Copenhagen HDD Capabilities

Embed Size (px)

Citation preview

  • 7/27/2019 Copenhagen HDD Capabilities

    1/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    HORIZONTAL DIRECTIONAL DRILLING (HDD),

    MICROTUNNELING

    PIPE JACKING

    TRENCHLESS INSTALLATION PROGRAM

  • 7/27/2019 Copenhagen HDD Capabilities

    2/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    1

    Contents

    Company Overview..................................................................................................................... 2

    Horizontal Directional Drilling (HDD) ........................................................................................ 2

    Microtunneling ........................................................................... Error! Bookmark not defined.

    Pipe Jacking and Auger Boring .............................................................................................. 11

    Completed Projects .................................................................................................................. 15

    Key Personnel ........................................................................................................................... 16

  • 7/27/2019 Copenhagen HDD Capabilities

    3/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    2

    Company Overview

    Background

    Copenhagen Contractors is a customer focused construction and contracting company, which

    undertakes all contracted works to relevant Western European, US or other InternationalStandards, according to the demands of the individual client.

    Copenhagen Contractors,WWW.CPHCON.COM, was established in 2004 with a mission to

    supply and support international organizations around the globe with turnkey construction

    solutions and to generate the most efficient and effective results. Today, Copenhagen

    Contractors is recognized as a leading supplier of contingency logistics, specialized

    construction solutions, infrastructure projects and O&M services to civilian contractors,

    international organizations and governmental bodies.

    Together with our trusted partners Vadnais Microtunneling L.L.C.,WWW.VADNAISLLC.COM,

    our team has a strong, established presence and many years experience of providing acomplete range of timely services in support of electrical, oil and gas companies, municipalities,

    governments and international organizations worldwide. This experience ensures that not only

    have our systems and procedures been developed and refined over time to optimize support to

    locations throughout the world. We have also in place the personnel with the right technical

    experience and ability of operating in demanding environments in many parts of the globe.

    Copenhagen Contractors brings staff with a wealth of experience in construction, infrastructure

    projects and trenchless utilities installations in the Balkan region, the Middle East and Asia.

    For further information on Trenchless installation of utilities (by means of Horizontal Directional

    Drilling (HDD), Micro tunneling and Pipe Jacking) please contact:

    Mr. Jay Hicks

    Regional Manager, Middle East

    COPENHAGEN CONTRACTORS

    Maghater Complex Bld 31 Office 19,

    Farwaniya, Kuwait

    Mobile Kuwait: (+965) 65133508

    Mobile UAE: (+971) 508088323

    Office: (+965) 24773770

    Fax: (+965) 24773771

    E-mail:[email protected]

    Mr. Mahmoud Khader

    General Manager, Kuwait

    COPENHAGEN CONTRACTORS

    Maghater Complex Bld 31 Office 19,

    Farwaniya, Kuwait

    Mobile Kuwait: (+965) 65135001

    Office [ +965] 24773770

    Fax: [+965] 24773771

    E-mail:[email protected]

    I am confident you will find Copenhagen Contractors to be a reliable and professional partner

    in any construction project as well as an innovative and flexible sparring partner for future

    business opportunities

    Horizontal Directional Drilling (HDD)

    http://www.cphcon.com/http://www.cphcon.com/http://www.cphcon.com/http://www.vadnaisllc.com/http://www.vadnaisllc.com/http://www.vadnaisllc.com/mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]://www.vadnaisllc.com/http://www.cphcon.com/
  • 7/27/2019 Copenhagen HDD Capabilities

    4/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    3

    Pipe/Cable-laying by Horizontal Directional Drilling (HDD) is one of the most innovative

    construction methods today. With the ever growing need for infrastructure around the globe,

    Copenhagen Contractors A/S is pleased to provide turnkey trenchless routing projects for

    infrastructural networks, installation of conduits to carry electric and fiber optic cable, pipelines

    carrying water, sewage, fuel and other products.

    Due to the versatility of the system the installation can be carried out under roads, buildings,runways, pipeline corridors and waterways and through even the most difficult soil conditions,

    cobblestone and pure rock.

    Technology Overview and BenefitsDirectional borings are fast and have the least environmental impact of any alternate method.

