8/18/2019 Copy of 16 JRTP 02 ITP_rev01
1/13
Rev : 01 Date: 21/3/2016
CAPE RB H TR SAUDI ARAMCO
1.0 PRE-PRODUCTION REQUIREMENTS
1.1
1.1.1 Inspection and Test Plan (ITP) 16-JRTP-02-ITP S. ARAMCO Approved ITP H R R
1.1.2 Method Statement 16-JRTP-01-MS S. ARAMCO Approved M.S H R R
1.2
1.2.1 Material Storage SAES-N-110 Section 7 AFI / FORM NO: 008 W W S
1.2.2 Condition of refractory materials SAES-N-110Section 9.1.7 &
Product Data Sheet AFI / FORM NO: 008 W W S
2.0
2.1 SURFACE PREPARATION
2.1.1 Weather Protection of work area SAES-N-110 Section 9.1.6 AFI/FORM NO: 009 H W S
Surface free from oil, excessive rust, loose
mill scale.
2.1.3 Anchor Layout as per drawing (if provided) Anchor layout drawing Approved drawing AFI/FORM NO: 009 H W R
2.1.4 Application of surface coating to internal surface Anchor layout drawing Approved drawing AFI/FORM NO: 009 H W R
2.2
2.2.1 Correct type and size of Form work installed SAES-N-110 Section 11.2.3 AFI/FORM NO: 012 H R R
2.2.2 Correct method used for the formwork installation SAES-N-110 Section 9.6.2 & 11.2.3 AFI/FORM NO: 012 --- R R
2.3 GUNNITING APPLICATION
2.3.1 Verify water ratio and temperature of water SAES-N-110Section 9.1.11;
Section 9.1.12 AFI/FORM NO: 011 H W R
2.3.2 Verify lining surface temperature and ambient temperature SAES-N-110 Section 9.1 AFI/FORM NO: 011 H W R
2.3.3 Correct method used for gunning SAES-N-110 Section 9.4 AFI/FORM NO: 011 H S S
2.3.4 Verify thickness of refractory to be installed Approved drawing approved drawing AFI/FORM NO: 011 H W R
2.3.5 Production sample casting and marking SAES-N-110 Section 11.3 AFI/FORM NO: 015 W R R
2.3.6 Curing SAES-N-110 Section 10.2 AFI/FORM NO: 011 H W S
IN - PROCESS INSPECTION & TESTING
MATERIAL HANDLING AND STORAGE
Section 8.1 SSAES-N-110
FORM WORK / SHUTTERING APPLICATION
AFI/FORM NO: 009 H
SAES-N-130, SAES-N-140
W.P. / Description : REFRACTORY INSTALLATION
Inspection / Test Stage Acceptance Criteria Verifying Documents
Responsibility
2.1.2
SPECIFICATION: SAES-N-110Inspection and Test Plan
REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN
REFINERY
Reference Document
Doc. No: 16-JRTP-02-ITP
S
PROCEDURE SUBMITTALS
Page 1 of 13
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
2/13
Rev : 01 Date: 21/3/2016
CAPE RB H TR SAUDI ARAMCO
SAES-N-130, SAES-N-140
W.P. / Description : REFRACTORY INSTALLATION
Inspection / Test Stage Acceptance Criteria Verifying Documents
Responsibility
SPECIFICATION: SAES-N-110Inspection and Test Plan
REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN
REFINERY
Reference Document
Doc. No: 16-JRTP-02-ITP
2.4 CASTABLE REFRACTORY APPLICATION
2.4.1 Verify water ratio and temperature of water SAES-N-110Section 9.1.11;
Section 9.1.12 AFI/FORM NO: 010 H S S
2.4.2 Verify lining surface temperature and ambient tempure. SA ES-N-110 Section 9.1.4 & 9.1.5 AFI/FORM N O: 010 H R R
2.4.3 Mixing of refractory castable SAES-N-110 section 9.5 AFI/FORM NO: 010 W W S
2.4.4 Verify thickness of refractory to be installed Approv ed drawing Approved drawing AFI/FORM N O: 010 H W R
2.4.5 Production sample casting and marking SAES-N-110 Section 11.3 AFI/FORM NO: 015 W R R
2.4.6 Curing SAES-N-110 Section 10.2 AFI/FORM NO: 010 H W S
2.5
2.5.1 Type of material as per drawing / agreed for the contract Approved drawing ------ AFI/FORM NO:013 H W S
2.5.2 Brick lining method SAES-N-130 Section 6 AFI/FORM NO:013 S R R
2.5.3 Verify the staggering of bricks SAES-N-130 Section 6 AFI/FORM NO:013 H W R
2.5.4 Verify the thickness of installed bricklining Approved drawing ----- AFI/FORM NO:013 H W R
2.5.5 Excess mortar removed ------ ----- AFI/FORM NO:013 S W S
2.6 RCF APPLICATION
2.6.1 Orientation of studs As per approved drawing specification Approved drawing AFI/FORM NO:014 H W S
2.6.2 Type of ceramic fiber blanket As per approved drawing specification Approved drawing AFI/FORM NO:014 H W R
2.6.3 Joints (Lap / butt joint) SAES-N-140 Section 9.1.2 AFI/FORM NO:014 H S S
2.6.4 Verify thickness of installed blanket As per approv ed drawing specification Approved drawing A FI/F ORM NO:014 H W R
2.6.5 Verify Orientation / Securement of blanket lining ---- Approved drawing AFI/FORM NO:014 H R R
3.0
3.1 Visual inspection after curing of casting and gunniting ---- --- AFI/FORM NO: 010 & 011 H R R
3.2 SAES-N-110 Section 11.3.6 AFI/FORM NO: 010 & 011 H W WHammer Test
BRICK LINING APPLICATION
FINAL INSPECTION AND TESTING
Page 2 of 13
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
3/13
Rev : 01 Date: 21/3/2016
CAPE RB H TR SAUDI ARAMCO
SAES-N-130, SAES-N-140
W.P. / Description : REFRACTORY INSTALLATION
Inspection / Test Stage Acceptance Criteria Verifying Documents
Responsibility
SPECIFICATION: SAES-N-110Inspection and Test Plan
REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN
REFINERY
Reference Document
Doc. No: 16-JRTP-02-ITP
4.0
4.1 All Documents in file ---- All inspection documents signed
by client inspector ITP & Inspection forms H & R R R
4.2 ---- Final Acceptance Certificate ---- H & R R R
Cape RBH TR SAUDI ARAMCO Comments
