SRF No. 0148483
County Project No. 091101
CSAH 112 – Phase 1
Project Advisory Committee (PAC) Meeting April 15, 2015; 8:00 am – 10:15 am
Orono City Hall
MEETING RECORD
A project PAC meeting for the referenced project was held at the Orono City Hall on April 15, 2015, from 8:00 a.m. – 10:00 a.m. The following is a summary of the meeting based on the Agenda, which is attached to this record: Meeting Summary: 1. Introductions:
Nate Will opened the meeting. A copy of the meeting sign-in sheet is attached to this meeting record.
2. Review of March 18, 2015, Project Advisory Committee Meeting Record:
Nate asked that any comments on the Meeting Record from the March 18, 2015, meeting be sent electronically to him at SRF. No specific comments were provided by the PAC. Nate will post the meeting record on the project website at www.CSAH112.com on the status page.
3. Review of Previous Action Items:
The following action items were reviewed. Any items shown in grey require additional action, which is added to the action items from this meeting below.
Task Responsible Party
Due Date
Resolution
SRF to prepare memorandum to document decision for constructing the Rapid Rectangular-Flashing Beacon (RRFB) at intersection of CSAH 112 and Mill Street.
Nate Will Ongoing
City of Long Lake to develop and pass resolution to ban parking along both sides of Martha Lane and along Symes Street adjacent to the Nelson Lakeside Park.
Scott Weske 4/15/15 Completed, see follow up discussion below
Develop and send out notices for public open house three weeks prior to meeting date.
Nate Will & Kristy Morter
4/1/15 Completed
SRF to update project website (www.csah112.com) to include meeting record for PAC meeting held on 2/18/15.
Nate Will 3/20/15 Completed
Project Advisory Committee Meeting Record April 15, 2015 Page 2 of 5
www.CSAH112.com
Task Responsible Party
Due Date
Resolution
County will discuss internally the proposed shared-use bike lanes along Martha Lane assuming parking remains permissible along residential properties.
Kristy Morter 4/15/15 Completed
SRF to update the streetscape layout to show locations of existing trees that are expected to remain and colored concrete at intersection corners.
Michael Jischke
4/15/15 Completed
SRF to revise the preferred Gateway design (Option C) to remove the scroll engraving and delete the Wayzata Boulevard plaque.
Michael Jischke
4/15/15 Completed
SRF to revise the preferred Ornamental Fence design (Option A) to add ball final post caps.
Michael Jischke
4/8/15 Completed
Review proposed tree locations Mill Street and Martha Lane, adjacent to Gear West with property owner. (Timing dependent on owner availability)
Michael Jischke
Ongoing
SRF to coordinate with Xcel Energy on pricing out the potential burial of overhead utility lines in Phase 1 and Phase 2 with separate splits for the following:
1) Willow Road to Brown Road – Phase 1, City of Orono
2) From 700 feet west of Cemetery Road to Cemetery Road – Phase 1, City of Long Lake
3) From Cemetery Road to Wolf Pointe Trail – Phase 1, City of Long Lake
4) From Cemetery Road to east end of Phase 2, all lines/crossings buried, City of Long Lake
From Cemetery Road to east end of Phase 2, only crossing buried, City of Long Lake
Nate Will 4/15/15 Completed for Phase 1, see discussion
below
4. Discussion Items:
a. Review revised streetscape layout
Nate Will presented the streetscape layout that was revised to show existing trees that are expected to remain with Phase 1. He focused the discussion on the area between Mill Street and Martha Lane where the layout shows proposed trees along the Gear West business (north side of CSAH 112) which closely matches the trees that are to remain along the south side of the roadway. There was some discussion by the PAC that several proposed trees be deleted from the north side, to avoid impacting inplace or proposed landscaping that may occur at Gear West. The City mentioned they were expecting to receive a landscape plan for Gear West that may be helpful in coordinating with the roadway project. The PAC decided to proceed with showing the streetscape layout as currently proposed to the public open house and see if the landowners have questions or comments. The PAC inquired about planting trees along Phase 1, west of the Brown Road intersection. Nate used the overall Phase 1 layout to assist with locating potential tree planting areas west of Brown Road. The PAC requested that SRF review locations for trees and show those trees on the Phase 1 layout for display at the public open house.
Project Advisory Committee Meeting Record April 15, 2015 Page 3 of 5
www.CSAH112.com
b. Parking / shared bike lanes along Martha Lane
Kristy Morter provided additional discussion related to the County’s position on the proposed shared bike lanes versus the proposed “no parking” along Martha Lane and Symes Street. She indicated that the County is acceptable with allowing the parking and no parking usage that exists along both Martha Lane and Symes Street while permitting the shared bike lanes to coexist on these two streets. Nate noted that additional directional signage would be useful to direct bikers along Martha Lane thru the trail connection and along Symes Street. He noted that since parking would continue to be allowed on both streets, it would not be recommended to use the “sharrow” bike pavement markings. This was acceptable to the PAC. Nate noted that the proposed “no parking resolutions” would need to be removed by the City of Long Lake for both Martha Lane and Symes Street.
