e do
cum
ent (
FEIS
/RO
D) a
nd p
age,
the
Prog
ram
con
trac
ts th
e co
mm
itmen
t app
lies
to, t
he d
esig
n/co
nstru
ctio
n sta
tus
and
impl
emen
tatio
n du
e da
te, t
he lo
catio
ns w
ithin
the
desi
gn d
ocum
ents
whe
re th
e co
mm
itmen
t is a
ddre
ssed
, and
the
parti
es
resp
onsi
ble
for
inco
rpor
atin
g th
e co
mm
itmen
t int
o th
e fin
al d
esig
n pl
ans
and
the
cons
truc
tion.
Com
mitm
ents
that
app
ly to
the
I-95
Pro
gram
on
a co
rrid
or-w
ide
basi
s ar
e de
sign
ated
as
“Pro
gram
(92-
505)
” un
der t
he “
Con
tract
/Sta
te P
roje
ct N
umbe
r“ fi
eld.
T
rack
ing
The
Man
agem
ent C
onsu
ltant
trac
ks th
e id
entif
ied
com
mitm
ents
dur
ing
desig
n to
ens
ure
the
com
mitm
ents
hav
e be
en in
corp
orat
ed in
to th
e fin
al d
esig
n pl
ans.
The
man
ner i
n w
hich
co
mm
itmen
ts h
ave
been
add
ress
ed in
the
cont
ract
pla
ns a
nd sp
ecifi
catio
ns a
re c
onfir
med
and
doc
umen
ted
in th
e da
taba
se u
nder
the “
Des
ign
Doc
umen
t Loc
atio
ns”
field
. W
hen
adeq
uate
ly a
ddre
ssed
, the
com
mitm
ent i
s m
arke
d as
“Co
mpl
eted
” un
der
the
“Des
ign
Stat
us”
field
. So
me
com
mitm
ents
are
“cl
osed
out
” du
ring
the
desi
gn p
hase
and
, the
refo
re, n
ot tr
acke
d du
ring
the
cons
truct
ion
phas
e. O
ther
com
mitm
ents
are
trac
ked
and
“clo
sed
out”
dur
ing
the
cons
truc
tion
phas
e. W
hen
adeq
uate
ly a
ddre
ssed
, the
se c
omm
itmen
ts a
re m
arke
d as
“C
ompl
eted
” un
der t
he “
Con
stru
ctio
n St
atus
” fi
eld.
A li
tera
l rea
ding
of
each
com
mitm
ent w
as u
sed
in d
eter
min
ing
whe
ther
a c
omm
itmen
t was
trac
ked
duri
ng d
esig
n on
ly o
r thr
ough
the
cons
truct
ion
phas
e al
so.
Clo
se-O
ut
Whe
n a
cont
ract
com
mitm
ent i
s “c
lose
d ou
t” in
the
desi
gn p
hase
, thi
s sig
nifie
s th
at th
e co
mm
itmen
t has
bee
n ad
dres
sed
in th
e de
sign
and
that
the
com
mitm
ent w
ill n
ot b
e tra
cked
dur
ing
cons
truc
tion.
In
this
cas
e a
chec
k m
ark
is p
lace
d in
the
“Cls
d D
sn”
box
(i.e.
clo
sed
in d
esig
n) in
the
data
base
.
Whe
n a
cont
ract
com
mitm
ent i
s “c
lose
d ou
t” in
the
cons
truc
tion
phas
e, th
is s
igni
fies t
hat t
he c
omm
itmen
t has
bee
n ad
dres
sed
duri
ng c
onst
ruct
ion.
In
this
cas
e a
chec
k m
ark
is p
lace
d in
th
e “C
lsd
Cns
” bo
x (i
.e. c
lose
d in
con
stru
ctio
n) in
the
data
base
. It
shou
ld b
e n
oted
tha
t a c
ontr
act
com
mitm
ent
is e
ithe
r “cl
osed
out
” du
ring
the
desi
gn
pha
se O
R th
e co
nst
ruct
ion
pha
se,
but n
ever
bot
h.
