April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:09:08 AM
FOREWORD
This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2018 by TxDOT.
There are five sections to this document:
1. Projects that are scheduled to let through the statewide letting process at Austin headquarters2. Projects that are approved by the TxDOT administration to let by a local entity such as a city or county3. Other financial obligations that do not go through a letting process4. Project selected as Comprehensive Development Agreement5. Projects selected as Design Build
Projects and other financial obligations are funded by various funding sources, the details of which are provided on the following page. The State Highway Fund is TxDOT’s traditional method of project funding and in recent years the department has received additional financial tools from the Legislature to advance projects.
The projects and financial obligations in this schedule are based on the current estimated construction costs of the projects and the current forecast of available funds for fiscal year 2018. Changing conditions may result in projects being removed or added to this Letting Schedule. These changes could include financial issues such as receiving more or less revenues than forecasted, adjustments to fit within obligation limits, the execution of funding agreements, bids on projects being higher or lower than the project estimates, and increasing or decreasing cost on existing contracts through change orders or quantity overruns. Likewise, some projects and financial obligations may move out of or into the Letting Schedule due to project development issues associated with receiving environmental clearance or required right of way, changes in project priorities at the local or statewide level, or conflicts with other ongoing construction or maintenance work.
*
*The following list includes projects known at the time of publication based on input from the districts. The current letting schedule will be reflected each week according to district requested project scheduling changes.
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:09:08 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
TotalSIB1 2 Texas Mobility Fund
INCLUDES STATEWIDE LETTINGS, LOCAL LETTINGSFISCAL YEAR 2018 CURRENT STATEWIDE SUMMARY
AND OTHER OBLIGATIONS (In Millions)ALL PROJECTS BASED ON CURRENT ESTIMATE
Rail Funds
Prop 1
ABILENE $133.23 $0.00 $0.00 $0.00 $0.10 $133.33$0.00 $0.00$0.00$0.00
AMARILLO $170.01 $0.00 $0.00 $0.00 $0.03 $170.04$0.00 $0.00$0.00$0.00
ATLANTA $62.82 $0.00 $0.00 $0.00 $0.40 $63.23$0.00 $0.00$0.00$0.00
AUSTIN $204.01 $0.00 $0.00 $0.00 $111.83 $315.84$0.00 $0.00$0.00$0.00
BEAUMONT $294.41 $20.13 $0.00 $0.00 $0.21 $316.53$0.00 $1.77$0.00$0.00
BROWNWOOD $56.73 $0.00 $0.00 $0.00 $0.00 $57.66$0.00 $0.00$0.00$0.93
BRYAN $136.08 $0.00 $48.72 $0.00 $0.05 $309.70$0.00 $124.48$0.00$0.38
CHILDRESS $43.84 $0.00 $0.00 $0.00 $0.00 $43.84$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $320.53 $0.00 $0.00 $0.00 $8.02 $340.70$0.00 $1.68$0.00$10.48
DALLAS $941.33 $0.00 $44.89 $0.00 $9.39 $1,036.52$0.00 $0.00$0.00$40.92
EL PASO $136.37 $0.00 $0.00 $0.00 $24.30 $165.16$0.00 $0.00$0.00$4.50
FORT WORTH $548.71 $0.00 $20.00 $0.00 $18.75 $590.08$0.00 $0.00$0.00$2.62
HOUSTON $1,224.30 $0.00 $106.26 $0.00 $121.65 $1,467.01$0.00 $7.90$0.00$6.91
LAREDO $124.70 $0.00 $0.00 $0.00 $3.87 $128.57$0.00 $0.00$0.00$0.00
LUBBOCK $148.95 $0.00 $0.00 $0.00 $0.00 $148.95$0.00 $0.00$0.00$0.00
LUFKIN $164.69 $0.00 $0.00 $0.00 $0.40 $165.08$0.00 $0.00$0.00$0.00
ODESSA $240.17 $0.00 $0.00 $0.00 $1.65 $243.65$0.00 $0.00$1.83$0.00
PARIS $209.67 $0.00 $0.00 $0.00 $40.21 $254.64$0.00 $0.00$0.00$4.77
PHARR $157.67 $0.00 $0.00 $0.00 $176.86 $338.23$0.00 $0.00$0.00$3.70
SAN ANGELO $124.16 $0.00 $0.00 $0.00 $0.30 $124.70$0.00 $0.00$0.24$0.00
SAN ANTONIO $712.27 $0.00 $0.00 $0.00 $11.69 $743.23$0.00 $0.00$0.00$14.27
TYLER $143.68 $0.00 $0.00 $0.00 $0.27 $144.06$0.00 $0.00$0.00$0.11
WACO $124.54 $0.00 $0.00 $0.00 $2.03 $145.35$0.00 $0.00$0.00$18.78
WICHITA FALLS $66.54 $0.00 $0.00 $0.00 $0.00 $67.87$0.00 $0.00$0.00$1.33
YOAKUM $412.83 $0.00 $0.00 $0.00 $0.00 $415.61$0.00 $2.78$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$1.05 $0.00 $0.00 $0.00 $0.00 $1.05$0.00 $0.00RAILROAD DIVISION $0.00$0.00
$6,903.27 $20.13 $219.87 $0.00 $531.98 $7,930.61 District Total: $0.00 $138.61
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
*
* Actual totals may include local letting and other obligations remaining to be obligated and/or concurrence of award.
$2.07$109.68
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:19 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
TotalSIB1 2 Texas Mobility Fund
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
Rail Funds
Prop 1
ABILENE $132.73 $0.00 $0.00 $0.00 $0.10 $132.83$0.00 $0.00$0.00$0.00
AMARILLO $169.51 $0.00 $0.00 $0.00 $0.03 $169.54$0.00 $0.00$0.00$0.00
ATLANTA $61.01 $0.00 $0.00 $0.00 $0.40 $61.41$0.00 $0.00$0.00$0.00
AUSTIN $190.32 $0.00 $0.00 $0.00 $106.52 $296.84$0.00 $0.00$0.00$0.00
BEAUMONT $284.82 $0.00 $0.00 $0.00 $0.00 $284.82$0.00 $0.00$0.00$0.00
BROWNWOOD $56.23 $0.00 $0.00 $0.00 $0.00 $57.16$0.00 $0.00$0.00$0.93
BRYAN $85.83 $0.00 $0.00 $0.00 $0.05 $86.26$0.00 $0.00$0.00$0.38
CHILDRESS $43.81 $0.00 $0.00 $0.00 $0.00 $43.81$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $315.36 $0.00 $0.00 $0.00 $4.00 $329.84$0.00 $0.00$0.00$10.48
DALLAS $309.45 $0.00 $12.88 $0.00 $1.27 $364.52$0.00 $0.00$0.00$40.92
EL PASO $101.69 $0.00 $0.00 $0.00 $0.00 $101.69$0.00 $0.00$0.00$0.00
FORT WORTH $485.05 $0.00 $0.00 $0.00 $13.87 $501.54$0.00 $0.00$0.00$2.62
HOUSTON $851.80 $0.00 $0.00 $0.00 $37.78 $904.38$0.00 $7.90$0.00$6.91
LAREDO $101.73 $0.00 $0.00 $0.00 $0.00 $101.73$0.00 $0.00$0.00$0.00
LUBBOCK $147.70 $0.00 $0.00 $0.00 $0.00 $147.70$0.00 $0.00$0.00$0.00
LUFKIN $162.45 $0.00 $0.00 $0.00 $0.40 $162.84$0.00 $0.00$0.00$0.00
ODESSA $235.71 $0.00 $0.00 $0.00 $1.65 $239.19$0.00 $0.00$1.83$0.00
PARIS $166.96 $0.00 $0.00 $0.00 $0.03 $171.76$0.00 $0.00$0.00$4.77
PHARR $127.93 $0.00 $0.00 $0.00 $5.59 $137.23$0.00 $0.00$0.00$3.70
SAN ANGELO $123.06 $0.00 $0.00 $0.00 $0.30 $123.60$0.00 $0.00$0.24$0.00
SAN ANTONIO $698.40 $0.00 $0.00 $0.00 $11.03 $728.69$0.00 $0.00$0.00$14.27
TYLER $141.01 $0.00 $0.00 $0.00 $0.27 $141.39$0.00 $0.00$0.00$0.11
WACO $108.41 $0.00 $0.00 $0.00 $0.00 $127.18$0.00 $0.00$0.00$18.78
WICHITA FALLS $66.53 $0.00 $0.00 $0.00 $0.00 $67.86$0.00 $0.00$0.00$1.33
YOAKUM $412.79 $0.00 $0.00 $0.00 $0.00 $412.79$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$5,580.29 $0.00 $12.88 $0.00 $183.28 $5,896.60District Total $0.00 $7.90
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
$2.07$105.18
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:24 AM
ABILENE DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$1.09 $0.00 $0.00 $0.00 $0.00NOVEMBER $1.09$0.00 $0.00$0.00$0.00
$19.10 $0.00 $0.00 $0.00 $0.00DECEMBER $19.10$0.00 $0.00$0.00$0.00
$17.53 $0.00 $0.00 $0.00 $0.10JANUARY $17.63$0.00 $0.00$0.00$0.00
$7.21 $0.00 $0.00 $0.00 $0.00FEBRUARY $7.21$0.00 $0.00$0.00$0.00
$4.47 $0.00 $0.00 $0.00 $0.00MARCH $4.47$0.00 $0.00$0.00$0.00
$1.29 $0.00 $0.00 $0.00 $0.00APRIL $1.29$0.00 $0.00$0.00$0.00
$7.48 $0.00 $0.00 $0.00 $0.00MAY $7.48$0.00 $0.00$0.00$0.00
$10.62 $0.00 $0.00 $0.00 $0.00JUNE $10.62$0.00 $0.00$0.00$0.00
$5.88 $0.00 $0.00 $0.00 $0.00JULY $5.88$0.00 $0.00$0.00$0.00
$58.06 $0.00 $0.00 $0.00 $0.00AUGUST $58.06$0.00 $0.00$0.00$0.00
$132.73 $0.00 $0.00 $0.00 $0.10 $132.83District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:24 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ABILENE DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0005-05-111ABILENE HOWARD
INSTALL MEDIAN BARRIER
IH 20 MAY 2018
MARTIN CO LINELIMITS FROM: FM 818LIMITS TO:
$ 575,110
DESCRIPTION:
STP 2018(826)HESPROJ NUM:
2.232
YNHS:
ROW CSJ: $ 575,1101 Project0004-06-036CONTRACT CSJ: MAY 2018
0006-04-072ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT NOODLE CREEK (IH 20 NFR & SFR)LIMITS FROM: 0.10 MI E OF FM 1085LIMITS TO:
$ 242,444
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.639
YNHS:
ROW CSJ:
0006-04-073ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT BITTER CREEK (IH 20 NFR & SFR)LIMITS FROM: 2.50 MI E OF FM 1085LIMITS TO:
$ 76,350
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.634
YNHS:
ROW CSJ:
0006-04-074ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT LITTLE CREEK (IH 20 -NFR &SFR)LIMITS FROM: 3.10 MI W OF FM 126LIMITS TO:
$ 60,525
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.633
YNHS:
ROW CSJ:
0006-04-075ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT MULBERRY (IH 20 -NFR & SFR)LIMITS FROM: 4.55 MI E OF FM 126LIMITS TO:
$ 69,117
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.630
YNHS:
ROW CSJ:
0006-04-076ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT DRAW (IH 20 NFR & SFR)LIMITS FROM: 1.05 MI W OF FM 126LIMITS TO:
$ 69,230
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.404
YNHS:
ROW CSJ:
0006-04-077ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT E FORK BITTER CREEK(IH20 NFS&SRFLIMITS FROM: 0.35 MI E OF FM 126LIMITS TO:
$ 83,619
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.639
YNHS:
ROW CSJ:
0006-04-078ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT DRAW (IH 20 NFR &SFR)LIMITS FROM: 1.95 MI E OF FM 126LIMITS TO:
$ 38,821
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.399
YNHS:
ROW CSJ:
0006-05-112ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT INDIAN CREEK (IH 20 - NFR)LIMITS FROM: 0.35 MI W OF FM 707LIMITS TO:
$ 35,580
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.400
YNHS:
ROW CSJ:
0006-05-113ABILENE TAYLOR
REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
IH 20 MAY 2018
AT DRAW (IH 20 WBML)LIMITS FROM: 0.20 MI E OF US 83LIMITS TO:
$ 22,220
DESCRIPTION:
BR 2018(827)PROJ NUM:
0.025
YNHS:
ROW CSJ: $ 697,9069 Projects0006-04-072CONTRACT CSJ: MAY 2018
0006-18-058ABILENE TAYLOR
OVERLAY AND TRAFFIC SIGNAL UPGRADES
BI 20-R MAY 2018
US 83 (WINTERS FWY)LIMITS FROM: NEAR NEWMAN ROADLIMITS TO:
$ 6,206,481
DESCRIPTION:
C 6-18-58PROJ NUM:
6.533
YNHS:
ROW CSJ: $ 6,206,4811 Project0006-18-058CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 7,479,49711 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ABILENE DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0006-07-079ABILENE CALLAHAN
MILL AND OVERLAY
IH 20 JUN 2018
TAYLOR COUNTY LINELIMITS FROM: EAST OF FM 1707LIMITS TO:
$ 7,500,000
DESCRIPTION:
C 6-7-79PROJ NUM:
6.693
YNHS:
ROW CSJ: $ 7,500,0001 Project0006-07-079CONTRACT CSJ: JUN 2018
0296-02-033ABILENE FISHER
BRIDGE REPLACEMENT
US 180 JUN 2018
ALKALI CREEKLIMITS FROM: .LIMITS TO:
$ 1,983,905
DESCRIPTION:
BR 2018(951)PROJ NUM:
0.146
NNHS:
ROW CSJ: $ 1,983,9051 Project0296-02-033CONTRACT CSJ: JUN 2018
0908-00-087ABILENE TAYLOR
SPOT PAVEMENT REPAIR
VA JUN 2018
VARIOUS LOCATIONS IN THELIMITS FROM: ABILENE DISTRICTLIMITS TO:
$ 1,138,791
DESCRIPTION:
NH 1802(212)PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 1,138,7911 Project0908-00-087CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 10,622,6963 Projects 3 Contracts
0033-01-040ABILENE STONEWALL
REPLACE BRIDGE AND APPROACHES
US 83 JUL 2018
AT DOUBLE MTN FORK OF BRAZOS RIVERLIMITS FROM: .LIMITS TO:
$ 5,367,648
DESCRIPTION:
BR 1802(318)PROJ NUM:
0.137
NNHS:
ROW CSJ: $ 5,367,6481 Project0033-01-040CONTRACT CSJ: JUL 2018
0033-06-114ABILENE TAYLOR
ILLUMINATION UPGRADE
US 83 JUL 2018
NORTH 10 THLIMITS FROM: SOUTH 1STLIMITS TO:
$ 507,729
DESCRIPTION:
NH 1802(319)PROJ NUM:
0.648
YNHS:
ROW CSJ: $ 507,7291 Project0033-06-114CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 5,875,3772 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ABILENE DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0034-01-126ABILENE TAYLOR
CONSTRUCT OVERPASS AND RELOCATE RAMPS
US 83 AUG 2018
S OF FM 204(CLARK/REMINGTON RD)LIMITS FROM: FM 707LIMITS TO:
$ 15,500,000
DESCRIPTION:
NH ( )PROJ NUM:
2.656
YNHS:
0034-01-132ROW CSJ:
0034-01-128ABILENE TAYLOR
REGRADE VERTICAL CURVE TO ELIMINATE SIGHT DISTANCE ISSUES,ELIMINATE CROSS-OVERS AND ADD ACCEL AND DECEL LANES
US 83 AUG 2018
JUST SOUTH OF FM 204LIMITS FROM: US 83 -US 84 SPLITLIMITS TO:
$ 11,500,000
DESCRIPTION:
NH ( )PROJ NUM:
5.878
YNHS:
0034-01-134ROW CSJ: $ 27,000,0002 Projects0034-01-126CONTRACT CSJ: AUG 2018
0068-08-065ABILENE HOWARD
BRIDGE REHAB
US 87 AUG 2018
UPRR @ BEALS CREEKLIMITS FROM: ..LIMITS TO:
$ 6,953,100
DESCRIPTION:
BR ( )PROJ NUM:
0.160
YNHS:
ROW CSJ: $ 6,953,1001 Project0068-08-065CONTRACT CSJ: AUG 2018
0484-01-023ABILENE JONES
WIDEN ROADWAY
FM 707 AUG 2018
US 83LIMITS FROM: FM 605LIMITS TO:
$ 7,225,000
DESCRIPTION:
STP ( )HESPROJ NUM:
11.831
NNHS:
ROW CSJ:
0677-02-016ABILENE TAYLOR
WIDEN ROADWAY
FM 707 AUG 2018
TAYLOR COUNTY LINELIMITS FROM: NEAR IH 20LIMITS TO:
$ 2,590,000
DESCRIPTION:
STP ( )HESPROJ NUM:
4.241
NNHS:
ROW CSJ:
0677-03-010ABILENE JONES
WIDEN ROADWAY
FM 707 AUG 2018
FM 605LIMITS FROM: TAYLOR COUNTY LINELIMITS TO:
$ 1,556,000
DESCRIPTION:
STP ( )HESPROJ NUM:
2.548
NNHS:
ROW CSJ:
0975-01-023ABILENE JONES
WIDEN ROADWAY
FM 605 AUG 2018
SOUTH INTERSECTION OF FM 707LIMITS FROM: NORTH INTERSECTION OF FM 707LIMITS TO:
$ 950,000
DESCRIPTION:
STP ( )HESPROJ NUM:
1.555
NNHS:
ROW CSJ:
1360-02-010ABILENE JONES
WIDEN ROADWAY
FM 1226 AUG 2018
US 180LIMITS FROM: FM 1082LIMITS TO:
$ 6,135,519
DESCRIPTION:
STP ( )HESPROJ NUM:
12.268
NNHS:
ROW CSJ: $ 18,456,5195 Projects0484-01-023CONTRACT CSJ: AUG 2018
1503-02-011ABILENE HOWARD
PAVEMENT WIDENING
FM 1584 AUG 2018
FM 846LIMITS FROM: US 87LIMITS TO:
$ 5,650,000
DESCRIPTION:
STP ( )HESPROJ NUM:
4.533
NNHS:
ROW CSJ: $ 5,650,0001 Project1503-02-011CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 58,059,6199 Projects 4 Contracts
ABILENE $ 82,037,18925 Projects 12 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
AMARILLO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$12.84 $0.00 $0.00 $0.00 $0.03OCTOBER $12.86$0.00 $0.00$0.00$0.00
$16.21 $0.00 $0.00 $0.00 $0.00NOVEMBER $16.21$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$77.19 $0.00 $0.00 $0.00 $0.00JANUARY $77.19$0.00 $0.00$0.00$0.00
$14.98 $0.00 $0.00 $0.00 $0.00FEBRUARY $14.98$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$19.50 $0.00 $0.00 $0.00 $0.00APRIL $19.50$0.00 $0.00$0.00$0.00
$12.93 $0.00 $0.00 $0.00 $0.00MAY $12.93$0.00 $0.00$0.00$0.00
$13.14 $0.00 $0.00 $0.00 $0.00JUNE $13.14$0.00 $0.00$0.00$0.00
$2.73 $0.00 $0.00 $0.00 $0.00JULY $2.73$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$169.51 $0.00 $0.00 $0.00 $0.03 $169.54District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AMARILLO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0040-01-050AMARILLO DALLAM
MILLED EDGELINE RUMBLE STRIPS
US 87 MAY 2018
0.804 MILES EAST OF FM 296LIMITS FROM: 7.455 MILES EAST OF FM 296LIMITS TO:
$ 28,093
DESCRIPTION:
STP 1802(176)HESPROJ NUM:
6.651
YNHS:
ROW CSJ:
0040-01-047AMARILLO DALLAM
NBL - OVERLAY AND PAVEMENT REPAIR
US 87 MAY 2018
C &G SOUTH OF TEXLINELIMITS FROM: 8.6 MI SE OF NEW MEXICO STATE LINELIMITS TO:
$ 3,014,337
DESCRIPTION:
C 40-1-47PROJ NUM:
6.511
YNHS:
ROW CSJ:
0040-01-048AMARILLO DALLAM
SBL - OVERLAY AND PAVEMENT REPAIR
US 87 MAY 2018
NEW MEXICO STATE LINELIMITS FROM: 8.6 MI SE OF NEW MEXICO STATE LINELIMITS TO:
$ 3,100,984
DESCRIPTION:
C 40-1-48PROJ NUM:
8.651
YNHS:
ROW CSJ:
0040-02-022AMARILLO DALLAM
NBL - OVERLAY AND PAVEMENT REPAIR
US 87 MAY 2018
8.6 MI SE OF NEW MEXICO STATE LINELIMITS FROM: 0.6 MI NW OF FM 1879LIMITS TO:
$ 2,626,721
DESCRIPTION:
C 40-2-22PROJ NUM:
9.451
YNHS:
ROW CSJ:
0040-02-023AMARILLO DALLAM
SBL - OVERLAY AND PAVEMENT REPAIR
US 87 MAY 2018
8.6 MI SE OF NEW MEXICO STATE LINELIMITS FROM: 0.6 MI NW OF FM 1879LIMITS TO:
$ 2,628,547
DESCRIPTION:
C 40-2-23PROJ NUM:
9.451
YNHS:
ROW CSJ:
0040-02-027AMARILLO DALLAM
MILLED EDGELINE RUMBLE STRIPS
US 87 MAY 2018
7.455 MILES EAST OF FM 296LIMITS FROM: 9.404 MILES EAST OF FM 296LIMITS TO:
$ 8,232
DESCRIPTION:
STP 1802(176)HESPROJ NUM:
1.949
YNHS:
ROW CSJ: $ 11,406,9146 Projects0040-01-050CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AMARILLO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0090-05-095AMARILLO POTTER
IMPROVE TRAFFIC SIGNALS
SL 279 MAY 2018
AT WESTERN STREETLIMITS FROM: .LIMITS TO:
$ 307,064
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.001
NNHS:
ROW CSJ:
0030-02-048AMARILLO OCHILTREE
IMPROVE TRAFFIC SIGNALS
US 83 MAY 2018
AT FM 377LIMITS FROM: .LIMITS TO:
$ 200,749
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0168-08-071AMARILLO RANDALL
IMPROVE TRAFFIC SIGNALS
US 60 MAY 2018
AT FM 2590 IN CANYONLIMITS FROM: .LIMITS TO:
$ 93,852
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.001
YNHS:
ROW CSJ:
0168-09-168AMARILLO RANDALL
IMPROVE TRAFFIC SIGNALS
IH 27 MAY 2018
AT 45TH AVENUELIMITS FROM: .LIMITS TO:
$ 391,950
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.001
YNHS:
ROW CSJ:
0169-07-050AMARILLO GRAY
IMPROVE TRAFFIC SIGNALS
US 60 MAY 2018
AT SH 273 IN PAMPALIMITS FROM: .LIMITS TO:
$ 108,077
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.001
YNHS:
ROW CSJ:
0169-07-051AMARILLO GRAY
IMPROVE TRAFFIC SIGNALS
US 60 MAY 2018
AT BARNES STREET IN PAMPALIMITS FROM: .LIMITS TO:
$ 84,198
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.001
YNHS:
ROW CSJ:
0226-05-063AMARILLO DEAF SMITH
IMPROVE TRAFFIC SIGNALS
US 385 MAY 2018
AT MOREMAN ROADLIMITS FROM: .LIMITS TO:
$ 83,816
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0455-01-045AMARILLO HUTCHINSON
IMPROVE TRAFFIC SIGNALS
SH 152 MAY 2018
AT SS 246LIMITS FROM: .LIMITS TO:
$ 96,263
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0490-01-034AMARILLO GRAY
IMPROVE TRAFFIC SIGNALS
SH 70 MAY 2018
AT KENTUCKYLIMITS FROM: .LIMITS TO:
$ 78,277
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0490-01-035AMARILLO GRAY
IMPROVE TRAFFIC SIGNALA
SH 70 MAY 2018
AT SH 152LIMITS FROM: .LIMITS TO:
$ 75,500
DESCRIPTION:
STP 2018(815)HESPROJ NUM:
0.011
NNHS:
ROW CSJ: $ 1,519,74610 Projects0090-05-095CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 12,926,66016 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AMARILLO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0169-08-024AMARILLO ROBERTS
THICK OVERLAY AND JCP JOINT REPAIR
US 60 JUN 2018
GRAY COUNTY LINELIMITS FROM: HEMPHILL COUNTY LINELIMITS TO:
$ 8,282,818
DESCRIPTION:
NH 2018(974)PROJ NUM:
14.042
YNHS:
ROW CSJ:
0169-08-027AMARILLO ROBERTS
MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPS
US 60 JUN 2018
0.557 MILES EAST OF FM 282LIMITS FROM: HEMPHILL COUNTY LINELIMITS TO:
$ 49,282
DESCRIPTION:
STP 2018(976)HESPROJ NUM:
6.249
YNHS:
ROW CSJ:
0169-09-017AMARILLO HEMPHILL
THICK OVERLAY AND JCP JOINT REPAIR
US 60 JUN 2018
ROBERTS COUNTY LINELIMITS FROM: US 83LIMITS TO:
$ 4,630,959
DESCRIPTION:
NH 2018(975)PROJ NUM:
9.207
YNHS:
ROW CSJ:
0169-09-018AMARILLO HEMPHILL
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 60 JUN 2018
ROBERTS COUNTY LINELIMITS FROM: US 83LIMITS TO:
$ 108,190
DESCRIPTION:
STP 2018(976)HESPROJ NUM:
9.305
YNHS:
ROW CSJ:
0169-09-019AMARILLO HEMPHILL
MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPS
US 60 JUN 2018
ROBERTS COUNTY LINELIMITS FROM: US 83LIMITS TO:
$ 70,091
DESCRIPTION:
STP 2018(976)HESPROJ NUM:
9.305
YNHS:
ROW CSJ: $ 13,141,3405 Projects0169-08-024CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 13,141,3405 Projects 1 Contract
0357-05-025AMARILLO ARMSTRONG
GUARDRAIL IMPROVEMENTS
SH 207 JUL 2018
FM 2272LIMITS FROM: BRISCOE COUNTY LINELIMITS TO:
$ 1,125,000
DESCRIPTION:
STP 1802(471)HESPROJ NUM:
13.481
NNHS:
ROW CSJ:
0357-03-025AMARILLO ARMSTRONG
GUARDRAIL IMPROVEMENTS
SH 207 JUL 2018
FM 1151LIMITS FROM: FM 2272LIMITS TO:
$ 375,000
DESCRIPTION:
STP ( )HESPROJ NUM:
13.077
NNHS:
ROW CSJ:
0560-01-032AMARILLO GRAY
GUARDRAIL IMPROVEMENTS
SH 273 JUL 2018
LP 171 SOUTH OF PAMPALIMITS FROM: 0.452 MI N OF FM 291LIMITS TO:
$ 443,400
DESCRIPTION:
STP ( )PROJ NUM:
11.101
NNHS:
ROW CSJ:
0560-02-036AMARILLO GRAY
GUARDRAIL IMPROVEMENTS
SH 273 JUL 2018
0.452 MI N OF FM 291LIMITS FROM: BI 40-H IN MCLEANLIMITS TO:
$ 786,600
DESCRIPTION:
STP ( )HESPROJ NUM:
19.708
NNHS:
ROW CSJ: $ 2,730,0004 Projects0357-05-025CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 2,730,0004 Projects 1 Contract
AMARILLO $ 28,798,00025 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
ATLANTA DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$2.58 $0.00 $0.00 $0.00 $0.19SEPTEMBER $2.76$0.00 $0.00$0.00$0.00
$4.74 $0.00 $0.00 $0.00 $0.00OCTOBER $4.74$0.00 $0.00$0.00$0.00
$0.22 $0.00 $0.00 $0.00 $0.22NOVEMBER $0.44$0.00 $0.00$0.00$0.00
$4.45 $0.00 $0.00 $0.00 $0.00DECEMBER $4.45$0.00 $0.00$0.00$0.00
$5.94 $0.00 $0.00 $0.00 $0.00JANUARY $5.94$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$8.63 $0.00 $0.00 $0.00 $0.00MARCH $8.63$0.00 $0.00$0.00$0.00
$8.99 $0.00 $0.00 $0.00 $0.00APRIL $8.99$0.00 $0.00$0.00$0.00
$7.45 $0.00 $0.00 $0.00 $0.00MAY $7.45$0.00 $0.00$0.00$0.00
$11.52 $0.00 $0.00 $0.00 $0.00JUNE $11.52$0.00 $0.00$0.00$0.00
$6.49 $0.00 $0.00 $0.00 $0.00JULY $6.49$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$61.01 $0.00 $0.00 $0.00 $0.40 $61.41District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ATLANTA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0248-05-064ATLANTA UPSHUR
RESURFACE EXISTING 4-LANE HIGHWAY
US 271 MAY 2018
SH 155(S)LIMITS FROM: FM 726LIMITS TO:
$ 5,482,193
DESCRIPTION:
C 248-5-64PROJ NUM:
7.072
NNHS:
ROW CSJ: $ 5,482,1931 Project0248-05-064CONTRACT CSJ: MAY 2018
0495-08-110ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT SL 281(SB)LIMITS FROM: .LIMITS TO:
$ 294,527
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.006
YNHS:
ROW CSJ:
0495-08-111ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT SL 281(NB)LIMITS FROM: .LIMITS TO:
$ 363,600
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.006
YNHS:
ROW CSJ:
0495-08-112ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT CR 3110 (GALILEE RD)LIMITS FROM: .LIMITS TO:
$ 281,496
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.005
YNHS:
ROW CSJ:
0495-08-113ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT SEWELL CREEK(EB)LIMITS FROM: .LIMITS TO:
$ 136,000
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.037
YNHS:
ROW CSJ:
0495-08-114ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT FM 968LIMITS FROM: .LIMITS TO:
$ 226,454
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.005
YNHS:
ROW CSJ:
0495-08-115ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT FM 3251LIMITS FROM: .LIMITS TO:
$ 228,666
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.006
YNHS:
ROW CSJ:
0495-09-057ATLANTA HARRISON
BRIDGE PREVENTATIVE MAINTENANCE
IH 20 MAY 2018
AT SH 43LIMITS FROM: .LIMITS TO:
$ 438,480
DESCRIPTION:
BR 2018(831)PROJ NUM:
0.013
YNHS:
ROW CSJ: $ 1,969,2237 Projects0495-08-110CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 7,451,4168 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ATLANTA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0096-07-045ATLANTA HARRISON
IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE
US 80 JUN 2018
AT TOM BROWN INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 399,093
DESCRIPTION:
STP 1802(247)HESPROJ NUM:
0.003
YNHS:
ROW CSJ:
0096-07-046ATLANTA HARRISON
IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS,INSTALL PAVEMENT MARKINGS & INSTALL PEDESTRIAN CROSSWALK
US 80 JUN 2018
AT FM 450 INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 181,315
DESCRIPTION:
STP 1802(247)HESPROJ NUM:
0.003
YNHS:
ROW CSJ:
1575-05-015ATLANTA HARRISON
MODERNIZE FLASHING BEACON,INSTALL ADVANCE SIGNALS & SIGNS,SAFETY LIGHTING AT INTERSECTION
SL 390 JUN 2018
AT INTERSECTION OF FM 1998LIMITS FROM: .LIMITS TO:
$ 189,663
DESCRIPTION:
STP 1802(247)HESPROJ NUM:
0.003
NNHS:
ROW CSJ:
2642-02-024ATLANTA HARRISON
IMPROVE TRAFFIC SIGNALS,INTERCONNECT SIGNALS,INSTALLFLASHING YELLOW ARROW,INSTALL RAISED MEDIAN,SAFETY LIGHTING
SL 281 JUN 2018
AT INTERSECTION OF PAGE ROADLIMITS FROM: .LIMITS TO:
$ 102,722
DESCRIPTION:
STP 1802(247)HESPROJ NUM:
0.003
NNHS:
ROW CSJ: $ 872,7934 Projects0096-07-045CONTRACT CSJ: JUN 2018
0394-03-040ATLANTA PANOLA
RECONSTRUCT INTERSECTION WITH CONCRETE PAVING
FM 699 JUN 2018
AT INTERSECTION OF FM 2517LIMITS FROM: .LIMITS TO:
$ 1,232,917
DESCRIPTION:
STP 1802(213)PROJ NUM:
0.118
NNHS:
ROW CSJ: $ 1,232,9171 Project0394-03-040CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ATLANTA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0945-03-009ATLANTA CASS
IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXEDOBJECTS
FM 3129 JUN 2018
FM 251LIMITS FROM: FM 249(E)LIMITS TO:
$ 68,279
DESCRIPTION:
STP 1802(436)HESPROJ NUM:
2.874
NNHS:
ROW CSJ:
0945-03-008ATLANTA CASS
REHABILITATE PAVMENT ON EXISTING 2-LANE HIGHWAY
FM 3129 JUN 2018
FM 251LIMITS FROM: FM 249(E)LIMITS TO:
$ 2,379,378
DESCRIPTION:
C 945-3-8PROJ NUM:
2.874
NNHS:
ROW CSJ:
0945-03-010ATLANTA CASS
PROFILE EDGELINE & CENTERLINE MARKINGS
FM 3129 JUN 2018
FM 251LIMITS FROM: FM 249(E)LIMITS TO:
$ 20,015
DESCRIPTION:
STP 1802(436)HESPROJ NUM:
2.874
NNHS:
ROW CSJ:
0945-05-022ATLANTA CASS
REHABILITATE PAVMENT ON EXISTING 2-LANE HIGHWAY
FM 3129 JUN 2018
7.2 MI. N. OF FM 251LIMITS FROM: 2.9 MI. N. OF FM 251LIMITS TO:
$ 3,960,813
DESCRIPTION:
C 945-5-22PROJ NUM:
4.291
NNHS:
ROW CSJ:
0945-05-023ATLANTA CASS
IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXEDOBJECTS
FM 3129 JUN 2018
7.2 MI. N. OF FM 251LIMITS FROM: FM 251LIMITS TO:
$ 244,419
DESCRIPTION:
STP 1802(436)HESPROJ NUM:
7.194
NNHS:
ROW CSJ:
0945-05-024ATLANTA CASS
REHABILITATE EXISTING 2-LANE HIGHWAY
FM 3129 JUN 2018
2.9 MI. N. OF FM 251LIMITS FROM: FM 251LIMITS TO:
$ 2,162,126
DESCRIPTION:
C 945-5-24PROJ NUM:
2.903
NNHS:
ROW CSJ:
1989-01-013ATLANTA CASS
IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXEDOBJECTS
FM 3129 JUN 2018
FM 249(W)LIMITS FROM: SH 77LIMITS TO:
$ 301,607
DESCRIPTION:
STP 1802(436)HESPROJ NUM:
4.546
NNHS:
ROW CSJ:
3195-01-018ATLANTA CASS
IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXEDOBJECTS
FM 3129 JUN 2018
US 59LIMITS FROM: 7.2 MI. N. OF FM 251LIMITS TO:
$ 279,260
DESCRIPTION:
STP 1802(436)HESPROJ NUM:
4.706
NNHS:
ROW CSJ: $ 9,415,8978 Projects0945-03-009CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 11,521,60713 Projects 3 Contracts
0392-01-073ATLANTA MORRIS
RESURFACE EXISTING 4-LANE ROADWAY
US 259 JUL 2018
FM 250LIMITS FROM: UPSHUR C/LLIMITS TO:
$ 3,601,251
DESCRIPTION:
STP 1802(323)PROJ NUM:
2.709
NNHS:
ROW CSJ:
0392-02-095ATLANTA UPSHUR
RESURFACE EXISTING 4-LANE ROADWAY
US 259 JUL 2018
MORRIS C/LLIMITS FROM: 0.3 MI S OF FM 557LIMITS TO:
$ 2,198,748
DESCRIPTION:
STP 1802(323)PROJ NUM:
1.260
NNHS:
ROW CSJ: $ 5,799,9992 Projects0392-01-073CONTRACT CSJ: JUL 2018
0919-00-078ATLANTA CASS
2018 DISTRICT SEAL COAT PAVEMENT MARKINGS
VA JUL 2018
VARIOUS LOCATIONSLIMITS FROM: VARIOUS LOCATIONSLIMITS TO:
$ 690,000
DESCRIPTION:
STP 1802(324)PROJ NUM:
80.840
NNHS:
ROW CSJ: $ 690,0001 Project0919-00-078CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 6,489,9993 Projects 2 Contracts
ATLANTA $ 25,463,02224 Projects 7 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
AUSTIN DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$1.89 $0.00 $0.00 $0.00 $0.00SEPTEMBER $1.89$0.00 $0.00$0.00$0.00
$2.36 $0.00 $0.00 $0.00 $0.12OCTOBER $2.47$0.00 $0.00$0.00$0.00
$2.36 $0.00 $0.00 $0.00 $0.00NOVEMBER $2.36$0.00 $0.00$0.00$0.00
$8.27 $0.00 $0.00 $0.00 $37.27DECEMBER $45.54$0.00 $0.00$0.00$0.00
$5.61 $0.00 $0.00 $0.00 $0.00JANUARY $5.61$0.00 $0.00$0.00$0.00
$7.95 $0.00 $0.00 $0.00 $0.00FEBRUARY $7.95$0.00 $0.00$0.00$0.00
$1.47 $0.00 $0.00 $0.00 $0.00MARCH $1.47$0.00 $0.00$0.00$0.00
$0.33 $0.00 $0.00 $0.00 $0.11APRIL $0.44$0.00 $0.00$0.00$0.00
$12.18 $0.00 $0.00 $0.00 $0.38MAY $12.56$0.00 $0.00$0.00$0.00
$26.00 $0.00 $0.00 $0.00 $68.18JUNE $94.17$0.00 $0.00$0.00$0.00
$27.02 $0.00 $0.00 $0.00 $0.47JULY $27.48$0.00 $0.00$0.00$0.00
$94.89 $0.00 $0.00 $0.00 $0.00AUGUST $94.89$0.00 $0.00$0.00$0.00
$190.32 $0.00 $0.00 $0.00 $106.52 $296.84District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0071-05-031AUSTIN MASON
REPAIR, LEVEL-UP & SEAL COAT
US 87 MAY 2018
RM 2242LIMITS FROM: MASON C/LLIMITS TO:
$ 1,178,714
DESCRIPTION:
C 71-5-31PROJ NUM:
6.170
NNHS:
ROW CSJ:
0071-06-059AUSTIN GILLESPIE
REPAIR, LEVEL-UP & SEAL COAT
US 87 MAY 2018
MASON C/LLIMITS FROM: FM 648LIMITS TO:
$ 1,445,580
DESCRIPTION:
C 71-6-59PROJ NUM:
7.746
NNHS:
ROW CSJ:
0396-02-028AUSTIN MASON
REPAIR AND SEAL COAT
SH 29 MAY 2018
MENARD COUNTY LINELIMITS FROM: US 377LIMITS TO:
$ 594,804
DESCRIPTION:
C 396-2-28PROJ NUM:
12.346
NNHS:
ROW CSJ: $ 3,219,0983 Projects0071-05-031CONTRACT CSJ: MAY 2018
0320-03-092AUSTIN WILLIAMSON
BRIDGE WIDENING & REPLACE APPROACHES
SH 95 MAY 2018
AT DRAINLIMITS FROM: STR 0320-03-034LIMITS TO:
$ 344,532
DESCRIPTION:
BR 2018(819)PROJ NUM:
0.063
NNHS:
0320-03-098ROW CSJ: $ 344,5321 Project0320-03-092CONTRACT CSJ: MAY 2018
0320-03-099AUSTIN WILLIAMSON
REPLACE DECK AND STRUCTURAL REPAIRS
SH 95 MAY 2018
AT SAN GABRIEL RIVERLIMITS FROM: .LIMITS TO:
$ 1,008,963
DESCRIPTION:
BR 2018(820)PROJ NUM:
0.679
NNHS:
ROW CSJ: $ 1,008,9631 Project0320-03-099CONTRACT CSJ: MAY 2018
0334-05-032AUSTIN LEE
LEVEL-UP & SEAL COAT
FM 141 MAY 2018
SH 21LIMITS FROM: 0.17 MI S OF FM 1697LIMITS TO:
$ 690,346
DESCRIPTION:
STP 2018(595)PROJ NUM:
7.964
NNHS:
ROW CSJ:
0334-05-031AUSTIN LEE
REPAIR, LEVEL-UP & SEAL COAT
FM 141 MAY 2018
0.007 MI S OF CR 119LIMITS FROM: US 290LIMITS TO:
$ 584,162
DESCRIPTION:
C 334-5-31PROJ NUM:
7.300
NNHS:
ROW CSJ: $ 1,274,5082 Projects0334-05-032CONTRACT CSJ: MAY 2018
0914-00-398AUSTIN TRAVIS
FY 2018 SITE SPECIFIC SIGNALS
VA MAY 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,999,975
DESCRIPTION:
STP 2018(821)PROJ NUM:
0.003
NNHS:
ROW CSJ: $ 1,999,9751 Project0914-00-398CONTRACT CSJ: MAY 2018
1200-03-055AUSTIN TRAVIS
CONSTRUCT RIGHT AND LEFT TURN LANES
FM 973 MAY 2018
0.9 MILES N. OF THE COLORADO RIVERLIMITS FROM: 0.6 MILES N. OF THE COLORADO RIVERLIMITS TO:
$ 377,503
DESCRIPTION:
CC 1200-3-55PROJ NUM:
0.397
NNHS:
ROW CSJ: $ 377,5031 Project1200-03-055CONTRACT CSJ: MAY 2018
1378-02-053AUSTIN WILLIAMSON
INSTALLATION OF A SOUND WALL ALONG THE NORTH RIGHT OF WAYLINE
RM 1431 MAY 2018
SAM BASS RDLIMITS FROM: ROYAL VISTA BLVDLIMITS TO:
$ 1,002,252
DESCRIPTION:
NH 2018(600)PROJ NUM:
0.288
YNHS:
ROW CSJ: $ 1,002,2521 Project1378-02-053CONTRACT CSJ: MAY 2018
1566-01-011AUSTIN WILLIAMSON
DEPTH REPAIR, UNDERSEAL & THIN OV
FM 1660 MAY 2018
US 79LIMITS FROM: SH 29LIMITS TO:
$ 3,331,266
DESCRIPTION:
C 1566-1-11PROJ NUM:
7.290
NNHS:
ROW CSJ: $ 3,331,2661 Project1566-01-011CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 12,558,09711 Projects 8 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0015-08-153AUSTIN WILLIAMSON
LANDSCAPING AND IRRIGATION
IH 35 JUN 2018
1500 FT NORTH OF LAKEWAY DRIVELIMITS FROM: 3872 FT SOUTH OF SH 195LIMITS TO:
$ 1,825,127
DESCRIPTION:
NH 1802(196)PROJ NUM:
1.023
YNHS:
ROW CSJ: $ 1,825,1271 Project0015-08-153CONTRACT CSJ: JUN 2018
0440-06-018AUSTIN TRAVIS
ADD ONE LANE IN EACH DIRECTION
SH 130 JUN 2018
US 290LIMITS FROM: SH 71LIMITS TO:
$ 68,177,377
DESCRIPTION:
CC 440-6-18PROJ NUM:
11.248
NNHS:
ROW CSJ: $ 68,177,3771 Project0440-06-018CONTRACT CSJ: JUN 2018
0535-03-025AUSTIN CALDWELL
BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ONMAINLANE
IH 10 JUN 2018
GUADALUPE/GONZALES COUNTY LINELIMITS FROM: US 183LIMITS TO:
$ 3,563,917
DESCRIPTION:
C 535-3-25PROJ NUM:
2.700
YNHS:
ROW CSJ: $ 3,563,9171 Project0535-02-046CONTRACT CSJ: JUN 2018
0914-00-410AUSTIN TRAVIS
INSTALL OR REBUILD TRAFFIC SIGNALS
VA JUN 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 2,324,700
DESCRIPTION:
STP 1802(197)PROJ NUM:
0.002
NNHS:
ROW CSJ: $ 2,324,7001 Project0914-00-410CONTRACT CSJ: JUN 2018
1198-01-022AUSTIN BURNET
PROVIDE ADDITIONAL PAVED SURFACE
RM 963 JUN 2018
FM 1174LIMITS FROM: US 183LIMITS TO:
$ 4,319,586
DESCRIPTION:
C 1198-1-22PROJ NUM:
9.284
NNHS:
ROW CSJ:
1198-02-018AUSTIN BURNET
PROVIDE ADDITIONAL PAVEMENT SURFACE
RM 963 JUN 2018
US 183LIMITS FROM: RM 2657LIMITS TO:
$ 3,501,883
DESCRIPTION:
C 1198-2-18PROJ NUM:
7.580
NNHS:
ROW CSJ: $ 7,821,4692 Projects1198-01-022CONTRACT CSJ: JUN 2018
1202-01-020AUSTIN WILLIAMSON
REHAB, ADD SHOULDER & SAFETY TREAT
FM 972 JUN 2018
0.78 MI E OF FM 1105LIMITS FROM: SH 95LIMITS TO:
$ 10,460,504
DESCRIPTION:
C 1202-1-20PROJ NUM:
9.045
NNHS:
ROW CSJ: $ 10,460,5041 Project1202-01-020CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 94,173,0947 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0015-08-140AUSTIN WILLIAMSON
BRIDGE REPLACEMENT
IH 35 JUL 2018
AT CR 305LIMITS FROM: .LIMITS TO:
$ 6,620,695
DESCRIPTION:
NH 1802(398)PROJ NUM:
0.100
YNHS:
0015-08-149ROW CSJ: $ 6,620,6951 Project0015-08-140CONTRACT CSJ: JUL 2018
0265-02-035AUSTIN TRAVIS
EXTEND WESTBOUND LEFT TURN LANE
SH 71 JUL 2018
0.120 MI. EAST OF NAVARRO CREEK RD.LIMITS FROM: 0.316 MI EACH OF NAVARRO CREEK RD.LIMITS TO:
$ 155,300
DESCRIPTION:
CC 265-2-35PROJ NUM:
0.196
YNHS:
ROW CSJ: $ 155,3001 Project0265-02-035CONTRACT CSJ: JUL 2018
0683-07-008AUSTIN TRAVIS
LANDSCAPING AND IRRIGATION
SH 45 JUL 2018
2692 FT FROM SH 130LIMITS FROM: NBFR SH 130 AT KELLY LANELIMITS TO:
$ 2,667,436
DESCRIPTION:
NH 1802(399)PROJ NUM:
0.506
YNHS:
ROW CSJ:
0440-06-020AUSTIN TRAVIS
LANDSCAPING AND IRRIGATION
SH 130 JUL 2018
876 FT SOUTH OF KELLY LANELIMITS FROM: 2578 FT SOUTH OF FM 685LIMITS TO:
$ 870,359
DESCRIPTION:
NH 1802(399)PROJ NUM:
0.922
YNHS:
ROW CSJ: $ 3,537,7952 Projects0683-07-008CONTRACT CSJ: JUL 2018
0914-04-229AUSTIN TRAVIS
REPLACE BRIDGE AND APPROACHES
CS JUL 2018
ON BOYCE LANE AT HARRIS BRANCHLIMITS FROM: STR AA14-81-002LIMITS TO:
$ 475,698
DESCRIPTION:
BR 1502(360)PROJ NUM:
0.070
NNHS:
ROW CSJ: $ 475,6981 Project0914-04-229CONTRACT CSJ: JUL 2018
1186-01-098AUSTIN TRAVIS
SAFETY LIGHTING
FM 969 JUL 2018
0.3 MI WEST OF US 183LIMITS FROM: 0.3 MI EAST OF CRAIGWOOD DRLIMITS TO:
$ 242,037
DESCRIPTION:
STP 1802(400)HESPROJ NUM:
0.939
YNHS:
ROW CSJ: $ 242,0371 Project1186-01-098CONTRACT CSJ: JUL 2018
2100-01-054AUSTIN TRAVIS
RECONSTRUCT 4-LANE ROADWAY TO 6-LANE DIVIDED ROADWAY
RM 2222 JUL 2018
BONAVENTURE DR.LIMITS FROM: RIBELIN RANCH RD.LIMITS TO:
$ 13,516,235
DESCRIPTION:
NH 1802(401)PROJ NUM:
1.202
YNHS:
2100-01-061ROW CSJ:
2100-01-061AUSTIN TRAVIS
LAND ACQUISITION AND UTILITIES
RM 2222 JUL 2018
BONAVENTURE DR.LIMITS FROM: RIBELIN RANCH RD.LIMITS TO:
$ 275,000
DESCRIPTION:
NH 1802(393)PROJ NUM:
1.202
YNHS:
ROW CSJ: $ 13,791,2352 Projects2100-01-054CONTRACT CSJ: JUL 2018
3005-02-006AUSTIN BURNET
PROVIDE ADDITIONAL PAVED SURFACE
RM 690 JUL 2018
CR 114 (STATE MAINTENANCE ENDS)LIMITS FROM: 1.092 MILES NORTH OF SH 29LIMITS TO:
$ 2,258,528
DESCRIPTION:
STP 2013(635)PROJ NUM:
4.627
NNHS:
ROW CSJ: $ 2,258,5281 Project3005-02-006CONTRACT CSJ: JUL 2018
3417-03-024AUSTIN TRAVIS
ADDING 2ND LEFT TURN LANES TO TWO INTERSECTIONS TO CREATEDUAL LEFT OPERATIONS
FM 734 JUL 2018
0.157 MI. WEST OF MCCALLEN PASSLIMITS FROM: 0.08 MI. EAST OF HARRIS RIDGE BLVD.LIMITS TO:
$ 403,326
DESCRIPTION:
NH 1802(402)PROJ NUM:
0.610
YNHS:
ROW CSJ: $ 403,3261 Project3417-03-024CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 27,484,61410 Projects 8 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0015-17-028AUSTIN WILLIAMSON
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SS 158 AUG 2018
IH 35LIMITS FROM: N CHURCH ST/N MYRTLE STLIMITS TO:
$ 267,790
DESCRIPTION:
STP ( )HESPROJ NUM:
1.801
NNHS:
ROW CSJ:
0151-05-117AUSTIN WILLIAMSON
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 183 AUG 2018
NEW HOPE RD.LIMITS FROM: S. LAKELINE BLVD.LIMITS TO:
$ 172,162
DESCRIPTION:
STP ( )HESPROJ NUM:
4.168
YNHS:
ROW CSJ:
0273-04-044AUSTIN WILLIAMSON
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 183 AUG 2018
BURNET COUNTY LINELIMITS FROM: SH 29LIMITS TO:
$ 164,005
DESCRIPTION:
STP ( )HESPROJ NUM:
13.028
YNHS:
ROW CSJ:
0320-04-026AUSTIN WILLIAMSON
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 79 AUG 2018
BU 79BLIMITS FROM: WEST 2ND STREETLIMITS TO:
$ 488,375
DESCRIPTION:
STP ( )HESPROJ NUM:
4.550
YNHS:
ROW CSJ:
0337-03-018AUSTIN WILLIAMSON
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 1331 AUG 2018
SH 95LIMITS FROM: CR 444LIMITS TO:
$ 24,155
DESCRIPTION:
STP ( )HESPROJ NUM:
12.045
NNHS:
ROW CSJ:
3417-01-031AUSTIN TRAVIS
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 734 AUG 2018
WILLIAMSON COUNTY LINELIMITS FROM: SL 1LIMITS TO:
$ 115,332
DESCRIPTION:
STP ( )HESPROJ NUM:
3.302
YNHS:
ROW CSJ: $ 1,231,8196 Projects0015-17-028CONTRACT CSJ: AUG 2018
0016-03-103AUSTIN HAYS
REPLACE BRIDGE & APPROACHES
IH 35 AUG 2018
0.741 MI. N. OF POSEY ROADLIMITS FROM: COMAL COUNTY LINELIMITS TO:
$ 28,963,904
DESCRIPTION:
NH ( )PROJ NUM:
2.271
YNHS:
0016-03-117ROW CSJ: $ 28,963,9041 Project0016-03-103CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0112-03-035AUSTIN GILLESPIE
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 290 AUG 2018
0.05 MI EAST OF REEH RD.LIMITS FROM: US 87LIMITS TO:
$ 2,013,121
DESCRIPTION:
STP ( )HESPROJ NUM:
12.561
YNHS:
ROW CSJ:
0071-04-055AUSTIN MASON
IMPROVE GUARDRAIL TO DESIGN STANDARD
US 87 AUG 2018
BROAD STREETLIMITS FROM: 0.365 MI NORTH OF RM 152LIMITS TO:
$ 439,278
DESCRIPTION:
STP ( )HESPROJ NUM:
11.710
NNHS:
ROW CSJ:
0112-02-034AUSTIN GILLESPIE
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 290 AUG 2018
0.2 MI EAST OF DOSS-SPRING CREEK RDLIMITS FROM: 0.05 MI EAST OF REEH RD.LIMITS TO:
$ 56,697
DESCRIPTION:
STP ( )HESPROJ NUM:
