CSC1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International

CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

  • Upload
    others

  • View
    12

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

CSC‐1582 The Project Controls Manager’s Survival Guidebook

Les McMullan (FAACE)aace International

Page 2: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

BIO of Les McMullan

• Les McMullan, GM Project Controls, Project Delivery & Implementation, Rio Tinto

• Past President of the Montreal aace Section & current Board member

• Fellow, AACE International 2012 (FAACE)• Education: Graduate McGill University, Montreal• Guest lecturer at Montreal Universities• Worked both for EPCM firms and Owner• > 35 years project experience in project controls• Something You Don’t Know About Me: I like to sing and play guitar with friends; enjoy Irish & Celtic music

2

Page 3: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Guide ‐ AGENDA

• Why a Guidebook?• The Project Environment• The Role of PCM• The Mission

– The adventure begins!• PCM Survival Guide Tips 

– What you need to know!• PCM Resources

– Help is on the way.• Conclusions

3

Page 4: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Why a PCM Survival Guidebook?

• Little literature about the role• Many learn “on the job”• Turnover in PCMs evident• People skills often overlooked• Focus on the technical skills only• Projects fail due to inexperience• Resources for PCMs needed• Qualified PCMs in short supply

4

PCM SURVIVAL GUIDEBOOK

Page 5: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The Project Environment

• “It’s a jungle out there”• Changing project landscape *

– Projects are complex, EPC and EPCM, alliances, etc.– Mega projects are the norm– Often remote locations with multiple offices and sites– Virtual teams – Attempts to transfer risk– Lack of qualified PC resources

• Some not be ready for the PCM role• Many dangers and pitfalls• In a changing market it is survival of the fittest

– You need the PCM Survival Guide!

5

* Ref: CII Study IR244-2

Page 6: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

THE PROJECT CONTROLS MANAGER’S ROLE

6

Page 7: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Some Definitions

• Project Controls:– “includes the people, processes and tools for the planning and execution of all phases, including, but not limited to Estimating, Cost Control, Planning, Scheduling, Change Management, Progressing and Forecasting”…. CII 

– Brings a business sense in time and money– Preserves business case and shareholder value

• The Project Controls Manager:– “Orchestrates the combined functions that enable managers in their own firm and the Owner’s, to anticipate necessary changes to keep the project on schedule and within budget”…. aace International.

7

Page 8: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Right hand to the project manager– “the eyes and ears of management”

• Manage and lead the project controls team• To enable team members to best do their jobs• Primary contact on cost and schedule• Liaison with client/other stakeholders• Interface with project counterparts• Oversight on reporting and trends• Identify risks and opportunities• Promote best practices

The Role of the Project Controls Manager

8

Page 9: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

9FI

Profile of a PCM/Leader

1. Excellent technical understanding

2. Proven communication skills

3. Able to deliver the news, deal with criticism

4. Having integrity, lead by example

9

Page 10: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The PCM Role : the Big Picture

• The PCM must see the overview• Getting into the weeds will leave you grounded• Be able to spot trends, trouble spots• Provide an overall check and balance• Keep the team focused on the items needing attention

10

Page 11: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• The top 4 characteristics of leaders from a survey:– Honesty, being forward looking, inspiring, competent

• Leader needs to be:– Action oriented, have vision, actions and priorities

• Avoid taking on all the issues (monkeys*) on your back that should be manageable by senior staff

• If you want to survive…. learn to delegate• Don’t become the bottleneck!• Focus on team development and guidance• Collaborate; keep staff well informed• Give credit and celebrate successes

Leadership & Management Styles

11

* Ref: The One Minute Manager

Page 12: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Accountability

• Transparency and accountability to:• Project Manager• Business Management• Corporate Finance• Functional Management• The Owner• Peer reviews• QA audits• SOX audits

12

Page 13: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

THE ADVENTURE BEGINS

13

Page 14: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The Mission

Your new job title: Senior Project Controls Manager  Project: Mega project; new technology project Location: Remote location, overseas. Your mission: to head up a large team of project controls professionals of varying backgrounds and cultures

Phase: Project at NTP; baselines established, cost and schedule optimized, contingency reduced

Base: Home Office, site to mobilize later Situation: PCM for study left; you are asked to take over Client: Known to be very hands on; aversion to change approval.

