Christer Building Design Assignment

Embed Size (px)

Citation preview

  • 8/16/2019 Christer Building Design Assignment

    1/23

    FACULTY OF BUILT ENVIRONMENT (FBE)DEPARTMENT OF BUILDING SURVEYING

    BSEB1170 BUILDING DESIGN COMMUNICATION

    TOPIC: SITE ANALYSIS AND DESIGN DEVELOPMENT

    NAME : NG BEE XIN

    MATRIX NUMBER : BEB140012

    LECTURER’S NAME : DR. SR NORHAYATI BINTI MAHYUDDIN

      DR. SR NOR HANIZA BINTI ISHAK

      DR. SR FARID WAJDI BIN AKASHAH

  • 8/16/2019 Christer Building Design Assignment

    2/23

    SEMESTER : 02

    SESSION : 2014201!

    TITLE : FINAL TASK

    ACKNOWLEDGEMENT

    I would like to express my deepest appreciation here to all those who provided

    me with possibilities to complete this assignment report. First and the foremost, I

    would like to acknowledge with much appreciation to my Building Design

    Communication lecturers, Dr. r !or"ayati Binti #ahyuddin, Dr. r !or "ani$a

    Binti Ishak and Dr. r Farid %ad&i 'kashah for the valuable guidance and advices.

    (hey inspired me greatly and patiently to work in this report and willingness to

    motivate me. %ithout the knowledge and assistance, this case study would not have

     been successful. I also would like to thank to them for give me timely suggestions

    when I have lost idea with my sport club design. Furthermore, sincere thanks goes to

    my group members during do the %)( analysis. (hanks for everyone*s cooperation

    and hard effort which strengthened our consistency and made the complicated

     procedure much easier and en&oyable. +ast but not least, an honourable mention goes

    to my family for their understandings and supports on me in completing this case

    study.

  • 8/16/2019 Christer Building Design Assignment

    3/23

    ABSTRACT

      (his proposal reveals the suggestion to build a sport club for the students and

    also outsiders at niversity of #alaya. In this assignment, we are given a site which is

    located next to the -arsity +ake and also near to the main road. (here are some factors

    which need to be taken in account before start to design a new sport club.

    First at all, the purpose and function of the building need to be determined. %e

    need to concern on the ma&or functions of a sport club and also its advantages for 

    niversity of #alaya itself or the occupants including students and staffs. !ext,

    appearance of a building also important to be included since the site is located near to

    the main road and main entrance /+ gate0. )ther than that, we also need to consider 

    the amount of occupants can be accommodated and also types of activities that can be

    held in the sport club.

     Furthermore, the site location and site condition are the most significant

    criteria for designing a building. %e need to do the %)( analysis on the site, to get

    know well the site condition. For designing a building, we are need to include some

    factors that may affect the design and structure of the buildings, for example

    orientation of the building, climate change, topography, vegetation, landscape, natural

    ventilation and so on. "ence, site analysis is needed before design a building, to make

    sure that the design of the building is depend on the site conditions and safe for use.

    Before coming out with a floor plan of the sport club, bubble diagram or 

    spatial plan is needed to be decided. Bubble diagram is very useful for people to

    decide the location of different rooms and also relationships between spaces. +ist of 

    spaces also need to be considered in this very first stage which consist of four types of 

    spaces such as private, semi private, semi1public and public. Bubble diagram and list

    of spaces is the first stage for designing a building.

  • 8/16/2019 Christer Building Design Assignment

    4/23

    (he proposed sport club is also designed based on the legislations and

    regulations in #alaysia, especially niform Building By1+aws 2345, to ensure the

    safety of the occupants and fulfil the re6uirement of a building. In this proposal. (he

    design development for the sport club is shown and the final output is explained in

    form of details. Besides that, the submission drawing plans for the sport club are

    attached to give a clearer imagination on the proposed sport club.

