21
Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27 th September 2017 CMEMS IBI-MFC Forecasting Service Operational forecast and reanalysis in North Atlantic waters R&D Team: M.G. Sotillo, R. Aznar, E. Gutknecht, G. Reffray, S. Cailleau, B. Levier, T. Dabrowski, P. Bowyer, L. Aouf, A. Dalphinet, R. Rainaud, J.E. Barrera, C. Toledano, A. Amo- Baladrón, P. Lorente, A. Pascual, E. Alvarez-Fanjul. CESGA Team: P. Rey, A. Rodríguez, J. Villasuso, A. Feijoo, C. Fernández, A. Gómez, I. López.

CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

CMEMS IBI-MFC Forecasting Service

Operational forecast and reanalysis in North Atlantic waters

R&D Team: M.G. Sotillo, R. Aznar, E. Gutknecht, G. Reffray, S.Cailleau, B. Levier, T. Dabrowski, P. Bowyer, L. Aouf, A.Dalphinet, R. Rainaud, J.E. Barrera, C. Toledano, A. Amo-Baladrón, P. Lorente, A. Pascual, E. Alvarez-Fanjul.

CESGA Team: P. Rey, A. Rodríguez, J. Villasuso, A. Feijoo, C.Fernández, A. Gómez, I. López.

Page 2: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Copernicus: The European Earth

Observation Programme

Copernicus Marine Environment Monitoring Service (CMEMS)

2012/04

MyOcean MyOcean-2 MyOcean-FO

2014/10 2015/052009/04

• Environment protection.

• Management of urban areas.

• Forestry.• Fisheries.• Health.• Transport.• Climate change.• Sustainable

development.• Civil protection.• Tourism.

Land Atmosphere MarineClimatechange

Emergencymanagement

Security

Page 3: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Short & Medium Weather Forecast

CMEMS objectives

Seasonal Forecast

Oil Spill Combat

Ice Shipping Route

Search & Rescue

Offshore Energy

Water Pollution

Coastal Environment Climate Change

SustainableAquaculture

Ecosystem-basedfisheries management

Marine biology

Page 5: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

CMEMS IBI-MFC: what is IBI?

Check of physical processes:- Eddies- Coastal Upwelling (western African & Iberian coasts)- Gibraltar inflow/outflow- Slope/shelf currents in the Bay of Biscay

The IBI (Iberia-Biscay-Ireland) area

Page 6: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

The IBI Consortium

More than 30 experts in the IBI Team

IBI-MFC COORDINATION

PHYSICAL BIOGEOCHEMICAL WAVES

OPERATION & SERVICE

CROSS-CUTTING

R&D

Page 7: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

CMEMS IBI-MFC: Current products

IBI Products disseminated to end-users through CMEMS web catalogue:

TEMP, SAL, U, V & SSH

IBI_ANALYSIS_FORECAST_PHYS_005_001

dataset-ibi-analysis-forecast-phys-005-001-hourly

dataset-ibi-analysis-forecast-phys-005-001-daily

Near Real Time Forecast (1/36º)

(2012-Today)

Chl, Fer, NH4, NO3, O2, PO4, Si, Phytoplanckton,

Primary production & Euphotic depth

IBI_ANALYSIS_FORECAST_BIO_005_004

dataset-ibi-analysis-forecast-bio-005-004-daily

VPED, VHM0_SW1, VTM02, VTM10, VTPK, VMDR,

VHM0_SW2, VTM01_SW2, VTM01_SW1,

VMDR_SW2, VMDR_SW1, VTM01_WW, VMDR_WW,

VHM0_WW, VSDY, VSDX, VHM0

IBI_ANALYSIS_FORECAST_WAV_005_005

dataset-ibi-analysis-forecast-wav-005-005-hourly

TEMP, SAL,U,V & SSH

IBI_REANALYSIS_PHYS_005_002

dataset-ibi-reanalysis-phys-005-002-hourly-regulargrid

dataset-ibi-reanalysis-phys-005-002-daily-regulargrid

dataset-ibi-reanalysis-phys-005-002-monthly-regulargrid

dataset-ibi-reanalysis-phys-005-002-monthly-nativegrid

Chl, Fer, NH4, NO3, O2, PO4, Si, Phytoplanckton,

Primary production & Euphotic depth

IBI_REANALYSIS_BIO_005_003

dataset-ibi-reanalysis-bio-005-003-monthly-regulargrid

dataset-ibi-reanalysis-bio-005-003-monthly-nativegrid

Multi-year (1/12º) (2002-2014)

