    Rev : 01 Date: 21/3/2016

    CAPE RB H TR SAUDI ARAMCO

    1.0 PRE-PRODUCTION REQUIREMENTS 

    1.1

    1.1.1 Inspection and Test Plan (ITP) 16-JRTP-02-ITP S. ARAMCO Approved ITP H R R

    1.1.2 Method Statement 16-JRTP-01-MS S. ARAMCO Approved M.S H R R

    1.2

    1.2.1 Material Storage SAES-N-110 Section 7 AFI / FORM NO: 008 W W S

    1.2.2 Condition of refractory materials SAES-N-110Section 9.1.7 &

    Product Data Sheet AFI / FORM NO: 008 W W S

    2.0

    2.1 SURFACE PREPARATION

    2.1.1 Weather Protection of work area SAES-N-110 Section 9.1.6 AFI/FORM NO: 009 H W S

    Surface free from oil, excessive rust, loose

    mill scale.

    2.1.3 Anchor Layout as per drawing (if provided) Anchor layout drawing Approved drawing AFI/FORM NO: 009 H W R

    2.1.4 Application of surface coating to internal surface Anchor layout drawing Approved drawing AFI/FORM NO: 009 H W R

    2.2

    2.2.1 Correct type and size of Form work installed SAES-N-110 Section 11.2.3 AFI/FORM NO: 012 H R R

    2.2.2 Correct method used for the formwork installation SAES-N-110 Section 9.6.2 & 11.2.3 AFI/FORM NO: 012   --- R R

    2.3 GUNNITING APPLICATION

    2.3.1 Verify water ratio and temperature of water SAES-N-110Section 9.1.11;

    Section 9.1.12 AFI/FORM NO: 011 H W R

    2.3.2 Verify lining surface temperature and ambient temperature SAES-N-110 Section 9.1 AFI/FORM NO: 011 H W R

    2.3.3 Correct method used for gunning SAES-N-110 Section 9.4 AFI/FORM NO: 011 H S S

    2.3.4 Verify thickness of refractory to be installed Approved drawing approved drawing AFI/FORM NO: 011 H W R

    2.3.5 Production sample casting and marking SAES-N-110 Section 11.3 AFI/FORM NO: 015 W R R

    2.3.6 Curing SAES-N-110 Section 10.2 AFI/FORM NO: 011 H W S

    IN - PROCESS INSPECTION & TESTING

    MATERIAL HANDLING AND STORAGE

    Section 8.1 SSAES-N-110

    FORM WORK / SHUTTERING APPLICATION

      AFI/FORM NO: 009 H

    SAES-N-130, SAES-N-140

    W.P. / Description : REFRACTORY INSTALLATION

    Inspection / Test Stage Acceptance Criteria Verifying Documents

    Responsibility

    2.1.2

    SPECIFICATION: SAES-N-110Inspection and Test Plan

    REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN

    REFINERY

    Reference Document

    Doc. No: 16-JRTP-02-ITP

    S

    PROCEDURE SUBMITTALS

    Page 1 of 13

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    2/13

    Rev : 01 Date: 21/3/2016

    CAPE RB H TR SAUDI ARAMCO

    SAES-N-130, SAES-N-140

    W.P. / Description : REFRACTORY INSTALLATION

    Inspection / Test Stage Acceptance Criteria Verifying Documents

    Responsibility

    SPECIFICATION: SAES-N-110Inspection and Test Plan

    REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN

    REFINERY

    Reference Document

    Doc. No: 16-JRTP-02-ITP

    2.4 CASTABLE REFRACTORY APPLICATION

    2.4.1 Verify water ratio and temperature of water SAES-N-110Section 9.1.11;

    Section 9.1.12 AFI/FORM NO: 010 H S S

    2.4.2 Verify lining surface temperature and ambient tempure. SA ES-N-110 Section 9.1.4 & 9.1.5 AFI/FORM N O: 010 H R R

    2.4.3 Mixing of refractory castable SAES-N-110 section 9.5 AFI/FORM NO: 010 W W S