Con
stru
ctio
n P
hase
Env
iron
men
tal P
roce
sses
C
ompl
ianc
e w
ith p
rogr
am c
omm
itmen
ts is
add
ress
ed th
roug
h th
e co
ntra
ct d
ocum
ents
, env
iron
men
tal p
erm
its, a
nd c
onst
ruct
ion
phas
e en
viro
nmen
tal p
roce
sses
incl
udin
g bu
t not
lim
ited
to: C
TDO
T / C
TD
EEP
MO
U –
On
Site
CT
DE
EP R
epre
sent
ativ
e, I
nspe
ctio
n R
epor
ting
Proc
ess,
Cha
nge
to W
ork
/ Per
mit
Rev
isio
ns P
roce
ss, E
mer
genc
y R
espo
nse
Spill
/ R
elea
se
Proc
edur
e, E
nvir
onm
enta
l Rev
iew
Mee
tings
, MPT
Mee
tings
/ C
oord
inat
ion
Proc
ess,
TMP
Rev
iew
and
Upd
ates
, Bic
ycle
and
Ped
estri
an Im
prov
emen
ts, a
nd P
ublic
Out
reac
h.
This
repo
rt w
as p
rinte
d on
3/1
8/20
14 5
:36:
43 P
M
New
Hav
en -
Eas
t Hav
en -
Bra
nfo
rdM
ITIG
AT
ION
ME
AS
UR
ES
AN
D P
RO
GR
AM
C
OM
MIT
ME
NT
DA
TA
BA
SE
This
repo
rt w
as p
rinte
d on
3/1
8/20
14 5
:36:
44 P
M
Thi
s re
port
con
tain
s 19
6 co
mm
itm
ents
.
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
3/18
/201
4
GGLL
OOSS
SSAA
RRYY
OOFF
TTEE
RRMM
SS
TTEE
RRMM
DD
EEFF
IINNIITT
IIOONN
ID #
Un
ique
num
ber i
dent
ifica
tion
for
eac
h co
mm
itmen
t
Com
mit
men
t Br
ief n
ame
of c
omm
itm
ent
Des
crip
tion
Com
mitm
ent d
escr
iptio
n pa
raph
rase
d fr
om r
epor
t, p
rim
arily
from
mul
tiple
sou
rces
(Not
e: S
ee s
ourc
e fo
r fu
ll de
scri
ptio
n.)
Stat
us-
Des
ign
and
Con
stru
ctio
n Cu
rren
t lev
el of
com
plet
ion
– D
esig
n/C
onst
ruct
ion
Pha
se: “
On-
Hol
d,”
“Pen
ding
” [s
tart
of f
inal
de
sign
/con
stru
ctio
n], “
On-
goin
g,”
“Com
plet
ed”
PD
Pr
elim
inar
y D
esig
n
FD
P Fi
nal D
esig
n Pl
ans
ADV
Ad
vert
isem
ent d
ate
for
cont
ract
CCD
Co
nstr
ucti
on C
ompl
etio
n D
ate
TB
D
To
Be
Det
erm
ined
Res
pons
ible
Par
ty- D
esig
n an
d C
onst
ruct
ion
Resp
onsi
ble p
arty
for i
mpl
emen
tati
on o
f com
mitm
ent i
n co
ntra
ct d
ocu
men
ts a
nd in
fiel
d
Ref
eren
ce D
ocu
men
t and
Pag
e Num
ber
Repo
rt(s)
whe
re c
omm
itm
ent i
s sp
ecifi
cally
men
tione
d an
d pa
ge n
umbe
rs
Due
Dat
e- D
esig
n an
d C
onst
ruct
ion
Tim
e or
desc
ript
ion
whe
n co
mm
itm
ent s
houl
d be
add
ress
ed in
Des
ign
Com
men
ts o
r in
Fie
ld
Impl
emen
tati
on C
omm
ents
An
y co
mm
ents
rela
ted
to im
plem
enta
tion
of C
omm
itmen
t D
esig
n D
ocum
ent L
ocat
ions
- C
ontr
act
Plan
s and
Sp
ecif
icat
ions
De
sign
Doc
umen
t(s) w
here
com
mitm
ent h
as b
een
inco
rpor
ated
or
addr
esse
d
Pro
gram
(92-
505)
Re
fers
to c
omm
itm
ents
that
do
not s
pecif
ical
ly a
pply
to a
pro
gram
cont
ract
or
appl
y to
the
prog
ram
in
a gen
eral
sen
se.