c. Public Open House
Date is Wednesday, April 22, 2015 from 4:30 pm to 6:30 pm,
Review items to display at open house
Nate presented the graphic boards that are planned for display at the public open house. A copy of the graphic boards presented are attached to this meeting record. He pointed out the new perspective rendering (View C) which illustrates the proposed Gateway Area at the southeast corner of the Brown Road intersection. He mentioned the Gateway Monument was modified to remove the “scroll” engraving and removed the wording “Wayzata Boulevard”. There was some discussion with the PAC about wording “Hennepin County” that is shown on the monument and whether or not it is required. Nate also pointed out the perspective (View B) which shows the proposed concrete walk colors and texture treatments selected previously by the PAC. He noted these areas are depicted on the streetscape layout being displayed at the public open house. Nate displayed the graphics showing the proposed retaining wall aesthetics which included the wall colors, textures and railings preferred by the PAC. A comment was made by the PAC to show post caps (finials) on the railing as previously agreed to by the PAC. A graphic showing the proposed detour route was presented to the PAC for discussion. A comment was made by a PAC member regarding the possibility for a temporary 4-way stop at County Road (CR) 6 and Brown Road. It was noted that the official detour route is along CR 6; however, residents familiar with the area, may travel Brown Road to areas along CSAH 112 and south of Trunk Highway (TH) 12. A comment was made to consider adding additional construction signage along CR 6 to direct motorists to downtown businesses during the construction of Phase 1, especially during the proposed closure. A few comments were made to run the detour along TH 12 to the interchange with CR 6 and provide additional signage to guide visitors across CR 6 to CSAH 112 (Wayzata Boulevard). A comment was made that the current signage at the CR 6/ramp from TH 12 is difficult and poorly signed for traffic wanting to travel into Long Lake/Orono.
d. Phase 1 Cost Summary
Nate presented a draft Cost Summary for the estimate project costs for Phase 1. A copy of the Cost Summary is attached to this meeting record. He described the information that was used to develop
Project Advisory Committee Meeting Record April 15, 2015 Page 4 of 5
www.CSAH112.com
the Cost Summary which is based upon a detailed cost estimate. A copy of the detailed estimate was not provided to the PAC; however, a copy was submitted separately to the city engineer’s for both Long Lake and Orono along with the 60-percent construction plan. Nate continued describing the individual line items and associated costs for each. He noted the costs were based upon recent bidding climate for work to be completed in 2015-2016. The costs shown include a 10-percent contingency factor and the 18-percent Engineering and Construction Administration fee.
e. Utility burial costs
Nate mentioned to the PAC that Xcel responded back with some costs to bury their power lines. He presented the following information:
City of Orono: from Willow Drive to Brown Road - $350,000
City of Long Lake: from 700’ west of Cemetery Road to Cemetery Road - $90,000
from Cemetery Road to Wolf Pointe Trail - $143,000
He mentioned Xcel was unable to provide additional engineering estimates without entering into an engineering contract so they are compensated for their efforts. The estimated fee for the engineering work is $5000. Xcel understands the issues that exist in the Phase 2 project area for CSAH 112 and additional discussion and coordination will be necessary to address the concerns of the City and public.
5. Update of ongoing design efforts
a. Geotechnical Investigation/Coordination
Due to limited time, no update was provided.
b. Utility Coordination and Mapping
Due to limited time, no update was provided.
c. Environmental Investigation
Due to limited time, no update was provided.
6. Open Discussion
Due to limited time, no open discussion occurred at the meeting.
Project Advisory Committee Meeting Record April 15, 2015 Page 5 of 5
www.CSAH112.com
7. Follow Up Items/Action Items: For tracking purposes, we have assigned a responsible party and a due date for completing the following action items, which were identified at the meeting:
Task Responsible Party
Due Date
SRF to update project website (www.csah112.com) to include meeting record for PAC meeting held on 3/18/15.
Nate Will 4/27/15
City of Long Lake to revise the no parking resolutions to remove Martha Lane and Symes Street from the resolutions.
Scott Weske 5/15/15
Review project corridor, west of Brown Road, to add trees at locations where deemed appropriate. Bring updated layout to Public Open House.
Michael Jischke
4/22/15
Add the post caps (finials) to the metal railings figures for the Public Open House. Michael Jischke
4/22/15
Investigate previous decisions during preliminary design that led to recommending the roadway width along Long Lake (12’ lanes, 8’ shoulders)
Nate Will 5/15/15
City of Long Lake to provide copy of Landscape Plan for the Gear West Expansion to the County.
Scott Weske 5/20/15
Investigate 4-way stop at CSAH 6 and Brown Road during construction detour. Kristy Morter 5/20/15
8. Upcoming Meetings:
a. PMT Meeting: May 7, 2015; 1:00 pm – 2:30 pm b. PAC Meeting: May 20, 2015; 8:00 am – 10:00 am c. Public Open House: April 22, 2015; 4:30 pm – 6:30 pm Meeting Record Revisions:
The preceding represents SRF Consulting Group’s understanding of the referenced meeting. If you identify discrepancies or items that require clarification, please contact Nate Will at SRF, via email at [email protected], or via telephone at (763) 249-6761.
NW/gjd
H:\Projects\8483\_Correspondence\Meetings\Meeting Records\PAC Meetings\150415_PAC\8483_CSAH 112_PACMeetingRecord_150415.docx
CSAH 112 Project Final Design – Phase 1
Project Advisory Committee (PAC) Meeting Sign-In Sheet Wednesday, April 15, 2015 (8:00 – 10:00 a.m.)
Please return to Nate Will, SRF Consulting Group, Inc. 8483”Meetings”
Present Name/Organization Mailing Address Phone Email
☒ Kristy Morter Hennepin County
1600 Prairie Drive Medina, MN 55340
612-596-0384 [email protected]
☐ Mike Turner SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-249-6717 [email protected]
☐ Jessica Loftus City of Orono
P.O. Box 66 Crystal Bay, MN 55323
952-249-4601 [email protected]
☒ Scott Weske City of Long Lake
P.O. Box 606 Long Lake, MN 55356
952-473-6961x2 [email protected]
☒ Nate Will SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-249-6761 [email protected]
☒ Adam Edwards City of Orono
P.O. Box 66 Crystal Bay, MN 55323
952-249-4661 [email protected]
☒ Liz Olson Long Lake City Council
P.O. Box 606 Long Lake, MN 55356
☒ Donny Chillstrom Long Lake Mayor
P.O. Box 606 Long Lake, MN 55356
612-710-0569 [email protected]
☐ Tom Skjaret Long Lake Resident
☒ Lili McMillan Orono Mayor
P.O. Box 66 Crystal Bay, MN 55323
612-840-8484 [email protected]
☐ Jeanne Mabusth Orono Resident
740 Brown Road N Orono, MN
952-476-0578 [email protected]
CSAH 112 Project Final Design – Phase 1
Project Advisory Committee (PAC) Meeting Sign-In Sheet Wednesday, April 15, 2015 (8:00 – 10:00 a.m.)