0.899
YNHS:
ROW CSJ:
0150-02-041AUSTIN LLANO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 29 AUG 2018
MASON COUNTY LINELIMITS FROM: 0.02 MI EAST AUTUMN AVE.LIMITS TO:
$ 503,562
DESCRIPTION:
STP ( )HESPROJ NUM:
16.977
NNHS:
ROW CSJ:
0252-01-083AUSTIN BURNET
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 281 AUG 2018
1.392 MI SOUTH OF PR 4LIMITS FROM: 1.732 MI SOUTH OF PR 4LIMITS TO:
$ 138,175
DESCRIPTION:
STP ( )HESPROJ NUM:
0.340
YNHS:
ROW CSJ:
0289-07-022AUSTIN LLANO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 16 AUG 2018
SAN SABA COUNTY LINELIMITS FROM: SH 29LIMITS TO:
$ 311,560
DESCRIPTION:
STP ( )HESPROJ NUM:
12.131
NNHS:
ROW CSJ:
0290-01-046AUSTIN LLANO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 16 AUG 2018
SH 29LIMITS FROM: GILLESPIE COUNTY LINELIMITS TO:
$ 396,002
DESCRIPTION:
STP ( )HESPROJ NUM:
18.395
NNHS:
ROW CSJ:
0700-01-043AUSTIN BURNET
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 71 AUG 2018
LLANO COUNTY LINELIMITS FROM: US 281LIMITS TO:
$ 105,408
DESCRIPTION:
STP ( )HESPROJ NUM:
3.342
NNHS:
ROW CSJ:
0700-04-050AUSTIN LLANO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 71 AUG 2018
SH 16LIMITS FROM: BURNET COUNTY LINELIMITS TO:
$ 931,175
DESCRIPTION:
STP ( )HESPROJ NUM:
27.232
NNHS:
ROW CSJ: $ 4,894,9789 Projects0112-03-035CONTRACT CSJ: AUG 2018
0113-13-175AUSTIN TRAVIS
MILL & INLAY
SH 71 AUG 2018
IH 35LIMITS FROM: US 183LIMITS TO:
$ 3,519,596
DESCRIPTION:
C 113-13-175PROJ NUM:
4.088
YNHS:
ROW CSJ:
0015-11-064AUSTIN TRAVIS
MILL, SEAL AND INLAY
SL 275 AUG 2018
RUNDBERG LNLIMITS FROM: MORROW LNLIMITS TO:
$ 2,265,790
DESCRIPTION:
C 15-11-64PROJ NUM:
1.498
NNHS:
ROW CSJ:
0151-06-141AUSTIN TRAVIS
MILL, SEAL AND 1.5" TY D
SL 111 AUG 2018
E MARTIN LUTHER KING JR. BLVDLIMITS FROM: 0.15 SOUTH OF GLISSMAN RDLIMITS TO:
$ 1,650,101
DESCRIPTION:
C 151-6-141PROJ NUM:
2.100
YNHS:
ROW CSJ:
3277-01-023AUSTIN TRAVIS
TOM OVERLAY
FM 3177 AUG 2018
US 290LIMITS FROM: FM 969LIMITS TO:
$ 1,229,342
DESCRIPTION:
C 3277-1-23PROJ NUM:
4.706
NNHS:
ROW CSJ: $ 8,664,8294 Projects0113-13-175CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0116-01-039AUSTIN LEE
LEVEL-UP, FULL DEPTH REPAIR AND TOM
SH 21 AUG 2018
US 77LIMITS FROM: BURLESON COUNTY LINELIMITS TO:
$ 7,367,376
DESCRIPTION:
C 116-1-39PROJ NUM:
10.885
YNHS:
ROW CSJ:
0473-02-037AUSTIN LEE
LEVEL-UP, FULL DEPTH REPAIR AND TOM
SH 21 AUG 2018
FM 2440LIMITS FROM: US 77LIMITS TO:
$ 4,465,434
DESCRIPTION:
C 473-2-37PROJ NUM:
7.201
YNHS:
ROW CSJ: $ 11,832,8102 Projects0116-01-039CONTRACT CSJ: AUG 2018
0153-01-014AUSTIN CALDWELL
PAVEMENT REPAIR AND RESURFACING
US 183 AUG 2018
0.166 MILES SOUTH OF IH 10LIMITS FROM: GONZALES C/LLIMITS TO:
$ 750,000
DESCRIPTION:
C 153-1-14PROJ NUM:
1.012
YNHS:
ROW CSJ: $ 750,0001 Project0153-02-040CONTRACT CSJ: AUG 2018
0252-02-054AUSTIN BURNET
ADD CENTER LEFT TURN LANE AND SHOULDERS
US 281 AUG 2018
RM 2147 EASTLIMITS FROM: 0.466 MI. NORTH OF SH 71LIMITS TO:
$ 6,333,151
DESCRIPTION:
NH ( )PROJ NUM:
2.034
YNHS:
0252-02-055ROW CSJ: $ 6,333,1511 Project0252-02-054CONTRACT CSJ: AUG 2018
0286-03-017AUSTIN CALDWELL
LEVEL-UP, FULL DEPTH REPAIR AND TOM
SH 80 AUG 2018
0.123 MI E OF FM 20LIMITS FROM: US 183LIMITS TO:
$ 3,790,500
DESCRIPTION:
C 286-3-17PROJ NUM:
9.385
NNHS:
ROW CSJ:
0286-02-033AUSTIN CALDWELL
LEVEL-UP, FULL DEPTH REPAIR AND TOM
SH 80 AUG 2018
0.243 MI E OF FM 1979LIMITS FROM: 0.248 MI W OF FM 20LIMITS TO:
$ 2,014,953
DESCRIPTION:
C 286-2-33PROJ NUM:
5.964
NNHS:
ROW CSJ: $ 5,805,4532 Projects0286-03-017CONTRACT CSJ: AUG 2018
0322-01-049AUSTIN BASTROP
MILL, SEAL & TOM OVERLAY
SH 95 AUG 2018
0.157 MILES NORTH OF FM 1441LIMITS FROM: LP 150LIMITS TO:
$ 1,037,981
DESCRIPTION:
C 322-1-49PROJ NUM:
3.525
NNHS:
ROW CSJ:
0322-01-050AUSTIN BASTROP
MILL, SEAL & TOM OVERLAY
SH 95 AUG 2018
ON SH 21 FROM LP 150LIMITS FROM: SH 71LIMITS TO:
$ 153,372
DESCRIPTION:
C 322-1-50PROJ NUM:
0.389
NNHS:
ROW CSJ: $ 1,191,3532 Projects0322-01-049CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0471-05-047AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 21 AUG 2018
CALDWELL COUNTY LINELIMITS FROM: SH 71LIMITS TO:
$ 364,368
DESCRIPTION:
STP ( )HESPROJ NUM:
13.843
YNHS:
ROW CSJ:
0115-04-053AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 20 AUG 2018
CALDWELL COUNTY LINELIMITS FROM: SH 21LIMITS TO:
$ 239,560
DESCRIPTION:
STP ( )HESPROJ NUM:
14.820
NNHS:
ROW CSJ:
0211-04-025AUSTIN LEE
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 77 AUG 2018
0.177 MI SOUTH OF CR 327LIMITS FROM: 0.5 MI NORTH OF INDUSTRIAL PARK RD.LIMITS TO:
$ 105,628
DESCRIPTION:
STP ( )HESPROJ NUM:
6.040
NNHS:
ROW CSJ:
0265-03-051AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 71 AUG 2018
TRAVIS COUNTY LINELIMITS FROM: SH 21/WOODLANDS DRIVELIMITS TO:
$ 209,368
DESCRIPTION:
STP ( )HESPROJ NUM:
8.148
YNHS:
ROW CSJ:
0265-04-068AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 21 AUG 2018
SH 71/WOODLANDS DRIVELIMITS FROM: COLORADO RIVER BRIDGELIMITS TO:
$ 140,000
DESCRIPTION:
STP ( )HESPROJ NUM:
5.875
YNHS:
ROW CSJ:
0265-05-082AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 21 AUG 2018
COLORADO RIVER BRIDGELIMITS FROM: LOVERS LANELIMITS TO:
$ 15,000
DESCRIPTION:
STP ( )HESPROJ NUM:
0.316
YNHS:
ROW CSJ:
0334-05-034AUSTIN LEE
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 141 AUG 2018
SH 21LIMITS FROM: 0.5 MI NORTH OF CR 425LIMITS TO:
$ 103,429
DESCRIPTION:
STP ( )HESPROJ NUM:
2.053
NNHS:
ROW CSJ:
0472-01-046AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 21 AUG 2018
CARDINAL DRIVELIMITS FROM: US 290LIMITS TO:
$ 115,618
DESCRIPTION:
STP ( )HESPROJ NUM:
5.543
YNHS:
ROW CSJ:
1186-02-023AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 969 AUG 2018
TRAVIS COUNTY LINELIMITS FROM: SH 21LIMITS TO:
$ 232,168
DESCRIPTION:
STP ( )HESPROJ NUM:
12.196
NNHS:
ROW CSJ:
1533-01-021AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARD
FM 1704 AUG 2018
US 290LIMITS FROM: FM 969LIMITS TO:
$ 232,168
DESCRIPTION:
STP ( )HESPROJ NUM:
9.804
NNHS:
ROW CSJ:
2083-01-012AUSTIN BASTROP
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 2104 AUG 2018
US 290LIMITS FROM: HECTOR ROADLIMITS TO:
$ 193,206
DESCRIPTION:
STP ( )HESPROJ NUM:
11.853
NNHS:
ROW CSJ: $ 1,950,51311 Projects0471-05-047CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0533-01-020AUSTIN BURNET
LEVEL-UP AND SEAL COAT
PR 4 AUG 2018
CR 116LIMITS FROM: US 281LIMITS TO:
$ 871,939
DESCRIPTION:
C 533-1-20PROJ NUM:
9.445
NNHS:
ROW CSJ:
1378-04-051AUSTIN BURNET
FULL DEPTH REPAIR & SEAL COAT
RM 1431 AUG 2018
CR 662LIMITS FROM: WEST OF NORTH PHILLIPS RANCH RD.LIMITS TO:
$ 321,536
DESCRIPTION:
C 1378-4-51PROJ NUM:
3.445
NNHS:
ROW CSJ:
2207-01-007AUSTIN BURNET
LEVEL-UP AND SEAL COAT
RM 2342 AUG 2018
PR 4LIMITS FROM: RM 1431LIMITS TO:
$ 603,561
DESCRIPTION:
C 2207-1-7PROJ NUM:
4.359
NNHS:
ROW CSJ: $ 1,797,0363 Projects0533-01-020CONTRACT CSJ: AUG 2018
1186-01-094AUSTIN TRAVIS
PEDESTRIAN FACILITY
FM 969 AUG 2018
TANNEHILL LANELIMITS FROM: FM 3177LIMITS TO:
$ 800,000
DESCRIPTION:
STP ( )PROJ NUM:
1.830
NNHS:
ROW CSJ: $ 800,0001 Project1186-01-094CONTRACT CSJ: AUG 2018
1349-03-013AUSTIN BURNET
PROVIDE ADDITIONAL PAVED SURFACE
RM 1174 AUG 2018
CR 320LIMITS FROM: RM 243LIMITS TO:
$ 6,095,160
DESCRIPTION:
C 1349-3-13PROJ NUM:
6.060
NNHS:
ROW CSJ: $ 6,095,1601 Project1349-03-013CONTRACT CSJ: AUG 2018
1566-02-019AUSTIN WILLIAMSON
REHAB RDWY
FM 1660 AUG 2018
KING LN IN HUTTOLIMITS FROM: FM 973LIMITS TO:
$ 11,222,522
DESCRIPTION:
C 1566-2-19PROJ NUM:
6.321
NNHS:
1566-02-021ROW CSJ: $ 11,222,5221 Project1566-02-019CONTRACT CSJ: AUG 2018
2293-01-030AUSTIN HAYS
RESURFACE ROADWAY
FM 2439 AUG 2018
NORTH OF CENTER POINT RDLIMITS FROM: SOUTH OF POSEY RDLIMITS TO:
$ 457,859
DESCRIPTION:
C 2293-1-030PROJ NUM:
2.031
NNHS:
ROW CSJ: $ 457,8591 Project2293-01-030CONTRACT CSJ: AUG 2018
3417-01-029AUSTIN TRAVIS
PAVEMENT REPAIR, UNDERSEAL & OVERLAY
FM 734 AUG 2018
WILLIAMSON COUNTY LINELIMITS FROM: LP 1LIMITS TO:
$ 2,897,573
DESCRIPTION:
C 3417-1-29PROJ NUM:
3.346
YNHS:
ROW CSJ: $ 2,897,5731 Project3417-01-029CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 94,888,96047 Projects 16 Contracts
AUSTIN $ 229,104,76575 Projects 38 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:25 AM
BEAUMONT DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$8.89 $0.00 $0.00 $0.00 $0.00SEPTEMBER $8.89$0.00 $0.00$0.00$0.00
$2.97 $0.00 $0.00 $0.00 $0.00OCTOBER $2.97$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$3.52 $0.00 $0.00 $0.00 $0.00DECEMBER $3.52$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$11.87 $0.00 $0.00 $0.00 $0.00FEBRUARY $11.87$0.00 $0.00$0.00$0.00
$1.65 $0.00 $0.00 $0.00 $0.00MARCH $1.65$0.00 $0.00$0.00$0.00
$24.71 $0.00 $0.00 $0.00 $0.00APRIL $24.71$0.00 $0.00$0.00$0.00
$4.05 $0.00 $0.00 $0.00 $0.00MAY $4.05$0.00 $0.00$0.00$0.00
$19.93 $0.00 $0.00 $0.00 $0.00JUNE $19.93$0.00 $0.00$0.00$0.00
$195.99 $0.00 $0.00 $0.00 $0.00JULY $195.99$0.00 $0.00$0.00$0.00
$11.24 $0.00 $0.00 $0.00 $0.00AUGUST $11.24$0.00 $0.00$0.00$0.00
$284.82 $0.00 $0.00 $0.00 $0.00 $284.82District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0028-07-052BEAUMONT JEFFERSON
UPGRADE BRIDGE AND APPROACH RAILING
US 90 MAY 2018
AT HILLEBRANDT BAYOULIMITS FROM: (STR 201240002807044)LIMITS TO:
$ 91,856
DESCRIPTION:
BR 2018(848)PROJ NUM:
0.019
YNHS:
ROW CSJ:
0028-07-053BEAUMONT JEFFERSON
UPGRADE BRIDGE AND APPROACH RAILING
US 90 MAY 2018
AT CALDWOOD CUTOFFLIMITS FROM: (STR 201240002807063)LIMITS TO:
$ 103,633
DESCRIPTION:
BR 2018(848)PROJ NUM:
0.021
YNHS:
ROW CSJ:
0028-07-054BEAUMONT JEFFERSON
UPGRADE BRIDGE AND APPROACH RAILING
US 90 MAY 2018
AT PINCHBACKLIMITS FROM: (STR 201240002807130)LIMITS TO:
$ 82,188
DESCRIPTION:
BR 2018(848)PROJ NUM:
0.015
YNHS:
ROW CSJ: $ 277,6773 Projects0028-07-052CONTRACT CSJ: MAY 2018
0877-03-025BEAUMONT TYLER
REPLACE BRIDGE AND APPROACHES
FM 256 MAY 2018
AT BELT CREEKLIMITS FROM: (STR 087703003)LIMITS TO:
$ 598,911
DESCRIPTION:
BR 2018(849)PROJ NUM:
0.125
NNHS:
ROW CSJ: $ 598,9111 Project0877-03-025CONTRACT CSJ: MAY 2018
0883-02-086BEAUMONT ORANGE
PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINERUMBLE STRIPS, MILLED CENTERLINE RUMBLE STRIPS
FM 105 MAY 2018
0.09 MI E OF BYRON RD, EASTLIMITS FROM: 0.02 MI E OF FM 1135LIMITS TO:
$ 1,372,418
DESCRIPTION:
SSW 883-2-86PROJ NUM:
2.191
NNHS:
ROW CSJ: $ 1,372,4181 Project0883-02-086CONTRACT CSJ: MAY 2018
1024-01-074BEAUMONT CHAMBERS
WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURN LANE
FM 565 MAY 2018
1.4 MILES EAST OF FM 3180LIMITS FROM: FM 3180LIMITS TO:
$ 1,803,180
DESCRIPTION:
STP 2018(757)HESPROJ NUM:
1.400
NNHS:
ROW CSJ: $ 1,803,1801 Project1024-01-074CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 4,052,1866 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0028-03-105BEAUMONT LIBERTY
IMPROVE TRAFFIC SIGNALS
US 90 JUN 2018
0.100 MI W OF SH 321LIMITS FROM: 0.103 MI E OF MAINLIMITS TO:
$ 323,435
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.343
NNHS:
ROW CSJ:
0064-08-058BEAUMONT JASPER
IMPROVE TRAFFIC SIGNALS
US 96 JUN 2018
AT FM 776LIMITS FROM: .LIMITS TO:
$ 96,618
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.380
YNHS:
ROW CSJ:
0200-16-018BEAUMONT JEFFERSON
IMPROVE TRAFFIC SIGNALS
US 69 JUN 2018
AT 39THLIMITS FROM: .LIMITS TO:
$ 112,978
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0368-01-089BEAUMONT CHAMBERS
IMPROVE TRAFFIC SIGNALS
SH 124 JUN 2018
AT W. BUCCANEER DR.LIMITS FROM: .LIMITS TO:
$ 98,064
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0389-02-053BEAUMONT CHAMBERS
IMPROVE TRAFFIC SIGNALS
SH 146 JUN 2018
AT FM 565LIMITS FROM: .LIMITS TO:
$ 99,667
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0703-02-060BEAUMONT HARDIN
IMPROVE TRAFFIC SIGNALS
FM 92 JUN 2018
AT FM 1122LIMITS FROM: .LIMITS TO:
$ 92,361
DESCRIPTION:
STP 2018(654)HESPROJ NUM:
0.200
NNHS:
ROW CSJ: $ 823,1236 Projects0028-03-105CONTRACT CSJ: JUN 2018
0200-14-085BEAUMONT JEFFERSON
REPAINT STEEL MEMBERS, REPLACE BACK WALLS AND APPROACH SLABSUPGRADE APPURTENANCES, AND PERFORM SPOT REPAIRS
US 69 JUN 2018
0.15 MI N OF SP 380, SOUTHLIMITS FROM: 0.20 MI S OF SH 347LIMITS TO:
$ 6,910,034
DESCRIPTION:
BR 2018(658)PROJ NUM:
1.211
YNHS:
ROW CSJ: $ 6,910,0341 Project0200-14-085CONTRACT CSJ: JUN 2018
0920-03-034BEAUMONT HARDIN
REPLACE BRIDGE
CR JUN 2018
ON CR 30 AT VILLAGE CREEK BRANCHLIMITS FROM: (STR AA03-38-001)LIMITS TO:
$ 718,136
DESCRIPTION:
BR 93(356)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 718,1361 Project0920-03-034CONTRACT CSJ: JUN 2018
0932-01-090BEAUMONT JEFFERSON
REPLACE BRIDGE AND APPROACHES
FM 365 JUN 2018
AT HILLEBRANDT BAYOULIMITS FROM: (STR 093201011)LIMITS TO:
$ 11,476,257
DESCRIPTION:
BR 2018(955)PROJ NUM:
0.445
NNHS:
ROW CSJ: $ 11,476,2571 Project0932-01-090CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 19,927,5509 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0064-08-057BEAUMONT JASPER
OVERLAY EXISTING ROADWAY
US 96 JUL 2018
0.56 MI NORTH OF RE 255, SOUTHLIMITS FROM: FM 2799LIMITS TO:
$ 11,625,000
DESCRIPTION:
NH 1802(032)PROJ NUM:
10.299
YNHS:
ROW CSJ:
0064-08-059BEAUMONT JASPER
MILLED EDGELINE RUMBLE STRIPS
US 96 JUL 2018
0.642 MI N OF RE 255LIMITS FROM: 0.940 MI N OF FM 2800LIMITS TO:
$ 17,788
DESCRIPTION:
STP 2018(657)HESGPROJ NUM:
8.108
YNHS:
ROW CSJ:
0065-01-058BEAUMONT JASPER
OVERLAY EXISTING ROADWAY
US 96 JUL 2018
FM 2799, SOUTHLIMITS FROM: US 190LIMITS TO:
$ 875,000
DESCRIPTION:
NH 1802(032)PROJ NUM:
0.704
YNHS:
ROW CSJ: $ 12,517,7883 Projects0064-08-057CONTRACT CSJ: JUL 2018
0065-05-145BEAUMONT HARDIN
OVERLAY EXISTING ROADWAY
US 96 JUL 2018
VILLAGE CREEK BRIDGELIMITS FROM: US 69LIMITS TO:
$ 4,000,000
DESCRIPTION:
C 65-5-145PROJ NUM:
4.896
YNHS:
ROW CSJ:
0739-02-164BEAUMONT JEFFERSON
OVERLAY EXISTING ROADWAY
IH 10 JUL 2018
WALDEN ROADLIMITS FROM: 0.23 MILES WEST OF US 90LIMITS TO:
$ 2,150,000
DESCRIPTION:
C 739-2-164PROJ NUM:
2.337
YNHS:
ROW CSJ: $ 6,150,0002 Projects0065-05-145CONTRACT CSJ: JUL 2018
0065-07-062BEAUMONT JEFFERSON
WIDEN FREEWAY FROM 4 TO 6 LANES
US 69 JUL 2018
TRAM ROAD, SOUTHLIMITS FROM: LNVA CANALLIMITS TO:
$ 14,250,000
DESCRIPTION:
NH 1802(412)PROJ NUM:
2.279
YNHS:
ROW CSJ:
0200-11-095BEAUMONT JEFFERSON
WIDEN FREEWAY FROM 4 TO 6 LANES
US 69 JUL 2018
LNVA CANAL, SOUTHLIMITS FROM: IH 10LIMITS TO:
$ 19,300,000
DESCRIPTION:
NH 1802(412)PROJ NUM:
4.099
YNHS:
ROW CSJ: $ 33,550,0002 Projects0065-07-062CONTRACT CSJ: JUL 2018
0739-02-162BEAUMONT JEFFERSON
WIDEN FREEWAY FROM 4 TO 6 LANES
IH 10 JUL 2018
FM 365, EASTLIMITS FROM: CR 131 (WALDEN ROAD)LIMITS TO:
$ 143,510,000
DESCRIPTION:
NH 1802(413)PROJ NUM:
9.936
YNHS:
0739-02-172ROW CSJ: $ 143,510,0001 Project0739-02-162CONTRACT CSJ: JUL 2018
0920-00-121BEAUMONT JEFFERSON
INSTALL LANDSCAPING
VA JUL 2018
DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 264,000
DESCRIPTION:
NH 1802(409)PROJ NUM:
1.000
YNHS:
ROW CSJ: $ 264,0001 Project0920-00-121CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 195,991,7889 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0200-10-067BEAUMONT HARDIN
WIDEN EXISTING HIGHWAY TO 4 LANES WITH A CONTINUOUS LEFTTURN LANE
US 69 AUG 2018
FM 421, SOUTHLIMITS FROM: US 96LIMITS TO:
$ 2,500,000
DESCRIPTION:
STP ( )PROJ NUM:
1.888
YNHS:
ROW CSJ: $ 2,500,0001 Project0200-10-067CONTRACT CSJ: AUG 2018
1024-01-042BEAUMONT CHAMBERS
RECONSTRUCT AND REALIGN EXISTING ROADWAY
FM 565 AUG 2018
0.305 MI W OF FM 2354LIMITS FROM: 0.018 MI E OF FM 1405LIMITS TO:
$ 5,790,000
DESCRIPTION:
STP 2018(850)PROJ NUM:
1.864
NNHS:
1024-01-063ROW CSJ: $ 5,790,0001 Project1024-01-042CONTRACT CSJ: AUG 2018
1024-01-072BEAUMONT CHAMBERS
CONSTRUCT PAVED SHOULDERS, INSTALL CONTINUEOUS TURN LANE
FM 565 AUG 2018
OLD RIVER DRIVELIMITS FROM: BB LANELIMITS TO:
$ 2,363,880
DESCRIPTION:
STP ( )HESPROJ NUM:
2.097
NNHS:
ROW CSJ:
1024-01-078BEAUMONT CHAMBERS
INCREASE SUPERELEVATION, MILLED EDGELINE RUMBLE STRIPS,MILLED CENTERLINE RUMBLE STRIPS
FM 565 AUG 2018
SUNNYSIDE DRIVELIMITS FROM: 0.241 MI E OF SUNNYSIDE DRIVELIMITS TO:
$ 586,462
DESCRIPTION:
STP ( )HESGPROJ NUM:
0.241
NNHS:
ROW CSJ: $ 2,950,3422 Projects1024-01-072CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 11,240,3424 Projects 3 Contracts
BEAUMONT $ 231,211,86628 Projects 16 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
BROWNWOOD DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$1.59 $0.00 $0.00 $0.00 $0.00OCTOBER $1.59$0.00 $0.00$0.00$0.00
$6.29 $0.00 $0.00 $0.00 $0.00NOVEMBER $6.29$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$8.28 $0.00 $0.00 $0.00 $0.00JANUARY $9.21$0.00 $0.00$0.00$0.93
$3.67 $0.00 $0.00 $0.00 $0.00FEBRUARY $3.67$0.00 $0.00$0.00$0.00
$5.02 $0.00 $0.00 $0.00 $0.00MARCH $5.02$0.00 $0.00$0.00$0.00
$8.91 $0.00 $0.00 $0.00 $0.00APRIL $8.91$0.00 $0.00$0.00$0.00
$21.21 $0.00 $0.00 $0.00 $0.00MAY $21.21$0.00 $0.00$0.00$0.00
$1.23 $0.00 $0.00 $0.00 $0.00JUNE $1.23$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$56.23 $0.00 $0.00 $0.00 $0.00 $57.16District Total: $0.00 $0.00$0.00$0.93
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BROWNWOOD DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0127-02-142BROWNWOOD EASTLAND
RECONSTRUCT URBAN ROADWAY
US 183 MAY 2018
RISING STAR NCLLIMITS FROM: NEAR SH 36LIMITS TO:
$ 5,261,153
DESCRIPTION:
STP 2018(829)PROJ NUM:
0.809
NNHS:
0127-02-146ROW CSJ:
0127-02-143BROWNWOOD EASTLAND
RECONSTRUCT URBAN ROADWAY
US 183 MAY 2018
NEAR SH 36LIMITS FROM: NEAR RISING STAR SCLLIMITS TO:
$ 4,801,570
DESCRIPTION:
STP 2018(829)PROJ NUM:
0.667
NNHS:
0127-02-147ROW CSJ:
0127-02-146BROWNWOOD EASTLAND
ACQUISITION AND UTILITY ADJUSTMENTS
US 183 MAY 2018
RISING STAR NCLLIMITS FROM: NEAR SH 36LIMITS TO:
$ 2,650,394
DESCRIPTION:
STP 2018(212)PROJ NUM:
0.809
NNHS:
ROW CSJ:
0127-02-147BROWNWOOD EASTLAND
UTILITY ADJUSTMENTS
US 183 MAY 2018
NEAR SH 36LIMITS FROM: NEAR RISING STAR SCLLIMITS TO:
$ 2,302,362
DESCRIPTION:
STP 2018(211)PROJ NUM:
0.667
NNHS:
ROW CSJ: $ 15,015,4794 Projects0127-02-142CONTRACT CSJ: MAY 2018
0231-01-056BROWNWOOD LAMPASAS
PLANING AND ACP OVERLAY
US 190 MAY 2018
0.1 MI EAST US 183LIMITS FROM: 0.1 MI WEST LP 257LIMITS TO:
$ 1,221,674
DESCRIPTION:
C 231-1-56PROJ NUM:
1.094
YNHS:
ROW CSJ: $ 1,221,6741 Project0231-01-056CONTRACT CSJ: MAY 2018
0636-01-038BROWNWOOD COLEMAN
MILLED EDGELINE/CENTERLINE RUMBLE STRIPS
SH 153 MAY 2018
RUNNELS C/LLIMITS FROM: 0.013 MI. W OF CR 407LIMITS TO:
$ 147,412
DESCRIPTION:
STP 1802(202)HESPROJ NUM:
16.969
NNHS:
ROW CSJ:
0011-09-072BROWNWOOD STEPHENS
MILLED EDGELINE/CENTERLINE RUMBLE STRIPS
US 180 MAY 2018
0.204 MI E OF US 67 NLIMITS FROM: PALO PINTO C/LLIMITS TO:
$ 140,155
DESCRIPTION:
STP 1802(202)HESPROJ NUM:
17.282
NNHS:
ROW CSJ:
0099-01-033BROWNWOOD COLEMAN
MILLED EDGELINE/CENTERLINE RUMBLE STRIPS
US 283 MAY 2018
0.131 MI. S. OF PLUM AVELIMITS FROM: 0.325 MI. S. OF CR 236LIMITS TO:
$ 100,938
DESCRIPTION:
STP 1802(202)HESPROJ NUM:
15.732
NNHS:
ROW CSJ:
0099-02-024BROWNWOOD COLEMAN
MILLED EDGELINE/CENTERLINE RUMBLE STRIPS
US 283 MAY 2018
0.325 MI. S. OF CR 236LIMITS FROM: MCCULLOCH C/LLIMITS TO:
$ 31,016
DESCRIPTION:
STP 1802(202)HESPROJ NUM:
4.116
NNHS:
ROW CSJ:
0923-00-059BROWNWOOD BROWN
THERMOPLASTIC STRIPING
VA MAY 2018
DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,900,496
DESCRIPTION:
C 923-0-59PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 2,320,0175 Projects0636-01-038CONTRACT CSJ: MAY 2018
2561-01-011BROWNWOOD MC CULLOCH
REHAB EXISTING ROADWAY
SH 71 MAY 2018
US 87LIMITS FROM: FM 2309LIMITS TO:
$ 2,654,220
DESCRIPTION:
C 2561-1-11PROJ NUM:
1.724
NNHS:
ROW CSJ: $ 2,654,2201 Project2561-01-011CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 21,211,39011 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BROWNWOOD DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0480-01-039BROWNWOOD BROWN
IMPROVE GUARDRAIL TO DESIGN STANDARDS,INCREASE SUPERELEVATION,RESURFACE,CONSTRUCT FLUSH MEDIAN,MILLED RUMBLE STRIPS
SH 279 JUN 2018
FM 2632LIMITS FROM: 1.2 MI E OF FM 2632LIMITS TO:
$ 1,231,791
DESCRIPTION:
STP 1802(256)HESPROJ NUM:
1.155
NNHS:
ROW CSJ: $ 1,231,7911 Project0480-01-039CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 1,231,7911 Project 1 Contract
BROWNWOOD $ 22,443,18112 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
BRYAN DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$1.00 $0.00 $0.00 $0.00 $0.05SEPTEMBER $1.43$0.00 $0.00$0.00$0.38
$13.44 $0.00 $0.00 $0.00 $0.00OCTOBER $13.44$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$5.49 $0.00 $0.00 $0.00 $0.00DECEMBER $5.49$0.00 $0.00$0.00$0.00
$2.29 $0.00 $0.00 $0.00 $0.00JANUARY $2.29$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$6.33 $0.00 $0.00 $0.00 $0.00MARCH $6.33$0.00 $0.00$0.00$0.00
$4.37 $0.00 $0.00 $0.00 $0.00APRIL $4.37$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$32.96 $0.00 $0.00 $0.00 $0.00JUNE $32.96$0.00 $0.00$0.00$0.00
$10.48 $0.00 $0.00 $0.00 $0.00JULY $10.48$0.00 $0.00$0.00$0.00
$9.47 $0.00 $0.00 $0.00 $0.00AUGUST $9.47$0.00 $0.00$0.00$0.00
$85.83 $0.00 $0.00 $0.00 $0.05 $86.26District Total: $0.00 $0.00$0.00$0.38
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BRYAN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0049-08-065BRYAN ROBERTSON
CONSTRUCT TURN LANES AND PFC OVERLAY
US 190 JUN 2018
0.27 MI NORTH OF CR 226 (ABBOTT RD)LIMITS FROM: 0.45 MILES S OF CR806 (SADBERRY RD)LIMITS TO:
$ 6,088,171
DESCRIPTION:
NH 2018(615)PROJ NUM:
8.515
YNHS:
ROW CSJ:
0049-07-064BRYAN ROBERTSON
MILLING AND HMA OVERLAY
US 79 JUN 2018
0.17 MILES N OF US 79 & SH 6 INTCHGLIMITS FROM: US 190LIMITS TO:
$ 1,488,074
DESCRIPTION:
NH 2018(993)PROJ NUM:
2.512
YNHS:
ROW CSJ:
0049-08-066BRYAN ROBERTSON
MILLING AND HMA OVERLAY
US 190 JUN 2018
US 79LIMITS FROM: 0.27 MI NORTH OF CR 226 (ABBOTT RD)LIMITS TO:
$ 434,281
DESCRIPTION:
NH 2018(993)PROJ NUM:
1.300
YNHS:
ROW CSJ:
0049-08-067BRYAN ROBERTSON
MILLING AND HMA OVERLAY
US 190 JUN 2018
0.45 MI S OF CR 806 (SADBERRY RD)LIMITS FROM: OSR (COUNTY LINE)LIMITS TO:
$ 970,026
DESCRIPTION:
C 49-8-67PROJ NUM:
2.465
YNHS:
ROW CSJ: $ 8,980,5524 Projects0049-08-065CONTRACT CSJ: JUN 2018
0186-04-032BRYAN BURLESON
GOVERNORS COMMUNITY ACHIEVEMENT AWARD PROJECT TO IMPROVEPARK LANDSCAPE AND SITE AMENITIES
SH 36 JUN 2018
0.07 MILES NORTH OF FM 1361LIMITS FROM: 0.1 MILES SOUTH OF FM 1361LIMITS TO:
$ 101,808
DESCRIPTION:
STP 2018(994)PROJ NUM:
0.101
NNHS:
ROW CSJ: $ 101,8081 Project0186-04-032CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BRYAN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0475-03-064BRYAN MADISON
REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING,STRUCTURES, BASE, SURFACE AND PAVEMENT MARKINGS
OSR JUN 2018
0.76 MI EAST OF THE BRAZOS C/LLIMITS FROM: 6.5 MI EAST OF FM 39 (POND BRANCH)LIMITS TO:
$ 18,713,421
DESCRIPTION:
STP 1802(002)PROJ NUM:
14.479
NNHS:
ROW CSJ:
0475-03-065BRYAN MADISON
SAFETY WORK CONSISTING OF PROFILE MARKING TEXTURE SHOULDERSCENTERLINE
OSR JUN 2018
BRAZOS COUNTY LINELIMITS FROM: SH 75LIMITS TO:
$ 112,404
DESCRIPTION:
STP 1802(001)HESPROJ NUM:
21.373
NNHS:
ROW CSJ:
0475-03-069BRYAN MADISON
REPLACE BRIDGE
OSR JUN 2018
AT COTTONWOOD CREEKLIMITS FROM: .LIMITS TO:
$ 606,798
DESCRIPTION:
BR 2018(999)PROJ NUM:
0.060
NNHS:
ROW CSJ:
0475-03-070BRYAN MADISON
WIDEN BRIDGE
OSR JUN 2018
AT RED BANK CREEKLIMITS FROM: .LIMITS TO:
$ 359,712
DESCRIPTION:
BR 2018(998)PROJ NUM:
0.070
NNHS:
ROW CSJ:
0475-03-071BRYAN MADISON
REPLACE BRIDGE
OSR JUN 2018
AT BRANCH OF CARRYALL CREEKLIMITS FROM: .LIMITS TO:
$ 423,810
DESCRIPTION:
BR 2018(997)PROJ NUM:
0.075
NNHS:
ROW CSJ:
0475-03-072BRYAN MADISON
WIDEN BRIDGE
OSR JUN 2018
AT CARRYALL CREEKLIMITS FROM: .LIMITS TO:
$ 427,018
DESCRIPTION:
BR 2018(996)PROJ NUM:
0.090
NNHS:
ROW CSJ:
0475-03-073BRYAN MADISON
REPLACE BRIDGE
OSR JUN 2018
AT EAST CANEY CREEKLIMITS FROM: .LIMITS TO:
$ 627,360
DESCRIPTION:
BR 2018(995)PROJ NUM:
0.030
NNHS:
ROW CSJ:
0475-04-025BRYAN MADISON
SAFETY WORK CONSISTING OF PROFILE MARKING TEXTURE SHOULDERSAND CENTERLINE
OSR JUN 2018
SH 75LIMITS FROM: SH 21LIMITS TO:
$ 67,057
DESCRIPTION:
STP 1802(001)HESPROJ NUM:
11.588
NNHS:
ROW CSJ: $ 21,337,5808 Projects0475-03-064CONTRACT CSJ: JUN 2018
0675-01-072BRYAN FREESTONE
INSTALLATION OF CRASH WALLS
IH 45 JUN 2018
AT CR 1100LIMITS FROM: .LIMITS TO:
$ 477,824
DESCRIPTION:
BR 1802(006)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0675-02-083BRYAN FREESTONE
INSTALLATION OF CRASH WALLS
IH 45 JUN 2018
AT CR 172_(CHURCH STREET)LIMITS FROM: .LIMITS TO:
$ 393,906
DESCRIPTION:
BR 1802(005)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0675-02-084BRYAN FREESTONE
INSTALLATION OF CRASH WALLS
IH 45 JUN 2018
AT CR 691LIMITS FROM: .LIMITS TO:
$ 396,577
DESCRIPTION:
BR 1802(004)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0675-02-085BRYAN FREESTONE
INSTALLATION OF CRASH WALLS
IH 45 JUN 2018
AT FM 489LIMITS FROM: .LIMITS TO:
$ 910,811
DESCRIPTION:
BR 1802(003)PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 2,179,1184 Projects0675-01-072CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BRYAN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0917-19-050BRYAN WASHINGTON
REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES,AND BASE
CS JUN 2018
ON TEXAS STREETLIMITS FROM: AT INDIAN CREEKLIMITS TO:
$ 365,648
DESCRIPTION:
BR 2017(904)PROJ NUM:
0.068
NNHS:
ROW CSJ: $ 365,6481 Project0917-19-050CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 32,964,70618 Projects 5 Contracts
0050-01-080BRYAN BRAZOS
MISCELLANEOUS CONSTRUCTION CONSISTING OF INSTALLATION OF ARAISED MEDIAN, SURFACE AND MARKERS
BS 6-R JUL 2018
FM 2818LIMITS FROM: 0.7 MILES SOUTH OF FM 2818LIMITS TO:
$ 126,266
DESCRIPTION:
STP 1802(407)HESPROJ NUM:
0.679
YNHS:
ROW CSJ:
0050-01-085BRYAN BRAZOS
MISCELLANEOUS CONSTRUCTION CONSISTING OF INSTALLATION OF ARAISED MEDIAN, SURFACE AND MARKERS
BS 6-R JUL 2018
FM 2818LIMITS FROM: 0.85 MILES SOUTH OF FM 2818LIMITS TO:
$ 850,000
DESCRIPTION:
NH 1802(406)PROJ NUM:
0.851
YNHS:
ROW CSJ: $ 976,2662 Projects0050-01-080CONTRACT CSJ: JUL 2018
0050-03-100BRYAN GRIMES
MILLING, HMA OVERLAY, PAVEMENT MARKINGS AND MARKERS
SH 6 JUL 2018
BRAZOS COUNTY LINELIMITS FROM: WALLER COUNTY LINELIMITS TO:
$ 9,500,000
DESCRIPTION:
C 50-3-100PROJ NUM:
14.383
YNHS:
ROW CSJ: $ 9,500,0001 Project0050-03-100CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 10,476,2663 Projects 2 Contracts
0049-09-079BRYAN BRAZOS
INSTALL TRAFFIC SIGNAL
US 190 AUG 2018
AT FM 2818LIMITS FROM: .LIMITS TO:
$ 392,423
DESCRIPTION:
STP ( )HESGPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 392,4231 Project0049-09-079CONTRACT CSJ: AUG 2018
0212-03-062BRYAN BRAZOS
MILL AND INLAY
FM 158 AUG 2018
SH 6LIMITS FROM: SH 30LIMITS TO:
$ 1,700,000
DESCRIPTION:
STP ( )PROJ NUM:
3.944
NNHS:
ROW CSJ:
0116-05-020BRYAN BRAZOS
MILL AND INLAY
FM 158 AUG 2018
SH 21LIMITS FROM: BS 6-RLIMITS TO:
$ 680,000
DESCRIPTION:
STP 1802(392)PROJ NUM:
1.188
NNHS:
ROW CSJ:
0540-08-007BRYAN BRAZOS
OVERLAY
SH 40 AUG 2018
FM 2154LIMITS FROM: SH 6 WFRLIMITS TO:
$ 2,100,000
DESCRIPTION:
STP ( )PROJ NUM:
2.970
NNHS:
ROW CSJ: $ 4,480,0003 Projects0212-03-062CONTRACT CSJ: AUG 2018
0540-05-048BRYAN BRAZOS
REHABILITATE EXISTING ROAD
FM 159 AUG 2018
SH 6LIMITS FROM: 2.8 MILES SOUTH OF FM 2154LIMITS TO:
$ 4,550,000
DESCRIPTION:
C 540-5-48PROJ NUM:
5.614
NNHS:
ROW CSJ:
0540-05-050BRYAN BRAZOS
REGRADE DITCH - WEST SIDE
FM 159 AUG 2018
4.6 MILES SOUTH OF FM 2154LIMITS FROM: 4.8 MILES SOUTH OF FM 2154LIMITS TO:
$ 50,000
DESCRIPTION:
C 540-5-50PROJ NUM:
0.227
NNHS:
ROW CSJ: $ 4,600,0002 Projects0540-05-048CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 9,472,4236 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BRYAN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
BRYAN $ 52,913,39527 Projects 10 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
CHILDRESS DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$4.17 $0.00 $0.00 $0.00 $0.00SEPTEMBER $4.17$0.00 $0.00$0.00$0.00
$4.15 $0.00 $0.00 $0.00 $0.00OCTOBER $4.15$0.00 $0.00$0.00$0.00
$4.17 $0.00 $0.00 $0.00 $0.00NOVEMBER $4.17$0.00 $0.00$0.00$0.00
$6.83 $0.00 $0.00 $0.00 $0.00DECEMBER $6.83$0.00 $0.00$0.00$0.00
$0.99 $0.00 $0.00 $0.00 $0.00JANUARY $0.99$0.00 $0.00$0.00$0.00
$7.74 $0.00 $0.00 $0.00 $0.00FEBRUARY $7.74$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.38 $0.00 $0.00 $0.00 $0.00APRIL $0.38$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$15.37 $0.00 $0.00 $0.00 $0.00JUNE $15.37$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$43.81 $0.00 $0.00 $0.00 $0.00 $43.81District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CHILDRESS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0042-07-067CHILDRESS DONLEY
REHABILITATION OF EXISTING ROAD
US 287 JUN 2018
HEDLEY NCL, SOUTHLIMITS FROM: 5,216.32 FTLIMITS TO:
$ 6,657,691
DESCRIPTION:
C 42-7-67PROJ NUM:
0.988
YNHS:
ROW CSJ:
0042-06-072CHILDRESS DONLEY
REHABILITATION OF EXISTING ROADWAY
US 287 JUN 2018
0.015 MILES WEST OF GORST ST EASTLIMITS FROM: 0.024 MILESLIMITS TO:
$ 203,594
DESCRIPTION:
C 42-6-72PROJ NUM:
0.039
YNHS:
ROW CSJ:
0042-08-057CHILDRESS DONLEY
REHABILITATION OF EXISTING ROAD
US 287 JUN 2018
5216.32 FT NORTH OF HEDLEY SCLLIMITS FROM: HEDLEY SCLLIMITS TO:
$ 483,064
DESCRIPTION:
C 42-8-57PROJ NUM:
0.113
YNHS:
ROW CSJ: $ 7,344,3493 Projects0042-07-067CONTRACT CSJ: JUN 2018
0704-05-022CHILDRESS MOTLEY
WIDENING OF NON-FREEWAY FACILITY
FM 94 JUN 2018
MIDDLE PEASE RIVER, NELIMITS FROM: 7.357 MILES S OF NORTHFIELDLIMITS TO:
$ 6,496,016
DESCRIPTION:
C 704-5-22PROJ NUM:
10.240
NNHS:
0704-05-025ROW CSJ: $ 6,496,0161 Project0704-05-022CONTRACT CSJ: JUN 2018
0925-08-019CHILDRESS CHILDRESS
REPLACEMENT OF EXISTING BRIDGE FACILITY
CR JUN 2018
CR 22 @ SAND CREEKLIMITS FROM: .LIMITS TO:
$ 538,959
DESCRIPTION:
BR 1702(581)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0925-11-013CHILDRESS WHEELER
REPLACEMENT OF EXISTING BRIDGE FACILITY
CR JUN 2018
CR 28 @ SWEETWATER CREEKLIMITS FROM: .LIMITS TO:
$ 991,169
DESCRIPTION:
BR 1702(580)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,530,1282 Projects0925-08-019CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 15,370,4936 Projects 3 Contracts
CHILDRESS $ 15,370,4936 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
CORPUS CHRISTI DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$6.66 $0.00 $0.00 $0.00 $0.50OCTOBER $7.16$0.00 $0.00$0.00$0.00
$2.81 $0.00 $0.00 $0.00 $0.00NOVEMBER $2.81$0.00 $0.00$0.00$0.00
$4.62 $0.00 $0.00 $0.00 $0.00DECEMBER $4.62$0.00 $0.00$0.00$0.00
$9.42 $0.00 $0.00 $0.00 $0.00JANUARY $9.42$0.00 $0.00$0.00$0.00
$0.86 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.86$0.00 $0.00$0.00$0.00
$5.68 $0.00 $0.00 $0.00 $0.00MARCH $5.68$0.00 $0.00$0.00$0.00
$1.86 $0.00 $0.00 $0.00 $0.00APRIL $1.86$0.00 $0.00$0.00$0.00
$52.46 $0.00 $0.00 $0.00 $0.00MAY $52.46$0.00 $0.00$0.00$0.00
$24.96 $0.00 $0.00 $0.00 $0.00JUNE $24.96$0.00 $0.00$0.00$0.00
$131.23 $0.00 $0.00 $0.00 $1.50JULY $132.73$0.00 $0.00$0.00$0.00
$74.82 $0.00 $0.00 $0.00 $2.00AUGUST $87.30$0.00 $0.00$0.00$10.48
$315.36 $0.00 $0.00 $0.00 $4.00 $329.84District Total: $0.00 $0.00$0.00$10.48
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0100-10-015CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT LOW CONTROL CSJ
BU 181F MAY 2018
US 181LIMITS FROM: SH 72LIMITS TO:
$ 50,305
DESCRIPTION:
STP 2018(186)PROJ NUM:
0.820
NNHS:
ROW CSJ:
0102-01-115CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT_FRONTAGE LANES
SH 44 MAY 2018
GIBLON LN.LIMITS FROM: BU 44LIMITS TO:
$ 36,498
DESCRIPTION:
STP 2018(186)PROJ NUM:
1.038
NNHS:
ROW CSJ:
0371-05-001CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 2046 MAY 2018
FM 1944LIMITS FROM: FM 631LIMITS TO:
$ 41,663
DESCRIPTION:
STP 2018(186)PROJ NUM:
1.993
NNHS:
ROW CSJ:
0447-05-070CORPUS CHRISTI REFUGIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 774 MAY 2018
FM 2678LIMITS FROM: SH 35LIMITS TO:
$ 314,273
DESCRIPTION:
STP 2018(186)PROJ NUM:
19.776
NNHS:
ROW CSJ:
0738-01-059CORPUS CHRISTI REFUGIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 136 MAY 2018
FM 1360LIMITS FROM: FM 2678LIMITS TO:
$ 229,483
DESCRIPTION:
STP 2018(186)PROJ NUM:
11.314
NNHS:
ROW CSJ:
0988-01-024CORPUS CHRISTI BEE
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 623 MAY 2018
FM 673LIMITS FROM: US 181LIMITS TO:
$ 210,288
DESCRIPTION:
STP 2018(186)PROJ NUM:
8.373
NNHS:
ROW CSJ:
0991-01-026CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 626 MAY 2018
FM 99LIMITS FROM: FM 882 INTERSECTIONLIMITS TO:
$ 264,057
DESCRIPTION:
STP 2018(186)PROJ NUM:
9.495
NNHS:
ROW CSJ:
1088-04-026CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 892 MAY 2018
BU 77ULIMITS FROM: FM 2826LIMITS TO:
$ 95,949
DESCRIPTION:
STP 2018(186)PROJ NUM:
3.379
NNHS:
ROW CSJ:
1093-01-029CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 763 MAY 2018
SH 44LIMITS FROM: FM 665LIMITS TO:
$ 116,195
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.015
NNHS:
ROW CSJ:
1117-01-016CORPUS CHRISTI BEE
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 798 MAY 2018
FM 2985LIMITS FROM: SH 72LIMITS TO:
$ 182,930
DESCRIPTION:
STP 2018(186)PROJ NUM:
6.677
NNHS:
ROW CSJ:
1121-01-021CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 792 MAY 2018
SH 72LIMITS FROM: SH 80LIMITS TO:
$ 243,426
DESCRIPTION:
STP 2018(186)PROJ NUM:
8.307
NNHS:
ROW CSJ:
1122-02-040CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 887 MAY 2018
SH 123LIMITS FROM: US 181LIMITS TO:
$ 194,519
DESCRIPTION:
STP 2018(186)PROJ NUM:
7.525
NNHS:
ROW CSJ:
1122-02-041CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 887 MAY 2018
SS 190 INTERSECTIONLIMITS FROM: SH 123LIMITS TO:
$ 332,642
DESCRIPTION:
STP 2018(186)PROJ NUM:
12.727
NNHS:
ROW CSJ:
1196-03-018CORPUS CHRISTI GOLIAD
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 884 MAY 2018
SH 119LIMITS FROM: FM 1726LIMITS TO:
$ 170,777
DESCRIPTION:
STP 2018(186)PROJ NUM:
6.399
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
1209-02-019CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 631 MAY 2018
US 181LIMITS FROM: SH 188LIMITS TO:
$ 134,150
DESCRIPTION:
STP 2018(186)PROJ NUM:
5.056
NNHS:
ROW CSJ:
1446-01-014CORPUS CHRISTI KLEBERG
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1355 MAY 2018
FM 1898LIMITS FROM: BU 77VLIMITS TO:
$ 64,480
DESCRIPTION:
STP 2018(186)PROJ NUM:
2.000
NNHS:
ROW CSJ:
1447-01-024CORPUS CHRISTI JIM WELLS
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1352 MAY 2018
FM 665LIMITS FROM: FM 2508 INTERSECTIONLIMITS TO:
$ 146,905
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.926
NNHS:
ROW CSJ:
1485-01-013CORPUS CHRISTI JIM WELLS
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1554 MAY 2018
FM 2507LIMITS FROM: FM 625LIMITS TO:
$ 72,126
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.810
NNHS:
ROW CSJ:
1549-02-014CORPUS CHRISTI ARANSAS
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1069 MAY 2018
SH 188LIMITS FROM: SAN PATRICIO COUNTY LINELIMITS TO:
$ 76,209
DESCRIPTION:
STP 2018(186)PROJ NUM:
2.987
NNHS:
ROW CSJ:
1549-03-027CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1069 MAY 2018
SAN PATRICIO COUNTY LINELIMITS FROM: BS 35LIMITS TO:
$ 37,612
DESCRIPTION:
STP 2018(186)PROJ NUM:
1.453
NNHS:
ROW CSJ:
1553-01-014CORPUS CHRISTI LIVE OAK
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1042 MAY 2018
US 281LIMITS FROM: FM 1545LIMITS TO:
$ 223,670
DESCRIPTION:
STP 2018(186)PROJ NUM:
8.687
NNHS:
ROW CSJ:
1558-02-037CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 70 MAY 2018
FM 665LIMITS FROM: BU 77VLIMITS TO:
$ 416,432
DESCRIPTION:
STP 2018(186)PROJ NUM:
14.304
NNHS:
ROW CSJ:
1558-03-006CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 70 MAY 2018
BU 77VLIMITS FROM: CR 73ALIMITS TO:
$ 151,817
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.579
NNHS:
ROW CSJ:
1559-01-025CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1074 MAY 2018
FM 1944LIMITS FROM: FM 893LIMITS TO:
$ 244,898
DESCRIPTION:
STP 2018(186)PROJ NUM:
9.427
NNHS:
ROW CSJ:
1742-01-027CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1694 MAY 2018
IH 37LIMITS FROM: SH 44LIMITS TO:
$ 174,475
DESCRIPTION:
STP 2018(186)PROJ NUM:
5.475
NNHS:
ROW CSJ:
1808-01-030CORPUS CHRISTI LIVE OAK
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 534 MAY 2018
FM 3024LIMITS FROM: CR 171LIMITS TO:
$ 164,741
DESCRIPTION:
STP 2018(186)PROJ NUM:
5.358
NNHS:
ROW CSJ:
2342-01-012CORPUS CHRISTI GOLIAD
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 2442 MAY 2018
SH 239LIMITS FROM: FM 883LIMITS TO:
$ 202,256
DESCRIPTION:
STP 2018(186)PROJ NUM:
8.314
NNHS:
ROW CSJ:
2413-01-007CORPUS CHRISTI JIM WELLS
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 2507 MAY 2018
SH 44LIMITS FROM: FM 1554LIMITS TO:
$ 26,212
DESCRIPTION:
STP 2018(186)PROJ NUM:
0.976
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
2432-01-009CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 626 MAY 2018
FM 882 INTERSECTIONLIMITS FROM: SH 72LIMITS TO:
$ 52,161
DESCRIPTION:
STP 2018(186)PROJ NUM:
1.949
NNHS:
ROW CSJ:
2755-01-010CORPUS CHRISTI KARNES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 2724 MAY 2018
FM 887LIMITS FROM: FM 81LIMITS TO:
$ 226,550
DESCRIPTION:
STP 2018(186)PROJ NUM:
8.038
NNHS:
ROW CSJ:
2756-01-014CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 2725 MAY 2018
SH 361LIMITS FROM: FM 1069LIMITS TO:
$ 98,959
DESCRIPTION:
STP 2018(186)PROJ NUM:
3.445
NNHS:
ROW CSJ:
2942-01-008CORPUS CHRISTI NUECES
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1355 MAY 2018
FM 70LIMITS FROM: KLEBERG COUNTY LINELIMITS TO:
$ 20,563
DESCRIPTION:
STP 2018(186)PROJ NUM:
0.592
NNHS:
ROW CSJ:
2942-02-015CORPUS CHRISTI KLEBERG