NTC
No
tice t
o C
ontr
acto
r
FE
IS
Fina
l Env
iron
men
tal I
mpa
ct S
tate
men
t (M
ay, 1
999)
RO
D
Reco
rd o
f Dec
isio
n (A
ugus
t, 1
999)
MO
A
Mem
oran
dum
of
Agr
eem
ent b
etw
een
Con
nDO
T a
nd S
HPO
(M
ay, 1
999)
TIP
Am
endm
ent S
ix
Tran
spor
tatio
n Im
prov
emen
t Pla
n A
men
dmen
t Six
(Apr
il, 1
999)
New
Hav
en -
Eas
t Hav
en -
Bra
nfor
dM
ITIG
AT
ION
ME
AS
UR
ES
AN
D P
RO
GR
AM
C
OM
MIT
ME
NT
DA
TA
BA
SE
Thi
s re
port
con
tain
s 19
6 co
mm
itm
ents
.
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
3/18
/201
4
NO
TE: T
he F
EIS/
RO
D c
ateg
ory
entit
led
"Ene
rgy"
is n
ot in
clud
ed.
It's t
wo
com
mitm
ents
- Tr
ansi
t and
TSM
Com
pone
nts,
and
Con
stru
ctio
n Tr
affic
Man
agem
ent P
lan
- are
list
ed u
nder
the
cate
gorie
s "Tr
ansi
t and
TSM
Ele
men
ts"
and
"Pro
gram
C
omm
itmen
ts,"
resp
ectiv
ely.
Cat
egor
y O
rder
:T
rans
it an
d TS
M E
lem
ents
Hig
hway
Com
pone
nts
Oth
er C
onsi
dera
tions
/Rel
ated
Pro
ject
s/Stu
dies
P
rogr
am C
omm
itmen
ts
Env
iron
men
tal M
itig
atio
n –
Lan
d U
se
Env
iron
men
tal M
itig
atio
n –
Soci
oeco
nom
ics
Env
iron
men
tal M
itig
atio
n –
Inst
ituti
onal
Res
ourc
es a
nd P
ublic
4(f
) Lan
ds
Env
iron
men
tal M
itig
atio
n –
Farm
land
E
nvir
onm
enta
l Mit
igat
ion
– H
isto
ric
Res
ourc
es/S
ecti
on 4
(f)
Env
iron
men
tal M
itig
atio
n –
Arc
haeo
logi
cal R
esou
rces
E
nvir
onm
enta
l Mit
igat
ion
– A
ir Q
ualit
y E
nvir
onm
enta
l Mit
igat
ion
– T
raff
ic N
oise
E
nvir
onm
enta
l Mit
igat
ion
– V
isua
l & A
esth
etic
Cha
ract
er
Env
iron
men
tal M
itig
atio
n –
Ter
rest
rial
Eco
logy
E
nvir
onm
enta
l Mit
igat
ion
– Fi
sher
ies
Env
iron
men
tal M
itig
atio
n –
Wat
er R
esou
rces
/Wat
er Q
ualit
y E
nvir
onm
enta
l Mit
igat
ion
– C
oast
al Z
one/
Coa
stal
Res
ourc
es
Env
iron
men
tal M
itig
atio
n –
Wat
er D
epen
dent
Use
s E
nvir
onm
enta
l Mit
igat
ion
– Fl
oodp
lain
s E
nvir
onm
enta
l Mit
igat
ion
– W
etla
nds
Env
iron
men
tal M
itig
atio
n –
Wat
erbo
dies
E
nvir
onm
enta
l Mit
igat
ion
– E
nvir
onm
enta
l Ris
k Si
tes
Env
iron
men
tal M
itig
atio
n –
Con
side
rati
ons
rela
ting
to P
edes
tria
ns &
Bic
yclis
ts
Env
iron
men
tal M
itig
atio
n –
Con
stru
ctio
n Im
pac
ts a
nd E
ngin
eeri
ng C
onsid
erat
ions
E
nvir
onm
enta
l Mit
igat
ion
– Se
cond
ary
& C
umul
ativ
e E
nvir
onm
enta
l Mit
igat
ion
– Pe
rmits
and
App
rova
ls
Mon
itor
ing
and
Enf
orce
men
t F
Y 1
999
- FY
200
1 T
rans
port
atio
n Im
prov
emen
t Pro
gram
(TIP
) “A
men
dmen
t Six
” V
E D
esig
n Su
gges
tions
10/
26/0
1 V
E R
ecom
men
dati
ons
10/2
6/01
C
ity o
f New
Hav
en C
omm
itm
ents/
Miti
gatio
n M
easu
res
Tow
n of
Eas
t Hav
en C
omm
itmen
ts/M
itig
atio
n M
easu
res
Ree
valu
atio
n of
Pro
ject
No.