Please return to Nate Will, SRF Consulting Group, Inc. 8483”Meetings”
Name/Organization Mailing Address Phone Email
☐ Marty Schneider Long Lake City Council
1176 W. Wayzata Blvd. Long Lake, MN 55356
612-237-3843 [email protected]
☐ Tim Bruers Hennepin County
1600 Prairie Drive Medina, MN 55340
612-596-0393 [email protected]
☐ Michael Jischke SRF Consulting Group
1 Carlson Parkway, Suite 150 Minneapolis, MN 55447
763-267-6600 [email protected]
☒ Jim Cornick Orono City Council
Box 66 Crystal Bay, MN 55323
952-300-0954 [email protected]
☒ Jahn Dyvik Long Lake City Council
1780 Martha Lane Long Lake, MN 55356
612-202-7391 [email protected]
☐ Marv Wurzer Long Lake Public Works
450 Virginia Ave. Long Lake, MN 55356
612-720-4261 [email protected]
☐
☐
☐
☐
SRF No. 0148483
County Project No. 091101
CSAH 112 – Phase 1
Project Advisory Committee (PAC) Meeting April 15, 2015; 8:00 am – 10:00 am
Orono City Hall AGENDA
1. Introductions: (5 Minutes)
2. Review of March 18, 2015 Project Advisory Committee Meeting Record: (5 Minutes)
3. Review of Previous Action Items: (10 Minutes)
Task Responsible Party
Due Date
Resolution
SRF to prepare memorandum to document decision for constructing the Rapid Rectangular-Flashing Beacon (RRFB) at intersection of CSAH 112 and Mill Street.
Nate Will Ongoing
City of Long Lake to develop and pass resolution to ban parking along both sides of Martha Lane and along Symes Street adjacent to the Nelson Lakeside Park.
Scott Weske Ongoing
Develop and send out notices for public open house three weeks prior to meeting date.
Nate Will & Kristy Morter
4/1/15 Completed
SRF to update project website (www.csah112.com) to include meeting record for PAC meeting held on 2/18/15.
Nate Will 3/20/15 Completed
County will discuss internally the proposed shared-use bike lanes along Martha Lane assuming parking remains permissible along residential properties.
Kristy Morter
4/15/15 Completed
SRF to update the streetscape layout to show locations of existing trees that are expected to remain and colored concrete at intersection corners.
Michael Jischke
4/15/15 Completed
SRF to revise the preferred Gateway design (Option C) to remove the scroll engraving and delete the Wayzata Boulevard plaque.
Michael Jischke
4/15/15 Completed
CSAH 112 PAC Meeting April 15, 2015 Page 2 of 3
Task Responsible
Party Due Date
Resolution
SRF to revise the preferred Ornamental Fence design (Option A) to add ball final post caps.
Michael Jischke
4/8/15 Completed
Review proposed tree locations Mill Street and Martha Lane, adjacent to Gear West with property owner. (Timing dependent on owner availability)
Michael Jischke
Ongoing
SRF to coordinate with Xcel Energy on pricing out the potential burial of overhead utility lines in Phase 1 and Phase 2 with separate splits for the following:
1) Willow Road to Brown Road – Phase 1, City of Orono
2) From 700 feet west of Cemetery Road to Cemetery Road – Phase 1, City of Long Lake
3) From Cemetery Road to Wolf Pointe Trail – Phase 1, City of Long Lake
4) From Cemetery Road to east end of Phase 2, all lines/crossings buried, City of Long Lake
5) From Cemetery Road to east end of Phase 2, only crossing buried, City of Long Lake
Nate Will 4/15/15 Partially completed Phase 1, see
discussion below
4. Discussion Items: (60 Minutes)
a. Review revised streetscape layout
b. Parking / shared bike lanes along Martha Lane
c. Public Open House
Date is Wednesday, April 22, 2015 from 4:30 pm to 6:30 pm,
Review items to display at open house
d. Phase 1 Cost Summary
e. Utility burial costs
5. Update of ongoing design efforts (5 Minutes)
i. Final Design ii. Utility Coordination iii. Environmental Investigation
6. Open Discussion (5 Minutes)
CSAH 112 PAC Meeting April 15, 2015 Page 3 of 3
7. Follow Up Items/Action Items: (5 Minutes)
Task Responsible Party
Due Date
Resolution
8. Upcoming Meetings:
a. Open House: April 22, 2015; 4:30 pm – 6:30 pm b. PMT Meeting: May 7, 2015; 1:00 pm – 2:30 pm c. PAC Meeting: Tentative - May 20, 2015; 8:00 am – 10:00 am (or potential Council Work
Session)
H:\Projects\8483\_Correspondence\Meetings\Agendas\PAC Meetings\150415_PAC\8483_CSAH 112_Agenda_PAC Meeting_150415.docx
Project BackgroundCounty State Aid Highway (CSAH) 112, formerly Old Trunk Highway (TH) 12, was originally constructed as part of the State’s trunk highway system. In the mid to late 2000s, MnDOT built the TH 12 bypass, and in 2011 returned jurisdiction of old TH 12 (current CSAH 112/West Wayzata Boulevard) to Hennepin County. As part of the TH 12 project, the roadway was overlain with bituminous to temporarily correct poor pavement surfaces. Other significant improvements of the corridor were not performed as part of MnDOT’s TH 12 construction project.