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1355 MAY 2018
KLEBERG COUNTY LINELIMITS FROM: FM 1898LIMITS TO:
$ 131,720
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.541
NNHS:
ROW CSJ:
3279-01-008CORPUS CHRISTI GOLIAD
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 1351 MAY 2018
FM 883LIMITS FROM: RIVERDALE RD.LIMITS TO:
$ 222,914
DESCRIPTION:
STP 2018(186)PROJ NUM:
10.601
NNHS:
ROW CSJ:
3474-01-010CORPUS CHRISTI SAN PATRICIO
2018 DISTRICT WIDE SEAL COAT PROJECT
FM 136 MAY 2018
FM 3284LIMITS FROM: SH 35LIMITS TO:
$ 173,462
DESCRIPTION:
STP 2018(186)PROJ NUM:
4.897
NNHS:
ROW CSJ: $ 5,545,31735 Projects0100-10-015CONTRACT CSJ: MAY 2018
0102-01-088CORPUS CHRISTI NUECES
UPGRADE FROM 4-LN DIVIDED HWY TO 4-LN FREEWAY W/FTRGBY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FTRG ROADS
SH 44 MAY 2018
WEST OF FM 3386LIMITS FROM: EAST OF FM 1694LIMITS TO:
$ 24,121,095
DESCRIPTION:
NH 2018(842)PROJ NUM:
2.290
YNHS:
ROW CSJ:
0102-01-117CORPUS CHRISTI NUECES
MILL AND OVERLAY FRONTAGE ROADS INCL DRAINAGE IMPROVEMENTS
SH 44 MAY 2018
WEST OF FM 3386LIMITS FROM: EAST OF FM 1694LIMITS TO:
$ 9,260,199
DESCRIPTION:
C 102-1-117PROJ NUM:
2.290
YNHS:
ROW CSJ: $ 33,381,2942 Projects0102-01-088CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0102-01-116CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL PROJECT
BS 44D MAY 2018
SH 44 (GORE)LIMITS FROM: SH 44LIMITS TO:
$ 146,407
DESCRIPTION:
STP 2018(444)PROJ NUM:
1.723
NNHS:
ROW CSJ:
0102-14-105CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL PROJECT
SS 544 MAY 2018
GORE W. OF TALBERT LN.LIMITS FROM: SH 358LIMITS TO:
$ 104,587
DESCRIPTION:
STP 2018(444)PROJ NUM:
0.649
NNHS:
ROW CSJ:
0180-05-066CORPUS CHRISTI ARANSAS
2018 HOT RUBBER SEAL PROJECT
BS 35-L MAY 2018
SL 70LIMITS FROM: STAPP ST.LIMITS TO:
$ 373,949
DESCRIPTION:
STP 2018(444)PROJ NUM:
7.226
NNHS:
ROW CSJ:
0270-08-023CORPUS CHRISTI BEE
2018 HOT RUBBER SEAL PROJECT
SH 72 MAY 2018
LIVE OAK COUNTY LINELIMITS FROM: KARNES COUNTY LINELIMITS TO:
$ 524,234
DESCRIPTION:
STP 2018(444)PROJ NUM:
7.970
NNHS:
ROW CSJ:
0373-01-106CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL
SS 22 MAY 2018
CR 46LIMITS FROM: SS 22LIMITS TO:
$ 146,068
DESCRIPTION:
STP 2018(444)PROJ NUM:
2.077
NNHS:
ROW CSJ:
0373-01-107CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL PROJECT
SS 22 MAY 2018
SH 44LIMITS FROM: BU 77ULIMITS TO:
$ 31,359
DESCRIPTION:
STP 2018(444)PROJ NUM:
0.270
NNHS:
ROW CSJ:
0542-06-048CORPUS CHRISTI LIVE OAK
2018 HOT RUBBER SEAL PROJECT
US 59 MAY 2018
LAGARTO RD.LIMITS FROM: MCMULLEN COUNTY LINELIMITS TO:
$ 1,210,826
DESCRIPTION:
NH 2018(443)PROJ NUM:
20.639
YNHS:
ROW CSJ:
1069-01-040CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL PROJECT
SH 357 MAY 2018
GREENWOOD DR.LIMITS FROM: FM 665LIMITS TO:
$ 76,343
DESCRIPTION:
STP 2018(444)PROJ NUM:
2.279
NNHS:
ROW CSJ:
3075-01-012CORPUS CHRISTI GOLIAD
2018 HOT RUBBER SEAL PROJECT
SH 239 MAY 2018
US 183LIMITS FROM: REFUGIO COUNTY LINELIMITS TO:
$ 514,440
DESCRIPTION:
STP 2018(444)PROJ NUM:
14.997
NNHS:
ROW CSJ:
3364-01-021CORPUS CHRISTI NUECES
2018 HOT RUBBER SEAL PROJECT
FM 3386 MAY 2018
HAVEN DR.LIMITS FROM: S. OF PLANT ENTRANCELIMITS TO:
$ 73,934
DESCRIPTION:
STP 2018(444)PROJ NUM:
2.887
NNHS:
ROW CSJ: $ 3,202,14710 Projects0102-01-116CONTRACT CSJ: MAY 2018
0617-01-196CORPUS CHRISTI NUECES
NOVACHIP ROADWAY
SH 358 MAY 2018
IH 37LIMITS FROM: WEST POINT RD.LIMITS TO:
$ 6,115,730
DESCRIPTION:
NH 2018(843)PROJ NUM:
4.100
YNHS:
ROW CSJ: $ 6,115,7301 Project0617-01-196CONTRACT CSJ: MAY 2018
0916-00-086CORPUS CHRISTI NUECES
DISTRICT WIDE SIGN REPLACEMENT
VA MAY 2018
AT VARIOUS LOCATION IN CC DISTRICTLIMITS FROM: .LIMITS TO:
$ 1,207,059
DESCRIPTION:
STP 2018(844)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0916-00-218CORPUS CHRISTI NUECES
DISTRICT WIDE SIGN REPLACEMENT ON FUNCTIONALLY CLASSIFIEDROADWAYS OF MINOR COLLECTORS (6)
VA MAY 2018
AT VARIOUS LOCATIONS IN CC DISTRICTLIMITS FROM: ON FM3035,FM1684,FM1257 ETC.LIMITS TO:
$ 154,750
DESCRIPTION:
C 916-00-218PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,361,8092 Projects0916-00-086CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
1206-01-018CORPUS CHRISTI LIVE OAK
REPLACE BRIDGE AND APPROACHES
FM 1358 MAY 2018
IH 37LIMITS FROM: APPROX 1.0 MI EAST OF IH 37LIMITS TO:
$ 2,850,575
DESCRIPTION:
BR 1502(580)PROJ NUM:
1.113
NNHS:
1206-01-022ROW CSJ: $ 2,850,5751 Project1206-01-018CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 52,456,87251 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:26 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0100-05-184CORPUS CHRISTI KARNES
RECONSTRUCT INTERSECTION
US 181 JUN 2018
AT SH80/BU 181E INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 5,000,000
DESCRIPTION:
NH 2018(781)PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 5,000,0001 Project0100-05-184CONTRACT CSJ: JUN 2018
0102-04-103CORPUS CHRISTI KLEBERG
SAFETY LIGHTING
US 77 JUN 2018
0.7 MILES NORTH OF SH 285LIMITS FROM: 0.17 MILES NORTH OF SH 285LIMITS TO:
$ 139,029
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
0.554
YNHS:
ROW CSJ:
0372-01-100CORPUS CHRISTI SAN PATRICIO
SAFETY LIGHTING
US 77 JUN 2018
.169 MI S OF SH 188LIMITS FROM: .74 MI N OF MF 1945LIMITS TO:
$ 218,625
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
1.000
YNHS:
ROW CSJ:
0617-01-193CORPUS CHRISTI NUECES
SAFETY LIGHTING
SH 358 JUN 2018
1.4 MI W OF SS3LIMITS FROM: .5 MI W OF SS3LIMITS TO:
$ 179,218
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
1.160
YNHS:
ROW CSJ:
1087-01-015CORPUS CHRISTI JIM WELLS
SAFETY LIGHTING
FM 738 JUN 2018
.517 MI S OF FM 534LIMITS FROM: 1.725 MI S OF FM 534LIMITS TO:
$ 46,826
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
1.210
NNHS:
ROW CSJ:
1446-01-013CORPUS CHRISTI KLEBERG
SAFETY LIGHTING
FM 1355 JUN 2018
.2 MI W OF BU 77LIMITS FROM: BU 77LIMITS TO:
$ 35,029
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
1558-03-034CORPUS CHRISTI NUECES
SAFETY LIGHTING
FM 70 JUN 2018
.7 MI W OF FM 892LIMITS FROM: .7 MI E OF FM 892LIMITS TO:
$ 92,742
DESCRIPTION:
STP 2018(782)HESPROJ NUM:
1.320
NNHS:
ROW CSJ: $ 711,4696 Projects0102-04-103CONTRACT CSJ: JUN 2018
0254-03-079CORPUS CHRISTI JIM WELLS
BASE REPAIR AND OVERLAY (SB LANES)
US 281 JUN 2018
LIVE OAK COUNTY LINELIMITS FROM: US 281 RELIEF ROUTELIMITS TO:
$ 12,600,000
DESCRIPTION:
C 254-3-79PROJ NUM:
17.405
YNHS:
ROW CSJ: $ 12,600,0001 Project0254-03-079CONTRACT CSJ: JUN 2018
0270-04-006CORPUS CHRISTI KARNES
REHAB ROADWAY
BS 72-B JUN 2018
BU 181-GLIMITS FROM: SH 72LIMITS TO:
$ 1,875,605
DESCRIPTION:
STP 2018(977)PROJ NUM:
1.096
NNHS:
ROW CSJ: $ 1,875,6051 Project0270-04-006CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0916-35-184CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
GLAZE BROOKLIMITS FROM: TEXAN TRAILLIMITS TO:
$ 260,503
DESCRIPTION:
STP 2016(710)HESPROJ NUM:
0.177
NNHS:
ROW CSJ:
0916-35-185CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
MCARDLE ST.LIMITS FROM: PORT ST.LIMITS TO:
$ 361,024
DESCRIPTION:
STP 2016(711)HESPROJ NUM:
0.590
NNHS:
ROW CSJ:
0916-35-186CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
AIRPORT RD.LIMITS FROM: CROSSTOWN EXPRESSWAY (SH 286)LIMITS TO:
$ 383,396
DESCRIPTION:
STP 2016(712)HESPROJ NUM:
3.000
NNHS:
ROW CSJ:
0916-35-187CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
ALAMEDA ST.LIMITS FROM: OCEAN DR.LIMITS TO:
$ 190,034
DESCRIPTION:
STP 2016(713)HESPROJ NUM:
0.528
NNHS:
ROW CSJ:
0916-35-188CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS
CS JUN 2018
SOUTH PADRE ISLAND DRIVE (SH 358)LIMITS FROM: GOLLIHARLIMITS TO:
$ 250,422
DESCRIPTION:
STP 2016(714)HESPROJ NUM:
0.717
NNHS:
ROW CSJ:
0916-35-189CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS
CS JUN 2018
MCARDLE ST.LIMITS FROM: NORTON ST.LIMITS TO:
$ 394,383
DESCRIPTION:
STP 2016(715)HESPROJ NUM:
1.219
NNHS:
ROW CSJ:
0916-35-190CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS INTERCONNECT SIGNALS
CS JUN 2018
TARLTON ST.LIMITS FROM: RUTH ST.LIMITS TO:
$ 380,164
DESCRIPTION:
STP 2016(716)HESPROJ NUM:
2.500
NNHS:
ROW CSJ:
0916-35-191CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
MUSTANG RD.LIMITS FROM: CARMEL PARKWAYLIMITS TO:
$ 449,616
DESCRIPTION:
STP 2016(717)HESPROJ NUM:
1.004
NNHS:
ROW CSJ:
0916-35-192CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
MCARDLE ST.LIMITS FROM: GOLLIHAR RD.LIMITS TO:
$ 136,974
DESCRIPTION:
STP 2016(718)HESPROJ NUM:
0.499
NNHS:
ROW CSJ:
0916-35-193CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS
CS JUN 2018
PEOPLE ST.LIMITS FROM: CRAIG ST.LIMITS TO:
$ 470,536
DESCRIPTION:
STP 2018(727)HESPROJ NUM:
0.926
NNHS:
ROW CSJ:
0916-35-194CORPUS CHRISTI NUECES
IMPROVE TRAFFIC SIGNALS, IMTERCONNECT SIGNALS
CS JUN 2018
CRAIG ST.LIMITS FROM: LOUISIANA ST.LIMITS TO:
$ 145,795
DESCRIPTION:
STP 2018(728)HESPROJ NUM:
0.981
NNHS:
ROW CSJ: $ 3,422,84711 Projects0916-35-184CONTRACT CSJ: JUN 2018
1423-01-034CORPUS CHRISTI REFUGIO
SAFETY TRT FIXED OBJ, WIDEN LANES, WIDEN PAVED SHOULDERS
FM 1360 JUN 2018
BOENIG RD.LIMITS FROM: FM 629LIMITS TO:
$ 1,348,894
DESCRIPTION:
STP 2018(978)HESPROJ NUM:
3.050
NNHS:
ROW CSJ: $ 1,348,8941 Project1423-01-034CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 24,958,81521 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0102-16-001CORPUS CHRISTI NUECES
CONSTRUCT RELIEF ROUTE AROUND DRISCOLL
US 77 JUL 2018
CR 28LIMITS FROM: CR16LIMITS TO:
$ 75,000,000
DESCRIPTION:
STP 2018(201)PROJ NUM:
4.132
YNHS:
0102-03-086ROW CSJ:
0102-02-101CORPUS CHRISTI NUECES
CONSTRUCT MAIN LANES,FRONTAGE ROADS AND STRUCTURES
US 77 JUL 2018
NORTH OF FM 2826LIMITS FROM: SOUTH OF CR 28 (CONTROL BREAK)LIMITS TO:
$ 13,000,000
DESCRIPTION:
NH 1802(404)PROJ NUM:
2.476
YNHS:
0102-02-102ROW CSJ:
0102-03-082CORPUS CHRISTI NUECES
CONSTRUCT MAIN LANES AND OVERPASSES
US 77 JUL 2018
CR 16LIMITS FROM: SOUTH OF FM 3354LIMITS TO:
$ 22,000,000
DESCRIPTION:
NH 1802(404)PROJ NUM:
2.012
YNHS:
0102-03-084ROW CSJ: $ 110,000,0003 Projects0102-16-001CONTRACT CSJ: JUL 2018
0383-04-061CORPUS CHRISTI KLEBERG
MISCELLANEOUS CONSTRUCTION
SH 141 JUL 2018
ON SH 141 FROM BU77-V INTER.LIMITS FROM: US 77LIMITS TO:
$ 1,229,126
DESCRIPTION:
STP 1802(405)PROJ NUM:
0.917
NNHS:
ROW CSJ:
0916-00-080CORPUS CHRISTI NUECES
CONSTRUCT CURB RAMPS ALONG BU 281, SH 44, FM 2508, SH141,BU 77, FM 1356 AND FM 2045
VA JUL 2018
AT VARIOUS LOCATION INLIMITS FROM: KLEBERG & JIM WELLS COUNTIESLIMITS TO:
$ 2,335,659
DESCRIPTION:
STP 1802(405)PROJ NUM:
0.100
NNHS:
ROW CSJ:
2429-01-012CORPUS CHRISTI JIM WELLS
MISCELLANEOUS CONSTRUCTION
FM 2508 JUL 2018
US 281LIMITS FROM: 3RD ST. IN BEN BOLTLIMITS TO:
$ 207,227
DESCRIPTION:
STP 1802(405)PROJ NUM:
0.271
NNHS:
ROW CSJ: $ 3,772,0123 Projects0383-04-061CONTRACT CSJ: JUL 2018
0691-01-035CORPUS CHRISTI KARNES
WIDEN OR REPLACE STRUCTURE
FM 81 JUL 2018
ON FM 81 AT CHICKEN CREEK STR2LIMITS FROM: APPROX. 7.8 MI SE OF SH 72LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 691-1-35PROJ NUM:
0.073
NNHS:
ROW CSJ:
0691-01-036CORPUS CHRISTI KARNES
WIDEN OR REPLACE STRUCTURE
FM 81 JUL 2018
ON FM 81 AT DRAW STR3LIMITS FROM: APPROX. 6.7 MI SE OF SH 72LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 691-1-36PROJ NUM:
0.075
NNHS:
ROW CSJ:
0691-01-037CORPUS CHRISTI KARNES
WIDEN OR REPLACE STRUCTURE
FM 81 JUL 2018
ON FM 81 AT YATES CREEK STR4LIMITS FROM: APPROX. 2.2 MI SE OF SH 72LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 691-1-37PROJ NUM:
0.075
NNHS:
ROW CSJ:
0691-01-038CORPUS CHRISTI KARNES
WIDEN OR REPLACE STRUCTURE
FM 81 JUL 2018
ON FM 81 AT OJO DE AGUA CREEK STR5LIMITS FROM: APPROX. 0.8 MI SE OF SH 72LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 691-1-38PROJ NUM:
0.073
NNHS:
ROW CSJ:
0691-01-041CORPUS CHRISTI KARNES
BRIDGE CULVERT REPLACEMENT
FM 81 JUL 2018
ON FM 81LIMITS FROM: APPROX. 3.5 MI SE OF SH 72LIMITS TO:
$ 555,910
DESCRIPTION:
C 691-1-41PROJ NUM:
0.030
NNHS:
ROW CSJ: $ 4,555,9105 Projects0691-01-035CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
3026-01-026CORPUS CHRISTI SAN PATRICIO
UPGRADE TO 5-LANE URBAN ROADWAY BY CONSTRUCTING ADDTNL 2LANES AND CLTL
FM 2986 JUL 2018
US 181LIMITS FROM: FM 3239 (BUDDY GANEM DR)LIMITS TO:
$ 13,500,000
DESCRIPTION:
STP 2018(633)PROJ NUM:
2.200
NNHS:
3026-01-028ROW CSJ:
3026-01-027CORPUS CHRISTI SAN PATRICIO
OVERLAY, PEDESTRIAN BEACON
FM 2986 JUL 2018
FM 3239LIMITS FROM: MEMORIAL PRKWYLIMITS TO:
$ 900,000
DESCRIPTION:
STP 2018(634)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 14,400,0002 Projects3026-01-026CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 132,727,92213 Projects 4 Contracts
0101-03-088CORPUS CHRISTI SAN PATRICIO
CONSTRUCT GRADE SEPARATION
US 181 AUG 2018
ON US181 AT SH 89 INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 7,300,000
DESCRIPTION:
STP ( )PROJ NUM:
0.500
YNHS:
ROW CSJ:
0101-08-004CORPUS CHRISTI SAN PATRICIO
CONSTRUCT GRADE SEPARATION
SH 89 AUG 2018
ON SH89 AT US181 INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 7,200,000
DESCRIPTION:
STP ( )PROJ NUM:
0.500
NNHS:
ROW CSJ: $ 14,500,0002 Projects0101-03-088CONTRACT CSJ: AUG 2018
0101-04-097CORPUS CHRISTI SAN PATRICIO
CONSTRUCT AUXILIARY LANES AND RAMP REVERSAL_TO EXIST 4-LNFREEWAY
US 181 AUG 2018
SUNSET ROADLIMITS FROM: FM 3239 (BUDDY GANEM)LIMITS TO:
$ 15,000,000
DESCRIPTION:
NH 1702(490)PROJ NUM:
1.728
YNHS:P1
ROW CSJ:
0101-04-112CORPUS CHRISTI SAN PATRICIO
CONSTR. GRADE SEPARATION OVER SUNSET RD BY BUILDING 4-LNDIVIDED MAINLANES AT EXISTING AT GRADE INTERS
US 181 AUG 2018
ON US181 AT SH35 INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 40,000,000
DESCRIPTION:
STP ( )PROJ NUM:
1.800
YNHS:
0101-04-116ROW CSJ: $ 55,000,0002 Projects0101-04-097CONTRACT CSJ: AUG 2018
0270-03-075CORPUS CHRISTI KARNES
REHABILITATE ROADWAY AND ADD PASSING LANES
SH 72 AUG 2018
1 MILE EAST OF SH 239LIMITS FROM: WEST MAIN STREET (RUNGE)LIMITS TO:
$ 12,800,000
DESCRIPTION:
STP ( )PROJ NUM:
6.824
NNHS:
ROW CSJ:
0270-03-076CORPUS CHRISTI KARNES
REHABILITATE ROADWAY AND ADD PASSING LANES
SH 72 AUG 2018
WILBERN ST.LIMITS FROM: DEWITT COUNTY LINELIMITS TO:
$ 5,000,000
DESCRIPTION:
STP ( )PROJ NUM:
3.282
NNHS:
ROW CSJ: $ 17,800,0002 Projects0270-03-075CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 87,300,0006 Projects 3 Contracts
CORPUS CHRISTI $ 297,443,60991 Projects 19 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DALLAS DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$12.86 $0.00 $0.00 $0.00 $0.00OCTOBER $12.86$0.00 $0.00$0.00$0.00
$2.98 $0.00 $11.37 $0.00 $0.00NOVEMBER $14.35$0.00 $0.00$0.00$0.00
$2.60 $0.00 $0.00 $0.00 $0.00DECEMBER $2.60$0.00 $0.00$0.00$0.00
$38.40 $0.00 $0.00 $0.00 $0.00JANUARY $38.40$0.00 $0.00$0.00$0.00
$4.47 $0.00 $0.00 $0.00 $0.00FEBRUARY $4.47$0.00 $0.00$0.00$0.00
$17.37 $0.00 $0.00 $0.00 $1.23MARCH $33.57$0.00 $0.00$0.00$14.97
$31.13 $0.00 $0.00 $0.00 $0.04APRIL $31.17$0.00 $0.00$0.00$0.00
$69.73 $0.00 $0.00 $0.00 $0.00MAY $70.65$0.00 $0.00$0.00$0.93
$98.40 $0.00 $1.51 $0.00 $0.00JUNE $99.91$0.00 $0.00$0.00$0.00
$30.75 $0.00 $0.00 $0.00 $0.00JULY $55.77$0.00 $0.00$0.00$25.02
$0.77 $0.00 $0.00 $0.00 $0.00AUGUST $0.77$0.00 $0.00$0.00$0.00
$309.45 $0.00 $12.88 $0.00 $1.27 $364.52District Total: $0.00 $0.00$0.00$40.92
*The estimated costs shown are total estimated construction costs. Please see the Statewide Summary page for the financial impact to the State Highway Fund in FY 2009.
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0091-03-027DALLAS COLLIN
INSTALLATION OF TRAFFIC SIGNALS
SH 289 MAY 2018
AT CR 93 / CR 94 INTERSECTIONLIMITS FROM: IN THE CITY OF CELINALIMITS TO:
$ 198,911
DESCRIPTION:
C 91-3-27PROJ NUM:
0.036
YNHS:
ROW CSJ:
0091-04-063DALLAS COLLIN
INSTALLATION OF TRAFFIC SIGNALS
SH 289 MAY 2018
AT GLENDENNING PKWYLIMITS FROM: IN THE CITY OF CELINALIMITS TO:
$ 195,626
DESCRIPTION:
C 91-4-63PROJ NUM:
0.029
YNHS:
ROW CSJ:
0451-01-056DALLAS ROCKWALL
INSTALLATION OF TRAFFIC SIGNALS
SH 205 MAY 2018
AT DAMASCUS/JUSTIN INTERSECTIONLIMITS FROM: IN THE CITY OF ROCKWALLLIMITS TO:
$ 235,467
DESCRIPTION:
C 451-1-56PROJ NUM:
0.034
YNHS:
ROW CSJ:
1017-01-016DALLAS ROCKWALL
INSTALLATION OF TRAFFIC SIGNALS
FM 552 MAY 2018
AT JOHN KING BLVDLIMITS FROM: IN THE CITY OF ROCKWALLLIMITS TO:
$ 208,769
DESCRIPTION:
C 1017-1-16PROJ NUM:
0.051
YNHS:
ROW CSJ:
1290-01-013DALLAS ROCKWALL
INSTALLATION OF TRAFFIC SIGNALS
FM 1141 MAY 2018
AT JOHN KING BLVDLIMITS FROM: IN THE CITY OF ROCKWALLLIMITS TO:
$ 190,087
DESCRIPTION:
C 1290-1-13PROJ NUM:
0.051
NNHS:
ROW CSJ:
1973-01-017DALLAS COLLIN
INSTALLATION OF TRAFFIC SIGNALS
FM 1461 MAY 2018
COIT RD TO FM 2478 (WEST)LIMITS FROM: IN THE TOWN OF PROSPERLIMITS TO:
$ 345,767
DESCRIPTION:
C 1973-1-17PROJ NUM:
2.096
YNHS:
ROW CSJ: $ 1,374,6276 Projects0091-03-027CONTRACT CSJ: MAY 2018
0095-13-040DALLAS DALLAS
LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS
IH 20 MAY 2018
AT SEAGOVILLE ROADLIMITS FROM: AT S BELTLINE ROADLIMITS TO:
$ 1,580,295
DESCRIPTION:
NH 2018(450)PROJ NUM:
2.355
YNHS:
ROW CSJ:
0009-03-046DALLAS DALLAS
LANDSCAPE TREATMENTS OF RIGHTS OF WAY
SH 66 MAY 2018
AT ANTIOCHLIMITS FROM: .LIMITS TO:
$ 133,136
DESCRIPTION:
NH 2018(886)PROJ NUM:
0.054
YNHS:
ROW CSJ:
0009-04-069DALLAS ROCKWALL
LANDSCAPE TREATMENTS OF RIGHTS OF WAY
SH 66 MAY 2018
HERITAGE PARKWAYLIMITS FROM: EASTERN CITY LIMITSLIMITS TO:
$ 170,064
DESCRIPTION:
NH 2018(886)PROJ NUM:
0.179
YNHS:
ROW CSJ:
0197-08-008DALLAS KAUFMAN
LANDSCAPE TREATMENTS OF RIGHTS OF WAY
SH 243 MAY 2018
WEST OF JACKSON STLIMITS FROM: WASHINGTON STLIMITS TO:
$ 201,561
DESCRIPTION:
NH 2018(886)PROJ NUM:
0.103
YNHS:
ROW CSJ:
0430-01-062DALLAS DALLAS
LANDSCAPE ENHANCEMENT OF RIGHTS OF WAY
SH 352 MAY 2018
SAM HOUSTONLIMITS FROM: SH 352LIMITS TO:
$ 787,583
DESCRIPTION:
NH 2018(886)PROJ NUM:
3.630
YNHS:
ROW CSJ:
2374-02-155DALLAS DALLAS
REMOVE MULCH AND REPLACE WITH COBBLE ROCK AND LARGE GRANITESTONE
IH 635 MAY 2018
ELAM ROADLIMITS FROM: LAKE JUNE ROADLIMITS TO:
$ 542,131
DESCRIPTION:
NH 2018(450)PROJ NUM:
1.585
YNHS:
ROW CSJ: $ 3,414,7706 Projects0095-13-040CONTRACT CSJ: MAY 2018
0918-47-176DALLAS DALLAS
DRAINAGE IMPROVEMENTS
CS MAY 2018
ON BELTLINE RD, FROM DRY BRANCHLIMITS FROM: BEAR CREEKLIMITS TO:
$ 3,519,866
DESCRIPTION:
STP 2018(887)PROJ NUM:
0.473
NNHS:
ROW CSJ: $ 3,519,8661 Project0918-47-176CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0997-03-007DALLAS NAVARRO
REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS
FM 667 MAY 2018
SH 31LIMITS FROM: FM 744LIMITS TO:
$ 6,713,713
DESCRIPTION:
STP 2018(888)PROJ NUM:
4.850
NNHS:
ROW CSJ:
0747-02-018DALLAS NAVARRO
REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS
FM 667 MAY 2018
SH 22LIMITS FROM: ELLIS COUNTY LINELIMITS TO:
$ 3,964,546
DESCRIPTION:
STP 2018(888)PROJ NUM:
2.476
NNHS:
ROW CSJ:
0747-02-019DALLAS NAVARRO
REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS, MILL, FULLDEPTH CONCRETE REPAIR AND OVERLAY
FM 667 MAY 2018
FM 744LIMITS FROM: SH 22LIMITS TO:
$ 9,313,885
DESCRIPTION:
STP 2018(888)PROJ NUM:
7.306
NNHS:
ROW CSJ: $ 19,992,1443 Projects0997-03-007CONTRACT CSJ: MAY 2018
1015-01-023DALLAS ROCKWALL
WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN DIVIDED
FM 3549 MAY 2018
IH 30LIMITS FROM: NORTH OF SH 66LIMITS TO:
$ 9,387,999
DESCRIPTION:
STP 2018(889)PROJ NUM:
1.300
NNHS:P1
1015-01-077ROW CSJ: $ 9,387,9991 Project1015-01-023CONTRACT CSJ: MAY 2018
1051-01-037DALLAS ELLIS
WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDINGINTERSECTION IMPROVEMENTS
FM 664 MAY 2018
WESTMORELAND RDLIMITS FROM: IH 35E IN CITY OF RED OAKLIMITS TO:
$ 31,521,150
DESCRIPTION:
STP 1802(011)MMPROJ NUM:
3.352
NNHS:
1051-01-043ROW CSJ: $ 31,521,1501 Project1051-01-037CONTRACT CSJ: MAY 2018
1394-02-026DALLAS ELLIS
SAFETY TREAT FIXED OBJECTS,CONSTRUCT PAVED SHOULDERS (1-4FT)
FM 1387 MAY 2018
1.542 MI NE OF BU 287QLIMITS FROM: 2.51 MI NE OF BU 287QLIMITS TO:
$ 1,096,264
DESCRIPTION:
STP 2018(890)HESPROJ NUM:
0.968
NNHS:
ROW CSJ: $ 1,096,2641 Project1394-02-026CONTRACT CSJ: MAY 2018
2374-02-143DALLAS DALLAS
CONSTRUCT SIDEWALKS ON APPROACHES & IMPLEMENT PEDESTRIANSAFETY IMPROVEMENTS ON QUAIL DRIVE/IH 635 BRIDGE
IH 635 MAY 2018
AT QUAIL DRIVELIMITS FROM: .LIMITS TO:
$ 345,609
DESCRIPTION:
CM 2018(891)PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 345,6091 Project2374-02-143CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 70,652,42920 Projects 8 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0081-03-061DALLAS DENTON
INSTALLATION OF TRAFFIC SIGNALS
US 377 JUN 2018
AT MARSHALL CREEKLIMITS FROM: IN THE CITY OF ROANOKELIMITS TO:
$ 215,967
DESCRIPTION:
NH 1802(179)PROJ NUM:
0.005
YNHS:
ROW CSJ:
0092-08-018DALLAS ELLIS
INSTALLATION OF TRAFFIC SIGNALS
BI 45-G JUN 2018
MARTIN LUTHER KING DRLIMITS FROM: FM 1181 (CREECHVILLE RD)LIMITS TO:
$ 197,614
DESCRIPTION:
STP 1802(180)PROJ NUM:
1.277
NNHS:
ROW CSJ:
0172-11-013DALLAS ELLIS
INSTALLATION OF TRAFFIC SIGNALS
BU 287R JUN 2018
GRAND AVELIMITS FROM: COLLEGE STLIMITS TO:
$ 203,355
DESCRIPTION:
STP 1802(180)PROJ NUM:
1.217
NNHS:
ROW CSJ:
0172-12-006DALLAS ELLIS
INSTALLATION OF TRAFFIC SIGNALS
BU 287S JUN 2018
YORKSTOWN DRLIMITS FROM: S.E. MAIN STLIMITS TO:
$ 143,655
DESCRIPTION:
NH 1802(179)PROJ NUM:
1.600
YNHS:
ROW CSJ:
0451-04-023DALLAS ROCKWALL
INSTALLATION OF TRAFFIC SIGNALS
SH 205 JUN 2018
AT FM 552LIMITS FROM: IN THE CITY OF ROCKWALLLIMITS TO:
$ 201,836
DESCRIPTION:
STP 1802(180)PROJ NUM:
0.004
NNHS:
ROW CSJ:
1392-01-043DALLAS COLLIN
INSTALLATION OF TRAFFIC SIGNALS
FM 1378 JUN 2018
FM 2170/COUNTRY CLUB RDLIMITS FROM: LUCAS RD/COUNTRY CLUB RDLIMITS TO:
$ 309,801
DESCRIPTION:
STP 1802(180)PROJ NUM:
1.111
NNHS:
ROW CSJ: $ 1,272,2286 Projects0081-03-061CONTRACT CSJ: JUN 2018
0092-03-050DALLAS ELLIS
SLOPE FAILURE REPAIR
IH 45 JUN 2018
AT SOUTH OF MATT RDLIMITS FROM: .LIMITS TO:
$ 991,162
DESCRIPTION:
NH 1802(181)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0091-04-060DALLAS COLLIN
SLOPE FAILURE REPAIR
SH 289 JUN 2018
CR 83LIMITS FROM: CARTER RANCH RDLIMITS TO:
$ 454,104
DESCRIPTION:
NH 1802(181)PROJ NUM:
0.509
YNHS:
ROW CSJ:
0172-04-044DALLAS ELLIS
SLOPE FAILURE REPAIRS
US 287 JUN 2018
AT ST. PAUL ROADLIMITS FROM: .LIMITS TO:
$ 1,166,275
DESCRIPTION:
NH 1802(181)PROJ NUM:
0.259
YNHS:
ROW CSJ: $ 2,611,5413 Projects0092-03-050CONTRACT CSJ: JUN 2018
0092-13-023DALLAS NAVARRO
MINOR DRAINAGE PAVEMENT OVERLAY
BI 45-F JUN 2018
SOUTH OF PHIFE RD IN CORSICANALIMITS FROM: IH 45NLIMITS TO:
$ 2,409,906
DESCRIPTION:
NH 1802(182)PROJ NUM:
1.300
YNHS:
ROW CSJ:
0995-01-022DALLAS NAVARRO
RECONSTRUCT EXISTING ROADWAY AND ADD SHOULDERS
FM 637 JUN 2018
US 287 SOUTH OF CORSICANALIMITS FROM: FM 2859LIMITS TO:
$ 8,026,875
DESCRIPTION:
STP 1802(183)PROJ NUM:
5.688
NNHS:
ROW CSJ: $ 10,436,7812 Projects0092-13-023CONTRACT CSJ: JUN 2018
0092-14-093DALLAS DALLAS
BRIDGE DECK REPAIR AND ABUTMENT & BENT WORK
IH 345 JUN 2018
AT ROSS AVELIMITS FROM: .LIMITS TO:
$ 950,740
DESCRIPTION:
C 92-14-93PROJ NUM:
0.300
YNHS:
ROW CSJ: $ 950,7401 Project0092-14-093CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0095-03-093DALLAS KAUFMAN
MILL AND OVERLAY EXISTING ROADWAY
US 80 JUN 2018
DALLAS COUNTY LINELIMITS FROM: FM 548LIMITS TO:
$ 3,931,667
DESCRIPTION:
C 95-3-93PROJ NUM:
5.330
YNHS:
ROW CSJ:
0095-03-094DALLAS KAUFMAN
RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS ON FRONTAGEROAD
US 80 JUN 2018
DALLAS C/LLIMITS FROM: FM740LIMITS TO:
$ 1,388,543
DESCRIPTION:
C 95-3-94PROJ NUM:
3.451
YNHS:
ROW CSJ:
0095-04-070DALLAS KAUFMAN
MILL AND OVERLAY EXISTING ROAD AND CONNECTORS
US 80 JUN 2018
FM 548LIMITS FROM: SP 557LIMITS TO:
$ 3,895,108
DESCRIPTION:
C 95-4-70PROJ NUM:
5.242
YNHS:
ROW CSJ: $ 9,215,3183 Projects0095-03-093CONTRACT CSJ: JUN 2018
0197-02-121DALLAS DALLAS
SLOPE FAILURE REPAIRS
US 175 JUN 2018
SEAGOVILLE RDLIMITS FROM: MALLOY BRIDGE RDLIMITS TO:
$ 3,736,968
DESCRIPTION:
NH 1802(184)PROJ NUM:
1.776
YNHS:
ROW CSJ: $ 3,736,9681 Project0197-02-121CONTRACT CSJ: JUN 2018
0197-02-125DALLAS DALLAS
MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENTMARKINGS ON MAINLANES
US 175 JUN 2018
IH 20LIMITS FROM: KAUFMAN COUNTY LINELIMITS TO:
$ 10,003,478
DESCRIPTION:
C 197-2-125PROJ NUM:
7.166
YNHS:
ROW CSJ: $ 10,003,4781 Project0197-02-125CONTRACT CSJ: JUN 2018
0918-18-135DALLAS NAVARRO
REPLACE TURNDOWNS AND GUARDRAILS
VA JUN 2018
AT VARIOUS LOCATIONSLIMITS FROM: .LIMITS TO:
$ 4,829,630
DESCRIPTION:
C 918-18-135PROJ NUM:
12.986
NNHS:
ROW CSJ: $ 4,829,6301 Project0918-18-135CONTRACT CSJ: JUN 2018
0918-22-157DALLAS ELLIS
REPLACE TURNDOWNS AND GUARDRAILS
VA JUN 2018
AT VARIOUS LOCATIONSLIMITS FROM: .LIMITS TO:
$ 5,010,440
DESCRIPTION:
C 918-22-157PROJ NUM:
8.379
NNHS:
ROW CSJ: $ 5,010,4401 Project0918-22-157CONTRACT CSJ: JUN 2018
1317-01-015DALLAS ELLIS
RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
FM 1183 JUN 2018
SH 34 IN ENNISLIMITS FROM: IH 45LIMITS TO:
$ 10,922,782
DESCRIPTION:
STP 1802(185)PROJ NUM:
7.442
NNHS:
ROW CSJ: $ 10,922,7821 Project1317-01-015CONTRACT CSJ: JUN 2018
2679-02-008DALLAS COLLIN
RECONSTRUCT 2 LANE RURAL TO 4 LANE (ULTIMATE 6 LANE) URBANDIVIDED
FM 2514 JUN 2018
FM 2551LIMITS FROM: WEST OF FM 1378LIMITS TO:
$ 16,312,439
DESCRIPTION:
STP 1802(470)PROJ NUM:
2.377
NNHS:RTR
2679-02-009ROW CSJ:
2679-02-009DALLAS COLLIN
RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
FM 2514 JUN 2018
FM 2551LIMITS FROM: WEST OF FM 1378LIMITS TO:
$ 2,539,566
DESCRIPTION:
STP 2015(430)PROJ NUM:
2.522
NNHS:
ROW CSJ: $ 18,852,0052 Projects2679-02-008CONTRACT CSJ: JUN 2018
2964-01-048DALLAS DALLAS
WIDEN AND RECONSTRUCT 4 (6 LANES DURING PEAK TRAVEL) TO 8GENERAL PURPOSE LANES
SH 161 JUN 2018
SOUTH OF SH 183LIMITS FROM: NORTH OF BELT LINE RDLIMITS TO:
$ 22,069,943
DESCRIPTION:
NH 1802(186)PROJ NUM:
3.233
YNHS:
ROW CSJ: $ 22,069,9431 Project2964-01-048CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
JUN 2018 TOTAL: $ 99,911,85423 Projects 12 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0009-03-047DALLAS DALLAS
TRAFFIC SIGNAL IMPROVEMENT
SH 66 JUL 2018
DEXHAM RD TO DALROCK RDLIMITS FROM: IN THE CITY OF ROWLETTLIMITS TO:
$ 603,189
DESCRIPTION:
STP 1802(305)HESPROJ NUM:
4.056
YNHS:
ROW CSJ:
0009-04-070DALLAS ROCKWALL
TRAFFIC SIGNAL IMPROVEMENT
SH 66 JUL 2018
DALROCK RD TO SCENIC DRLIMITS FROM: IN THE CITY OF ROWLETTLIMITS TO:
$ 138,110
DESCRIPTION:
STP 1802(305)HESPROJ NUM:
0.544
YNHS:
ROW CSJ: $ 741,2992 Projects0009-03-047CONTRACT CSJ: JUL 2018
0081-04-025DALLAS DENTON
WIDEN 2 LANE TO 6 LANE DIVIDED URBAN SECTION
US 377 JUL 2018
IH 35ELIMITS FROM: SOUTH OF FM 1830LIMITS TO:
$ 18,730,806
DESCRIPTION:
C 81-4-25PROJ NUM:
1.575
YNHS:P1
0081-04-036ROW CSJ:
0081-04-035DALLAS DENTON
REPLACE RAILROAD OVERPASS
US 377 JUL 2018
AT UNION PACIFIC RR OVERPASSLIMITS FROM: (0.4 MI S OF IH 35E)LIMITS TO:
$ 10,250,830
DESCRIPTION:
NH 1802(372)PROJ NUM:
0.001
YNHS:P1
ROW CSJ:
0081-04-036DALLAS DENTON
ROW ACQUISITION, RELOCATION & UTILITIES
US 377 JUL 2018
IH 35ELIMITS FROM: SOUTH OF FM 1830LIMITS TO:
$ 3,276,985
DESCRIPTION:
ROW 81-4-36PROJ NUM:
1.575
YNHS:RTR
ROW CSJ: $ 32,258,6213 Projects0081-04-025CONTRACT CSJ: JUL 2018
0092-13-028DALLAS NAVARRO
FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS
BI 45-F JUL 2018
EAST 5TH AVELIMITS FROM: EAST 12TH AVELIMITS TO:
$ 727,941
DESCRIPTION:
NH 1802(373)PROJ NUM:
0.514
YNHS:
ROW CSJ:
0162-09-039DALLAS NAVARRO
FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENTMARKINGS
FM 709 JUL 2018
SH 31LIMITS FROM: NORTH SPIKES RDLIMITS TO:
$ 1,854,291
DESCRIPTION:
STP 1802(374)PROJ NUM:
1.445
NNHS:
ROW CSJ: $ 2,582,2322 Projects0092-13-028CONTRACT CSJ: JUL 2018
0751-02-025DALLAS KAUFMAN
REPLACE BRIDGE AND APPROACHES
FM 148 JUL 2018
AT BUFFALO CREEKLIMITS FROM: .LIMITS TO:
$ 3,264,572
DESCRIPTION:
BR 1802(375)PROJ NUM:
0.230
NNHS:
0751-02-028ROW CSJ: $ 3,264,5721 Project0751-02-025CONTRACT CSJ: JUL 2018
1091-03-012DALLAS ROCKWALL
RESTORE EXISTING PAVEMENT AND ADD SHOULDERS
FM 1140 JUL 2018
FM 740 SOUTHLIMITS FROM: FM 740 NORTHLIMITS TO:
$ 4,038,370
DESCRIPTION:
STP 1802(376)PROJ NUM:
2.418
NNHS:
ROW CSJ: $ 4,038,3701 Project1091-03-012CONTRACT CSJ: JUL 2018
1746-01-027DALLAS COLLIN
PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND PROFILE EDGELINEAND CENTERLINE MARKINGS
FM 1827 JUL 2018
US 380LIMITS FROM: FM 75LIMITS TO:
$ 4,653,545
DESCRIPTION:
STP 1802(377)HESGPROJ NUM:
5.551
NNHS:
ROW CSJ:
1746-01-026DALLAS COLLIN
BASE REPAIR, MILL AND OVERLAY
FM 1827 JUL 2018
WEST OF FM 75LIMITS FROM: FM 75LIMITS TO:
$ 318,069
DESCRIPTION:
STP 1802(378)PROJ NUM:
0.661
NNHS:
ROW CSJ: $ 4,971,6142 Projects1746-01-027CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
2374-02-147DALLAS DALLAS
REPLACE BRIDGE DECK
IH 635 JUL 2018
AT SEAGOVILLE RD NBLIMITS FROM: .LIMITS TO:
$ 2,129,643
DESCRIPTION:
BR 1802(379)PROJ NUM:
0.041
YNHS:
2374-02-154ROW CSJ:
2374-02-148DALLAS DALLAS
REPLACE BRIDGE DECK
IH 635 JUL 2018
AT SEAGOVILLE RD SBLIMITS FROM: .LIMITS TO:
$ 2,160,543
DESCRIPTION:
BR 1802(379)PROJ NUM:
0.041
YNHS:
ROW CSJ:
2374-03-086DALLAS DALLAS
BRIDGE DECK REPAIR
IH 20 JUL 2018
AT HOUSTON SCHOOL RD EBLIMITS FROM: .LIMITS TO:
$ 1,811,778
DESCRIPTION:
BR 1802(379)PROJ NUM:
0.041
YNHS:
ROW CSJ:
2374-03-088DALLAS DALLAS
BRIDGE DECK REPAIR
IH 20 JUL 2018
AT HOUSTON SCHOOL RD WBLIMITS FROM: .LIMITS TO:
$ 1,806,778
DESCRIPTION:
BR 1802(379)PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 7,908,7424 Projects2374-02-147CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 55,765,45015 Projects 7 Contracts
0081-05-044DALLAS DENTON
PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINERUMBLE STRIPS, MILLED CENTERLINE RUMBLE STRIPS
FM 3524 AUG 2018
FM 428LIMITS FROM: US 377LIMITS TO:
$ 765,847
DESCRIPTION:
SSW 81-5-44PROJ NUM:
1.814
NNHS:
ROW CSJ: $ 765,8471 Project0081-05-044CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 765,8471 Project 1 Contract
DALLAS $ 227,095,58059 Projects 28 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DESIGN DIVISION DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
EL PASO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$1.77 $0.00 $0.00 $0.00 $0.00NOVEMBER $1.77$0.00 $0.00$0.00$0.00
$15.37 $0.00 $0.00 $0.00 $0.00DECEMBER $15.37$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.84 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.84$0.00 $0.00$0.00$0.00
$4.50 $0.00 $0.00 $0.00 $0.00MARCH $4.50$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.23 $0.00 $0.00 $0.00 $0.00MAY $0.23$0.00 $0.00$0.00$0.00
$2.09 $0.00 $0.00 $0.00 $0.00JUNE $2.09$0.00 $0.00$0.00$0.00
$15.29 $0.00 $0.00 $0.00 $0.00JULY $15.29$0.00 $0.00$0.00$0.00
$61.60 $0.00 $0.00 $0.00 $0.00AUGUST $61.60$0.00 $0.00$0.00$0.00
$101.69 $0.00 $0.00 $0.00 $0.00 $101.69District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
EL PASO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0415-01-025EL PASO JEFF DAVIS
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 118 MAY 2018
15.219 MI N OF SH 17LIMITS FROM: SH 17LIMITS TO:
$ 233,352
DESCRIPTION:
STP 2018(878)HESPROJ NUM:
15.219
NNHS:
ROW CSJ: $ 233,3521 Project0415-01-025CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 233,3521 Project 1 Contract
0924-00-099EL PASO EL PASO
FY 2018 BRIDGE MAINTENANCE
VA JUN 2018
DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 2,089,082
DESCRIPTION:
STP 2018(932)PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 2,089,0821 Project0924-00-099CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 2,089,0821 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
EL PASO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0167-02-051EL PASO EL PASO
OVERLAY
BU 54-A JUL 2018
MESQUITE HILLS DRLIMITS FROM: NEW MEXICO STATE LINELIMITS TO:
$ 1,500,000
DESCRIPTION:
C 167-2-51PROJ NUM:
4.130
YNHS:
ROW CSJ:
1046-01-034EL PASO EL PASO
MILL AND INLAY
FM 659 JUL 2018
IH 10LIMITS FROM: FM 76 (NORTH LOOP RD)LIMITS TO:
$ 800,000
DESCRIPTION:
C 1046-1-34PROJ NUM:
1.306
YNHS:
ROW CSJ: $ 2,300,0002 Projects0167-02-051CONTRACT CSJ: JUL 2018
0924-06-578EL PASO EL PASO
FY 2018 GREEN RIBBON PROJECT (LANDSCAPING IN THE TOWN OF ANTHONY, TX)
VA JUL 2018
ANTHONY, TX AREALIMITS FROM: .LIMITS TO:
$ 504,000
DESCRIPTION:
NH 2018(477)PROJ NUM:
1.500
YNHS:
ROW CSJ: $ 504,0001 Project0924-06-578CONTRACT CSJ: JUL 2018
1281-02-007EL PASO EL PASO
CONSTRUCT AND UPGRADE TO 4 LANE DIVIDED ARTERIAL
FM 1110 JUL 2018
FM 76 (NORTH LOOP)LIMITS FROM: I-10LIMITS TO:
$ 5,500,000
DESCRIPTION:
STP 1802(352)PROJ NUM:
1.099
NNHS:
1281-02-008ROW CSJ: $ 5,500,0001 Project1281-02-007CONTRACT CSJ: JUL 2018
2121-02-159EL PASO EL PASO
REPLACE BRIDGE AND APPROACH RAILING
IH 10 JUL 2018
SL 478 (N COPIA ST)LIMITS FROM: US 62 (PAISANO DR)LIMITS TO:
$ 195,000
DESCRIPTION:
BR 1802(327)PROJ NUM:
1.704
YNHS:
ROW CSJ:
2121-04-105EL PASO EL PASO
REPLACE BRIDGE AND APPROACH RAILING
IH 10 JUL 2018
3.6 MI E OF FM 1281LIMITS FROM: 0.2 MI E OF FM 793LIMITS TO:
$ 147,000
DESCRIPTION:
BR 1802(327)PROJ NUM:
8.003
YNHS:
ROW CSJ:
2121-04-106EL PASO EL PASO
REPLACE BRIDGE AND APPROACH RAILING
IH 10 JUL 2018
1.8 MI W OF FM 1281LIMITS FROM: 3.6 MI E OF FM 1281LIMITS TO:
$ 111,000
DESCRIPTION:
BR 1802(327)PROJ NUM:
5.424
YNHS:
ROW CSJ:
2121-04-108EL PASO EL PASO
REPLACE BRIDGE AND APPROACH RAILING
IH 10 JUL 2018
0.70 MI S OF SL 375 ON IH 10LIMITS FROM: 2.75 M S OF SL 375 ON IH 10LIMITS TO:
$ 204,772
DESCRIPTION:
BR 1802(327)PROJ NUM:
2.052
YNHS:
ROW CSJ: $ 657,7724 Projects2121-02-159CONTRACT CSJ: JUL 2018
2121-04-086EL PASO EL PASO
FRONTAGE ROAD MILL AND OVERLAY
IH 10 JUL 2018
HORIZON (FM 1281)LIMITS FROM: CLINT (FM 1110)LIMITS TO:
$ 3,579,000
DESCRIPTION:
C 2121-4-86PROJ NUM:
4.772
YNHS:
ROW CSJ: $ 3,579,0001 Project2121-04-086CONTRACT CSJ: JUL 2018
3572-01-006EL PASO EL PASO
MILL AND OVERLAY
SS 6 JUL 2018
SH 20 (MAIN ST)LIMITS FROM: FM 1905 (ANTONIO ST)LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 3572-1-6PROJ NUM:
1.506
NNHS:
ROW CSJ:
2551-01-010EL PASO EL PASO
MILL AND OVERLAY
FM 1905 JUL 2018
SH 20 (DONIPHAN)LIMITS FROM: SS 6 (WILDCAT) INTERSECTIONLIMITS TO:
$ 1,750,000
DESCRIPTION:
C 2551-1-10PROJ NUM:
1.418
NNHS:
ROW CSJ: $ 2,750,0002 Projects3572-01-006CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 15,290,77211 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
EL PASO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0002-01-095EL PASO EL PASO
EXTEND BOX CULVERT, PEDESTRIAN IMPROVEMENTS AND DRIVEWAYS
SH 20 AUG 2018
0.142 MI S OF FM 76LIMITS FROM: 0.242 MI S OF FM 76LIMITS TO:
$ 480,000
DESCRIPTION:
STP ( )PROJ NUM:
0.100
NNHS:
0002-01-097ROW CSJ: $ 480,0001 Project0002-01-095CONTRACT CSJ: AUG 2018
0002-07-049EL PASO HUDSPETH
REPLACE BRIDGES AND APPROACHES
IH 10 AUG 2018
1.17 MI W OF RM 1111LIMITS FROM: 0.01 MI E OF RM 1111LIMITS TO:
$ 3,100,000
DESCRIPTION:
BR ( )PROJ NUM:
0.829
YNHS:
ROW CSJ:
0002-08-054EL PASO HUDSPETH
BRIDGE APPROACH AND ROADWAY WORK
IH 10 AUG 2018
0.01 MI E OF RM 1111LIMITS FROM: 0.89 MI E OF RM 1111LIMITS TO:
$ 1,000,000
DESCRIPTION:
BR ( )PROJ NUM:
1.189
YNHS:
ROW CSJ:
1282-03-009EL PASO HUDSPETH
GRADING, BASE, PAVEMENT, DRAINAGE, SIGNING AND PAVEMENT MARKINGS
RM 1111 AUG 2018
0.03 MI S OF IH 10LIMITS FROM: 0.03 MI N OF IH 10LIMITS TO:
$ 400,000
DESCRIPTION:
C 1282-3-9PROJ NUM:
0.067
NNHS:
ROW CSJ: $ 4,500,0003 Projects0002-07-049CONTRACT CSJ: AUG 2018
0374-08-021EL PASO CULBERSON
INSTALLATION OF SHEET PILING AND GABION MATTRESSES
US 62 AUG 2018
4.79 MI SW OF SH54LIMITS FROM: 3.59 MI SW OF SH54LIMITS TO:
$ 1,800,000
DESCRIPTION:
C 374-8-21PROJ NUM:
1.200
YNHS:
0374-08-024ROW CSJ: $ 1,800,0001 Project0374-08-021CONTRACT CSJ: AUG 2018
1046-01-030EL PASO EL PASO
OPERATIONAL IMPROVEMENTS AT ZARAGOZA RD/MONTWOOD DR/LP 375INTERSECTION
FM 659 AUG 2018
0.227 MI N OF SAUL KLEINFELDLIMITS FROM: 0.144 E OF LOOP 375LIMITS TO:
$ 15,000,000
DESCRIPTION:
NH ( )PROJ NUM:
0.540
YNHS:
1046-01-033ROW CSJ: $ 15,000,0001 Project1046-01-030CONTRACT CSJ: AUG 2018
2121-03-160EL PASO EL PASO
RAMP AND INTERSECTION IMPROVEMENTS AT AIRWAYS, HAWKINS AND VISCOUNT (PHASE 2)
IH 10 AUG 2018
AIRWAY BLVDLIMITS FROM: VISCOUNT BLVDLIMITS TO:
$ 8,662,291
DESCRIPTION:
STP ( )MMPROJ NUM:
1.941
YNHS:
2121-03-161ROW CSJ: $ 8,662,2911 Project2121-03-160CONTRACT CSJ: AUG 2018
2552-03-058EL PASO EL PASO
LP 375 (AMERICAS) RAMPS RECONFIGURATION AND FRONTAGE ROADEXTENSION W/GRADE SEPARATION AT RAILROAD CROSSING
SL 375 AUG 2018
FM 76 NORTH LOOPLIMITS FROM: ZARAGOZA POELIMITS TO:
$ 31,157,851
DESCRIPTION:
NH ( )PROJ NUM:
2.523
YNHS:
2552-03-062ROW CSJ: $ 31,157,8511 Project2552-03-058CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 61,600,1428 Projects 6 Contracts
EL PASO $ 79,213,34821 Projects 14 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
FORT WORTH DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$2.49 $0.00 $0.00 $0.00 $2.75OCTOBER $5.24$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$182.08 $0.00 $0.00 $0.00 $0.00DECEMBER $182.08$0.00 $0.00$0.00$0.00
$9.06 $0.00 $0.00 $0.00 $0.00JANUARY $9.06$0.00 $0.00$0.00$0.00
$56.34 $0.00 $0.00 $0.00 $0.00FEBRUARY $58.96$0.00 $0.00$0.00$2.62
$12.43 $0.00 $0.00 $0.00 $0.00MARCH $12.43$0.00 $0.00$0.00$0.00
$10.13 $0.00 $0.00 $0.00 $0.00APRIL $10.13$0.00 $0.00$0.00$0.00
$36.74 $0.00 $0.00 $0.00 $0.11MAY $36.85$0.00 $0.00$0.00$0.00
$14.18 $0.00 $0.00 $0.00 $0.00JUNE $14.18$0.00 $0.00$0.00$0.00
$3.55 $0.00 $0.00 $0.00 $0.00JULY $3.55$0.00 $0.00$0.00$0.00
$158.06 $0.00 $0.00 $0.00 $11.00AUGUST $169.06$0.00 $0.00$0.00$0.00
$485.05 $0.00 $0.00 $0.00 $13.87 $501.54District Total: $0.00 $0.00$0.00$2.62
*The estimated costs shown are total estimated construction costs. Please see the Statewide Summary page for the financial impact to the State Highway Fund in FY 2009.