Approved Approved with
comments
To be resubmittedDate
Legend :
H = Hold Point W = Witness (if no show, work may proceed) S =
Surveillance R = Record and/or review
Name
Final Acceptance & release
Sign
SAUDI ARAMCO
FINAL DOCUMENTATION AND PACKAGE REVIEW
Y N
Y
Y
N
N
Page 3 of 13
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
4/13
INSP. DATE:INSP. TIME:
RECEIVING INSP: IN-PROCESS INSP: FINAL INSPECTION: OTHER: (specify)
PROJECT: EQPT. TO BE INSPECTED:
CONTRACT NO: AREA LOCATION:
SITE LOCATION: REF. DWG. / SPECS.:
ATTENTION OF: DISCIPLINE:
REQUESTED BY:TYPE OF INSPECTION
VISUAL DIMENSIONAL WITNESS TEST
ITEM DESCRIPTION:
SUMMARY OF RESULTS:
APPLICATION FOR INSPECTION
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
5/13
Project Name :
Contract Numb :Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Material conformity to specification.
Material conformity certificates (pre-shipment test certificates)
Material Data sheets
Visual condition of material acceptable upon receipt
Material stored properly
MATERIAL INSPECTION AND ACCEPTANCE RECORD
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1
1.5
1.2
1.3
1.4
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
6/13
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
7/13
Project Name :
Contract Numb :Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Weather Proofing of Work Area
Refractory anchors installed correcly
Hammer test of anchor (random selection)
Internal surface coating
Ventilation
1.2
1.6
1.3
1.4
INSPECTION RECORD FOR SURFACE PREPARATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1
Surface to be lined is free of oil, dust, loose mill scale or other foreign
materials.
1.5
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
8/13
Project Name :
Contract Number :
Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Check condition of refractory material
Check mixing of refractory castable
Check placement of refractory castable
Shuttering or Form Works
Vibration, spade or puddle rodding of castable
Check curing
Check presence of cracks (more than 3mm not acceptable)
Hammer Test
Check environmental conditions (I.e. ambient temp., equipment temp., water and dry
material temperature)
1.4
1.2
1.3
INSPECTION RECORD FOR REFRACTORY CASTING APPLICATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1
1.5
1.6
1.7
1.9
1.8
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
9/13
Project Name :
Contract Number :
Project Locatio :J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Application Prequalification
Check proper consistancy of the material through gunning
Check placement of refractory castable
Trimming of surface and its roughness
Check curing
Check presence of unacceptable cracks
Hammer Test of refractory liningFinal Inspection
1.2
1.3
1.4
Check environmental conditions (I.e. ambient temp., equipment temp.,
water and dry material temperature)
INSPECTION RECORD FOR REFRACTORY GUNNING APPLICATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1
1.5
1.6
1.7
1.81.9
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
10/13
Project Name :
Contract Numbe :
Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Shuttering installed correctly (where required)
INSPECTION RECORD FOR FORM WORK / SHUTTERING APPLICATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1Check for correct type, size and surface of formwork (for casting and gunning only)
coated with layer of releasing agent
1.2
1.3 Verify thickness of installed formwork as per drawing
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
11/13
Project Name :
Contract Number :Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :
ITP STEP NO. :
YES NO N/A
Condition of refractory material
Mortar mixing
Brick handled carefully
Chipped or broken bricks not used
Brick laying as per specification and drawing
Sufficient mortar applied to each brick
Set bricks driven firmly into place
Excess mortar scraped off Expansion joints left free of mortar,dust and other contaminants
INSPECTION RECORD FOR BRICK LINING APPLICATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
12/13
Project Name :
Contract Number :
Project Location :
J. O. No. :
EQUIPMENT / TAG NO. : AREA : REPORT NO. :
DATE : SERVICE DESCRIPTION : SYSTEM
REF. DRWG NO. : TYPE OF MATERIAL MANUFACTURER
YES NO N/A
INSPECTION RECORD FOR RCF INSTALLATION
1. INSPECTION REQUIREMENTS
COMPLIANCE
1.1 Condition of insulation material
1.2 Orientation of studs
1.3 Blankets installed in accordance with manufacturer's detailed drawing
1.4 Verify the thickness and securement of installed blanket / module
1.5Method of joining (lap joint / butt joint method) used for installation of
blanket.
1.6 Sur face Appearance
8/18/2019 Copy of 16 JRTP 02 ITP_rev01
13/13
ITP NO: Site /Location: Date:
SN Sample Time Date Type of Batch/Pallet Method of Amb Dry Steel Water Mixing LOCATION
Number Sampled Sampled Material Number Application Temp Temp Temp Temp Temp
SAUDI ARAMCO
Name:
Signature:
Date
FORM NO: 015
Castable & Gunning Refractory Production Sample Log Sheet
TRCAPE RB HILTON