92-
619
and
the
FEIS
/Sec
tion
4(f)
: 3/
29/1
0 an
d 2/
29/1
2 M
iscel
lane
ous
This
repo
rt w
as p
rinte
d on
3/1
8/20
14 5
:36:
44 P
M
New
Hav
en -
Eas
t Hav
en -
Bra
nfo
rd
MIT
IGA
TIO
N M
EA
SUR
ES
AN
D
PR
OG
RA
M C
OM
MIT
ME
NT
DA
TA
BA
SE
Com
mitm
ent S
umm
ary
ID#
Ref
eren
ce D
ocu
men
t and
Pag
eD
escr
ipti
on
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
Tra
nsi
t and
TS
M E
lem
ents
35Pu
blic
and
Priv
ate
Car
pool
Mat
chin
gD
istri
butio
n of
"how
to" k
its to
em
ploy
ers a
nd a
pub
lic fu
ll tim
e co
ordi
nato
r with
a
PC-b
ased
syst
em fo
r mat
chin
g.FE
ISES
-16;
2-4
8R
OD
4, 3
2
154
Bus
Ser
vice
Con
tinue
to p
rovi
de b
us se
rvic
e be
twee
n B
ranf
ord
and
New
Hav
en v
ia th
e To
mlin
son
Brid
ge a
t ser
vice
leve
ls in
ope
ratio
n at
the
time
of th
e st
art o
f co
nstru
ctio
n (6
/28/
02).
RO
D3,
32
FEIS
ES-1
6; 2
-19;
2-4
8
155
Impr
oved
Tra
nsit
Mar
ketin
gM
arke
ting
mea
sure
s can
incl
ude
dire
ct m
ail,
new
spap
er a
dver
tisem
ents
and
te
levi
sion
spot
s, m
ore
freq
uent
dis
tribu
tion
of im
prov
ed sc
hedu
les,
mor
e is
suin
g of
an
up-
to-d
ate
regi
onal
tran
sit g
uide
and
"tra
nsit
in th
e sc
hool
s" p
rogr
am.
RO
D3,
32
FEIS
ES-1
6; 2
-48
156
Tran
sit I
nfor
mat
ion
Up-
to-d
ate
sche
dule
s will
be
mai
ntai
ned
at e
ach
trans
it st
op a
nd th
e tra
nsit
info
rmat
ion
tele
phon
e lin
e w
ill b
e im
prov
ed to
min
imiz
e "b
usy"
sign
als.
RO
D4,
32
FEIS
ES-1
6; 2
-48
157
Opt
imiz
ed F
lext
ime
Empl
oyer
s in
the
regi
on w
ill b
e ap
proa
ched
by
Con
nDO
T or
its r
epre
sent
ativ
es
with
a m
arke
ting
info
rmat
ion
prog
ram
abo
ut th
e em
ploy
er v
olun
taril
y pr
ovid
ing
flext
ime
wor
k sc
hedu
les.