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0008-05-027FORT WORTH TARRANT
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
SH 180 MAY 2018
WEST OF RIVERSIDE DRIVELIMITS FROM: TIERNEY ROADLIMITS TO:
$ 5,393,469
DESCRIPTION:
C 8-5-27PROJ NUM:
3.535
YNHS:
ROW CSJ:
0008-06-051FORT WORTH TARRANT
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
SH 180 MAY 2018
TIERNEY RDLIMITS FROM: LOUISE STLIMITS TO:
$ 1,966,099
DESCRIPTION:
C 8-6-51PROJ NUM:
1.368
YNHS:
ROW CSJ: $ 7,359,5682 Projects0008-05-027CONTRACT CSJ: MAY 2018
0008-09-036FORT WORTH PARKER
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
FM 5 MAY 2018
6 MILES WEST OF FM 1187LIMITS FROM: NORTH OF FM 1187LIMITS TO:
$ 3,485,424
DESCRIPTION:
C 8-9-36PROJ NUM:
6.165
NNHS:
ROW CSJ:
1469-01-019FORT WORTH PARKER
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
FM 5 MAY 2018
IH 20LIMITS FROM: 4.8 MILES SOUTH OF IH 20LIMITS TO:
$ 2,167,167
DESCRIPTION:
C 1469-1-19PROJ NUM:
4.859
NNHS:
ROW CSJ: $ 5,652,5912 Projects0008-09-036CONTRACT CSJ: MAY 2018
0014-03-095FORT WORTH JOHNSON
REPAIR CONCRETE FAILURES, MILL, HMAC OVERLAY, PAVEMENTMARKINGS
IH 35W MAY 2018
CR 604LIMITS FROM: TARRANT C/LLIMITS TO:
$ 10,982,248
DESCRIPTION:
NH 2018(892)PROJ NUM:
9.351
YNHS:
ROW CSJ: $ 10,982,2481 Project0014-03-095CONTRACT CSJ: MAY 2018
0014-03-096FORT WORTH JOHNSON
SAFETY LIGHTING
IH 35W MAY 2018
0.391 MI S OF FM 917LIMITS FROM: 1.672 MI N OF FM 917LIMITS TO:
$ 565,685
DESCRIPTION:
STP 2018(893)HESPROJ NUM:
2.063
YNHS:
ROW CSJ: $ 565,6851 Project0014-03-096CONTRACT CSJ: MAY 2018
0363-01-146FORT WORTH TARRANT
INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OFSH 26
SH 26 MAY 2018
EB IH 820 FRONTAGE ROADLIMITS FROM: BEDFORD EULESS ROADLIMITS TO:
$ 358,098
DESCRIPTION:
NH 2018(894)PROJ NUM:
0.207
YNHS:
ROW CSJ: $ 358,0981 Project0363-01-146CONTRACT CSJ: MAY 2018
0902-48-744FORT WORTH TARRANT
REPLACE AND RELOCATE BRIDGE AND APPROACH
CR MAY 2018
BURLESON-RETTA RD AT VILLAGE CREEKLIMITS FROM: .LIMITS TO:
$ 3,690,823
DESCRIPTION:
BR 2013(641)PROJ NUM:
0.495
NNHS:
ROW CSJ: $ 3,690,8231 Project0902-48-744CONTRACT CSJ: MAY 2018
1601-02-032FORT WORTH PARKER
INSTALLATION OF TRAFFIC ACTUATED SIGNAL
FM 1884 MAY 2018
AT W BB FIELDER DRLIMITS FROM: .LIMITS TO:
$ 113,740
DESCRIPTION:
CC 1601-2-32PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 113,7401 Project1601-02-032CONTRACT CSJ: MAY 2018
3207-01-011FORT WORTH JOHNSON
WIDEN PAVEMENT, EXTEND CULVERTS, PAVEMENT MARKING
FM 3136 MAY 2018
FM 4LIMITS FROM: CR 316LIMITS TO:
$ 5,913,804
DESCRIPTION:
STP 2018(895)PROJ NUM:
5.296
NNHS:
3207-01-013ROW CSJ: $ 5,913,8041 Project3207-01-011CONTRACT CSJ: MAY 2018
3372-01-016FORT WORTH JOHNSON
REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
FM 3391 MAY 2018
IH 35WLIMITS FROM: END OF FM 3391LIMITS TO:
$ 2,217,686
DESCRIPTION:
STP 2018(896)PROJ NUM:
3.860
NNHS:
ROW CSJ: $ 2,217,6861 Project3372-01-016CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
MAY 2018 TOTAL: $ 36,854,24311 Projects 9 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0014-16-276FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING/ADD SAFETY ENDTREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ HATTIE STREETLIMITS FROM: .LIMITS TO:
$ 470,202
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.034
YNHS:
ROW CSJ:
0014-16-270FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING/ SAFETY END TREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ MORNINGSIDE DRIVELIMITS FROM: .LIMITS TO:
$ 80,143
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.030
YNHS:
ROW CSJ:
0014-16-271FORT WORTH TARRANT
REPLACE BRIDGE & ADD SAFETY END TREATMENT OR REPLACEGUARDFENCE
IH 35W JUN 2018
@ FELIX STREETLIMITS FROM: .LIMITS TO:
$ 79,790
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.032
YNHS:
ROW CSJ:
0014-16-272FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING & ADD SAFETY ENDTREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ EAST RIPY STREETLIMITS FROM: .LIMITS TO:
$ 84,648
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.027
YNHS:
ROW CSJ:
0014-16-273FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING & ADD SAFETY ENDTREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ ALLEN AVE.LIMITS FROM: .LIMITS TO:
$ 95,566
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.031
YNHS:
ROW CSJ:
0014-16-274FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING & ADD SAFETY ENDTREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ BERRY STREETLIMITS FROM: .LIMITS TO:
$ 76,709
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.027
YNHS:
ROW CSJ:
0014-16-275FORT WORTH TARRANT
REPLACE BRIDGE & APPROACH RAILING & ADD SAFETY ENDTREATMENT/REPLACE GUARDFENCE
IH 35W JUN 2018
@ SEMINARY DRIVELIMITS FROM: .LIMITS TO:
$ 90,395
DESCRIPTION:
BR 1802(187)PROJ NUM:
0.033
YNHS:
ROW CSJ: $ 977,4537 Projects0014-16-276CONTRACT CSJ: JUN 2018
0352-01-061FORT WORTH WISE
MILL, HMAC OVERLAY, PAVEMENT MARKINGS
SH 114 JUN 2018
LOOP 373LIMITS FROM: WEST OF FM 51 (SOUTH)LIMITS TO:
$ 4,988,364
DESCRIPTION:
C 352-1-61PROJ NUM:
9.849
YNHS:
ROW CSJ: $ 4,988,3641 Project0352-01-061CONTRACT CSJ: JUN 2018
0902-90-045FORT WORTH TARRANT
CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OFSHARED USE PATH FOR PEDESTRIAN/BICYCLISTS
VA JUN 2018
FM 156 AND HURLEY STREETLIMITS FROM: FM 156 AND SCHOOLHOUSELIMITS TO:
$ 1,241,298
DESCRIPTION:
STP 1702(004)TAPSPROJ NUM:
1.420
NNHS:
ROW CSJ: $ 1,241,2981 Project0902-90-045CONTRACT CSJ: JUN 2018
1179-01-043FORT WORTH WISE
REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
FM 920 JUN 2018
SOUTH OF TRINITY RIVERLIMITS FROM: SOUTH OF BOONSVILLELIMITS TO:
$ 3,315,175
DESCRIPTION:
STP 1802(189)PROJ NUM:
10.966
NNHS:
ROW CSJ: $ 3,315,1751 Project1179-01-043CONTRACT CSJ: JUN 2018
1603-03-040FORT WORTH TARRANT
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
FM 1709 JUN 2018
STONE BRIDGE LNLIMITS FROM: US 377LIMITS TO:
$ 3,655,192
DESCRIPTION:
C 1603-3-40PROJ NUM:
3.861
NNHS:
ROW CSJ: $ 3,655,1921 Project1603-03-040CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:27 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
JUN 2018 TOTAL: $ 14,177,48211 Projects 5 Contracts
0081-02-069FORT WORTH TARRANT
LANDSCAPING IMPROVEMENTS
US 377 JUL 2018
NORTH TARRANT PARKWAYLIMITS FROM: WATAUGA ROADLIMITS TO:
$ 350,000
DESCRIPTION:
NH 1802(380)PROJ NUM:
2.388
YNHS:
ROW CSJ: $ 350,0001 Project0081-02-069CONTRACT CSJ: JUL 2018
0902-20-111FORT WORTH WISE
REPLACE BRIDGE AND APPROACHES
CR JUL 2018
CR 2327 AT TRIBUTARY TO BLACK CREEKLIMITS FROM: .LIMITS TO:
$ 549,935
DESCRIPTION:
BR 1502(023)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 549,9351 Project0902-20-111CONTRACT CSJ: JUL 2018
1068-01-219FORT WORTH TARRANT
LANDSCAPE ENHANCEMENT
IH 30 JUL 2018
WEST OF MONTGOMERY STLIMITS FROM: EAST OF MONTGOMERY STLIMITS TO:
$ 400,000
DESCRIPTION:
NH 1802(381)PROJ NUM:
0.492
YNHS:
ROW CSJ: $ 400,0001 Project1068-01-219CONTRACT CSJ: JUL 2018
2417-02-016FORT WORTH JOHNSON
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS,MBGF
FM 2331 JUL 2018
TARRANT C/LLIMITS FROM: SH 171LIMITS TO:
$ 2,246,920
DESCRIPTION:
STP 1802(382)PROJ NUM:
8.244
NNHS:
ROW CSJ: $ 2,246,9201 Project2417-02-016CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 3,546,8554 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0008-13-239FORT WORTH TARRANT
RECONSTRUCT DAMAGED RIPRAPS
IH 820 AUG 2018
AT SP 303LIMITS FROM: AT SUN VALLEYLIMITS TO:
$ 710,130
DESCRIPTION:
C 8-13-239PROJ NUM:
0.197
YNHS:
ROW CSJ: $ 710,1301 Project0008-13-239CONTRACT CSJ: AUG 2018
0080-07-097FORT WORTH TARRANT
INSTALLATION OF TRAFFIC SIGNAL
US 377 AUG 2018
COOK RANCH ROADLIMITS FROM: US 377 (BENBROOK BLVD)LIMITS TO:
$ 178,843
DESCRIPTION:
C 80-7-97PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 178,8431 Project0080-07-097CONTRACT CSJ: AUG 2018
0080-11-001FORT WORTH HOOD
CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATIONAT FWWR AND SH 171
US 377 AUG 2018
APPROX. 1.4 MI SOUTH OF SH 171LIMITS FROM: JOHNSON COUNTY LINELIMITS TO:
$ 54,774,421
DESCRIPTION:
NH ( )PROJ NUM:
1.700
YNHS:
0080-11-002ROW CSJ:
0080-12-001FORT WORTH JOHNSON
CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATIONAT FWWR AND SH 171
US 377 AUG 2018
HOOD COUNTY LINELIMITS FROM: APPROX. 1.1 MI NORTH OF SH 171LIMITS TO:
$ 21,506,795
DESCRIPTION:
NH ( )PROJ NUM:
1.806
NNHS:
0080-12-002ROW CSJ: $ 76,281,2162 Projects0080-11-001CONTRACT CSJ: AUG 2018
0134-12-005FORT WORTH WISE
REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
BU 380F AUG 2018
US 380LIMITS FROM: BU 81LIMITS TO:
$ 832,838
DESCRIPTION:
STP ( )PROJ NUM:
1.465
NNHS:
ROW CSJ: $ 832,8381 Project0134-12-005CONTRACT CSJ: AUG 2018
0172-09-036FORT WORTH TARRANT
INSTALLATION OF ITS FIBER & EQUIPMENT
US 287 AUG 2018
IH 20LIMITS FROM: JOHNSON COUNTY LINELIMITS TO:
$ 2,228,000
DESCRIPTION:
CM ( )PROJ NUM:
8.800
YNHS:
ROW CSJ:
0172-10-014FORT WORTH JOHNSON
INSTALLATION OF ITS FIBER & EQUIPMENT
US 287 AUG 2018
TARRANT/JOHNSON COUNTY LINELIMITS FROM: SH 360LIMITS TO:
$ 472,000
DESCRIPTION:
CM ( )PROJ NUM:
2.304
YNHS:
ROW CSJ: $ 2,700,0002 Projects0172-09-036CONTRACT CSJ: AUG 2018
0364-01-148FORT WORTH TARRANT
RECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION
SH 121 AUG 2018
GLADE RDLIMITS FROM: SH 183LIMITS TO:
$ 28,400,000
DESCRIPTION:
STP ( )MMPROJ NUM:
3.258
YNHS:
0364-01-152ROW CSJ:
0364-01-151FORT WORTH TARRANT
INSTALLATION OF ITS FIBER OPTIC CABLE AND EQUIPMENT
SH 121 AUG 2018
STONE MYERS PKWYLIMITS FROM: GLADE RDLIMITS TO:
$ 1,600,000
DESCRIPTION:
NH ( )PROJ NUM:
1.420
YNHS:
ROW CSJ: $ 30,000,0002 Projects0364-01-148CONTRACT CSJ: AUG 2018
0718-02-045FORT WORTH TARRANT
WIDEN 2 TO 4 LANE DIVIDED
FM 156 AUG 2018
US 81/287LIMITS FROM: WATAUGA ROAD (MCELROY)LIMITS TO:
$ 52,555,000
DESCRIPTION:
STP ( )MMPROJ NUM:
3.777
NNHS:
0718-02-050ROW CSJ: $ 52,555,0001 Project0718-02-045CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0902-00-205FORT WORTH TARRANT
CONSTRUCT CURB RAMS AT VARIOUS LOCATIONS ALONG BU 67-M INCLEBURNE, BU 377-H, FM 4, SH 144, & US 377 IN GRANBURY
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: IN JOHNSON AND HOOD COUNTIESLIMITS TO:
$ 2,418,561
DESCRIPTION:
STP ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,418,5611 Project0902-00-205CONTRACT CSJ: AUG 2018
0902-00-209FORT WORTH TARRANT
BRIDGE MAINTENANCE
VA AUG 2018
VARIOUS LOCATIONS WITHIN THELIMITS FROM: FORT WORTH DISTRICTLIMITS TO:
$ 1,000,000
DESCRIPTION:
NH ( )PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 1,000,0001 Project0902-00-209CONTRACT CSJ: AUG 2018
0902-00-213FORT WORTH TARRANT
CONCRETE PAVEMENT REPAIR, SPOT REPAIRS VARIOUS LOCATIONS
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: DISTRICTWIDE FY 18LIMITS TO:
$ 1,777,070
DESCRIPTION:
C 902-00-213PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,777,0701 Project0902-00-213CONTRACT CSJ: AUG 2018
0902-20-099FORT WORTH WISE
REPLACE BRIDGE AND APPROACHES
CR AUG 2018
CR 2224 AT CATLETT CREEKLIMITS FROM: .LIMITS TO:
$ 606,020
DESCRIPTION:
BR 2009(900)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 606,0201 Project0902-20-099CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 169,059,67814 Projects 11 Contracts
FORT WORTH $ 223,638,25840 Projects 29 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
HOUSTON DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.59 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.59$0.00 $0.00$0.00$0.00
$42.61 $0.00 $0.00 $0.00 $0.00OCTOBER $42.61$0.00 $0.00$0.00$0.00
$23.23 $0.00 $0.00 $0.00 $0.00NOVEMBER $23.23$0.00 $0.00$0.00$0.00
$30.98 $0.00 $0.00 $0.00 $20.00DECEMBER $58.88$0.00 $7.90$0.00$0.00
$47.12 $0.00 $0.00 $0.00 $0.75JANUARY $47.87$0.00 $0.00$0.00$0.00
$2.55 $0.00 $0.00 $0.00 $0.00FEBRUARY $4.96$0.00 $0.00$0.00$2.41
$25.53 $0.00 $0.00 $0.00 $0.00MARCH $25.53$0.00 $0.00$0.00$0.00
$48.49 $0.00 $0.00 $0.00 $0.00APRIL $48.49$0.00 $0.00$0.00$0.00
$218.55 $0.00 $0.00 $0.00 $0.00MAY $223.05$0.00 $0.00$0.00$4.50
$187.64 $0.00 $0.00 $0.00 $8.65JUNE $196.30$0.00 $0.00$0.00$0.00
$68.54 $0.00 $0.00 $0.00 $8.37JULY $76.91$0.00 $0.00$0.00$0.00
$155.95 $0.00 $0.00 $0.00 $0.00AUGUST $155.95$0.00 $0.00$0.00$0.00
$851.80 $0.00 $0.00 $0.00 $37.78 $904.38District Total: $0.00 $7.90$0.00$6.91
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0367-02-075HOUSTON GALVESTON
REHABILITATE AND RAISE ROADWAY
SH 87 MAY 2018
NORTH OF SH 124 ON HIGH ISLANDLIMITS FROM: SEAGULL LANELIMITS TO:
$ 16,539,199
DESCRIPTION:
NH 1802(203)PROJ NUM:
6.738
YNHS:P1
ROW CSJ:
0367-03-038HOUSTON GALVESTON
REHABILITATE AND RAISE ROADWAY
SH 87 MAY 2018
SEAGULL LANELIMITS FROM: ROLLOVER PASSLIMITS TO:
$ 1,732,145
DESCRIPTION:
NH 1802(203)PROJ NUM:
0.711
YNHS:
ROW CSJ: $ 18,271,3442 Projects0367-02-075CONTRACT CSJ: MAY 2018
0389-05-116HOUSTON HARRIS
WIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES
SH 146 MAY 2018
NASA 1LIMITS FROM: HARRIS/GALVESTON COUNTY LINELIMITS TO:
$ 75,532,581
DESCRIPTION:
NH 2018(852)PROJ NUM:
1.000
YNHS:
0389-05-095ROW CSJ:
0389-05-088HOUSTON HARRIS
WIDEN TO 8-LANES, GS AT MAJOR INTERSECTIONS AND 2 2-LANEFRONTAGE ROADS
SH 146 MAY 2018
RED BLUFFLIMITS FROM: NASA 1LIMITS TO:
$ 53,416,829
DESCRIPTION:
NH 2018(852)PROJ NUM:
1.983
YNHS:
0389-05-095ROW CSJ:
0389-06-095HOUSTON GALVESTON
WIDEN TO 6 LANES WITH 4-LANE EXPRESS LANES
SH 146 MAY 2018
HARRIS/GALVESTON COUNTY LINELIMITS FROM: FM 518LIMITS TO:
$ 65,499,541
DESCRIPTION:
NH 2018(852)PROJ NUM:
0.900
YNHS:
0389-06-096ROW CSJ: $ 194,448,9513 Projects0389-05-116CONTRACT CSJ: MAY 2018
0500-03-583HOUSTON HARRIS
RESTORATION OF FRONTAGE ROADS
IH 45 MAY 2018
0.6 MILES SOUTH OF CROSSTIMBERSLIMITS FROM: 0.16 MILES NORTH OF AIRLINE DRIVELIMITS TO:
$ 2,091,866
DESCRIPTION:
NH 2018(685)PROJ NUM:
1.134
YNHS:
ROW CSJ: $ 2,091,8661 Project0500-03-583CONTRACT CSJ: MAY 2018
0912-72-333HOUSTON HARRIS
REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271)
CS MAY 2018
KIRKMEADOW DR AT HCFCD DITCHLIMITS FROM: .LIMITS TO:
$ 469,352
DESCRIPTION:
BR 2016(408)PROJ NUM:
0.047
NNHS:
ROW CSJ:
0912-72-334HOUSTON HARRIS
REPLACE BRIDGE AND APPROACHES (NBI #12102B32978001)
CS MAY 2018
HUENI RD AT MILLS BRANCHLIMITS FROM: .LIMITS TO:
$ 478,865
DESCRIPTION:
BR 2016(409)PROJ NUM:
0.070
NNHS:
ROW CSJ: $ 948,2172 Projects0912-72-333CONTRACT CSJ: MAY 2018
1005-02-001HOUSTON HARRIS
REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDEDW/CURB AND GUTTER FOR APPROX. 950 FEET
FM 525 MAY 2018
LEE ROADLIMITS FROM: US 59LIMITS TO:
$ 1,905,026
DESCRIPTION:
STP 2018(854)MMPROJ NUM:
0.179
NNHS:
1005-02-002ROW CSJ: $ 1,905,0261 Project1005-02-001CONTRACT CSJ: MAY 2018
1257-01-049HOUSTON FORT BEND
CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS ANDCROSSWALKS WITH WHEELCHAIR RAMPS & CONNECT EXIST SIDEWALKS
FM 1092 MAY 2018
AT WEST AIRPORT BLVDLIMITS FROM: .LIMITS TO:
$ 2,554,181
DESCRIPTION:
STP 2017(782)MMPROJ NUM:
0.198
NNHS:
1257-01-050ROW CSJ: $ 2,554,1811 Project1257-01-049CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
3256-01-111HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SL 8 MAY 2018
WESTVIEW DRIVELIMITS FROM: 0.300 MILES EAST OF SH 249LIMITS TO:
$ 131,000
DESCRIPTION:
NH 2018(855)PROJ NUM:
12.572
YNHS:
ROW CSJ:
0110-06-141HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SS 261 MAY 2018
SOUTH VICTORY STEETLIMITS FROM: WEST RITTENHOUSE ROADLIMITS TO:
$ 82,550
DESCRIPTION:
NH 2018(855)PROJ NUM:
0.445
YNHS:
ROW CSJ:
0720-03-139HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SH 249 MAY 2018
HOLLISTER DRIVELIMITS FROM: 249B SOUTHLIMITS TO:
$ 81,200
DESCRIPTION:
NH 2018(855)PROJ NUM:
11.613
YNHS:
ROW CSJ:
0720-06-001HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SH 249 MAY 2018
B249 SOUTHLIMITS FROM: B249 NORTHLIMITS TO:
$ 58,100
DESCRIPTION:
NH 2018(855)PROJ NUM:
2.827
YNHS:
ROW CSJ:
1006-01-077HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
FM 529 MAY 2018
ENCHANTED CREEK DRIVELIMITS FROM: PADDOCK BEND DRIVELIMITS TO:
$ 26,050
DESCRIPTION:
NH 2018(855)PROJ NUM:
1.627
YNHS:
ROW CSJ:
3256-02-104HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SL 8 MAY 2018
0.300 MILES EAST OF SH 249LIMITS FROM: BAMMEL NORTH HOUSTON ROADLIMITS TO:
$ 94,850
DESCRIPTION:
NH 2018(855)PROJ NUM:
0.790
YNHS:
ROW CSJ: $ 473,7506 Projects3256-01-111CONTRACT CSJ: MAY 2018
3510-06-015HOUSTON HARRIS
CONSTRUCT SOUNDWALL
SH 99 MAY 2018
AT MOSSY OAKSLIMITS FROM: .LIMITS TO:
$ 2,359,259
DESCRIPTION:
STP 2018(857)PROJ NUM:
0.551
NNHS:
ROW CSJ: $ 2,359,2591 Project3510-06-015CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 223,052,59417 Projects 8 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0111-09-043HOUSTON BRAZORIA
LANDSCAPE DEVELOPMENT
BS 288B JUN 2018
CANNAN DRIVE/TIGNER STEETLIMITS FROM: EAST WILKINS STREETLIMITS TO:
$ 90,280
DESCRIPTION:
NH 2018(956)PROJ NUM:
0.633
YNHS:
ROW CSJ:
0111-13-002HOUSTON BRAZORIA
LANDSCAPE DEVELOPMENT
SL 274 JUN 2018
EAST WILKINS STREETLIMITS FROM: SH 35LIMITS TO:
$ 104,776
DESCRIPTION:
NH 2018(956)PROJ NUM:
0.627
YNHS:
ROW CSJ: $ 195,0562 Projects0111-09-043CONTRACT CSJ: JUN 2018
0192-01-093HOUSTON FORT BEND
WIDEN FROM 6 TO 8 LANES
SH 6 JUN 2018
N OF BROOKS STLIMITS FROM: LEXINGTON BLVDLIMITS TO:
$ 7,027,472
DESCRIPTION:
STP 2018(958)MMPROJ NUM:
1.485
YNHS:
0192-01-098ROW CSJ: $ 7,027,4721 Project0192-01-093CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0271-07-318HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 10 JUN 2018
SH 6LIMITS FROM: HOGAN STEETLIMITS TO:
$ 198,858
DESCRIPTION:
NH 2018(960)PROJ NUM:
17.627
YNHS:
ROW CSJ:
0027-13-230HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 69 JUN 2018
CLAY STREETLIMITS FROM: HARRIS/FORT BEND C/LLIMITS TO:
$ 11,370
DESCRIPTION:
NH 2018(960)PROJ NUM:
15.600
YNHS:
ROW CSJ:
0027-15-028HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SS 527 JUN 2018
IH 69LIMITS FROM: ELGIN STEETLIMITS TO:
$ 40,080
DESCRIPTION:
STP 2018(961)PROJ NUM:
0.863
NNHS:
ROW CSJ:
0089-09-087HOUSTON FORT BEND
LANDSCAPE DEVELOPMENT
US 59 JUN 2018
FM 2919LIMITS FROM: AND INTERSECTION OF ISLEIB ROADLIMITS TO:
$ 6,370
DESCRIPTION:
NH 2018(959)PROJ NUM:
0.055
YNHS:
ROW CSJ:
0177-11-155HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 69 JUN 2018
CLAY STEETLIMITS FROM: IH 10LIMITS TO:
$ 5,080
DESCRIPTION:
NH 2018(960)PROJ NUM:
1.800
YNHS:
ROW CSJ:
0271-05-046HOUSTON FORT BEND
LANDSCAPE DEVELOPMENT
IH 10 JUN 2018
PIN OAK ROADLIMITS FROM: FORT BEND/HARRIS C/LLIMITS TO:
$ 5,080
DESCRIPTION:
NH 2018(960)PROJ NUM:
0.520
YNHS:
ROW CSJ:
0271-06-127HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 10 JUN 2018
FORT BEND/HARRIS C/LLIMITS FROM: SH 6LIMITS TO:
$ 248,764
DESCRIPTION:
NH 2018(960)PROJ NUM:
10.193
YNHS:
ROW CSJ:
0271-17-171HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 JUN 2018
RICHMONDLIMITS FROM: IH 10LIMITS TO:
$ 3,550
DESCRIPTION:
NH 2018(960)PROJ NUM:
3.345
YNHS:
ROW CSJ:
1415-02-050HOUSTON FORT BEND
LANDSCAPE DEVELOPMENT
FM 1464 JUN 2018
FM 1464LIMITS FROM: SH 99 TO ALIEF CLODINE ROADLIMITS TO:
$ 10,240
DESCRIPTION:
STP 2018(961)PROJ NUM:
7.390
NNHS:
ROW CSJ:
3256-01-112HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SL 8 JUN 2018
IH 10LIMITS FROM: GARDENS STREETLIMITS TO:
$ 3,550
DESCRIPTION:
NH 2018(959)PROJ NUM:
11.400
YNHS:
ROW CSJ:
3256-04-075HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SL 8 JUN 2018
GARDENS STREETLIMITS FROM: FM 521LIMITS TO:
$ 3,550
DESCRIPTION:
NH 2018(959)PROJ NUM:
6.634
YNHS:
ROW CSJ: $ 536,49211 Projects0271-07-318CONTRACT CSJ: JUN 2018
0271-16-145HOUSTON HARRIS
CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL,DECK FACIA AND SOFFIT AND CONCRETE BEAM REPAIR
IH 610 JUN 2018
AT MLK BLVD- EB ONLYLIMITS FROM: .LIMITS TO:
$ 267,048
DESCRIPTION:
BR 2018(962)PROJ NUM:
0.040
YNHS:
ROW CSJ:
0271-16-146HOUSTON HARRIS
CONCRETE REPAIR OF DAMAGED BEAMS AT BENT CAP AND SAWCUTTING OF BEAM ENDS
IH 610 JUN 2018
AT US 90ALIMITS FROM: .LIMITS TO:
$ 285,402
DESCRIPTION:
BR 2018(962)PROJ NUM:
0.550
YNHS:
ROW CSJ: $ 552,4502 Projects0271-16-145CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0500-04-106HOUSTON GALVESTON
RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGEROADS
IH 45 JUN 2018
N OF FM 517LIMITS FROM: S OF FM 1764LIMITS TO:
$ 156,554,526
DESCRIPTION:
NH 2018(963)PROJ NUM:
5.070
YNHS:
0500-04-136ROW CSJ:
0500-04-136HOUSTON GALVESTON
ROW ACQUISITION
IH 45 JUN 2018
N OF FM 517LIMITS FROM: S OF FM 1764LIMITS TO:
$ 6,500
DESCRIPTION:
ROW 500-4-136PROJ NUM:
5.070
YNHS:
ROW CSJ: $ 156,561,0262 Projects0500-04-106CONTRACT CSJ: JUN 2018
0502-01-214HOUSTON HARRIS
UPGRADE ILLUMINATION
SH 225 JUN 2018
BW 8LIMITS FROM: BATTLEGROUND ROADLIMITS TO:
$ 3,679,007
DESCRIPTION:
NH 2018(665)PROJ NUM:
3.660
YNHS:
ROW CSJ: $ 3,679,0071 Project0502-01-214CONTRACT CSJ: JUN 2018
0720-03-133HOUSTON HARRIS
RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB
SH 249 JUN 2018
SOUTH OF CHASEWOOD PARK DRIVELIMITS FROM: NORTH OF GREGSON ROADLIMITS TO:
$ 450,495
DESCRIPTION:
NH 2018(964)PROJ NUM:
3.617
YNHS:
ROW CSJ: $ 450,4951 Project0720-03-133CONTRACT CSJ: JUN 2018
0912-37-228HOUSTON MONTGOMERY
REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001)
CR JUN 2018
SUPERIOR RD AT LAKE CREEKLIMITS FROM: .LIMITS TO:
$ 1,163,657
DESCRIPTION:
BR 2016(616)PROJ NUM:
0.124
NNHS:
ROW CSJ: $ 1,163,6571 Project0912-37-228CONTRACT CSJ: JUN 2018
0912-70-086HOUSTON HARRIS
IMPROVE TRAFFIC SIGNAL AT INTERSECTION
CR JUN 2018
ON FAIRMONT PKWY AT UNDERWOOD ROADLIMITS FROM: .LIMITS TO:
$ 227,381
DESCRIPTION:
STP 2018(966)HESGPROJ NUM:
0.202
NNHS:
ROW CSJ: $ 227,3811 Project0912-70-086CONTRACT CSJ: JUN 2018
0912-72-420HOUSTON HARRIS
RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALLAND WINGWALLS
VA JUN 2018
BATTLEGROUND RD; AT UPRRLIMITS FROM: .LIMITS TO:
$ 572,360
DESCRIPTION:
BR 2018(970)PROJ NUM:
0.150
NNHS:
ROW CSJ:
0912-72-421HOUSTON HARRIS
REPLACE BEARING PADS, CONCRETE STRUCTURE REPAIRS
VA JUN 2018
BATTLEGROUND RD; AT SH 225 MLLIMITS FROM: AND WB FRTG RDLIMITS TO:
$ 338,260
DESCRIPTION:
BR 2018(970)PROJ NUM:
0.073
NNHS:
ROW CSJ: $ 910,6202 Projects0912-72-420CONTRACT CSJ: JUN 2018
1259-01-042HOUSTON MONTGOMERY
WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE
FM 1097 JUN 2018
ANDERSON ROADLIMITS FROM: IH 45LIMITS TO:
$ 14,602,515
DESCRIPTION:
STP 2018(800)PROJ NUM:
2.143
NNHS:
1259-01-035ROW CSJ: $ 14,602,5151 Project1259-01-042CONTRACT CSJ: JUN 2018
2938-02-022HOUSTON BRAZORIA
PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY
FM 2917 JUN 2018
SH 35LIMITS FROM: FM 2004LIMITS TO:
$ 3,663,000
DESCRIPTION:
C 2938-2-22PROJ NUM:
9.381
NNHS:
ROW CSJ: $ 3,663,0001 Project2938-02-022CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
3050-03-021HOUSTON HARRIS
REPLACE BRIDGE AND APPROACHES
FM 2978 JUN 2018
AT SPRING CREEKLIMITS FROM: .LIMITS TO:
$ 5,195,881
DESCRIPTION:
STP 1802(218)PROJ NUM:
0.187
NNHS:
ROW CSJ:
3050-02-034HOUSTON MONTGOMERY
REPLACE BRIDGE AND APPROACHES
FM 2978 JUN 2018
AT SPRING CREEKLIMITS FROM: .LIMITS TO:
$ 1,531,965
DESCRIPTION:
STP 1802(218)PROJ NUM:
0.187
NNHS:
ROW CSJ: $ 6,727,8462 Projects3050-03-021CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 196,297,01728 Projects 13 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0027-06-051HOUSTON FORT BEND
ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS
US 90A JUL 2018
FM 1952LIMITS FROM: SP 10LIMITS TO:
$ 10,017,228
DESCRIPTION:
STP 2013(736)PROJ NUM:
6.412
NNHS:
ROW CSJ:
0027-06-052HOUSTON FORT BEND
ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE/EXTEND CULVERTS
US 90A JUL 2018
WHARTON COUNTY LINELIMITS FROM: FM 1952LIMITS TO:
$ 5,826,764
DESCRIPTION:
STP 2018(101)PROJ NUM:
3.836
NNHS:
ROW CSJ: $ 15,843,9922 Projects0027-06-051CONTRACT CSJ: JUL 2018
0089-18-003HOUSTON FORT BEND
CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIR,PLANING,SEAT COAT,ACP OVERLAY SIGING & PAVEMENT MARKINGS
SL 540 JUL 2018
US 59 SW OF BEASLEYLIMITS FROM: US 59 NE OF BEASLEYLIMITS TO:
$ 973,765
DESCRIPTION:
C 89-18-3PROJ NUM:
2.732
NNHS:
ROW CSJ:
0089-17-004HOUSTON FORT BEND
CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIRPLANING,SEAT COAT,ACP OVERLAY SIGING & PAVEMENT MARKINGS
SL 541 JUL 2018
US 59 SW OF KENDLETONLIMITS FROM: US 59 NE OF KENDLETONLIMITS TO:
$ 769,317
DESCRIPTION:
C 89-17-4PROJ NUM:
2.107
NNHS:
ROW CSJ: $ 1,743,0822 Projects0089-18-003CONTRACT CSJ: JUL 2018
0114-12-011HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
US 290 JUL 2018
EAST OF BADTKE ROADLIMITS FROM: HARRIS/WALLER COUNTY LINELIMITS TO:
$ 2,267,392
DESCRIPTION:
NH 2018(900)PROJ NUM:
7.537
YNHS:
ROW CSJ: $ 2,267,3921 Project0114-12-011CONTRACT CSJ: JUL 2018
0178-02-089HOUSTON BRAZORIA
DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS
SH 35 JUL 2018
BS 35CLIMITS FROM: SH 6LIMITS TO:
$ 1,933,000
DESCRIPTION:
C 178-2-89PROJ NUM:
2.997
YNHS:
ROW CSJ:
0178-03-153HOUSTON BRAZORIA
DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS
SH 35 JUL 2018
SH 6LIMITS FROM: FM 1462LIMITS TO:
$ 1,552,000
DESCRIPTION:
C 178-3-153PROJ NUM:
2.347
YNHS:
ROW CSJ: $ 3,485,0002 Projects0178-02-089CONTRACT CSJ: JUL 2018
0500-03-588HOUSTON HARRIS
RECONSTRUCT FRONTAGE ROADS (IH 45 NB TO EB IH 610; DETROITTO BERKLEY) AND (WB IH 610 TO NB IH 45; BERKLEY TO BROAD)
IH 45 JUL 2018
IH 45 NB FROM DETROIT TO BERKLEYLIMITS FROM: AND IH 610 WB FROM BERKLEY TO BROADLIMITS TO:
$ 5,500,000
DESCRIPTION:
NH 1802(410)PROJ NUM:
1.909
YNHS:
ROW CSJ: $ 5,500,0001 Project0500-03-588CONTRACT CSJ: JUL 2018
0543-02-065HOUSTON FORT BEND
WIDEN TO 4 LANES ARTERIAL, NON TOLL
FM 359 JUL 2018
FM 1093/FM 359LIMITS FROM: WEST OF CROSS CREEK RANCH BLVDLIMITS TO:
$ 15,000,000
DESCRIPTION:
C 543-2-65PROJ NUM:
1.330
NNHS:
0543-02-072ROW CSJ:
1258-02-034HOUSTON FORT BEND
WIDEN TO 4 LANES ARTERIAL, NON TOLL
FM 1093 JUL 2018
JAMES LANELIMITS FROM: FM 1093/FM 359LIMITS TO:
$ 4,000,000
DESCRIPTION:
C 1258-2-34PROJ NUM:
0.470
NNHS:
1258-02-038ROW CSJ: $ 19,000,0002 Projects0543-02-065CONTRACT CSJ: JUL 2018
0912-00-531HOUSTON HARRIS
INSTALL NEW TRAFFIC SIGNALS
VA JUL 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,904,486
DESCRIPTION:
C 912-0-531PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,904,4861 Project0912-00-531CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0912-72-075HOUSTON HARRIS
RECONSTRUCT CLINTON DRIVE
CS JUL 2018
CLINTON DR-PORT OF HOUSTON GATE 8LIMITS FROM: IH 610LIMITS TO:
$ 22,294,836
DESCRIPTION:
HP 1402(016)PROJ NUM:
2.000
YNHS:
0912-72-270ROW CSJ: $ 22,294,8361 Project0912-72-075CONTRACT CSJ: JUL 2018
1685-05-118HOUSTON HARRIS
CONSTRUCT SIDEWALKS
SH 6 JUL 2018
US 290LIMITS FROM: FM 529LIMITS TO:
$ 1,799,862
DESCRIPTION:
NH 1802(411)PROJ NUM:
3.244
YNHS:
ROW CSJ:
1743-01-010HOUSTON HARRIS
CONSTRUCT SIDEWALKS
FM 1876 JUL 2018
BELLAIRE BLVDLIMITS FROM: FORT BEND COUNTY LINELIMITS TO:
$ 443,779
DESCRIPTION:
STP 1802(368)PROJ NUM:
2.307
NNHS:
ROW CSJ:
1743-02-026HOUSTON FORT BEND
CONSTRUCT SIDEWALKS
FM 1876 JUL 2018
HARRIS COUNTY LINELIMITS FROM: WEST AIRPORT BLVDLIMITS TO:
$ 1,279,565
DESCRIPTION:
NH 1802(411)PROJ NUM:
1.364
YNHS:
ROW CSJ: $ 3,523,2063 Projects1685-05-118CONTRACT CSJ: JUL 2018
1986-01-063HOUSTON MONTGOMERY
BASE REPAIR, OCST, 1.5IN HMA LEVEL-UP, 1.5IN HMA OVERLAY
FM 1314 JUL 2018
SH 105LIMITS FROM: SL 336LIMITS TO:
$ 1,350,000
DESCRIPTION:
C 1986-1-63PROJ NUM:
2.214
NNHS:
ROW CSJ: $ 1,350,0001 Project1986-01-063CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 76,911,99416 Projects 10 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0050-06-090HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
US 290 AUG 2018
TELGE ROADLIMITS FROM: B 290LIMITS TO:
$ 1,171,002
DESCRIPTION:
NH ( )PROJ NUM:
12.438
YNHS:
ROW CSJ: $ 1,171,0021 Project0050-06-090CONTRACT CSJ: AUG 2018
0110-04-199HOUSTON MONTGOMERY
REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECK
IH 45 AUG 2018
AT RAYFORD/SAWDUST RD- NB ONLYLIMITS FROM: .LIMITS TO:
$ 695,634
DESCRIPTION:
NH ( )PROJ NUM:
0.060
YNHS:
ROW CSJ:
0110-04-200HOUSTON MONTGOMERY
REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECK
IH 45 AUG 2018
AT RAYFORD/SAWDUST RD- SB ONLYLIMITS FROM: .LIMITS TO:
$ 695,634
DESCRIPTION:
NH ( )PROJ NUM:
0.060
YNHS:
ROW CSJ: $ 1,391,2682 Projects0110-04-199CONTRACT CSJ: AUG 2018
0110-05-128HOUSTON HARRIS
REPLACE/RESET BEARING PADS
IH 45 AUG 2018
AT UPRR & SPRING STUEBNERLIMITS FROM: .LIMITS TO:
$ 304,759
DESCRIPTION:
NH 1802(417)PROJ NUM:
0.148
YNHS:
ROW CSJ: $ 304,7591 Project0110-05-128CONTRACT CSJ: AUG 2018
0177-14-010HOUSTON MONTGOMERY
RECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION(FLUSH MEDIAN)
SL 494 AUG 2018
N OF KINGWOOD DRLIMITS FROM: HARRIS C/LLIMITS TO:
$ 13,628,849
DESCRIPTION:
STP ( )PROJ NUM:
0.925
NNHS:
0177-14-036ROW CSJ:
0177-15-003HOUSTON HARRIS
RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED URBAN SECTION(RAISED MEDIAN)
SL 494 AUG 2018
MONTGOMERY C/LLIMITS FROM: N OF SORTERS-MCCLELLAN ROADLIMITS TO:
$ 4,753,235
DESCRIPTION:
STP ( )PROJ NUM:
0.582
NNHS:
0177-15-006ROW CSJ: $ 18,382,0842 Projects0177-14-010CONTRACT CSJ: AUG 2018
0271-06-120HOUSTON HARRIS
EROSION REPAIR AND CHANNEL PROTECTION
IH 10 AUG 2018
AT MASON CREEKLIMITS FROM: .LIMITS TO:
$ 2,000,000
DESCRIPTION:
NH ( )PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 2,000,0001 Project0271-06-120CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0271-14-236HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
US 290LIMITS FROM: IH 10LIMITS TO:
$ 26,650
DESCRIPTION:
STP ( )PROJ NUM:
12.663
YNHS:
ROW CSJ:
0028-02-094HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
US 90 AUG 2018
0.050 MILES SOUTH OF OATES ROADLIMITS FROM: HUNTING BAYOULIMITS TO:
$ 9,000
DESCRIPTION:
STP ( )PROJ NUM:
0.975
YNHS:
ROW CSJ:
0177-05-114HOUSTON MONTGOMERY
LANDSCAPE DEVELOPMENT
IH 69 AUG 2018
HARRIS/MONTGOMERY C/LLIMITS FROM: ETTA ROADLIMITS TO:
$ 286,537
DESCRIPTION:
STP ( )PROJ NUM:
0.001
YNHS:
ROW CSJ:
0177-06-084HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 69 AUG 2018
EASTWOOD VILLAGE DRIVELIMITS FROM: HARRIS/MONTGOMERY C/LLIMITS TO:
$ 222,741
DESCRIPTION:
STP ( )PROJ NUM:
2.392
YNHS:
ROW CSJ:
0271-15-091HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
IH 10LIMITS FROM: SHIP CHANNEL BRIDGELIMITS TO:
$ 18,800
DESCRIPTION:
STP ( )PROJ NUM:
3.810
YNHS:
ROW CSJ:
2483-01-013HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
SS 548 AUG 2018
IH 610LIMITS FROM: EAST CROSSTIMBERS STEETLIMITS TO:
$ 12,750
DESCRIPTION:
STP ( )PROJ NUM:
1.506
YNHS:
ROW CSJ: $ 576,4786 Projects0271-14-236CONTRACT CSJ: AUG 2018
0271-16-140HOUSTON HARRIS
RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASSAT CAMBRIDGE STREET/ALMEDA ROAD/UPRR
IH 610 AUG 2018
WEST OF CAMBRIDGELIMITS FROM: WEST OF SCOTT STREETLIMITS TO:
$ 75,000,000
DESCRIPTION:
NH 1802(175)PROJ NUM:
1.953
YNHS:
0271-16-141ROW CSJ:
0271-16-147HOUSTON HARRIS
RECONSTRUCT FRONTAGE ROAD AND INTERSECTION IMPROVEMENTAT CAMBRIDGE STREET/ALMEDA ROAD/UPRR
IH 610 AUG 2018
WEST OF CAMBRIDGELIMITS FROM: EAST OF ALMEDA ROADLIMITS TO:
$ 25,000,000
DESCRIPTION:
C 271--16-147PROJ NUM:
1.805
YNHS:
ROW CSJ: $ 100,000,0002 Projects0271-16-140CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0271-16-144HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
NORTH BRAESWOOD BOULEVARDLIMITS FROM: REVEILLE STEETLIMITS TO:
$ 86,270
DESCRIPTION:
STP ( )PROJ NUM:
10.243
YNHS:
ROW CSJ:
0271-15-092HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
SH 225LIMITS FROM: SHIP CHANNEL BRIDGELIMITS TO:
$ 81,150
DESCRIPTION:
NH ( )PROJ NUM:
1.192
YNHS:
ROW CSJ:
0271-17-170HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
WESTPARKLIMITS FROM: NORTH BRAESWOOD BOULEVARDLIMITS TO:
$ 81,270
DESCRIPTION:
STP ( )PROJ NUM:
3.049
YNHS:
ROW CSJ:
0500-01-151HOUSTON GALVESTON
LANDSCAPE DEVELOPMENT
IH 45 AUG 2018
LEWIS LANELIMITS FROM: VIRGINIA POINT ROADLIMITS TO:
$ 23,000
DESCRIPTION:
PROJ NUM:
2.415
YNHS:
ROW CSJ:
0500-03-617HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 45 AUG 2018
NYACK DRIVELIMITS FROM: FRANKLIN STEETLIMITS TO:
$ 23,000
DESCRIPTION:
NH ( )PROJ NUM:
16.635
YNHS:
ROW CSJ:
0500-04-141HOUSTON GALVESTON
LANDSCAPE DEVELOPMENT
IH 45 AUG 2018
DICKINSON BAYOULIMITS FROM: DEATS ROADLIMITS TO:
$ 9,900
DESCRIPTION:
PROJ NUM:
0.700
YNHS:
ROW CSJ:
0502-01-223HOUSTON HARRIS
LANDSCAPE DEVELOPMENT
IH 610 AUG 2018
BERKLEY STEETLIMITS FROM: SH 225LIMITS TO:
$ 81,150
DESCRIPTION:
STP ( )PROJ NUM:
1.220
YNHS:
ROW CSJ:
0976-03-106HOUSTON GALVESTON
LANDSCAPE DEVELOPMENT
FM 518 AUG 2018
FRIENDSWOOD LINK ROADLIMITS FROM: RIVERSIDE DRIVELIMITS TO:
$ 85,276
DESCRIPTION:
NH ( )PROJ NUM:
2.300
YNHS:
ROW CSJ: $ 471,0168 Projects0271-16-144CONTRACT CSJ: AUG 2018
0271-17-164HOUSTON HARRIS
�PLANING, SEAL COAT, TOM-F AND 1 TOM-C
IH 610 AUG 2018
N. BRAESWOOD BLVDLIMITS FROM: WESTPARK DR (FRONTAGE ROADS)LIMITS TO:
$ 2,300,000
DESCRIPTION:
C 271-17-164PROJ NUM:
3.000
YNHS:
ROW CSJ:
0177-11-154HOUSTON HARRIS
HIGH FRICTION SURFACE TREATMENT ON CURVE
IH 69 AUG 2018
0.176 MILES NORTH EAST OF IH 10LIMITS FROM: IH 10LIMITS TO:
$ 81,279
DESCRIPTION:
STP ( )HESPROJ NUM:
0.176
YNHS:
ROW CSJ: $ 2,381,2792 Projects0271-17-164CONTRACT CSJ: AUG 2018
0523-08-014HOUSTON MONTGOMERY
BASE REPAIR, OCST, 1.5IN HMA LEVEL-UP, 1.5IN HMA OVERLAY
FM 1488 AUG 2018
WALLER C/LLIMITS FROM: FM 1774LIMITS TO:
$ 3,700,000
DESCRIPTION:
C 523-8-14PROJ NUM:
3.500
NNHS:
ROW CSJ: $ 3,700,0001 Project0523-08-014CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0720-03-143HOUSTON HARRIS
INTERCONNECT SIGNALS
SH 249 AUG 2018
SPRING CYPRESSLIMITS FROM: GRANT/SCHROEDERLIMITS TO:
$ 359,333
DESCRIPTION:
STP 1802(437)HESPROJ NUM:
3.776
NNHS:
ROW CSJ:
0050-05-068HOUSTON WALLER
INSTALL ADVANCED WARNING SIGNALS AND SIGNS (CURVE)
BU 290H AUG 2018
0.082 MI SOUTH OF US 290LIMITS FROM: 0.851 MI S OF US 290LIMITS TO:
$ 41,411
DESCRIPTION:
STP 1802(437)HESPROJ NUM:
0.769
NNHS:
ROW CSJ:
0050-06-095HOUSTON HARRIS
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDSIGNALS AND SIGNS (INTERSECTION)
BU 290H AUG 2018
AT KERMIER ROADLIMITS FROM: .LIMITS TO:
$ 48,897
DESCRIPTION:
STP 1802(437)HESPROJ NUM:
0.200
NNHS:
ROW CSJ: $ 449,6413 Projects0720-03-143CONTRACT CSJ: AUG 2018
0912-70-093HOUSTON HARRIS
REPLACE BRIDGE AND APPROACHES (NBI# 12102B11625561)
CS AUG 2018
CALHOUN STREET; AT BRAYS BAYOULIMITS FROM: .LIMITS TO:
$ 2,932,130
DESCRIPTION:
BR 2014(687)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,932,1301 Project0912-70-093CONTRACT CSJ: AUG 2018
0912-73-204HOUSTON GALVESTON
REHABILITATE BRIDGE AND APPROACHES_(NBI# 12085B00790001)
CR AUG 2018
SEAWOLF PKWY AT PELICAN ISLAND CHANLIMITS FROM: .LIMITS TO:
$ 3,558,060
DESCRIPTION:
BR 1702(557)PROJ NUM:
0.613
NNHS:
ROW CSJ: $ 3,558,0601 Project0912-73-204CONTRACT CSJ: AUG 2018
1006-01-073HOUSTON HARRIS
UPGRADE TRAFFIC SIGNAL SYSTEMS
FM 529 AUG 2018
SETTLERS VILLAGELIMITS FROM: US 290LIMITS TO:
$ 735,000
DESCRIPTION:
C 1006-1-73PROJ NUM:
9.912
YNHS:
ROW CSJ:
1685-05-106HOUSTON HARRIS
UPGRADE TRAFFIC SIGNAL SYSTEMS
SH 6 AUG 2018
US 290LIMITS FROM: PINE FORESTLIMITS TO:
$ 1,385,000
DESCRIPTION:
C 1685-5-106PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 2,120,0002 Projects1006-01-073CONTRACT CSJ: AUG 2018
2524-02-022HOUSTON BRAZORIA
REPLACE BRIDGE AND APPROACHES (NBI# 12020252402001)
FM 2611 AUG 2018
AT SAN BERNARD RIVERLIMITS FROM: .LIMITS TO:
$ 9,459,052
DESCRIPTION:
BR 2018(103)PROJ NUM:
0.810
NNHS:
2524-02-023ROW CSJ: $ 9,459,0521 Project2524-02-022CONTRACT CSJ: AUG 2018
3158-01-032HOUSTON MONTGOMERY
WIDEN TO 4-LANE DIVIDED URBAN
FM 3083 AUG 2018
UPRRLIMITS FROM: LP 336 NORTHLIMITS TO:
$ 7,058,180
DESCRIPTION:
STP ( )PROJ NUM:
1.818
NNHS:
3158-01-041ROW CSJ: $ 7,058,1801 Project3158-01-032CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 155,954,94935 Projects 16 Contracts
HOUSTON $ 652,216,55496 Projects 47 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
LAREDO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$3.64 $0.00 $0.00 $0.00 $0.00SEPTEMBER $3.64$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$1.52 $0.00 $0.00 $0.00 $0.00MARCH $1.52$0.00 $0.00$0.00$0.00
$11.66 $0.00 $0.00 $0.00 $0.00APRIL $11.66$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$29.12 $0.00 $0.00 $0.00 $0.00JUNE $29.12$0.00 $0.00$0.00$0.00
$7.50 $0.00 $0.00 $0.00 $0.00JULY $7.50$0.00 $0.00$0.00$0.00
$48.30 $0.00 $0.00 $0.00 $0.00AUGUST $48.30$0.00 $0.00$0.00$0.00
$101.73 $0.00 $0.00 $0.00 $0.00 $101.73District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0022-06-051LAREDO VAL VERDE