14

How many red flags do you see above?

Page 15: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Team: well seasoned, know the terrain• Maps, GPS: PEP, SoW, WBS, cost and schedule baselines, contractual documents

• Tools & Equipment: Management Systems, procedures, project toolkit, roadmaps

• Survival gear: Early warning systems, risk management, trending, lessons learned

• Antidotes: Best practices, communication, management control loop

The Adventure Begins: What you need

15

Page 16: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The Team ‐ Organization

Estimating Project Control Implementing Guides

Cost Control

Project Manager

Project Controls Manager

Planning & Scheduling

Risk Management

Project Controls Corporate Mgr

Other Services

Owner Project Team

Controls Manager

Owner Core Functional

Management

Owner

Site Controls

16

Page 17: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Team selection: PCM’s most important decision

• Leads well experienced are the pillars

• Must know the terrain• Skills assessment• The generation gap• Achieve proper mix• Global Teams: communication• Managing Virtual teams• Make training a priority

The Team

Owner

Consultant

No Surprises

17

Page 18: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Managing interpersonal issues• Communication issues• Managers who may not fully understand or appreciate the role or benefit of project controls

• Perceptions of project controls• International teams – cultural differences• Overseas and isolated• Expat hiring and conditions• Teambuilding requirements

The Team: The Human Factor

18

Page 19: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The Team: Perceptions of Project Controls

“To see ourselves as others see us” – Robert Burns

Engineering

Not this……

But this… a team

19

Page 20: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

The Team ‐ Collaboration

•Equipment lists•Bulk material & quantities•Engineering deliverables•Design change notices•Earned value by deliverable•Eng. change notices

ENGINEERING

•Scope of work•PEP/ WBS/packages•Project baseline budget•Project CPM schedule•Risk management•Finance & accounting data•Resource plan & loading•Change management system•PM systems•Owner data

PROJECT MANAGEMENT•Contractor detailed schedules•Contractor resource loading•Quantities Installed & hours•Field change notices•Earned value & productivity•Const. indirect costs•Manpower forecasts•Contract admin. reports•Pre-comm. & comm. systems

CONSTRUCTION

•Bid evaluations•Recommend. & approvals•Purchase orders•Change notices•Contract terms and conditions•Contract price breakdowns•Negotiations

PROCUREMENT

Project Controls

Progress & Cost ReportsTrends & ForecastsSchedules & UpdatesVariance AnalysisReview MeetingsRisk Register

“No controls with out authority”20

Page 21: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Maps, GPS: Key Documents for the PCM

• Project Execution Plan– Organization, project strategy, functional plans, means and methods of execution

• Scope of Work (SoW)– Detailed description of the scope of work by facility supported by engineering 

documentation. The master scope document reference for change management• Work Breakdown Structure (WBS)

– Facility numbers breaking down the project into physical elements; followed by standard discipline and commodity codes: the common project language 

• Commitment Packages & Package Dictionary– Description of the content, interfaces and milestones of all the procurement and 

contract packages listed in the PEP and as defined by the procurement strategy• Baselines

– The cost and schedule baseline documents for project execution developed during the definition stage (FS) and converted into detailed control documents

• Project Controls Plan– The detailed plan that determines the controls organization, tools, procedures, 

processes and interfaces• Master Contract

– The documents that determine the rules of engagement with the primary contractor and/or joint venture partners regarding scope, milestones, management of change, payments and all other interactions.

21

Page 22: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Maps, GPS: Project Controls PlanMaps, GPS: Project Controls Plan

• The process of determining and defining the project control work processes to be used in executing the project scope of work– Organization– Deliverables– Tools– Interfaces– Responsibility matrix– Procedures– Meetings

“ He who fails to plan, plans to fail” – Sir Winston Churchill

22

Page 23: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Tagged Equipment & Bulks

Commodity Codes

Costs Reconciled

Estimates

Schedules

Tools: PM Systems on the Digital Project

Project management 

System

Deliverables

Estimating

Timeline

Progress

Cost

Materials

Portfolio Management Executive Information Systems

Owner Corporate Legacy System

CAE and 3D CAD systems

Estimating Software

Planning Software

Resources

23

Page 24: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Tools: Total Cost Management Framework

Portfolio of Enterprise Assets

STRATEGICASSET

PLANNING(3)