    2.4.4 Verify thickness of refractory to be installed Approv ed drawing Approved drawing AFI/FORM N O: 010 H W R

    2.4.5 Production sample casting and marking SAES-N-110 Section 11.3 AFI/FORM NO: 015 W R R

    2.4.6 Curing SAES-N-110 Section 10.2 AFI/FORM NO: 010 H W S

    2.5

    2.5.1 Type of material as per drawing / agreed for the contract Approved drawing ------ AFI/FORM NO:013 H W S

    2.5.2 Brick lining method SAES-N-130 Section 6 AFI/FORM NO:013 S R R

    2.5.3 Verify the staggering of bricks SAES-N-130 Section 6 AFI/FORM NO:013 H W R

    2.5.4 Verify the thickness of installed bricklining Approved drawing ----- AFI/FORM NO:013 H W R

    2.5.5 Excess mortar removed ------ ----- AFI/FORM NO:013 S W S

    2.6 RCF APPLICATION

    2.6.1 Orientation of studs As per approved drawing specification Approved drawing AFI/FORM NO:014 H W S

    2.6.2 Type of ceramic fiber blanket As per approved drawing specification Approved drawing AFI/FORM NO:014 H W R

    2.6.3 Joints (Lap / butt joint) SAES-N-140 Section 9.1.2 AFI/FORM NO:014 H S S

    2.6.4 Verify thickness of installed blanket As per approv ed drawing specification Approved drawing A FI/F ORM NO:014 H W R

    2.6.5 Verify Orientation / Securement of blanket lining ---- Approved drawing AFI/FORM NO:014 H R R

    3.0

    3.1 Visual inspection after curing of casting and gunniting ---- --- AFI/FORM NO: 010 & 011 H R R

    3.2 SAES-N-110 Section 11.3.6 AFI/FORM NO: 010 & 011 H W WHammer Test

    BRICK LINING APPLICATION

    FINAL INSPECTION AND TESTING

    Page 2 of 13

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    3/13

    Rev : 01 Date: 21/3/2016

    CAPE RB H TR SAUDI ARAMCO

    SAES-N-130, SAES-N-140

    W.P. / Description : REFRACTORY INSTALLATION

    Inspection / Test Stage Acceptance Criteria Verifying Documents

    Responsibility

    SPECIFICATION: SAES-N-110Inspection and Test Plan

    REFRACTORY INSTALLATION TO 8 HEATERS AT 2220 JIZAN

    REFINERY

    Reference Document

    Doc. No: 16-JRTP-02-ITP

    4.0

    4.1 All Documents in file ---- All inspection documents signed

    by client inspector ITP & Inspection forms H & R R R

    4.2 ---- Final Acceptance Certificate ---- H & R R R

    Cape RBH TR SAUDI ARAMCO Comments

     Approved Approved with

    comments

    To be resubmittedDate

    Legend :

    H = Hold Point W = Witness (if no show, work may proceed) S =

    Surveillance R = Record and/or review

    Name

    Final Acceptance & release

    Sign

    SAUDI ARAMCO

    FINAL DOCUMENTATION AND PACKAGE REVIEW

    Y N

    Y

    Y

    N

    N

    Page 3 of 13

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    4/13

    INSP. DATE:INSP. TIME:  

    RECEIVING INSP: IN-PROCESS INSP: FINAL INSPECTION: OTHER: (specify)

    PROJECT: EQPT. TO BE INSPECTED:

    CONTRACT NO: AREA LOCATION:

    SITE LOCATION: REF. DWG. / SPECS.:

     ATTENTION OF: DISCIPLINE:

    REQUESTED BY:TYPE OF INSPECTION

    VISUAL DIMENSIONAL WITNESS TEST

    ITEM DESCRIPTION:

    SUMMARY OF RESULTS:

    APPLICATION FOR INSPECTION

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    5/13

    Project Name :

    Contract Numb :Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

    Material conformity to specification.