A former trunk highway, the roadway was primarily designed for efficient traffic movement through the corridor, and does not adequately address many local priorities (such as pedestrian mobility and safety, parking, bicycle trail connectivity, and access).
Project StatusThis first phase of an important four-mile corridor servicing Long Lake and Orono became part of Hennepin County’s jurisdiction after being turned-back by the Minnesota Department of Transportation.
The county is currently in the process of developing detailed design plans for roadway and streetscape enhancement elements. The final design is scheduled for completion at the end of this year. Right of way and easements will be acquired in 2016 to allow construction to begin in 2017.
Project partners include the cities of Long Lake and Orono. For more information, visit www.csah112.com.
Phase 1 Schedule Phase 1 - Final Design: 2014 - 2015Phase 1 - Construction: 2017 - 2018
Open House To Do List:• Sign in• Visit with Hennepin County staff and design team• Learn about Phase 1 project process and schedule• Visit Phase 1 project displays
- Phase 1 corridor improvement concepts - Streetscape Enhancement Concepts
• Review Phase 1 Detour Layout• Review Long Lake Shoreline Cross Section
Next Public Open House• View Final Layout (Tentative)
August 2015
Notes:
Phase 1 Final Design oF Wayzata BoulevarD imProvements(CSAH 112)
Public OPen HOuse
For more information please visit:
www.CSAH112.com
Kristy MorterProfessional Engineer – Design DivisionHennepin County Transportation Department1600 Prairie DriveMedina, MN [email protected] Nathen WillSRF Consulting Group, Inc.One Carlson Parkway, Suite 150Plymouth, MN [email protected]
Project Area MapPhase 3
Construction 2020 - 2021Phase 1
Construction 2017 - 2018Phase 2Construction 2018 - 2019
Phase 1 – WilloW Drive to WolF Pointe trail
Final Design oF Csah 112 From Csah 6 to th 12
Phase 1 Design TreatmentsStatement introducing Phase 1 design treatments ...
Long Lake Shoreline RestorationIncludes concrete curb and gutter, riprap and guardrail. Addition of roadway lighting is designed to minimize lighting of the lakeshore while providing adequate illumination for the roadway and trail.
Gateway Monument at Brown Road The addition of a Gateway Monument at the Southeast corner of the CSAH 112 and Brown Road intersection, improves aesthetics and identifies the Village Center. (This is a discretionary spending item and the cost will be funded by the City.)
Village Center Existing ConditionsExisting Conditions looking East along the North side of Wayzata Blvd. (CSAH 112) at Lake Street.
Village Center StreetscapeStreetscape elements are proposed for the project corridor to improve aesthetics and create a sense of place. (This is a discretionary spending item and the cost will be shared by the County and City based on policy.)
ST
OC
K PI
LE
ST
OC
K PI
LE
STOCK PILE
STOCK PILE
STOCK PILE
STOCK PILESTOCK PILE
STOCK PILE
STOCK PILE
STOCK PILE
STOCK PILE
STOCK PILE
STOCK PILE
STOCK PILE
FL
AG
FL
AG
FL
AG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
FLAG
SUPERAMERICA
2400
AUTO BODY
ELITE
2325
SOLUTIONS
MN EQUIPMENT
SCHARBER & SONS
2315
J MAC'S AUTOS
545
RECYCLERS
EWASTE
525
WELDING
REPAIR AND
PERRY'S TRUCK
525
& MORE LLC
OUTDOOR
520
TRANSPORT INC.
BUESING BULK
2160
LIQUOR BARN
2067
ELECTRIC INC.
MILOW
2065
ENGINEERING INC.
LAKE
2085
HARVEST MOON
2380
LANDSCAPING
GARDEN CENTER &
OTTEN BROS.
2350
SERVICE 800
2190
BANK
COMMUNITY
LAKE
1964
& RESTAURANT
RED ROOSTER BAR
1832
RUN & SOCCER
GEAR WEST SKI,
1786
2120
2060
540
520 2045
515
425
570
450
1895
1877
1798
1790
1788
1784
1780
1776
1601
1595 323
331
339
342
1345
315
303
292
330
318
306
289
2070
VACANT
580
PARTS
AUTO
NAPA
2365
AND GLASS
AUTOBODY
CHARLIE'S
2205
VACANT
2073
COFFEE
CARIBOU
KARATE
NATIONAL
TANNERS
BODY GLOW
CLEANERS
PILGRIM
FITNESS
ANYTIME
NAILS
FABULOUS
SKINGEVITY
RIDGE
STONE
MURPHY
PAPA
CENTERS
PRINTING
BUDGET
2069
SENIOR LIVING
ORONO WOODS
2040
MUSEUM
PIONEER
1945
WINE & SPIRITS
LAKESIDE
1916
VACANT
VACANT
1905
1880 FAMILY DENTISTRY
1882 FAMILY INSURANCE
AMERICAN
1890AND SPA OF DISTINCTION
HAIR ENVY SALON
1870 DENTAL
LONG LAKE
STATE FARM
1854 VETERINARY
LONG LAKE
CAPITAL
CORE GLOBAL1844
1850 WELLNESS
ALIGN HEALTH &
SUBWAY
EL PARIAN
ACORNS
LITTLE DOMINOS
LIBRARY
HENNEPIN COUNTY
1865
TRUE VALUE
CONSTRUCTION
AREA UNDER
1810
1605
EATING
HEALTHY
SUTTON
SEATTLE
PRODUCE
FATHERS
FOUNDING
JEWELRY
ALBERS
1935
RESTAURANT
BIRCH'S
CINDI
NAILS BY
INSURANCE
FARMERS
REPAIR
FURNITURE
WAYZATA
VACANT
1948
GENERAL STORE
BIG ISLAND
2160
COIN LAUNDRY
CONSIGNMENT
EKEKO
SALON 12
GROOM ROOM
2160
CLUB MUTTS
1977
STOCK PILE
MB
432
448
1843 1828
1802
ONE STOP AUTO
455
REPAIR
APPLIANCE
S.O.S.