PROJECTSIMPLEMENTATION

(4)

STRATEGICASSET

PERFORMANCEMEASUREMENT

(5)

STRATEGICASSET

PERFORMANCEASSESSMENT

(6)

StrategicAsset

ManagementProcess

(2.3)

PROJECTPLANNING

(7)

PROJECTACTIVITY

IMPLEMENTATION(8)

PROJECTPERFORMANCEMEASUREMENT

(9)

PROJECTPERFORMANCEASSESSMENT

(10)

ProjectControlProcess

(2.4)

Portfolio of Projects

Plan

Do

Check

Assess

Plan

Do

Check

Assess

Doing the Right Project

Doing the Project Right

Strategic Asset Management Process Project Control Process

Project Shaping

24

Page 25: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Tools: Common Toolkit

• Corporate project controls policies• Standard procedures & guidance• Project framework• Common WBS and commodity codes• Integrated suite of software tools• Portfolio & drill down reporting• Key performance indexes and dashboards• Training programs• Lessons learned database

25

Page 26: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Survival Gear & Processes: Successful Launch

• Projects need successful launch at execution• Lead personnel on board, no empty boxes in the organization chart

• Full suite of procedures & processes ready• Estimates & schedules converted to baseline documents

• Get help as required in the front‐end• Setting up PM systems always takes longer• Ensure training programs in place for staff• Projects that stumble at the start are often in a catch‐up mode or off balance

26

Page 27: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Survival Gear & Processes: Meetings

• There must be standard meetings– Schedule reviews– Trend Meetings– Risk review Meetings– Progress Reviews

• Lean Approach– Meeting with the team– Control charts– KPIs– Efficient reviews

27

Page 28: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Survival Gear & Processes: Reporting for Control

• Maintain integrity of the WBS and coding structures• Use dashboard approach – executive template• Portfolio management and drill down capability• Frequent reporting can lead to greater control• Identify trends; reports should be trigger points• Exception reporting & variance analysis• Avoid the reporting trap; focus on the results

28

Page 29: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Antidotes: The Project Controls Process

Scope of Work

Commitment Packages

Budget Schedule

Monitoring

Trending/ Forecasting

Management Reporting

Action/Mitigation

29

Page 30: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

Antidotes: Communication

Project Controls

Engineering

Owner Management 

Team

Procurement Construction

ContractorsVendors

Business Unit

Operations

POV/Comm

EPCM

Other Stakeholders

30

Owner

Page 31: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips – The  PC Trifecta

Change Management Earned Value Forecasting

Most firms often find these are areas to work on

31

Page 32: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Change Management

• Inadequate management of change often cited as a reason for poor project performance

• Roles and responsibilities need to be clearly defined• Scope creep and engineering design has the greatest impact and is to be closely monitored

• Some suffer from the “iceberg effect” • Sources and types of changes must be identified• Death by 1,000 cuts• Secondary change magnifies impact• Schedule impacts often under‐evaluated

32

Page 33: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Earned Value

• A practical and consistent earned value system is required to measure the project progress

• Templates are established for the measurement of engineering deliverables; drawings, specs, 3D models

• Procurement progress  is measured from vendor design, through material delivery, fabrication and delivery

• Construction may be measured by contract and activity with templates, quantities and physical progressing

• Avoid the saw tooth affect on project progress

33

Page 34: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Forecasting

• Control costs before they occur • Forecasting provides advance intelligence to control and/or avoid cost and schedule variance

• Trending is the backbone of the forecasting system• Do not take the trend system for granted and continually test the integrity of the process

• Identifying scope changes from trends is essential aspect of the process and ties back to MOC

• Use the pareto principle• Plan a rolling forecast

34

Page 35: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Mega Projects

• Much anecdotal evidence exists across industries• Projects are huge and require massive coordination• Projects may seem on track on the surface • Flaws can become evident thru pressures of execution• Because of the size, ripple effects have major impact• Top causes for deviation tend to be common• Very susceptible to the market • PCMs need to be aware of the causes*• If causes seen early, can be managed

35

* Many are mentioned in this presentation and paper. See paper references for more.

