Upload
scrbdgharavi
View
227
Download
0
Embed Size (px)
Citation preview
7/27/2019 CAS_BUCK.XLS
1/2
161277235.xls.ms_office MITCHELL ENGINEERING PROGRAMS
COPYRIGHT 1990 MITCHELL ENGINEERING, PO BOX 1492. GOLDEN, CO, 80402, USA (303) 273 3744
Buckling & Wellhead Load After Cementing
CASING PROPERTIES
CASING OD (IN.) 7 EXTERNAL END AREA (SQ.IN.) 38.48
CASING ID (IN.) 6.276 INTERNAL END AREA (SQ.IN.) 30.94
CASING WT./FT 26 STEEL END AREA (SQ.IN.) 7.55
CASING LENGTH (FT 10,000
Wellhead Loads after Cementing
INITIAL CONDITIONS (While cement sets)Wellhead Load (=Tension at surface)
T; Mlbs
Mud wt. inside (MWi) 9 ppg +wt. of pipe +wpf*L/1000 260
Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai L/1000 145
Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64
Pressure outside (Po) 1,000 psi -wt. mud outside -0.052MWo Ao TOC/1000 -192
Avg cement dens (MWc) 16 ppg + pressure-area + (PiAi - PoAo)/1000 8
Top of cement (TOC) 8,000 ft + Pickup + Pickup 18
Pickup is + 18 Mlb (Slackoff is -)
Initial Wellhead Load 175
FINAL CONDITIONS
Mud wt inside 13 ppg
Mud wt outside 8 ppg
Pressure inside 2,000 psiPressure outside 3,000 psi
Changes (final - initial) Formulae for dT dT; Mlbs
dMWi 4 ppg + (0.052dMWi)Ai(TOC)/1000 15
dMWo -4 ppg - (0.052dMWo)Ao(TOC)/1000 19
dPi 500 psi +2 dPi Ai/1000 9
dPo 2,000 psi -2 dPo Ao/1000 -46
dTemp 34 F -AE(dTemp)/1000 -53Total dT -55
Final Wellhead Load 119
Page 1 of 2
7/27/2019 CAS_BUCK.XLS
2/2
161277235.xls.ms_office MITCHELL ENGINEERING PROGRAMS
Buckling of Casing after Cementing
INITIAL CONDITIONS (While cement sets)Initial Effective tension at TOC Teff;Mlbs
Mud wt. inside (MWi) 9 ppg +pipe below TOC +wpf(L-TOC)/1000 52
Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai(L-TOC)/1000 29
Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64
Pressure outside (Po) 1,000 psi +Pickup +Pickup 18Avg. cement dens (MWc) 16 ppg
Top of cement (TOC) 8,000 ft Initial Teff at TOC 35
Pickup 18 Mlb (Slackoff is -)
FINAL CONDITIONSMud wt inside 13 ppg
Mud wt outside 8 ppg
Pressure inside 2,000 psi
Pressure outside 3,000 psi
Changes (final - initial) Formula for d dTeff;Mlbs
dMWi 4 ppg -(1-)(0.052dMWi)Ai(TOC)/1000 -36
dMWo -4 ppg +(1-)(0.052dMWo)Ao(TOC)/1000 -45
dPi 500 psi -(1-2)dPi Ai/1000 -6dPo 2,000 psi +(1-2)dPo Ao/1000 31
dTemp 34 F -AE(dTemp)/1000 -53
If Teff < 0, assume casing is buckled. Total dTeff -109
Final Teff at TOC -74
Buckled? Yes
TEMPERATURE CALCULATIONS
(For drilling strings )Static Temperatures
Surface (Ts) 60 F y = TOC/TVD 0.57
Bottom hole (Tb) 355 F k = 0.4+0.306y+0.029y 2-0.125y 3 0.561
TVD next hole section 14,000 ft Init. avg temp: Ts + (Tb-Ts)y/2 144Final avg temp;F: Ts+(Tb-Ts)k 225
Must be entered above;F: dTemp 81
(For completion strings )
Surface Injection (Tsi) 32 F y = TOC/TVD 0.89
At perforations (Tp) 123 F For big jobs f = 3 Little jobs f = 2 3
TVD Perforations 9000 ft Final avg temp; F: Tsi+(Tp-Tsi)y/f 59Must be entered above; F: dTemp -85
30,000,000 psi; Poisson's ratio = 0.3; Coefficient of thermal expansion = 6.9E-6 /F
PROGRAM DOS NAME: CAS_BUCK.XLS
PURPOSE: Computes stresses, loads, and buckling in casing after cementing
COMPUTATIONS:
1. Buckling in intermediate and completion casings
2. Wellhead loads in intermediate and completion casings
Page 2 of 2