2265
WELL
WELL
MBMBMBMBMBMBMBMB
FLAG
WELL
MB
MB
FLAG
CITY OF ORONO
CITY OF LONG LAKE
CITY OF ORONO
CITY OF LONG LAKECSAH 112
CSAH 112
DANIELS ST.
SH
AU
GH
NE
SS
Y
AV
E.
WI
LL
OW
DR.
VI
RGI
NI
A
AV
E.
LA
KE ST.
MILL ST.
MA
RT
HA
LA.
SY
MES S
T.
TA
MA
RA
CK
AV
E.
BRI
MH
AL
L
AV
E.
BNSF RAILWAY
ORCHARD LA.
BR
OW
N
RD. (
CS
AH 146)
35
SP
EE
D
LI
MI
T
40
SP
EE
D
LI
MI
T
SP
EE
D
LI
MI
T
40
13 PARKING SPACES
13 P
AR
KI
NG SP
AC
ES
SP
EE
D
LI
MI
T
30
SP
EE
DLI
MI
T
40
SP
EE
DLI
MI
T
35
SP
EE
D
LI
MI
T
40
BR
OW
N
RD.
SP
EE
D
LI
MI
T
30
SP
EE
D
LI
MI
T
50
SECTION I
TYPICAL
SECTION I
TYPICAL
SECTION J
TYPICAL
SECTION J
TYPICAL
SE
CTI
ON
M
TYPI
CAL
SE
CTI
ON
M
TYPI
CAL
SECTION N
TYPICAL
SECTION N
TYPICAL
SECTION P
TYPICAL
SECTION P
TYPICAL
SE
CTI
ON
X
TYPI
CAL
SE
CTI
ON
X
TYPI
CAL
SECTION K
TYPICAL
SECTION K
TYPICAL
SE
CTI
ON L
TYPI
CAL
SE
CTI
ON L
TYPI
CAL
SECTION O
TYPICAL
SECTION O
TYPICALSECTION ITYPICAL
SECTION RTYPICAL
SECTION ITYPICAL
SECTION RTYPICAL
LC
THRU
11.0' 11.0'
B624 C&G
12.0'
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
WALKLT. TURN
CONT.
4.0'
SHLD
LC
THRU
2.0%
THRU
11.0'
B624 C&G
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
2.0%1.5%1.5%
4.0'
SHLD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - L
GRADE
PROFILE
2.0% 2.0% 2.0%
VAR (1:4)
(OR FLATTER)
VAR (1:4)
(OR FLATTER)
B612 C&G
LOTPARKING
2.8' 4.0'-14.0'
RT TURNSHLD/
8.0'5.0' 4.4'
LC
THRU
11.0' 11.0'
B624 C&G
12.0'
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
WALKLT. TURN
CONT.
4.0'
SHLDPARKING
LC
THRU
2.0%
THRU
11.0'
B424 C&G
WALK
10.0'
B624 C&G
CSAH 112
CSAH 112
2.0%
WALK
1.5%1.5%
4.0'
SHLDPARKING
DESIGN SPEED = 30 MPH
TYPICAL SECTION - M
GRADE
PROFILE
2.0% 2.0% 2.0%
4.0%
10.0'12.0'-14.0'
B624 C&GB624 C&G
3.0'
8.0'
6.2' TO
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
2.0'
1.5%
BLVD
VAR (1:4)
(OR FLATTER)
B624 C&G
CSAH 112
CSAH 112
2.0%
2.0'
VAR (1:4)
(OR FLATTER)
1.5%2.0%
9.0' 6.0'
WALKTRAIL
10.0' 14.0'
RT TURNLT. TURN
CONT.
DESIGN SPEED = 30-40 MPH
TYPICAL SECTION - I
4.0% 4.0%
VAR (1:4)
(OR FLATTER)
(OR FLATTER)
VAR (1:3)
14.0'
RT TURN
9.0'
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
2.0'
1.5%
BLVD
VAR (1:4)
(OR FLATTER)
B624 C&G
CSAH 112
CSAH 112
2.0%1.5%
9.0' 6.0'
WALKTRAIL
10.0'
4.0% 4.0%
14.0'
RT TURN
4.0'
SHLD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - K
9.0'
LT. TURN
VAR.
B624 C&GB624 C&G
3.0'
2.0'
VAR.
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B624 C&G
BLVD
12.0'
2.0% 2.0%
4.5'
1.5%
BLVD
B624 C&G
CSAH 112
CSAH 112
2.0%
2.0'
VAR (1:4)
(OR FLATTER)
1.5%2.0%
9.0' 6.0'
WALKTRAIL
10.0' 14.0'
RT TURNLT. TURN
CONT.
4.0% 4.0%
9.0'
VAR (1:4)
(OR FLATTER)
DESIGN SPEED = 30 MPH
TYPICAL SECTION - J
8.0'
SHLD
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'
B624 C&G
12.0'
2.0% 2.0%
WALK
B624 C&G
CSAH 112
CSAH 112
2.0%
2.0'
VAR (1:4)
(OR FLATTER)
WALK
1.5%1.5%
LT. TURN
CONT.