RO
D4,
32
FEIS
ES-1
6; 2
-48
158
Gua
rant
eed
Rid
e H
ome
Empl
oyer
s in
the
regi
ons w
ill b
e ap
proa
ched
by
Con
nDO
T or
its r
epre
sent
ativ
es to
se
t up
a pr
ogra
m in
whi
ch th
e em
ploy
er w
ould
vol
unta
rily
prov
ide
for d
ocum
ente
d rid
esha
re ri
ders
, tax
i or e
quiv
alen
t ser
vice
hom
e fro
m w
ork.
RO
D4,
32
FEIS
ES-1
6; 2
-49
188
Shor
e Li
ne E
ast S
ervi
ceC
ontin
ue to
pro
vide
Sho
re L
ine
East
rail
pass
enge
r ser
vice
bet
wee
n N
ew H
aven
an
d N
ew L
ondo
n. S
ervi
ce le
vels
in o
pera
tion
at th
e tim
e of
the
star
t of
cons
truct
ion
will
be
cont
inue
d. R
ider
ship
and
serv
ice
freq
uenc
ies w
ill b
e m
onito
red
regu
larly
to d
eter
min
e th
e ne
ed fo
r ser
vice
mod
ifica
tions
.
FEIS
ES- 1
6; 2
-18,
30
RO
D3,
32
203
Vol
unta
ry R
ides
hare
Pre
fere
ntia
l Par
king
Empl
oyer
s in
the
regi
on w
ill b
e ap
proa
ched
by
Con
nDO
T or
its r
epre
sent
ativ
e w
ith
a m
arke
ting/
info
rmat
ion
prog
ram
abo
ut th
e em
ploy
er v
olun
taril
y pr
ovid
ing
pref
eren
tial p
arki
ng fo
r rid
esha
re (H
OV
) par
ticip
ants
. Pre
fere
ntia
l par
king
cou
ld
cons
ist o
f bot
h fr
ee p
arki
ng fo
r Hig
h O
ccup
ancy
Veh
icle
s (H
OV
) and
a p
hysi
cal
arra
ngem
ent,
whe
re p
ossi
ble,
such
that
the
long
est w
alk
from
a re
serv
ed H
OV
sp
ace
wou
ld b
e no
long
er th
an th
e sh
orte
st w
alk
from
a n
on-H
OV
spac
e. O
ngoi
ng
or p
erio
dic
revi
ews a
nd su
rvey
s will
be
mad
e to
asc
erta
in th
e le
vel o
f par
ticip
atio
n,
and
adju
stm
ents
to th
e pr
ogra
m w
ill b
e m
ade
to c
once
ntra
te o
n th
e m
ost p
rodu
ctiv
e ty
pes o
f em
ploy
ers.
FEIS
ES-1
6; 2
-48
RO
D4,
32
204
Insu
ranc
e B
reak
s for
Rid
esha
reA
ll in
sura
nce
prov
ider
s ser
ving
the
regi
on w
ill b
e ap
proa
ched
by
Con
nDO
T or
its
repr
esen
tativ
e to
set u
p a
prog
ram
in w
hich
the
insu
ranc
e co
mpa
ny w
ould
vo
lunt
arily
pro
vide
an
annu
al re
bate
to a
uto
insu
ranc
e po
licy
hold
ers w
ho c
ould
do
cum
ent r
egul
ar tr
ansi
t or H
OV
use
. It
is a
ssum
ed th
at tr
avel
ers c
hoos
ing
to
trave
l by
HO
V o
r tra
nsit
wou
ld b
e ab
le to
obt
ain
such
doc
umen
tatio
n w
ith
negl
igib
le in
conv
enie
nce.
