    SECARB Plant Barry to CitronelleResearch Experience in Carbon Sequestration June 8, 2012

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    2/16

    x

    x

    2

    Our Company

    Denbury Resources Inc. (NYSE: DNR):

    A growing independent oil and gas companyApproximately 1309 employees (578 in Plano,731 in the field) The largest oil and natural gas operator in Mississippi and Montana Owns the largest reserves of CO2 used for tertiary oil recovery east of the

    Mississippi River

    Holds significant operating acreage in the Rockies, Mid-Continent and GulfCoast

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    3/16

    x

    x

    Areas of Operations: 2 Target Areas

    3

    GreenPipeline

    JacksonDome

    Free StatePipeline

    Delta Pipeline

    NEJDPipeline

    Sonat MSPipeline

    ND

    SDLost

    Cabin

    ID

    MT

    WY

    TXLA

    MS

    IL

    IN

    KY

    Greencore

    Pipeline

    Rockies

    CO2 Pipelines Under Development

    CO2 Source Owned or Contracted

    Existing CO2 Pipelines

    Rocky Mountain Fields With EORPotential

    Existing Anthropogenic CO2 Sources

    Proposed Coal to Gas or Liquids

    Gulf Coast

    Gulf Coast Pipelines

    Source: Jackson Dome

    NEJD LineBrookhavenMallalieuLittle CreekMcCombSmithdaleCranfieldLockhart CrossingFree State LineMartinvilleSosoEucuttaHeidelbergDelta LineTinsleyDelhiGreen LineOyster BayouHastingsSeabreezeConroe (TBC)Thompson (TBC)

    Rockies Pipelines

    Source: Riley Ridge

    Greencore LineBell Creek (C) (EOY)Cedar Creek Anticline (TBC)Anadarko Line

    Grieve (TBC)

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    4/16

    x

    x

    Denbury Study Partnerships

    4

    East Region Cranfield Adams & Franklin Counties, MS

    Large Scale CO2 Injection MVA BEG / SECARB Citronelle Mobile County, AL

    CO2 Injection Pilot UAB / UA / AA&M / UNCC Sequestering CO2 in a Saline Reservoir EPRI / SSEB / SECARB

    West Region

    West Hastings Brazoria County, TX Anthropogenic CO2 Injection for EOR MVA BEG / GCCC

    Delhi Richland Parish, LA Geophysical Mapping CSM

    North Region Bell Creek Powder River County, MT

    MVA Program PCOR / EERC / UND

    MVA (Monitoring, Verification, Accounting)

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    5/16

    x

    x

    Citronelle Field Basic Facts

    Citronelle Field located in & aroundthe City of Citronelle Approx. 1 hour north of Mobile, AL

    Field is comprised of 3 active units:Main, East & Southeast

    There are 423 wells in the 3Denbury operated units

    168 active producers 62 active injectors 7 SWD wells 93 TA/TP wells 88 plugged 5 SECARB

    Denbury took over operations onFeb. 1, 2006 from Merit Energy

    5

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    6/16

    x

    x

    Citronelle Geological Field Summary

    Field discovered 1955 Discovery Well: Zach Brooks Drilling #1 Donovan (Unit Well A-25-5) Producing formations:

    Upper Donovan Sands (Rodessa) Lower Donovan Sands (Sligo)

    Current Well Spacing: 40 acres

    Original GOR = 244 cft/bbl in Rodessa and 104 cft/bbl in Sligo

    Oil Gravity (43-45 degrees API) Water flood June 1961 to present Cumulative Production approximately 165 MMBO

    (Estimated Primary cum production approximately 52 MMBO)

    Estimated OOIP between 300-500 MMBO

    Structure is a salt-cored, un-faulted, ovate anticline with NW-SE trending axis. Regional structural dip is generally to the south.

    Reservoir seal for Rodessa is Ferry Lake Anhydrite Reservoir seal for Sligo is Pine Island Shale

    6

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    7/16

    x

    x

    Citronelle Geological Field Summary

    Productive Area approximately 33 square miles 53 productive sandstones have been identified. 481 wells on the structure Currently 168 active producers and 62 active water injectors Daily production averages approximately 1,580 BOPD (gross)

    with approximately 9,700 BWPD and water injection

    approximately the same as water produced. (Apr 2012 avg thru 4/9)

    Depositional Model Tidal Channel / Tidal Flat / Estuarine Environment Brackish water; semi-arid climate; pedogenic features Abundant bioturbation (even within channel deposits) Modern-day analogy = Indus Delta

    7

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    8/16

    x

    x

    SECARB Phase III Anthropogenic Test - Schedule

    8

    The CO2 capture unit at Alabama Powers(Southern Co.) Plant Barry became operationalin 3Q 2011.

    A newly built 12 mile CO2 pipeline from PlantBarry to the Citronelle Dome completed in 4Q2011.

    A characterization well was drilled in 1Q 2011to confirmed geology.

    Injection wells were drilled in 4Q 2011.

    100 to 300 thousand metric tons of CO2 will be

    injected into a saline formation over 2 to 3years beginning in 2Q 2012.

    3 years of post-injection monitoring.