    Material conformity certificates (pre-shipment test certificates)

    Material Data sheets

    Visual condition of material acceptable upon receipt

    Material stored properly

    MATERIAL INSPECTION AND ACCEPTANCE RECORD

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1

    1.5

    1.2

    1.3

    1.4

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    6/13

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    7/13

    Project Name :

    Contract Numb :Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

    Weather Proofing of Work Area

    Refractory anchors installed correcly

    Hammer test of anchor (random selection)

    Internal surface coating

    Ventilation

    1.2

    1.6

    1.3

    1.4

    INSPECTION RECORD FOR SURFACE PREPARATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1

    Surface to be lined is free of oil, dust, loose mill scale or other foreign

    materials.

    1.5

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    8/13

    Project Name :

    Contract Number :

    Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

    Check condition of refractory material

    Check mixing of refractory castable

    Check placement of refractory castable

    Shuttering or Form Works

    Vibration, spade or puddle rodding of castable

    Check curing

    Check presence of cracks (more than 3mm not acceptable)

    Hammer Test

    Check environmental conditions (I.e. ambient temp., equipment temp., water and dry

    material temperature)

    1.4

    1.2

    1.3

    INSPECTION RECORD FOR REFRACTORY CASTING APPLICATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1

    1.5

    1.6

    1.7

    1.9

    1.8

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    9/13

    Project Name :

    Contract Number :

    Project Locatio :J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

     Application Prequalification

    Check proper consistancy of the material through gunning

    Check placement of refractory castable

    Trimming of surface and its roughness

    Check curing

    Check presence of unacceptable cracks

    Hammer Test of refractory liningFinal Inspection

    1.2

    1.3

    1.4

    Check environmental conditions (I.e. ambient temp., equipment temp.,

    water and dry material temperature)

    INSPECTION RECORD FOR REFRACTORY GUNNING APPLICATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1

    1.5

    1.6

    1.7

    1.81.9

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    10/13

    Project Name :

    Contract Numbe :

    Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

    Shuttering installed correctly (where required)

    INSPECTION RECORD FOR FORM WORK / SHUTTERING APPLICATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1Check for correct type, size and surface of formwork (for casting and gunning only)

    coated with layer of releasing agent

    1.2

    1.3 Verify thickness of installed formwork as per drawing

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    11/13

    Project Name :

    Contract Number :Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL & MANUFACTURER ITP NO. :

      ITP STEP NO. :

     YES NO N/A

    Condition of refractory material

    Mortar mixing

    Brick handled carefully

    Chipped or broken bricks not used

    Brick laying as per specification and drawing

    Sufficient mortar applied to each brick

    Set bricks driven firmly into place

    Excess mortar scraped off Expansion joints left free of mortar,dust and other contaminants

    INSPECTION RECORD FOR BRICK LINING APPLICATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1.7

    1.8

    1.9

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    12/13

    Project Name :

    Contract Number :

    Project Location :

    J. O. No. :

    EQUIPMENT / TAG NO. : AREA : REPORT NO. :

    DATE : SERVICE DESCRIPTION : SYSTEM

    REF. DRWG NO. : TYPE OF MATERIAL MANUFACTURER

     

     YES NO N/A

    INSPECTION RECORD FOR RCF INSTALLATION

    1. INSPECTION REQUIREMENTS

    COMPLIANCE

    1.1 Condition of insulation material

    1.2 Orientation of studs

    1.3 Blankets installed in accordance with manufacturer's detailed drawing

    1.4 Verify the thickness and securement of installed blanket / module

    1.5Method of joining (lap joint / butt joint method) used for installation of 

    blanket.

    1.6 Sur face Appearance

  • 8/18/2019 Copy of 16 JRTP 02 ITP_rev01

    13/13

    ITP NO: Site /Location: Date:

    SN Sample Time Date Type of Batch/Pallet Method of Amb Dry Steel Water Mixing LOCATION

    Number Sampled Sampled Material Number Application Temp Temp Temp Temp Temp

    SAUDI ARAMCO

    Name:

    Signature:

    Date

    FORM NO: 015 

    Castable & Gunning Refractory Production Sample Log Sheet

    TRCAPE RB HILTON