Chemical Bonding Procedure 500-0615

Embed Size (px)

Citation preview

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    1/12

    HILTI RE 500 INJECTION ADHESIVE ANCHORINSTALLATION PROCEDURE

    NEW INSTALLATION ON PREEXISTING MATFOR

    VertexRSISATELLITE EARTH STATION ANTENNAS

    500-0615

    Revision AApril 23, 2003

    Prepared by:

    ANTENNA PRODUCTS DIVISION

    2600 N. Longview St. Kilgore, Texas USA 75662-6842Phone (903) 984-0555 FAX (903) 984-1826

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    2/12

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    3/12

    PROPRIETARY NOTICE

    All computer software, technical data, or other information pertaining to the equipment covered by thismanual is considered proprietary to VertexRSI Antenna Products Division. Such information istransmitted in this manual or related documents for the benefit of VertexRSI customers and is not tobe disclosed to other parties verbally or in writing without prior written approval of VertexRSI Antenna

    Products Division. Additionally, this manual may not be reproduced in whole or in part without writtenconsent from VertexRSI Antenna Products Division.

    A ORIGINAL RELEASE 9/10/02 VKV JRS HP

    REV. DESCRIPTION DATE WRITER CHECK APPR.

    500-0615A i

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    4/12

    SAFETY NOTICE

    The following safety procedures are listed to remind those performing any work on theantenna system that safety rules must be observed. Failure to do so may result inserious injury or death. Always work safely and in accordance with establishedprocedures.

    Care shall be taken in all operations to safeguard other people as well as property andto comply with all local safety procedures as established by the customers siterepresentative.

    All persons performing work on the antenna system shall also comply with theOccupational Safety and Health Act (OSHA) standards and all other federal state andlocal laws, ordinances, regulations and codes relating to designated work.

    Unless the customers representative on site specifically designates an individualresponsible for site safety, the VertexRSI Site Supervisor shall be responsible for andestablish a site safety program for the VertexRSI installation work. The site safety

    program shall incorporate all VertexRSI safety procedures and requirements, includingthe following:

    ! Always remove all power to the system prior to working on theantenna, the reflector assembly, the reflector backup assembly orthe feed assembly.

    ! Always tag all circuits noting that the power is OFF, the date andyour name prior to commencing any work on that system.

    ALWAYS WORK SAFE!

    500-0615A ii

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    5/12

    TABLE OF CONTENTS

    SECTION DESCRIPTION PAGE

    1.0 INTRODUCTION ................................................................................................. 1

    2.0 REFERENCES .................................................................................................... 1

    3.0 HARDWARE........................................................................................................ 1

    4.0 EQUIPMENT........................................................................................................ 1

    5.0 SITE REQUIREMENTS....................................................................................... 1

    6.0 PREPARATION PRIOR TO INSTALLATION..................................................... 2

    7.0 INSTALLATION................................................................................................... 2

    APPENDIX A ILLUSTRATION OF HILTI INSTALLATION PROCEDURE............................. A1

    TABLES

    TABLE DESCRIPTION PAGE

    1 Initial Cure Time, Hilti RE 500 Injection Adhesive.......................................... 3

    2 Final Cure Time, Hilti RE 500 Injection Adhesive........................................... 3

    500-0615A iii

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    6/12

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    7/12

    1.0 INTRODUCTION

    This specification provides installation instructions for the Hilti RE 500 injection adhesive anchorsystem that is used to install foundation anchor bolts mounted on an existing concrete mat. Inaddition to the installation procedure itself, the applicable references, required equipment, andsite requirements are included in this document.

    2.0 REFERENCES

    Hilti Adhesive Anchors Literature: Hilti 2002 Product Technical Guide, pp 109-124Hilti Material Safety Data Sheets

    3.0 HARDWARE

    Refer to Document 500-0616 for hardware requirements

    4.0 EQUIPMENT

    Coring machine with appropriate extensions and bits to core holes to appropriate depth.Recommended Hilti Equipment or equivalent as follows:

    1. DD160E Combination Vacuum/Anchor Deluxe Rig . . . . . . . . . . . . . . . . . (Hilti item00332510)

    2. DCM 1 Water Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(Hilti item00009829)

    3. Hilti HIT Blowout Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(Hilti item00060579)

    4. CORE BITS- See Field Services Department for Details

    Must be larger than bolt size

    5. Hilti MD 2000 Dispenser + 1 Refill Holder . . . . . . . . . . . . . . . . . . . . . . . .(Hilti item

    00229154)

    6. Hilti RE 500 Refill Packs See Document 500-0616 for quantities . . . . .(Hilti item00340225)

    7. Suitable Hammer Drill

    8. Drill Bit to Correspond with Core Bit Diameter (Same Size as # 4)

    One Hilti Flat Wire Brush 3/T69 (Item No. 00003206) for cleaning the holes.

    One open-end or adjustable wrench.

    5.0 SITE REQUIREMENTS

    500-0615A 1

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    8/12

    Access to electrical supply that conforms to voltage and amperage requirements of coringmachine.

    Access to clean water supply.

    Concrete mat, minimum cover of 3 inches (7.62 cm) with regards to foundation anchor bolts,3,000 psi minimum 28-day compressive strength and adequate resistance to overturning.

    Adequate soil bearing strength, as specified on the applicable foundation drawing. Consulta soils engineer for soil conditions

    500-0615A 2

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    9/12

  • 7/21/2019 Chemical Bonding Procedure 500-0615

    10/12

    Table 1. Initial Cure Time, Hilti RE 500 Injection Adhesive

    Table 2. Final Cure Time, Hilti RE 500 Injection Adhesive

    Table 3. Gel Time, Hilti RE 500 Injection Adhesive

    500-0615A 4