1 City of Kansas City Human Relations Department Date: March 19, 2015 To: Construction Workforce Board From: Phillip Yelder, Director Subject: January 2015 Narrative for the Construction Workforce Reports Construction Workforce Action Update: The Construction Workforce ordinance applies to all construction contracts the City entered into after January 1, 2007 that will require more than 800 construction labor hours and with an estimated cost that exceeds $300,000. In addition, on December 15, 2009 the Statutory Agencies adopted the City’s construction workforce reporting as embodied in Ordinance No. 070504. The Workforce Ordinance under Chapter 38 was repealed in its entirety May 1, 2013 and replaced with Ordinance No. 130275 Sections 3-501 thru 3-527. All projects (including public, private and statutory agency projects) that started after May 1, 2013 are subject to the monitoring and penalties set forth therein. The established Company-wide workforce participation goals for minority and female workers are ten (10) percent and two (2) percent respectively. The hours for the month of January 2015 are depicted in the titled January 2015 Detail Report. This report consists of the KCMO City projects followed by the Statutory Agencies’ reports. Workforce hour totals for the month of January 2015 are as follows: *Percentages are rounded to the nearest whole percent Total Minority *% Female % KCMO *% Companywide prime 273,818 32,438 12 9,597 3.5 33,440 12 Project Specific prime 43,133 6,268 15 1,223 3 5,835 14 Project Specific subcontractor 78,903 20,356 26 1,996 3 9,492 12

City of Kansas City Human Relations Department Subs not reporting include trucking/hauling contractors and suppliers: - HRD is still in the process of removing trucking/hauling contractors

Embed Size (px)

Citation preview

1

City of Kansas City Human Relations Department

Date: March 19, 2015 To: Construction Workforce Board From: Phillip Yelder, Director Subject: January 2015 Narrative for the Construction Workforce Reports

Construction Workforce Action Update: The Construction Workforce ordinance applies to all construction contracts the City entered into after January 1, 2007 that will require more than 800 construction labor hours and with an estimated cost that exceeds $300,000. In addition, on December 15, 2009 the Statutory Agencies adopted the City’s construction workforce reporting as embodied in Ordinance No. 070504. The Workforce Ordinance under Chapter 38 was repealed in its entirety May 1, 2013 and replaced with Ordinance No. 130275 Sections 3-501 thru 3-527. All projects (including public, private and statutory agency projects) that started after May 1, 2013 are subject to the monitoring and penalties set forth therein. The established Company-wide workforce participation goals for minority and female workers are ten (10) percent and two (2) percent respectively. The hours for the month of January 2015 are depicted in the titled January 2015 Detail Report. This report consists of the KCMO City projects followed by the Statutory Agencies’ reports. Workforce hour totals for the month of January 2015 are as follows:

*Percentages are rounded to the nearest whole percent

Total Minority *% Female % KCMO *%

Companywide

prime 273,818 32,438 12 9,597 3.5 33,440 12

Project

Specific prime 43,133 6,268 15 1,223 3 5,835 14

Project Specific

subcontractor 78,903 20,356 26 1,996 3 9,492 12

2

Total Number

%

Total number of City projects for the month of January 2015 67

Total Number of Prime Contractors 38

Total Number of Prime Contracts reporting in the month of January 2015

35 92%

Total number of subcontractor audits to be completed in January 2015

711 -

Total Number of subcontractor audits accepted in January 2015 534 75%

Total Number of rejected reports still pending:

• WSD8920 (Blue Nile)

• WSD8930 (Beemer)

2 -

The Prime Contracts reporting and the number of subcontractors in the month is progressing in the positive with a 15% increase in accepted reports. The following factors are still contributing to the low percentages:

• Subs not reporting include trucking/hauling contractors and suppliers:

- HRD is still in the process of removing trucking/hauling contractors from the workforce reporting

Those Primes with multiple contracts were notified of non-compliant reporting and given until the end of January to complete incomplete audits. Staff has increased enforcement activity for non-compliance with reporting requirements and will send non-compliant notices to those Primes that are still in non-compliance with the reporting requirements no later than March 31, 2015. Statutory Agency Projects

The Mayor’s Advance KC Initiative program has designated the Economic Development Corporation’s Office as the central point of entry for those entities seeking tax abatement or re-imbursement in the KCMO area. There are a total fifty-six (56) projects that meet the workforce reporting requirement. Staff is working with the Agency’s to upload the projects into the online diversity management system known as B2GNow. Staff is actively training Developers and their General Contractors regarding reporting requirements for both contract and workforce audits.

The following is a listing of the projects that have begun construction or have initiated communication with HRD for compliance purposes (e.g. Contractor Utilization Plan, budgets, advertisements, Letters of Intent, etc.).

3

Agency Project Developer

LCRA 911 Main/Commerce Bank Tower Ryan Companies

LCRA 1914 Main/Crossroads Urban Apts Centric Projects

LCRA Brewery Emperial Harbinger, LLC

LCRA Butler Brothers Lofts-804 Broadway Butler Brothers Lofts, LLC

LCRA Columbus Park ?

LCRA Cosby Hotel Sunflower Development Group, LLC

LCRA Faxon School Apartments Sunflower Development Group, LLC

LCRA Gillham Park Row Apartments Gillham Park Row, LLC

LCRA Gumbel Building/801 Walnut Hampton Inn?

LCRA Interstate Building ?

LCRA LAMP Linwood Area Ministry Partners, LLC

LCRA Morning Star Life & Family Ctr

LCRA Oak Point Oak Point Redevelopment, LLC

LCRA Pickwick Hotel HarenLaughlin

LCRA Switzer Elementary Rehabilitation Foutch Brothers

LCRA Truman Medical Center Ambulatory Care Center Landmark Healthcare & TMC Joint Venture

Agency

Project Developer General Contractor

TIF 22nd & Main Candle Building - Project 28 Vince Bryant Centric Projects

TIF Antioch Crossing Antioch Redev Partners Antioch Redev Partners LLC

TIF Briarcliff West: Ph. 1 Riverfront Infrastructure Briarcliff Development HarenLaughlin

TIF Briarcliff West: Ph. 2 Riverfront Infrastructure Briarcliff Development HarenLaughlin

TIF Crossroads Academy Crossroads Academy McCownGordon

TIF Riverfront Plaza Apartments Briarcliff Development HarenLaughlin

TIF KCI Corridor: S5 Interceptor Sewer Hunt Midwest Hunt Midwest

TIF KCI Corridor: S1-S5 Interceptor Sewer Hunt Midwest Hunt Midwest

TIF KCI Corridor: NW 88th St MD Management Mega Industries

TIF KCI Corridor: 2nd Creek Interceptor-Central Br

MD Management Kissick Construction

TIF KCI Corridor: 2nd Creek Interceptor-East MD Management Kissick Construction

TIF KCI Corridor: SE Branch Sewer MD Management Redford Construction

TIF KCI Corridor: Genesis Branch MD Management Redford Construction

4

Agency

Project Developer General Contractor

TIF NE Parvin Rd/N Arlington & N Birming. Hunt Midwest Hunt Midwest

TIF North Oak TIF Plan/Infrastructure Hunt Midwest Hunt Midwest

TIF KCP&L Garage Northpointe Development Neighbors Construction

TIF Riverfront Plaza Apts Briarcliff Development HarenLaughlin TIF Rivermarket Infrastructure Improvements Community Impv Dist (CID) RiverMarket CID

TIF Santa Fe, Ph.2,3, 4 Purcell Mid-City

Redevelopment, LLC Damon Purcell Construction

TIF Shoal Creek: 104th Street, Proj K Hunt Midwest Hunt Midwest

TIF Shoal Creek: Soccer Dr (Ph. 2) Hunt Midwest Hunt Midwest

TIF Bannister & I-435 Bid Pkg 1-7* Cerner JE Dunn

PIEA Power & Light Bldg and Garage Northpoint Neighbors Const.

PIEA 1515 Walnut 1515 WalnutJ Tomlinson Homoly Construction

PIEA 1102 Grand Amerimar MTS Contracting

PIEA One Light Tower Cordish JE Dunn

PIEA River Market Apartments River Market LLC Neighbors

PIEA Rockhill Senior Townhomes

(fka Brookside Senior Living ) Landmark LLC Rau Construction

PIEA Newbern Apartments Silliman Group HarenLaughlin

PIEA The Argyle Building Sunflower Development TBD

PIEA The Centropolis KC Realty Group INK construction

PIEA Rose Hill Town Homes Deramus TBD

PIEA Seven301 Seven 301 LLC TBD

PIEA 1515 Genesee-Stockyards Bill Haw Centrics

PIEA 1706 Baltimore Pete Lacy Centrics

PIEA Cityscapes-Quality Hill John Thomas TBD

PIEA Cityscapes-Apex John Thomas TBD

PIEA Cityscapes-Summit on the Hill John Thomas TBD

PIEA Folger’s Building Loft O'Reilly Development Build LLC

CHAP.100 A.B. May Co. Relocation A.B. May 3 Square

5

Site Visits Conducted

Project Prime Minority Female Other Total Sewer Line Repairs Genesis Plumbing 1 0 0 3 KCSC KCSC 23 10 97 130 KCSC VMF KCSC 3 0 15 18 KC Animal Hospital Rand 0 0 5 5 WMR Eastern to Lees Summit Rd Haines & Assoc 0 0 7 7 WMR St. Andrews to Holmes Blue Nile 3 0 0 3 Meetings Staff Attended in January

• TIF Commission Meeting • TIF Sub-Committee Meeting • LCRA Board Meeting • PIEA Board Meeting • Port Authority Board Meeting • KCSC/FTA Bus Tour

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

HoursACE Pipe Cleaning, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%ACE Pipe Cleaning, Inc. C-W R&R of Fire Hydants IV WSD8960 $800,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Rodriguez Mechanical Contractors, Inc. C-W R&R of Fire Hydants IV WSD8960 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Trekk Design Group, LLC C-W R&R of Fire Hydants IV WSD8960 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Alexander Mechanical Contractors, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 3632.50 332.00 9.14% 0.00 0.00% 0.00 0.00% 3300.5 0 332 0 0 0 0 0 0 0 0

Total 3632.50 332.00 9.14% 0.00 0.00% 0.00 0.00%Beemer Construction Co., Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 4433.00 551.50 12.44% 0.00 0.00% 0.00 0.00% 3881.5 0 0 0 296 0 0 255.5 0 0 0

Total 4433.00 551.50 12.44% 0.00 0.00% 0.00 0.00%Beemer Construction Co., Inc. City-Wide Valve Repair & Replacement - Renewal 1 WSD9036 $2,000,000.00 Prime 818.00 98.00 11.98% 8.00 0.98% 22.00 2.69% 712 8 0 0 60 0 0 38 0 0 0

Beemer Construction Co., Inc. PipelineSuppWFDistribSysRpr WSD9038 $842,275.00 Prime 664.50 54.50 8.20% 19.00 2.86% 16.00 2.41% 591 19 0 0 38.5 0 0 16 0 0 0Beemer Construction Co., Inc. PipelineSupWrkforce TransSysRpr WSD8993 $1,500,000.00 Prime 768.00 74.00 9.64% 0.00 0.00% 22.00 2.86% 694 0 0 0 52 0 0 22 0 0 0Beemer Construction Co., Inc. WMR; Oak to Mersington Ave, 39th Terr to Englewood