    1.0 INTRODUCTION

    (he proposal aims to design and build a sport club with floor area 577 metres s6uare

    at the propose site, which named -arsity port Club. (he new design is done based on

    the re6uirements of legislations and regulations, knowledge of sub&ects that I learnt

     before, such as #aterial and Construction (echnology, 8nvironmental 9hysics,

    Building +aw and also #echanical and 8lectrical ervices. (he sketch plans are

     prepared and attached with the re6uired documents.

    1.1 OBJECTIVE

    2. (o perform site analysis to document site specific characteristics as part of essential

     process for a design.

    :.(o draw a submission plan to propose a new university sports and recreation club,

    making sure that the relevant building control legislation is met.

    ;.(o identify the type and purpose of the building which are going to build.

    5.(o apply the #alaysia 'cts in the stage of designing of a building.

    i. +ist of spaces re6uired>1

    • #ini gymnasium

    • #ultipurpose room for sport activities

    • +ounge space

    •  Changing rooms

    • Caf?

    • torage room• )ffice space

  • 8/16/2019 Christer Building Design Assignment

    5/23

    • #eeting room

    ii. %)( analysis on the proposed sport club, which included the strength and weakness

    of the site and the building, and their opportunities and threats

    1. LEGISLATIONS

    (he proposal of build a sport club in niversity of #alaya is always based on the following

    regulations and guidelines>

    I. niform Building By1+aws 2345

    II. +ocal @overnment 'ct 23A

    III. treet, Drainage and Building 'ct 23A5

    I-. (own and Country 9lanning 'ct 23A, etc.

    2.0 SITE LOCATION

    Figure 2.1 Site locationSource: Google map

  • 8/16/2019 Christer Building Design Assignment

    6/23

    Figure 2.2 Site plan drawingSource: Author. 2015

    From the figure :.2=:.:, we can clearly see the location of the site which we are assigned to

     build a sport club. (he site location is a very good strategy place since it is access to the main

    road alan +ingkung Budi0 which is connected with the /+ gate main entrance0 and also

    9etaling aya gate main entrance0. (here are also a lot of faculties and residential around the

    site, such as Faculty of +aw, first residential, second residential and so on. 

    Figure 2.3 Site location and dimensionSource: Author, 2015

    (he dimension and shape of the site is shown as above. (he dimension of the sites are

    measured by using the measuring tape.

    .0 SITE ANALYSIS

  • 8/16/2019 Christer Building Design Assignment

    7/23

    %e need to go through the site analysis in order to get more information about the site before

    the design process is started. For site analysis. %e need to consider the strategic location of 

    the site, site condition, current context, accessibility. (opography, vegetation, sun orientation

    and so on.

    ;.2 'CC8IBI+I(

    Figure 3.1 Road near to the siteSource: Google map

    2. 'ccess to main road

    In the #, alan +ingkung Budi and alan Ilmu is related to the site.

    't outside of #, alan niversity, alan Dato 'bu Bakar, 9EI!( highway and so on

    are near to the # main entrance.

    :. (ransportation

    1 9ublic transportation always pass through the road beside the site

    For example Eapid/+ Bus (;:0 and (axi waiting time 2

  • 8/16/2019 Christer Building Design Assignment

    8/23

    Figure 3.2 Route of landmarks near to the site.Source: Google map, Author,2015

    ;.; 8E-IC8 !8'E () ("8 I(8

    "8'+(" 8E-IC8 # #edical Centre 99#0

    'F8( 8E-IC8 @uard house /+ @ate0

    ecurity )ffice college 2:th0

    9olice station

    F))D C)E( Food unction

    /9 9erdanasiswa Complex0

    B ()9 First residential college

    # centre

    ;.5 -8@8('(I)!