FEIS
ES-1
6; 2
-49
RO
D4,
32
Tu
esda
y, M
arch
18,
201
4
Pag
e 4
of 6
New
Hav
en -
Eas
t Hav
en -
Bra
nfo
rd
MIT
IGA
TIO
N M
EA
SUR
ES
AN
D
PR
OG
RA
M C
OM
MIT
ME
NT
DA
TA
BA
SE
Com
mitm
ent S
umm
ary
ID#
Ref
eren
ce D
ocu
men
t and
Pag
eD
escr
ipti
on
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
Tra
nsi
t and
TS
M E
lem
ents
271
Shor
e Li
ne E
ast S
tatio
n U
pgra
des
(Sta
te P
roje
ct N
os. 3
10-0
19, -
020,
-021
, -02
2, -0
26) C
onst
ruct
ion
of th
e B
ranf
ord,
G
uilfo
rd, a
nd C
linto
n St
atio
n up
grad
esN
/AN
/A
Oth
er C
onsi
dera
tion
s/R
elat
ed P
roje
cts/
Stu
dies
234
Har
bors
ide
Trai
lTh
is is
a C
SRC
OG
pro
ject
(in
asso
ciat
ion
w/C
ity o
f New
Hav
en, C
ity o
f Wes
t H
aven
, and
Vis
ion
for G
reat
er N
ew H
aven
) to
prov
ide
a fo
ot tr
ail a
long
New
H
aven
Har
bor f
rom
Sav
in R
ock
in W
est H
aven
, thr
ough
Lon
g W
harf
, and
acr
oss
the
Tom
linso
n B
ridge
to L
ight
hous
e Pa
rk o
n th
e ea
st sh
ore
in N
ew H
aven
. Th
e R
ecom
men
ded
Act
ion
will
not
aff
ect t
he d
evel
opm
ent a
nd im
plem
enta
tion
of th
is
proj
ect.
FEIS
8-3
Pro
gram
Com
mit
men
ts19
6Tr
affic
Pla
nsA
con
stru
ctio
n Tr
affic
Man
agem
ent P
lan
shal
l be
impl
emen
ted.
The
Pla
n w
ill
addr
ess o
ppor
tuni
ty fo
r alte
rnat
e tra
vel m
odes
dur
ing
cons
truct
ion.
Thi
s pla
n w
ill
be d
evel
oped
in c
oord
inat
ion
with
the
Sout
h C
entra
l Reg
ion
Cou
ncil
Of
Gov
ernm
ents
, inc
ludi
ng th
e fir
st e
lect
ed o
ffic
ials
of t
he a
ffec
ted
corr
idor
tow
ns.
The
Plan
will
incl
ude
Shor
e Li
ne E
ast r
ail p
asse
nger
stat
ion
and
park
ing
impr
ovem
ents
and
fixe
d ro
ute
bus s
ervi
ce im
prov
emen
ts in
the
East
Sho
re/M
orris
C
ove
area
(New
Hav
en/E
ast H
aven
).
RO
D11
; 32;
33
En
viro
nm
enta
l Mit
igat
ion
- L
and
Use
5A
ltern
ate
trave
l rou
tes
Alte
rnat
e tra
vel r
oute
s will
be
prov
ided
(to
the
exte
nt p
ossi
ble)
to re
plac
e af
fect
ed
rout
es.
Ther
e w
ill b
e on
goin
g ev
alua
tion
of th
e ef
fect
iven
ess o
f rou
tes a
nd d
etou
rs
corr
idor
wid
e.
FEIS
ES-1
1; 4
-7, 7
0R
OD
19
En
viro
nm
enta
l Mit
igat
ion
- S
ocio
econ
omic
s21
Coo
rdin
atio
nC
ontin
ued
coor
dina
tion
with
the
mun
icip
aliti
es a
nd n
eigh
borh
ood
asso
ciat
ions
will
be
und
erta
ken
to m
inim
ize
any
soci
oeco
nom
ic im
pact
s of p
roje
ct.
FEIS
ES-1
1; 4
-7; 4
-77
RO
D19
En
viro
nm
enta
l Mit
igat
ion
- T
raff
ic N
oise
96N
oise
Bar
rier
Noi
se b
arrie
r will
be
cons
truct
ed a
t Ram
ona
Way
, alo
ng so
uth
side
of I
-95,
ap
prox
imat
ely
6.1
met
ers i
n he
ight
and
283
.5 m
eter
s in
leng
th.