RoadWSD8930 $12,383,830.00 Prime 799.50 197.00 24.64% 0.00 0.00% 0.00 0.00% 602.5 0 0 0 6 0 0 191 0 0 0

Total 3050.00 423.50 13.89% 27.00 0.89% 60.00 1.97%All American Redi-Mix, LLC City-Wide Valve Repair & Replacement - Renewal 1 WSD9036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

All American Redi-Mix, LLC PipelineSuppWFDistribSysRpr WSD9038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All American Redi-Mix, LLC PipelineSupWrkforce TransSysRpr WSD8993 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All American Redi-Mix, LLC WMR; Oak to Mersington Ave, 39th Terr to Englewood

RoadWSD8930 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

G & G Mechanical Contractors, Inc. City-Wide Valve Repair & Replacement - Renewal 1 WSD9036 Subcontractor 207.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 207 0 0 0 0 0 0 0 0 0 0

G & G Mechanical Contractors, Inc. PipelineSuppWFDistribSysRpr WSD9038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0G & G Mechanical Contractors, Inc. PipelineSupWrkforce TransSysRpr WSD8993 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. City-Wide Valve Repair & Replacement - Renewal 1 WSD9036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Little Joe's Asphalt, Inc. PipelineSuppWFDistribSysRpr WSD9038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. PipelineSupWrkforce TransSysRpr WSD8993 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. WMR; Oak to Mersington Ave, 39th Terr to Englewood

RoadWSD8930 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

South 71 Trucking Co., LLC City-Wide Valve Repair & Replacement - Renewal 1 WSD9036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

South 71 Trucking Co., LLC PipelineSuppWFDistribSysRpr WSD9038 Subcontractor 2.00 2.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 2 0 0 0 0 0 0 0 0South 71 Trucking Co., LLC PipelineSupWrkforce TransSysRpr WSD8993 Subcontractor 2.00 2.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 2 0 0 0 0 0 0 0 0South 71 Trucking Co., LLC WMR; Oak to Mersington Ave, 39th Terr to Englewood

RoadWSD8930 Subcontractor 4.00 4.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 4 0 0 0 0 0 0 0 0

Total 215.00 8.00 3.72% 0.00 0.00% 0.00 0.00%BLUE MOON HAULING LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 144.50 100.50 69.55% 0.00 0.00% 100.50 69.55% 44 0 100.5 0 0 0 0 0 0 0 0

Total 144.50 100.50 69.55% 0.00 0.00% 100.50 69.55%Blue Nile Contractors, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 7040.00 1140.35 16.20% 367.50 5.22% 1044.20 14.83% 5532.15 200 931.85 167.5 208.5 0 0 0 0 0 0

Total 7040.00 1140.35 16.20% 367.50 5.22% 1044.20 14.83%Blue Nile Contractors, Inc. 24 inch WME N Eastern Ave WSD8977 $1,419,487.00 Prime 96.50 22.00 22.80% 10.00 10.36% 0.00 0.00% 64.5 10 0 0 22 0 0 0 0 0 0Blue Nile Contractors, Inc. Brookside Watershed Phase 3B WSD998 $3,896,498.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Blue Nile Contractors, Inc. Citywide Water Service Line Kill Program WSD8900 $1,000,000.00 Prime 568.00 27.00 4.75% 20.00 3.52% 166.00 29.23% 521 20 10 0 17 0 0 0 0 0 0Blue Nile Contractors, Inc. CS140002-135th Street Improvem CS140002 $2,243,536.41 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Blue Nile Contractors, Inc. WMR Hickman Mills-Bristol WSD8934 $2,049,116.81 Prime 1557.90 136.40 8.76% 70.00 4.49% 0.00 0.00% 1351.5 30 135.9 40 0.5 0 0 0 0 0 0Blue Nile Contractors, Inc. WMR N Oakley to N Meadowbrook, 50th St to 56th St WSD8912 $2,166,830.00 Prime 458.50 51.00 11.12% 20.00 4.36% 39.50 8.62% 387.5 20 30 0 21 0 0 0 0 0 0

Blue Nile Contractors, Inc. WMR; Cmabridge-Elm, E51-E74th St WSD8920 $2,423,300.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Blue Nile Contractors, Inc. WMR; EasternSycamore, 43rd to 51st St. WSD8924 $758,383.17 Prime 70.00 0.00 0.00% 10.00 14.29% 0.00 0.00% 60 0 0 10 0 0 0 0 0 0 0Blue Nile Contractors, Inc. WMR; Manchester to Ashland Ridge, 29th to 40 Hwy WSD8936 $910,656.05 Prime 641.50 106.50 16.60% 20.00 3.12% 130.50 20.34% 515 20 20 0 86.5 0 0 0 0 0 0

Blue Nile Contractors, Inc. WMR; St. Andrews-Holmes,124thSt-135thSt WSD8938 $1,112,031.96 Prime 441.50 70.00 15.86% 10.00 2.27% 29.00 6.57% 361.5 10 40 0 30 0 0 0 0 0 0Total 3833.90 412.90 10.77% 160.00 4.17% 365.00 9.52%

All American Redi-Mix, LLC Brookside Watershed Phase 3B WSD998 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Aman Construction, Inc. 24 inch WME N Eastern Ave WSD8977 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Aman Construction, Inc. CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Aman Construction, Inc. WMR Hickman Mills-Bristol WSD8934 Subcontractor 562.25 182.25 32.41% 60.00 10.67% 132.75 23.61% 320 0 162.75 60 19.5 0 0 0 0 0 0Aman Construction, Inc. WMR N Oakley to N Meadowbrook, 50th St to 56th St WSD8912 Subcontractor 167.00 86.00 51.50% 40.00 23.95% 0.00 0.00% 41 0 86 40 0 0 0 0 0 0 0

Aman Construction, Inc. WMR; Cmabridge-Elm, E51-E74th St WSD8920 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Aman Construction, Inc. WMR; EasternSycamore, 43rd to 51st St. WSD8924 Subcontractor 29.50 17.00 57.63% 5.00 16.95% 0.00 0.00% 7.5 5 0 0 17 0 0 0 0 0 0Aman Construction, Inc. WMR; Manchester to Ashland Ridge, 29th to 40 Hwy WSD8936 Subcontractor 42.00 12.00 28.57% 10.00 23.81% 0.00 0.00% 20 0 12 10 0 0 0 0 0 0 0

Aman Construction, Inc. WMR; St. Andrews-Holmes,124thSt-135thSt WSD8938 Subcontractor 49.50 10.00 20.20% 10.00 20.20% 0.00 0.00% 29.5 0 10 10 0 0 0 0 0 0 0

000

0

0000

00

0

00000

0

0

0

00

0

0

000

0

0

0

0

000

0

0

00

0

0

00

Asian Female Hours

0

0

0

00

Human Relations Department January 2015 Construction Workforce Detailed Report

6

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Boles Trucking, Inc. CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0G & G Mechanical Contractors, Inc. WMR; Cmabridge-Elm, E51-E74th St WSD8920 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Gil's Sales Company, Inc. CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Goode Developing & Associates, LLC CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0International Builders & Consultants, Inc. WMR; Cmabridge-Elm, E51-E74th St WSD8920 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0J.A. Lillig Grading, LLC 24 inch WME N Eastern Ave WSD8977 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midwest Contracting Services, LLC Brookside Watershed Phase 3B WSD998 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. Citywide Water Service Line Kill Program WSD8900 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. WMR Hickman Mills-Bristol WSD8934 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. WMR N Oakley to N Meadowbrook, 50th St to 56th St WSD8912 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Tenoch Construction, Inc. WMR; St. Andrews-Holmes,124thSt-135thSt WSD8938 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. Brookside Watershed Phase 3B WSD998 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. WMR; Cmabridge-Elm, E51-E74th St WSD8920 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. Brookside Watershed Phase 3B WSD998 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR Hickman Mills-Bristol WSD8934 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR N Oakley to N Meadowbrook, 50th St to 56th St WSD8912 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total Sodding & Seeding, Inc. WMR; Cmabridge-Elm, E51-E74th St WSD8920 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR; EasternSycamore, 43rd to 51st St. WSD8924 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR; Manchester to Ashland Ridge, 29th to 40 Hwy WSD8936 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total Sodding & Seeding, Inc. WMR; St. Andrews-Holmes,124thSt-135thSt WSD8938 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tycon Company, LLC Brookside Watershed Phase 3B WSD998 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tycon Company, LLC CS140002-135th Street Improvem CS140002 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tycon Company, LLC WMR N Oakley to N Meadowbrook, 50th St to 56th St WSD8912 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Tycon Company, LLC WMR; EasternSycamore, 43rd to 51st St. WSD8924 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tycon Company, LLC WMR; Manchester to Ashland Ridge, 29th to 40 Hwy WSD8936 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Tycon Company, LLC WMR; St. Andrews-Holmes,124thSt-135thSt WSD8938 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 850.25 307.25 36.14% 125.00 14.70% 132.75 15.61%

BR Carpet Company COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

BR Carpet Company City-Wide IDIQ Flooring Installation & Repair EV1837-1 $450,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

Complete Systems, Inc. City-Wide IDIQ Flooring Installation & Repair EV1837-1 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GFI Renovations, LLC City-Wide IDIQ Flooring Installation & Repair EV1837-1 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Burns & McDonnell COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Burns & McDonnell Burns & McDonnell Headquarter Expansion 1A-CUP-CS $66,236,808.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Capital Electric Construction Co., Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 28586.30 2936.50 10.27% 306.00 1.07% 7549.50 26.41% 25343.8 306 1466.5 0 950 0 147 0 0 0 373

Total 28586.30 2936.50 10.27% 306.00 1.07% 7549.50 26.41%Capital Electric Construction Co., Inc. 2013 Citywide Lighting Improve POC2014012 $370,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Kansas City Electrical Supply Co. 2013 Citywide Lighting Improve POC2014012 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Reynolds Electric, Inc. 2013 Citywide Lighting Improve POC2014012 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Centric Projects, LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 4103.50 423.50 10.32% 0.00 0.00% 671.50 16.36% 3680 0 127.5 0 168 0 0 128 0 0 0

Total 4103.50 423.50 10.32% 0.00 0.00% 671.50 16.36%Centric Projects, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS $2,340,136.00 Prime 128.00 128.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 128 0 0 0Centric Projects, LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee $6,039,756.00 Prime 291.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 291 0 0 0 0 0 0 0 0 0 0Centric Projects, LLC PIEA-Globe Building CSPIEA-Globe Building $3,408,303.00 Prime 260.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 260 0 0 0 0 0 0 0 0 0 0

Total 679.00 128.00 18.85% 0.00 0.00% 0.00 0.00%3 FEATHERS CONSTRUCTION & SALES, LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0AAS Restoration, Inc. Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 60.00 60.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 60 0 0 0 0 0 0Accurate Mechanical, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Accurate Mechanical, LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 772.50 301.00 38.96% 0.00 0.00% 0.00 0.00% 471.5 0 0 0 301 0 0 0 0 0 0Accurate Mechanical, LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 30.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 30 0 0 0 0 0 0 0 0 0 0Advantage Fire Protection Systems, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9 0 0 0 0 0 0 0 0 0 0AGP, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 67.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 67.5 0 0 0 0 0 0 0 0 0 0Alliance Fire Protection Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