    Figure 3.3 egetation on the site.Source: Author. 2015

  • 8/16/2019 Christer Building Design Assignment

    9/23

    (here is also a lot of existing vegetation at the site. %e will consider this as our building

    design factor, so that we will minimi$e use of the green space in order to maintain the green

    environment and achieve the environment sustainability. -egetation on the site can supply

    fresh air to the people around there as well as for the occupants of a new sport club in future.

    ;.< 9)E( F'CI+I(I8

    Figure 3.4 !acilities near to the site.Source: Google map, Author, 2015

    ;. ! )EI8!('(I)! '!D %I!D DIE8C(I)!

    Figure 3.5 Sun orientation on the site.Source: Author, 2015

  • 8/16/2019 Christer Building Design Assignment

    10/23

    Figure 3.6 "ind direction on the site.Source: Author, 2015

    un orientation on the site is very important to decide the building location and

    orientation. %e need to avoid the building from direct sunlight, so that the

    temperature of the sport club will not be affected. For wind direction, it is not

    necessary to take in account because they are always different in the time and days, so

    actually can be said that the wind direction may come to any angle of ;7 degree of 

    the site. But, it is possible to consider the wind direction as the building design criteria

    with determine the most wind direction along the site in a year.

    (he landscape of the site is considered flat althought there is some holes at the

    middle of the site. "ence, there &ust need a minor site clearance need to be done and

    same as the excavation works in the construction stage. !onetheless, the soil at the

    site is considered low bearing capacity soft0 may be due to the -arsity +ake is beside

    the site. "ence, during the construction process, the soil compaction process is needed

    to make sure the soil can withstand high load bearing, so that the sport club will not

    sink in the future. Besides that, there is also a potential problem which the sport club

    may face is the risk of flooding although there is a river along the site, ungai 9antai

    can somehow function as drainage but the drainage system at the site is not proper 

    installed yet. In history of #, niversity of #alaya has faced a serious flooding

    which is included the proposed site.

    !.0 SWOT ANALYSIS

    %)( analysis is a study of determining the possible strength, weakness, potential

    opportunities and threats of the site. trength and weakness are considered to be the

    internal positive and internal negative impacts whereas the opportunities and threats

  • 8/16/2019 Christer Building Design Assignment

    11/23

    are categoti$ed as the extenal latent affects on this site. (he %)( analysis for this

     building is showed as the table below. By doing this assessment, useful outcomes

    such as the strengths and opportunities could be reinforced while the weaknesses and

    threars would be improved through appropriate solutions.

    T"#$% !.1 %)( analysis on the site.

    STRENGT&S

    2. (E'(8@IC +)C'(I)!

    1 !ear to -arsity +ake

    1 !ear to main road

    +ingkungan Budi, alan 9antai Baru,/erinchi G niversity +E( station, alan

    niversiti, eksyen 20

    1 !ear to the faculties and residential

    colleges

     !ear to # Centre and 9erdanasiswa

    Complex

    :. 'CC8IBI+I(

    1 Bus stop available for >1

    H # bus

    H Eapid /+ Bus (;:0H (axi

    H #otorcyclist pathway

    ;. 8I(I!@ F'CI+I(I8

    1 Food courts G canteen

    1 Eesidential colleges

    1 #ini gymnasium

    1 # #edical Centre

    1 -arious types of courts

    5. %ID8 '!D C+8'E 'E8'

    1 !o blockage from high building1 Flat topography land.

    WEAKNESSES

    2. (E'FFIC '#

    1 8specially during the peak hours in

    the morning and evening.

    1 Due to beside the main roadm students and staff and also

    outsiders use the main road.

    1 )utsiders like to use alan

    +ingkungan Budi to travel from /+

    gate to 9etaling aya gate.

    :. C'E 9'E/ 

    1 !o parking lots available at that

    site.

    1 8xisting parking spaces have adistance from the site.

    ;. )I+ C)!DI(I)!

    1 +ow bearing capacity

    1 #ay lead to risk od soil sink 

    5. !'(E'+ DI'(8E 

    1"igh possibility of flood occurrence

    during heavy rainfall

    OPPORTUNITIES

    2. (E'(8@IC +)C'(I)!

