Upload
lamthuan
View
223
Download
2
Embed Size (px)
Citation preview
A Noble DrillingCorporation Subsidiary
TT00-38 1
April 19, 2001
Coiled-Tubing High Pressure
Jet Drilling System
Dr. William C. Maurer
TT00-38 2
HP Pump
HP Line
HP Rotary Hose
HP Swivel
High StrengthDrill Pipe
HP Seal
Tool-JointSeal HP Bit
Exxon High Pressure Drill Rig
TT00-38 7
Comparison of Drilling Methods
0
200
400
600
800
1000
1200
Conventional Drilling Motor/Jet Bit
Dri
llin
g R
ate
(ft
/h
r)
Rotary Motor
TT00-38 9
CT ReelInjector Head
Single-Flow HP Bit
LP & HP Pumps
HP
Flo
w
High Pressure CT Drilling System
(Single Flow)
Single Flow HP Motor(Solid Rotor)
ConventionalCoiled Tubing
TT00-38 10
Project Participants
Maurer Engineering - Motors and Bits
Quality Tubing - HP Coiled Tubing
Stewart & Stevenson - CT Rig
BJ Services - Field Operations
Marathon - Operator Requirements
ARCO - Operator Requirements
TT00-38 12
High Pressure CT Motor (Single Flow)
Titanium Drive Shaft
PDC Thrust Bearings
Titanium
Flexshaft
High Pressure
Jet Bit
Filter
PDM Multilobe
Rotor/Stator (3 1/8”)
2 3/8” CT
Solid Titanium
Flexshaft
Radial Bearings/
Flow Restrictors
High Pressure
Low Pressure
Solid Rotor
TT00-38 15
Bearing Load Comparison
5600
16,800
0
5000
10000
15000
20000
Ball Bearing PDC Bearing
Lo
ad
Ca
pa
cit
y
100 Hours @ 300 rpm
TT00-38 17
Motor Labyrinth Leakage
8.1
12.1
0
2
4
6
8
10
12
14
16
0.004" 0.006"Leakage Clearance (w)
Flo
w R
ate
(g
pm
)
wFour 5” Labyrinths10,000 psi
TT00-38 20
7500
900
85
1100
Rotary Speed Torque
With Gear Box
Without Gear Box
(RPM) (ft-lbs)
Turbodrill Performance
TT00-38 25
Coiled Tubing Burst Pressure(100,000 psi yield)
CT Diameter (in.)
1.00
1.25
1.50
1.75
2.00
2.375
2.875
3.500
Wall Thk. (in.)
0.109
0.156
0.175
0.188
0.203
0.203
0.203
0.203
Burst Pressure (psi)
20,800
24,160
22,670
20,910
19,800
16,670
13,770
11,310
TT00-38 26
0
50
100
150
200
6,000 9,000 12,000
1.75"
2.00"
CT FATIGUE LIFE
Fati
gu
e L
ife
(tri
ps)
Internal Pressure (psi)
QT-1000
(based on MEI CTLIFE model)
TT00-38 27
Fiberspar Spoolable Products
Production Tubing - FS PT
Line Pipe - FS LP
Coiled Tubing -FS CT (for Well Servicing)
TT00-38 29
0
10000
20000
30000
40000
QT-1000 Incoloy-625 Composite
Bu
rst
Pre
ssu
re (
psi
)CT Burst Pressure
2.00 inch OD
TT00-38 39
CT High Pressure Jet Drilling Rate
150
300
1600
0
200
400
600
800
1000
1200
1400
1600
1800
Rotary Conventional High Pressure
Dri
llin
g R
ate
Motor Motor
Leauder Limestone3-1/8” Bit
A Noble DrillingCorporation Subsidiary
TT00-38 40
DOE High-Pressure Coiled Tubing Drilling System
Phase III Commercialization
William C. Maurer
August 8, 2000
TT00-38 41
Objective: Field test and demonstrate
prototype CT Drilling System
Sub Contractors: BJ Services
Quality Tubing
Phase III Commercialization
Start Date Oct. 1, 2000
Phase III Budget $3,152,498
DOE Phase III Funding $1,585,556
TT00-38 42
Phase III Tasks
1. Conduct shallow field test
2. Modify system
3. Conduct deep field test
4. Develop Commercialization Plan
5. Write Final Report
TT00-38 43
Phase III Plans
Shallow field tests - Catoosa
Deeper field tests - Marathon Oil
Commercial tests - BJ Services
TT00-38 44
High Pressure Bit
HP
Flo
w
ConventionalCoiled Tubing
High Pressure Motor
Drilling (Vertical)
TT00-38 46
Formation Damage Mechanism(Timmerman, 1982)
Pressure profilein the formation
Dpskin = Pressure drop acrossthe damaged zone
Skin or zoneof damage
TT00-38 47
“ In must homogeneous matrix situations, the physical depth of
solids invasion tends to be shallow (1-2 cm into the
formation)”
(Bennion et al., 2000)
TT00-38 53
CT Cement Cleanout Rates
60
1000
0
200
400
600
800
1000
1200
Low Pressure 10,000 psi
RO
P (
ft/h
r)
TT00-38 54
Cement Cleanout Assumptions
Conventional ROP = 60 ft/hr
Jet ROP = 600 ft/hr
Conv. CT Rig = $10,000/day
Jet CT Rig = $20,000/day
Land Rig = $5,000/day
Offshore Rig = $200,000/day
Well Depth = 10,000 ft.
Conv. Land Cost =($10,000 + $5,000) x 10,000
60 x 24= $104,000
TT00-38 55
Cement Cleanout Costs(Land Well)
104
21
0
20
40
60
80
100
120
Cost
Cle
an
ou
t C
osts
($
10
00
's)
Conventional
Jet
TT00-38 56
Cement Cleanout Costs(Offshore Well)
0.15
1.46
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
Cost
Cle
an
ou
t C
osts
($
Millio
ns)
Conventional
Jet
TT00-38 62
Phase III Commercialization
BJ Services
CT field operations
Quality Tubing
High Pressure CT
Marathon Oil
Field test sites
Maurer Engineering
HP motor/bit development