    The technology also allows conduit placement under obstacles and provides maximum

    protection and minimizes maintenance costs. During installation normal business operations

    are not interrupted which is of utmost importance in any operational environment.

    Directional borings have a predictable and short construction schedule and the major benefits

    are:

    Continuation of normal operation

    Avoidance of identified infrastructure installations

    Maintain integrity of roadways, buildings, and natural features

    Little or no disturbance to wetlands or nature conservators.

    Minimum site restoration

    Copenhagen Contractors HDD at Kandahar Airfield, Afghanistan

  • 7/27/2019 Copenhagen HDD Capabilities

    5/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    4

    Technology and ServicesCopenhagen Contractors A/S owns, maintains and operates a fleet of state-of-the-art horizontal

    drilling rigs. The D16X20, D36X50 and D100x120 II Series rigs and Drilling Fluid Mixing

    Systems are manufactured by Vermeer in Pella, Iowa, USA. The range of capacity in these

    rigs combined with a series of specialized drill bits and the R.A.T.T. (Rock Adaptable Terrain

    Tool) provide the opportunity to match the equipment to any field conditions in the Middle East,

    including rock and cobblestone conditions.

    Vermeer D16x24 Series II NAVIGATOR rig

    Vermeer D16x20 Series II NAVIGATORLoaded with many intelligent features on a compact frame, the D16x20 Series II is powered by

    a 65 hp/48 kW Kubota diesel engine, giving you 2,000 ft-lb/2,700 Nm of rotational torque and

    1,600 lbs/71 kN of thrust/pullback. The onboard pump provides high flow in large-diameter

    bores for more efficient backreaming.

    Vermeer D36x50 Series II NAVIGATOR rig.

    Vermeer D36x50 Series II NAVIGATORWith the highest power-to-size ratio in its class the D36x50 Series II is powered by a 140 hp

    (104 kw) engine and delivers 4928 ft-lb (6681 Nm) of rotary torque and 33,000 lb (14,969 kg) of

    thrust with 36,000 lb (16,329 kg) of pullback. It's narrowly designed rack and pinion design

    helps to maintain a small footprint for access into congested areas. The D36x50 is built to

    perform a wide range of medium diameter, moderate-to-long distance utility installations (up to

    450 / 137 meters).

  • 7/27/2019 Copenhagen HDD Capabilities

    6/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    5

    Vermeer D36x50 Series II NAVIGATOR rig.

    Vermeer D100x120 Series II NAVIGATORPower through a wide range of bores, even in difficult ground conditions, with the D100x120Series II. Equipped with a 225 hp/150 kW John Deere 6068 Tier 3 diesel engine, the D100x120

    Series II offers 12,000 ft-lb./16,270 Nm of rotational torque and 100,000 lbs/445 kN of

    thrust/pullback force.

    Due to its compact design the HDDdrilling rigs are able to operate incongested and hard-to-reach places.

    Precision multiple pipe installationin three separate crossings.

  • 7/27/2019 Copenhagen HDD Capabilities

    7/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    6

    Copenhagen Contractors HDD Assets

    MX240 Drilling Fluid Mixing SystemThe MX240 Modular Drilling Fluid System is designed to

    provide fast mixing of high volumes of drilling fluid for

    large-diameter and long-distance HDD applications. The

    system features a 25 hp (18.6 kw) Kohler gas or 22 hp

    (16.4 kw) Hatz diesel engine supporting a 1000 gallon

    (3785 L) mixing tank.

    Rock Adaptable Terrain Tool (R.A.T.T)

    Especially for very demanding soil conditions

    Copenhagen Contractors provides the Rock Adaptable

    Terrain Tool (R.A.T.T.). The R.A.T.T. offers operators

    the ability to drill and steer through varying soil

    conditionsincluding soft soil, gravel, cobblestone and

    solid rock.

    Drilling Bits, Reamers and Spare Parts

    Copenhagen Contractors uses Genuine Vermeer parts

    exclusively. All drill bits, reamers, shark teeth, cutters

    etc. are precision-crafted to match our Vermeer

    equipment exactly. This ensures that our HDD system

    runs as smoothly as possible, with the least amount of

    service and maintenance.