Page 36: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Know the difference between planning and scheduling• Always prepare a Basis of Schedule• Ensure proper schedule levels, logic and maintenance• Respect baseline protocol• Ensure that all phases are covered• Keep network to controllable level • Ensure schedules are resource loaded • Follow critical and near critical paths• Run schedule risk analysis • Ensure team participation and buy‐in• Use earned with clear rules of credit• Apply last planner© principles whenever possible• Be aware of construction contractor planning capabilities

PCM Survival Tips: Planning & Scheduling

36

Page 37: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Understand estimate classes & input required• Establish WBS and use standard commodity codes• Know the estimate plan and work it!• Basis of Estimate is the key reference document

– Know how estimate was developed – quantities, allowances, design progress, accuracy, etc.

– Understand productivity, crew rates• Use estimate review checklist & process• Prepare well for the estimate review• Be familiar with key ratios & benchmarks• Estimators throughout execution is a must to save  significant costs!

PCM Survival Tips: Estimating

37

Page 38: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Cost Control

• TCM: Control costs before they occur• Greatest cost impact is scoping and design: project front end• Understand basis of budget and packaging• Plan trending on a rolling basis:

– Trend meetings a MUST, not optional– Remember Pareto 20/80 rule– Scope = QUANTITIES = COST (and don't forget it)– Insist on proper variance analysis (by WBS and package) – Contingency: watch for back‐end!

• Ensure proper collection of benchmark data throughout the project

• Watch for change and secondary impact!• Avoid forensic cost control… after the fact• Cost report must be accurate & current;

Finger on the pulse of the project

38

Page 39: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Inadequate stage‐gate process; conditional pass• Organization issues: no RACI; high turnover• Inexperienced team: Consultant/Owner• No integrated project management system• Design issues: P&IDs and plot plans not “frozen”• Scope creep; Late engineering changes• Major quantity fluctuations• Inadequate change management process• Project controls excluded in pre‐bid process• Delays in placement of long lead items• Protracted procurement cycle on packages • Procurement planning  not prioritized or levelled• Lack of expediting & inspection/ not following subs• Delays in vendor drawings and knock‐on effect on engineering• Lack of materials management

PCM Survival Tips: Danger Zones

39

Page 40: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Tips: Danger Zones

• Milestone slippage ‐ lack of schedule accountability• Continuously missing targets with ineffective mitigation• System POV and commissioning added late in schedule, 

requiring modifications to construction sequencing• Incomplete RFQ packages issued for bid  = $$$$ Later• Key controls/risk meetings not attended by management• Churn in packages content & continual budget transfer• Impact of secondary change unaccounted for• Resource shortages – contractor supervision & craft workers• Growth on contracts affecting performance,  schedule, 

productivity and indirect costs• Risk register is static; not updated• Silo approach, poor communication & morale

40

Page 41: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Resources

• Standard PM systems• Common tools• Procedures & guidance• Project training• Qualified PC team• Owner procedures• Internal quality assurance

• Certification programs• Recommended practices• Skills & knowledge guides• Technical meetings• Virtual libraries• Websites• AACE, PMI, CII & others

Internal Project Professional Associations

Internal Firm

• Social media• Academic programs• Peers and colleagues• PCM project experience• PCM leadership capability• PCM Survival Guidebook • Other published references

Other

• Corporate PC manager• Co. “Academy” courses• Policies & processes• Benchmarking data• Communities of practice• Project peer reviews • Lessons learned

41

Page 42: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

• Community of Practices– Specialties (e.g. PCM Forums)

• Professional Associations– Certifications

• Company “college”• Company PC Annual Meetings• Functional manager

– Helpline• Project peers and managers• QA Reviews; Health Checks• Social Networks• Academic programs• Business & project management

PCM Resources Summarized

42

Page 43: CSC 1582 The Project Controls Manager’s Survival …...CSC‐1582 The Project Controls Manager’s Survival Guidebook Les McMullan (FAACE) aace International BIO of Les McMullan

PCM Survival Guide ‐ Conclusions

If you want to thrive…• Careful team selection• Be a leader• Focus on best practices• Start with a Project Controls Plan• Toolkits in place; procedures & systems• Interface at all levels• Communicate well & often• See the BIG Picture• Implement proactive trending• Raise the flags early• Manage change relentlessly• Benefit from prior  “Lessons learned”• Deal with the ostrich attitude• Mitigate, find solutions• Don’t hesitate to ask for help!• Be the navigator for Project Management