CasingCementingModuleSubsea.xls

Embed Size (px)

Citation preview

  • 7/28/2019 CasingCementingModuleSubsea.xls

    1/7

    CASING and CEMENTING Module for Subsea

    Lease and Block: Well Name & No:

    OCS-G-Number: Permit MD: KOP: Rig Elevation:

    Prepared By: Permit TVD: Date:

    VENDORS:

    Casing Crews & Service: Frank's Casing Crews

    Cement & Cement Service: Halliburton

    Cement Accessories: Gemoco, Centralizers. Davis Lynch, Float Equipment

    Liner Equipment & Service:

    Logging Services:

    Other Related Services:

    Subsea Wellheads & Service:

    DEPTH CASING POINTS:

    Drive Pipe: 357' 1st Drilling Liner: NoneConductor: None 2nd Drilling Liner: None

    Surface: 3,400' Production Liner: None1st Intermediate: 9,748' Production Tie-back String: None

    2nd Intermediate: None Production Long String: 11,712'

    1. DRIVE PIPE . . . .

    OD Drive Pipe: 36" Wall Thickness: 1.00" Slot: None Air Gap: 80' Pipe ID: 34.0"

    Penetration BML: 350' Pre Driven: No Water Depth: 1696' Setting Depth: 2126'

    2. CONDUCTOR CASING . . . .

    Hole Size: 28.000" Casing OD: 24.000" Drift Diameter: 22.250"

    Setting Depth, MD: 2,600' Setting Depth, TVD: 2,600' Clearance: 1.500"

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn. Grade Weight Weight Tension Collapse Top Burst Btm Burst

    1,696 2,600 904 156.00 S-60 X-56 141,024 141,024 17.78 0.95 2.24 2.39

    Design Conditions -

    Backup Gradient: 8.942 , ppg Mud Weight: 9.0 , ppg Gas Gradient: 0.100

    Fracture Gradient: 10.2 , ppg MASP, psi: 1292

    Cement Design -

    % Excess OH: 100 Sacks of Lead: 420 Sacks of Tail: 752

    Cement Top: 1,696' Slurry Wt. Lead: 10.8 Slurry Wt. Tail: 15.6

    Thickening Time: 5.0 hr Yield, ft/sx Lead: 4.18 Yield,, ft/sx Tail: 1.21

    Placement Time: 3.0 hr Volume, ft Lead: 1,755 Volume, ft Tail: 681

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Page 1

  • 7/28/2019 CasingCementingModuleSubsea.xls

    2/7

    3. SURFACE CASING . . . .

    Hole Size: 26.000" Casing OD: 20.000" Drift Diameter: 18.542"

    Setting Depth, MD: 4,200' Setting Depth, TVD: 4,200' Clearance: 2.500"

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    1696 4,200 2,504 133.00 S-60 HCN80 333,032 333,032 10.20 1.42 1.84 2.11

    Design Conditions -

    Backup Gradient: 8.942 , ppg Mud Weight: 10.0 , ppg Gas Gradient: 0.100Fracture Gradient: 12.2 , ppg MASP, psi: 2,412

    Cement Design -

    % Excess OH: 100 Sacks of Lead: 2,055 Sacks of Tail: 1387

    Cement Top: 1696' Slurry Wt. Lead: 12.0 Slurry Wt. Tail: 15.6

    Thickening Time: 5.0 hr Yield, ft/sx Lead: 1.84 Yield, ft/sx Tail: 1.2

    Placement Time: 3.5 hr Volume, ft Lead: 3,780 Volume, ft Tail: 1,665

    Type Lead Cement:

    Type Tail Cement:

    Well Head:

    Accessories:

    4. INTERMEDIATE CASING - 1 . . . .

    Hole Size: 17.500" Casing OD: 13.375" Drift Diameter: 12.347"

    Setting Depth, MD: 6,600' Setting Depth, TVD: 6,600' Clearance: 1.563"

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    1,696 6,600 4,904 72.00 BUTT HCN80 353,088 353,088 5.76 1.00 2.43 1.64

    Design Conditions - Fracture Gradient: 15.0

    Backup Gradient: 8.942 , ppg Completion Fluid Wt: 12.0 , ppg Mud Weight: 12.0Pore PSI For MASP: 11.8 , ppg TVD For MASP: 10,830' MASP, psi: 2,212

    Cement Design -

    % Excess OH: 25 Sacks of Lead: 1,301 Sacks of Tail: 878

    Cement Top MD: 3,700' Slurry Wt. Lead: 12.7 Slurry Wt. Tail: 16.4

    Thickening Time: 6.0 hr Yield, ft/sx Lead: 1.28 Yield, ft/sx Tail: 1.07

    Placement Time: 3.0 hr Volume, ft Lead: 1,665 Volume, ft Tail: 939

    Spacer:

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Page 2

  • 7/28/2019 CasingCementingModuleSubsea.xls

    3/7

    5. INTERMEDIATE CASING - 2 . . . .

    Hole Size: Casing OD: Drift Diameter:

    Setting Depth, MD: Setting Depth, TVD: Clearance:

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    Design Conditions - Fracture Gradient:

    Backup Gradient: , ppg Completion Fluid Wt: , ppg Mud Weight:Pore PSI For MASP: , ppg TVD For MASP: MASP, psi:

    Cement Design -

    % Excess OH: Sacks of Lead: Sacks of Tail:

    Cement Top MD: Slurry Wt. Lead: Slurry Wt. Tail:

    Thickening Time: Yield, ft/sx Lead: Yield, ft/sx Tail:

    Placement Time: Volume, ft Lead: Volume, ft Tail:

    Spacer:

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Page 3

  • 7/28/2019 CasingCementingModuleSubsea.xls

    4/7

  • 7/28/2019 CasingCementingModuleSubsea.xls

    5/7

    6. PRODUCTION LINER . . . .

    Hole Size: 8.500" Casing OD: 7.000" Drift Diameter: 6.184"

    Setting Depth, MD: 11,712' Setting Depth, TVD: 10,830' Clearance: 0.750"

    Top of Liner, MD: 9,246' Top of Liner, TVD: 8,695'

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    9,246 11,712 2,466 29.00 SHJF P-110 71,514 71,514 10.17 1.14 1.38 1.31

    Design Conditions -Backup Gradient: 10.0 , ppg Completion Fluid Wt.: 13.2 , ppg Mud Weight: 13.2

    Pore PSI For MASP: 11.8 , ppg TVD For MASP: 10,830' MASP, psi: 5,452

    Cement Design -

    % Excess OH: 50 Sacks of Lead: 470 Sacks of Tail: None

    Cement Top: 9,246' Slurry Wt. Lead: 16 Slurry Wt. Tail:

    Thickening Time: 5.0 hr Yield, ft/sx Lead: 1.14 Yield, ft/sx Tail:

    Placement Time: 3.0 hr Volume, ft Lead: 536 Volume, ft Tail:

    Spacer:

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Liner Equipment:

    Page 5

  • 7/28/2019 CasingCementingModuleSubsea.xls

    6/7

    PRODUCTION CASING LINER 1

    Hole Size: 8.500" Casing OD: 7.000" Drift Diameter: 6.184"

    Setting Depth, MD: 11,712' Setting Depth, TVD: 10,830' Clearance: 0.750"

    Top of Liner, MD: 9,246' Top of Liner, TVD: 8,695'

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    9,246 11,712 2,466 29.00 71514.00 P-110 71,514 71,514 10.17 1.14 1.39 1.32

    Design Conditions -Backup Gradient: 10.0 , ppg Completion Fluid Wt.: 13.2 , ppg Mud Weight: 13.2

    Pore PSI For MASP: 11.8 , ppg TVD For MASP: 10,830' MASP, psi: 5,375

    Cement Design -

    % Excess OH: 50 Sacks of Lead: 470 Sacks of Tail: None

    Cement Top: 9,246' Slurry Wt. Lead: 16 Slurry Wt. Tail:

    Thickening Time: 5.0 hr Yield, ft/sx Lead: 1.14 Yield, ft/sx Tail:

    Placement Time: 3.0 hr Volume, ft Lead: 536 Volume, ft Tail:

    Spacer:

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Liner Equipment:

    Page 6

  • 7/28/2019 CasingCementingModuleSubsea.xls

    7/7

    DRILLING CASING LINER 2

    Hole Size: 8.500" Casing OD: 7.000" Drift Diameter: 6.184"

    Setting Depth, MD: 11,712' Setting Depth, TVD: 10,830' Clearance: 0.750"

    Top of Liner, MD: 9,246' Top of Liner, TVD: 8,695'

    INTERVAL Interval Cum DESIGN SAFETY FACTOR

    From To Footage Wt/Ft Conn Grade Weight Weight Tension Collapse Top Burst Btm Burst

    9,246 11,712 2,466 29.00 SHFJ P-110 71,514 71,514 10.17 1.14 2.37 2.22

    Design Conditions -Backup Gradient: 10.0 , ppg Completion Fluid Wt.: 13.2 , ppg Mud Weight: 13.2

    Pore PSI For MASP: 11.8 , ppg TVD For MASP: 10,830' MASP, psi: 2,788

    Cement Design -

    % Excess OH: 50 Sacks of Lead: 470 Sacks of Tail: None

    Cement Top: 9,246' Slurry Wt. Lead: 16.0 Slurry Wt. Tail:

    Thickening Time: 5.0 hr Yield, ft/sx Lead: 1.14 Yield, ft/sx Tail:

    Placement Time: 3.0 hr Volume, ft Lead: 536 Volume, ft Tail:

    Spacer:

    Type Lead Cement:

    Type Tail Cement:

    Well head:

    Accessories:

    Liner Equipment:

    Page 7