4.0'
SHLDPARKING1.0'
BLVD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - N
8.0'7.0'-17.0'
VAR (1:2)
(OR FL
ATTER)
& VAR6.0%
10.0'10.0'-14.0'
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'
2.0% 2.0%
B624 C&G
CSAH 112
CSAH 112
LT. TURN
CONT. SHLD
DESIGN SPEED = 30 MPH
TYPICAL SECTION - O
BLVD1.0'
1.5%
TRAIL
10.0'
VAR (1:2)
(OR FL
ATTER)
7.0'2.0'-6.0'
B424 C&G
SHLD
2.0'-6.0'
GUARDRAIL
(OR FLATTER)
VAR (1:3)
BLVD
8.0' 0.0'-12.0'
& VAR.6.0%
LC
THRU
12.0'
GRADE
PROFILE
2.0% 2.0%
THRU
12.0'
B424 C&G
BLVD BLVD
B624 C&G
CSAH 112
CSAH 112
2.0% 2.0%
8.0'
SHLD
6.0' 8.0'
SHLD
4.0%
1.0'
1.5%
TRAIL
10.0'
VAR (1:2)
(OR FL
ATTER)
7.0'-9.0'
SHORELINE
1:1
TYP
DESIGN SPEED = 30 MPH
TYPICAL SECTION - P
GUARDRAIL
& VAR.6.0%
REINFORCED
SOIL
SLOPE
DESIGN SPEED = 30 MPH
TYPICAL SECTION - X
LC
15.0' 15.0'
SYMES ST.
VAR VAR1.5%
6.0'
WALK SHARED LN SHARED LN
SHARED LANE TRAIL
SHORELINE STABLIZATION
LEGEND
RAISED MEDIANS & CURBS
PAVED SHOULDERS
PAVED ROADWAY
EXISTING RIGHT OF WAY
BITUMINOUS TRAILS & BIKEWAYS
PROPOSED TRAFFIC SIGNAL
RETAINING WALL
GUARDRAIL
PROPOSED RIGHT OF WAY
PROPOSED DRY POND LOCATION
(TOE OF SLOPE)
PRELIMINARY CONSTRUCTION LIMITS
WETLANDS
CONCRETE SIDEWALKS & TRAILS
H:\Projects\8483\CAD_BIM\Layout\8483_loa_150422POH.dgn
PROPOSED TEMPORARY EASEMENT
PROPOSED PERMANENT EASEMENT
DRAFT
(RAPID RECTANGULAR FLASHER BEACON)
PROPOSED PEDESTRIAN FLASHER SYSTEM
CITY LIMITS
SHORELINE STABLIZATION
LEGEND
RAISED MEDIANS & CURBS
PAVED SHOULDERS
PAVED ROADWAY
EXISTING RIGHT OF WAY
BITUMINOUS TRAILS & BIKEWAYS
PROPOSED TRAFFIC SIGNAL
RETAINING WALL
GUARDRAIL
PROPOSED RIGHT OF WAY
PROPOSED DRY POND LOCATION
(TOE OF SLOPE)
PRELIMINARY CONSTRUCTION LIMITS
WETLANDS
CONCRETE SIDEWALKS & TRAILS
H:\Projects\8483\CAD_BIM\Layout\8483_loa_150422POH.dgn
PROPOSED TEMPORARY EASEMENT
PROPOSED PERMANENT EASEMENT
DRAFT
(RAPID RECTANGULAR FLASHER BEACON)
PROPOSED PEDESTRIAN FLASHER SYSTEM
CITY LIMITS
2000 100
scale in feet
CSAH 112 PHASE 1 LAYOUT
10901095
1100
1105
1110
1115
1120
1125
1130
1135
1140
1145
1150
1155
1160
1165
100
101
120
121
140
141
160
163
180
185
10
14
191
193
200
201
220
221
1138
1139
401
402
LONG LAKE
LONG LAKE
WOLF P
OI
NTE TR.
CE
METER
Y R
D.
US 12
LONG LAKE CITY TRAIL
LO
NG
LA
KE
CR
EE
K
BLVD
5.7'
GUARDRAIL
5.0'
2.0'
LC
THRU
11.0'
GRADE
PROFILE
2.0% 2.0%
THRU
11.0'11.0'
2.0% 2.0%
CSAH 112
2.0%4.0%
LT. TURN
8.0'
SHLD
8.0'
SHLD
VAR (1:2)
(OR FL
ATTER)
BLVD
1.5%
7.0'
TRAIL
4.0%
B624 C&G
8.0'
VAR (1:3)
(OR FLATTER)
4.0%
30.0'
CLEAR ZONE
CSAH 112
DESIGN SPEED = 40 MPH
TYPICAL SECTION - R
DET
OUR
DETOUR
DETOUR
DETOUR
DET
OUR
DETOUR
DETOUR
DE
TO
UR
112COUNTY
112
CO
UN
TY
112
CO
UNT
Y
112COUNT
Y
112
CO
UNT
Y
112
CO
UNT
Y
112COUNTY
112
COUNTY
112
COUNTY
112
COUNTY
EAST
WEST
DETOUR DE
TOUR
WEST
WEST
WE
ST
WEST
EAST
WEST
EAST
WEST
EXIT
EXIT
ROAD
CLOSED
AHEAD
RO
AD
CL
OSE
DA
HE
AD
8000 400
scale in feet
LEGEND
DRAFT
CITY LIMITS
PHASE 1
PROPOSED DETOUR ROUTE FOR
H:\Projects\8483\CAD_BIM\Layout\8483_lob.dgn
4/10/2015
11:58:54 AM
CONSTRUCTION YEARS 2017-2018
PHASE 1
CSAH 112 (WAYZATA BLVD) PHASE 1 DETOUR LAYOUT
8000 400
scale in feet
DRAFTH:\Projects\8483\CAD_BIM\Layout\8483_lob.dgn
4/10/2015
11:58:54 AM
BUSINESSES
MAINTAINED TO APARTMENTS AND
RESTORATION. LIMITED ACCESS
ROAD CLOSURE TO CONSTRUCT SHORELINE
LEGEND
CITY LIMITS
PHASE 1
PROPOSED DETOUR ROUTE FOR
CONSTRUCTION YEARS 2017-2018
PHASE 1
BUSINESSES
MAINTAINED TO APARTMENTS AND
RESTORATION. LIMITED ACCESS
ROAD CLOSURE TO CONSTRUCT SHORELINE
PHASE 1 CONSTRUCTION 2017-2018CLASSON LAKE
CL
AS
SO
N
CR
EE
K
US 12
CS
AH 6
OL
D
CR
YS
TA
L
BA
Y
RO
AD
KELLEY PARKWAY
CSAH 112
CSAH 112
CSAH 112US 12
W. INDUSTRIAL BLVD.
BNSF R
AIL
WA
Y
KELLEY PARKWAY
DANIELS ST. SH
AU
GH
NE
SS
Y
AV
E.
