    Buckling & Wellhead Load After Cementing

    CASING PROPERTIES

    CASING OD (IN.) 7 EXTERNAL END AREA (SQ.IN.) 38.48

    CASING ID (IN.) 6.276 INTERNAL END AREA (SQ.IN.) 30.94

    CASING WT./FT 26 STEEL END AREA (SQ.IN.) 7.55

    CASING LENGTH (FT 10,000

    Wellhead Loads after Cementing

    INITIAL CONDITIONS (While cement sets)Wellhead Load (=Tension at surface)

    T; Mlbs

    Mud wt. inside (MWi) 9 ppg +wt. of pipe +wpf*L/1000 260

    Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai L/1000 145

    Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64

    Pressure outside (Po) 1,000 psi -wt. mud outside -0.052MWo Ao TOC/1000 -192

    Avg cement dens (MWc) 16 ppg + pressure-area + (PiAi - PoAo)/1000 8

    Top of cement (TOC) 8,000 ft + Pickup + Pickup 18

    Pickup is + 18 Mlb (Slackoff is -)

    Initial Wellhead Load 175

    FINAL CONDITIONS

    Mud wt inside 13 ppg

    Mud wt outside 8 ppg

    Pressure inside 2,000 psiPressure outside 3,000 psi

    Changes (final - initial) Formulae for dT dT; Mlbs

    dMWi 4 ppg + (0.052dMWi)Ai(TOC)/1000 15

    dMWo -4 ppg - (0.052dMWo)Ao(TOC)/1000 19

    dPi 500 psi +2 dPi Ai/1000 9

    dPo 2,000 psi -2 dPo Ao/1000 -46

    dTemp 34 F -AE(dTemp)/1000 -53Total dT -55

    Final Wellhead Load 119

    Page 1 of 2

  • 7/27/2019 CAS_BUCK.XLS

    2/2

    161277235.xls.ms_office MITCHELL ENGINEERING PROGRAMS

    Buckling of Casing after Cementing

    INITIAL CONDITIONS (While cement sets)Initial Effective tension at TOC Teff;Mlbs

    Mud wt. inside (MWi) 9 ppg +pipe below TOC +wpf(L-TOC)/1000 52

    Mud wt outside (MWo) 12 ppg +wt mud inside +0.052MWi Ai(L-TOC)/1000 29

    Pressure inside (Pi) 1,500 psi -wt cement -0.052MWc Ao(L-TOC)/1000 -64

    Pressure outside (Po) 1,000 psi +Pickup +Pickup 18Avg. cement dens (MWc) 16 ppg

    Top of cement (TOC) 8,000 ft Initial Teff at TOC 35

    Pickup 18 Mlb (Slackoff is -)

    FINAL CONDITIONSMud wt inside 13 ppg

    Mud wt outside 8 ppg

    Pressure inside 2,000 psi

    Pressure outside 3,000 psi

    Changes (final - initial) Formula for d dTeff;Mlbs

    dMWi 4 ppg -(1-)(0.052dMWi)Ai(TOC)/1000 -36

    dMWo -4 ppg +(1-)(0.052dMWo)Ao(TOC)/1000 -45

    dPi 500 psi -(1-2)dPi Ai/1000 -6dPo 2,000 psi +(1-2)dPo Ao/1000 31

    dTemp 34 F -AE(dTemp)/1000 -53

    If Teff < 0, assume casing is buckled. Total dTeff -109

    Final Teff at TOC -74

    Buckled? Yes

    TEMPERATURE CALCULATIONS

    (For drilling strings )Static Temperatures

    Surface (Ts) 60 F y = TOC/TVD 0.57

    Bottom hole (Tb) 355 F k = 0.4+0.306y+0.029y 2-0.125y 3 0.561

    TVD next hole section 14,000 ft Init. avg temp: Ts + (Tb-Ts)y/2 144Final avg temp;F: Ts+(Tb-Ts)k 225

    Must be entered above;F: dTemp 81

    (For completion strings )

    Surface Injection (Tsi) 32 F y = TOC/TVD 0.89

    At perforations (Tp) 123 F For big jobs f = 3 Little jobs f = 2 3

    TVD Perforations 9000 ft Final avg temp; F: Tsi+(Tp-Tsi)y/f 59Must be entered above; F: dTemp -85

    30,000,000 psi; Poisson's ratio = 0.3; Coefficient of thermal expansion = 6.9E-6 /F

    PROGRAM DOS NAME: CAS_BUCK.XLS

    PURPOSE: Computes stresses, loads, and buckling in casing after cementing

    COMPUTATIONS:

    1. Buckling in intermediate and completion casings

    2. Wellhead loads in intermediate and completion casings

    Page 2 of 2