00000

0

000

0

00

0

00

0

0

0

0

0

0

0

00

0

0

0000

000

00

00000

00000

00000

Human Relations Department January 2015 Construction Workforce Detailed Report

7

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Alliance Fire Protection PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0AmeriFence Corporation PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Anytime Labor-KC Metro LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Asphalt Wizards, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Ballard Excavating, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Bedrock Concrete Services, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 310.00 285.00 91.94% 0.00 0.00% 0.00 0.00% 25 0 0 0 285 0 0 0 0 0 0Builders Steel Company Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 34.00 4.00 11.76% 0.00 0.00% 0.00 0.00% 30 0 0 0 0 0 0 4 0 0 0Builders Stone Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 24.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 24 0 0 0 0 0 0 0 0 0 0Building Keepers, Inc. Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 112.25 88.25 78.62% 0.00 0.00% 6.50 5.79% 24 0 19.5 0 40.5 0 0 0 0 0 28.25Building Keepers, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Building Keepers, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 222.75 180.75 81.14% 0.00 0.00% 42.00 18.86% 42 0 74 0 78.25 0 0 0 0 0 28.5Byers Glass & Mirror Inc PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 413.50 2.50 0.60% 0.00 0.00% 0.00 0.00% 411 0 0 0 2.5 0 0 0 0 0 0CBS Piling Solutions PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Chris Shipley Excavating Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Contract Services Corporation of America PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Coreslab Structures (Missouri) Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 94.00 27.00 28.72% 24.00 25.53% 0.00 0.00% 43 24 27 0 0 0 0 0 0 0 0Crookham Construction, LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Dayco Painting, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Dello Eco Industrial PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DEMOLITION INTERIOR SPECIALISTS, INC. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Design Supply, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DH Pace dba Overhead Door KC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 25.58 0.00 0.00% 0.00 0.00% 0.00 0.00% 25.58 0 0 0 0 0 0 0 0 0 0DH Pace dba Overhead Door KC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Donald E Bishop PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Drywall Systems Inc PIEA-Globe Building CSPIEA-Globe Building Subcontractor 37.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 37 0 0 0 0 0 0 0 0 0 0Dyllan Construction, Inc. Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0ENCOMPAS CORPORATION PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Engineering Solutions Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Engineering Solutions PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Excel Lighting LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Global Construction Strategies Inc PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Great American Building Materials, Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Green Field Energy Group Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0HERMES LANDSCAPING INC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Higman Equipment Company, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Industrial Roofing, Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 518.50 44.50 8.58% 8.00 1.54% 0.00 0.00% 466 8 44.5 0 0 0 0 0 0 0 0Install Solutions LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 48.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 48 0 0 0 0 0 0 0 0 0 0Jabral Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 67.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 67 0 0 0 0 0 0 0 0 0 0John Norris Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Joseph T. Wright PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0K & G Plumbing Contractors Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 30.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 30 0 0 0 0 0 0 0 0 0 0K & G STRIPING PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5 0 0 0 0 0 0 0 0 0 0K. D. Christian Construction Co., Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 855.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 855 0 0 0 0 0 0 0 0 0 0Kansas City Electrical Supply Co. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Kasa Electric LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KAW VALLEY SAND & GRAVEL PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KIWI LANDSCAPING, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0LARKIN CONTRACTING, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 145.00 68.00 46.90% 0.00 0.00% 68.00 46.90% 77 0 0 0 68 0 0 0 0 0 0LAWRENCE GLASS & MIRROR CO INC. Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0LLR&J Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0M Crider Enterprizes Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 201.50 64.50 32.01% 0.00 0.00% 0.00 0.00% 137 0 56.5 0 8 0 0 0 0 0 0M Crider Enterprizes Inc PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0M Crider Enterprizes Inc PIEA-Globe Building CSPIEA-Globe Building Subcontractor 180.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 180 0 0 0 0 0 0 0 0 0 0Mann Fence Company Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mario Sanchez Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MC Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MD Repair LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Meyer Construction Specialties Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Meyer Construction Specialties PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mid-State Restoration LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0OTIS ELEVATOR COMPANY PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Precision Roofing PIEA-Globe Building CSPIEA-Globe Building Subcontractor 20.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 20 0 0 0 0 0 0 0 0 0 0PREMIER CONTRACTING INC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 22.00 20.00 90.91% 0.00 0.00% 0.00 0.00% 2 0 0 0 20 0 0 0 0 0 0Pro Circuit, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0QK Construction LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 290.50 34.50 11.88% 0.00 0.00% 0.00 0.00% 256 0 0 0 34.5 0 0 0 0 0 0

00000

00000

00000

00000

00000

00000

00000

00000

00000

00000

00000

00000

00000

Human Relations Department January 2015 Construction Workforce Detailed Report

8

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

RCS Millwork LC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Schindler Elevator PIEA-Globe Building CSPIEA-Globe Building Subcontractor 30.00 10.00 33.33% 0.00 0.00% 0.00 0.00% 20 0 0 0 10 0 0 0 0 0 0Shawnee Steel & Welding, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Signature Craft, LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Skold Construction Inc Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Sorella Group, Inc. PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STAR SIGNS LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Steven F. Hawkins Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Superior Steel Erectors, Inc. PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 114.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 114 0 0 0 0 0 0 0 0 0 0System Design Solutions LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0The Hayes Company Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 5.00 1.00 20.00% 0.00 0.00% 0.00 0.00% 4 0 1 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tip Top Painting, LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tip Top Painting, LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Treadwell LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0TRIFECTA CONTRACTING PIEA-Globe Building CSPIEA-Globe Building Subcontractor 22.00 4.00 18.18% 3.00 13.64% 0.00 0.00% 15 0 0 0 4 3 0 0 0 0 0Vision Masonry LLC Gillham Park Row Apartments/3630 Gillham LCRA-3630-GPRCS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Vision Masonry LLC PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Western Fireproofing Co of KS Inc PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 169.50 25.50 15.04% 0.00 0.00% 0.00 0.00% 144 0 0 0 0 0 25.5 0 0 0 0Westhues Electric Inc PIEA-CS-1515 Genessee-Stockyard Place PIEA-CS-1515 Genessee Subcontractor 288.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 288.5 0 0 0 0 0 0 0 0 0 0Wilson Composites LLC PIEA-Globe Building CSPIEA-Globe Building Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 5223.58 1220.50 23.37% 35.00 0.67% 116.50 2.23%Clarkson Construction Co COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 27821.00 2324.00 8.35% 1922.50 6.91% 1882.50 6.77% 23574.5 1338.5 819.5 331 1245 0 0 139 253 0 120.5

Total 27821.00 2324.00 8.35% 1922.50 6.91% 1882.50 6.77%COLLINS AND HERMANN COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 5215.50 541.00 10.37% 0.00 0.00% 0.00 0.00% 4674.5 0 136.5 0 404.5 0 0 0 0 0 0

Total 5215.50 541.00 10.37% 0.00 0.00% 0.00 0.00%Custom Lighting Services LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 6912.00 273.00 3.95% 0.00 0.00% 752.00 10.88% 6639 0 69 0 204 0 0 0 0 0 0

Total 6912.00 273.00 3.95% 0.00 0.00% 752.00 10.88%Custom Lighting Services LLC Stlight & TrafficSignal - Renewal 1 CS110132 $16,139,305.12 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Custom Lighting Services LLC Streetlights - Renewal 2 CS110132A $5,441,871.83 Prime 1242.90 109.50 8.81% 0.00 0.00% 193.00 15.53% 1133.4 0 105.5 0 4 0 0 0 0 0 0

Total 1242.90 109.50 8.81% 0.00 0.00% 193.00 15.53%CCD Construction, Inc. Stlight & TrafficSignal - Renewal 1 CS110132 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0CCD Construction, Inc. Streetlights - Renewal 2 CS110132A Subcontractor 340.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 340 0 0 0 0 0 0 0 0 0 0Gil's Sales Company, Inc. Stlight & TrafficSignal - Renewal 1 CS110132 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Gil's Sales Company, Inc. Streetlights - Renewal 2 CS110132A Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Max Electric, Inc. Stlight & TrafficSignal - Renewal 1 CS110132 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Max Electric, Inc. Streetlights - Renewal 2 CS110132A Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0NightHawk, LLC Stlight & TrafficSignal - Renewal 1 CS110132 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0NightHawk, LLC Streetlights - Renewal 2 CS110132A Subcontractor 8.00 1.00 12.50% 5.00 62.50% 0.00 0.00% 2 4 1 1 0 0 0 0 0 0 0

Total 348.00 1.00 0.29% 5.00 1.44% 0.00 0.00%Foley Company COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Foley Company East Bottoms PS Rehab Phase I WSD8864 $3,163,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Foley Company NEID Installation of 3 Bar Screens WSD1106 $1,772,038.15 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Foley Company Turkey Creek WWPS Modification WSD908 $16,270,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Foley Company Waldo PS & Reservoir Rehabilitation WSD8849 $6,688,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%All Pro Construction, Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. NEID Installation of 3 Bar Screens WSD1106 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. Waldo PS & Reservoir Rehabilitation WSD8849 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Custom Engineering, Inc. NEID Installation of 3 Bar Screens WSD1106 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Genesis Environmental Solutions, Inc. East Bottoms PS Rehab Phase I WSD8864 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Genesis Environmental Solutions, Inc. NEID Installation of 3 Bar Screens WSD1106 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Genesis Environmental Solutions, Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1 0 0 0 0 0 0 0 0 0 0Hodnett Photographics, LLC Waldo PS & Reservoir Rehabilitation WSD8849 Subcontractor 1.00 1.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 1 0 0 0 0 0 0 0 0International Builders & Consultants, Inc. East Bottoms PS Rehab Phase I WSD8864 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0J & J Corporation I dba A & A Concrete Co., Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Life Design Photography East Bottoms PS Rehab Phase I WSD8864 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0PBP, LLC Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Realm Construction, Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Richardson Haulling Inc. Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Trekk Design Group, LLC Turkey Creek WWPS Modification WSD908 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC East Bottoms PS Rehab Phase I WSD8864 Subcontractor 62.00 0.00 0.00% 0.00 0.00% 50.00 80.65% 62 0 0 0 0 0 0 0 0 0 0

00

00000

0000

00000

000

0

0

0

0

000

00000

0

00

0

0

0

00000

00000

00000

00000

Human Relations Department January 2015 Construction Workforce Detailed Report

9

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Whatever It Takes Electrical Contractors, LLC NEID Installation of 3 Bar Screens WSD1106 Subcontractor 869.00 66.50 7.65% 0.00 0.00% 99.50 11.45% 802.5 0 66.5 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC Turkey Creek WWPS Modification WSD908 Subcontractor 526.00 97.00 18.44% 0.00 0.00% 253.00 48.10% 429 0 97 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC Waldo PS & Reservoir Rehabilitation WSD8849 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 1459.00 164.50 11.27% 0.00 0.00% 402.50 27.59%Genesis Plumbing Enterprises, LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 5475.00 804.00 14.68% 154.00 2.81% 825.00 15.07% 4517 154 307 0 309 0 0 188 0 0 0

Total 5475.00 804.00 14.68% 154.00 2.81% 825.00 15.07%Genesis Plumbing Enterprises, LLC Sewer Line Repairs FY15 WSD1129 $3,000,000.00 Prime 1986.00 444.00 22.36% 0.00 0.00% 299.50 15.08% 1542 0 207.5 0 225 0 0 11.5 0 0 0Genesis Plumbing Enterprises, LLC WMRStatelineVirginia99th112thSt WSD8926 $1,903,853.00 Prime 1724.50 221.50 12.84% 138.50 8.03% 362.00 20.99% 1364.5 138.5 66 0 7 0 0 148.5 0 0 0