    1 (here are a lot of students and outsiders

    may pass through the site since there can

     be considered as intersection point from

    the faculties, m centre and so on.

    1 "ence, when the sport club is

    T&REATS

    2. EI/ )F 'CCIC8!( I!CE8'8

    1 !ear to entrances /+ gate =

    9etaling aya gate0

    1 Due to traffic &am

    1 +ots of students cross the road1 Driving cars at high speed

  • 8/16/2019 Christer Building Design Assignment

    12/23

    constructed, there may many people will

    know about it and try to spread the news.

    1 !ice scenery view due to -arsity +ake.

    :. 'CC8IBI+I(

    1 8asy to spot by public transportation.

    1 )utsiders also easy to access to the site

    easily.

    1 #otorcyclist can drive through the site.

    tudents and publics may easy to come

    for recreation activities.

    ;. 8I(I!@ F'CI+I(I8

    1 -arieties of food court

    1 8ase to go for medication if get in&ured

    1 -arious type of sport e6uipment for

    exercising.

    5. %ID8 '!D C+8'E 'E8'

    1 !atural ventilation is available.

    1 upply sufficient fresh air 

    :. C'E 9'E/ 

    1 (he students or outsiders may park

    their cars besides the road due to lack 

    of car park lots.

    1 (hen it will cause a serious traffic &am happen.

    ;. )I+ C)!DI(I)!

    1 need to undergo the process of soil

    compaction before the construction of 

    sport club.

    5. 8I(I!@ 9)E( F'CI+I(I8

    1 9eople have more choices to choose

    where to go

    1 #ay lead less people choose thenew sport club in future

  • 8/16/2019 Christer Building Design Assignment

    13/23

    (** 5 **) (D"6) *2 (A4"8) *2

    9lant room ;777 2:77 ;. ;.7

    tore room ;777 :777 .7

  • 8/16/2019 Christer Building Design Assignment

    14/23

    Closet

    Caf? 2

  • 8/16/2019 Christer Building Design Assignment

    15/23

    9.0 BUBBLE DIAGRAM

    @E)!D F+))E 

    STORE

    ROOM

    CAFE

    WC

    STAFF

    WC

    PLANT

    ROOM

    PANTRY

    MEETING

    ROOM

    OFFICE

    SPACE

    CHANGING

    ROOM

    RECEPTION

    AREA

    LOUNGE SPACE

  • 8/16/2019 Christer Building Design Assignment

    16/23

    F4% 9.1 @round floor bubble diagram

    FIE( F+))E 

    KITCHEN

    Public Space

    Semi-public Space

    Semi-pria!e Space

    Pria!e Space

    GYMNASIUM WC MULTI

    PURPOSE

    ROOM I

    MUTL

    PURPOSEROOM II

  • 8/16/2019 Christer Building Design Assignment

    17/23

    F4% 9.2 First floor bubble diagram

    Semi-pria!e Space

    7.0 DESIGN CONCEPT

    (he figure above shows the location of the sport club on the site which is facing the

    -arsity +ake. (he total floor area for the sport club is 577 s6uare metres only because we

    need to maintain the vacant green environment. 't the ground floor, there are plant room,

    store room, pantry for officers0, office space, meeting room, foyer, lounge space, reception

    area, staff water closet, changing room and caf?, meanwhile, at the first floor, there are

    gymnasium, two multipurpose rooms and water closet. For the sport club that I have

    designed, all the sport activities will be conducted at the first floor and the ground floor is for 

    reception, light refreshment and also area for people to change clothes.

    (here are four different types of spaces at the ground floor which are private

    spaces, semi1private spaces, semi1public spaces and also public spaces. From the

    ground floor plan, we can see that the flow of the different spaces and there is no

    mixing of public and private spaces due to the privacy.