FEIS
ES-1
2; 4
-8; 4
-100
RO
D25
97N
oise
Bar
rier
Noi
se b
arrie
r will
be
cons
truct
ed a
t O'B
rien
Roa
d, a
long
the
north
side
of I
-95,
ap
prox
imat
ely
3.0
met
ers i
n he
ight
and
213
met
ers i
n le
ngth
.FE
ISES
-12;
4-8
; 4-1
00R
OD
25
Tu
esda
y, M
arch
18,
201
4
Pag
e 5
of 6
New
Hav
en -
Eas
t Hav
en -
Bra
nfo
rd
MIT
IGA
TIO
N M
EA
SUR
ES
AN
D
PR
OG
RA
M C
OM
MIT
ME
NT
DA
TA
BA
SE
Com
mitm
ent S
umm
ary
ID#
Ref
eren
ce D
ocu
men
t and
Pag
eD
escr
ipti
on
I- 9
5 N
ew H
aven
Har
bor
Cro
ssin
g C
orri
dor
Impr
ovem
ent P
rogr
am
En
viro
nm
enta
l Mit
igat
ion
- T
raff
ic N
oise
98N
oise
Bar
rier
Noi
se b
arrie
r will
be
cons
truct
ed a
t Gre
enfie
ld A
venu
e, a
long
nor
th si
de o
f I-9
5,
appr
oxim
atel
y 4.
3 to
5.5
met
ers i
n he
ight
and
210
met
ers i
n le
ngth
.FE
ISES
-12;
4-8
; 4-1
00R
OD
25
99N
oise
Bar
rier
Noi
se b
arrie
r will
be
cons
truct
ed a
t Alle
n Pl
ace,
alo
ng th
e so
uth
side
of I
-95,
ap
prox
imat
ely
3.0
met
ers i
n he
ight
and
121
. 9 m
eter
s in
leng
th.
FEIS
ES-1
2; 4
-8; 4
-100
RO
D25
100
Noi
se B
arrie
rEx
istin
g no
ise
barr
ier n
ear t
he W
oost
er S
quar
e ar
ea o
f New
Hav
en a
long
the
wes
t si
de o
f I-9
1 (s
outh
boun
d) w
ill b
e re
plac
ed, a
s req
uire
dFE
ISES
-12;
4-8
; 4-1
00R
OD
25
En
viro
nm
enta
l Mit
igat
ion
- C
onsi
dera
tion
s R
elat
ing
to P
edes
tria
ns
and
Bic
ycli
sts
104
Pede
stria
ns a
nd B
icyc
lists
The
disp
ositi
on o
f any
aba
ndon
ed ri
ght-o
f-w
ay w
ill b
e de
term
ined
by
the
syst
emat
ic p
rope
rty tr
ansf
er p
roce
ss.
Con
nDO
T w
ill c
onsi
der t
he p
ossi
bilit
y of
m
akin
g su
ch la
nd a
vaila
ble
for p
ublic
spac
e, w
here
app
ropr
iate
for p
edes
trian
and
bi
cycl
e us
e.
FEIS
ES-1
7; 4
-12;
4-1
43R
OD
24, 3
2
105
Pede
stria
ns a
nd B
icyc
lists
Pede
stria
n an
d bi
cycl
e de
tour
s will
be
inco
rpor
ated
in th
e de
sign
if a
nd w
hen
path
way
s are
clo
sed.
FEIS
ES-1
7; 4
-12;
4-1
43R
OD
24, 3
2
209
Pede
stria
ns a
nd B
icyc
lists
Whe
re w
arra
nted
and
reas
onab
le, a
ccom
mod
atio
ns fo
r bic
yclis
ts a
nd p
edes
trian
s w
ill b
e m
ade
part
of d
esig
n, c
onst
ruct
ion,
ope
ratio
n, a
nd m
aint
enan
ce a
ctiv
ities
.R
OD
24, 3
2
En
viro
nm
enta
l Mit
igat
ion
- C
onst
ruct
ion
Im
pact
s an
d E
ngi
nee
rin
g C
onsi
dera
tion
s90
Min
imiz
e N
oise
Lev
els
All
cons
truct
ion
unde
rtake
n sh
ould
be
cons
iste
nt w
ith D
OT
Stan
dard
sp
ecifi
catio
ns fo
r noi
se le
vels
(For
m 8
16).