VPED, VHM0_SW1, VTM02, VTM10, VTPK, VMDR,

VHM0_SW2, VTM01_SW2, VTM01_SW1,

VMDR_SW2, VMDR_SW1, VTM01_WW, VMDR_WW,

VHM0_WW, VSDY, VSDX, VHM0

IBI_REANALYSIS_WAV_005_006

dataset-ibi-reanalysis-wav-005-006-hourly

Sotillo et al. 2015: The MyOcean IBI Ocean Forecast and Reanalysis Systems: operational products and roadmap to thefuture Copernicus Service. J of. Op. Oc., Vol. 8 , Iss. 1

Page 8: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Behind the IBI-MFC: PHY component

IBI NEMO v3.6 is a 3D baroclinic model that:

Solves Navier-Stockes and state equations in geopotential coordinates under hydrostatic and

Boussinesq approximations.

Solves high-frequency shelf processes.

Horizontal Resolution: 1/36° (≈ 2 km).

Vertical Resolution: 50 z-coord levels.

Grid size 1093 x 1894 x 50 = 1.035e08 grid points.

Composite Bathymetry from ETOPO 2 & GEBCO.

Tidal forcing at OBC & tidal astronomic potential.

(11 harmonics from FES2004 and TPXO7.1 tidal models solutions)

High frequency Atmospheric forcing (3h atmospheric forcing from ECMWF Model)

Nesting into CMEMS GLOBAL system (Lateral Open Boundary Condition: daily 1/12º data

interpolated to the NEMO grid. 3D T, S, Sea Level & velocities)

Daily update of river discharge inputs (River flowrates sources for 33 rivers)

Run daily forecast + 2 weekly hindcasts (Mon & Wed) with spectral nudging (Data

Assimilation from April 2018)

Page 9: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

• New IBI-NRT-BIO forecast service in V3 (April 2017).

• PISCES model v3.6

• High resolution (1/36º - 50lev) biogeochemical forecast

(+7D), updated weekly (on Thu).

• PISCES 3.6 Application:

– 24 state variables. Delivers chlorophyll, oxygen,

iron, nitrate, ammonium, phosphate, silicate, net

primary production and the euphotic zone depth,…

• On-line coupling with IBI NRT PHY Solution.

• Nested (BIO OBC) to CMEMS GLOBAL BIO Solution.

• Detailed System description in PUM.

2014 Annual average chlorophyll. IBI_ANALYSIS_FORECAST_BIO_005_004 only delivered for the IBI service domain (in red).

Behind the IBI-MFC: BIO component

The IBI BIO-Team: Mercator Ocean-Marine Institute-PdESci Development: MOQualification: MI & PdETransition into operations: MO & PdEProduction & validation: PdE

Page 10: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

• New IBI-NRT-WAV forecast service in V3 (April 2017).

• MFWAM model code used as base.

• 10Km resolution.

• Spectral resolution 24 directions and 30 frequencies

(start at 0.035Hz).

• 3h ECMWF wind forcing (same as IBI PHY) .

• OBC from CMEMS WAV GLOBAL.

• Run twice a day, 5 day forecast on daily basis.

• Product contains the usual wave variables, including

swell and wind wave separation.

• Additionally, wave inputs for phy-wav coupling:

computation of Stoke Drift.Altimeter Ja-2 & saral (JFM-2015)

The IBI WAV-Team: MF-AEMET-PdESci Development: MF & AEMETQualification: MF, AEMET & PdETransition into operations: AEMET & PdEProduction & validation: PdE

SWH

Behind the IBI-MFC: WAV component

Page 11: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

NARVAL web tool

Use of diverse observational networks encompassing both in situ and remote sensing instruments, available within IBI domain

NARVAL (North Atlantic Regional VALidation)

• Real Time (« Online-mode»)Performed automatically performs after forecast consistency metrics

• Delayed ModeMonthly / Quarterly / annual basis

Page 12: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Number of CMEMS Users/Subscribers since January 2013(Data source: CMEMS Service Monitoring report)

The CMEMS User community

ModellingObservations

Number of users by product family(Data source: CMEMS Service Monitoring report)

IBI

Heterogeneous:

Public Agencies, Universities, companies, etc… (Ex.: The SpanishIBI User Group)Active:

Many User feedbacks

i.e. questions, requests, warning onservice anomalies, bug detection, …

Satisfied (but asking for more…):

Operational Users looking for an

efficient way to downscale IBI solution.