WI
LL
OW
DR.
VI
RGI
NI
A
AV
E.
LA
KE ST.
MILL ST. M
AR
TH
A
LA.
SY
MES S
T.
TA
MA
RA
CK
AV
E.
BRI
MH
AL
L
AV
E.
LONG LAKE
WOLF P
OI
NTE TR.
GL
EN
MO
OR
LA.
HE
AT
HE
R
LA.
RU
SS
EL
L
LA.
GR
EE
N
HI
LL
LA.
UN
DE
RHI
LL
CI
R. OLD LONG LAKE RD.
LI
ND
AW
OO
D
LA.
LUCE LINE TRAIL
CSAH 112
US 12
WAYZATA BLVD.
BNSF RAILWAY
BNSF R
AIL
WA
Y
CS
AH 112
CE
METER
Y R
D.
LO
NG
LA
KE
CR
EE
K
ORCHARD LA.
BR
OW
N
RD. (
CS
AH 146)
LUCE LI
NE TRAI
L
CSAH 6
CSAH 6
CSAH 6
CSAH 6
WI
LL
OW
DR.
FE
RN
DA
LE
RD.
CS
AH 101
TH 394
SHORELINE DR. (CSAH 1
5)
SPRINGHILL RD.
LONG LAKE CITY TRAIL
960
950
940
960
950
940
LONG LAKE
CL CSAH 112
1:1
CL
INP 8" WM
INP 15" STM
0 10 20 4030 5050 40 30 20 10
INP R/W
PROP RIPRAP
& GUARDRAIL
PROP LIGHT FTG1144+00
INP GND
FENCE
NOISE
INP MnDOT
R/WINP MnDOT
OHW 944.3
COFFERDAM
SHEET PILE
TEMPORARY
SEWERPROP STORM
1140+90 TO 1146+25REINFORCEMENT
AREA & GEOGRIDCONSTRUCTION STAGING
OR TREES PERMITTEDNO PRIVATE UTILITIES
REINFORCED SOIL SLOPE
LONG LAKE SHORELINE RESTORATION AREAPERMANENT ROADWAY SECTION ALONG
ROADWAY CLOSURE REQUIRED TO CONSTRUCT
& TRAILUTILITY CORRIDOR
INPLACE / PROPOSED
50 10
scale in feet
DRAFT
H:\
Proje
cts\8
483\C
AD
_BIM\G
raphics\R
SS W
all\8
483_gr1_
Open
House_150422.d
gn
Figure 1
4/12/2015Job #8483
LONG LAKE SHORELINE RESTORATION - REINFORCED SOIL SLOPE SECTION
CSAH 112 (WAYZATA BLVD) - PHASE 1
HENNEPIN COUNTY
H:\P
roje
cts\
8483
\LA
\Gra
phic
s\D
ownt
ownS
treet
scap
e201
5021
8\D
ownt
ownS
treet
scap
e201
5041
0
Bituminous
Standard Concrete Walk
Exposed Aggregate Concrete Walk (Furnishing Zone)
Colored Concrete Walk at Corners
Multi-use Trail
Turf Boulevard
Deciduous Canopy Tree
Ornamental Tree
Retaining Wall
Ornamental Railing or Fence
Gateway Monument
Bench
Bike Rack
15’ Decoative Light Pole
25’ Decorative Decorative Fixture
Traffic signal
Pedestrian Crossing Signal
KEY NORTH0 15’ 30’ 60’
Phase 1 – WilloW Drive to Wolf Pointe trail
final Design of Csah 112 from Csah 6 to th 12Open House April 22, 2015
Downtown Streetscape
CSAH 112 / Wayzata Boulevard
Lake
Stre
et
North Brown Road
Mill S
treet
Symes Street
Martha Lane
CSAH 112 / Wayzata Boulevard
2
Wall Aw/ Railing
Gateway Sign
OrnamentalFence
OrnamentalFence
ExistingPond
1 See Section Drawing
See Section Drawing
3 See Section Drawing
4 See Section Drawing
Public Parking
Lot
WalkWalk
Trail
Walk
Walk
Trail
Trail
Long Lake
Park
Wall Bw/ Railing
Wall Cw/ Railing
Bench
Bike Racks
Tree in Grate
Ornamental Fence
Wall Dw/ Railing
Wall Ew/ Railing
Pedestrian Crossing and
Signal
Advance Pedestrian Signal
Wood Privacy Fence
Pedestrian Crossing
Wall F
Guardrail
Shoreline Stabilization
Existing Landscape Berm
Existing Noise Wall
TH 12
GatewaySign
Connection to Luce Line TrailSee
PerspectiveDrawing
C
Trail
SeePerspectiveDrawing
B
Advance Pedestrian Signal
5 See Section Drawing Walk
Walk
Trail
6 See Section Drawing
SeePerspectiveDrawing
A
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
Perspective Renderings
View B - Looking Southeast at the Lake Street Intersection View C - Looking Southeast at the Brown Road Intersection Gateway Area
View A - Looking West along the Long Lake Shoreline Approaching the Village Center
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
0 5’ 10’
1
2
10’
Trail
Commercial Property Commercial Property9’
Blvd.