Total 3710.50 665.50 17.94% 138.50 3.73% 661.50 17.83%America On The Go Plumbing, LLC WMRStatelineVirginia99th112thSt WSD8926 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0CU Contracting Services, LLC Sewer Line Repairs FY15 WSD1129 Subcontractor 170.00 170.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 170 0 0 0 0 0 0 0 0DLC, INC. Sewer Line Repairs FY15 WSD1129 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DLC, INC. WMRStatelineVirginia99th112thSt WSD8926 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Leslie Glasgow Impressions Sewer Line Repairs FY15 WSD1129 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. WMRStatelineVirginia99th112thSt WSD8926 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Yelsaeb Enterprises, LLC Sewer Line Repairs FY15 WSD1129 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 170.00 170.00 100.00% 0.00 0.00% 0.00 0.00%Grand Construction COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 716.00 0.00 0.00% 60.00 8.38% 64.00 8.94% 656 60 0 0 0 0 0 0 0 0 0

Total 716.00 0.00 0.00% 60.00 8.38% 64.00 8.94%GUNTER CONSTRUCTION COMPANY COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%GUNTER CONSTRUCTION COMPANY 8180-N. Indiana Ave Improvement CS130075 $1,330,759.92 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GUNTER CONSTRUCTION COMPANY 89060407-Citywide 2013-14 CS140010 $351,169.90 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GUNTER CONSTRUCTION COMPANY ConcreteRehab@WTP&IntakePhsV WSD8972 $1,960,000.00 Prime 277.00 79.00 28.52% 3.00 1.08% 0.00 0.00% 195 3 0 0 79 0 0 0 0 0 0

Total 277.00 79.00 28.52% 3.00 1.08% 0.00 0.00%AMC Industries, LLC 8180-N. Indiana Ave Improvement CS130075 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Audrie Seeley & Co. 89060407-Citywide 2013-14 CS140010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0BILLIE WYATT TRUCKING 89060407-Citywide 2013-14 CS140010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Crookham Construction, LLC 89060407-Citywide 2013-14 CS140010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Genesis Environmental Solutions, Inc. ConcreteRehab@WTP&IntakePhsV WSD8972 Subcontractor 9.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 9 0 0 0 0 0 0 0 0 0 0Iron Hand, LLC ConcreteRehab@WTP&IntakePhsV WSD8972 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0JJT Enterprises, LLC 89060407-Citywide 2013-14 CS140010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Max Electric, Inc. ConcreteRehab@WTP&IntakePhsV WSD8972 Subcontractor 124.00 0.00 0.00% 0.00 0.00% 13.00 10.48% 124 0 0 0 0 0 0 0 0 0 0Pro Circuit, Inc. 89060407-Citywide 2013-14 CS140010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0RLS Trucking, Inc. 8180-N. Indiana Ave Improvement CS130075 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. 8180-N. Indiana Ave Improvement CS130075 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. 8180-N. Indiana Ave Improvement CS130075 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 133.00 0.00 0.00% 0.00 0.00% 13.00 9.77%Haines & Associates Const Co COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 2550.00 288.00 11.29% 0.00 0.00% 460.00 18.04% 2262 0 288 0 0 0 0 0 0 0 0

Total 2550.00 288.00 11.29% 0.00 0.00% 460.00 18.04%Haines & Associates Const Co CW Rpr & Repl WS Curb Stops and Meters WSD8899 $3,000,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Haines & Associates Const Co WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 $2,606,500.00 Prime 767.00 10.00 1.30% 0.00 0.00% 160.00 20.86% 757 0 10 0 0 0 0 0 0 0 0

Total 767.00 10.00 1.30% 0.00 0.00% 160.00 20.86%All American Redi-Mix, LLC WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Caman Construction Company, Inc. WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0G & G Mechanical Contractors, Inc. WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Redford Construction, Inc. CW Rpr & Repl WS Curb Stops and Meters WSD8899 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rick Sauceda Trucking WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR Eastern-Lee's Summit, 70th St to Bannister WSD8922 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%HarenLaughlin COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 6092.50 792.00 13.00% 0.00 0.00% 208.00 3.41% 5300.5 0 0 0 792 0 0 0 0 0 0

Total 6092.50 792.00 13.00% 0.00 0.00% 208.00 3.41%HarenLaughlin PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments $10,910,965.00 Prime 935.00 298.00 31.87% 0.00 0.00% 0.00 0.00% 637 0 0 0 298 0 0 0 0 0 0

Total 935.00 298.00 31.87% 0.00 0.00% 0.00 0.00%American Fire Sprinkler Corp. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 123.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 123 0 0 0 0 0 0 0 0 0 0D & D MASONRY, INC PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Eiberger Construction, Inc. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 1679.50 1041.00 61.98% 118.00 7.03% 895.50 53.32% 520.5 118 271.5 0 769.5 0 0 0 0 0 0ELITE ONE, INC. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Epic Concrete Construction Inc. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Green Field Energy Group PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0International Builders & Consultants, Inc. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 94.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 94.5 0 0 0 0 0 0 0 0 0 0MILLER PLUMBING COMPANY INC. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MTS CONTRACTING INC. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Reynolds Electric, Inc. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 816.50 8.00 0.98% 13.00 1.59% 0.00 0.00% 795.5 13 0 0 8 0 0 0 0 0 0

000

00000

0

00

00

0

00000

0

00

00000

00000

00

00

0

0

0

0000

0

000

0

0

000

Human Relations Department January 2015 Construction Workforce Detailed Report

10

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Skyline Construction Company, Inc. PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 1309.00 74.00 5.65% 0.00 0.00% 0.00 0.00% 1235 0 0 0 74 0 0 0 0 0 0Tip Top Painting, LLC PIEA-NEWBERN APARTMENTS CSPIEA-Newbern Apartments Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 4022.50 1123.00 27.92% 131.00 3.26% 895.50 22.26%HAVENS CONSTRUCTION CO INC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%HAVENS CONSTRUCTION CO INC MBR SWR Rehab Area I WSD1128 $3,369,000.00 Prime 1044.50 125.00 11.97% 0.00 0.00% 0.00 0.00% 919.5 0 0 0 24 0 0 101 0 0 0

Total 1044.50 125.00 11.97% 0.00 0.00% 0.00 0.00%G & G Mechanical Contractors, Inc. MBR SWR Rehab Area I WSD1128 Subcontractor 120.00 40.00 33.33% 0.00 0.00% 0.00 0.00% 80 0 40 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. MBR SWR Rehab Area I WSD1128 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 120.00 40.00 33.33% 0.00 0.00% 0.00 0.00%Hunt Midwest Real Estate Devel COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 168.00 0.00 0.00% 0.00 0.00% 168.00 100.00% 168 0 0 0 0 0 0 0 0 0 0

Total 168.00 0.00 0.00% 0.00 0.00% 168.00 100.00%Hunt Midwest Real Estate Devel KCI TIF Project S1 TIF-CSS1-2014 $400,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hunt Midwest Real Estate Devel TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS $8,000,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Audrie Seeley & Co. TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. KCI TIF Project S1 TIF-CSS1-2014 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Garney Construction TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Insituform Technologies, Inc. TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. KCI TIF Project S1 TIF-CSS1-2014 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Redford Construction, Inc. KCI TIF Project S1 TIF-CSS1-2014 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Redford Construction, Inc. TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S.A. Flick Seed Co. TIF 1st Creek Sewer Project KCI Corridor CS 11333-TIF-CS Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Ideker Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 2066.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2066 0 0 0 0 0 0 0 0 0 0

Total 2066.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Ideker Inc. 87052304-Roadway Improvement PW2014-014 $3,185,388.72 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Ideker Inc. 89020269 14-1 Resurface Design - Mo River to North

City LimitCS140036 $3,149,005.01 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Ideker Inc. Rehabilitate RW 1R-19L @ KCI 62140441 $17,958,490.59 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

Blue Nile Contractors, Inc. 87052304-Roadway Improvement PW2014-014 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. 89020269 14-1 Resurface Design - Mo River to North

City LimitCS140036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Clymore Trucking Company, Inc. Rehabilitate RW 1R-19L @ KCI 62140441 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0EG-Tech, LLC Rehabilitate RW 1R-19L @ KCI 62140441 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Pine Valley Contracting, Inc. Rehabilitate RW 1R-19L @ KCI 62140441 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0R.L. Hannah & Sons Trucking, Inc. Rehabilitate RW 1R-19L @ KCI 62140441 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rick Sauceda Trucking 89020269 14-1 Resurface Design - Mo River to North

City LimitCS140036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Tenoch Construction, Inc. 89020269 14-1 Resurface Design - Mo River to North City Limit

CS140036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Thorne & Son Asphalt Paving Co. 87052304-Roadway Improvement PW2014-014 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC 89020269 14-1 Resurface Design - Mo River to North

City LimitCS140036 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Insituform Technologies, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 2284.00 158.00 6.92% 0.00 0.00% 0.00 0.00% 2126 0 0 0 158 0 0 0 0 0 0

Total 2284.00 158.00 6.92% 0.00 0.00% 0.00 0.00%Insituform Technologies, Inc. City Wide Sewer Main Rehabilitation FY 2015 WSD1130 $4,500,000.00 Prime 1109.50 80.00 7.21% 0.00 0.00% 0.00 0.00% 1029.5 0 0 0 80 0 0 0 0 0 0

Total 1109.50 80.00 7.21% 0.00 0.00% 0.00 0.00%Blue Nile Contractors, Inc. City Wide Sewer Main Rehabilitation FY 2015 WSD1130 Subcontractor 859.10 451.15 52.51% 80.00 9.31% 427.25 49.73% 327.95 40 451.15 40 0 0 0 0 0 0 0G & G Mechanical Contractors, Inc. City Wide Sewer Main Rehabilitation FY 2015 WSD1130 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Trekk Design Group, LLC City Wide Sewer Main Rehabilitation FY 2015 WSD1130 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 859.10 451.15 52.51% 80.00 9.31% 427.25 49.73%J M Fahey Construction Co COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 1166.00 271.50 23.28% 0.00 0.00% 108.00 9.26% 894.5 0 89 0 182.5 0 0 0 0 0 0

Total 1166.00 271.50 23.28% 0.00 0.00% 108.00 9.26%J M Fahey Construction Co 89020270 14-2 Resurface Designated Streets Mo River -

63rd StreetCS140037 $2,638,999.00 Prime 7.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 7 0 0 0 0 0 0 0 0 0 0

J M Fahey Construction Co 89020271 14-3 Resurface Designated Streets 63rd St - South City Limit

CS140038 $2,985,630.25 Prime 113.50 8.50 7.49% 0.00 0.00% 7.00 6.17% 105 0 8.5 0 0 0 0 0 0 0 0

J M Fahey Construction Co WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 $6,668,806.90 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 120.50 8.50 7.05% 0.00 0.00% 7.00 5.81%A. Robinson Trucking, LLC 89020270 14-2 Resurface Designated Streets Mo River -