  • 8/16/2019 Christer Building Design Assignment

    18/23

    (here is a caf? with total floor areas ;< s6uare metres which consists of a A.<

    s6uare metres of kitchen and two of 2.< s6uare metres of water closets. 8stimated

    floor area for seating and counter space is 2

  • 8/16/2019 Christer Building Design Assignment

    19/23

    space because office space is a private space, so it is not allowed for other people

    simply to get in. (here is also a back exit for the building to let people exit or enter 

    the building and also fulfil the re6uirement of fire safety according the BB+ 2345.

    For the first floor, there is only one type of space which is semi1private space.

    @ymnasium and multipurpose room are considered as semi1private spaces because the

    first floor only for the sport club members and the members share to use.

    For gymnasium, there are divided into three different areas which are stretch

    area, cardiovascular area and also resistance or free weight area. (he stretch area is

    the first and last area to be used, for warming up and warming down, hence it should

    located near to the fitness gym entrance to promote its use. (his area will be supplied

    with vinyl covered padded floor matting. (he cardiovascular area is supplied and

    located next to the gla$ing external wall which is facing the -arsity +ake. "ence, for 

    those who work out at cardiovascular area such as using treadmills, upper body

    ergometers, exercise bicycle and so on, will face the -arsity +ake when they are doing

    their exercises. 9eople can en&oy the beauty of the lake and at the same time, they also

    can en&oy their exercises. For the resistance and free weight area, such as dumbbell

    weights, arm machine, smith machines and so on are located at the behind of the

    gymnasium. (he minimum re6uired space is :< s6uare metres. (he gymnasium can

    accommodate about ;7 to 57 people and full with exercise e6uipment. For the

    multipurpose room, it can be used as aerobic room, dancing room, martial arts room.

    #ultipurpose room can accommodate about

  • 8/16/2019 Christer Building Design Assignment

    20/23

  • 8/16/2019 Christer Building Design Assignment

    21/23

    O

  • 8/16/2019 Christer Building Design Assignment

    22/23

    F4% 7.1 8nvironment re6uirement for gym and studio

    ource> Design port 8ngland @uidance !ote Book

    ;.0 CONCLUSION

    (he proposal of designing the sport club is need to be considered in many

    considerations and re6uirements which is related to legislations and regulations,

    mechanical and electrical services, materials and construction technology, building

    services etc.

    (o start the design of the sport club, we need to do research about the

     background and history of the site. %e need to do the site analysis to observe and

    determine the site conditions. Besides that, %)( analysis is need for every design of 

     building, to identify the Mtrengths, %eaknesses, )pportunities and (hreatsN of the

    site. 'fter that, re6uirement and purpose of the building is need to be considered

    during design the sport club, such as amount of occupants, functions of the building,

    thermal comfort and so on.

    During building designing process, we need to consider the re6uirement andregulations of #alaysia. For instance, we need to fulfil the minimum re6uirement for 

    natural ventilation and also natural lighting of a building which is stated in the

    niform Building By1laws 2345. Besides that, minimum re6uirement for area of a

    room also need to be taken in account in the designing of the sport club.

    'lthough there are some weaknesses and threats for the site, but we can

    overcome them by change them into strengths and opportunities of the site. (hus, the

    sport club can attract more people to come for recreation purpose and en&oy the nice

    scenery view from the building.

    REFERENCES

    2. Frederick . #erritt, onathan (.Eicketts. :7770. Building Design andConstruction "andbook. ixth 8dition0. nited tates> #c@raw"ill.

  • 8/16/2019 Christer Building Design Assignment

    23/23

    :. /olpeterson. :7220. Building design and construction process P step by step.

    Eetrieved from> http>GGaccessorydwellings.orgG:722G22G73Gbuilding1design1and1

    construction1process1step1by1stepG 

    ;. port 8ngland. :774. Design @uidance !ote "andbook.