Growing:

98 IBI Users in April-June 2017 & Top-4 most downloaded modelling CMEMS products

Sea LevelGlobal SST Med Oceancolour

In situ NWS Baltic Arctic Sea Ice Black SeaWind

ModellingObservations

Page 13: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Downstream use cases

Oleg Naydenov Oil Spill

Gran Canaria

… actions taken by local and national authorities and emergencyservices to mitigate the environmental damage. Monitoringevolution of the spill during the crisis, one of them. The CMEMS IBIforecast product played a significant role in achieving this goal.

Page 14: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Flying gliders with IBI

Now: SILBO

Entered IBI domain on

18th October 2016

Downstream use cases

Page 15: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

The IBI-MFC systems

– Increase of complexity of IBI NRT PHY Op suite.

• SAM2 Data Assimilation Tool already in V3 (running Spectral Nudging Solution).

– New BIO & WAV Op.

– Increase of number of products to be generated, managed, stored & disseminated.

• Challenging Hourly 3D Product.

Noticeable upgrade of operational services at V3:

Page 16: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

224G(PHY)1.8T(PHY)!! 244G(BIO) 1G(WAV)

24G(PHY)197G(PHY) 61G(BIO) 1G(WAV)

4351 (44 PHY/BIO + 7 WAV)

V2 V3Nodes

(24 cores)

Output

Disk spacefor run

HPC resources for IBI-MFC

– Increment in the number of nodes (+8). 1032 cores for PHY/BIO; 144 for WAV.

– Increment in outputs size.

– Huge increment in the temporary disk space for PHY run (hourly 3D products).

Noticeable upgrade of operational services at V3: Increase of HPC resources to face IBI V3 upgrade.

Page 17: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

0

20

40

60

80

100

120

140

160

180

PHY forecast(2,3h)

WAV forecast(0,6h)

PHY hindcast(2,3h)

BIO hindcast(2,8h)

BIO forecast(1,6h)

3 0 4 7 6

60

20

95

130

60

60

15

30

20

20

12

1

7

5

5

3

1

2

3

2

Computing time (min)

pre-proc model post-proc dissemination storage

DailyMon &

Wed

Thu

Wed

Twicea day

HPC resources for IBI-MFC

Virtual machines:- puertos2.cesga.es (OP): MOTU (webserver), THREDDS, M-FTP (CMEMS FTP server) installed.- test-puertos2.cesga.es: test machine (same as OP) for new products dissemination testing

(i.e., 3D hourly products).- puertos.cesga.es: for double dissemination (1month) when new version update.

+

Page 18: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

IBI-MFC systems performance

Incidents/Problems/PSO

Status of the period (from 1/5/2016 to 31/03/2017)

How many have been raised?

How long did theytake? [mean in days]

How many are stillopen?

Incidents 6 1 0

Problems 0 0 0

Planned ServiceOutages

3 1 (<8h) 0

Page 19: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

Products

Status of the period (1/5/2016 to 31/03/2017)

Availability:

% Availability of download

mechanisms (HTTP/FTP)

Timeliness:%Products ready for

download

How manyquestions from

users

Are some of yourproducts

distributed by another service?

SUB-DGF/WMS/MFTP99.83/99.92/99.95

98.81 4 No

• Questions from users related to:

Problems with data download (metadata info through subsetterinterface).

Request of variables not distributed.

Problem with postprocessed data (BIO)

IBI-MFC systems performance

Page 20: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

SAMPA & SAMOA: PdE coastal

downscaling capabilities

Algeciras

Las Palmas

S.C. deLa Palma

S.S. deLa Gomera

S.C. deTenerife

Ferrol

Barcelona

Tarragona

Bilbao

SAMPA

SAMOA systems

Local HR Harbor Circulation Systems:

Almería

PRT-FER

PRTFER: 197 x 92

(dx~dy ≈ 70m)

CST-FER

CSTFER: 120 x 74

(dx~dy ≈ 350m)

CMEMS IBI

CMEMS GLO

PdE CST

PdE PRT

Page 21: CMEMS IBI-MFC Forecasting Service Aznar.pdfServicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017 CMEMS IBI-MFC Forecasting

Servicios marinos y supercomputación: experiencias y retos futuros Santiago de Compostela, 27th September 2017

The IBI-MFC Team