63rd StreetCS140037 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

A. Robinson Trucking, LLC 89020271 14-3 Resurface Designated Streets 63rd St - South City Limit

CS140038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

0

0

0

0

0

0

000

0

0

00

0000

0

0

00

0

0

00

000

0000

0

00

00

0

0

0

00

Human Relations Department January 2015 Construction Workforce Detailed Report

11

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Delta Sweeping Company 89020270 14-2 Resurface Designated Streets Mo River - 63rd Street

CS140037 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Delta Sweeping Company 89020271 14-3 Resurface Designated Streets 63rd St - South City Limit

CS140038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Kansas City Electrical Supply Co. WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Pine Valley Contracting, Inc. WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

R.L. Hannah & Sons Trucking, Inc. 89020270 14-2 Resurface Designated Streets Mo River - 63rd Street

CS140037 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

R.L. Hannah & Sons Trucking, Inc. 89020271 14-3 Resurface Designated Streets 63rd St - South City Limit

CS140038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

R.L. Hannah & Sons Trucking, Inc. WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Redford Construction, Inc. WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Richardson Haulling Inc. WMR Troost 23rd-30th Streets and PW2014-038 - Beacon Hill Troost

WSD80001713 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

RLS Trucking, Inc. 89020270 14-2 Resurface Designated Streets Mo River - 63rd Street

CS140037 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

RLS Trucking, Inc. 89020271 14-3 Resurface Designated Streets 63rd St - South City Limit

CS140038 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%JE Dunn Construction COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 44532.50 5648.00 12.68% 2928.50 6.58% 9522.50 21.38% 35956 2581.5 1727.5 24 2256.5 0 471 1022.5 323 0 170.5

Total 44532.50 5648.00 12.68% 2928.50 6.58% 9522.50 21.38%JE Dunn Construction KCPD Headquarters-Interior 07000150-004 $28,472,000.00 Prime 1278.00 334.50 26.17% 0.00 0.00% 323.50 25.31% 943.5 0 0 0 0 0 168 166.5 0 0 0JE Dunn Construction PIEA-One Light Tower CSPIEA-One light Tower $47,981,433.00 Prime 9320.00 1692.00 18.15% 366.50 3.93% 2576.00 27.64% 7261.5 366.5 327.5 0 740.5 0 143 321 0 0 160

Total 10598.00 2026.50 19.12% 366.50 3.46% 2899.50 27.36%A. ZAHNER COMPANY KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0A2MG Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 91.00 11.00 12.09% 0.00 0.00% 0.00 0.00% 80 0 0 0 11 0 0 0 0 0 0A2MG Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 2611.25 632.25 24.21% 0.00 0.00% 326.50 12.50% 1979 0 468.25 0 0 0 0 164 0 0 0Advantage Fire Protection Systems, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0AGP, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 67.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 67 0 0 0 0 0 0 0 0 0 0AGP, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 271.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 271 0 0 0 0 0 0 0 0 0 0Alexander Mechanical Contractors, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 431.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 431 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 677.50 24.00 3.54% 168.00 24.80% 0.00 0.00% 485.5 168 0 0 0 0 0 24 0 0 0Audrie Seeley & Co. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0BK Construction Services, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0C & C Group, Inc KCPD Headquarters-Interior 07000150-004 Subcontractor 56.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 56 0 0 0 0 0 0 0 0 0 0Capital Electric Construction Co., Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 2931.00 248.50 8.48% 0.00 0.00% 424.50 14.48% 2682.5 0 193.5 0 55 0 0 0 0 0 0Carpet Factory Outlet Inc KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Cass County Coatings, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Ceco Concrete Construction, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Continental Steel & Fabrication PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Contract Services Corporation of America PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Cornell Roofing & Sheet Metal Company PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 44.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 44 0 0 0 0 0 0 0 0 0 0CYNTHIA AYRES & COMPANY PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0D.E.L.L. Plaster & Drywall Construction, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 424.00 144.00 33.96% 0.00 0.00% 0.00 0.00% 280 0 0 0 144 0 0 0 0 0 0Dayco Painting, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 252.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 252 0 0 0 0 0 0 0 0 0 0Dayspring Electric, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Deb's Disposal Service, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DELTA INNOVATIVE SERVICES KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Desco Coatings Inc KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DH Pace dba Overhead Door KC KCPD Headquarters-Interior 07000150-004 Subcontractor 13.92 0.00 0.00% 0.00 0.00% 0.00 0.00% 13.92 0 0 0 0 0 0 0 0 0 0DH Restoration, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DH Restoration, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0E & K of Kansas City, Inc PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 3207.50 525.00 16.37% 0.00 0.00% 96.00 2.99% 2682.5 0 0 0 71 0 0 144 0 0 310EG-Tech, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Fabricor, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Fagan Company PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 1820.00 104.00 5.71% 0.00 0.00% 440.00 24.18% 1716 0 104 0 0 0 0 0 0 0 0Falcon Contracting, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Fox Ceramic Tile, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hayes Drilling KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hogarty Sales, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Infinite Energy Construction, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0InVision Flooring, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Jabral Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

000

00000

00000

00000

00000

00000

00000

00000

00

00

0

0

0

0

0

0

0

0

0

0

0

0

Human Relations Department January 2015 Construction Workforce Detailed Report

12

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

John A. Marshall Company KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0John A. Marshall Company PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0K & G STRIPING KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0K Building Specialties, Inc. dba Perkins Fireproofing KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

KISSICK CONSTRUCTION CO INC KCPD Headquarters-Interior 07000150-004 Subcontractor 36.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 36 0 0 0 0 0 0 0 0 0 0Lawson Steel Erection, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 18.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 18 0 0 0 0 0 0 0 0 0 0Lawson Steel Erection, LLC PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 665.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 665 0 0 0 0 0 0 0 0 0 0Mark One Electric Company, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 835.50 0.00 0.00% 0.00 0.00% 184.00 22.02% 835.5 0 0 0 0 0 0 0 0 0 0Midwest Contracting Services, LLC PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midwest Interior Systems, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 20.00 20.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 20 0 0 0 0 0 0Mission Electronics, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 11.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 11 0 0 0 0 0 0 0 0 0 0Pro Metals, LLC PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 535.00 143.00 26.73% 0.00 0.00% 136.00 25.42% 392 0 0 0 143 0 0 0 0 0 0R. L. Duncan PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0RF Fisher Electric Company, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 302.00 0.00 0.00% 0.00 0.00% 107.00 35.43% 302 0 0 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Saxton & Saxton Construction Co., Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Signature Craft, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Skyline Construction Company, Inc. KCPD Headquarters-Interior 07000150-004 Subcontractor 38.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 38 0 0 0 0 0 0 0 0 0 0Skyline Construction Company, Inc. PIEA-One Light Tower CSPIEA-One light Tower Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STAR SIGNS LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0WON-DOOR CORP KCPD Headquarters-Interior 07000150-004 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 15357.67 1851.75 12.06% 168.00 1.09% 1714.00 11.16%JE Dunn-Alexander Mechanical COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%JE Dunn-Alexander Mechanical KCPD E Patrol Police Campus CM@Risk 07000168 $50,030,514.00 Prime 356.00 188.00 52.81% 0.00 0.00% 196.00 55.06% 168 0 188 0 0 0 0 0 0 0 0

Total 356.00 188.00 52.81% 0.00 0.00% 196.00 55.06%777 Construction LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 514.00 195.00 37.94% 64.50 12.55% 0.00 0.00% 254.5 0 195 64.5 0 0 0 0 0 0 0A CLEAN SLATE KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0A2MG Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 255.00 121.00 47.45% 0.00 0.00% 121.00 47.45% 134 0 121 0 0 0 0 0 0 0 0Absolute Crane LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Acme Floor Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0AGP, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 40.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 40 0 0 0 0 0 0 0 0 0 0All American Redi-Mix, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All Purpose Construction LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Alpha Energy & Electric, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 1504.00 351.00 23.34% 0.00 0.00% 200.00 13.30% 1153 0 200 0 151 0 0 0 0 0 0American Fire Sprinkler Corp. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 272.00 136.00 50.00% 0.00 0.00% 0.00 0.00% 136 0 136 0 0 0 0 0 0 0 0Angelo Concrete & Masonry Co KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Audrie Seeley & Co. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0BK Construction Services, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 27.00 27.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 27 0 0 0 0 0 0 0 0Building Erection Services Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 64.00 8.00 12.50% 0.00 0.00% 0.00 0.00% 56 0 8 0 0 0 0 0 0 0 0Bulte Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Caman Construction Company, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Carthage Stoneworks, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Cass County Coatings, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Central Industrial Sheet Metal Works, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 460.00 134.50 29.24% 125.50 27.28% 0.00 0.00% 200 0 134.5 125.5 0 0 0 0 0 0 0Citadel Electric Group, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0City Wide Electric, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 335.00 3.00 0.90% 0.00 0.00% 0.00 0.00% 332 0 3 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Construction Anchors, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Contract Services Corporation of America KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Cornell Roofing & Sheet Metal Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Crenshaw Constructon Co., LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0CS Humphrey & Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0D & D MASONRY, INC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0D.E.L.L. Plaster & Drywall Construction, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Dayco Painting, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Desco Coatings Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DH Pace dba Overhead Door KC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0DH Restoration, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 629.50 89.00 14.14% 0.00 0.00% 89.00 14.14% 540.5 0 89 0 0 0 0 0 0 0 0E & J Specialty, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0E & K of Kansas City, Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 65.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 65.5 0 0 0 0 0 0 0 0 0 0E & S Excavating, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

000

00000

00000

00000

00000

00000

00000

0

000

0

0

00000

00000

00000

00

000

00

Human Relations Department January 2015 Construction Workforce Detailed Report

13

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Engineering Solutions KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Fagan Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 722.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 722 0 0 0 0 0 0 0 0 0 0Falcon Contracting, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 8.00 4.00 50.00% 2.00 25.00% 0.00 0.00% 2 0 2 2 2 0 0 0 0 0 0Foley Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Four Star Construction Contractors, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Freeman Concrete Construction, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Gateway Building Products KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0General Automatic Sprinkler Fire Protection Co., Inc.

KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 300.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 300 0 0 0 0 0 0 0 0 0 0

George J. Shaw Construction Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 294.00 16.00 5.44% 0.00 0.00% 0.00 0.00% 278 0 0 0 0 0 0 16 0 0 0Great Plains Roofing and Sheet Metal KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Haldeman-Homme, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hanrahan Asphalt Paving KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hayes Ditching KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Henry E. Lyons & Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Higman Equipment Company, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hogarty Sales, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hot Mix Materials, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0INSCO Industries, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0J & J Corporation I dba A & A Concrete Co., Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0J J & W Construction, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 3.00 2.00 66.67% 1.00 33.33% 0.00 0.00% 0 0 2 1 0 0 0 0 0 0 0J.A. Lillig Grading, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 25.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 25 0 0 0 0 0 0 0 0 0 0JA Lillig Excavating, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6 0 0 0 0 0 0 0 0 0 0Johnson Controls, Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0K Building Specialties, Inc. dba Perkins Fireproofing KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 138.50 48.50 35.02% 0.00 0.00% 0.00 0.00% 90 0 46.5 0 0 0 2 0 0 0 0

Kansas City Electrical Supply Co. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Kansas City Structural Steel Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0LanTel Communication Services, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Leavcon II Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 7.00 2.00 28.57% 0.00 0.00% 0.00 0.00% 5 0 1 0 1 0 0 0 0 0 0LMG Construction Services, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Lovelace & Associates, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Lynch Electrical, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Marathon Reprographics, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mark One Electric Company, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Martinez Concrete & Construction Co., Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Meggitt Training Systems Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Metro Tile Contractors, Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midland Marble & Granite, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midland Steel Company KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midland Steel Erection KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 137.00 8.00 5.84% 0.00 0.00% 0.00 0.00% 129 0 8 0 0 0 0 0 0 0 0Midwest Crane and Rigging KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midwest Interior Systems, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MJ Builders, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 477.25 477.25 100.00% 0.00 0.00% 0.00 0.00% 0 0 477.25 0 0 0 0 0 0 0 0National MRI Shielding, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Pro Metals, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 1323.00 708.00 53.51% 0.00 0.00% 657.00 49.66% 615 0 503 0 205 0 0 0 0 0 0Redlef, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0REGENTS FLOORING CO. INC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Reynolds Electric, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0RF Fisher Electric Company, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 52.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 52 0 0 0 0 0 0 0 0 0 0River Works Electric, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S & W Waterproofing, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S.A. Flick Seed Co. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Shelby & Son's Steel, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Skyline Construction Company, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 1115.00 303.00 27.17% 0.00 0.00% 0.00 0.00% 812 0 155.5 0 147.5 0 0 0 0 0 0Southwest Solutions Group, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STAR SIGNS LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Superior Concrete Cutting, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tinmaster, Inc. (company went out of business) KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total Sodding & Seeding, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whitley Construction Company, LLC KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 572.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 572.5 0 0 0 0 0 0 0 0 0 0Wrightway Pressure Washing, Inc. KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0WT and More Inc KCPD E Patrol Police Campus CM@Risk 07000168 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 00

0

0000

00000

00000

00000

00000

00000

00000

00

000

00000

00000

0

0000

00000

00

Human Relations Department January 2015 Construction Workforce Detailed Report

14

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Total 9346.25 2633.25 28.17% 193.00 2.06% 1067.00 11.42%KC Streetcar Constructors COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 4974.00 1145.00 23.02% 333.00 6.69% 508.00 10.21% 3496 333 384 0 761 0 0 0 0 0 0

Total 4974.00 1145.00 23.02% 333.00 6.69% 508.00 10.21%KC Streetcar Constructors 89022000-KC Streetcar Ph 1 PW2014-028 $62,293,008.00 Prime 4974.00 1145.00 23.02% 333.00 6.69% 508.00 10.21% 3496 333 384 0 761 0 0 0 0 0 0

Total 4974.00 1145.00 23.02% 333.00 6.69% 508.00 10.21%3 FEATHERS CONSTRUCTION & SALES, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 190.00 0.00 0.00% 0.00 0.00% 43.50 22.89% 190 0 0 0 0 0 0 0 0 0 03T-Design & Development, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0A+ Engineering Services, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All Pro Construction, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Alpha Energy & Electric, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 84.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 84 0 0 0 0 0 0 0 0 0 0Boswell & Lee Trucking, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Columbia Curb & Gutter 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0COMANCHE CONSTRUCTION, INC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Delta Sweeping Company 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 21.75 0.00 0.00% 0.00 0.00% 0.00 0.00% 21.75 0 0 0 0 0 0 0 0 0 0Dimensional Innovations, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0ESI CONTRACTING CORP 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GREG BAIR TRACK HOE SERVICE INC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 285.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 285 0 0 0 0 0 0 0 0 0 0Heartland Fabrication & Machine, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hodnett Photographics, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 4.00 4.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 4 0 0 0 0 0 0 0 0Ideker Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 180.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 180 0 0 0 0 0 0 0 0 0 0International Builders & Consultants, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 799.00 78.50 9.82% 201.00 25.16% 0.00 0.00% 519.5 98.5 70.5 102.5 8 0 0 0 0 0 0J M Fahey Construction Co 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 213.50 80.50 37.70% 0.00 0.00% 0.00 0.00% 133 0 80.5 0 0 0 0 0 0 0 0Kansas City Testing & Engineering, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Kansas City Ultimate Security, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KC Coring & Cutting Inc 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 103.25 33.75 32.69% 0.00 0.00% 0.00 0.00% 69.5 0 33.75 0 0 0 0 0 0 0 0KISSICK CONSTRUCTION CO INC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 5621.00 608.00 10.82% 164.00 2.92% 458.00 8.15% 4849 164 151 0 279 0 0 178 0 0 0LFL INTERNATIONAL INC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mark One Electric Company, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 725.00 0.00 0.00% 116.00 16.00% 0.00 0.00% 609 116 0 0 0 0 0 0 0 0 0Mass. Electric Construction Company 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midwest Contract Services, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 24.00 24.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 24 0 0 0 0 0 0 0 0New Horizons Enterprises, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 28.00 0.00 0.00% 13.50 48.21% 6.50 23.21% 14.5 13.5 0 0 0 0 0 0 0 0 0Parson & Associates, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Phillips-West Public Relations & Communications 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Porter Roofing Company, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0R.L. Hannah & Sons Trucking, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0RANGEL DISTRIBUTING COMPANY 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Realm Construction, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Redford Construction, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 2914.00 569.00 19.53% 213.00 7.31% 127.00 4.36% 2132 98 0 47 321 68 133 115 0 0 0Reynolds Electric, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 320.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 320.5 0 0 0 0 0 0 0 0 0 0Richardson Haulling Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0RLS Trucking, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S & A Contracting, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 24.25 0.00 0.00% 0.00 0.00% 0.00 0.00% 24.25 0 0 0 0 0 0 0 0 0 0Skyline Construction Company, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Sorella Group, Inc. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STREETWISE INC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0The Whiting - Turner Contracting Company 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 78.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 78 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Trekk Design Group, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 690.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 690 0 0 0 0 0 0 0 0 0 0VSM Engineering, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC 89022000-KC Streetcar Ph 1 PW2014-028 Subcontractor 87.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 87 0 0 0 0 0 0 0 0 0 0

Total 12392.25 1397.75 11.28% 707.50 5.71% 635.00 5.12%Kellogg Brown & Root Services, Inc. dba KBR COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 190.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 190 0 0 0 0 0 0 0 0 0 0

Total 190.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Kellogg Brown & Root Services, Inc. dba KBR

JOB ORDER CONTRACTING EV0701-4 $16,129,480.00 Prime 190.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 190 0 0 0 0 0 0 0 0 0 0

Total 190.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Acme Sign Hanger, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Alexander Mechanical Contractors, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All Pro Construction, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Alpha Energy & Electric, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Ambient Tempco, Inc. - Co went out of business in 2013

JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 000

0

000

0

000

00000

00000

00000

00000

00000

00000

00000

00000

00000

0

0

Human Relations Department January 2015 Construction Workforce Detailed Report

15

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

America On The Go Plumbing, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0American Osage Consulting, Inc.- New Owner as of April 2014 - No longer Certified

JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

APP Painting, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Audrie Seeley & Co. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0CALVERT'S PAVING INC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Caman Construction Company, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Capital Electric Construction Co., Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0City Cement Concrete Construction Co. JOB ORDER CONTRACTING EV0701-4 Subcontractor 630.00 110.00 17.46% 0.00 0.00% 0.00 0.00% 520 0 0 0 110 0 0 0 0 0 0Collins & Hermann JOB ORDER CONTRACTING EV0701-4 Subcontractor 584.50 0.00 0.00% 0.00 0.00% 0.00 0.00% 584.5 0 0 0 0 0 0 0 0 0 0Complete Systems, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Crabtree Contracting JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0D.E.L.L. Plaster & Drywall Construction, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Dayco Painting, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0E & S Excavating, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GC of Missouri, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Genesis Environmental Solutions, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0GREEN WAVE TECHNOLOGIES, INC. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0HANKINS SERVICES INC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Hartline Construction, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Howell Construction Co., Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Image Flooring JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0JACOR Contracting, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0John A. Marshall Company JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0JUST INTERIORS LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KINGSTON ENVIRONMENTAL SERVICES JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KREN Contracting Inc JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Liberty Erection, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Little Joe's Asphalt, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0LMG Construction Services, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Luevano & Hart Construction, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Lynch Electrical, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mark One Electric Company, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Michele & Associates JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MTS CONTRACTING INC. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MUSSELMAN & HALL CONTRACT JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MUSTARDSEED CULTURAL AND ENVIRONMENTAL SERVICES, LLC

JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

NIS Security Services, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0NORTH TOWN MECHANICAL, INC. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Obi Consulting Engineers, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Porter Roofing Company, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Pro Circuit, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Pro Metals, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 11.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 11 0 0 0 0 0 0 0 0 0 0Professional Elevator Services, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Sorella Group, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Southtown Glass Co. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STANGER INDUSTRIES INC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tech Services to Go, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tinmaster, Inc. (company went out of business) JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Vazquez Commercial Contracting, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Volt Electric, Inc. JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC JOB ORDER CONTRACTING EV0701-4 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 1225.50 110.00 8.98% 0.00 0.00% 0.00 0.00%KES CONSTRUCTION LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 250.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 250 0 0 0 0 0 0 0 0 0 0

Total 250.00 0.00 0.00% 0.00 0.00% 0.00 0.00%KES CONSTRUCTION LLC Garrison CC FEMA Safe Rm/Gym Addition POC2015026 $2,752,000.00 Prime 32.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 32 0 0 0 0 0 0 0 0 0 0

Total 32.00 0.00 0.00% 0.00 0.00% 0.00 0.00%AGP, Inc. Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Cass County Coatings, Inc. Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Piping Concepts, LLC Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Porter Roofing Company, Inc. Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S & A Contracting, LLC Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Volt Electric, Inc. Garrison CC FEMA Safe Rm/Gym Addition POC2015026 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 00

00000

0

0

0

000

00000

00000

0000

0

00000

00000

00000

00000

00000

00000

000

Human Relations Department January 2015 Construction Workforce Detailed Report

16

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Kimery Painting, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 856.00 680.00 79.44% 0.00 0.00% 0.00 0.00% 176 0 0 0 680 0 0 0 0 0 0

Total 856.00 680.00 79.44% 0.00 0.00% 0.00 0.00%Kimery Painting, Inc. Ground Storage Tank Rehabilitation and Painting -

Phase IIIWSD8983 $928,586.00 Prime 856.00 680.00 79.44% 0.00 0.00% 0.00 0.00% 176 0 0 0 680 0 0 0 0 0 0

Total 856.00 680.00 79.44% 0.00 0.00% 0.00 0.00%Contract Services Corporation of America Ground Storage Tank Rehabilitation and Painting -

Phase IIIWSD8983 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Deb's Disposal Service, LLC Ground Storage Tank Rehabilitation and Painting - Phase III

WSD8983 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Image Staffing, LLC Ground Storage Tank Rehabilitation and Painting - Phase III

WSD8983 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

NonStop Sign Shop, Inc. Ground Storage Tank Rehabilitation and Painting - Phase III

WSD8983 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Warehouse One, Inc. Ground Storage Tank Rehabilitation and Painting - Phase III

WSD8983 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%KISSICK CONSTRUCTION CO INC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 33135.00 1569.00 4.74% 575.00 1.74% 962.00 2.90% 30991 575 491 0 859 0 41 178 0 0 0