    Bore Planning

    Copenhagen Contractors uses the Vermeer Atlas Bore

    Planning system to efficiently plan our bores. The bore

    planning software heightens professionalism by aiding

    the operator in preplanning the bore and comparing the

    planned bore path with the actual bore path.

  • 7/27/2019 Copenhagen HDD Capabilities

    8/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    7

    Locating System:

    The locating system is a system that

    verifies the proposed drill route

    establishing surface navigational

    systems (tolerance and accuracy) andtesting of the survey systems to be used

    as down hole.

    The position of the underground drilling

    head is determined by the locator. To

    bore straight, steer and rotate the angle

    of direction and forward thrust will be

    applied.

    Drilling Fluid (Bentonite)

    Bentonite based drilling fluids are used

    in both vertical and horizontal drilling. It

    is a colloidal clay mineral, compsed

    primarily of montmorillonite, especially

    chosen for its capacity to absorb

    enormous quantities of water. The

    absorption increases the distance

    between individual clay platelets and this

    mechanism in turn increases the

    viscosity of the fluid

  • 7/27/2019 Copenhagen HDD Capabilities

    9/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    8

    HDD fleet specifications

    D16x20 Series II D36x50 Series II 15' D100x120 Series II

    Weight10,500 lbs (4,762.72

    kg)

    21,850 lbs (9,910.99

    kg)

    21,850 lbs (9,910.99

    kg)

    Engine make

    and modelKubota 3,600

    John Deere PowerTech

    4,045HF275John Deere 6,068

    Gross

    Horsepower65 hp (48.47 kw) 140 hp (104.4 kw) 225 hp (167.78 kw)

    Thrust 16,000 lbs (7,257 kg) 33,000 lbs (14,968 kg)100,000 lbs (45,359

    kg)

    Pullback 16,000 lbs (7,257 kg) 33,000 lbs (14,968 kg)100,000 lbs (45,359

    kg)

    Minimum Bore

    Diameter3.5" (8.89 cm) 3.5" (8.89 cm) 5" (12.7 cm)

    Auxiliary PumpFlow at

    Maximum

    Engine RPM

    26 gpm 47 gpm 20 gpm

    Auxiliary Pump

    Relief Pressure

    3,300 psi (227.53 bar) 3,000 psi (206.84 bar) 3,000 psi (206.84 bar)

    Thrust/Pullback

    Pump Flow at

    Max Engine RPM

    36 gpm (136.27

    L/min)

    33.06 gpm (125.3

    L/min)

    45 gpm (170.34

    L/min)

    Thrust/Pullback

    Pump Relief

    Pressure

    3,335 psi (229.94 bar) 2,650 psi (182.71 bar) 2,650 psi (182.71 bar)

    Beside the HDD rigs Copenhagen Contractors owns and operates a fleet of support vehicles,

    including but not limited to:

    Water Tankers,

    Tractors

    Trucks

    http://www2.vermeer.com/vermeer/equipment/directional_drills/d16x20_series_iihttp://www2.vermeer.com/vermeer/equipment/directional_drills/d36x50_series_ii_15%2527_http://www2.vermeer.com/vermeer/equipment/directional_drills/d100x120_series_iihttp://www2.vermeer.com/vermeer/equipment/directional_drills/d100x120_series_iihttp://www2.vermeer.com/vermeer/equipment/directional_drills/d36x50_series_ii_15%2527_http://www2.vermeer.com/vermeer/equipment/directional_drills/d16x20_series_ii
  • 7/27/2019 Copenhagen HDD Capabilities

    10/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    9

    HDD Method StatementOur HDD works can be divided into 3 independent stages, namely:

    1. Pilot Bore

    The pilot bore is the first phase in any HDD project. The pilot bore is executed by

    directionally guiding the drill head along a determined path from entry point (rig side) to the

    exit point (pipe side).

    Machinery utilized for drilling the pilot bore in hard rock conditions are available and

    includes the R.A.T.T (Rock Adaptable Terrain Tools) to penetrate into hard rock

    conditions. During the pilot bore a sonde (transmitter) and a tracking (receiver) device are

    utilized to be able to precisely locate and steer the drill string underneath the surface.

