“ Boston already has the Silver Line, but why not create a true BRT that runs from Egleston all the way to Downtown? One with prioritized lanes AND prioritized traffic signals AND limited access boarding? Roxbury needs better transit connections.”
—02130
Was
hington S
t
Essex St
Was
hington S
t
Essex St
BostonCommon
Thompson Square/Bunker Hill
SullivanSquare
FranklinPark
CodmanSquare
DudleySquare
OlmstedPark
EglestonSquare
Upham’sCorner
ArnoldArboretum
JoeMoakley
Park
FortPoint
C h a r l e s R i v e r
M y s t i c R i v e r
JamaicaPond
Old Harbor
PleasureBay
ChestnutHill
Reservoir
C h e l s e a R i v e r
90
90
93
93
93
9
2
28
28
3
20
1
95
1
Dorchester
Hyde Park
Roxbury
East Boston
Brighton
West Roxbury
Mattapan
Jamaica Plain
Roslindale
Fenway
South Boston
Allston
Charlestown
South End
Back Bay
Downtown
Mission Hill
Seaport
West End
Beacon Hill
North End
LMA
BrooklineNewton
Watertown Cambridge
Milton
Quincy
Dedham
Everett
Chelsea
Revere
Somerville
Improved Silver Line: Dudley to Downtown
Today the Silver Line between Dudley and downtown along Washington Street has protected bus shelters and an exclusive red bus lane. In the next five years, the width of the lane will be increased, physical buffers and stronger enforcement will ensure that it is not used for double parking, an off-board payment system will allow for all-door boarding and prevent long passenger queues from delaying stops, automated signal priority will avoid red-light delays, and raised, accessible platforms will make it safer and easier for passengers of all abilities to board. An improved Dudley Station will be paired with improved termini at Downtown Crossing and South Station, where new in-street platforms will enable faster transfers to the Orange, Red, and waterfront Silver Lines.
Project Description
Identified on the ballot as an Early Action commitment
Crosstown Project Score
Best PracticesThe GRTC Pulse is under construction in Richmond, VA. This BRT project will be a mix of bus-only lanes and mixed-traffic with queue jumps. Level boarding will speed the boarding process. www.ridegrtc.com/brt
Public Input
Benefits and Issues AddressedThe evolution of bus rapid transit (BRT) technologies since the creation of the Silver Line nearly two decades ago allows for the Washington Street line to finally be upgraded to gold-standard BRT and provide streetcar-quality service into the heart of the South End, Roxbury, and Dudley Square. With faster and more frequent service, residents of Roxbury and several neighborhoods whose buses feed into Dudley would have better access to Downtown, to health care at Boston University and Tufts Medical Centers, and to transfers to other rapid transit lines, driving up transit ridership to meet Go Boston 2030’s targets. Visitors could travel to Dudley, expanding commercial activity and contributing to the vitality that evolves around transit hubs elsewhere in Boston.
Implementation
Better rapid bus service and terminals on the Silver Line from downtown to Dudley
Access 1 Safety 1 Reliability
Access 2 Safety 2 Affordability
Sustainability/Resiliency 1 Sustainability/Resiliency 2 Governance
Approximate Cost: $22 million for capital improvements Potential Funding Sources: MassDOT/MBTA, City capital program, and FTA Who’s responsible: BTD, PWD, and MassDOT/MBTA Time Frame: Design and initial improvements within five years
GO BOSTON 2030 ACTION PLAN Projects and Policies
Boston Transportation Department March 2017