Total 33135.00 1569.00 4.74% 575.00 1.74% 962.00 2.90%KISSICK CONSTRUCTION CO INC WMR Myrtle-Hardesty WSD8932 $5,338,310.00 Prime 1716.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1716 0 0 0 0 0 0 0 0 0 0KISSICK CONSTRUCTION CO INC WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 $1,638,660.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 1716.00 0.00 0.00% 0.00 0.00% 0.00 0.00%All American Redi-Mix, LLC WMR Myrtle-Hardesty WSD8932 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All American Redi-Mix, LLC WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Anderson Sons Trucking, Inc. WMR Myrtle-Hardesty WSD8932 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Anderson Sons Trucking, Inc. WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. WMR Myrtle-Hardesty WSD8932 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Clymore Trucking Company, Inc. WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S.A. Flick Seed Co. WMR Myrtle-Hardesty WSD8932 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S.A. Flick Seed Co. WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. WMR Myrtle-Hardesty WSD8932 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. WMR: Stateline-Rockhill, 64th Terr to Romany WSD8918 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Landmark Structures I, L.P. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 10.00 9.00 90.00% 0.00 0.00% 0.00 0.00% 1 0 0 0 9 0 0 0 0 0 0

Total 10.00 9.00 90.00% 0.00 0.00% 0.00 0.00%Leath & Sons, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 1756.00 348.00 19.82% 112.00 6.38% 59.00 3.36% 1296 112 156 0 192 0 0 0 0 0 0

Total 1756.00 348.00 19.82% 112.00 6.38% 59.00 3.36%Leath & Sons, Inc. Catch Basin Replacement FY15 WSD301 $435,925.00 Prime 477.00 205.00 42.98% 0.00 0.00% 23.00 4.82% 272 0 147 0 58 0 0 0 0 0 0Leath & Sons, Inc. WMR Ind-Cindy, 53rd-MeyerBlvd WSD8906 $899,985.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Leath & Sons, Inc. WW Collection Supp Work Force Contract FY15 -

Renewal 1WSD1155 $3,000,000.00 Prime 1279.00 143.00 11.18% 112.00 8.76% 57.00 4.46% 1024 112 9 0 134 0 0 0 0 0 0

Total 1756.00 348.00 19.82% 112.00 6.38% 80.00 4.56%Blue Nile Contractors, Inc. WMR Ind-Cindy, 53rd-MeyerBlvd WSD8906 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Diggs Construction, LLC WMR Ind-Cindy, 53rd-MeyerBlvd WSD8906 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Diggs Construction, LLC WW Collection Supp Work Force Contract FY15 -

Renewal 1WSD1155 Subcontractor 440.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 440 0 0 0 0 0 0 0 0 0 0

G & G Mechanical Contractors, Inc. Catch Basin Replacement FY15 WSD301 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0G & G Mechanical Contractors, Inc. WMR Ind-Cindy, 53rd-MeyerBlvd WSD8906 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Richardson Haulling Inc. WMR Ind-Cindy, 53rd-MeyerBlvd WSD8906 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Richardson Haulling Inc. WW Collection Supp Work Force Contract FY15 -

Renewal 1WSD1155 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Thorne & Son Asphalt Paving Co. WW Collection Supp Work Force Contract FY15 - Renewal 1

WSD1155 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Tycon Company, LLC Catch Basin Replacement FY15 WSD301 Subcontractor 166.00 166.00 100.00% 0.00 0.00% 0.00 0.00% 0 0 150 0 16 0 0 0 0 0 0Total 606.00 166.00 27.39% 0.00 0.00% 0.00 0.00%

Mark One Electric Company, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 28315.50 3968.50 14.02% 947.00 3.34% 5792.50 20.46% 23400 947 1794.5 0 1258 0 433.5 340.5 0 0 142Total 28315.50 3968.50 14.02% 947.00 3.34% 5792.50 20.46%

Mark One Electric Company, Inc. Installation Adj Speed Drv Pump1,3Trk WSD9047 $472,441.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mark One Electric Company, Inc. PW2015-021-Traffic Signal Upgrade at 6 Intersections -

Phsae IPW2015-021 $1,320,782.10 Prime 834.00 0.00 0.00% 0.00 0.00% 425.00 50.96% 834 0 0 0 0 0 0 0 0 0 0

Total 834.00 0.00 0.00% 0.00 0.00% 425.00 50.96%Alpha Energy & Electric, Inc. PW2015-021-Traffic Signal Upgrade at 6 Intersections -

Phsae IPW2015-021 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Clymore Trucking Company, Inc. Installation Adj Speed Drv Pump1,3Trk WSD9047 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Freeman Concrete Construction, LLC PW2015-021-Traffic Signal Upgrade at 6 Intersections -

Phsae IPW2015-021 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

International Builders & Consultants, Inc. PW2015-021-Traffic Signal Upgrade at 6 Intersections - Phsae I

PW2015-021 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Kansas City Electrical Supply Co. Installation Adj Speed Drv Pump1,3Trk WSD9047 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 00

0

0

00

0

0

00

0

0

0

00

00

000

0

0

0000

0

00000

00

0

0

0

0

0

0

0

0

0

Human Relations Department January 2015 Construction Workforce Detailed Report

17

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Kansas City Electrical Supply Co. PW2015-021-Traffic Signal Upgrade at 6 Intersections - Phsae I

PW2015-021 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

McClan Construction, LLC Installation Adj Speed Drv Pump1,3Trk WSD9047 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC Installation Adj Speed Drv Pump1,3Trk WSD9047 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC PW2015-021-Traffic Signal Upgrade at 6 Intersections -

Phsae IPW2015-021 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%MCCOWNGORDON CONSTRUCTION LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%MCCOWNGORDON CONSTRUCTION LLC Crossroads Academy TIF-CS1100 $1,831,928.00 Prime 32.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 32 0 0 0 0 0 0 0 0 0 0

Total 32.00 0.00 0.00% 0.00 0.00% 0.00 0.00%A K Lee Construction, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0AEL, Inc Crossroads Academy TIF-CS1100 Subcontractor 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3 0 0 0 0 0 0 0 0 0 0American Fire Sprinkler Corp. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Atronic Alarms Crossroads Academy TIF-CS1100 Subcontractor 26.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 26 0 0 0 0 0 0 0 0 0 0Barrier Technologies, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Ben Tarbe Used Brick, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Builders Steel Company Crossroads Academy TIF-CS1100 Subcontractor 6.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6 0 0 0 0 0 0 0 0 0 0Building Keepers, Inc. Crossroads Academy TIF-CS1100 Subcontractor 36.00 27.00 75.00% 0.00 0.00% 0.00 0.00% 9 0 18 0 0 0 0 0 0 0 9Byers Glass & Mirror Inc Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Chappell Electric, LLC Crossroads Academy TIF-CS1100 Subcontractor 70.00 31.50 45.00% 0.00 0.00% 0.00 0.00% 38.5 0 31.5 0 0 0 0 0 0 0 0Control Service Co., Inc. Crossroads Academy TIF-CS1100 Subcontractor 10.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 10 0 0 0 0 0 0 0 0 0 0Cornerstone Services Group, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Deb's Disposal Service, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Dependable Flooring Take-Up, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Higman Equipment Company, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0HUNTER DRAPE Crossroads Academy TIF-CS1100 Subcontractor 1.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 1 0 0 0 0 0 0 0 0 0 0INSCO Industries, Inc. Crossroads Academy TIF-CS1100 Subcontractor 34.00 19.50 57.35% 0.00 0.00% 0.00 0.00% 14.5 0 19.5 0 0 0 0 0 0 0 0Install Solutions LLC Crossroads Academy TIF-CS1100 Subcontractor 12.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 12 0 0 0 0 0 0 0 0 0 0Jabral Inc. Crossroads Academy TIF-CS1100 Subcontractor 12.00 6.00 50.00% 0.00 0.00% 6.00 50.00% 6 0 0 0 6 0 0 0 0 0 0John A. Marshall Company Crossroads Academy TIF-CS1100 Subcontractor 5.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 5 0 0 0 0 0 0 0 0 0 0Kansas City Electrical Supply Co. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0KC Mechanical Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Leavcon II Inc Crossroads Academy TIF-CS1100 Subcontractor 2.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 2 0 0 0 0 0 0 0 0 0 0LMG Construction Services, LLC Crossroads Academy TIF-CS1100 Subcontractor 14.50 4.00 27.59% 0.00 0.00% 0.00 0.00% 10.5 0 0 0 4 0 0 0 0 0 0Midland Marble & Granite, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Performance Contracting Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Porter Roofing Company, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Precision Cutting & Coring, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0S & W Waterproofing, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Stadium Sheet Metal, Inc. Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0STAR SIGNS LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tigris Specialty Construction, LLC Crossroads Academy TIF-CS1100 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Universal Technologies, LLC Crossroads Academy TIF-CS1100 Subcontractor 3.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3 0 0 0 0 0 0 0 0 0 0

Total 234.50 88.00 37.53% 0.00 0.00% 6.00 2.56%MEGA INDUSTRIES CORP COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 1990.75 999.50 50.21% 34.50 1.73% 310.00 15.57% 956.75 0 1.5 34.5 998 0 0 0 0 0 0

Total 1990.75 999.50 50.21% 34.50 1.73% 310.00 15.57%MEGA INDUSTRIES CORP 89004324-Geometric Upgrades and Traffic Signal

Modifications at 39th St and Clever II Blvd.PW2015-015 $507,485.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

MEGA INDUSTRIES CORP Emergency Power Generation Group II WSD8256 $2,381,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0MEGA INDUSTRIES CORP PW2015-026-Main St. Viaduct - Walnut Ramp Removal

and Vault RepairPW2015-024 $612,290.00 Prime 844.50 623.50 73.83% 5.50 0.65% 133.50 15.81% 215.5 0 0 5.5 623.5 0 0 0 0 0 0

MEGA INDUSTRIES CORP Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 $3,469,000.00 Prime 446.00 150.00 33.63% 18.00 4.04% 82.50 18.50% 278 0 1.5 18 148.5 0 0 0 0 0 0

Total 1290.50 773.50 59.94% 23.50 1.82% 216.00 16.74%AGP, Inc. Swope Cmpus Parking Lot and sustainable Stormwater

Improvements ProjectWSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

All American Redi-Mix, LLC PW2015-026-Main St. Viaduct - Walnut Ramp Removal and Vault Repair

PW2015-024 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Alpha Energy & Electric, Inc. Emergency Power Generation Group II WSD8256 Subcontractor 324.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 324 0 0 0 0 0 0 0 0 0 0AT Abatement Services Inc PW2015-026-Main St. Viaduct - Walnut Ramp Removal

and Vault RepairPW2015-024 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Brandy Electric, Inc. Emergency Power Generation Group II WSD8256 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Brandy Electric, Inc. PW2015-026-Main St. Viaduct - Walnut Ramp Removal

and Vault RepairPW2015-024 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Burnaugh Construction, LLC Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 133.50 0.00 0.00% 0.00 0.00% 26.00 19.48% 133.5 0 0 0 0 0 0 0 0 0 0

0

0

0

0

00

0

0

00

0

0

000

00000

00000

0000

00000

000

00000

0

0

0

0

0

00

0

00

Human Relations Department January 2015 Construction Workforce Detailed Report

18

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

Capital Electric Construction Co., Inc. Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Gene Ables Construction, LLC Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Gil's Sales Company, Inc. 89004324-Geometric Upgrades and Traffic Signal Modifications at 39th St and Clever II Blvd.

PW2015-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Jessie's Quality Concrete Co., Inc. 89004324-Geometric Upgrades and Traffic Signal Modifications at 39th St and Clever II Blvd.