    2. Pre-Reaming

    Pre-Reaming is done with the same machine as the machine that was used for drilling the

    pilot bore. Once the pilot bore is completed the drill head and tracking system is

    disconnected from the drill string and back reamers are installed. Back reaming is usually

    performed in stages until the final desired diameter of hole is reached, hence the pipe isready to be pulled. The stages vary from site to site and from job to job depending on the

    specific circumstances of each.

    Copenhagen Contractors owns back reamers of various types and models and are

    selected as per the ground conditions they are to be operated in. In hard rock conditions

    Rock Back reamers will be utilized due to the higher performance and efficiency required

    3. Pipe Pulling

    Pipe pulling is the last phase before the job is done. The pipe is connected to the drill

    string and it is then pulled from the exit pit side towards the entry pit side (rig side).

    Copenhagen Contractors offers a wide variety of Pipes/Pipe Sleeves/Cables to be pulled

    depending on the project specifications.

  • 7/27/2019 Copenhagen HDD Capabilities

    11/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    10

    HDD Design Rules of thumb:

    Every site is unique and every installation method will be selected to draw on the experience of

    Copenhagen Contractors A/S HDD engineer to meet the exact needs of the client and address

    the characteristics of the site. With this as a caveat, the following guidance has been described

    by directional boring designers and constructors:

    Mobilization and set up of the drilling equipment usually takes one day and includes site

    preparation and excavation.

    Under good conditions Copenhagen Contractors A/S can install 50-80 meters of pipe per

    day.

    A crew of one operator, one locator and two to three helpers shall be working on each

    rig. The locator shall take readings in short intervals and lead the operator drilling path

    A setback is needed for entrance and exit points and must be included in the length ofthe borehole. Setbacks range from 1 to 2 meters for each meter below grade of the

    installation. For example, for a placement 2 meters below grade, include 5 to 8 meters of

    boring on each side of the installation for the setbacks.

    To cool the drill head and flush the debris out of the hole drilling fluid mix (bentonite and

    other additives) are pumped into the drill string throughout all phases of the drilling.

    Cobblestones are the nemesis of directional drills and can deflect drill strings. Difficult-to-

    penetrate conditions may increase the time needed to complete a project.

    Safety on site is ensured at all times, and safety gloves, shoes, reflective jackets are

    worn by the entire crew.

    De-mobilization usually takes one day and includes backfilling and compaction of the

    soil.

    The provision of Personal Protective Equipment (PPE) and implementation of Health &

    Safety (H&S) and Quality Assurance (QA) procedures are vital to a successful project.

  • 7/27/2019 Copenhagen HDD Capabilities

    12/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    11

    Pipe Jacking and Auger Boring

    Copenhagen Contractors is proud to provide pipe jacking as part of our range of services. Pipe

    Jacking and Auger boring are specialist tunneling methods for installing underground pipelines

    with a minimum of surface disruption. The techniques are primarily used for sewer replacement

    and relining, gas and water mains, oil pipelines, electricity and telecommunication installations,

    culverts and subways. Where pipelines are laid at depths greater than five metres for lengths

    longer than 50 metres, concrete pipe jacking is always considered as an economic alternative

    to trenching.

    Benefits of Pipe Jacking and Auger Boring include but are not limited to:

    Safety during installation. Remote controlled, mechanical excavation

    Cost effectiveness

    Long drive lengths

    Minimal, gasketed flexible joints

    Structural soundness and Engineering integrity

    Watertight, maintenance free pipelines

    Continuous ground support

    Good flow characteristics

    Environmental benefits include:

    Reduces disruption and damage to services.

    Highway protected

    90% less vehicle movements

    Less spoil

    Less quarried material

    The techniques require no second lining and is the Economic alternative to a disruptive, deep

    open cut. The laser guidance system allows for Real-time line and level checks, Maintains

    accuracy in difficult ground and allows remote operations.

  • 7/27/2019 Copenhagen HDD Capabilities

    13/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    12

    Method Statement Conventional Jacking System

    Method of Construction:

    1. Depending on soil conditions, this method may require deep-wells for dewatering

    purposes to be drilled at intervals along the span according to existing water level.

