Page 1: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx

Civic Design ReviewConcept Design

New Treasure Island Wastewater Treatment Plant 1/13/2020

Page 2: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx

• Project Objectives

• Project Context

• Project Delivery Approach

• Concept Design

Agenda

2

Page 3: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 3

PROJECT OBJECTIVES

3

Page 4: Civic Design Review Concept Design

• SFPUC provides contracted services to TIDA for O&M of all utilities on TI/YBI through a yearly MOU

• Developer is obligated to construct and fund the new infrastructure for TI/YBI

Treasure Island Background• Naval Station Treasure Island (NSTI) is a former US Navy base located in the City and County

of San Francisco

• Treasure Island Development Authority (TIDA) is responsible for the reuse and development of NSTI and operation and maintenance of all utilities on Treasure Island and Yerba Buena Island (TI/YBI)

Page 5: Civic Design Review Concept Design

New TI Water Resource Recovery Facility

Page 6: Civic Design Review Concept Design

Project Objectives

• Address aging infrastructure • Ensure regulatory compliance• Meet the wastewater and recycled water needs of the future TI/YBI development

Page 7: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 7

PROJECT CONTEXT

7

Page 8: Civic Design Review Concept Design

Project Team

8

• Project Manager – Tom Birmingham, SFPUC• Project Engineer – Calvin Huey, SFPUC• Wastewater Enterprise Liaison – Nohemy Revilla• Owner’s Agent – Carollo Engineers, Inc.• Lead Architect - Michele Hollenbaugh, Carollo Engineers, Inc• Landscape Architect - Chris Guillard, CMG Landscape Architecture

Page 9: Civic Design Review Concept Design

Treasure Island Master Plan Long Term Vision

9

Page 10: Civic Design Review Concept Design

Site Constraints

10

Page 11: Civic Design Review Concept Design

New Treasure Island Water Resource Recovery Facility

11

Page 12: Civic Design Review Concept Design

Geotechnical Improvements and SLR

Page 13: Civic Design Review Concept Design

Recycled Water System

13

Buildout recycled water demands:• Average Annual = 0.43 mgd• Peak = 0.98 mgd

Anticipated Recycled Water Uses:• Open space irrigation• Urban farm irrigation• Commercial Building Plumbing• Dry season Green Infrastructure

plant maintenance

Page 14: Civic Design Review Concept Design

Stormwater Management

14

Page 15: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 15

PROJECT DELIVERY APPROACH

15

Page 16: Civic Design Review Concept Design

Alternative Project Delivery Methods

16

TRADITIONALDESIGN-BID-BUILD

DesignerGeneral Contractor

Trade Subcontractors

DESIGN-BUILD

Designer General Contractor

Trade Subcontractors

CONSTRUCTION MANAGER/GENERAL

CONTRACTOR

DesignerGeneral Contractor

Trade Subcontractors

DESIGN-BUILD-OPERATE

Designer General Contractor

Trade Subcontractors

Operator

Page 17: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 17

CONCEPT DESIGN

17

Page 18: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 18

Page 19: Civic Design Review Concept Design

Treasure Island Northeast Concept Plan

19

FUTURE WWTP AND/OR CORPORATION YARD

P R O P O S E D T I W R R F

Page 20: Civic Design Review Concept Design

Wetland Site Plan

20

P R O P O S E D T I W R R F

Page 21: Civic Design Review Concept Design

Excerpt from Treasure Island D4D (2011)

21

Page 22: Civic Design Review Concept Design

Facility Perimeter Design Goals

22

Page 23: Civic Design Review Concept Design

Facility Structure

23

Page 24: Civic Design Review Concept Design

Examples of Buildings to be Designed, Pending CDR Approval

24

Page 25: Civic Design Review Concept Design

Perimeter Design Elements

25

Page 26: Civic Design Review Concept Design

Preliminary Cross Sections and Sightlines

26

Page 27: Civic Design Review Concept Design

Wetland Barrier Fence

27

Page 28: Civic Design Review Concept Design

Berm and Tree Screening

28

Page 29: Civic Design Review Concept Design

Perimeter Enclosure

29

Page 30: Civic Design Review Concept Design

Perimeter Enclosure Design Requirements

30

• 10’ height• 10’ clear zone (low vegetation)• Non-climbable• Non-cuttable• Anti-tunneling continuous concrete foundation• Anti-graffiti• Durability in a marine environment

Page 31: Civic Design Review Concept Design

Perimeter Edge Design Requirements

31

Page 32: Civic Design Review Concept Design

Impasse Fence – SFPUC Standard Option

32

Page 33: Civic Design Review Concept Design

Design Goals

33

1. CONTINUITY WITHOUT MONOTONY

2. DIFFERENTIATE THE EDGE ON AVENUE M (EASTSIDE ROAD)

3. DESIGN TO MATCH THE SCALE OF THE SITE

4. MATERIAL INTEREST AND QUALITY

5. DURABLE AND PRACTICAL MATERIAL THAT SPEAKS TO THE INDUSTRIAL NATURE OF THE SITE

6. ENGAGE LIGHT PHENOMENA – REFLECITIVITY AND SHADOW

Page 34: Civic Design Review Concept Design

34

Security Perimeter Design Iterations

Page 35: Civic Design Review Concept Design

35

Security Perimeter Design Iterations

Page 36: Civic Design Review Concept Design

Security Perimeter Design Iterations

36

Page 37: Civic Design Review Concept Design

Security Perimeter Design Concept

37

Page 38: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 38

PERIMETER ENCLOSURE Eastside Road View

Page 39: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 39

PERIMETER ENCLOSURE Eastside Road View

Page 40: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 40

PERIMETER ENCLOSURE Eastside Road View

Page 41: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 41

PERIMETER ENCLOSUREWetland View

Page 42: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 42

PERIMETER ENCLOSUREWetland View

Page 43: Civic Design Review Concept Design

Draft for discussion purposes.sfpuc0718i1-11140.pptx 43

PERIMETER ENCLOSUREWetland View

Page 44: Civic Design Review Concept Design

Potential Public Art Locations, to be Discussed with SFAC Staff

44