PW2015-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

JK Concrete Construction Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

K & G STRIPING Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

MCCONNELL & ASSOCIATES CORP. Emergency Power Generation Group II WSD8256 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Midwest Contracting Services, LLC PW2015-026-Main St. Viaduct - Walnut Ramp Removal

and Vault RepairPW2015-024 Subcontractor 113.75 57.50 50.55% 10.00 8.79% 69.75 61.32% 46.25 10 35 0 11 0 0 11.5 0 0 0

Outlook Inc Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 219.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 219 0 0 0 0 0 0 0 0 0 0

PBP, LLC Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Piping Concepts, LLC Emergency Power Generation Group II WSD8256 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Seal-O-Matic Paving Company Swope Cmpus Parking Lot and sustainable Stormwater

Improvements ProjectWSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Shelby & Son's Steel, LLC PW2015-026-Main St. Viaduct - Walnut Ramp Removal and Vault Repair

PW2015-024 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Thorne & Son Asphalt Paving Co. 89004324-Geometric Upgrades and Traffic Signal Modifications at 39th St and Clever II Blvd.

PW2015-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Thorne & Son Asphalt Paving Co. Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Welch Silt Fence & Erosion Control Swope Cmpus Parking Lot and sustainable Stormwater Improvements Project

WSD1091 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 790.25 57.50 7.28% 10.00 1.27% 95.75 12.12%Neighbors Construction Company Inc COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 7755.75 2260.00 29.14% 1174.50 15.14% 0.00 0.00% 4321.25 1174.5 1248.5 0 1011.5 0 0 0 0 0 0

Total 7755.75 2260.00 29.14% 1174.50 15.14% 0.00 0.00%Pyramid Excavation COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Pyramid Excavation Stormwater Culverts and Detention Pond - Oldham Rd

to 82nd StreetWSD267 $723,085.50 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Pyramid Excavation WMR McGee-Chestnut WSD8928 $5,172,575.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

Bruner Contracting Company, LLC Stormwater Culverts and Detention Pond - Oldham Rd to 82nd Street

WSD267 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Bruner Contracting Company, LLC WMR McGee-Chestnut WSD8928 Subcontractor 176.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 176 0 0 0 0 0 0 0 0 0 0Jessie's Quality Concrete Co., Inc. Stormwater Culverts and Detention Pond - Oldham Rd

to 82nd StreetWSD267 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Jessie's Quality Concrete Co., Inc. WMR McGee-Chestnut WSD8928 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. WMR McGee-Chestnut WSD8928 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total Sodding & Seeding, Inc. WMR McGee-Chestnut WSD8928 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 176.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Radmacher Bros Excavat Co., Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 4332.50 246.00 5.68% 310.00 7.16% 0.00 0.00% 3776.5 310 61 0 88.5 0 0 96.5 0 0 0

Total 4332.50 246.00 5.68% 310.00 7.16% 0.00 0.00%Radmacher Bros Excavat Co., Inc. 89005496 James Street Bridge PW2014-015 $2,926,113.47 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Radmacher Bros Excavat Co., Inc. Chouteau Parkway Improvements 70400001-010 $17,012,154.20 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Radmacher Bros Excavat Co., Inc. Universal Ave - Phase I - Stillwell Ave. Storm Sewer

ImprovementsWSD262 $3,667,915.00 Prime 701.00 32.50 4.64% 0.00 0.00% 0.00 0.00% 668.5 0 0 0 0 0 0 32.5 0 0 0

Total 701.00 32.50 4.64% 0.00 0.00% 0.00 0.00%All Pro Construction, Inc. 89005496 James Street Bridge PW2014-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0All Pro Construction, Inc. Chouteau Parkway Improvements 70400001-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Construction Anchors, Inc. 89005496 James Street Bridge PW2014-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Construction Anchors, Inc. Chouteau Parkway Improvements 70400001-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Jessie's Quality Concrete Co., Inc. Universal Ave - Phase I - Stillwell Ave. Storm Sewer

ImprovementsWSD262 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Kansas City Electrical Supply Co. Chouteau Parkway Improvements 70400001-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Lewis Block & Supply Company Chouteau Parkway Improvements 70400001-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Malco Construction, Inc. 89005496 James Street Bridge PW2014-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. 89005496 James Street Bridge PW2014-015 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. Chouteau Parkway Improvements 70400001-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Thorne & Son Asphalt Paving Co. Universal Ave - Phase I - Stillwell Ave. Storm Sewer

ImprovementsWSD262 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%RAND CONSTRUCTION COMPANY COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 14969.00 867.50 5.80% 0.00 0.00% 1505.00 10.05% 14101.5 0 215 0 483.5 0 0 161 0 0 8

Total 14969.00 867.50 5.80% 0.00 0.00% 1505.00 10.05%0

000

000

00

0

00

0

0

0

000

0

0

0

0

0

0

0

0

0

00

0

0

00

0

0

0

0

00

0

0

0

Human Relations Department January 2015 Construction Workforce Detailed Report

19

Prime Contractor Subcontractor Contract Title Contract Number Contract Value VendorTotal Hours

Total Minority Hours

% of Minority Hours

Total Female Hours

% of Female Hours

KCMO Resident

Hours

% of KCMO

Resident Hours

Caucasian Male Hours

Caucasian Female Hours

African Amer. Male

African Amer.

Female

Hispanic Male

Hours

Hispanic Female Hours

Asian Male

Hours

Native Amer. Male

Hours

Native Amer.

Female Hours

Other Female Hours

Other Male

Hours

Asian Female Hours

RAND CONSTRUCTION COMPANY City-Wide IDIQ Plumbing Installation - Renewal of EV1679-1

EV1679-2 $450,000.00 Prime 241.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 241 0 0 0 0 0 0 0 0 0 0

RAND CONSTRUCTION COMPANY KC Zoo Animal Hosp HVAC Replacement POC2015034 $633,025.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Total 241.00 0.00 0.00% 0.00 0.00% 0.00 0.00%

America On The Go Plumbing, LLC City-Wide IDIQ Plumbing Installation - Renewal of EV1679-1

EV1679-2 Subcontractor 35.00 5.00 14.29% 0.00 0.00% 0.00 0.00% 30 0 5 0 0 0 0 0 0 0 0

EG-Tech, LLC City-Wide IDIQ Plumbing Installation - Renewal of EV1679-1

EV1679-2 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Pro Metals, LLC KC Zoo Animal Hosp HVAC Replacement POC2015034 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Stadium Sheet Metal, Inc. KC Zoo Animal Hosp HVAC Replacement POC2015034 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC KC Zoo Animal Hosp HVAC Replacement POC2015034 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 35.00 5.00 14.29% 0.00 0.00% 0.00 0.00%Redford Construction, Inc. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 6490.00 1016.00 15.65% 373.00 5.75% 195.00 3.00% 5101 121 0 47 353 205 155 508 0 0 0

Total 6490.00 1016.00 15.65% 373.00 5.75% 195.00 3.00%SAK Construction, LLC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%SAK Construction, LLC 22nd Paseo 114th Sewer Interceptor WSD1033 $1,477,576.00 Prime 980.00 479.50 48.93% 0.00 0.00% 0.00 0.00% 500.5 0 127.5 0 352 0 0 0 0 0 0SAK Construction, LLC South Airport Harlem Force Main Rehab. WSD1031 $923,680.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 980.00 479.50 48.93% 0.00 0.00% 0.00 0.00%Blaylock Chemical, LLC 22nd Paseo 114th Sewer Interceptor WSD1033 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Blaylock Chemical, LLC South Airport Harlem Force Main Rehab. WSD1031 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0CU Contracting Services, LLC South Airport Harlem Force Main Rehab. WSD1031 Subcontractor 203.75 160.25 78.65% 0.00 0.00% 0.00 0.00% 43.5 0 160.25 0 0 0 0 0 0 0 0Rodriguez Mechanical Contractors, Inc. 22nd Paseo 114th Sewer Interceptor WSD1033 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Trekk Design Group, LLC 22nd Paseo 114th Sewer Interceptor WSD1033 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 203.75 160.25 78.65% 0.00 0.00% 0.00 0.00%Superior Bowen Asphalt Co COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 6540.50 251.50 3.85% 0.00 0.00% 753.50 11.52% 6289 0 251.5 0 0 0 0 0 0 0 0

Total 6540.50 251.50 3.85% 0.00 0.00% 753.50 11.52%Superior Bowen Asphalt Co 49th Street Resurfac CS130065 $3,655,858.26 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Superior Bowen Asphalt Co Asphalt and Concrete Restoration WSD8986 $7,000,000.00 Prime 1575.50 10.00 0.63% 0.00 0.00% 0.00 0.00% 1565.5 0 10 0 0 0 0 0 0 0 0Superior Bowen Asphalt Co Mo River to Northern City Limi CS130064 $4,134,286.79 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Superior Bowen Asphalt Co Runway 1R-19L Repairs 62140438 $598,500.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 1575.50 10.00 0.63% 0.00 0.00% 0.00 0.00%Boswell & Lee Trucking, Inc. Mo River to Northern City Limi CS130064 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Delta Sweeping Company Runway 1R-19L Repairs 62140438 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Diamond Dump Truck Service Mo River to Northern City Limi CS130064 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mid City Hauling, Inc. 49th Street Resurfac CS130065 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Mid City Hauling, Inc. Mo River to Northern City Limi CS130064 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Realm Construction, Inc. 49th Street Resurfac CS130065 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Realm Construction, Inc. Asphalt and Concrete Restoration WSD8986 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. 49th Street Resurfac CS130065 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. Asphalt and Concrete Restoration WSD8986 Subcontractor 710.50 200.50 28.22% 0.00 0.00% 0.00 0.00% 510 0 0 0 200.5 0 0 0 0 0 0Tenoch Construction, Inc. Mo River to Northern City Limi CS130064 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. Runway 1R-19L Repairs 62140438 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 710.50 200.50 28.22% 0.00 0.00% 0.00 0.00%THE WILSON GROUP INC. COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 6497.00 575.50 8.86% 0.00 0.00% 0.00 0.00% 5921.5 0 160 0 292.5 0 0 123 0 0 0

Total 6497.00 575.50 8.86% 0.00 0.00% 0.00 0.00%TRINITY EXCAVATING & CONSTRUCTION INC COMPANY WIDE PRIME WORKFORCE REPORT Subcontractor 1874.50 534.00 28.49% 0.00 0.00% 0.00 0.00% 1340.5 0 0 0 292.5 0 0 241.5 0 0 0

Total 1874.50 534.00 28.49% 0.00 0.00% 0.00 0.00%TRINITY EXCAVATING & CONSTRUCTION INC

PW2014-010 St. Michael's Roadw PW2014-010 $1,155,000.00 Prime 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%Freeman Concrete Construction, LLC PW2014-010 St. Michael's Roadw PW2014-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Tenoch Construction, Inc. PW2014-010 St. Michael's Roadw PW2014-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0Whatever It Takes Electrical Contractors, LLC PW2014-010 St. Michael's Roadw PW2014-010 Subcontractor 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0 0 0 0 0 0 0 0 0 0 0

Total 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00%0

0

0

0

0000

00

0000

00

00

00

00000

0

0

00

0

0

0

0

0

00

0

0

Human Relations Department January 2015 Construction Workforce Detailed Report

20