    2. A rectangular shaft is excavated of max. 6,700 x 5,000 mm or min. 5,700 x 3,500 mm to

    suit site conditions. A separate drawing will be submitted for each location.

    3. 200 mm thick concrete base will be provided at the bottom of each shaft.

    4. Pre-fabricated jacking rail is lowered into the shaft.

    5. A leading pipe steel sleeve is then lowered into the shaft and set on the rail.

    6. The leading pipe is then jacked into the soil by two hydraulic jacks, 300 tones each.

    7. Skilled miners then carry forward the face excavation until sufficient clearance is achieved.

    The jacking operation is then repeated.

    8. This action of excavation and jacking continues until the leading pipe is fully buried into the

    ground.

    9. When the leading pipe is fully buried the next section of the sleeve (each between 2,000 or

    3,000 mm in length depending on the shaft size) is lowered and connected to the tail end

    of the leading pipe by a steel collar to give some flexibility to the directional operation.

  • 7/27/2019 Copenhagen HDD Capabilities

    14/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    13

    Method Statement Auger System

    An Auger Boring Machine (ABM) is used to bore horizontally through soil or rock with a cutting

    head and auger. The majority of ABMs are used to install pipe casings under railroads,

    highways, airport runways, creeks or any area of ground that cannot be open cut or disturbedin any way.

    The machine bores through the earth with a cutting head and the jacking force is provided by

    the hydraulic thrust. The pipe casing and auger sections are added as the machine advances.

    Spoil is removed from the auger through the casing to a door located on the side of the

    machine.

    Method of Construction

    1. Depending upon soil conditions this method may require a dewatering system if the

    existing water table level is above the drilling line.

    2. A rectangular shaft is excavated of min. 8,000 x 3,000 mm to suit site conditions. A

    separate drawing will be submitted for each location. This will be the starting pit.

    3. A 200 mm thick concrete base will be provided at the bottom of each shaft as a base for

    the Auger machine.

    4. The Auger machine is lowered into the shaft.

    5. A leading pipe steel sleeve with the required diameter is lowered with the crushing head

    into the shaft and set on the rail.

    6. The auguring process is then started until the leading pipe is fully buried into the ground.

    7. When the leading pipe is finished another sleeve will be lowered and welded to the end of

    the leading sleeve.

    8. The auguring process then continues until the sleeve is fully buried into the ground.

    9. Steps 6-7-8 are repeated until the sleeve reaches the exit pit.

  • 7/27/2019 Copenhagen HDD Capabilities

    15/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    14

    Equipment description

    Auger Boring Machines (ABM)

    Main advantages:

    Large Deutz or CAT diesel engines for more power. Split design with easy connecting features.

    Heavy duty sub-frame for more stability.

    Pressure compensated load sensing system.

    Base can be used as pipe jacking unit.

    Steering head and grade indicator for accurate borings.

    All ABMs are equipped with:

    Rapid track and Rapid split.

    Auto hook roller engagement.

    Hydraulic clutch.

    Electronic anti-tilt switch. Pushbar engagement lights.

    Rugged, easy to use proportional controls.

    Several sizes of ABMs are readily available:

    Descript ion Uni t ABM 36 ABM 48 ABM 60 ABM 72

    Engine CAT 3054C CAT 3056C CAT 3126B CAT 3126B

    Engine Power kW 80 117 154 192

    Torque kNm 166 271 280 375

    Clutch dia. Mm 343 343 365 (2 plate) 365 (2 plate)

    Drive hex 4 4 5 5

    Hydraulics l/min 144 144 236 236

    Cylinder ram stroke Mm (2) 914 (3) 914 (4) 914 (4) 914

    Ram thrust kN 2830 4250 5660 5660

    Length mm 3658 3962 3962 3962

    Width mm 1524 1689 2134 2438

    Heigth mm 1676 1676 1854 2184

  • 7/27/2019 Copenhagen HDD Capabilities

    16/18

  • 7/27/2019 Copenhagen HDD Capabilities

    17/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    16

    Kuwait Al OmaraSleeve Installation of4 Way 6& 8" HDPEPipes

    1128 HDD 2011

    Afghanistan USIDCINCInstallation of SteelSleeve 36" x 0,5"

    59.37 Pipe Jacking 2011

    KuwaitCombinedGroup Cont.Co.