2’ 14’
Right Turn
9’
Blvd.
6’
Walk
R.O.W.PermanentEasement R.O.W.
12’
Thru
12’
Left Turn
4’ 3.5’
Shld
18’
Transition
SOUTHNORTH
25’ Tall Light, typ.
New Canopy Tree, typ.
Modular Block Retaining Wall with Railing
Paved ClearZone
Pond Area
10’
Trail
9’
Boulevard
8’
Shoulder
9’
Boulevard
6’
Walk
Residential Property
R.O.W.
25’ Tall Light, typ.
Modular Block Retaining Wall with Railing
SOUTHNORTH
12’
Thru
12’
Cont. Left Turn
12’
Thru
14’
Right Turn
West of Brown Road
East of Brown Road
Streetscape Cross Sections
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
0 5’ 10’
R.O.W.R.O.W.
9’±
Property Frontage/
Walk
Commercial Property
PermanentEasement
Commercial Property 12’
Shared LeftTurn Lane
11’
Thru Lane
11’
Thru Lane
4’±
Walk
4’
Furn. Zone
5.7’
Furn. Zone
10’
Parking
4’
Shld.
PotentialFurnishings by
Property Owners
15’ Tall Light
Landscaping by Property Owner
Modular BlockRetaining Wallwith Railing
New Canopy Tree
LLL
5.7’
Furn. Zone
R.O.W.R.O.W.PermanentEasement
Modular Block Retaining Wall
with Railing
OrnamentalFence
2’
Paved Clear Zone
8’
Trail
Varies
RightTurn
Transition
4’
Shld.
4.3’
Walk
5.7’
Furn. Zone
11’
Thru
11’
Thru
12’
Cont. Left Turn
Commercial Property Commercial Property
15’ TallLight, typ.
New Canopy Tree, typ.
SOUTHNORTH
SOUTHNORTH
3 West of Lake Street
4 Between Lake Street and Mill Street
Streetscape Cross Sections
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
25’ Tall Light withBack-Side Shield
Rip-Rap Slope Protection
Near Water Line
R.O.W.
20’±
Stabilized Slope with Grass Seeding only
R.O.W.
Long Lake
Existing Landscape
Berm
ExistingNoise Wall
ExistingNoise Wall
8’
Shoulder
11’
Thru Lane
11’
Thru Lane
8’
Shoulder
9’
Boulevard
10’
Trail
18’±
0 5’ 10’
SOUTH
SOUTH
NORTH
NORTH
R.O.W.
R.O.W.
4.3’
Walk
5.7’
Furn.Zone
8’
Parking
11’
Thru
11’
Thru
4’
Shld.
7’
Blvd.
8’
Trail
ExistingLandscape
Berm
Commercial Property 12’
Cont. Left Turn
15’ Tall Light typ.
New Canopy Tree
5 Between Mill Streetand Martha Lane
6 Along Long Lake Shoreline
Streetscape Cross Sections
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
Cross Section
Wall Elevation View from CSAH 112
CSAH 112
Wall Elevation View from Adjacent Property
Adjacent Property Trail
Wall Details• Architectural Cap• Modular Block with Rusticated Limestone Texture• Color Stain (Natural Limestone Appearance)
Railing Details• Steel Construction• Painted Black
Wall
Railin
g1’
3’-6”
Sidewalk or Trail
4’-6”
Retaining Wall Aesthetics - Concrete Modular Block Wall
PHASE 1 – WILLOW DRIVE TO WOLF POINTE TRAIL
FINAL DESIGN OF CSAH 112 FROM CSAH 6 TO TH 12Open House April 22, 2015
Cross Section
Wall Elevation View from CSAH 112
Wall Elevation View from Adjacent Property
Wall Details• Architectural Cap• Cast in Place Concrete with Rusticated Limestone Texture• Color Stain (Natural Limestone Appearance)
Railing Details• Steel Construction• Painted Black
Barri
erRa
iling
2’-8”
1’-10
”
Sidewalk or Trail
4’-6”
CSAH 112 Adjacent PropertyTrail
Retaining Wall Aesthetics - Cast-in-place Concrete Wall
FINAL DESIGN - Phase 1 Project Schedule
Phase 1 – WilloW Drive to Wolf Pointe trail
final Design of Csah 112 from Csah 6 to th 12
2015 2016 2017
rev 2015.04.09 MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
AGENCY AND PUBLIC INVOLVEMENT
Technical Advisory Committee = T T T T
Project Advisory Committee = P P P P
PUBLIC INFORMATION MEETINGS
Phase 1 Project Open House = OH OH OH
Business Meeting (Long Lake) = LL LL
Business Meeting (Orono) = O O
City Council Meeting/Work Session = C C
Utility Coordination Meeting = U U U
FINAL DESIGN - Phase 1
Project Management
60% Construction Plans
90% Construction Plans
Municipal Approval
100% Construction Plans
Right of Way Acquisition
Advertise, Bid Letting & Award
Phase 1 Construction (2017 - 2018)
= KEY PROJECT MILESTONES / DELIVERABLES
Ongoing Coordination
Approved Plans
Municipal Consent
TODAYApril 22, 2015
YOUR COMMENTS ARE IMPORTANT TO US! Please write your comments on this form. You may either put your completed form in the comment box during the Open House or return it to the address listed on the back. Please submit your response by Wednesday May 6, 2015 so your feedback can be incorporated in a timely fashion. We would like to have your name, address and E-mail so that we might address your comments.
This information is optional.
Name:
Address: E-mail Address:
Are there areas of the project where additional consideration should be given?
Your Input:_______________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
__________________________________________________________________
Wayzata Boulevard (CSAH 112) Phase 1 Final Design Willow Drive to Wolf Pointe Trail
Public Open House Meeting – April 22, 2015