FEIS
4-15
8
136
Traf
fic P
lans
Mai
nten
ance
and
pro
tect
ion
of tr
affic
pla
ns a
ssur
ing
safe
and
reas
onab
ly
unin
terru
pted
trav
el o
f veh
icle
s thr
ough
out t
he a
rea
of c
onst
ruct
ion.
FEIS
4-15
7
Tu
esda
y, M
arch
18,
201
4
Pag
e 6
of 6
SUMMARY REPORT
NuRiders
New NuRiders 6,318 (60% prev. dr. alone)
Total NuRiders 6,318 (60% prev. dr. alone)
Active NuRiders (#) 2,189 (41% prev. dr. alone)
Active NuRiders (%) 35%
Organizations 918
Male / female 38% / 62%
Activity All trips Adjusted
Recorded trips 1,371,570
Avg trip distance (mi) 26.8
Avg vehicle occupancy - -
Reduced car trips 1,229,296 394,024
Reduced miles (VMT) 33,221,081 11,383,825
Reduced starts (VT) 1,107,440 335,682
Gallons of gas saved 1,493,479
Reduced NOx (tons) 26.82 9.14
Reduced VOC (tons) 10.81 3.59
Reduced CO2 (tons) 14,636.1 4,871.67
Total reduced emissions 14,673.73 4,884.4
Money saved $17,999,265
Calories burned 66,062,868
Rewards
Rewards redeemed $258,461
Redemptions 19,889
Other
Parking spots saved 616.4 avg per week day
All trips
Reduced miles (VMT) - cumulative
Select NuRiders Select Date Range
Affiliated with: Any organization Time period: Monthly
Who live: in New Haven County, CT or Start date: Jan 05
Who commute: to New Haven County, CT End date: Mar 14
Promotion: Any
Co-branding: Any
All trips
Compweek
Bike
Walk
Tele...
Tra...
Van...
Car...
Jan-05Mar-0
6May-07
Jul-08Sep-09
Nov-10Jan-12
Mar-13
0
10,000
20,000
30,000
40,000
Reduced miles (VMT) - cumulative
Compweek
Bike
Walk
Tele...
Tra...
Van...
Car...
Jan-05Mar-0
6May-07
Jul-08Sep-09
Nov-10Jan-12
Mar-13
0
10,000,000
20,000,000
30,000,000
40,000,000
DEFINITIONS & VARIABLES
New NuRiders = NuRiders who joined during the specified period
Total NuRiders = total NuRiders as of the end date
Active NuRiders (#) = all NuRiders who have taken at least 1 trip as of the end date
Active NuRiders (%) = (active NuRiders) / (total NuRiders)
Prev. dr. alone = abbreviation for "previously drove alone" — the percent of people who drove alone prior to joining NuRide
Organizations = the number of organizations in the selected region(s) that have at least 1 NuRide member
Recorded trips = number of recorded trips during the specified period
Reduced car trips = the number of car trips not taken during the specified period
Reduced miles (VMT) = the number of vehicle miles not driven during the specified period
Reduced car starts (VT) = the number of times a car was not started during the specified period
Reduced NOx (tons) = the total NOx not emitted during the specified period
Reduced VOC (tons) = the total VOC not emitted during the specified period
Reduced CO2 (tons) = the total CO2 not emitted during the specified period
Total reduced emissions = the total NOx, VOC & CO2 not emitted during the specified period
Adjusted results = recorded results multiplied by the Prev. dr. alone percentage, indicating trips taken by people who used to drive alone
Money saved = the value of the savings realized by not driving during the specified period
Rewards redeemed = the value of the rewards redeemed during the specified period
Redemptions = total number of redemptions during the specified period
Parking spots saved = the average number of parking spots saved for the most recent 4-week period
NOx - trip end emissions = 0.9905 grams per one-way VT
NOx - running emissions = 0.6995 grams per VMT
VOC - trip end emissions = 2.3454 grams per one-way VT
VOC - running emissions = 0.217 grams per VMT