    Installation of 9 Wayx 110mm UPVCPipes

    100 HDD 2011

    Kuwait KNETCOHDD Installation of 3Way UPVC Pipes

    500 HDD 2011

    Kuwait Al- Jahra Co.Installation of 315mmHDPE pipe - KOCProject

    350 HDD 2011

    KuwaitBurhan Int.Co.

    Installation of1800mm DiaConcrete Pipe- MPWProject

    90 Pipe Jacking 2011

    KuwaitHOTEngineering &Construction

    Installation of100/150mm (2 way)UPVC Pipe- MPWProject

    810 HDD 2011

    Key Personnel

    Senior Management:

    Mr. Jeppe Handwerk, CEO, Owner,[email protected]

    Mr. Jeppe Handwerk established Copenhagen Contractors in 2004. During the following years the

    company has developed rapidly to encompass a wide variety of construction services, including

    design engineering, trenchless technology and building construction. Mr. Jeppe Handwerk served

    as a personal assistant for Kuwaiti Sheik Jasim al Homaizi and has in depth knowledge of the

    country.

    Mr. Brad Hester, Regional Director, Middle East/Africa, Copenhagen Group A/S,

    [email protected]

    Mr. Hester provides management direction to Copenhagen Group subsidiaries operating in Middle

    East region, with specific focus on HDD operations. He joined the company in 2009 as Director of

    Communications and Administration. Prior to that he served in numerous management positions

    within US government agencies, both in the United States and abroad.

    Mr. Jay Bryan Hicks. General Manager,[email protected]

    Mr. Jay Hicks has been training clients for Vermeer Middle East in the trenchless industry as the

    trenchless manager. Projects are numerous and include projects in Lebanon, UAE, Oman. Kuwait,

    Qatar, Sudan, Philippines, for all industries oil and gas, telecommunications, water, storm and

    sanitation drains, electrical, and fiber projects which includes all types of products and pipe.

    Field Management:

    Mr. Makhmoud Khader, Project Manager HDD,[email protected]

    Mahmoud Khader has a long record of successful Horizontal Directional Drilling projects in

    Kuwait. He is responsible for finding and offering the HDD jobs by meeting with the client to

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/27/2019 Copenhagen HDD Capabilities

    18/18

    COPENHAGEN CONTRACTORSMaghater Complex * Building 31,3rd Floor, Office 19

    Farwaniya , KuwaitWWW.CPHCON.COM * [email protected]

    17

    introduce the work in presenting HDD jobs (method of statement, previous and current projects,

    approvals and equipment details) and provide other technical clarification details to the clients.

    Furthermore, Mahmoud Khader is liable in finalizing the sub-contract agreement, purchase

    order or work order with the sub-contractor before commencing HDD jobs. On the job site he is

    responsible for ensuring that the work is properly done before and while commencing the majorstages of HDD works. The job involves in procuring and meeting the supplier for HDD materials

    and equipment for negotiation and order finalization.

    Mr. John Salem, Project Manager Pipe Jacking and Microtunelling,[email protected]

    John Salem is a results-driven Project Manager with demonstrated expertise in managing,

    controlling and overseeing technical operators in pipe jacking and micro tunnelling. Responsibilities

    include supervision of site management team and ensuring that QA / QC, Health, & Safety and

    Environmental procedures are followed. John Salem has worked as Pipe Jacking project Manager

    on major Cross Country Pipeline Projects.

    Furthermore, he offers design support and estimating, planning, field supervision, quantity

    surveying, contracts administration, cost control, scheduling, budget administration, valuations,contractual assessment and variance analysis; Q.C. inspection on: - welding, coating, painting,

    building works, and civil works.

    Admin and Logistics

    Mr. Sivaprasad Ramanputty, Admin Manager,[email protected]

    Sivaprasad is in charge of Administration Department. His responsibilities include but are not limitedto maintaining and keeping personnel file, Staff db, mobilization, R/R, Permits and passes, travelarrangements, visa, Salary conciliation, handling of petty cash, B/P, B/R, preparing invoices and

    other required official letters

    ill.: Copenhagen Contractors regional office, Farwaniya, Kuwait

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]