    Project Schedule and Milestones

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    9/16

    x

    x

    Approx. 12 mi (19 km) to the SE Citronelle Unitin Citronelle Oil Field

    Right-of-Way 1 mi (2 km) inside Plant Barry property > 8 mi (13 km) along existing power corridor 2 mi (3 km) undisturbed forested land

    Permanent cleared width 20 ft (6 m) Temporary construction width 40 ft (12 m) Right-of-Way habitat

    9 mi (14.5 km) of forested and commericaltimber land

    3 mi (5 km) of emergent, shrub and forestedwetlands

    Endangered Gopher Tortoise habitat 110 burrows in or adjacent to constructionarea

    9

    CO2 Pipeline Right-of-Way

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    10/16

    x

    x

    Applicable regulatory standard: USDepart of Transportation, 49 CFR Part

    195 Transportation of HazardousLiquids by Pipeline

    Welding - API 1104 & B31.3 (plantsection)

    4-inch (10 cm) pipe diameter X42/52 carbon steel pipe MOP 2,220 psig (flange limitation) Normal operating pressure: 1,500 psig

    (10.3 MPa) maximum

    Buried average of 5 ft (1.5 m) withsurface re-vegetation and erosion control

    Handling pipe for horizontal directional drill

    CO2 Pipeline and Measurement Design

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    11/16

    x

    x

    11

    Directional drilled 18 sections of the pipelineunder roads, utilities, railroad tracks, tortoise

    colonies, and wetlands. (30 to 60 ft deep)

    Trenched remaining sections Corrosion protection

    Fusion Bond Epoxy coated pipe Jeep pipe for coating damage; manuallycoat joint welds and scratches Impressed current cathodic protection AC mitigation for overhead powerlines

    using copper wire

    ACVG survey after construction to checkagain for coating damage

    Caliper tool run to check for dents causedby rock or equipment

    Workers dressing welded pipe joints

    CO2 Pipeline Design and Construction

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    12/16

    x

    x

    Denbury pipeline purity requirementis:

    > 97% dry CO2 at 115F (46C) < 0.5% inerts (incl. N2 & argon) < 30 lb water per 1MMSCF < 20 ppm H

    2S

    Impurities affect and sometimesamplify pipe fracture toughness

    requirements

    Hydrogen & Nitrogenproblematic

    Toughness requirements for thisproject met by standard X42 pipe.

    Other projects require added wallthickness, modified pipe chemistry

    and/or crack arrestor installation.

    12

    CO2 Pipeline and Measurement Design

    Custody meter station and building

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    13/16

    x

    x

    13

    CO2 Pipeline and Measurement Commissioning

    Pipeline was commissioned March 8, 2012 At custody meter station there is the capability of

    taking samples of CO2 stream.

    Samples will be taken periodically for permitsand GHG reporting.

    Sample obtained for Class V injection permitshowed 99.6% pure CO2. Major impurities were

    Nitrogen (2700 ppm) Line was filled with N2 to pressure test line

    then swept with CO2 prior to commissioning

    Oxygen + Argon (880 ppm). Lab impurity?

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    14/16

    x

    x

    CO2 Specific Design Requirements Valve seals Accepted: Nylon,

    peroxide cured Buna N

    (HBNR-90/95), ethylenepropylene rubber (EPDM)

    Valve packing Teflon Low temperature materials for

    valves used for blowdownservice only.

    Mainline valve station similar tonatural gas with blowdowns formaintenance.

    14

    CO2 Pipeline and Measurement Design

    Mainline valve station & CP test station

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    15/16

    x

    x

    CO2 measured with senior orificemeter and gas chromatograph

    Custody measurement meets AGAReport #3, Parts 1 & 2

    Accuracy and mechanical issues withturbine, Coriolis, & ultrasonic meters

    Turbine CO2 is dry damagesmoving parts. CO2 viscocity rangecan be problematic

    Coriolis Accuracy not as good asorifice

    Ultrasonic CO2 absorbs and distortssignal

    Communication using SCADA andsatellite.

    Check meter installed for pipeline leakdetection and verification of injected

    volumes

    15

    CO2 Pipeline and Measurement Design

    Check meter station and building atDenbury Citronelle Field

  • 7/31/2019 CO2 Pipeline - SECARB, Plant Barry to Citronelle

    16/16

    x

    x

    CO2 Booster Pump Designed & fabricated by Wood Group

    (GE)

    130 stages (impellers) 44 ft long 4 suction 3 discharge 300 HP electric motor 3570 rpm w/

    variable speed drive

    Pneumatic shut downs (2), pneumaticcontrol valves (2), manual shut down

    valves (2), vibration shut down switch

    (1), manual blowdown valves (2),

    discharge check valve (1)

    Inlet pressure 1300 psi outletpressure 3200 psi

    Variable speed drive with recycle valvefor near 100% turndown

    Max rate approx. 14 MMCFD CO2 Satellite link for communication

    2 pressure transmitters & 2temperature transmitters

    Stand alone air compressor system tooperate valves & controls

    16

    CO2 Pipeline and Measurement Design

    Horizontal Injection Pump @ D-9-7 #2 Wellsite