REHABILITATION OF EXISTING BRIDGE
US 90 JUN 2018
200 FT NORTHWEST OF PECOS BRIDGELIMITS FROM: 200 FT SOUTHEAST OF PECOS BRIDGELIMITS TO:
$ 468,761
DESCRIPTION:
C 22-6-51PROJ NUM:
0.325
YNHS:
ROW CSJ: $ 468,7611 Project0022-06-051CONTRACT CSJ: JUN 2018
0086-01-091LAREDO WEBB
PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS
SH 359 JUN 2018
JUDITH GUTIERREZ PARKWAYLIMITS FROM: 8.892 MILES EAST OF SL 20LIMITS TO:
$ 2,016,798
DESCRIPTION:
STP 1802(248)HESPROJ NUM:
2.686
NNHS:
ROW CSJ:
0038-01-088LAREDO WEBB
REHABILITATION OF EXISTING HIGHWAY
US 83 JUN 2018
CIELITO-LINDO BLVD (SB)LIMITS FROM: 0.74 MI S OF ESPEJO MOLINA RD (SB)LIMITS TO:
$ 2,449,380
DESCRIPTION:
C 38-1-88PROJ NUM:
5.578
YNHS:
ROW CSJ:
0086-01-090LAREDO WEBB
RESURFACE OF EXISTING HIGHWAY
SH 359 JUN 2018
4.829 MILES EAST OF SL 20LIMITS FROM: 8.892 MILES EAST OF SL 20LIMITS TO:
$ 2,921,778
DESCRIPTION:
C 86-1-90PROJ NUM:
4.063
NNHS:
ROW CSJ:
0086-02-027LAREDO WEBB
RESURFACE OF EXISTING HIGHWAY
SH 359 JUN 2018
8.892 MILES EAST OF SL 20LIMITS FROM: 1.515 MILES WEST OF FM 2895LIMITS TO:
$ 8,112,476
DESCRIPTION:
C 86-2-27PROJ NUM:
12.605
NNHS:
ROW CSJ:
0086-02-028LAREDO WEBB
PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS
SH 359 JUN 2018
8.892 MILES EAST OF SL 20LIMITS FROM: 1.515 MILES WEST OF FM 2895LIMITS TO:
$ 56,770
DESCRIPTION:
STP 1802(249)HESPROJ NUM:
12.605
NNHS:
ROW CSJ:
0086-03-030LAREDO WEBB
PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS
SH 359 JUN 2018
1.515 MILES WEST OF FM 2895LIMITS FROM: 1.363 MILES EAST OF FM 649LIMITS TO:
$ 35,907
DESCRIPTION:
STP 1802(250)HESPROJ NUM:
8.208
YNHS:
ROW CSJ:
0086-03-033LAREDO WEBB
RESURFACE OF EXISTING HIGHWAY
SH 359 JUN 2018
1.515 MILES WEST OF FM 2895LIMITS FROM: 1.363 MILES EAST OF FM 649LIMITS TO:
$ 5,357,278
DESCRIPTION:
C 86-3-33PROJ NUM:
8.208
NNHS:
ROW CSJ:
0086-04-023LAREDO WEBB
RESURFACE OF EXISTING HIGHWAY
SH 359 JUN 2018
1.363 MI EAST OF FM 649LIMITS FROM: DUVAL COUNTY LINELIMITS TO:
$ 7,643,852
DESCRIPTION:
C 86-4-23PROJ NUM:
12.529
NNHS:
ROW CSJ:
0086-04-025LAREDO WEBB
PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS
SH 359 JUN 2018
1.363 MILES EAST OF FM 649LIMITS FROM: DUVAL COUNTY LINELIMITS TO:
$ 54,295
DESCRIPTION:
STP 1802(251)HESPROJ NUM:
12.529
NNHS:
ROW CSJ: $ 28,648,5349 Projects0086-01-091CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 29,117,29510 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0018-01-097LAREDO LA SALLE
RESURFACE OF EXISTING HIGHWAY
IH 35 JUL 2018
FM 133LIMITS FROM: 1.031 MI S OF BI 35C (SOUTH INT)LIMITS TO:
$ 5,218,530
DESCRIPTION:
C 18-1-97PROJ NUM:
10.708
YNHS:
ROW CSJ: $ 5,218,5301 Project0018-01-097CONTRACT CSJ: JUL 2018
0922-00-064LAREDO WEBB
REPLACEMENT OF BRIDGE AND APPROACH RAIL
VA JUL 2018
DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,396,772
DESCRIPTION:
STP 1802(313)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0018-02-085LAREDO LA SALLE
REPLACEMENT OF BRIDGE AND APPROACH RAIL
IH 35 JUL 2018
WEBB COUNTY LINELIMITS FROM: FM 133LIMITS TO:
$ 619,909
DESCRIPTION:
BR 1802(408)PROJ NUM:
17.743
YNHS:
ROW CSJ:
1229-01-066LAREDO MAVERICK
REPLACEMENT OF BRIDGE AND APPROACH RAIL
FM 1021 JUL 2018
FM 3443LIMITS FROM: 0.383 MI NORTH OF FM 2644LIMITS TO:
$ 263,265
DESCRIPTION:
BR 1802(314)PROJ NUM:
15.896
NNHS:
ROW CSJ: $ 2,279,9463 Projects0922-00-064CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 7,498,4764 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0018-04-060LAREDO WEBB
INSTALL FLASHING BEACON
IH 35 AUG 2018
@ SH 255LIMITS FROM: .LIMITS TO:
$ 253,309
DESCRIPTION:
STP 1802(363)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0037-06-101LAREDO DIMMIT
MODERNIZE FLASHING BEACON
US 83 AUG 2018
@ SL 225LIMITS FROM: .LIMITS TO:
$ 48,221
DESCRIPTION:
STP 1802(366)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0299-04-077LAREDO MAVERICK
INTERCONNECT SIGNALS
US 277 AUG 2018
FM 1588LIMITS FROM: BU 277 NLIMITS TO:
$ 153,125
DESCRIPTION:
STP 1802(360)HESPROJ NUM:
1.710
YNHS:
ROW CSJ:
0299-04-078LAREDO MAVERICK
INTERCONNECT SIGNALS
US 277 AUG 2018
N OF BIBB AVELIMITS FROM: SS 216LIMITS TO:
$ 99,750
DESCRIPTION:
STP 1802(361)HESPROJ NUM:
1.153
YNHS:
ROW CSJ:
0299-13-033LAREDO MAVERICK
IMPROVE TRAFFIC SIGNAL
BU 277N AUG 2018
@ SS 240LIMITS FROM: .LIMITS TO:
$ 90,187
DESCRIPTION:
STP 1802(365)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0300-03-074LAREDO DIMMIT
INTERCONNECT SIGNALS
US 277 AUG 2018
FM 517LIMITS FROM: US 83LIMITS TO:
$ 89,323
DESCRIPTION:
STP 1802(367)HESPROJ NUM:
2.394
YNHS:
ROW CSJ:
0301-02-052LAREDO DIMMIT
MODERNIZE FLASHING BEACON
SH 85 AUG 2018
@ FM 1867LIMITS FROM: .LIMITS TO:
$ 27,309
DESCRIPTION:
STP 1802(364)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
1229-01-070LAREDO MAVERICK
INTERCONNECT SIGNALS
FM 1021 AUG 2018
0.1 MI N OF FM 3443LIMITS FROM: LAS QUINTAS AVENUELIMITS TO:
$ 99,725
DESCRIPTION:
STP 1802(358)HESPROJ NUM:
0.556
NNHS:
ROW CSJ:
2150-03-029LAREDO WEBB
MODERNIZE FLASHING BEACON
FM 1472 AUG 2018
@ SH 255LIMITS FROM: .LIMITS TO:
$ 44,594
DESCRIPTION:
STP 1802(362)HESPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 905,5439 Projects0018-04-060CONTRACT CSJ: AUG 2018
0237-07-015LAREDO DIMMIT
REHABILITATION OF EXISTING HIGHWAY
FM 133 AUG 2018
5.0 MILES EAST OF US 83LIMITS FROM: 9.0 MILES EAST OF US 83LIMITS TO:
$ 7,893,424
DESCRIPTION:
STP 2018(946)PROJ NUM:
4.000
NNHS:
ROW CSJ:
0237-07-016LAREDO DIMMIT
REHABILITATION OF EXISTING HIGHWAY
FM 133 AUG 2018
9.0 MILES EAST OF US 83LIMITS FROM: LA SALLE COUNTY LINELIMITS TO:
$ 8,276,871
DESCRIPTION:
C 237-7-16PROJ NUM:
4.730
NNHS:
ROW CSJ: $ 16,170,2952 Projects0237-07-015CONTRACT CSJ: AUG 2018
0301-04-020LAREDO DIMMIT
REHABILITATION OF EXISTING HIGHWAY
FM 186 AUG 2018
CASTELLAW ROADLIMITS FROM: END OF ROADWAYLIMITS TO:
$ 15,931,950
DESCRIPTION:
C 301-4-20PROJ NUM:
8.792
NNHS:
ROW CSJ: $ 15,931,9501 Project0301-04-020CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0922-33-176LAREDO WEBB
REPLACEMENT OF STRUCTURE ON EXISTING LOCATION
CR AUG 2018
ON ESPEJO GATES RD AT VALENZUELA CRLIMITS FROM: 5.20 MI WEST OF US 83LIMITS TO:
$ 1,293,126
DESCRIPTION:
BR ( )PROJ NUM:
0.500
NNHS:
ROW CSJ: $ 1,293,1261 Project0922-33-176CONTRACT CSJ: AUG 2018
3621-01-014LAREDO VAL VERDE
REHABILITATION OF EXISTING HIGHWAY
SL 79 AUG 2018
FM 2523LIMITS FROM: 2.0 MILES NORTH OF FM 2523LIMITS TO:
$ 4,000,000
DESCRIPTION:
STP ( )PROJ NUM:
2.000
NNHS:
ROW CSJ:
3621-01-015LAREDO VAL VERDE
REHABILITATION OF EXISTING HIGHWAY
SL 79 AUG 2018
2.0 MILES NORTH OF FM 2523LIMITS FROM: US 90 WESTLIMITS TO:
$ 10,000,000
DESCRIPTION:
C 3621-1-15PROJ NUM:
5.859
NNHS:
ROW CSJ: $ 14,000,0002 Projects3621-01-014CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 48,300,91415 Projects 5 Contracts
LAREDO $ 84,916,68529 Projects 9 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
LUBBOCK DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$2.60 $0.00 $0.00 $0.00 $0.00OCTOBER $2.60$0.00 $0.00$0.00$0.00
$14.07 $0.00 $0.00 $0.00 $0.00NOVEMBER $14.07$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$13.91 $0.00 $0.00 $0.00 $0.00JANUARY $13.91$0.00 $0.00$0.00$0.00
$2.94 $0.00 $0.00 $0.00 $0.00FEBRUARY $2.94$0.00 $0.00$0.00$0.00
$9.85 $0.00 $0.00 $0.00 $0.00MARCH $9.85$0.00 $0.00$0.00$0.00
$23.24 $0.00 $0.00 $0.00 $0.00APRIL $23.24$0.00 $0.00$0.00$0.00
$19.96 $0.00 $0.00 $0.00 $0.00MAY $19.96$0.00 $0.00$0.00$0.00
$60.88 $0.00 $0.00 $0.00 $0.00JUNE $60.88$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.25 $0.00 $0.00 $0.00 $0.00AUGUST $0.25$0.00 $0.00$0.00$0.00
$147.70 $0.00 $0.00 $0.00 $0.00 $147.70District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:28 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUBBOCK DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0168-01-029LUBBOCK PARMER
REHABILITATION OF EXISTING ROADWAY
US 60 MAY 2018
5.3 MILES WEST OF BOVINALIMITS FROM: 0.24 MILES WEST OF FM 1731 NORTHLIMITS TO:
$ 19,257,564
DESCRIPTION:
C 168-1-29PROJ NUM:
5.491
YNHS:
ROW CSJ:
0168-02-031LUBBOCK PARMER
REHABILITATION OF EXISTING ROADWAY
US 60 MAY 2018
0.24 MILES WEST OF FM 1731 NORTHLIMITS FROM: FM 1731 NORTHLIMITS TO:
$ 702,809
DESCRIPTION:
C 168-2-31PROJ NUM:
0.210
YNHS:
ROW CSJ: $ 19,960,3732 Projects0168-01-029CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 19,960,3732 Projects 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUBBOCK DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0145-01-032LUBBOCK BAILEY
SAFETY
US 70 JUN 2018
US 84LIMITS FROM: LAMB COUNTY LINELIMITS TO:
$ 59,721
DESCRIPTION:
STP 1802(350)HESPROJ NUM:
6.467
NNHS:
ROW CSJ:
0145-03-037LUBBOCK LAMB
SAFETY
US 70 JUN 2018
US 385LIMITS FROM: HALE COUNTY LINELIMITS TO:
$ 69,107
DESCRIPTION:
STP 2018(938)HESPROJ NUM:
13.501
NNHS:
ROW CSJ:
0461-07-014LUBBOCK BAILEY
SAFETY
SH 214 JUN 2018
PARMER COUNTY LINELIMITS FROM: US 70 NLIMITS TO:
$ 29,119
DESCRIPTION:
STP 2018(938)HESPROJ NUM:
5.729
NNHS:
ROW CSJ:
1041-01-026LUBBOCK HALE
SAFETY
FM 400 JUN 2018
US 70LIMITS FROM: FM 784LIMITS TO:
$ 45,421
DESCRIPTION:
STP 2018(938)HESPROJ NUM:
11.245
NNHS:
ROW CSJ: $ 203,3684 Projects0145-01-032CONTRACT CSJ: JUN 2018
0227-06-026LUBBOCK HOCKLEY
REHABILITATION OF EXISTING ROADWAY
US 385 JUN 2018
1.86 MI S OF FM 300LIMITS FROM: TERRY COUNTY LINELIMITS TO:
$ 12,221,215
DESCRIPTION:
STP 1802(433)PROJ NUM:
13.575
NNHS:
ROW CSJ:
0227-06-028LUBBOCK HOCKLEY
SAFETYINSTALL INTERSECTION FLASH BEACON,ADV WARNING SIGNALS,SIGNS
US 385 JUN 2018
INTERSECTIONLIMITS FROM: AT FM 1585LIMITS TO:
$ 27,492
DESCRIPTION:
STP 1802(472)HESPROJ NUM:
0.515
NNHS:
ROW CSJ:
0227-06-029LUBBOCK HOCKLEY
SAFETY
US 385 JUN 2018
FM 300LIMITS FROM: TERRY COUNTY LINELIMITS TO:
$ 95,198
DESCRIPTION:
STP 1802(472)HESPROJ NUM:
13.580
NNHS:
ROW CSJ:
0227-06-030LUBBOCK HOCKLEY
SAFETY TREAT FIXED OBJECTS
US 385 JUN 2018
FM 300LIMITS FROM: TERRY COUNTY LI008805085LIMITS TO:
$ 249,214
DESCRIPTION:
STP 2018(940)HESPROJ NUM:
13.580
NNHS:
ROW CSJ:
0227-09-018LUBBOCK TERRY
REHABILITATION OF EXISTING ROADWAY
US 385 JUN 2018
HOCKLEY COUNTY LINELIMITS FROM: RR CROSSING IN BROWNFIELDLIMITS TO:
$ 11,364,948
DESCRIPTION:
STP 2018(393)PROJ NUM:
13.958
NNHS:
ROW CSJ: $ 23,958,0675 Projects0227-06-026CONTRACT CSJ: JUN 2018
0461-08-023LUBBOCK YOAKUM
SUPER 2
SH 214 JUN 2018
US 82LIMITS FROM: YOAKUM COUNTY LINELIMITS TO:
$ 14,950,523
DESCRIPTION:
STP 2018(941)PROJ NUM:
12.071
NNHS:
ROW CSJ:
0461-09-018LUBBOCK GAINES
SUPER 2
SH 214 JUN 2018
YOAKUM COUNTY LINELIMITS FROM: US 62LIMITS TO:
$ 21,765,877
DESCRIPTION:
STP 2018(941)PROJ NUM:
19.879
NNHS:
ROW CSJ: $ 36,716,4002 Projects0461-08-023CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 60,877,83511 Projects 3 Contracts
0145-01-031LUBBOCK BAILEY
TREE REMOVAL IN CLEAR ZONE
US 70 AUG 2018
SH 214LIMITS FROM: LAMB COUNTY LINELIMITS TO:
$ 254,900
DESCRIPTION:
STP ( )HESPROJ NUM:
6.467
NNHS:
ROW CSJ: $ 254,9001 Project0145-01-031CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 254,9001 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUBBOCK DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
LUBBOCK $ 81,093,10814 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
LUFKIN DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$7.41 $0.00 $0.00 $0.00 $0.00OCTOBER $7.41$0.00 $0.00$0.00$0.00
$10.68 $0.00 $0.00 $0.00 $0.00NOVEMBER $10.68$0.00 $0.00$0.00$0.00
$3.16 $0.00 $0.00 $0.00 $0.00DECEMBER $3.16$0.00 $0.00$0.00$0.00
$6.34 $0.00 $0.00 $0.00 $0.00JANUARY $6.34$0.00 $0.00$0.00$0.00
$2.28 $0.00 $0.00 $0.00 $0.00FEBRUARY $2.28$0.00 $0.00$0.00$0.00
$11.16 $0.00 $0.00 $0.00 $0.00MARCH $11.16$0.00 $0.00$0.00$0.00
$8.81 $0.00 $0.00 $0.00 $0.00APRIL $8.81$0.00 $0.00$0.00$0.00
$72.63 $0.00 $0.00 $0.00 $0.00MAY $72.63$0.00 $0.00$0.00$0.00
$34.45 $0.00 $0.00 $0.00 $0.00JUNE $34.45$0.00 $0.00$0.00$0.00
$4.60 $0.00 $0.00 $0.00 $0.40JULY $5.00$0.00 $0.00$0.00$0.00
$0.91 $0.00 $0.00 $0.00 $0.00AUGUST $0.91$0.00 $0.00$0.00$0.00
$162.45 $0.00 $0.00 $0.00 $0.40 $162.84District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0109-06-040LUFKIN HOUSTON
IMPROVE GUARDRAIL TO DESIGN STANDARD/SAFETY TREAT FIXEDOBJECTS
SH 19 MAY 2018
1.6 MI N OF FM 231LIMITS FROM: TRINITY COUNTY LINELIMITS TO:
$ 465,084
DESCRIPTION:
STP 2018(810)HESPROJ NUM:
11.533
NNHS:
ROW CSJ:
2507-01-018LUFKIN ANGELINA
SAFETY TREAT FIXED OBJECTS
FM 326 MAY 2018
SH 103LIMITS FROM: FM 1475LIMITS TO:
$ 127,737
DESCRIPTION:
STP 2018(810)HESPROJ NUM:
1.787
NNHS:
ROW CSJ:
3418-01-011LUFKIN ANGELINA
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXEDOBJECTS
FM 1336 MAY 2018
1.810 MI W OF FM 324LIMITS FROM: FM 324LIMITS TO:
$ 297,335
DESCRIPTION:
STP 2018(810)HESPROJ NUM:
1.810
NNHS:
ROW CSJ: $ 890,1563 Projects0109-06-040CONTRACT CSJ: MAY 2018
0200-02-039LUFKIN ANGELINA
WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL
US 69 MAY 2018
FM 844LIMITS FROM: ZAVALLALIMITS TO:
$ 54,919,692
DESCRIPTION:
NH 2018(811)PROJ NUM:
9.293
YNHS:
ROW CSJ:
0200-03-024LUFKIN ANGELINA
WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL
US 69 MAY 2018
SH 63LIMITS FROM: FM 1270LIMITS TO:
$ 10,811,504
DESCRIPTION:
NH 2016(214)PROJ NUM:
1.759
YNHS:
0200-03-027ROW CSJ: $ 65,731,1962 Projects0200-02-039CONTRACT CSJ: MAY 2018
0893-01-034LUFKIN NACOGDOCHES
IMPROVE GUARDRAIL TO DESIGN STANDARDS,SAFETY TREAT FIXEDOBJECTS
FM 226 MAY 2018
SH 21LIMITS FROM: SH 103LIMITS TO:
$ 914,390
DESCRIPTION:
STP 2018(812)HESPROJ NUM:
17.031
NNHS:
ROW CSJ:
0893-01-035LUFKIN NACOGDOCHES
IMPROVE GUARDRAIL TO DESIGN STANDARDS,SAFETY TREAT FIXEDOBJECTS
FM 226 MAY 2018
SH 103LIMITS FROM: 5.668 MI S OF SH 103LIMITS TO:
$ 182,615
DESCRIPTION:
STP 2018(812)HESPROJ NUM:
5.989
NNHS:
ROW CSJ: $ 1,097,0052 Projects0893-01-034CONTRACT CSJ: MAY 2018
0911-38-069LUFKIN ANGELINA
REPLACE BRIDGE AND APPROACHES
CR MAY 2018
ROBINSON LN AT GILLILAND CREEKLIMITS FROM: .LIMITS TO:
$ 353,013
DESCRIPTION:
BR 1702(558)PROJ NUM:
0.053
NNHS:
ROW CSJ: $ 353,0131 Project0911-38-069CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0928-02-020LUFKIN POLK
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXEDOBJECTS
FM 350 MAY 2018
2.625 MI N OF FM 3152LIMITS FROM: US 190LIMITS TO:
$ 801,822
DESCRIPTION:
STP 2018(813)HESPROJ NUM:
12.495
NNHS:
ROW CSJ:
1582-01-022LUFKIN SAN JACINTO
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXEDOBJECTS
FM 1725 MAY 2018
SH 150LIMITS FROM: LIBERTY COUNTY LINELIMITS TO:
$ 672,387
DESCRIPTION:
STP 2018(813)HESPROJ NUM:
17.773
NNHS:
ROW CSJ:
2591-01-010LUFKIN POLK
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 2610 MAY 2018
SH 146LIMITS FROM: LIBERTY COUNTY LINELIMITS TO:
$ 146,296
DESCRIPTION:
STP 2018(813)HESPROJ NUM:
4.962
NNHS:
ROW CSJ:
2667-01-013LUFKIN POLK
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 2665 MAY 2018
FM 1988LIMITS FROM: SH 146LIMITS TO:
$ 62,340
DESCRIPTION:
STP 2018(813)HESPROJ NUM:
8.817
NNHS:
ROW CSJ:
3471-01-024LUFKIN POLK
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 3277 MAY 2018
FM 2457LIMITS FROM: FM 3126LIMITS TO:
$ 110,548
DESCRIPTION:
STP 2018(813)HESPROJ NUM:
5.529
NNHS:
ROW CSJ: $ 1,793,3935 Projects0928-02-020CONTRACT CSJ: MAY 2018
1407-02-023LUFKIN NACOGDOCHES
SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACEWIDTH
FM 1638 MAY 2018
FM 698LIMITS FROM: US 59/SL 224LIMITS TO:
$ 2,764,681
DESCRIPTION:
STP 2018(814)HESPROJ NUM:
4.213
NNHS:
ROW CSJ: $ 2,764,6811 Project1407-02-023CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 72,629,44414 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0117-06-045LUFKIN HOUSTON
RECONSTRUCT PAVEMENT AND ADD PASSING LANES
SH 21 JUN 2018
EAST END OF TRINITY RIVER BRIDGELIMITS FROM: FM 1280LIMITS TO:
$ 13,199,964
DESCRIPTION:
NH 2018(933)PROJ NUM:
7.800
YNHS:
ROW CSJ:
0117-06-046LUFKIN HOUSTON
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXEDOBJECTS
SH 21 JUN 2018
MADISON COUNTY LINELIMITS FROM: FM 1280LIMITS TO:
$ 818,732
DESCRIPTION:
STP 2018(934)HESPROJ NUM:
8.537
YNHS:
ROW CSJ: $ 14,018,6962 Projects0117-06-045CONTRACT CSJ: JUN 2018
0395-02-041LUFKIN SAN JACINTO
RECONSTRUCT PAVEMENT AND ADD PASSING LANES
SH 150 JUN 2018
WALKER COUNTY LINELIMITS FROM: FM 945 (N)LIMITS TO:
$ 14,844,908
DESCRIPTION:
STP 1802(307)PROJ NUM:
7.616
NNHS:
ROW CSJ:
0395-02-038LUFKIN SAN JACINTO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
SH 150 JUN 2018
WALKER COUNTY LINELIMITS FROM: SH 156LIMITS TO:
$ 568,215
DESCRIPTION:
STP 2018(935)HESPROJ NUM:
15.058
NNHS:
ROW CSJ: $ 15,413,1232 Projects0395-02-041CONTRACT CSJ: JUN 2018
0911-00-075LUFKIN ANGELINA
CONSTRUCT CURB RAMPS IN VARIOUS LOCATION IN THE LUFKINDISTRICT
VA JUN 2018
VARIOUS LOCATIONSLIMITS FROM: .LIMITS TO:
$ 2,625,023
DESCRIPTION:
STP 2018(936)PROJ NUM:
4.567
NNHS:
ROW CSJ: $ 2,625,0231 Project0911-00-075CONTRACT CSJ: JUN 2018
0911-28-041LUFKIN HOUSTON
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
CR 2245 @ BIG ELKHART CREEKLIMITS FROM: .LIMITS TO:
$ 293,930
DESCRIPTION:
BR 1602(208)PROJ NUM:
0.088
NNHS:
ROW CSJ:
0911-28-042LUFKIN HOUSTON
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
CR 1515 SULLIVAN RD AT FLAT BRANCHLIMITS FROM: .LIMITS TO:
$ 343,196
DESCRIPTION:
BR 1602(209)PROJ NUM:
0.062
NNHS:
ROW CSJ: $ 637,1262 Projects0911-28-041CONTRACT CSJ: JUN 2018
3034-01-005LUFKIN HOUSTON
RECONSTRUCT AND WIDEN PAVEMENT
FM 2967 JUN 2018
FM 132LIMITS FROM: SH 21LIMITS TO:
$ 1,760,487
DESCRIPTION:
C 3034-1-5PROJ NUM:
2.800
NNHS:
ROW CSJ: $ 1,760,4871 Project3034-01-005CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 34,454,4558 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0176-03-131LUFKIN ANGELINA
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 59 JUL 2018
SL 287LIMITS FROM: POLK COUNTY LINELIMITS TO:
$ 1,366,382
DESCRIPTION:
STP 1802(326)HESPROJ NUM:
13.376
YNHS:
ROW CSJ:
0199-04-067LUFKIN ANGELINA
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 69 JUL 2018
CHEROKEE COUNTY LINELIMITS FROM: SH 103LIMITS TO:
$ 251,680
DESCRIPTION:
STP 1802(326)HESPROJ NUM:
13.057
YNHS:
ROW CSJ: $ 1,618,0622 Projects0176-03-131CONTRACT CSJ: JUL 2018
0176-08-024LUFKIN ANGELINA
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXEDOBJECTS
FM 324 JUL 2018
0.696 MI S OF SH 94LIMITS FROM: US 59LIMITS TO:
$ 571,870
DESCRIPTION:
STP 1802(328)HESPROJ NUM:
4.954
NNHS:
ROW CSJ: $ 571,8701 Project0176-08-024CONTRACT CSJ: JUL 2018
0403-02-019LUFKIN SAN JACINTO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 224 JUL 2018
SH 156 (N)LIMITS FROM: SH 156 (S)LIMITS TO:
$ 211,411
DESCRIPTION:
STP 1802(329)HESPROJ NUM:
7.743
NNHS:
ROW CSJ:
2594-01-014LUFKIN SAN JACINTO
IMPROVE GUARDRAIL TO DESIGN STANDARDS
FM 945 JUL 2018
SH 156LIMITS FROM: SH 150LIMITS TO:
$ 439,331
DESCRIPTION:
STP 1802(330)HESPROJ NUM:
8.851
NNHS:
ROW CSJ: $ 650,7422 Projects0403-02-019CONTRACT CSJ: JUL 2018
2590-01-020LUFKIN NACOGDOCHES
WIDEN FROM 2 TO 4 LANES
FM 2609 JUL 2018
RAGUET STREETLIMITS FROM: NORTH STREET (BU 59-F)LIMITS TO:
$ 2,157,005
DESCRIPTION:
STP 2013(518)PROJ NUM:
0.280
NNHS:
2590-01-027ROW CSJ: $ 2,157,0051 Project2590-01-020CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 4,997,6796 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0138-06-045LUFKIN NACOGDOCHES
UPGRADE INSTALL SAFETY LIGHTING WITHIN PROJECT
US 259 AUG 2018
RUSK COUNTY LINELIMITS FROM: BU 59-FLIMITS TO:
$ 30,760
DESCRIPTION:
STP ( )HESPROJ NUM:
11.369
NNHS:
ROW CSJ:
0176-05-189LUFKIN POLK
UPGRADE INSTALL SAFETY LIGHTING WITHIN PROJECT
US 59 AUG 2018
0.162 MILES NORTH OF FM 942LIMITS FROM: 0.217 MILES SOUTH OF US 190LIMITS TO:
$ 104,805
DESCRIPTION:
STP ( )HESPROJ NUM:
21.629
YNHS:
ROW CSJ:
0176-06-014LUFKIN POLK
UPGRADE INSTALL SAFETY LIGHTING WITHIN PROJECT
BU 59-J AUG 2018
0.488 MILE NORTH OF US 59LIMITS FROM: FM 1988LIMITS TO:
$ 117,857
DESCRIPTION:
STP ( )HESPROJ NUM:
4.586
NNHS:
ROW CSJ:
0177-01-109LUFKIN POLK
UPGRADE INSTALL SAFETY LIGHTING WITHIN PROJECT
US 59 AUG 2018
0.218 MILES SOUTH OF US 190LIMITS FROM: SAN JACINTO COUNTY LINELIMITS TO:
$ 96,773
DESCRIPTION:
STP ( )HESPROJ NUM:
9.706
YNHS:
ROW CSJ:
2560-01-084LUFKIN NACOGDOCHES
UPGRADE INSTALL SAFETY LIGHTING WITHIN PROJECT
US 59 AUG 2018
0.325 MILES SOUTH OF US 259LIMITS FROM: 0.326 MILES SOUTH OF BU 59LIMITS TO:
$ 295,063
DESCRIPTION:
STP ( )HESPROJ NUM:
7.785
YNHS:
ROW CSJ: $ 645,2585 Projects0138-06-045CONTRACT CSJ: AUG 2018
1407-03-018LUFKIN NACOGDOCHES
IMPROVE TRAFFIC AND PEDESTRIAN SIGNALS AT LOCATION
FM 1275 AUG 2018
AT EAST COLLEGE DRLIMITS FROM: AT EAST COLLEGE DRLIMITS TO:
$ 231,481
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0176-04-083LUFKIN POLK
INSTALL ADVANCE INTERSECTION WARNING SIGNALS-EXISTINGWARNING SIGNS
US 59 AUG 2018
AT US 287 IN CORRIGANLIMITS FROM: .LIMITS TO:
$ 37,990
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 269,4712 Projects1407-03-018CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 914,7297 Projects 2 Contracts
LUFKIN $ 112,996,30735 Projects 17 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
ODESSA DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$5.78 $0.00 $0.00 $0.00 $0.00NOVEMBER $5.78$0.00 $0.00$0.00$0.00
$9.51 $0.00 $0.00 $0.00 $0.00DECEMBER $9.51$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$11.37 $0.00 $0.00 $0.00 $0.00FEBRUARY $11.37$0.00 $0.00$0.00$0.00
$25.78 $0.00 $0.00 $0.00 $0.00MARCH $25.78$0.00 $0.00$0.00$0.00
$37.07 $0.00 $0.00 $0.00 $0.00APRIL $37.07$0.00 $0.00$0.00$0.00
$84.24 $0.00 $0.00 $0.00 $1.65MAY $87.72$0.00 $0.00$1.83$0.00
$37.64 $0.00 $0.00 $0.00 $0.00JUNE $37.64$0.00 $0.00$0.00$0.00
$6.16 $0.00 $0.00 $0.00 $0.00JULY $6.16$0.00 $0.00$0.00$0.00
$18.15 $0.00 $0.00 $0.00 $0.00AUGUST $18.15$0.00 $0.00$0.00$0.00
$235.71 $0.00 $0.00 $0.00 $1.65 $239.19District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ODESSA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0004-06-036ODESSA ECTOR
INSTALL MEDIAN BARRIER
IH 20 MAY 2018
FM 1053LIMITS FROM: 2.4 MI W OF FM 1601LIMITS TO:
$ 1,454,530
DESCRIPTION:
STP 2018(883)HESPROJ NUM:
5.656
YNHS:
ROW CSJ:
0004-07-127ODESSA ECTOR
INSTALL MEDIAN BARRIER
IH 20 MAY 2018
2.4 MI W OF FM 1601LIMITS FROM: BI 20-ELIMITS TO:
$ 2,835,279
DESCRIPTION:
STP 2018(883)HESPROJ NUM:
14.203
YNHS:
ROW CSJ:
0005-04-073ODESSA MARTIN
INSTALL MEDIAN BARRIER
IH 20 MAY 2018
WEST BI 20-FLIMITS FROM: HOWARD CO LINELIMITS TO:
$ 919,604
DESCRIPTION:
STP 2018(883)HESPROJ NUM:
9.315
YNHS:
ROW CSJ:
1188-02-101ODESSA MIDLAND
INSTALL MEDIAN BARRIER
SL 250 MAY 2018
SH 158LIMITS FROM: FAIRGROUNDS RDLIMITS TO:
$ 1,305,646
DESCRIPTION:
STP 2018(883)HESPROJ NUM:
7.537
YNHS:
ROW CSJ: $ 6,515,0594 Projects0004-06-036CONTRACT CSJ: MAY 2018
0139-04-045ODESSA REEVES
ROADWAY WIDENING TO A MODIFIED SUPER 2
US 285 MAY 2018
SH 302LIMITS FROM: FM 1216LIMITS TO:
$ 32,501,522
DESCRIPTION:
NH 2018(882)PROJ NUM:
16.855
YNHS:
ROW CSJ: $ 32,501,5221 Project0139-04-045CONTRACT CSJ: MAY 2018
0229-03-035ODESSA CRANE
WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY
US 385 MAY 2018
CASTLE GAP ROADLIMITS FROM: UPTON COUNTY LINELIMITS TO:
$ 26,009,506
DESCRIPTION:
NH 2018(881)PROJ NUM:
6.461
YNHS:
0229-03-036ROW CSJ: $ 26,009,5061 Project0229-03-035CONTRACT CSJ: MAY 2018
0380-09-087ODESSA MIDLAND
ROADWAY REHABILITATION
BS 349C MAY 2018
MARTIN COUNTY LINELIMITS FROM: SL 250LIMITS TO:
$ 8,676,768
DESCRIPTION:
NH 2018(880)PROJ NUM:
3.051
YNHS:
ROW CSJ: $ 8,676,7681 Project0380-09-087CONTRACT CSJ: MAY 2018
0626-01-007ODESSA REEVES
REHABILITATE STATE PARK ROADS AND PARKING LOTS
PR 30B MAY 2018
WITHIN BALMORHEA STATE PARKLIMITS FROM: .LIMITS TO:
$ 448,564
DESCRIPTION:
C 626-1-7PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 448,5641 Project0626-01-007CONTRACT CSJ: MAY 2018
1639-01-014ODESSA REEVES
ROADWAY REHABILITATION
FM 1450 MAY 2018
US 285LIMITS FROM: 8.5 MILES EAST OF US 285LIMITS TO:
$ 7,934,413
DESCRIPTION:
STP 2018(879)PROJ NUM:
8.500
NNHS:
ROW CSJ: $ 7,934,4131 Project1639-01-014CONTRACT CSJ: MAY 2018
7106-05-001ODESSA CRANE
REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS
RL SO MAY 2018
UPTON COUNTY LINE RRMP 843.6LIMITS FROM: CROCKETT COUNTY LINE RRMP 846.9LIMITS TO:
$ 409,560
DESCRIPTION:
STP 2018(117)PROJ NUM:
0.001
NNHS:
ROW CSJ:
7106-06-003ODESSA UPTON
INFRASTRUCTURE REHAB TO REPLACE JOINTED RAIL, REPLACE TIES,BALLAST, RECONSTRUCT GRADE
RL SO MAY 2018
REAGAN COUNTY LINE RRMP 810.4LIMITS FROM: CRANE COUNTY LINE RMP 843.6LIMITS TO:
$ 5,227,730
DESCRIPTION:
STP 2018(117)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 5,637,2902 Projects7107-04-001CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 87,723,12211 Projects 7 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ODESSA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0004-07-129ODESSA ECTOR
BRIDGE REPAIR
IH 20 JUN 2018
FM 1936 @ IH 20 & UPRRLIMITS FROM: .LIMITS TO:
$ 1,596,787
DESCRIPTION:
BR 2018(929)PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 1,596,7871 Project0004-07-129CONTRACT CSJ: JUN 2018
0292-02-040ODESSA WINKLER
ROADWAY REHABILITATION
SH 18 JUN 2018
FM 1232LIMITS FROM: WARD COUNTY LINELIMITS TO:
$ 10,995,861
DESCRIPTION:
STP 2018(930)PROJ NUM:
8.833
NNHS:
ROW CSJ: $ 10,995,8611 Project0292-02-040CONTRACT CSJ: JUN 2018
0493-02-015ODESSA LOVING
ROADWAY REHABILITATION
RM 652 JUN 2018
PECOS RIVERLIMITS FROM: N.M. STATE LINELIMITS TO:
$ 17,000,000
DESCRIPTION:
STP 2018(931)PROJ NUM:
11.295
NNHS:
ROW CSJ: $ 17,000,0001 Project0493-02-015CONTRACT CSJ: JUN 2018
1717-02-023ODESSA MIDLAND
ROADWAY RESTORATION
FM 1787 JUN 2018
FM 1788LIMITS FROM: SH 349LIMITS TO:
$ 8,051,284
DESCRIPTION:
C 1717-2-23PROJ NUM:
8.079
NNHS:
ROW CSJ: $ 8,051,2841 Project1717-02-023CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 37,643,9324 Projects 4 Contracts
0005-15-088ODESSA MIDLAND
REVERSAL OF EB ON/OFF RAMPS
IH 20 JUL 2018
LAMESA ROADLIMITS FROM: FM 715LIMITS TO:
$ 4,500,000
DESCRIPTION:
NH 2018(619)PROJ NUM:
0.996
YNHS:
ROW CSJ: $ 4,500,0001 Project0005-15-088CONTRACT CSJ: JUL 2018
0906-32-054ODESSA MIDLAND
IMPROVE TRAFFIC SIGNALS, ADD RIGHT TURN LANE
CS JUL 2018
WADLEY AVENUE @ NORTH A STREETLIMITS FROM: .LIMITS TO:
$ 1,661,520
DESCRIPTION:
STP 2017(228)HESPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,661,5201 Project0906-32-054CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 6,161,5202 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ODESSA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0005-01-109ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACONS, WARNING SIGNALS ANDSIGNS
BI 20-E AUG 2018
AT SH 302LIMITS FROM: .LIMITS TO:
$ 115,257
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0005-01-111ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDWARNING SIGNALS AND SIGNS (INTERSECTION)
BI 20-E AUG 2018
@NEWELLLIMITS FROM: .LIMITS TO:
$ 32,917
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0380-18-008ODESSA MIDLAND
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDWARNING SIGNALS AND SIGNS (INTERSECTION)
SH 349 AUG 2018
@CR60LIMITS FROM: .LIMITS TO:
$ 49,577
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0463-03-048ODESSA MIDLAND
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEINTERSECTION WARNING SIGNALS - EXISTING WARNING SIGNS
SH 158 AUG 2018
AT FM 1213LIMITS FROM: .LIMITS TO:
$ 127,054
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0572-01-064ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEINTERSECTION WARNING SIGNALS AND SIGNS, RUMBLE STRIPS
SH 302 AUG 2018
AT FM 1936LIMITS FROM: .LIMITS TO:
$ 118,897
DESCRIPTION:
STP ( )HESGPROJ NUM:
0.200
NNHS:
ROW CSJ:
0572-01-068ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDWARNING SIGNALS AND SIGNS (INTERSECTION)
SH 302 AUG 2018
@42NDLIMITS FROM: .LIMITS TO:
$ 46,150
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
1870-01-034ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDWARNING SIGNALS AND SIGNS (INTERSECTION)
FM 2020 AUG 2018
@FLAMINGO AVELIMITS FROM: .LIMITS TO:
$ 44,378
DESCRIPTION:
STP ( )HESGPROJ NUM:
0.200
NNHS:
ROW CSJ:
2224-01-096ODESSA ECTOR
INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEDINTERSECTION WARNING SIGNALS - EXISTING WARNING SIGNS
SL 338 AUG 2018
@ E HAMMETT DRLIMITS FROM: .LIMITS TO:
$ 63,710
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 597,9408 Projects0005-01-109CONTRACT CSJ: AUG 2018
0380-07-026ODESSA MARTIN
ARMORING WITH OVERLAY
SH 349 AUG 2018
DAWSON CO LINELIMITS FROM: SH 176LIMITS TO:
$ 7,967,734
DESCRIPTION:
NH ( )PROJ NUM:
16.312
YNHS:
ROW CSJ:
0380-08-022ODESSA MARTIN
ARMORING WITH OVERLAY
SH 349 AUG 2018
SH 176LIMITS FROM: BS 349-CLIMITS TO:
$ 7,804,100
DESCRIPTION:
NH ( )PROJ NUM:
15.977
YNHS:
ROW CSJ:
0380-08-023ODESSA MARTIN
ARMORING WITH OVERLAY
SH 349 AUG 2018
BS 349-CLIMITS FROM: MIDLAND COUNTY LINELIMITS TO:
$ 374,648
DESCRIPTION:
NH ( )PROJ NUM:
0.767
YNHS:
ROW CSJ:
0380-17-006ODESSA MARTIN
ARMORING WITH OVERLAY
SH 349 AUG 2018
BS 349-CLIMITS FROM: 2.7 MILES NORTH OF BS 349-CLIMITS TO:
$ 1,353,518
DESCRIPTION:
NH ( )PROJ NUM:
2.771
YNHS:
ROW CSJ: $ 17,500,0004 Projects0380-07-026CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ODESSA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
2296-01-052ODESSA ECTOR
WRONG WAY DRIVER WARNING SIGNS
SH 191 AUG 2018
EAST SL 338LIMITS FROM: MIDLAND COUNTY LINELIMITS TO:
$ 26,928
DESCRIPTION:
STP ( )HESPROJ NUM:
2.782
YNHS:
ROW CSJ:
0463-02-071ODESSA MIDLAND
WRONG WAY WARNING SIGNS
SH 158 AUG 2018
1 MILE WEST OF WEST LOOP 250LIMITS FROM: SL 250LIMITS TO:
$ 7,694
DESCRIPTION:
STP ( )HESPROJ NUM:
0.992
YNHS:
ROW CSJ:
2296-02-024ODESSA MIDLAND
WRONG WAY DRIVER WARNING SIGNS
SH 191 AUG 2018
ECTOR COUNTY LINELIMITS FROM: SH 158LIMITS TO:
$ 19,235
DESCRIPTION:
STP ( )HESPROJ NUM:
8.899
YNHS:
ROW CSJ: $ 53,8573 Projects2296-01-052CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 18,151,79715 Projects 3 Contracts
ODESSA $ 149,680,37132 Projects 16 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
PARIS DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$2.19 $0.00 $0.00 $0.00 $0.03SEPTEMBER $2.22$0.00 $0.00$0.00$0.00
$8.92 $0.00 $0.00 $0.00 $0.00OCTOBER $8.92$0.00 $0.00$0.00$0.00
$5.12 $0.00 $0.00 $0.00 $0.00NOVEMBER $5.12$0.00 $0.00$0.00$0.00
$23.07 $0.00 $0.00 $0.00 $0.00DECEMBER $23.07$0.00 $0.00$0.00$0.00
$6.46 $0.00 $0.00 $0.00 $0.00JANUARY $6.46$0.00 $0.00$0.00$0.00
$5.39 $0.00 $0.00 $0.00 $0.00FEBRUARY $7.19$0.00 $0.00$0.00$1.80
$1.04 $0.00 $0.00 $0.00 $0.00MARCH $1.04$0.00 $0.00$0.00$0.00
$1.94 $0.00 $0.00 $0.00 $0.00APRIL $1.94$0.00 $0.00$0.00$0.00
$0.17 $0.00 $0.00 $0.00 $0.00MAY $0.17$0.00 $0.00$0.00$0.00
$11.75 $0.00 $0.00 $0.00 $0.00JUNE $11.75$0.00 $0.00$0.00$0.00
$76.91 $0.00 $0.00 $0.00 $0.00JULY $76.91$0.00 $0.00$0.00$0.00
$24.00 $0.00 $0.00 $0.00 $0.00AUGUST $26.97$0.00 $0.00$0.00$2.97
$166.96 $0.00 $0.00 $0.00 $0.03 $171.76District Total: $0.00 $0.00$0.00$4.77
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0045-08-038PARIS LAMAR
INSTALL INTERSECTION FLASHING BEACON
US 82 MAY 2018
AT FM 38LIMITS FROM: .LIMITS TO:
$ 34,653
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0108-09-049PARIS HOPKINS
INSTALL ADVANCED INTERSECTION WARNING SIGNALS AND SIGNS
SH 19 MAY 2018
AT FM 2285LIMITS FROM: .LIMITS TO:
$ 20,793
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0221-01-077PARIS LAMAR
IMPROVE TRAFFIC SIGNALS
BU 271B MAY 2018
AT COLLEGIATE DRLIMITS FROM: .LIMITS TO:
$ 18,363
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0722-02-042PARIS RED RIVER
INSTALL INTERSECTION FLASHING BEACON
SH 37 MAY 2018
AT BS 37CLIMITS FROM: .LIMITS TO:
$ 30,473
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0723-01-037PARIS FRANKLIN
INSTALL INTERSECTION FLASHING BEACON
FM 115 MAY 2018
AT FM 1448LIMITS FROM: .LIMITS TO:
$ 36,726
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0730-02-023PARIS LAMAR
IMPROVE TRAFFIC SIGNALS
FM 195 MAY 2018
AT BU 82HLIMITS FROM: .LIMITS TO:
$ 33,461
DESCRIPTION:
STP 2018(808)HESPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 174,4696 Projects0045-08-038CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 174,4696 Projects 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0189-01-011PARIS RED RIVER
SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS
SH 37 JUN 2018
OKLAHOMA STATE LINELIMITS FROM: 0.453 MI S FROM STATE LINELIMITS TO:
$ 11,358
DESCRIPTION:
STP 2018(979)HESPROJ NUM:
0.453
NNHS:
ROW CSJ:
0189-02-051PARIS RED RIVER
SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS
SH 37 JUN 2018
0.453 MI S FROM STATE LINELIMITS FROM: US 82LIMITS TO:
$ 2,053,876
DESCRIPTION:
STP 2018(979)HESPROJ NUM:
17.200
NNHS:
ROW CSJ:
0189-04-020PARIS RED RIVER
SAFETY TREAT FIXED OBJECTS
SH 37 JUN 2018
US 271LIMITS FROM: FRANKLIN COUNTY LINELIMITS TO:
$ 557,060
DESCRIPTION:
STP 2018(979)HESPROJ NUM:
7.300
NNHS:
ROW CSJ:
0722-02-038PARIS RED RIVER
SAFETY TREAT FIXED OBJECTS
SH 37 JUN 2018
US 82LIMITS FROM: FM 411LIMITS TO:
$ 7,610,376
DESCRIPTION:
STP 2018(979)HESPROJ NUM:
9.497
NNHS:
ROW CSJ:
0772-03-018PARIS RED RIVER
SAFETY TREAT FIXED OBJECTS
SH 37 JUN 2018
FM 411LIMITS FROM: US 271LIMITS TO:
$ 289,517
DESCRIPTION:
STP 2018(979)HESPROJ NUM:
4.503
NNHS:
ROW CSJ: $ 10,522,1875 Projects0189-01-011CONTRACT CSJ: JUN 2018
0901-19-181PARIS GRAYSON
BRIDGE REPLACEMENT
CR JUN 2018
CR 195-1LIMITS FROM: AT JORDAN CREEKLIMITS TO:
$ 394,262
DESCRIPTION:
BR 2016(435)PROJ NUM:
0.010
NNHS:
ROW CSJ:
0901-32-063PARIS FANNIN
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
CR 4526-1LIMITS FROM: AT TRIB OF BOIS D'ARC CREEKLIMITS TO:
$ 298,402
DESCRIPTION:
BR 2015(755)PROJ NUM:
0.010
NNHS:
ROW CSJ:
0901-32-081PARIS FANNIN
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
AT CR 353-1 (FCR 2275)LIMITS FROM: AT COFFEE MILL CREEKLIMITS TO:
$ 312,221
DESCRIPTION:
BR 2013(432)PROJ NUM:
0.010
NNHS:
ROW CSJ:
0901-32-086PARIS FANNIN
BRIDGE REPLACEMENT
CR JUN 2018
CR 4131-1LIMITS FROM: AT COOPER CREEKLIMITS TO:
$ 219,877
DESCRIPTION:
BR 2015(757)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,224,7624 Projects0901-19-181CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 11,746,9499 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0045-20-018PARIS FANNIN
ADD TWO LANES WITH SHOULDERS
US 82 JUL 2018
0.5 MILES WEST OF SH 121LIMITS FROM: SH 78 (0.478 MI EAST OF SH 78)LIMITS TO:
$ 8,952,344
DESCRIPTION:
NH 1802(395)PROJ NUM:
2.031
YNHS:
ROW CSJ:
0045-21-011PARIS FANNIN
ADD TWO LANES WITH SHOULDERS
US 82 JUL 2018
0.478 MI E OF SH 78LIMITS FROM: FM 100LIMITS TO:
$ 52,654,366
DESCRIPTION:
NH 1802(395)PROJ NUM:
14.487
YNHS:
ROW CSJ:
0045-21-012PARIS FANNIN
WIDEN FROM 2-LANE TO 4-LANE
US 82 JUL 2018
FM 100LIMITS FROM: 0.5 MILES EAST OF SH 56LIMITS TO:
$ 10,569,204
DESCRIPTION:
NH 1802(395)PROJ NUM:
2.636
YNHS:
ROW CSJ: $ 72,175,9143 Projects0045-20-018CONTRACT CSJ: JUL 2018
0901-28-085PARIS HOPKINS
BRIDGE REPLACEMENT
CR JUL 2018
CR 578-1LIMITS FROM: AT BLACKS CREEKLIMITS TO:
$ 130,000
DESCRIPTION:
BR 2016(211)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 130,0001 Project0901-28-085CONTRACT CSJ: JUL 2018
2657-01-031PARIS LAMAR
REHABILITATION OF EXISTING ROAD
FM 2648 JUL 2018
US 271LIMITS FROM: FM 906LIMITS TO:
$ 4,609,082
DESCRIPTION:
C 2657-1-31PROJ NUM:
8.800
NNHS:
ROW CSJ: $ 4,609,0821 Project2657-01-031CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 76,914,9965 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0045-19-053PARIS GRAYSON
SAFETY TREAT FIXED OBJECTS
US 82 AUG 2018
FM 131LIMITS FROM: FM 1897LIMITS TO:
$ 1,164,771
DESCRIPTION:
STP ( )HESGPROJ NUM:
12.572
YNHS:
ROW CSJ:
0047-01-062PARIS GRAYSON
SAFETY TREAT FIXED OBJECTS
US 69 AUG 2018
US 75LIMITS FROM: 0.148 MI N OF FM 120LIMITS TO:
$ 352,861
DESCRIPTION:
STP ( )HESPROJ NUM:
2.954
NNHS:
ROW CSJ:
0410-01-029PARIS GRAYSON
SAFETY TREAT FIXED OBJECTS
US 69 AUG 2018
SS 503LIMITS FROM: US 82LIMITS TO:
$ 978,760
DESCRIPTION:
STP ( )HESPROJ NUM:
10.133
NNHS:
ROW CSJ:
0410-02-032PARIS GRAYSON
SAFETY TREAT FIXED OBJECTS
US 69 AUG 2018
US 82LIMITS FROM: SH 56LIMITS TO:
$ 164,205
DESCRIPTION:
STP ( )HESPROJ NUM:
1.700
NNHS:
ROW CSJ: $ 2,660,5974 Projects0045-19-053CONTRACT CSJ: AUG 2018
0083-03-055PARIS HOPKINS
MILL AND INLAY
SH 154 AUG 2018
BU 67 VLIMITS FROM: SH 11LIMITS TO:
$ 1,928,358
DESCRIPTION:
C 83-3-55PROJ NUM:
2.111
YNHS:
ROW CSJ:
0108-09-046PARIS HOPKINS
MILL AND INLAY
SH 19 AUG 2018
SH 154LIMITS FROM: BU 67 VLIMITS TO:
$ 2,036,411
DESCRIPTION:
C 108-9-46PROJ NUM:
3.948
YNHS:
ROW CSJ:
0400-02-050PARIS HOPKINS
MILL AND INLAY
SH 154 AUG 2018
LOOP 301LIMITS FROM: BU 67 VLIMITS TO:
$ 1,658,563
DESCRIPTION:
C 400-2-50PROJ NUM:
2.711
YNHS:
ROW CSJ: $ 5,623,3323 Projects0083-03-055CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0174-04-035PARIS FANNIN
RAISED EDGELINE RUMBLE STRIPS, RAISED CENTERLINE RUMBLESTRIPS
FM 79 AUG 2018
FM 100LIMITS FROM: LAMAR COUNTY LINELIMITS TO:
$ 194,690
DESCRIPTION:
STP ( )HESGPROJ NUM:
4.468
NNHS:
ROW CSJ:
0189-04-021PARIS RED RIVER
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 37 AUG 2018
1.577 MI S OF SS 38LIMITS FROM: FRANKLIN COUNTY LINELIMITS TO:
$ 37,755
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.419
NNHS:
ROW CSJ:
0202-09-029PARIS GRAYSON
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 697 AUG 2018
SH 11LIMITS FROM: US 69LIMITS TO:
$ 61,631
DESCRIPTION:
STP ( )HESGPROJ NUM:
14.749
NNHS:
ROW CSJ:
0203-02-045PARIS HUNT
RAISED EDGELINE RUMBLE STRIPS, RAISED CENTERLINE RUMBLESTRIPS
US 69 AUG 2018
CR 3401LIMITS FROM: CR 3231LIMITS TO:
$ 16,431
DESCRIPTION:
STP ( )HESGPROJ NUM:
1.778
YNHS:
ROW CSJ:
0203-04-039PARIS RAINS
RAISED EDGELINE RUMBLE STRIPS, RAISED CENTERLINE RUMBLESTRIPS
US 69 AUG 2018
0.251 MI S OF FM 2795LIMITS FROM: WOOD COUNTY LINELIMITS TO:
$ 42,063
DESCRIPTION:
STP ( )HESGPROJ NUM:
7.635
YNHS:
ROW CSJ:
0435-01-071PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 38 AUG 2018
FM 2352LIMITS FROM: FM 137LIMITS TO:
$ 75,013
DESCRIPTION:
STP ( )HESGPROJ NUM:
18.080
NNHS:
ROW CSJ:
0641-03-018PARIS HOPKINS
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 1567 AUG 2018
HUNT COUNTY LINELIMITS FROM: SH 19LIMITS TO:
$ 40,301
DESCRIPTION:
STP ( )HESGPROJ NUM:
9.689
NNHS:
ROW CSJ:
0641-04-018PARIS HOPKINS
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 1567 AUG 2018
SH 19LIMITS FROM: FM 2297LIMITS TO:
$ 12,465
DESCRIPTION:
STP ( )HESGPROJ NUM:
2.869
NNHS:
ROW CSJ:
0680-01-016PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 196 AUG 2018
US 271LIMITS FROM: CR 1630LIMITS TO:
$ 53,205
DESCRIPTION:
STP ( )HESGPROJ NUM:
13.090
NNHS:
ROW CSJ:
0680-07-011PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 196 AUG 2018
FM 195LIMITS FROM: US 82LIMITS TO:
$ 25,243
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.057
NNHS:
ROW CSJ:
0680-08-009PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 196 AUG 2018
US 82LIMITS FROM: US 271LIMITS TO:
$ 24,552
DESCRIPTION:
STP ( )HESGPROJ NUM:
5.916
NNHS:
ROW CSJ:
0688-02-059PARIS LAMAR
RAISED EDGELINE RUMBLE STRIPS, RAISED CENTERLINE RUMBLESTRIPS
FM 79 AUG 2018
FANNIN COUNTY LINELIMITS FROM: CR 32500LIMITS TO:
$ 122,670
DESCRIPTION:
STP ( )HESGPROJ NUM:
18.964
NNHS:
ROW CSJ:
0688-03-026PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 1497 AUG 2018
SL 286LIMITS FROM: FM 1498LIMITS TO:
$ 28,496
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.819
NNHS:
ROW CSJ:
0722-02-039PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 410 AUG 2018
FM 411LIMITS FROM: US 271LIMITS TO:
$ 14,844
DESCRIPTION:
STP ( )HESGPROJ NUM:
3.525
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0722-02-040PARIS RED RIVER
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 37 AUG 2018
0.096 MI S OF BS 37CLIMITS FROM: FM 411LIMITS TO:
$ 54,813
DESCRIPTION:
STP ( )HESGPROJ NUM:
8.524
NNHS:
ROW CSJ:
0729-01-041PARIS GRAYSON
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 121 AUG 2018
0.66 MI E OF BU 377DLIMITS FROM: SH 5LIMITS TO:
$ 81,160
DESCRIPTION:
STP ( )HESGPROJ NUM:
21.652
NNHS:
ROW CSJ:
0729-02-029PARIS GRAYSON
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 121 AUG 2018
SH 5LIMITS FROM: SH 160LIMITS TO:
$ 41,465
DESCRIPTION:
STP ( )HESGPROJ NUM:
10.803
NNHS:
ROW CSJ:
0730-01-008PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 195 AUG 2018
LAMAR COUNTY LINELIMITS FROM: FM 410LIMITS TO:
$ 8,946
DESCRIPTION:
STP ( )HESGPROJ NUM:
2.199
NNHS:
ROW CSJ:
0730-02-051PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 195 AUG 2018
US 82LIMITS FROM: RED RIVER COUNTY LINELIMITS TO:
$ 70,932
DESCRIPTION:
STP ( )HESPROJ NUM:
16.836
NNHS:
ROW CSJ:
0730-03-027PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 905 AUG 2018
SL 286LIMITS FROM: FM 1497LIMITS TO:
$ 64,844
DESCRIPTION:
STP ( )HESGPROJ NUM:
15.590
NNHS:
ROW CSJ:
0730-04-014PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 195 AUG 2018
FM 410LIMITS FROM: FM 410LIMITS TO:
$ 54,944
DESCRIPTION:
STP ( )HESGPROJ NUM:
13.390
NNHS:
ROW CSJ:
0749-02-020PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 38 AUG 2018
FM 137LIMITS FROM: DELTA COUNTY LINELIMITS TO:
$ 23,028
DESCRIPTION:
STP ( )HESGPROJ NUM:
5.462
NNHS:
ROW CSJ:
0763-01-019PARIS DELTA
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 198 AUG 2018
FM 128LIMITS FROM: SH 19/24LIMITS TO:
$ 8,340
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.263
NNHS:
ROW CSJ:
0763-02-009PARIS DELTA
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 198 AUG 2018
SH 19/24LIMITS FROM: FM 895LIMITS TO:
$ 29,395
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.983
NNHS:
ROW CSJ:
0766-02-017PARIS HOPKINS
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 69 AUG 2018
IH 30LIMITS FROM: SH 11LIMITS TO:
$ 28,548
DESCRIPTION:
STP ( )HESGPROJ NUM:
6.875
NNHS:
ROW CSJ:
0766-04-018PARIS HOPKINS
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 69 AUG 2018
SH 11LIMITS FROM: 2 MILES SOUTH OF SH 11LIMITS TO:
$ 7,843
DESCRIPTION:
STP ( )HESGPROJ NUM:
1.872
NNHS:
ROW CSJ:
0769-02-031PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 906 AUG 2018
1.708 MI W OF US 271LIMITS FROM: 1.562 MI E OF FM 3298LIMITS TO:
$ 32,033
DESCRIPTION:
STP ( )HESGPROJ NUM:
7.760
NNHS:
ROW CSJ:
0772-01-028PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 410 AUG 2018
1.625 MI N OF FM 195LIMITS FROM: 0.138 MI N OF FM 3281LIMITS TO:
$ 35,189
DESCRIPTION:
STP ( )HESGPROJ NUM:
11.660
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:29 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0772-02-017PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 410 AUG 2018
1.07 MI N OF FM 194LIMITS FROM: FM 411LIMITS TO:
$ 30,605
DESCRIPTION:
STP ( )HESGPROJ NUM:
8.103
NNHS:
ROW CSJ:
0772-03-019PARIS RED RIVER
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 37 AUG 2018
FM 411LIMITS FROM: 0.218 MI N OF SS 38LIMITS TO:
$ 21,678
DESCRIPTION:
STP ( )HESGPROJ NUM:
3.473
NNHS:
ROW CSJ:
1379-01-027PARIS GRAYSON
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 901 AUG 2018
7.075 MI W OF US 377LIMITS FROM: US 82LIMITS TO:
$ 70,760
DESCRIPTION:
STP ( )HESGPROJ NUM:
17.908
NNHS:
ROW CSJ:
1705-01-022PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 195 AUG 2018
FM 410LIMITS FROM: SH 37LIMITS TO:
$ 9,612
DESCRIPTION:
STP ( )HESGPROJ NUM:
2.300
NNHS:
ROW CSJ:
2155-01-011PARIS RED RIVER
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 410 AUG 2018
US 271LIMITS FROM: FM 196LIMITS TO:
$ 29,998
DESCRIPTION:
STP ( )HESGPROJ NUM:
7.156
NNHS:
ROW CSJ:
2490-01-009PARIS LAMAR
TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS
FM 196 AUG 2018
CR 1630LIMITS FROM: RED RIVER COUNTY LINELIMITS TO:
$ 10,652
DESCRIPTION:
STP ( )HESGPROJ NUM:
2.555
NNHS:
ROW CSJ: $ 1,464,14434 Projects0174-04-035CONTRACT CSJ: AUG 2018
0666-01-027PARIS GRAYSON
RECONST ROADWAY AND ADD 2 LANES
FM 691 AUG 2018
0.03 MI W OF LOY LAKE RD / FM 131LIMITS FROM: 0.11 MI W OF SB US 75 FRTG RDLIMITS TO:
$ 7,000,000
DESCRIPTION:
STP ( )PROJ NUM:
0.754
NNHS:P1
ROW CSJ:
0666-01-026PARIS GRAYSON
SAFETY TREAT FIXED OBJECTS
FM 691 AUG 2018
0.473 MI W OF FM 1417LIMITS FROM: SH 91LIMITS TO:
$ 651,594
DESCRIPTION:
STP ( )HESGPROJ NUM:
5.250
NNHS:
ROW CSJ: $ 7,651,5942 Projects0666-01-027CONTRACT CSJ: AUG 2018
0765-02-021PARIS FANNIN
REHABILITATION OF EXISTING ROAD
FM 1753 AUG 2018
FM 274LIMITS FROM: SH 78LIMITS TO:
$ 3,383,999
DESCRIPTION:
C 765-2-21PROJ NUM:
3.802
NNHS:
ROW CSJ:
1709-01-009PARIS GRAYSON
REHABILITATION OF EXISTING ROAD
FM 1753 AUG 2018
FM 1897LIMITS FROM: FANNIN COUNTY LINELIMITS TO:
$ 427,287
DESCRIPTION:
C 1709-1-9PROJ NUM:
0.620
NNHS:
ROW CSJ:
1709-02-020PARIS FANNIN
REHABILITATION OF EXISTING ROAD
FM 1753 AUG 2018
GRAYSON COUNTY LINELIMITS FROM: FM 274LIMITS TO:
$ 5,076,838
DESCRIPTION:
C 1709-2-20PROJ NUM:
8.500
NNHS:
ROW CSJ: $ 8,888,1243 Projects0765-02-021CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0901-29-082PARIS LAMAR
BRIDGE REPLACEMENT
CR AUG 2018
CR 281-3LIMITS FROM: AT FAUGHT CREEKLIMITS TO:
$ 136,500
DESCRIPTION:
BR 1402(211)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0901-31-121PARIS DELTA
REPLACE BRIDGE AND APPROACHES
CR AUG 2018
@ BIG CREEKLIMITS FROM: .LIMITS TO:
$ 156,000
DESCRIPTION:
BR 99(820)PROJ NUM:
0.068
NNHS:
ROW CSJ:
0901-31-130PARIS DELTA
BRIDGE REPLACEMENT
CR AUG 2018
CR 194-2LIMITS FROM: BRANCH OF BRUSHY CREEKLIMITS TO:
$ 234,000
DESCRIPTION:
BR 2016(891)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0901-31-131PARIS DELTA
BRIDGE REPLACEMENT
CR AUG 2018
CR 173-1LIMITS FROM: AT DRAW CREEKLIMITS TO:
$ 156,000
DESCRIPTION:
BR 2015(344)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 682,5004 Projects0901-29-082CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 26,970,29150 Projects 6 Contracts
PARIS $ 115,806,70570 Projects 12 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
PHARR DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$19.22 $0.00 $0.00 $0.00 $0.00OCTOBER $19.22$0.00 $0.00$0.00$0.00
$2.51 $0.00 $0.00 $0.00 $0.00NOVEMBER $2.51$0.00 $0.00$0.00$0.00
$7.23 $0.00 $0.00 $0.00 $0.00DECEMBER $10.94$0.00 $0.00$0.00$3.70
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$1.09 $0.00 $0.00 $0.00 $0.00FEBRUARY $1.09$0.00 $0.00$0.00$0.00
$5.54 $0.00 $0.00 $0.00 $0.17MARCH $5.70$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $4.43APRIL $4.43$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$34.94 $0.00 $0.00 $0.00 $1.00JUNE $35.94$0.00 $0.00$0.00$0.00
$6.84 $0.00 $0.00 $0.00 $0.00JULY $6.84$0.00 $0.00$0.00$0.00
$50.55 $0.00 $0.00 $0.00 $0.00AUGUST $50.55$0.00 $0.00$0.00$0.00
$127.93 $0.00 $0.00 $0.00 $5.59 $137.23District Total: $0.00 $0.00$0.00$3.70
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PHARR DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0039-02-066PHARR HIDALGO
OVERLAY
US 83 JUN 2018
HIDALGO/STARR CLLIMITS FROM: 0.65 MI E OF FM 886LIMITS TO:
$ 1,497,287
DESCRIPTION:
C 39-2-66PROJ NUM:
1.433
YNHS:
ROW CSJ:
0039-02-064PHARR HIDALGO
OVERLAY
US 83 JUN 2018
FM 2221LIMITS FROM: FM 1427LIMITS TO:
$ 1,238,111
DESCRIPTION:
C 39-2-64PROJ NUM:
2.865
YNHS:
ROW CSJ:
0039-17-189PHARR HIDALGO
OVERLAY_(MAIN LANES)
IH 2 JUN 2018
FM 1427LIMITS FROM: 0.5 MI E OF SH 364LIMITS TO:
$ 2,493,523
DESCRIPTION:
C 39-17-189PROJ NUM:
1.312
YNHS:
ROW CSJ:
0039-18-119PHARR HIDALGO
OVERLAY_(MAIN LANES)
IH 2 JUN 2018
FM 2557LIMITS FROM: FM 1423LIMITS TO:
$ 2,153,209
DESCRIPTION:
C 39-18-119PROJ NUM:
3.750
YNHS:
ROW CSJ:
1064-01-036PHARR HIDALGO
OVERLAY
FM 676 JUN 2018
FM 492LIMITS FROM: 0.2 MI W OF SH 364LIMITS TO:
$ 272,353
DESCRIPTION:
C 1064-1-36PROJ NUM:
1.280
NNHS:
ROW CSJ:
1804-01-077PHARR HIDALGO
OVERLAY
FM 1926 JUN 2018
SH 495LIMITS FROM: UVALDE AVE.LIMITS TO:
$ 638,099
DESCRIPTION:
C 1804-1-77PROJ NUM:
2.200
NNHS:
ROW CSJ: $ 8,292,5826 Projects0039-02-066CONTRACT CSJ: JUN 2018
0220-03-031PHARR CAMERON
REHAB EXISTING ROADWAY
US 281 JUN 2018
FM 509LIMITS FROM: 0.499 MI W OF FM 732LIMITS TO:
$ 10,785,224
DESCRIPTION:
C 220-4-44PROJ NUM:
3.956
NNHS:
ROW CSJ:
0220-04-044PHARR CAMERON
REHAB EXISTING ROADWAY
US 281 JUN 2018
0.499 MI W OF FM 732LIMITS FROM: 0.114 MI E OF FM 732LIMITS TO:
$ 1,622,408
DESCRIPTION:
C 220-4-44PROJ NUM:
0.613
NNHS:
ROW CSJ: $ 12,407,6322 Projects0220-03-031CONTRACT CSJ: JUN 2018
2094-01-038PHARR HIDALGO
WIDEN TO 6 LANE
FM 2220 JUN 2018
MILE 5 ROADLIMITS FROM: FM 1924LIMITS TO:
$ 13,413,851
DESCRIPTION:
STP 1602(275)MMPROJ NUM:
2.173
NNHS:
2094-01-044ROW CSJ:
2094-01-044PHARR HIDALGO
ROW ACQUISITION, RELOCATION ASSISTANCE AND UTILITIESADJUSTMENTS
FM 2220 JUN 2018
MILE 5 ROADLIMITS FROM: FM 1924LIMITS TO:
$ 1,825,693
DESCRIPTION:
STP 2016(795)PROJ NUM:
2.000
NNHS:
ROW CSJ: $ 15,239,5442 Projects2094-01-038CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 35,939,75810 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PHARR DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0039-16-066PHARR CAMERON
OVERLAY_(FRONTAGE ROADS)
IH 69E JUL 2018
FM 802LIMITS FROM: SH 4LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 39-16-66PROJ NUM:
3.488
YNHS:
ROW CSJ:
0039-08-102PHARR CAMERON
OVERLAY (FRONTAGE ROADS)
IH 69E JUL 2018
SH 550LIMITS FROM: 0.597 MI NORTH-WEST OF FM 3248LIMITS TO:
$ 1,476,050
DESCRIPTION:
C 39-8-102PROJ NUM:
3.581
YNHS:
ROW CSJ:
0039-09-061PHARR CAMERON
OVERLAY_(FRONTAGE ROADS)
IH 69E JUL 2018
SH 3248LIMITS FROM: 0.507 MI NORTH-WEST OF FM 802LIMITS TO:
$ 657,500
DESCRIPTION:
C 39-9-61PROJ NUM:
1.675
YNHS:
ROW CSJ:
0039-09-062PHARR CAMERON
OVERLAY_(FRONTAGE ROADS)
IH 69E JUL 2018
.597 MI NORTH-WEST OF FM 3248LIMITS FROM: FM 3248LIMITS TO:
$ 1,476,050
DESCRIPTION:
C 39-9-62PROJ NUM:
0.597
YNHS:
ROW CSJ:
0039-16-067PHARR CAMERON
OVERLAY (FRONTAGE ROADS)
IH 69E JUL 2018
0.507 NORTH WEST OF FM 802LIMITS FROM: FM 802LIMITS TO:
$ 657,500
DESCRIPTION:
C 39-16-67PROJ NUM:
0.512
YNHS:
ROW CSJ: $ 5,267,1005 Projects0039-16-066CONTRACT CSJ: JUL 2018
0921-02-305PHARR HIDALGO
REPLACE BRIDGE AND RECONSTRUCT APPROACHES
CS JUL 2018
ON CHAPIN RD, .25 MI E OF FM 2061LIMITS FROM: STR# E000-95-001 @ N MAIN DRAINAGELIMITS TO:
$ 700,000
DESCRIPTION:
BR 2015(640)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0921-02-304PHARR HIDALGO
REPLACE BRIDGE AND RECONSTRUCT APPROACHES
CS JUL 2018
ON 11TH ST, .70 MI E OF FM 493LIMITS FROM: @ DRAINAGE DITCH,STR# AA03-48-002LIMITS TO:
$ 520,000
DESCRIPTION:
BR 1402(233)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,220,0002 Projects0921-02-305CONTRACT CSJ: JUL 2018
0921-06-280PHARR CAMERON
CONSTRUCT 10' CONCRETE TRAIL PHASE 1
CS JUL 2018
SOUTHMOST NATURE TRAILLIMITS FROM: MANZANO ST. TO LA POSADALIMITS TO:
$ 356,250
DESCRIPTION:
STP 1702(342)MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 356,2501 Project0921-06-280CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 6,843,3508 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PHARR DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0327-10-062PHARR WILLACY
CONSTRUCT MAINLANES & OVERPASSES
US 77 AUG 2018
WILLACY/KENEDY C.L.LIMITS FROM: 0.93 MI S OF WILLACY/KENEDY C.L.LIMITS TO:
$ 14,004,994
DESCRIPTION:
NH ( )PROJ NUM:
0.942
YNHS:
ROW CSJ:
0327-05-042PHARR KENEDY
CONSTRUCT MAINLANES & OVERPASSES
US 77 AUG 2018
1.34 MI N OF WILLACY/KENEDY C.L.LIMITS FROM: WILLACY/KENEDY COUNTY LINELIMITS TO:
$ 11,764,195
DESCRIPTION:
NH ( )PROJ NUM:
1.345
YNHS:
ROW CSJ: $ 25,769,1892 Projects0327-10-062CONTRACT CSJ: AUG 2018
0433-02-052PHARR WILLACY
REHABILITATE ROADWAY (SUPER 2)
SH 186 AUG 2018
HIDALGO/ WILLACY C.L.LIMITS FROM: KING STLIMITS TO:
$ 23,000,000
DESCRIPTION:
C 433-2-52PROJ NUM:
12.500
NNHS:
0433-02-053ROW CSJ: $ 23,000,0001 Project0433-02-052CONTRACT CSJ: AUG 2018
0921-06-303PHARR CAMERON
CONSTRUCTION OF SIDEWALKS, CROSSWALKS, & PAVED SHARED USEPATHS FOR TRAILS FOR PEDESTRIAN & BICYCLE FACILITIES
VA AUG 2018
BROWNSVILLE BIKE/PED IMPROVEMENTSLIMITS FROM: VARIOUS ROADSLIMITS TO:
$ 300,803
DESCRIPTION:
STP ( )TPPROJ NUM:
0.513
NNHS:
ROW CSJ: $ 300,8031 Project0921-06-303CONTRACT CSJ: AUG 2018
1939-01-059PHARR HIDALGO
INSTALL TRAFFIC SIGNAL
FM 2061 AUG 2018
@ WISCONSIN AVE.LIMITS FROM: .LIMITS TO:
$ 199,248
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0487-01-012PHARR CAMERON
INSTALL TRAFFIC SIGNAL
FM 2519 AUG 2018
@ IOWA AVE./ JOSE COLUNGA AVE.LIMITS FROM: .LIMITS TO:
$ 210,693
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
1140-03-018PHARR CAMERON
INSTALL TRAFFIC SIGNAL
FM 802 AUG 2018
@ COFFEE PORT RD.LIMITS FROM: .LIMITS TO:
$ 210,693
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
1804-02-026PHARR HIDALGO
INSTALL TRAFFIC SIGNAL
FM 1926 AUG 2018
@ SPRAGUE AVE.LIMITS FROM: .LIMITS TO:
$ 235,014
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
1806-01-011PHARR CAMERON
INSTALL TRAFFIC SIGNAL
FM 313 AUG 2018
@ HOUSTON RD.LIMITS FROM: .LIMITS TO:
$ 210,693
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
1806-01-012PHARR CAMERON
INSTALL TRAFFIC SIGNAL
FM 313 AUG 2018
@ TRAVIS RD.LIMITS FROM: .LIMITS TO:
$ 210,693
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
3468-01-019PHARR HIDALGO
INSTALL TRAFFIC SIGNAL
FM 3362 AUG 2018
@ WISCONSIN AVE.LIMITS FROM: .LIMITS TO:
$ 199,248
DESCRIPTION:
STP 1802( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ: $ 1,476,2827 Projects1939-01-059CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 50,546,27411 Projects 4 Contracts
PHARR $ 93,329,38229 Projects 10 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
SAN ANGELO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$7.29 $0.00 $0.00 $0.00 $0.00SEPTEMBER $7.29$0.00 $0.00$0.00$0.00
$2.46 $0.00 $0.00 $0.00 $0.00OCTOBER $2.46$0.00 $0.00$0.00$0.00
$6.32 $0.00 $0.00 $0.00 $0.00NOVEMBER $6.32$0.00 $0.00$0.00$0.00
$6.60 $0.00 $0.00 $0.00 $0.00DECEMBER $6.60$0.00 $0.00$0.00$0.00
$3.26 $0.00 $0.00 $0.00 $0.00JANUARY $3.26$0.00 $0.00$0.00$0.00
$5.71 $0.00 $0.00 $0.00 $0.00FEBRUARY $5.71$0.00 $0.00$0.00$0.00
$6.53 $0.00 $0.00 $0.00 $0.00MARCH $6.53$0.00 $0.00$0.00$0.00
$4.37 $0.00 $0.00 $0.00 $0.00APRIL $4.37$0.00 $0.00$0.00$0.00
$0.78 $0.00 $0.00 $0.00 $0.00MAY $1.02$0.00 $0.00$0.24$0.00
$13.29 $0.00 $0.00 $0.00 $0.30JUNE $13.59$0.00 $0.00$0.00$0.00
$24.97 $0.00 $0.00 $0.00 $0.00JULY $24.97$0.00 $0.00$0.00$0.00
$41.48 $0.00 $0.00 $0.00 $0.00AUGUST $41.48$0.00 $0.00$0.00$0.00
$123.06 $0.00 $0.00 $0.00 $0.30 $123.60District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANGELO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0158-01-080SAN ANGELO RUNNELS
REPAIR BRIDGE RAILINGS
US 67 MAY 2018
AT WILLOW CREEKLIMITS FROM: .LIMITS TO:
$ 95,834
DESCRIPTION:
NH 1802(173)PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 95,8341 Project0158-01-080CONTRACT CSJ: MAY 2018
0907-26-004SAN ANGELO SCHLEICHER
SIDEWALKS AND TRAFFIC SAFETY IMPROVEMENTS
CS MAY 2018
VARIOUS LOCATIONS IN ELDORADOLIMITS FROM: .LIMITS TO:
$ 487,621
DESCRIPTION:
STP 2017(286)TAPSPROJ NUM:
1.095
NNHS:
ROW CSJ: $ 487,6211 Project0907-26-004CONTRACT CSJ: MAY 2018
7107-04-001SAN ANGELO CROCKETT
REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS
RL SO MAY 2018
CRANE COUNTY LINE RRMP 846.9LIMITS FROM: PECOS COUNTY LINE RRMP 847.8LIMITS TO:
$ 435,505
DESCRIPTION:
STP 2018(117)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 435,5051 Project7107-04-001CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 1,018,9603 Projects 3 Contracts
0141-09-070SAN ANGELO KIMBLE
ACP OVERLAY
IH 10 JUN 2018
9.9 MI E OF SUTTON COUNTY LINELIMITS FROM: 22.8 MI E OF SUTTON COUNTY LINELIMITS TO:
$ 8,419,450
DESCRIPTION:
C 141-9-70PROJ NUM:
12.953
YNHS:
ROW CSJ: $ 8,419,4501 Project0141-09-070CONTRACT CSJ: JUN 2018
0264-07-032SAN ANGELO TOM GREEN
ACP OVERLAY
SL 306 JUN 2018
2.13 MI NORTH OF US 877LIMITS FROM: US 67LIMITS TO:
$ 4,253,182
DESCRIPTION:
STP 1802(195)PROJ NUM:
4.465
NNHS:
ROW CSJ: $ 4,253,1821 Project0264-07-032CONTRACT CSJ: JUN 2018
0907-15-005SAN ANGELO CONCHO
SIDEWALKS, LIGHTING, AND BENCHES
CS JUN 2018
VARIOUS LOCATIONS IN EDENLIMITS FROM: .LIMITS TO:
$ 915,580
DESCRIPTION:
STP 2017(287)TAPSPROJ NUM:
0.303
NNHS:
ROW CSJ: $ 915,5801 Project0907-15-005CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 13,588,2123 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANGELO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0077-06-099SAN ANGELO TOM GREEN
ACP OVERLAY
US 67 JUL 2018
CHAPEL HILL DRIVELIMITS FROM: IRION COUNTY LINELIMITS TO:
$ 3,400,000
DESCRIPTION:
STP 1802(311)PROJ NUM:
11.222
NNHS:
ROW CSJ: $ 3,400,0001 Project0077-06-099CONTRACT CSJ: JUL 2018
0463-04-026SAN ANGELO GLASSCOCK
ACP OVERLAY
SH 158 JUL 2018
MIDLAND COUNTY LINELIMITS FROM: 0.3 MILES WEST OF RM 33LIMITS TO:
$ 7,360,934
DESCRIPTION:
NH 1802(312)PROJ NUM:
17.587
YNHS:
ROW CSJ:
0405-01-025SAN ANGELO GLASSCOCK
ACP OVERLAY
SH 158 JUL 2018
0.3 MILES EAST OF RM 33LIMITS FROM: STERLING COUNTY LINELIMITS TO:
$ 5,005,316
DESCRIPTION:
NH 1802(312)PROJ NUM:
13.407
YNHS:
ROW CSJ:
0405-02-026SAN ANGELO STERLING
ACP OVERLAY
SH 158 JUL 2018
GLASSCOCK COUNTY LINELIMITS FROM: US 87LIMITS TO:
$ 5,755,820
DESCRIPTION:
NH 1802(312)PROJ NUM:
14.444
YNHS:
ROW CSJ: $ 18,122,0703 Projects0463-04-026CONTRACT CSJ: JUL 2018
0907-00-170SAN ANGELO TOM GREEN
REPLACE GUARD FENCE, BRIDGE RAIL, AND SAFETY END TREATMENTS
VA JUL 2018
VARIOUS ROADWAYS IN SJT DISTRICTLIMITS FROM: .LIMITS TO:
$ 850,000
DESCRIPTION:
STP 1802(384)PROJ NUM:
0.001
NNHS:
ROW CSJ:
0907-00-187SAN ANGELO TOM GREEN
INSTALL CRASH WALLS
VA JUL 2018
VARIOUS LOCATIONS IN SJT DISTRICTLIMITS FROM: .LIMITS TO:
$ 2,600,000
DESCRIPTION:
BR 1802(385)PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 3,450,0002 Projects0907-00-170CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 24,972,0706 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANGELO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0140-11-045SAN ANGELO CROCKETT
RELOCATE EB EXIT RAMP 365 AND EXTEND SOUTH FRONTAGE ROAD
IH 10 AUG 2018
0.25 MILES WEST OF RIO GRANDE STLIMITS FROM: SH 163 IN OZONALIMITS TO:
$ 2,450,000
DESCRIPTION:
C 140-11-45PROJ NUM:
0.530
YNHS:
ROW CSJ: $ 2,450,0001 Project0140-11-045CONTRACT CSJ: AUG 2018
0158-02-084SAN ANGELO TOM GREEN
CONSTRUCT INTERCHANGE
US 67 AUG 2018
AT TRACTOR TRAILLIMITS FROM: .LIMITS TO:
$ 20,680,000
DESCRIPTION:
NH ( )PROJ NUM:
1.246
YNHS:
ROW CSJ:
0158-02-088SAN ANGELO TOM GREEN
CONSTRUCT INTERCHANGE
US 67 AUG 2018
AT PAULANN BLVD.LIMITS FROM: .LIMITS TO:
$ 11,872,290
DESCRIPTION:
NH ( )PROJ NUM:
0.490
YNHS:
ROW CSJ: $ 32,552,2902 Projects0158-02-084CONTRACT CSJ: AUG 2018
0264-04-052SAN ANGELO COKE
GRADING, BASE AND STRUCTURES
US 277 AUG 2018
SH 70LIMITS FROM: NORTH KICKAPOO CREEK BRIDGELIMITS TO:
$ 5,826,100
DESCRIPTION:
C 264-4-52PROJ NUM:
8.285
NNHS:
ROW CSJ: $ 5,826,1001 Project0264-04-052CONTRACT CSJ: AUG 2018
0907-00-191SAN ANGELO TOM GREEN
UPGRADE SMALL SIGNS
VA AUG 2018
ON US 87,US 67, SL 306, AND US 83LIMITS FROM: .LIMITS TO:
$ 655,637
DESCRIPTION:
NH ( )PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 655,6371 Project0907-00-191CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 41,484,0275 Projects 4 Contracts
SAN ANGELO $ 81,063,26917 Projects 13 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
SAN ANTONIO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$1.61 $0.00 $0.00 $0.00 $0.00SEPTEMBER $1.61$0.00 $0.00$0.00$0.00
$11.81 $0.00 $0.00 $0.00 $0.00OCTOBER $11.81$0.00 $0.00$0.00$0.00
$0.14 $0.00 $0.00 $0.00 $0.03NOVEMBER $0.67$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$7.90 $0.00 $0.00 $0.00 $0.50JANUARY $10.90$0.00 $0.00$0.00$0.00
$15.62 $0.00 $0.00 $0.00 $0.00FEBRUARY $17.62$0.00 $0.00$0.00$0.00
$67.06 $0.00 $0.00 $0.00 $0.00MARCH $67.06$0.00 $0.00$0.00$0.00
$15.78 $0.00 $0.00 $0.00 $0.00APRIL $15.78$0.00 $0.00$0.00$0.00
$150.77 $0.00 $0.00 $0.00 $0.00MAY $155.13$0.00 $0.00$0.00$4.37
$125.23 $0.00 $0.00 $0.00 $10.50JUNE $135.73$0.00 $0.00$0.00$0.00
$262.52 $0.00 $0.00 $0.00 $0.00JULY $272.42$0.00 $0.00$0.00$9.90
$39.95 $0.00 $0.00 $0.00 $0.00AUGUST $39.95$0.00 $0.00$0.00$0.00
$698.40 $0.00 $0.00 $0.00 $11.03 $728.69District Total: $0.00 $0.00$0.00$14.27
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0017-06-084SAN ANTONIO FRIO
REHAB EXISTING FRONTAGE ROADS
IH 35 MAY 2018
FM 3352LIMITS FROM: FM 462LIMITS TO:
$ 15,806,155
DESCRIPTION:
NH 2018(910)PROJ NUM:
6.428
YNHS:
ROW CSJ: $ 15,806,1551 Project0017-06-084CONTRACT CSJ: MAY 2018
0017-09-104SAN ANTONIO BEXAR
LANDSCAPE PLANTING AND IRRIGATION
IH 35 MAY 2018
0.25 MILES S OF S ZARZAMORA STLIMITS FROM: 0.25 MILES N OF S ZARZAMORA STLIMITS TO:
$ 387,593
DESCRIPTION:
NH 2018(801)PROJ NUM:
0.500
YNHS:
ROW CSJ: $ 387,5931 Project0017-09-104CONTRACT CSJ: MAY 2018
0017-10-280SAN ANTONIO BEXAR
CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS
IH 35 MAY 2018
IH 37/US 281LIMITS FROM: WALTERS ST.LIMITS TO:
$ 621,156
DESCRIPTION:
STP 2018(860)MMPROJ NUM:
1.694
YNHS:
ROW CSJ:
0915-12-586SAN ANTONIO BEXAR
CONSTRUCT CURB RAMPS, SIDEWALKS AND OTHER PEDESTRIAN RELATEDINFRASTRUCTURE;OPERATIONAL IMPROVEMENTS @ NORTH STAR TRANSIT
VA MAY 2018
VARIOUS LOCATIONS IN BEXAR COUNTYLIMITS FROM: ON STATE SYSTEMLIMITS TO:
$ 4,433,853
DESCRIPTION:
STP 2018(859)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 5,055,0092 Projects0017-10-280CONTRACT CSJ: MAY 2018
0025-02-160SAN ANTONIO BEXAR
EXPAND FROM 4 TO 6 LANE EXPRESSWAY
IH 10 MAY 2018
IH 410LIMITS FROM: LOOP 1604LIMITS TO:
$ 112,430,319
DESCRIPTION:
C 25-2-160PROJ NUM:
6.235
YNHS:P1
0025-02-213ROW CSJ: $ 112,430,3191 Project0025-02-160CONTRACT CSJ: MAY 2018
0072-12-198SAN ANTONIO BEXAR
INTERSECTION AND OPERATIONAL IMPROVEMENTS
IH 10 MAY 2018
AT WURZBACH ROADLIMITS FROM: .LIMITS TO:
$ 1,438,353
DESCRIPTION:
NH 2018(862)PROJ NUM:
0.300
YNHS:
ROW CSJ: $ 1,438,3531 Project0072-12-198CONTRACT CSJ: MAY 2018
0542-05-017SAN ANTONIO MC MULLEN
2018 HOT RUBBER SEAL PROJECT
US 59 MAY 2018
MCMULLEN COUNTY LINELIMITS FROM: DUVAL COUNTY LINELIMITS TO:
$ 187,882
DESCRIPTION:
NH 2018(403)PROJ NUM:
3.514
YNHS:
ROW CSJ: $ 187,8821 Project0102-01-116CONTRACT CSJ: MAY 2018
0521-06-144SAN ANTONIO BEXAR
HIGH MAST AND CONTINUOUS ILLUMINATION
IH 410 MAY 2018
IH 37LIMITS FROM: W.W. WHITE ROADLIMITS TO:
$ 1,449,247
DESCRIPTION:
C 521-6-144PROJ NUM:
1.961
YNHS:
ROW CSJ: $ 1,449,2471 Project0521-06-144CONTRACT CSJ: MAY 2018
0613-02-063SAN ANTONIO ATASCOSA
REPLACE EXISTING BRIDGE
SH 16 MAY 2018
AT ATASCOSA RIVERLIMITS FROM: .LIMITS TO:
$ 5,233,335
DESCRIPTION:
C 613-2-63PROJ NUM:
0.497
NNHS:
ROW CSJ: $ 5,233,3351 Project0613-02-063CONTRACT CSJ: MAY 2018
0915-00-168SAN ANTONIO BEXAR
CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN ATASCOSA,FRIO AND MEDINA COUNTIES
VA MAY 2018
VARIOUS LOCATIONS IN ATASCOSA,LIMITS FROM: FRIO & MEDINA COUNTIESLIMITS TO:
$ 1,413,506
DESCRIPTION:
STP 2018(865)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,413,5061 Project0915-00-168CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0915-00-179SAN ANTONIO BEXAR
CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN BANDERA ANDUVALDE COUNTIES
VA MAY 2018
VARIOUS LOCATIONS IN BANDERALIMITS FROM: AND UVALDE COUNTIESLIMITS TO:
$ 1,504,865
DESCRIPTION:
STP 2018(866)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,504,8651 Project0915-00-179CONTRACT CSJ: MAY 2018
3508-01-028SAN ANTONIO BEXAR
OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS
SH 151 MAY 2018
WISEMANLIMITS FROM: CASTROVILLE ROADLIMITS TO:
$ 10,227,512
DESCRIPTION:
C 3508-1-28PROJ NUM:
9.112
YNHS:
ROW CSJ: $ 10,227,5121 Project3508-01-028CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 155,133,77612 Projects 11 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0017-10-275SAN ANTONIO BEXAR
SPOT BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS
IH 35 JUN 2018
AUSTIN ST.LIMITS FROM: CRESTWAY/RANDOLPHLIMITS TO:
$ 9,195,498
DESCRIPTION:
C 17-10-275PROJ NUM:
9.131
YNHS:
0017-10-276ROW CSJ: $ 9,195,4981 Project0017-10-275CONTRACT CSJ: JUN 2018
0073-08-193SAN ANTONIO BEXAR
LANDSCAPE PLANTING AND IRRIGATION
IH 37 JUN 2018
AT E. CESAR CHAVEZ BLVDLIMITS FROM: .LIMITS TO:
$ 103,828
DESCRIPTION:
NH 1802(204)PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 103,8281 Project0073-08-193CONTRACT CSJ: JUN 2018
0328-04-044SAN ANTONIO ATASCOSA
REHABILITATE EXISTING ROADWAY
SH 97 JUN 2018
0.8 MI S OF FM 476LIMITS FROM: US 281LIMITS TO:
$ 3,650,291
DESCRIPTION:
C 328-4-44PROJ NUM:
1.364
YNHS:
ROW CSJ:
0328-04-041SAN ANTONIO ATASCOSA
INTERSECTION OPERATIONAL IMPROVEMENTS
SH 97 JUN 2018
US 281LIMITS FROM: .LIMITS TO:
$ 279,049
DESCRIPTION:
C 328-4-41PROJ NUM:
0.061
NNHS:
ROW CSJ: $ 3,929,3402 Projects0328-04-044CONTRACT CSJ: JUN 2018
0535-02-046SAN ANTONIO GUADALUPE
BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ONMAINLANE
IH 10 JUN 2018
SH 130LIMITS FROM: GONZALES/GUADALUPE COUNTY LINELIMITS TO:
$ 18,118,757
DESCRIPTION:
C 535-2-46PROJ NUM:
15.427
YNHS:
ROW CSJ: $ 18,118,7571 Project0535-02-046CONTRACT CSJ: JUN 2018
1479-01-024SAN ANTONIO BEXAR
EXPAND FROM 2 LANES TO 4 LANE DIVIDED
SL 1604 JUN 2018
US 281LIMITS FROM: FM 1937LIMITS TO:
$ 14,924,208
DESCRIPTION:
STP 2018(972)PROJ NUM:
2.732
NNHS:
1479-01-025ROW CSJ:
1479-01-025SAN ANTONIO BEXAR
UTILITY ONLY
SL 1604 JUN 2018
US 281LIMITS FROM: FM 1937LIMITS TO:
$ 1,775,029
DESCRIPTION:
ROW 1479-1-25PROJ NUM:
1.895
NNHS:
ROW CSJ:
2255-01-083SAN ANTONIO BEXAR
EXPAND FROM 2 LANES TO 4 LANE DIVIDED
SL 1604 JUN 2018
FM 1937LIMITS FROM: FM 1303LIMITS TO:
$ 17,507,468
DESCRIPTION:
STP 2018(972)PROJ NUM:
5.391
NNHS:
2255-01-085ROW CSJ:
2255-01-085SAN ANTONIO BEXAR
UTILITY ONLY
SL 1604 JUN 2018
FM 1937LIMITS FROM: FM 1303LIMITS TO:
$ 1,800,278
DESCRIPTION:
ROW 2255-1-85PROJ NUM:
5.103
NNHS:
ROW CSJ: $ 36,006,9834 Projects1479-01-024CONTRACT CSJ: JUN 2018
2452-02-118SAN ANTONIO BEXAR
INTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND
SL 1604 JUN 2018
AT FM 1535LIMITS FROM: .LIMITS TO:
$ 495,314
DESCRIPTION:
NH 2018(868)PROJ NUM:
0.265
YNHS:
ROW CSJ:
2452-02-120SAN ANTONIO BEXAR
IMPROVE TRAFFIC SIGNAL
SL 1604 JUN 2018
AT FM 1535LIMITS FROM: .LIMITS TO:
$ 312,335
DESCRIPTION:
STP 2018(869)HESPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 807,6492 Projects2452-02-118CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
2452-02-119SAN ANTONIO BEXAR
INTERSECTION OPERATIONAL IMPROVEMENTS- CONSTRUCT 4TURNAROUNDS
SL 1604 JUN 2018
BITTERS RDLIMITS FROM: HUEBNER RDLIMITS TO:
$ 4,831,011
DESCRIPTION:
NH 2018(870)PROJ NUM:
1.500
YNHS:
ROW CSJ:
2452-03-120SAN ANTONIO BEXAR
INTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND
SL 1604 JUN 2018
AT FM 2252LIMITS FROM: .LIMITS TO:
$ 2,059,832
DESCRIPTION:
NH 2018(870)PROJ NUM:
0.120
YNHS:
ROW CSJ: $ 6,890,8432 Projects2452-02-119CONTRACT CSJ: JUN 2018
2452-03-112SAN ANTONIO BEXAR
EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY
SL 1604 JUN 2018
IH 35LIMITS FROM: FM 78LIMITS TO:
$ 47,022,680
DESCRIPTION:
NH 2018(973)PROJ NUM:
3.107
YNHS:
2452-03-114ROW CSJ: $ 47,022,6801 Project2452-03-112CONTRACT CSJ: JUN 2018
2452-03-118SAN ANTONIO BEXAR
RECONFIGURE RAMPS, CONSTRUCT TURNAROUNDS AT BULVERDEAND OPERATIONAL IMPROVEMENTS
SL 1604 JUN 2018
REDLAND RDLIMITS FROM: BULVERDE RD.LIMITS TO:
$ 9,444,875
DESCRIPTION:
STP 2018(871)PROJ NUM:
1.700
YNHS:
ROW CSJ:
2452-03-119SAN ANTONIO BEXAR
BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ONMAINLANES
SL 1604 JUN 2018
0.3 MI W OF REDLANDLIMITS FROM: 0.4 MI E OF GREEN MOUNTAINLIMITS TO:
$ 4,207,527
DESCRIPTION:
C 2452-3-119PROJ NUM:
5.380
YNHS:
ROW CSJ: $ 13,652,4022 Projects2452-03-118CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 135,727,98016 Projects 9 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0017-10-286SAN ANTONIO BEXAR
LANDSCAPE PLANTING AND IRRIGATION
IH 35 JUL 2018
PINE STLIMITS FROM: UNION PACIFIC RAILROADLIMITS TO:
$ 593,000
DESCRIPTION:
NH 1802(386)PROJ NUM:
1.750
YNHS:
ROW CSJ: $ 593,0001 Project0017-10-286CONTRACT CSJ: JUL 2018
0025-02-216SAN ANTONIO BEXAR
UPGRADE ILLUMINATION
IH 10 JUL 2018
IH 35LIMITS FROM: IH 37LIMITS TO:
$ 5,500,000
DESCRIPTION:
C 25-2-216PROJ NUM:
2.605
YNHS:
ROW CSJ:
0073-08-192SAN ANTONIO BEXAR
UPGRADE ILLUMINATION
IH 37 JUL 2018
FAIR AVENUELIMITS FROM: IH 35LIMITS TO:
$ 1,200,000
DESCRIPTION:
C 73-8-192PROJ NUM:
4.054
YNHS:
ROW CSJ: $ 6,700,0002 Projects0025-02-216CONTRACT CSJ: JUL 2018
0072-07-070SAN ANTONIO BEXAR
CONSTRUCT GRADE SEPARATION AT BALCONES CREEK ROADRECONFIGURE RAMPS & WIDEN FR RD TO CONVERT TO ONE WAY
IH 10 JUL 2018
BEXAR/KENDALL COUNTY LINELIMITS FROM: FAIR OAKSLIMITS TO:
$ 32,371,235
DESCRIPTION:
NH 1802(387)PROJ NUM:
1.835
YNHS:
0072-07-074ROW CSJ: $ 32,371,2351 Project0072-07-070CONTRACT CSJ: JUL 2018
0072-10-006SAN ANTONIO KENDALL
PROVIDE ADDITIONAL PAVED SURFACE WIDTH
FM 289 JUL 2018
1.1 M NW OF IH 10LIMITS FROM: IH 10LIMITS TO:
$ 861,761
DESCRIPTION:
STP 1802(388)HESPROJ NUM:
1.100
NNHS:
ROW CSJ: $ 861,7611 Project0072-10-006CONTRACT CSJ: JUL 2018
0215-06-039SAN ANTONIO KENDALL
EXPAND FROM 2 LANES TO 4 LANES WITH RAISED MEDIAN ORCONTINUOUS LEFT TURN LANE
SH 46 JUL 2018
HERFF ROADLIMITS FROM: AMMANN ROADLIMITS TO:
$ 12,092,953
DESCRIPTION:
NH 1802(389)PROJ NUM:
1.913
YNHS:P1
0215-06-040ROW CSJ:
0215-06-040SAN ANTONIO KENDALL
ROW ACQUISITION & UTILITIES ADJUSTMENTS
SH 46 JUL 2018
HERFF ROADLIMITS FROM: AMMANN ROADLIMITS TO:
$ 234,138
DESCRIPTION:
NH 2017(418)PROJ NUM:
1.777
YNHS:
ROW CSJ: $ 12,327,0912 Projects0215-06-039CONTRACT CSJ: JUL 2018
0253-04-138SAN ANTONIO BEXAR
EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE RDS -4 GENERALPURPOSE & 2 HOV LANES
US 281 JUL 2018
0.8 MI.NORTH OF STONE OAKLIMITS FROM: BEXAR / COMAL COUNTY LINELIMITS TO:
$ 182,000,000
DESCRIPTION:
NH 1802(390)PROJ NUM:
4.153
YNHS:
0253-04-149ROW CSJ: $ 182,000,0001 Project0253-04-138CONTRACT CSJ: JUL 2018
0421-01-045SAN ANTONIO MEDINA
OVERLAY & PAVEMENT MARKINGS
SH 173 JUL 2018
0.1 MILES NORTH OF CR 5711LIMITS FROM: SH 132LIMITS TO:
$ 3,267,720
DESCRIPTION:
STP 1802(403)PROJ NUM:
1.613
NNHS:
ROW CSJ: $ 3,267,7201 Project0421-01-045CONTRACT CSJ: JUL 2018
0517-03-035SAN ANTONIO MC MULLEN
REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONALIMPROVEMENTS
SH 16 JUL 2018
SH 72 EASTLIMITS FROM: DUVAL COUNTY LINELIMITS TO:
$ 32,700,000
DESCRIPTION:
STP 2018(873)PROJ NUM:
28.385
NNHS:
ROW CSJ: $ 32,700,0001 Project0517-03-035CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0915-00-206SAN ANTONIO BEXAR
DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018PROJECT 3
VA JUL 2018
DISTRICTWIDE TRAFFIC CNTRL FY 2018LIMITS FROM: .LIMITS TO:
$ 1,600,000
DESCRIPTION:
STP 2018(899)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,600,0001 Project0915-00-206CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 272,420,80711 Projects 9 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0016-04-113SAN ANTONIO COMAL
REVISE RAMPS AND CONVERT FRONTAGE ROADS FROM TWO WAY TO ONEWAY OPERATION
IH 35 AUG 2018
HAYS COUNTY LINELIMITS FROM: 0.5 MI S OF HAYS COUNTY LINELIMITS TO:
$ 1,226,982
DESCRIPTION:
NH ( )PROJ NUM:
0.497
YNHS:
ROW CSJ: $ 1,226,9821 Project0016-03-103CONTRACT CSJ: AUG 2018
0016-08-036SAN ANTONIO BEXAR
INTERSECTION OPERATIONAL IMPROVEMENTS
SL 368 AUG 2018
AT N. NEW BRAUNFELS INTERSECTIONLIMITS FROM: .LIMITS TO:
$ 649,474
DESCRIPTION:
NH ( )PROJ NUM:
0.390
YNHS:
0016-08-040ROW CSJ: $ 649,4741 Project0016-08-036CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0017-01-024SAN ANTONIO BEXAR
PROFILE EDGELINE/CENTERLINE MARKINGS
SL 353 AUG 2018
PITLUK RDLIMITS FROM: CASSIN RDLIMITS TO:
$ 53,511
DESCRIPTION:
STP ( )HESPROJ NUM:
2.256
YNHS:
ROW CSJ:
0100-03-082SAN ANTONIO WILSON
PROFILE EDGELINE/CENTERLINE MARKINGS
US 181 AUG 2018
BEXAR/WILSON COUNTY LINELIMITS FROM: 1.4 MI N OF SH 97LIMITS TO:
$ 231,182
DESCRIPTION:
STP ( )HESPROJ NUM:
9.715
YNHS:
ROW CSJ:
0143-03-048SAN ANTONIO WILSON
MILLED CENTERLINE RUMBLE STRIPS
US 87 AUG 2018
BEXAR/WILSON COUNTY LINELIMITS FROM: CR 361LIMITS TO:
$ 31,698
DESCRIPTION:
STP ( )HESPROJ NUM:
3.050
YNHS:
ROW CSJ:
0216-02-063SAN ANTONIO GUADALUPE
PROFILE EDGELINE PAVEMENT MARKINGS
SH 46 AUG 2018
COMAL/GUADALUPE COUNTY LINELIMITS FROM: FM 78LIMITS TO:
$ 102,265
DESCRIPTION:
STP ( )HESPROJ NUM:
8.784
YNHS:
ROW CSJ:
0291-06-055SAN ANTONIO BANDERA
PROFILE EDGELINES/CENTERLINE MARKINGS
SH 16 AUG 2018
4.218 MI E OF SH 173LIMITS FROM: 5.23 MI E OF SH 173LIMITS TO:
$ 23,006
DESCRIPTION:
STP ( )HESPROJ NUM:
1.012
NNHS:
ROW CSJ:
0348-07-017SAN ANTONIO ATASCOSA
PROFILE EDGELINE/CENTERLINE MARKINGS
FM 99 AUG 2018
2.00 MI EAST OF FM 1099LIMITS FROM: FM 1099LIMITS TO:
$ 36,369
DESCRIPTION:
STP ( )HESPROJ NUM:
2.000
NNHS:
ROW CSJ:
0421-08-035SAN ANTONIO MEDINA
PROFILE EDGELINE/CENTERLINE MARKINGS
SH 173 AUG 2018
CR 241LIMITS FROM: CR 441LIMITS TO:
$ 181,843
DESCRIPTION:
STP ( )HESPROJ NUM:
5.388
NNHS:
ROW CSJ:
0421-09-018SAN ANTONIO ATASCOSA
INSTALL EDGE MARKING, PROFILE CENTERLINE MARKINGS
FM 3350 AUG 2018
FM 3510LIMITS FROM: FM 476LIMITS TO:
$ 39,372
DESCRIPTION:
STP ( )HESPROJ NUM:
1.537
NNHS:
ROW CSJ:
0511-02-022SAN ANTONIO COMAL
PROFILE EDGELINE/CENTERLINE MARKINGS
RM 32 AUG 2018
BLANCO COUNTY LINELIMITS FROM: HAYS COUNTY LINELIMITS TO:
$ 283,433
DESCRIPTION:
STP ( )HESPROJ NUM:
12.781
NNHS:
ROW CSJ:
0829-04-033SAN ANTONIO KERR
PROFILE EDGELINE/CENTERLINE MARKINGS
FM 1340 AUG 2018
SH 41LIMITS FROM: SH 39LIMITS TO:
$ 508,867
DESCRIPTION:
STP ( )HESPROJ NUM:
21.307
NNHS:
ROW CSJ:
0853-01-015SAN ANTONIO ATASCOSA
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 476 AUG 2018
FM 2504LIMITS FROM: FM 1333LIMITS TO:
$ 56,371
DESCRIPTION:
STP ( )HESPROJ NUM:
3.076
NNHS:
ROW CSJ:
0853-01-016SAN ANTONIO ATASCOSA
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 476 AUG 2018
FM 1333LIMITS FROM: SH 16LIMITS TO:
$ 56,371
DESCRIPTION:
STP ( )HESPROJ NUM:
3.334
NNHS:
ROW CSJ:
0853-02-031SAN ANTONIO ATASCOSA
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 476 AUG 2018
RED BARN RDLIMITS FROM: YELLOWSTONE STLIMITS TO:
$ 119,108
DESCRIPTION:
STP ( )HESPROJ NUM:
4.854
NNHS:
ROW CSJ:
0857-01-033SAN ANTONIO COMAL
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 306 AUG 2018
RM 484LIMITS FROM: FM 3424LIMITS TO:
$ 48,389
DESCRIPTION:
STP ( )HESPROJ NUM:
2.763
YNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
1009-01-040SAN ANTONIO WILSON
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 536 AUG 2018
CR 104LIMITS FROM: LP 181LIMITS TO:
$ 133,049
DESCRIPTION:
STP ( )HESPROJ NUM:
5.718
NNHS:
ROW CSJ:
1548-01-016SAN ANTONIO WILSON
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 1303 AUG 2018
FM 775LIMITS FROM: FM 536LIMITS TO:
$ 159,600
DESCRIPTION:
STP ( )HESPROJ NUM:
7.197
NNHS:
ROW CSJ:
2666-01-013SAN ANTONIO COMAL
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
RM 2722 AUG 2018
FM 2673LIMITS FROM: SH 46LIMITS TO:
$ 170,890
DESCRIPTION:
STP ( )HESPROJ NUM:
7.706
NNHS:
ROW CSJ:
3106-01-015SAN ANTONIO COMAL
PROFILE EDGELINE/CENTERLINE PAVEMENT MARKINGS
FM 306 AUG 2018
US 281LIMITS FROM: RM 484LIMITS TO:
$ 163,661
DESCRIPTION:
STP ( )HESGPROJ NUM:
9.345
YNHS:
ROW CSJ:
3544-02-006SAN ANTONIO BEXAR
PROFILE EDGELINE/CENTERLINE MARKINGS
SH 211 AUG 2018
SH 16LIMITS FROM: MEDINA COUNTY LINELIMITS TO:
$ 130,776
DESCRIPTION:
STP ( )HESPROJ NUM:
5.474
NNHS:
ROW CSJ: $ 2,529,76119 Projects0017-01-024CONTRACT CSJ: AUG 2018
0073-08-194SAN ANTONIO BEXAR
LANDSCAPE PLANTING AND IRRIGATION
IH 37 AUG 2018
0.25 MILES N OF SP 122LIMITS FROM: 0.25 MILES S OF US 181LIMITS TO:
$ 1,000,000
DESCRIPTION:
NH ( )PROJ NUM:
1.220
YNHS:
ROW CSJ: $ 1,000,0001 Project0073-08-194CONTRACT CSJ: AUG 2018
0517-01-043SAN ANTONIO ATASCOSA
REHAB AND WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS
SH 16 AUG 2018
FM 1332LIMITS FROM: MCMULLEN/ATASCOSA COUNTY LINELIMITS TO:
$ 21,360,000
DESCRIPTION:
STP ( )PROJ NUM:
17.779
NNHS:
ROW CSJ: $ 21,360,0001 Project0517-01-043CONTRACT CSJ: AUG 2018
2230-01-013SAN ANTONIO BEXAR
EXPAND FROM 2 TO 4 LANES WITH RAISED MEDIANS, BIKE LANES ANDSIDEWALKS
FM 1560 AUG 2018
SH 16LIMITS FROM: LOOP 1604LIMITS TO:
$ 12,934,566
DESCRIPTION:
STP ( )MMPROJ NUM:
2.091
NNHS:
2230-01-014ROW CSJ:
2230-01-014SAN ANTONIO BEXAR
ACQUISITION & ADJUSTMENT OF UTILITIES
FM 1560 AUG 2018
SH 16LIMITS FROM: LOOP 1604LIMITS TO:
$ 250,000
DESCRIPTION:
ROW 2230-1-14PROJ NUM:
2.100
NNHS:
ROW CSJ: $ 13,184,5662 Projects2230-01-013CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 39,950,78325 Projects 6 Contracts
SAN ANTONIO $ 603,233,34664 Projects 35 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
TRAFFIC DIVISION DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
TYLER DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.16 $0.00 $0.00 $0.00 $0.00OCTOBER $0.16$0.00 $0.00$0.00$0.00
$4.50 $0.00 $0.00 $0.00 $0.27NOVEMBER $4.77$0.00 $0.00$0.00$0.00
$10.19 $0.00 $0.00 $0.00 $0.00DECEMBER $10.19$0.00 $0.00$0.00$0.00
$0.23 $0.00 $0.00 $0.00 $0.00JANUARY $0.23$0.00 $0.00$0.00$0.00
$14.05 $0.00 $0.00 $0.00 $0.00FEBRUARY $14.15$0.00 $0.00$0.00$0.11
$7.89 $0.00 $0.00 $0.00 $0.00MARCH $7.89$0.00 $0.00$0.00$0.00
$9.59 $0.00 $0.00 $0.00 $0.00APRIL $9.59$0.00 $0.00$0.00$0.00
$13.75 $0.00 $0.00 $0.00 $0.00MAY $13.75$0.00 $0.00$0.00$0.00
$25.12 $0.00 $0.00 $0.00 $0.00JUNE $25.12$0.00 $0.00$0.00$0.00
$18.83 $0.00 $0.00 $0.00 $0.00JULY $18.83$0.00 $0.00$0.00$0.00
$36.70 $0.00 $0.00 $0.00 $0.00AUGUST $36.70$0.00 $0.00$0.00$0.00
$141.01 $0.00 $0.00 $0.00 $0.27 $141.39District Total: $0.00 $0.00$0.00$0.11
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:30 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
TYLER DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0109-02-026TYLER ANDERSON
REPAIR & RESURFACE ROADWAY
US 287 MAY 2018
0.154 MI S OF SH 294 IN ELKHART, SLIMITS FROM: HOUSTON C/L (3 MI N OF BU 287V)LIMITS TO:
$ 4,627,240
DESCRIPTION:
STP 2018(809)PROJ NUM:
4.967
NNHS:
ROW CSJ: $ 4,627,2401 Project0109-02-026CONTRACT CSJ: MAY 2018
0123-03-021TYLER CHEROKEE
PLANE, REPAIR & RESURFACE ROADWAY
US 84 MAY 2018
US 69 IN RUSK, N & ELIMITS FROM: .46 MI E OF SH 110, NEAR PR50LIMITS TO:
$ 3,263,492
DESCRIPTION:
C 123-3-21PROJ NUM:
1.338
NNHS:
ROW CSJ: $ 3,263,4921 Project0123-03-021CONTRACT CSJ: MAY 2018
0138-04-046TYLER RUSK
REPAIR & REPAVE ROADWAY-NBL ONLY
US 259 MAY 2018
US 79 IN HENDERSON, SLIMITS FROM: JARRELL CREEK, 2.8 MI N OF FM 1798LIMITS TO:
$ 5,863,094
DESCRIPTION:
C 138-4-46PROJ NUM:
7.622
YNHS:
ROW CSJ: $ 5,863,0941 Project0138-04-046CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 13,753,8263 Projects 3 Contracts
0206-03-061TYLER CHEROKEE
WIDEN ROADWAY FOR PASSING LANES-SUPER2
US 79 JUN 2018
ANDERSON C/L AT NECHES RIVER, NELIMITS FROM: 1.2 MI NE OF FM 747, J VILLE CLLIMITS TO:
$ 8,258,557
DESCRIPTION:
NH 1802(198)PROJ NUM:
9.687
YNHS:
ROW CSJ: $ 8,258,5571 Project0206-03-061CONTRACT CSJ: JUN 2018
0424-01-058TYLER SMITH
RESURFACE ROADWAY W/PFC & UPGRADE BRIDGE RAIL & GUARD FENCE
SH 31 JUN 2018
FM 850(N), ELIMITS FROM: FM 757LIMITS TO:
$ 1,878,650
DESCRIPTION:
C 424-1-58PROJ NUM:
6.462
NNHS:
ROW CSJ: $ 1,878,6501 Project0424-01-058CONTRACT CSJ: JUN 2018
0495-04-065TYLER SMITH
REALIGN & LENGTHEN WB EXIT & EB ENTRANCE RAMPS FOR US 69
IH 20 JUN 2018
US 69 IN LINDALE, ELIMITS FROM: 0.8 MI E OF US 69 (END C-S)LIMITS TO:
$ 10,460,575
DESCRIPTION:
NH 2018(425)PROJ NUM:
0.804
YNHS:
0495-04-073ROW CSJ:
0495-05-054TYLER SMITH
REALIGN & LENGTHEN WB EXIT & EB ENTRANCE RAMPS FOR US 69
IH 20 JUN 2018
0.8 MI E OF US 69 (BGN C-S), ELIMITS FROM: 1.75 MI E OF US 69 (JIM HOGG RD)LIMITS TO:
$ 4,002,903
DESCRIPTION:
NH 2018(425)PROJ NUM:
0.289
YNHS:
0495-05-056ROW CSJ: $ 14,463,4782 Projects0495-04-065CONTRACT CSJ: JUN 2018
0545-04-051TYLER GREGG
CLEAN & PAINT STEEL GIRDERS, CONCRETE & STEEL PILE REPAIR
SH 42 JUN 2018
AT RABBIT CRK, 0.8 MI N OF SH31LIMITS FROM: IN KILGORE, STR #0545-04-006LIMITS TO:
$ 514,481
DESCRIPTION:
BR 1802(170)PROJ NUM:
0.050
NNHS:
ROW CSJ: $ 514,4811 Project0545-04-051CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 25,115,1665 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
TYLER DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0164-04-160TYLER SMITH
REPAIR AND RESURFACE ROADWAY
SH 31 JUL 2018
SW SL 323 IN TYLER, ELIMITS FROM: 0.35 MI E OF US271, BROADWAY AVELIMITS TO:
$ 3,840,217
DESCRIPTION:
C 164-4-160PROJ NUM:
2.419
YNHS:
ROW CSJ: $ 3,840,2171 Project0164-04-160CONTRACT CSJ: JUL 2018
0393-02-027TYLER RUSK
REPAIR AND RESURFACE ROADWAY
SH 149 JUL 2018
GREGG C/L, ELIMITS FROM: PANOLA C012303021LIMITS TO:
$ 8,000,000
DESCRIPTION:
C 393-2-27PROJ NUM:
6.500
NNHS:
ROW CSJ: $ 8,000,0001 Project0393-02-027CONTRACT CSJ: JUL 2018
0910-00-111TYLER SMITH
THERMOPLASTIC PAVEMENT MARKINGS
VA JUL 2018
VARIOUS LOCATIONS INLIMITS FROM: THE TYLER DISTRICTLIMITS TO:
$ 1,000,000
DESCRIPTION:
C 910-00-111PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 1,000,0001 Project0910-00-111CONTRACT CSJ: JUL 2018
2654-01-022TYLER SMITH
WIDEN TO 26' FOR SAFETY,W/MILLED CENTER & EDGELINE RMBLESTRP
FM 2661 JUL 2018
SH 64, SLIMITS FROM: 0.062 MI N OF SH 31LIMITS TO:
$ 2,791,365
DESCRIPTION:
SSW 2654-1-22PROJ NUM:
3.158
NNHS:
ROW CSJ: $ 2,791,3651 Project2654-01-022CONTRACT CSJ: JUL 2018
3199-01-008TYLER ANDERSON
WIDEN TO 26' FOR SAFETY,W/MILLED CENTER & EDGELINE RMBLESTRP
FM 2054 JUL 2018
FM 321 NEAR TENNESSEE COLONY, SWLIMITS FROM: .866 MI S OF CR2802 (END ST MAINT)LIMITS TO:
$ 3,200,000
DESCRIPTION:
SSW 3199-1-8PROJ NUM:
3.448
NNHS:
ROW CSJ: $ 3,200,0001 Project3199-01-008CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 18,831,5825 Projects 5 Contracts
0191-01-063TYLER SMITH
CONSTRUCT GRADE-SEPARATED INTERCHANGE
US 69 AUG 2018
AT FM 346, E OF FLINTLIMITS FROM: .LIMITS TO:
$ 15,450,000
DESCRIPTION:
NH 2013(216)PROJ NUM:
0.948
YNHS:
0191-01-083ROW CSJ: $ 15,450,0001 Project0191-01-063CONTRACT CSJ: AUG 2018
0191-03-081TYLER SMITH
WIDEN FROM 2 LNS TO 4 LNS W/FLUSH MEDIAN (CONT LEFT TURN LN)
FM 2493 AUG 2018
FM 2813 IN GRESHAM, SLIMITS FROM: FM 346 IN FLINTLIMITS TO:
$ 13,400,000
DESCRIPTION:
STP 2013(215)PROJ NUM:
2.241
NNHS:
0191-03-082ROW CSJ: $ 13,400,0001 Project0191-03-081CONTRACT CSJ: AUG 2018
0592-02-015TYLER RUSK
WIDEN TO 26',SAFETY TREAT,IMPROVE GUARDRAIL TO DESIGN STNDSP-2
FM 840 AUG 2018
FM 2867,SELIMITS FROM: SH 315LIMITS TO:
$ 7,851,276
DESCRIPTION:
STP ( )HESPROJ NUM:
10.204
NNHS:
ROW CSJ: $ 7,851,2761 Project0592-02-015CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 36,701,2763 Projects 3 Contracts
TYLER $ 94,401,85016 Projects 15 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
WACO DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$7.92 $0.00 $0.00 $0.00 $0.00SEPTEMBER $7.92$0.00 $0.00$0.00$0.00
$6.12 $0.00 $0.00 $0.00 $0.00OCTOBER $6.12$0.00 $0.00$0.00$0.00
$2.66 $0.00 $0.00 $0.00 $0.00NOVEMBER $2.66$0.00 $0.00$0.00$0.00
$1.07 $0.00 $0.00 $0.00 $0.00DECEMBER $8.36$0.00 $0.00$0.00$7.29
$9.43 $0.00 $0.00 $0.00 $0.00JANUARY $9.43$0.00 $0.00$0.00$0.00
$28.96 $0.00 $0.00 $0.00 $0.00FEBRUARY $28.96$0.00 $0.00$0.00$0.00
$3.25 $0.00 $0.00 $0.00 $0.00MARCH $3.25$0.00 $0.00$0.00$0.00
$5.31 $0.00 $0.00 $0.00 $0.00APRIL $16.80$0.00 $0.00$0.00$11.49
$0.85 $0.00 $0.00 $0.00 $0.00MAY $0.85$0.00 $0.00$0.00$0.00
$5.56 $0.00 $0.00 $0.00 $0.00JUNE $5.56$0.00 $0.00$0.00$0.00
$34.90 $0.00 $0.00 $0.00 $0.00JULY $34.90$0.00 $0.00$0.00$0.00
$2.37 $0.00 $0.00 $0.00 $0.00AUGUST $2.37$0.00 $0.00$0.00$0.00
$108.41 $0.00 $0.00 $0.00 $0.00 $127.18District Total: $0.00 $0.00$0.00$18.78
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0232-05-016WACO BELL
SEAL AND OVERLAY
FM 2305 MAY 2018
IH 35LIMITS FROM: SH 317LIMITS TO:
$ 852,512
DESCRIPTION:
C 232-5-16PROJ NUM:
5.120
NNHS:
ROW CSJ: $ 852,5121 Project0232-05-016CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 852,5121 Project 1 Contract
0231-03-146WACO BELL
ROADWAY RECONFIGURATION TO IMPROVE TURNING MOVEMENTS
US 190 JUN 2018
@ CLEAR CREEK RDLIMITS FROM: .LIMITS TO:
$ 3,994,688
DESCRIPTION:
NH 1802(211)PROJ NUM:
0.387
YNHS:
ROW CSJ:
0231-03-150WACO BELL
CONSTRUCT EB AUXILIARY LANE BETWEEN RAMPS
US 190 JUN 2018
0.724 MI E OF CLEAR CREEK ROADLIMITS FROM: 1.258 MI E OF CLEAR CREEK ROADLIMITS TO:
$ 428,236
DESCRIPTION:
NH 1802(211)PROJ NUM:
0.531
YNHS:
ROW CSJ: $ 4,422,9242 Projects0231-03-146CONTRACT CSJ: JUN 2018
0909-40-074WACO LIMESTONE
REHABILITATE BRIDGE AND APPROACHES
CR JUN 2018
ON CR 311 @ NAVASOTA RIVERLIMITS FROM: (MAP #229)LIMITS TO:
$ 1,132,232
DESCRIPTION:
BR 2016(445)PROJ NUM:
0.111
NNHS:
ROW CSJ: $ 1,132,2321 Project0909-40-074CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 5,555,1563 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0014-05-039WACO HILL
MISC SPOT PAVEMENT REPAIRS
SH 81 JUL 2018
FM 66LIMITS FROM: .LIMITS TO:
$ 180,362
DESCRIPTION:
C 14-5-39PROJ NUM:
3.397
NNHS:
ROW CSJ:
0014-06-042WACO HILL
MISC SPOT PAVEMENT REPAIRS
SH 81 JUL 2018
>=LIMITS FROM: HILLSBORO CONCRETELIMITS TO:
$ 119,683
DESCRIPTION:
C 14-6-42PROJ NUM:
5.066
NNHS:
ROW CSJ:
0093-05-050WACO LIMESTONE
MISC SPOT PAVEMENT REPAIRS
SH 14 JUL 2018
SH 164LIMITS FROM: THORNTONLIMITS TO:
$ 89,750
DESCRIPTION:
C 93-5-50PROJ NUM:
8.627
NNHS:
ROW CSJ:
0093-06-024WACO LIMESTONE
MISC SPOT PAVEMENT REPAIRS
SH 14 JUL 2018
THORNTONLIMITS FROM: SH 7LIMITS TO:
$ 76,463
DESCRIPTION:
C 93-6-24PROJ NUM:
7.472
NNHS:
ROW CSJ:
0093-07-022WACO FALLS
MISC SPOT PAVEMENT REPAIRS
SH 14 JUL 2018
LIMESTONE COUNTY LINELIMITS FROM: ROBERTSON COUNTY LINELIMITS TO:
$ 300,963
DESCRIPTION:
C 93-7-22PROJ NUM:
6.895
NNHS:
ROW CSJ:
0209-12-005WACO HILL
MISC SPOT PAVEMENT REPAIRS
FM 3370 JUL 2018
FM 310LIMITS FROM: FM 1133LIMITS TO:
$ 249,952
DESCRIPTION:
C 209-12-5PROJ NUM:
4.046
NNHS:
ROW CSJ:
0382-02-037WACO FALLS
MISC SPOT PAVEMENT REPAIRS
SH 7 JUL 2018
SH 6LIMITS FROM: LIMESTONE COUNTY LINELIMITS TO:
$ 300,963
DESCRIPTION:
C 382-2-37PROJ NUM:
13.285
NNHS:
ROW CSJ:
0413-02-033WACO LIMESTONE
MISC SPOT PAVEMENT REPAIRS
SH 164 JUL 2018
MCLENNAN COUNTY LINELIMITS FROM: SH 14LIMITS TO:
$ 56,407
DESCRIPTION:
C 413-2-33PROJ NUM:
16.999
NNHS:
ROW CSJ:
0673-01-022WACO LIMESTONE
MISC SPOT PAVEMENT REPAIRS
FM 73 JUL 2018
US 84LIMITS FROM: SH 171LIMITS TO:
$ 128,440
DESCRIPTION:
C 673-1-22PROJ NUM:
11.696
NNHS:
ROW CSJ:
1191-04-025WACO LIMESTONE
MISC SPOT PAVEMENT REPAIRS
FM 937 JUL 2018
SH 164LIMITS FROM: ROBERTSON COUNTY LINELIMITS TO:
$ 56,407
DESCRIPTION:
C 1191-4-25PROJ NUM:
16.851
NNHS:
ROW CSJ:
2547-01-013WACO HILL
MISC SPOT PAVEMENT REPAIRS
FM 1713 JUL 2018
SPUR 1713LIMITS FROM: FM 933LIMITS TO:
$ 84,866
DESCRIPTION:
C 2547-1-13 )PROJ NUM:
3.845
NNHS:
ROW CSJ:
2547-01-014WACO HILL
MISC SPOT PAVEMENT REPAIRS
FM 1713 JUL 2018
END OF MAINTENANCELIMITS FROM: FM 1713LIMITS TO:
$ 27,709
DESCRIPTION:
C 2547-1-14PROJ NUM:
0.549
NNHS:
ROW CSJ:
3030-01-009WACO HILL
MISC SPOT PAVEMENT REPAIRS
FM 2959 JUL 2018
CR 4235LIMITS FROM: US 77LIMITS TO:
$ 115,770
DESCRIPTION:
C 3030-1-9PROJ NUM:
4.050
NNHS:
ROW CSJ:
3498-01-005WACO HILL
MISC SPOT PAVEMENT REPAIRS
FM 1534 JUL 2018
FM 1947LIMITS FROM: FM 933LIMITS TO:
$ 169,499
DESCRIPTION:
C 3498-1-5PROJ NUM:
4.609
NNHS:
ROW CSJ: $ 1,957,23414 Projects0014-05-039CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0014-08-084WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
IH 35 JUL 2018
HILLTOP LANELIMITS FROM: FM 1858LIMITS TO:
$ 270,175
DESCRIPTION:
C 14-8-84PROJ NUM:
6.882
YNHS:
ROW CSJ:
0014-09-100WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
BU 77-L JUL 2018
SPRING LAKE ROADLIMITS FROM: US 84LIMITS TO:
$ 79,708
DESCRIPTION:
C 14-9-100PROJ NUM:
4.487
NNHS:
ROW CSJ:
0014-10-065WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
BU 77-L JUL 2018
US 84LIMITS FROM: 18TH STREETLIMITS TO:
$ 100,000
DESCRIPTION:
C 14-10-65PROJ NUM:
4.323
YNHS:
ROW CSJ:
0055-15-069WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
US 84 JUL 2018
SP 298LIMITS FROM: SP 299LIMITS TO:
$ 40,000
DESCRIPTION:
C 55-15-69PROJ NUM:
7.107
YNHS:
ROW CSJ:
0056-01-034WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
US 84 JUL 2018
SH 31LIMITS FROM: LEAGUE RANCH RDLIMITS TO:
$ 3,951
DESCRIPTION:
C 56-1-34PROJ NUM:
0.465
NNHS:
ROW CSJ:
0162-01-095WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
US 84 JUL 2018
SP 299LIMITS FROM: SH 31LIMITS TO:
$ 40,000
DESCRIPTION:
C 162-1-95PROJ NUM:
5.206
YNHS:
ROW CSJ:
0258-09-146WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
SH 6 JUL 2018
US 77LIMITS FROM: SP 484LIMITS TO:
$ 200,000
DESCRIPTION:
C 258-9-146PROJ NUM:
4.839
YNHS:
ROW CSJ:
0413-01-030WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
SH 164 JUL 2018
SH 6LIMITS FROM: LIMESTONE COUNTY LINELIMITS TO:
$ 75,902
DESCRIPTION:
C 413-1-30PROJ NUM:
8.606
NNHS:
ROW CSJ:
3233-01-011WACO MC LENNAN
MISC SPOT PAVEMENT REPAIRS
FM 3148 JUL 2018
IH 35LIMITS FROM: US 77LIMITS TO:
$ 104,920
DESCRIPTION:
C 3233-1-11PROJ NUM:
5.679
NNHS:
ROW CSJ: $ 914,6569 Projects0014-08-084CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0120-01-019WACO HAMILTON
MISC SPOT PAVEMENT REPAIR
SH 22 JUL 2018
SH 36LIMITS FROM: FM 1602LIMITS TO:
$ 293,938
DESCRIPTION:
C 120-1-19PROJ NUM:
10.210
NNHS:
ROW CSJ:
0120-02-014WACO HAMILTON
MISC SPOT PAVEMENT REPAIRS
SH 22 JUL 2018
FM 1602LIMITS FROM: BOSQUE COUNTY LINELIMITS TO:
$ 89,687
DESCRIPTION:
C 120-2-14PROJ NUM:
7.237
NNHS:
ROW CSJ:
0183-04-056WACO CORYELL
MISC SPOT PAVEMENT REPAIRS
SH 36 JUL 2018
FM 929LIMITS FROM: US 84LIMITS TO:
$ 481,400
DESCRIPTION:
C 183-4-56PROJ NUM:
2.362
NNHS:
ROW CSJ:
0251-01-060WACO HAMILTON
MISC SPOT PAVEMENT REPAIRS
US 281 JUL 2018
SH 6LIMITS FROM: SH 36LIMITS TO:
$ 176,357
DESCRIPTION:
C 251-1-60PROJ NUM:
20.699
YNHS:
ROW CSJ:
0251-02-049WACO HAMILTON
MISC SPOT PAVEMENT REPAIRS
US 281 JUL 2018
SH 36LIMITS FROM: CORYELL COUNTY LINELIMITS TO:
$ 124,266
DESCRIPTION:
C 251-2-49PROJ NUM:
16.026
YNHS:
ROW CSJ:
0386-02-025WACO BOSQUE
MISC SPOT PAVEMENT REPAIRS
SH 144 JUL 2018
FM 203LIMITS FROM: FM 927LIMITS TO:
$ 151,254
DESCRIPTION:
C 386-2-25PROJ NUM:
0.624
NNHS:
ROW CSJ:
0398-01-043WACO BOSQUE
MISC SPOT PAVEMENT REPAIRS
FM 56 JUL 2018
SH 22LIMITS FROM: SH 6LIMITS TO:
$ 410,033
DESCRIPTION:
C 398-1-43PROJ NUM:
17.533
NNHS:
ROW CSJ: $ 1,726,9357 Projects0120-01-019CONTRACT CSJ: JUL 2018
0184-01-063WACO CORYELL
WIDEN ROADWAY AND ADD PASSING LANES
SH 36 JUL 2018
.7 MI W OF FM 931LIMITS FROM: BELL CO LINELIMITS TO:
$ 10,525,852
DESCRIPTION:
C 184-1-63PROJ NUM:
8.239
NNHS:
ROW CSJ: $ 10,525,8521 Project0184-01-063CONTRACT CSJ: JUL 2018
0184-02-053WACO BELL
WIDEN ROADWAY AND ADD PASSING LANES
SH 36 JUL 2018
CORYELL CO LINELIMITS FROM: LAKE BELTON BRDGLIMITS TO:
$ 4,120,013
DESCRIPTION:
STP 1802(474)PROJ NUM:
3.196
NNHS:
ROW CSJ: $ 4,120,0131 Project0184-02-053CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0184-04-050WACO BELL
MISC SPOT PAVEMENT REPAIRS
SH 36 JUL 2018
0.2 MI S OF SH 53LIMITS FROM: HOPI TRAILLIMITS TO:
$ 578,269
DESCRIPTION:
C 184-4-50PROJ NUM:
1.360
YNHS:
ROW CSJ:
0231-10-018WACO BELL
MISC SPOT PAVEMENT REPAIRS
BU 190F JUL 2018
US 190LIMITS FROM: FM 3423LIMITS TO:
$ 1,000,000
DESCRIPTION:
C 231-10-18PROJ NUM:
7.885
YNHS:
ROW CSJ:
0398-04-075WACO BELL
MISC SPOT PAVEMENT REPAIRS
SH 317 JUL 2018
SPARTA ROADLIMITS FROM: RAILROAD OVERPASSLIMITS TO:
$ 310,000
DESCRIPTION:
C 398-4-78PROJ NUM:
0.934
NNHS:
ROW CSJ:
0836-03-067WACO BELL
MISC SPOT PAVEMENT REPAIRS
FM 439 JUL 2018
@38TH STLIMITS FROM: .LIMITS TO:
$ 80,000
DESCRIPTION:
C 836-3-67PROJ NUM:
0.265
YNHS:
ROW CSJ:
2137-01-019WACO BELL
MISC SPOT PAVEMENT REPAIRS
FM 439 JUL 2018
FM 2271LIMITS FROM: SH 317LIMITS TO:
$ 750,000
DESCRIPTION:
C 2137-1-19PROJ NUM:
1.864
NNHS:
ROW CSJ:
2502-01-019WACO BELL
MISC SPOT PAVEMENT REPAIRS
LP 121 JUL 2018
IH 35LIMITS FROM: AUCTION BARN ROADLIMITS TO:
$ 260,000
DESCRIPTION:
C 2502-1-19PROJ NUM:
1.216
NNHS:
ROW CSJ: $ 2,978,2696 Projects0184-04-050CONTRACT CSJ: JUL 2018
0320-05-015WACO BELL
MILL, SEAL AND OVERLAY
SL 363 JUL 2018
IH 35LIMITS FROM: US 190LIMITS TO:
$ 3,379,993
DESCRIPTION:
C 320-5-15PROJ NUM:
6.592
NNHS:
ROW CSJ: $ 3,379,9931 Project0320-05-015CONTRACT CSJ: JUL 2018
0909-39-127WACO CORYELL
REPLACE BRIDGE AND APPROACHES
CR JUL 2018
ON CR 210 @ LEON RIVERLIMITS FROM: (MAP #10)LIMITS TO:
$ 875,000
DESCRIPTION:
BR 1502(366)PROJ NUM:
0.112
NNHS:
ROW CSJ: $ 875,0001 Project0909-39-127CONTRACT CSJ: JUL 2018
1656-03-012WACO FALLS
SAFETY TREAT FIXED OBJECTS
FM 413 JUL 2018
FM 2027LIMITS FROM: SL 265LIMITS TO:
$ 891,744
DESCRIPTION:
STP 1702(303)HESPROJ NUM:
6.175
NNHS:
ROW CSJ: $ 891,7441 Project1656-03-012CONTRACT CSJ: JUL 2018
2061-02-030WACO MC LENNAN
REHABILITATE AND WIDEN ROADWAY
FM 2114 JUL 2018
FM 2311LIMITS FROM: HILL CO LINELIMITS TO:
$ 2,940,500
DESCRIPTION:
STP 1802(320)PROJ NUM:
6.582
NNHS:
ROW CSJ:
2061-03-013WACO HILL
REHABILITATE AND WIDEN ROADWAY
FM 2114 JUL 2018
MCLENNAN CO LINELIMITS FROM: FM 308LIMITS TO:
$ 2,709,500
DESCRIPTION:
STP 1802(320)PROJ NUM:
5.349
NNHS:
ROW CSJ: $ 5,650,0002 Projects2061-02-030CONTRACT CSJ: JUL 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
2362-01-036WACO MC LENNAN
SEAL & OVERLAY
SL 340 JUL 2018
WILLIAMS RDLIMITS FROM: SH 6LIMITS TO:
$ 1,635,090
DESCRIPTION:
C 2362-1-36PROJ NUM:
3.472
YNHS:
ROW CSJ:
0258-09-145WACO MC LENNAN
INSTALL TRAFFIC SIGNALS AT EACH LEG OF THE INTERSECTION OFSH 6 & LP 340 (SH 6, LP 340, LP 484)
SH 6 JUL 2018
@ SH 6LIMITS FROM: LP 340LIMITS TO:
$ 248,695
DESCRIPTION:
C 258-9-145PROJ NUM:
0.080
YNHS:
ROW CSJ: $ 1,883,7852 Projects2362-01-036CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 34,903,48145 Projects 11 Contracts
0049-01-094WACO MC LENNAN
IMPROVE TRAFFIC SIGNALS
SH 6 AUG 2018
@ FM 1860LIMITS FROM: .LIMITS TO:
$ 263,658
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0056-03-065WACO LIMESTONE
IMPROVE TRAFFIC SIGNALS
US 84 AUG 2018
SH 14LIMITS FROM: ROSS ROAD IN MEXIA, TXLIMITS TO:
$ 320,520
DESCRIPTION:
STP ( )HESPROJ NUM:
0.932
YNHS:
ROW CSJ:
0057-01-030WACO LIMESTONE
IMPROVE TRAFFIC SIGNALS
US 84 AUG 2018
ROSS ROAD IN MEXIA, TXLIMITS FROM: FM 1365LIMITS TO:
$ 160,260
DESCRIPTION:
STP ( )HESPROJ NUM:
0.352
YNHS:
ROW CSJ:
2362-01-037WACO MC LENNAN
INSTAL INTERSECTION FLASHING BEACON
FM 2418 AUG 2018
AT PECAN LANELIMITS FROM: .LIMITS TO:
$ 72,185
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
2506-01-040WACO MC LENNAN
IMPROVE TRAFFIC SIGNALS
FM 1695 AUG 2018
AT PANTHER WAYLIMITS FROM: .LIMITS TO:
$ 428,387
DESCRIPTION:
STP ( )HESPROJ NUM:
0.200
YNHS:
ROW CSJ: $ 1,245,0105 Projects0049-01-094CONTRACT CSJ: AUG 2018
0909-29-040WACO HAMILTON
REPLACE BRIDGE AND APPROACHES
CR AUG 2018
ON CR 266 @ FALL CRKLIMITS FROM: (MAP #219)LIMITS TO:
$ 410,000
DESCRIPTION:
BR 1702(407)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 410,0001 Project0909-29-040CONTRACT CSJ: AUG 2018
0909-38-071WACO FALLS
REPLACE BRIDGE AND APPROACHES
CR AUG 2018
ON CR 236 @ BIG ELM CRLIMITS FROM: (MAP #19)LIMITS TO:
$ 350,000
DESCRIPTION:
BR 1702(197)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 350,0001 Project0909-38-071CONTRACT CSJ: AUG 2018
0909-38-078WACO FALLS
REPLACE BRIDGE AND APPROACHES
CS AUG 2018
CS 085 (ROWENA AVE)LIMITS FROM: @ DRAINAGE DITCH (MAP #1 ROSEBUD)LIMITS TO:
$ 361,499
DESCRIPTION:
BR 2017(203)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 361,4991 Project0909-38-078CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 2,366,5098 Projects 4 Contracts
WACO $ 43,677,65857 Projects 18 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
WICHITA FALLS DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$1.72 $0.00 $0.00 $0.00 $0.00OCTOBER $1.72$0.00 $0.00$0.00$0.00
$7.09 $0.00 $0.00 $0.00 $0.00NOVEMBER $7.09$0.00 $0.00$0.00$0.00
$6.90 $0.00 $0.00 $0.00 $0.00DECEMBER $6.90$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$5.61 $0.00 $0.00 $0.00 $0.00FEBRUARY $5.61$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00MARCH $0.50$0.00 $0.00$0.00$0.00
$1.61 $0.00 $0.00 $0.00 $0.00APRIL $1.61$0.00 $0.00$0.00$0.00
$9.03 $0.00 $0.00 $0.00 $0.00MAY $9.03$0.00 $0.00$0.00$0.00
$23.73 $0.00 $0.00 $0.00 $0.00JUNE $25.06$0.00 $0.00$0.00$1.33
$2.04 $0.00 $0.00 $0.00 $0.00JULY $2.04$0.00 $0.00$0.00$0.00
$8.30 $0.00 $0.00 $0.00 $0.00AUGUST $8.30$0.00 $0.00$0.00$0.00
$66.53 $0.00 $0.00 $0.00 $0.00 $67.86District Total: $0.00 $0.00$0.00$1.33
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0043-06-088WICHITA FALLS WILBARGER
MILL HOT MIX ON BRIDGE AND APPROACHES
US 70 MAY 2018
AT BNSF RAILROAD & DUGAN CREEK (SB)LIMITS FROM: .LIMITS TO:
$ 298,077
DESCRIPTION:
NH 2018(823)PROJ NUM:
0.483
YNHS:
ROW CSJ:
0043-06-089WICHITA FALLS WILBARGER
MILL HOT MIX ON BRIDGE AND APPROACHES
US 70 MAY 2018
AT BNSF RAILROAD & DUGAN CREEK (NB)LIMITS FROM: .LIMITS TO:
$ 107,627
DESCRIPTION:
NH 2018(823)PROJ NUM:
0.483
YNHS:
ROW CSJ:
0043-06-092WICHITA FALLS WILBARGER
MODERNIZE BRIDGE RAIL & APPROACH GUARDRAIL, IMPROVE GUARDRAIL, IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED
US 70 MAY 2018
0.731 MI W OF SL 404LIMITS FROM: 0.245 MI E OF SL 404LIMITS TO:
$ 1,157,549
DESCRIPTION:
STP 1802(257)HESPROJ NUM:
0.976
YNHS:
ROW CSJ: $ 1,563,2533 Projects0043-06-088CONTRACT CSJ: MAY 2018
0156-06-052WICHITA FALLS BAYLOR
RE-ALIGN ROADWAY
US 82 MAY 2018
APPROX. 1 MILE WEST OF US 183 (WB)LIMITS FROM: APPROX. 1 MILE EAST OF US 183 (WB)LIMITS TO:
$ 4,157,376
DESCRIPTION:
NH 1802(199)PROJ NUM:
1.990
YNHS:
ROW CSJ: $ 4,157,3761 Project0156-06-052CONTRACT CSJ: MAY 2018
0823-01-029WICHITA FALLS COOKE
EXTEND CULVERTS
FM 373 MAY 2018
CR 450LIMITS FROM: MUENSTERLIMITS TO:
$ 644,248
DESCRIPTION:
STP 2018(824)PROJ NUM:
4.499
NNHS:
ROW CSJ:
0823-01-033WICHITA FALLS COOKE
EXTEND CULVERTS
FM 373 MAY 2018
FM 2382LIMITS FROM: CR 450LIMITS TO:
$ 976,950
DESCRIPTION:
STP 2018(824)PROJ NUM:
9.205
NNHS:
ROW CSJ:
0823-01-035WICHITA FALLS COOKE
SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACEWIDTH, MILLED CENTERLINE RUMBLE STRIPS
FM 373 MAY 2018
CR 450LIMITS FROM: 0.042 MI N OF W 9TH STLIMITS TO:
$ 1,684,040
DESCRIPTION:
STP 2018(825)HESPROJ NUM:
4.409
NNHS:
ROW CSJ: $ 3,305,2383 Projects0823-01-029CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 9,025,8677 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0013-01-010WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
US 81 JUN 2018
OKLAHOMA STATE LINELIMITS FROM: 0.386 MI S OF OKLAHOMA STATE LINELIMITS TO:
$ 224,842
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
0.206
YNHS:
ROW CSJ:
0013-02-022WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
US 81 JUN 2018
0.386 MI S OF OKLAHOMA STATE LINELIMITS FROM: 0.122 MI N OF SL 19LIMITS TO:
$ 12,773
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
3.394
YNHS:
ROW CSJ:
0013-03-036WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
US 81 JUN 2018
0.122 MI N OF SL 19LIMITS FROM: FM 1806 WLIMITS TO:
$ 41,977
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.265
NNHS:
ROW CSJ:
0013-04-021WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
US 81 JUN 2018
FM 1806 WLIMITS FROM: 1.705 MI N OF FM 174LIMITS TO:
$ 22,992
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
6.167
NNHS:
ROW CSJ:
0133-04-043WICHITA FALLS BAYLOR
MILLED EDGELINE RUMBLE STRIPS
US 82 JUN 2018
KNOX COUNTY LINELIMITS FROM: BOONE RDLIMITS TO:
$ 39,824
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.673
YNHS:
ROW CSJ:
0133-05-027WICHITA FALLS BAYLOR
CENTERLINE TEXTURING
SH 114 JUN 2018
0.081 MI W OF US 183LIMITS FROM: FM 1285LIMITS TO:
$ 19,414
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.211
YNHS:
ROW CSJ:
0133-05-028WICHITA FALLS BAYLOR
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
0.081 MI W OF US 183LIMITS FROM: FM 1285 WESTLIMITS TO:
$ 36,703
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
9.831
YNHS:
ROW CSJ:
0133-06-030WICHITA FALLS BAYLOR
CENTERLINE TEXTURING
SH 114 JUN 2018
FM 1285LIMITS FROM: ARCHER COUNTY LINELIMITS TO:
$ 18,170
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
9.514
YNHS:
ROW CSJ:
0133-06-031WICHITA FALLS BAYLOR
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
FM 1285 WESTLIMITS FROM: ARCHER COUNTY LINELIMITS TO:
$ 35,403
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
9.514
YNHS:
ROW CSJ:
0133-07-027WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
FM 210 SLIMITS FROM: YOUNG COUNTY LINELIMITS TO:
$ 22,001
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
5.910
YNHS:
ROW CSJ:
0133-07-028WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
BAYLOR COUNTY LINELIMITS FROM: FM 1285 ELIMITS TO:
$ 1,483
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
0.370
YNHS:
ROW CSJ:
0133-08-036WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
ARCHER COUNTY LINELIMITS FROM: FM 2178 NLIMITS TO:
$ 15,263
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
4.083
YNHS:
ROW CSJ:
0134-01-023WICHITA FALLS YOUNG
CENTERLINE TEXTURING
SH 251 JUN 2018
0.178 MI S OF SH 79LIMITS FROM: 0.534 MI N OF FM 926LIMITS TO:
$ 20,553
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.794
NNHS:
ROW CSJ:
0134-01-024WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 251 JUN 2018
0.178 MI S OF SH 79LIMITS FROM: 0.444 MI N OF FM 926LIMITS TO:
$ 40,559
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.885
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0134-02-058WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
US 380 JUN 2018
0.009 MI E OF AUSTIN STLIMITS FROM: SH 16LIMITS TO:
$ 44,526
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.942
NNHS:
ROW CSJ:
0134-03-031WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
US 380 JUN 2018
1.039 MI E OF FM 2179LIMITS FROM: JACK COUNTY LINELIMITS TO:
$ 28,183
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
7.548
NNHS:
ROW CSJ:
0137-03-082WICHITA FALLS WICHITA
MILLED CENTERLINE RUMBLE STRIPSSTRIPS
SH 25 JUN 2018
FM 1811LIMITS FROM: ARCHER COUNTY LINELIMITS TO:
$ 27,147
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
14.322
NNHS:
ROW CSJ:
0146-07-029WICHITA FALLS WILBARGER
MILLED CENTERLINE RUMBLE STRIPS
US 70 JUN 2018
FOARD COUNTY LINELIMITS FROM: FM 3207LIMITS TO:
$ 23,546
DESCRIPTION:
STP 2018(950)PROJ NUM:
12.416
NNHS:
ROW CSJ:
0147-01-021WICHITA FALLS WILBARGER
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
US 70 JUN 2018
US 287LIMITS FROM: 1.7 MI N OF FM 1763LIMITS TO:
$ 32,288
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
5.728
NNHS:
ROW CSJ:
0147-02-021WICHITA FALLS WILBARGER
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
US 70 JUN 2018
1.7 MI N OF FM 1763LIMITS FROM: OKLAHOMA STATE LINELIMITS TO:
$ 5,838
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
1.035
NNHS:
ROW CSJ:
0156-02-029WICHITA FALLS WICHITA
MILLED EDGELINE RUMBLE STRIPS
SH 240 JUN 2018
GILBERT RDLIMITS FROM: NEAR ROBINSON RDLIMITS TO:
$ 16,921
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
4.561
NNHS:
ROW CSJ:
0156-03-047WICHITA FALLS WICHITA
MILLED EDGELINE RUMBLE STRIPS
SH 240 JUN 2018
NEAR ROBINSON RDLIMITS FROM: MISSILE RDLIMITS TO:
$ 7,118
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
1.908
YNHS:
ROW CSJ:
0156-04-117WICHITA FALLS WICHITA
MILLED CENTERLINE RUMBLE STRIPS
US 82 JUN 2018
ARCHER COUNTY LINELIMITS FROM: 0.5 MI WEST OF FM 369LIMITS TO:
$ 7,823
DESCRIPTION:
NH 2018(947)PROJ NUM:
3.937
YNHS:
ROW CSJ:
0156-06-055WICHITA FALLS BAYLOR
MILLED EDGELINE RUMBLE STRIPS (EB ONLY)
US 82 JUN 2018
SEYMOURLIMITS FROM: MABELLELIMITS TO:
$ 45,899
DESCRIPTION:
NH 2018(949)PROJ NUM:
7.351
YNHS:
ROW CSJ:
0239-05-033WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
SH 59 JUN 2018
US 287LIMITS FROM: CLAY COUNTY LINELIMITS TO:
$ 30,947
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
8.316
NNHS:
ROW CSJ:
0239-06-013WICHITA FALLS CLAY
MILLED EDGELINE RUMBLE STRIPS
SH 59 JUN 2018
MONTAGUE COUNTY LINELIMITS FROM: JACK COUNTY LINELIMITS TO:
$ 13,019
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
3.465
NNHS:
ROW CSJ:
0256-01-057WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 67 JUN 2018
FM 209LIMITS FROM: STEPHENS COUNTY LINELIMITS TO:
$ 42,712
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.448
NNHS:
ROW CSJ:
0282-02-030WICHITA FALLS CLAY
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 79 JUN 2018
OKLAHOMA STATE LINELIMITS FROM: SH 148LIMITS TO:
$ 62,995
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.193
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0282-03-029WICHITA FALLS CLAY
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 79 JUN 2018
SH 148LIMITS FROM: WICHITA COUNTY LINELIMITS TO:
$ 73,700
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
13.098
NNHS:
ROW CSJ:
0283-02-035WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 79 JUN 2018
WICHITA COUNTY LINELIMITS FROM: 1.8 MI S OF FM 2224LIMITS TO:
$ 34,113
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
9.142
NNHS:
ROW CSJ:
0283-03-022WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 79 JUN 2018
1.8 MI S OF FM 2224LIMITS FROM: 1.019 MI N OF SH 25LIMITS TO:
$ 30,639
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
8.277
NNHS:
ROW CSJ:
0283-04-034WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 79 JUN 2018
0.035 MI S OF W 4TH STLIMITS FROM: YOUNG COUNTY LINELIMITS TO:
$ 56,430
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
15.143
NNHS:
ROW CSJ:
0283-05-014WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 79 JUN 2018
ARCHER COUNTY LINELIMITS FROM: 0.56 MI S OF THE ARCHER COUNTY LINELIMITS TO:
$ 2,142
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
0.560
NNHS:
ROW CSJ:
0284-01-052WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 79 JUN 2018
0.56 MI S OF THE ARCHER COUNTY LINELIMITS FROM: FM 1768LIMITS TO:
$ 1,181
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
0.283
NNHS:
ROW CSJ:
0361-01-035WICHITA FALLS THROCKMORTON
MILLED EDGELINE RUMBLE STRIPS
US 380 JUN 2018
1.01 MI E OF US 183LIMITS FROM: YOUNG COUNTY LINELIMITS TO:
$ 44,952
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
12.065
NNHS:
ROW CSJ:
0361-02-045WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
US 380 JUN 2018
THROCKMORTON COUNTY LINELIMITS FROM: 0.263 MI S OF JENNINGS AVELIMITS TO:
$ 48,971
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
13.137
NNHS:
ROW CSJ:
0362-01-051WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 16 JUN 2018
FM 1287LIMITS FROM: PALO PINTO COUNTY LINELIMITS TO:
$ 39,917
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.700
NNHS:
ROW CSJ:
0423-01-016WICHITA FALLS MONTAGUE
MILLED EDGELINE RUMBLE STRIPS
SH 59 JUN 2018
US 82LIMITS FROM: 0.117 MI E OF SH 175LIMITS TO:
$ 42,550
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.430
NNHS:
ROW CSJ:
0444-01-042WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 114 JUN 2018
0.408 MI E OF SH 79LIMITS FROM: JACK COUNTY LINELIMITS TO:
$ 79,579
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
21.355
YNHS:
ROW CSJ:
0544-01-022WICHITA FALLS WICHITA
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLESTRIPS
SH 258 JUN 2018
SH 25LIMITS FROM: US 82LIMITS TO:
$ 61,345
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
11.165
NNHS:
ROW CSJ:
0655-01-033WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 16 JUN 2018
SH 114LIMITS FROM: 0.162 MI N OF FM 3491LIMITS TO:
$ 39,498
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.579
NNHS:
ROW CSJ:
0655-02-022WICHITA FALLS ARCHER
MILLED EDGELINE RUMBLE STRIPS
SH 16 JUN 2018
0.119 MI W OF US 281LIMITS FROM: YOUNG COUNTY LINELIMITS TO:
$ 22,899
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
6.140
NNHS:
ROW CSJ:
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0655-03-023WICHITA FALLS YOUNG
MILLED EDGELINE RUMBLE STRIPS
SH 16 JUN 2018
ARCHER COUNTY LINELIMITS FROM: SH 114LIMITS TO:
$ 38,642
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
10.390
NNHS:
ROW CSJ:
0681-01-024WICHITA FALLS WICHITA
MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE STRIPS
FM 171 JUN 2018
FM 890LIMITS FROM: CLAY CO LINELIMITS TO:
$ 35,760
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
6.503
NNHS:
ROW CSJ:
0903-00-106WICHITA FALLS WICHITA
PAVEMENT MARKINGS
VA JUN 2018
VARIOUS LOCATIONS DISTRICT WIDELIMITS FROM: .LIMITS TO:
$ 340,746
DESCRIPTION:
C 903-0-106PROJ NUM:
1.000
NNHS:
ROW CSJ:
1855-01-025WICHITA FALLS COOKE
MILLED CENTERLINE RUMBLE STRIPS
FM 922 JUN 2018
FM 2071LIMITS FROM: FM 372LIMITS TO:
$ 9,200
DESCRIPTION:
STP 2018(948)HESPROJ NUM:
4.821
NNHS:
ROW CSJ: $ 1,943,18346 Projects0013-01-010CONTRACT CSJ: JUN 2018
0043-09-135WICHITA FALLS WICHITA
MILL & OVERLAY
IH 44 JUN 2018
7TH STREETLIMITS FROM: 6TH STREET (EB FRONTAGE ROAD)LIMITS TO:
$ 992,773
DESCRIPTION:
C 43-9-135PROJ NUM:
0.100
YNHS:
ROW CSJ:
0156-07-110WICHITA FALLS WICHITA
MILL & OVERLAY
IH 44 JUN 2018
IH 44/US 287/SP 325 INTERCHANGELIMITS FROM: RED RIVERLIMITS TO:
$ 7,052,970
DESCRIPTION:
C 156-7-110PROJ NUM:
12.760
YNHS:
ROW CSJ:
0156-07-112WICHITA FALLS WICHITA
INSTALL MEDIAN BARRIER
IH 44 JUN 2018
EAST RDLIMITS FROM: SH 240LIMITS TO:
$ 884,615
DESCRIPTION:
STP 1802(418)HESPROJ NUM:
4.601
YNHS:
ROW CSJ: $ 8,930,3583 Projects0043-09-135CONTRACT CSJ: JUN 2018
0124-05-029WICHITA FALLS BAYLOR
ADD SHOULDERS
US 183 JUN 2018
WICHITA RIVERLIMITS FROM: US 82LIMITS TO:
$ 724,500
DESCRIPTION:
C 124-5-29PROJ NUM:
6.296
NNHS:
ROW CSJ:
0124-05-030WICHITA FALLS BAYLOR
SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACEWIDTH, MILLED CENTERLINE RUMBLE STRIPS
US 183 JUN 2018
6.296 MI N OF US 82LIMITS FROM: US 82LIMITS TO:
$ 4,987,764
DESCRIPTION:
STP 1802(419)HESPROJ NUM:
6.296
NNHS:
ROW CSJ: $ 5,712,2642 Projects0124-05-029CONTRACT CSJ: JUN 2018
0360-05-029WICHITA FALLS THROCKMORTON
FULL DEPTH REPAIR AND OVERLAY
US 380 JUN 2018
HASKELL COUNTY LINELIMITS FROM: NEAR WEST CL OF THROCKMORTONLIMITS TO:
$ 3,013,336
DESCRIPTION:
C 360-5-29PROJ NUM:
15.854
NNHS:
ROW CSJ: $ 3,013,3361 Project0360-05-029CONTRACT CSJ: JUN 2018
0802-02-053WICHITA FALLS WICHITA
ENCLOSE DRAINAGE DITCH
FM 369 JUN 2018
NEAR MCNIEL AVELIMITS FROM: NEAR RHEA RDLIMITS TO:
$ 5,458,463
DESCRIPTION:
NH 2017(606)PROJ NUM:
0.200
YNHS:P1
ROW CSJ: $ 5,458,4631 Project0802-02-053CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 25,057,60453 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0043-07-111WICHITA FALLS WILBARGER
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 287 JUL 2018
FM 1763LIMITS FROM: SH 240LIMITS TO:
$ 164,462
DESCRIPTION:
STP 1802(315)HESPROJ NUM:
0.701
YNHS:
ROW CSJ:
0043-08-079WICHITA FALLS WICHITA
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 287 JUL 2018
SH 25LIMITS FROM: MIDWAY CHURCH ROADLIMITS TO:
$ 252,814
DESCRIPTION:
STP 1802(315)HESPROJ NUM:
3.133
YNHS:
ROW CSJ:
0156-04-118WICHITA FALLS WICHITA
IMPROVE GUARDRAIL TO DESIGN STANDARDS
US 82 JUL 2018
KEMP STLIMITS FROM: TAFT STLIMITS TO:
$ 221,143
DESCRIPTION:
STP 1802(315)HESPROJ NUM:
0.576
YNHS:
ROW CSJ: $ 638,4193 Projects0043-07-111CONTRACT CSJ: JUL 2018
0194-01-014WICHITA FALLS COOKE
INCREASE SUPERELEVATION, MILLED EDGELINE RUMBLE STRIPS
IH 35 JUL 2018
3.184 MI N OF FM 1202LIMITS FROM: 3.395 MI N OF FM 1202LIMITS TO:
$ 45,258
DESCRIPTION:
STP 1802(316)HESGPROJ NUM:
0.179
YNHS:
ROW CSJ:
0194-02-099WICHITA FALLS COOKE
INCREASE SUPERELEVATION, MILLED EDGELINE RUMBLE STRIPS
IH 35 JUL 2018
1.233 MI S OF FM 372LIMITS FROM: 3.184 MI N OF FM 1202LIMITS TO:
$ 1,355,476
DESCRIPTION:
STP 1802(316)HESGPROJ NUM:
5.361
YNHS:
ROW CSJ: $ 1,400,7342 Projects0194-01-014CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 2,039,1535 Projects 2 Contracts
0043-08-075WICHITA FALLS WICHITA
INSTALL MEDIAN BARRIER
US 287 AUG 2018
NEAR BURNETT RANCH ROADLIMITS FROM: 0.45 MI WEST OF JOHNSON ROADLIMITS TO:
$ 1,970,000
DESCRIPTION:
NH 1802(303)PROJ NUM:
3.778
YNHS:
ROW CSJ:
0043-09-136WICHITA FALLS WICHITA
INSTALL MEDIAN BARRIER
US 287 AUG 2018
0.45MI WEST OF JOHNSON RDLIMITS FROM: FM 369LIMITS TO:
$ 720,000
DESCRIPTION:
NH ( )PROJ NUM:
5.501
YNHS:
ROW CSJ: $ 2,690,0002 Projects0043-08-075CONTRACT CSJ: AUG 2018
0681-04-039WICHITA FALLS WICHITA
WIDEN PAVEMENT AND OVERLAY
FM 367 AUG 2018
SH 25LIMITS FROM: FM 368LIMITS TO:
$ 500,000
DESCRIPTION:
C 681-4-39PROJ NUM:
9.254
NNHS:
ROW CSJ:
0681-04-041WICHITA FALLS WICHITA
SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACEWIDTH, MILLED CENTERLINE RUMBLE STRIPS
FM 367 AUG 2018
SH 25LIMITS FROM: FM 368LIMITS TO:
$ 5,114,246
DESCRIPTION:
STP 1802(253)HESPROJ NUM:
10.940
NNHS:
ROW CSJ: $ 5,614,2462 Projects0681-04-039CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 8,304,2464 Projects 2 Contracts
WICHITA FALLS $ 44,426,87069 Projects 12 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
YOAKUM DISTRICT
CURRENT STATEWIDE LETTING SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$16.55 $0.00 $0.00 $0.00 $0.00SEPTEMBER $16.55$0.00 $0.00$0.00$0.00
$2.00 $0.00 $0.00 $0.00 $0.00OCTOBER $2.00$0.00 $0.00$0.00$0.00
$7.90 $0.00 $0.00 $0.00 $0.00NOVEMBER $7.90$0.00 $0.00$0.00$0.00
$2.05 $0.00 $0.00 $0.00 $0.00DECEMBER $2.05$0.00 $0.00$0.00$0.00
$14.13 $0.00 $0.00 $0.00 $0.00JANUARY $14.13$0.00 $0.00$0.00$0.00
$14.31 $0.00 $0.00 $0.00 $0.00FEBRUARY $14.31$0.00 $0.00$0.00$0.00
$8.89 $0.00 $0.00 $0.00 $0.00MARCH $8.89$0.00 $0.00$0.00$0.00
$19.09 $0.00 $0.00 $0.00 $0.00APRIL $19.09$0.00 $0.00$0.00$0.00
$36.18 $0.00 $0.00 $0.00 $0.00MAY $36.18$0.00 $0.00$0.00$0.00
$20.59 $0.00 $0.00 $0.00 $0.00JUNE $20.59$0.00 $0.00$0.00$0.00
$9.01 $0.00 $0.00 $0.00 $0.00JULY $9.01$0.00 $0.00$0.00$0.00
$262.09 $0.00 $0.00 $0.00 $0.00AUGUST $262.09$0.00 $0.00$0.00$0.00
$412.79 $0.00 $0.00 $0.00 $0.00 $412.79District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0088-05-085YOAKUM VICTORIA
UPGRADE TO RURAL FREEWAY
US 59 MAY 2018
0.5 MI S OF FM 1686LIMITS FROM: SL 463LIMITS TO:
$ 23,782,518
DESCRIPTION:
C 88-5-85PROJ NUM:
2.769
YNHS:
0088-05-099ROW CSJ:
0088-05-099YOAKUM VICTORIA
UTILITY ONLY
US 59 MAY 2018
0.5 MI S OF FM 1686LIMITS FROM: SL 463LIMITS TO:
$ 657,781
DESCRIPTION:
ROW 88-5-99PROJ NUM:
3.329
YNHS:
ROW CSJ: $ 24,440,2992 Projects0088-05-085CONTRACT CSJ: MAY 2018
0088-06-004YOAKUM VICTORIA
IMPROVE TRAFFIC SIGNALS
BU 59-T MAY 2018
AT FM 236LIMITS FROM: .LIMITS TO:
$ 222,113
DESCRIPTION:
STP 2018(836)HESPROJ NUM:
0.200
YNHS:
ROW CSJ:
0144-03-038YOAKUM CALHOUN
IMPROVE TRAFFIC SIGNAL
US 87 MAY 2018
@ FM 1090LIMITS FROM: .LIMITS TO:
$ 133,400
DESCRIPTION:
STP 2018(836)HESPROJ NUM:
0.200
NNHS:
ROW CSJ:
0179-04-094YOAKUM MATAGORDA
IMPROVE TRAFFIC SIGNAL
SH 35 MAY 2018
AT FM 2668 (NICHOLAS AVE)LIMITS FROM: .LIMITS TO:
$ 142,253
DESCRIPTION:
STP 2018(836)HESPROJ NUM:
0.200
NNHS:
ROW CSJ: $ 497,7663 Projects0088-06-004CONTRACT CSJ: MAY 2018
0143-09-070YOAKUM DE WITT
LANDSCAPE DEVELOPMENT ON US 87 IN CUERO
US 87 MAY 2018
@ E COURTHOUSE STREET IN CUEROLIMITS FROM: .LIMITS TO:
$ 107,996
DESCRIPTION:
NH 2018(834)PROJ NUM:
0.001
YNHS:
ROW CSJ: $ 107,9961 Project0143-09-070CONTRACT CSJ: MAY 2018
0605-01-064YOAKUM MATAGORDA
PAVEMENT REPAIR AND RESURFACING
FM 457 MAY 2018
0.172 MI W OF FM 2540LIMITS FROM: 0.047 MI E OF FM 521LIMITS TO:
$ 3,100,208
DESCRIPTION:
STP 2018(837)PROJ NUM:
8.446
NNHS:
ROW CSJ: $ 3,100,2081 Project0605-01-064CONTRACT CSJ: MAY 2018
0913-09-073YOAKUM WHARTON
REPLACE BRIDGE AND APPROACHES
CR MAY 2018
AT TRES PALACIOS RIVERLIMITS FROM: WCR 410 STR AA04-40-001LIMITS TO:
$ 604,156
DESCRIPTION:
BR 2017(100)PROJ NUM:
0.072
NNHS:
ROW CSJ:
0913-09-085YOAKUM WHARTON
REPLACE BRIDGE AND APPROACHES
CR MAY 2018
AT DRAW CR 206LIMITS FROM: STR AA03-25-001LIMITS TO:
$ 165,632
DESCRIPTION:
BR 1602(118)PROJ NUM:
0.034
NNHS:
ROW CSJ:
0913-09-086YOAKUM WHARTON
REPLACE BRIDGE AND APPROACHES
CR MAY 2018
AT PEACH CREEK CR 232LIMITS FROM: STR AA029001LIMITS TO:
$ 330,650
DESCRIPTION:
BR 1602(015)PROJ NUM:
0.064
NNHS:
ROW CSJ: $ 1,100,4383 Projects0913-09-073CONTRACT CSJ: MAY 2018
2350-01-057YOAKUM VICTORIA
PAVEMENT REPAIR AND RESURFACING
SL 463 MAY 2018
US 77LIMITS FROM: 0.6 MI WEST OF FM 1315LIMITS TO:
$ 1,681,375
DESCRIPTION:
NH 2018(838)PROJ NUM:
0.512
YNHS:
ROW CSJ:
2350-01-058YOAKUM VICTORIA
PAVEMENT REPAIR AND RESURFACING
US 77 MAY 2018
SL 463LIMITS FROM: 1 MI. S. OF US 87LIMITS TO:
$ 5,252,015
DESCRIPTION:
NH 2018(839)PROJ NUM:
2.879
YNHS:
ROW CSJ: $ 6,933,3902 Projects2350-01-057CONTRACT CSJ: MAY 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
MAY 2018 TOTAL: $ 36,180,09712 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0153-02-043YOAKUM GONZALES
MISC BRIDGE REPAIR
US 183 JUN 2018
AT SPRING CREEKLIMITS FROM: STR # 0153-02-013LIMITS TO:
$ 392,050
DESCRIPTION:
BR 2018(990)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0153-02-044YOAKUM GONZALES
MISC BRIDGE REPAIR
US 183 JUN 2018
AT DRY FORK CREEKLIMITS FROM: STR # 0153-02-014LIMITS TO:
$ 67,950
DESCRIPTION:
BR 2018(989)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0154-04-031YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT MCCOY CREEKLIMITS FROM: STR # 0154-04-019LIMITS TO:
$ 29,200
DESCRIPTION:
BR 2018(985)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0154-04-032YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT CUERO CREEK RELIEFLIMITS FROM: STR # 0154-04-014LIMITS TO:
$ 66,500
DESCRIPTION:
BR 2018(984)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0154-04-033YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT CUERO CREEKLIMITS FROM: STR # 0154-04-015LIMITS TO:
$ 45,150
DESCRIPTION:
BR 2018(983)PROJ NUM:
0.100
YNHS:
ROW CSJ:
0155-01-039YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT 5 MILE COLETO CREEKLIMITS FROM: STR # 0155-01-013LIMITS TO:
$ 152,564
DESCRIPTION:
BR 2018(982)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0155-01-040YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT 12 MILE COLETO CREEKLIMITS FROM: STR # 0155-01-015LIMITS TO:
$ 147,714
DESCRIPTION:
BR 2018(981)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0155-01-041YOAKUM DE WITT
MISC BRIDGE REPAIR
US 183 JUN 2018
AT 15 MILE COLETO CREEKLIMITS FROM: STR # 0155-01-017LIMITS TO:
$ 637,714
DESCRIPTION:
BR 2018(980)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0445-01-063YOAKUM GONZALES
MISC BRIDGE REPAIR
US 90A JUN 2018
AT GELHORN CREEKLIMITS FROM: STR # 0445-01-012LIMITS TO:
$ 67,360
DESCRIPTION:
BR 2018(988)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0445-02-064YOAKUM LAVACA
MISC BRIDGE REPAIR
US 90A JUN 2018
AT ROCKY CREEKLIMITS FROM: STR # 0445-02-004LIMITS TO:
$ 306,800
DESCRIPTION:
BR 2018(987)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0445-02-065YOAKUM LAVACA
MISC BRIDGE REPAIR
US 90A JUN 2018
AT BOGGY CREEKLIMITS FROM: STR # 0445-02-006LIMITS TO:
$ 435,900
DESCRIPTION:
BR 2018(986)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,348,90211 Projects0153-02-043CONTRACT CSJ: JUN 2018
0515-06-024YOAKUM LAVACA
UPGRADE BRDG GUARDRAIL AND PROVIDE ADDITIONAL PAVED SURFACEWIDTH
FM 957 JUN 2018
6.6 MI S OF FM 532LIMITS FROM: 0.4 MI N OF US 77LIMITS TO:
$ 1,628,871
DESCRIPTION:
STP 2018(991)HESPROJ NUM:
3.424
NNHS:
ROW CSJ: $ 1,628,8711 Project0515-06-024CONTRACT CSJ: JUN 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:31 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0535-06-044YOAKUM FAYETTE
PAVEMENT REPAIR AND SURFACING
IH 10 JUN 2018
0.103 MI W OF FM 609LIMITS FROM: 0.311 MI W OF FM 2238LIMITS TO:
$ 6,026,579
DESCRIPTION:
C 535-6-44PROJ NUM:
5.786
YNHS:
ROW CSJ:
0535-07-049YOAKUM FAYETTE
PAVEMENT REPAIR AND SURFACING
IH 10 JUN 2018
0.311 MI W OF FM 2238LIMITS FROM: 0.08 MI E OF US 77LIMITS TO:
$ 5,595,010
DESCRIPTION:
C 535-7-49PROJ NUM:
6.414
YNHS:
ROW CSJ: $ 11,621,5892 Projects0535-06-044CONTRACT CSJ: JUN 2018
0716-02-042YOAKUM COLORADO
ADD SHOULDERS
FM 109 JUN 2018
BRUSHY CREEKLIMITS FROM: BU 71-FLIMITS TO:
$ 3,553,815
DESCRIPTION:
STP 2018(992)PROJ NUM:
5.092
NNHS:
ROW CSJ: $ 3,553,8151 Project0716-02-042CONTRACT CSJ: JUN 2018
0913-29-037YOAKUM LAVACA
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
AT CLARKS CREEK CR 444LIMITS FROM: (CR 444) STR # AA03-88-002LIMITS TO:
$ 756,334
DESCRIPTION:
BR 2007(662)PROJ NUM:
0.104
NNHS:
ROW CSJ:
0913-29-049YOAKUM LAVACA
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
AT BOGGY CREEK CR 354LIMITS FROM: STR AA01-30-001LIMITS TO:
$ 238,408
DESCRIPTION:
BR 2017(116)PROJ NUM:
0.065
NNHS:
ROW CSJ:
0913-29-051YOAKUM LAVACA
REPLACE BRIDGE AND APPROACHES
CR JUN 2018
AT BIG ROCKY CREEK___CR 229LIMITS FROM: STR# 13-143-0-AA02-63-004LIMITS TO:
$ 445,414
DESCRIPTION:
BR 2017(118)PROJ NUM:
0.075
NNHS:
ROW CSJ: $ 1,440,1563 Projects0913-29-037CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 20,593,33318 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:32 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0114-08-035YOAKUM FAYETTE
SAFETY TREAT FIXED OBJECTS
US 290 JUL 2018
LEE C/LLIMITS FROM: WASHINGTON C/LLIMITS TO:
$ 85,603
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
2.220
YNHS:
ROW CSJ:
0211-09-033YOAKUM FAYETTE
SAFETY TREAT FIXED OBJECTS
FM 155 JUL 2018
US 77LIMITS FROM: FAYETTE-COLORADO C/LLIMITS TO:
$ 1,324,683
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
14.414
NNHS:
ROW CSJ:
0211-10-041YOAKUM COLORADO
SAFETY TREAT FIXED OBJECTS
FM 155 JUL 2018
FAYETTE-COLORADO C/LLIMITS FROM: 0.838 MI S OF FAYETTE-COLORADO C/LLIMITS TO:
$ 115,752
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
0.838
NNHS:
ROW CSJ:
0267-01-032YOAKUM FAYETTE
SAFETY TREAT FIXED OBJECTS
SH 237 JUL 2018
2.7 MI E OF FM 954LIMITS FROM: 0.74 MI W OF FM 954LIMITS TO:
$ 499,986
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
3.440
NNHS:
ROW CSJ:
1265-01-018YOAKUM FAYETTE
SAFETY TREAT FIXED OBJECTS
FM 1291 JUL 2018
US 290LIMITS FROM: FM 2145LIMITS TO:
$ 289,823
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
6.875
NNHS:
ROW CSJ:
2096-01-022YOAKUM FAYETTE
SAFETY TREAT FIXED OBJECTS
FM 2237 JUL 2018
SH 95LIMITS FROM: 2.6 MI E OF SH 95LIMITS TO:
$ 243,013
DESCRIPTION:
STP 1802(396)HESPROJ NUM:
2.600
NNHS:
ROW CSJ: $ 2,558,8606 Projects0114-08-035CONTRACT CSJ: JUL 2018
0143-10-052YOAKUM VICTORIA
PAVEMENT REPAIR AND RESURFACING
US 87 JUL 2018
DEWITT C/LLIMITS FROM: 0.62 MI. NORTH OF FM 447LIMITS TO:
$ 5,000,000
DESCRIPTION:
NH 1802(473)PROJ NUM:
4.285
YNHS:
ROW CSJ: $ 5,000,0001 Project0143-10-052CONTRACT CSJ: JUL 2018
0269-02-065YOAKUM LAVACA
IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED OBJECTS
US 77 JUL 2018
FAYETTE C/LLIMITS FROM: US 90ALIMITS TO:
$ 291,817
DESCRIPTION:
STP 1802(397)HESPROJ NUM:
13.509
NNHS:
ROW CSJ:
0269-10-024YOAKUM LAVACA
SAFETY TREAT FIXED OBJECTS
FM 531 JUL 2018
0.1 MI E OF FM 318 NORTHLIMITS FROM: US 77LIMITS TO:
$ 675,047
DESCRIPTION:
STP 1802(397)HESPROJ NUM:
8.682
NNHS:
ROW CSJ:
0913-00-101YOAKUM DE WITT
UPGRADE BRIDGE AND APPROACH RAILING_OR ADD SAFETY END TREATMENT OR REPLACE GUARDFENCE
VA JUL 2018
DISTRICTWIDELIMITS FROM: DISTRICTWIDELIMITS TO:
$ 165,000
DESCRIPTION:
BR 2018(159)PROJ NUM:
2.000
YNHS:
ROW CSJ: $ 1,131,8643 Projects0269-02-065CONTRACT CSJ: JUL 2018
0913-20-090YOAKUM AUSTIN
REPLACE BRIDGE AND APPROACHES
CR JUL 2018
AT DRY CREEK CR 328LIMITS FROM: (KIESEWETTER RD) STR AA03-28-001LIMITS TO:
$ 318,000
DESCRIPTION:
BR 2018(207)PROJ NUM:
0.200
NNHS:
ROW CSJ: $ 318,0001 Project0913-20-090CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 9,008,72411 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:32 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0025-05-021YOAKUM GONZALES
SAFETY TREAT FIXED OBJECTS
US 90A AUG 2018
GUADALUPE C/LLIMITS FROM: 8.702 MI E OF GUADALUPE C/LLIMITS TO:
$ 1,066,191
DESCRIPTION:
STP ( )HESPROJ NUM:
8.702
NNHS:
ROW CSJ:
0025-06-055YOAKUM GONZALES
SAFETY TREAT FIXED OBJECTS
US 90A AUG 2018
8.702 MI E OF GUADALUPE C/LLIMITS FROM: US 183(WATER ST)LIMITS TO:
$ 1,000,000
DESCRIPTION:
STP ( )HESPROJ NUM:
7.587
NNHS:
ROW CSJ: $ 2,066,1912 Projects0025-05-021CONTRACT CSJ: AUG 2018
0089-06-090YOAKUM WHARTON
PAVEMENT REPAIR AND SURFACING
US 59 AUG 2018
FM 1163LIMITS FROM: LP 524 N. OF HILLJELIMITS TO:
$ 2,500,000
DESCRIPTION:
C 89-6-90PROJ NUM:
1.653
YNHS:
ROW CSJ:
0089-07-151YOAKUM WHARTON
PAVEMENT REPAIR AND SURFACING
US 59 AUG 2018
BU 59S NORTH OF EL CAMPOLIMITS FROM: FM 1163LIMITS TO:
$ 3,500,000
DESCRIPTION:
C 89-7-151PROJ NUM:
3.948
YNHS:
ROW CSJ: $ 6,000,0002 Projects0089-06-090CONTRACT CSJ: AUG 2018
0153-02-042YOAKUM GONZALES
MILLED CENTERLINE RUMBLE STRIPS
US 183 AUG 2018
CALDWELL C/LLIMITS FROM: BU 183-VLIMITS TO:
$ 63,897
DESCRIPTION:
STP 2018(835)HESGPROJ NUM:
10.813
YNHS:
ROW CSJ:
0154-01-066YOAKUM GONZALES
PAVEMENT REPAIR AND RESURFACING
US 183 AUG 2018
US 90ALIMITS FROM: 1.47 MI. SOUTH OF FM 3282LIMITS TO:
$ 3,271,277
DESCRIPTION:
NH ( )PROJ NUM:
5.559
YNHS:
ROW CSJ:
0266-05-050YOAKUM WHARTON
MILLED EDGELINE & CENTERLINE RUMBLE STRIPS
SH 71 AUG 2018
COLORADO C/LLIMITS FROM: FM 1300LIMITS TO:
$ 135,940
DESCRIPTION:
STP 2018(937)HESGPROJ NUM:
11.684
NNHS:
ROW CSJ: $ 3,471,1143 Projects0153-02-040CONTRACT CSJ: AUG 2018
0153-02-040YOAKUM GONZALES
PAVEMENT REPAIR AND RESURFACING
US 183 AUG 2018
CALDWELL C/LLIMITS FROM: US 90ALIMITS TO:
$ 9,554,992
DESCRIPTION:
NH ( )PROJ NUM:
11.943
YNHS:
ROW CSJ: $ 9,554,9921 Project0266-05-050CONTRACT CSJ: AUG 2018
0270-10-013YOAKUM DE WITT
REPLACE BRIDGE AND APPROACHES
SH 72 AUG 2018
AT GUADALUPE RIVERLIMITS FROM: STR # 0270-10-030LIMITS TO:
$ 7,500,000
DESCRIPTION:
BR ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 7,500,0001 Project0270-10-013CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:32 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
YOAKUM DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR STATEWIDE LETTING
0271-02-055YOAKUM AUSTIN
UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TOSIX MAIN LANES, 2-LANE FRONTAGE ROADS,SFTY LIGHTING, AND ITS
IH 10 AUG 2018
0.85 MI WEST OF FM 3538LIMITS FROM: SH 36LIMITS TO:
$ 57,900,001
DESCRIPTION:
NH ( )PROJ NUM:
2.948
YNHS:
0271-02-060ROW CSJ:
0271-03-046YOAKUM AUSTIN
UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TOSIX MAIN LANES, 2-LANE FRONTAGE ROADS,SFTY LIGHTING, AND ITS
IH 10 AUG 2018
MANAK ROADLIMITS FROM: EAST OF BRAZOS RIVERLIMITS TO:
$ 83,600,001
DESCRIPTION:
NH ( )PROJ NUM:
2.968
YNHS:
0271-03-059ROW CSJ:
0271-03-060YOAKUM AUSTIN
UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TOSIX MAIN LANES, 2-LANE FRONTAGE ROADS,SFTY LIGHTING, AND ITS
IH 10 AUG 2018
EAST OF KERSTEN RDLIMITS FROM: MANAK RDLIMITS TO:
$ 75,700,001
DESCRIPTION:
NH ( )PROJ NUM:
3.438
YNHS:
0271-03-063ROW CSJ:
0271-03-061YOAKUM AUSTIN
UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TOSIX MAIN LANES, 2-LANE FRONTAGE ROADS,SFTY LIGHTING, AND ITS
IH 10 AUG 2018
SH 36LIMITS FROM: EAST OF KERSTEN RDLIMITS TO:
$ 16,300,001
DESCRIPTION:
NH ( )PROJ NUM:
0.840
YNHS:
0271-03-062ROW CSJ: $ 233,500,0044 Projects0271-02-055CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 262,092,30113 Projects 6 Contracts
YOAKUM $ 327,874,45554 Projects 21 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 10:53:32 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE OVERSIGHT
State Total: 1015 Projects $ 3,999,449,266
ESTIMATE
415 Contracts
FISCAL YEAR 2018CURRENT STATEWIDE LETTING SUMMARY
BASED ON CURRENT ESTIMATE
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
TotalSIB1 2 Texas Mobility Fund
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
Rail Funds
Prop 1
ABILENE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AMARILLO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ATLANTA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AUSTIN $8.58 $0.00 $0.00 $0.00 $5.31 $13.89$0.00 $0.00$0.00$0.00
BEAUMONT $3.01 $20.13 $0.00 $0.00 $0.21 $25.12$0.00 $1.77$0.00$0.00
BROWNWOOD $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BRYAN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
CHILDRESS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $4.20 $0.00 $0.00 $0.00 $4.02 $9.90$0.00 $1.68$0.00$0.00
DALLAS $52.78 $0.00 $0.12 $0.00 $3.46 $56.36$0.00 $0.00$0.00$0.00
EL PASO $34.08 $0.00 $0.00 $0.00 $0.64 $34.72$0.00 $0.00$0.00$0.00
FORT WORTH $15.31 $0.00 $0.00 $0.00 $4.61 $19.92$0.00 $0.00$0.00$0.00
HOUSTON $81.88 $0.00 $0.00 $0.00 $83.87 $165.75$0.00 $0.00$0.00$0.00
LAREDO $21.39 $0.00 $0.00 $0.00 $3.81 $25.20$0.00 $0.00$0.00$0.00
LUBBOCK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LUFKIN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ODESSA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
PARIS $2.30 $0.00 $0.00 $0.00 $0.03 $2.33$0.00 $0.00$0.00$0.00
PHARR $27.76 $0.00 $0.00 $0.00 $171.26 $199.03$0.00 $0.00$0.00$0.00
SAN ANGELO $0.35 $0.00 $0.00 $0.00 $0.00 $0.35$0.00 $0.00$0.00$0.00
SAN ANTONIO $11.80 $0.00 $0.00 $0.00 $0.67 $12.47$0.00 $0.00$0.00$0.00
TYLER $1.63 $0.00 $0.00 $0.00 $0.00 $1.63$0.00 $0.00$0.00$0.00
WACO $14.27 $0.00 $0.00 $0.00 $2.03 $16.30$0.00 $0.00$0.00$0.00
WICHITA FALLS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
YOAKUM $0.00 $0.00 $0.00 $0.00 $0.00 $2.78$0.00 $2.78$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$279.35 $20.13 $0.12 $0.00 $279.91 $585.75District Total $0.00 $6.23
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
$0.00$0.00
* Actual totals may include local letting to be obligated and/or concurrence of award.
*
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
ABILENE DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
AMARILLO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
ATLANTA DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
AUSTIN DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.57 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.57$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$2.16 $0.00 $0.00 $0.00 $0.04NOVEMBER $2.20$0.00 $0.00$0.00$0.00
$1.48 $0.00 $0.00 $0.00 $1.01DECEMBER $2.49$0.00 $0.00$0.00$0.00
$3.88 $0.00 $0.00 $0.00 $0.53JANUARY $4.41$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $3.72JUNE $4.22$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$8.58 $0.00 $0.00 $0.00 $5.31 $13.89District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0151-03-041AUSTIN WILLIAMSON
INTERSECTION IMPROVEMENTS TO ADD TURN LANES AND IMPROVESIGHT DISTANCE
SH 29 JUN 2018
0.076 MI. WEST OF CR 200LIMITS FROM: 0.084 MI. EAST OF CR 200LIMITS TO:
$ 1,469,444
DESCRIPTION:
LC
STP 1802(194)PROJ NUM:
0.349
NNHS:
ROW CSJ: $ 1,469,4441 Project0151-03-041CONTRACT CSJ: JUN 2018
0204-01-069AUSTIN WILLIAMSON
INTERSECTION IMPROVEMENTS AT E PALM VALLEY BLVD AND HARRELLPARKWAY
US 79 JUN 2018
RED BUD LANELIMITS FROM: KENNEY FORT BLVDLIMITS TO:
$ 2,752,834
DESCRIPTION:
LC
CC 204-1-69PROJ NUM:
1.639
YNHS:
ROW CSJ: $ 2,752,8341 Project0204-01-069CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 4,222,2782 Projects 2 Contracts
AUSTIN $ 4,222,2782 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
BEAUMONT DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$3.01 $0.00 $0.00 $0.00 $0.21JANUARY $3.21$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $1.77$0.00 $1.77$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $20.13 $0.00 $0.00 $0.00JUNE $20.13$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$3.01 $20.13 $0.00 $0.00 $0.21 $25.12District Total: $0.00 $1.77$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0762-03-018BEAUMONT CHAMBERS
CONSTRUCT A 2 LANE HIGHWAY ON A NEW LOCATION
FM 1409 JUN 2018
FM 565 IN OLD RIVER-WINFREE, SOUTHLIMITS FROM: FM 565 W OF COVELIMITS TO:
$ 20,132,602
DESCRIPTION:
LC
PTF 1502(515)PROJ NUM:
4.550
NNHS:PTF
0762-03-020ROW CSJ: $ 20,132,6021 Project0762-03-018CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 20,132,6021 Project 1 Contract
BEAUMONT $ 20,132,6021 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
BROWNWOOD DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
BRYAN DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
CHILDRESS DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
CORPUS CHRISTI DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $4.02SEPTEMBER $5.70$0.00 $1.68$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.31 $0.00 $0.00 $0.00 $0.00JANUARY $0.31$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$2.92 $0.00 $0.00 $0.00 $0.00MAY $2.92$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.98 $0.00 $0.00 $0.00 $0.00AUGUST $0.98$0.00 $0.00$0.00$0.00
$4.20 $0.00 $0.00 $0.00 $4.02 $9.90District Total: $0.00 $1.68$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CORPUS CHRISTI DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0916-00-067CORPUS CHRISTI NUECES
UPGRADE/INSTALL TRAFFIC SIGNALS AND ADD RIGHT TURN LANE
VA MAY 2018
ON SPUR 3 (ENNIS JOSLIN)FROM SH 358LIMITS FROM: OCEAN DRLIMITS TO:
$ 1,030,000
DESCRIPTION:
LC
STP 1502(239)MMPROJ NUM:
0.100
NNHS:
0916-00-095ROW CSJ: $ 1,030,0001 Project0916-00-067CONTRACT CSJ: MAY 2018
0916-00-068CORPUS CHRISTI NUECES
PEDESTRIAN & BIKE FACILITIES IMPROVEMENTS
VA MAY 2018
AT VARIOUS LOC ON BREWSTER STREETLIMITS FROM: .LIMITS TO:
$ 1,200,000
DESCRIPTION:
LC
STP 1602(262)MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,200,0001 Project0916-00-068CONTRACT CSJ: MAY 2018
0916-35-206CORPUS CHRISTI NUECES
DESIGNATION OF BICYCLE BOULEVARDS WITH PAVEMENT MARKINGS ANDSIGNAGE
VA MAY 2018
VARIOUS LOCATIONS IN CC & PORTLANDLIMITS FROM: .LIMITS TO:
$ 522,500
DESCRIPTION:
LC
STP 2018(846)TPPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 522,5001 Project0916-35-206CONTRACT CSJ: MAY 2018
0916-35-207CORPUS CHRISTI NUECES
HAWK SIGNAL AT OCEAN DR AND DEL MAR
CS MAY 2018
ON OCEAN DR. ANDLIMITS FROM: AT DEL MARLIMITS TO:
$ 168,520
DESCRIPTION:
LC
STP 2018(908)TPPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 168,5201 Project0916-35-207CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 2,921,0204 Projects 4 Contracts
0916-28-070CORPUS CHRISTI SAN PATRICIO
CONSTRUCT HIKE AND BIKE TRAIL
CS AUG 2018
ON MEML PRKWY FROM 2986(WILDCAT DR)LIMITS FROM: BILLY G WEBB DRLIMITS TO:
$ 342,106
DESCRIPTION:
LC
STP ( )TPPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 342,1061 Project0916-28-070CONTRACT CSJ: AUG 2018
0916-35-200CORPUS CHRISTI NUECES
CONSTRUCTION HIKE & BIKE TRAIL
CS AUG 2018
ALONG SCHANEN DITCH SARATOGA BLVDLIMITS FROM: KILLARMETLIMITS TO:
$ 636,000
DESCRIPTION:
LC
STP 1602(477)TPPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 636,0001 Project0916-35-200CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 978,1062 Projects 2 Contracts
CORPUS CHRISTI $ 3,899,1266 Projects 6 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DALLAS DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$6.13 $0.00 $0.00 $0.00 $1.24OCTOBER $7.37$0.00 $0.00$0.00$0.00
$7.95 $0.00 $0.00 $0.00 $1.32NOVEMBER $9.27$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$19.80 $0.00 $0.12 $0.00 $0.44JANUARY $20.36$0.00 $0.00$0.00$0.00
$2.31 $0.00 $0.00 $0.00 $0.05FEBRUARY $2.36$0.00 $0.00$0.00$0.00
$3.48 $0.00 $0.00 $0.00 $0.00MARCH $3.48$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$13.10 $0.00 $0.00 $0.00 $0.42AUGUST $13.52$0.00 $0.00$0.00$0.00
$52.78 $0.00 $0.12 $0.00 $3.46 $56.36District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0918-18-132DALLAS NAVARRO
HUMPHREY SAFE ROUTES TO SCHOOL - CONSTRUCT SIDEWALKS
CS AUG 2018
WRIGHT AVE TO NW SECOND ON SH 31 &LIMITS FROM: KISD CAMPUS TO SH 31 ON S HUMPHREYLIMITS TO:
$ 653,524
DESCRIPTION:
LC
STP 2017(433)TAPSPROJ NUM:
0.619
NNHS:
ROW CSJ: $ 653,5241 Project0918-18-132CONTRACT CSJ: AUG 2018
0918-45-817DALLAS DALLAS
CITYWIDE SIGNAL SYSTEM UPGRADE
CS AUG 2018
VARIOUS LOCATIONS IN CITY OFLIMITS FROM: CARROLLTON - OFF-SYSTEMLIMITS TO:
$ 900,000
DESCRIPTION:
LC
CM 1602(579)PROJ NUM:
0.001
NNHS:
ROW CSJ:
0918-45-818DALLAS DALLAS
CITYWIDE SIGNAL SYSTEM UPGRADE
CS AUG 2018
VARIOUS LOCATIONS IN CITY OFLIMITS FROM: CARROLLTON ON-SYSTEMLIMITS TO:
$ 200,000
DESCRIPTION:
LC
CM 1602(580)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,100,0002 Projects0918-45-817CONTRACT CSJ: AUG 2018
0918-46-283DALLAS DENTON
GARDEN RIDGE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL
CS AUG 2018
GARDEN RIDGE BLVD AT IH 35ELIMITS FROM: NORTH VALLEY PKWY AT W. MAIN STLIMITS TO:
$ 2,024,473
DESCRIPTION:
LC
CM 2017(555)PROJ NUM:
4.200
NNHS:
ROW CSJ: $ 2,024,4731 Project0918-46-283CONTRACT CSJ: AUG 2018
0918-46-292DALLAS DENTON
DCTA A-TRAIN BIKE AND PEDESTRAIN TRAIL - EAGLE POINT SECTIONINSTALL BIKE/PED TRAIL,BARRIERS,LANDSCAPING AND AMENITIES
CS AUG 2018
DCTA RAIL CORRIDOR FROM MILL STLIMITS FROM: HIGHLAND VILLAGE/LEWISVILLE LK STA.LIMITS TO:
$ 2,605,107
DESCRIPTION:
LC
STP 2017(300)TAPSPROJ NUM:
2.500
NNHS:
ROW CSJ: $ 2,605,1071 Project0918-46-292CONTRACT CSJ: AUG 2018
0918-47-077DALLAS DALLAS
BIKE AND PEDESTRIAN IMPROVEMENTS
CS AUG 2018
ON DUCK CREEK TRAIL, FROM PLANO RDLIMITS FROM: CAMPBELL/US 75 IN RICHARDSONLIMITS TO:
$ 2,615,804
DESCRIPTION:
LC
CM 1702(595)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,615,8041 Project0918-47-077CONTRACT CSJ: AUG 2018
0918-47-099DALLAS DALLAS
BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING ANDLANDSCAPING; FROM IRBY LN TO WEST IRVING TRE STATION
CS AUG 2018
ROCK ISLAND BIKE AND PED FACILITYLIMITS FROM: ALONG TRE RAIL LINELIMITS TO:
$ 3,900,000
DESCRIPTION:
LC
STP 2014(094)TEPROJ NUM:
2.380
NNHS:
ROW CSJ: $ 3,900,0001 Project0918-47-099CONTRACT CSJ: AUG 2018
0918-47-140DALLAS DALLAS
BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCTPEDESTRIAN BRIDGE AND PURCHASE PEDESTRIAN SIGNALIZATION
CS AUG 2018
ON MARSH LN AT FARMERS CREEKLIMITS FROM: AND ON VALLEY VIEW LN AT ROSSER RDLIMITS TO:
$ 621,797
DESCRIPTION:
LC
STP 1602(604)TPPROJ NUM:
0.300
NNHS:
ROW CSJ: $ 621,7971 Project0918-47-140CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 13,520,7058 Projects 7 Contracts
DALLAS $ 13,520,7058 Projects 7 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DESIGN DIVISION DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
EL PASO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$1.06 $0.00 $0.00 $0.00 $0.00NOVEMBER $1.06$0.00 $0.00$0.00$0.00
$3.99 $0.00 $0.00 $0.00 $0.40DECEMBER $4.39$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.88 $0.00 $0.00 $0.00 $0.11FEBRUARY $0.99$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.63 $0.00 $0.00 $0.00 $0.00APRIL $0.63$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$5.20 $0.00 $0.00 $0.00 $0.00JUNE $5.20$0.00 $0.00$0.00$0.00
$0.49 $0.00 $0.00 $0.00 $0.14JULY $0.62$0.00 $0.00$0.00$0.00
$21.84 $0.00 $0.00 $0.00 $0.00AUGUST $21.84$0.00 $0.00$0.00$0.00
$34.08 $0.00 $0.00 $0.00 $0.64 $34.72District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:35 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
EL PASO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0924-06-498EL PASO EL PASO
STREET MEDIAN/PARKWAY LANDSCAPING
CS JUN 2018
CITYWIDELIMITS FROM: .LIMITS TO:
$ 5,200,000
DESCRIPTION:
LC
STP 2017(799)PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 5,200,0001 Project0924-06-498CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 5,200,0001 Project 1 Contract
0924-06-546EL PASO EL PASO
CONSTRUCTION OF BICYCLE FACILITIES, SIDEWALKS, ADA PEDESTRIAN RAMPS, PAVEMENT MARKINGS AND SIGNING
CS JUL 2018
(ON UNIVERSITY AVE) STANTON STLIMITS FROM: OREGON STLIMITS TO:
$ 623,908
DESCRIPTION:
LC
STP 2018(877)TPPROJ NUM:
0.140
NNHS:
ROW CSJ: $ 623,9081 Project0924-06-546CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 623,9081 Project 1 Contract
0374-02-089EL PASO EL PASO
RAPID TRANSIT SYSTEM (RTS)
US 62 AUG 2018
HUECO CLUB PARKLIMITS FROM: AIRWAYLIMITS TO:
$ 9,700,000
DESCRIPTION:
LC
NH 2011(492)PROJ NUM:
9.183
YNHS:
ROW CSJ: $ 9,700,0001 Project0374-02-089CONTRACT CSJ: AUG 2018
0924-06-418EL PASO EL PASO
ZARAGOZA POE, PAN AMERICAN DR & WINN RD BUILD/RECONSTRUCT 4LANE DIVIDED ROAD TO INCLUDE SIGNING AND LIGHTING
CS AUG 2018
LOOP 375LIMITS FROM: ZARAGOZA POE CAMPUSLIMITS TO:
$ 12,142,619
DESCRIPTION:
LC
CBI 2014(601)PROJ NUM:
2.030
NNHS:
ROW CSJ: $ 12,142,6191 Project0924-06-418CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 21,842,6192 Projects 2 Contracts
EL PASO $ 27,666,5274 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
FORT WORTH DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.69 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.69$0.00 $0.00$0.00$0.00
$0.87 $0.00 $0.00 $0.00 $0.46OCTOBER $1.33$0.00 $0.00$0.00$0.00
$3.56 $0.00 $0.00 $0.00 $0.00NOVEMBER $3.56$0.00 $0.00$0.00$0.00
$1.26 $0.00 $0.00 $0.00 $1.11DECEMBER $2.37$0.00 $0.00$0.00$0.00
$1.25 $0.00 $0.00 $0.00 $1.11JANUARY $2.36$0.00 $0.00$0.00$0.00
$0.95 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.95$0.00 $0.00$0.00$0.00
$2.27 $0.00 $0.00 $0.00 $0.37MARCH $2.64$0.00 $0.00$0.00$0.00
$0.86 $0.00 $0.00 $0.00 $0.28APRIL $1.14$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.40 $0.00 $0.00 $0.00 $0.00JUNE $0.40$0.00 $0.00$0.00$0.00
$3.20 $0.00 $0.00 $0.00 $1.28JULY $4.49$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$15.31 $0.00 $0.00 $0.00 $4.61 $19.92District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0094-02-133FORT WORTH TARRANT
INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OFSH 10
SH 10 JUN 2018
PRECINCT LINE ROADLIMITS FROM: HOLDER DRIVELIMITS TO:
$ 400,000
DESCRIPTION:
LC
NH 1802(188)PROJ NUM:
1.140
YNHS:
ROW CSJ: $ 400,0001 Project0094-02-133CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 400,0001 Project 1 Contract
0902-48-688FORT WORTH TARRANT
CLOSE EAST 1ST XING @ UPRR; INSTALL MEDIAN @ PEACH @ BNSF;MEDIAN AT EAST 1ST @ BNSF; MODIFY ACCESS AT EAST 1ST @ UPRR.
VA JUL 2018
E 4TH STREETLIMITS FROM: WEATHERFORD STREETLIMITS TO:
$ 1,302,300
DESCRIPTION:
LC
STP 2007(897)MMPROJ NUM:
0.235
NNHS:
0902-90-043ROW CSJ: $ 1,302,3001 Project0902-48-688CONTRACT CSJ: JUL 2018
0902-90-026FORT WORTH TARRANT
INTERSECTION/SIGNAL IMPROVEMENTS; TRAIL; PEDESTRIANUNDERPASS; SIDEWALK
VA JUL 2018
VARIOUS LOCATIONS INLIMITS FROM: WESTWORTH VILLAGELIMITS TO:
$ 1,785,000
DESCRIPTION:
LC
CM 1502(675)PROJ NUM:
1.900
NNHS:
ROW CSJ: $ 1,785,0001 Project0902-90-026CONTRACT CSJ: JUL 2018
2681-02-008FORT WORTH TARRANT
LANDSCAPE ENHANCEMENT
FM 2499 JUL 2018
SH 26LIMITS FROM: DENTON CREEKLIMITS TO:
$ 1,399,055
DESCRIPTION:
LC
STP 1802(383)PROJ NUM:
0.850
NNHS:
ROW CSJ: $ 1,399,0551 Project2681-02-008CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 4,486,3553 Projects 3 Contracts
FORT WORTH $ 4,886,3554 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
HOUSTON DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$6.45 $0.00 $0.00 $0.00 $21.23OCTOBER $27.68$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$17.47 $0.00 $0.00 $0.00 $1.94JANUARY $19.41$0.00 $0.00$0.00$0.00
$1.97 $0.00 $0.00 $0.00 $1.34FEBRUARY $3.31$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $59.36MAY $59.36$0.00 $0.00$0.00$0.00
$21.19 $0.00 $0.00 $0.00 $0.00JUNE $21.19$0.00 $0.00$0.00$0.00
$34.81 $0.00 $0.00 $0.00 $0.00JULY $34.81$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$81.88 $0.00 $0.00 $0.00 $83.87 $165.75District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0720-02-074HOUSTON MONTGOMERY
CONSTRUCT 4 LANE TOLLWAY WITH GRADE SEPARATIONS AT DECKERPRAIRIE/HARDIN STORE RD AND WOODTRACE BLVD
SH 249 MAY 2018
SPRING CREEK/HARRIS COUNTY LINELIMITS FROM: FM 1774/FM 149 IN PINEHURSTLIMITS TO:
$ 59,356,236
DESCRIPTION:
LC
CC 720-2-74PROJ NUM:
4.498
YNHS:
ROW CSJ: $ 59,356,2361 Project0720-02-074CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 59,356,2361 Project 1 Contract
0912-72-365HOUSTON HARRIS
IMPLEMTATION OF AUTOMATED PARKING GUIDANCE SYSTEM, INCLUDINGDYANAMIC MESSAGE SIGNS AND INFORMATION SYSTEMS
VA JUN 2018
VAR LOCATIONS IN CITY OF HOU CBDLIMITS FROM: .LIMITS TO:
$ 4,031,000
DESCRIPTION:
LC
CM 1702(625)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 4,031,0001 Project0912-72-365CONTRACT CSJ: JUN 2018
0912-72-372HOUSTON HARRIS
CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &COMMUNICATION UPGRADES AT 26 INTERSECTIONS
VA JUN 2018
SPRING CYPRESS RD; TELGE TO FM 2920LIMITS FROM: .LIMITS TO:
$ 5,253,750
DESCRIPTION:
LC
STP 2018(967)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 5,253,7501 Project0912-72-372CONTRACT CSJ: JUN 2018
0912-72-416HOUSTON HARRIS
CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &COMMUNICATION UPGRADES AT 29 INTERSECTIONS
VA JUN 2018
CYPRESSWOOD DR; HOLZWARTH TOLIMITS FROM: FM 1960LIMITS TO:
$ 6,653,750
DESCRIPTION:
LC
STP 2018(967)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 6,653,7501 Project0912-72-416CONTRACT CSJ: JUN 2018
0912-72-417HOUSTON HARRIS
CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &COMMUNICATION UPGRADES AT 25 INTERSECTIONS
VA JUN 2018
N. ELDRIDGE PKWY; 500 S OF TANNERLIMITS FROM: SPRING CYPRESSLIMITS TO:
$ 5,252,500
DESCRIPTION:
LC
STP 2018(967)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 5,252,5001 Project0912-72-417CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 21,191,0004 Projects 4 Contracts
0912-31-292HOUSTON BRAZORIA
CONSTRUCT SHADOW CREEK BIKE AND PEDESTRIAN TRAIL
VA JUL 2018
ON SHADOW CREEKLIMITS FROM: .LIMITS TO:
$ 1,624,755
DESCRIPTION:
LC
STP 2016(785)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,624,7551 Project0912-31-292CONTRACT CSJ: JUL 2018
0912-31-311HOUSTON BRAZORIA
RECONSTRUCT & WIDEN FROM 2 TO 4 LANES, ADD MEDIAN &SHOULDERS, ADD SIDEWALKS
CR JUL 2018
CR 403 FROM SMITH RANCH ROADLIMITS FROM: CULLEN BLVDLIMITS TO:
$ 33,184,000
DESCRIPTION:
LC
STP 1802(031)MMPROJ NUM:
2.019
NNHS:
ROW CSJ: $ 33,184,0001 Project0912-31-311CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 34,808,7552 Projects 2 Contracts
HOUSTON $ 115,355,9917 Projects 7 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
LAREDO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.82 $0.00 $0.00 $0.00 $0.24JUNE $1.06$0.00 $0.00$0.00$0.00
$2.75 $0.00 $0.00 $0.00 $0.04JULY $2.79$0.00 $0.00$0.00$0.00
$17.83 $0.00 $0.00 $0.00 $3.53AUGUST $21.36$0.00 $0.00$0.00$0.00
$21.39 $0.00 $0.00 $0.00 $3.81 $25.20District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0922-33-170LAREDO WEBB
ZACATE CREEK MULTI-USE ALTERNATIVE TRANSPORTATION TRAIL
CS JUN 2018
AT ZACATE CREEKLIMITS FROM: .LIMITS TO:
$ 1,056,250
DESCRIPTION:
LC
STP 2017(298)TPPROJ NUM:
1.941
NNHS:
ROW CSJ: $ 1,056,2501 Project0922-33-170CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 1,056,2501 Project 1 Contract
0922-11-031LAREDO VAL VERDE
NEW LOCATION TWO LANE HIGHWAY
CS JUL 2018
QUALIA DRIVELIMITS FROM: SPUR 239 & ALDERETE LANELIMITS TO:
$ 2,785,000
DESCRIPTION:
LC
CBI 2008(685)PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 2,785,0001 Project0922-11-031CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 2,785,0001 Project 1 Contract
0922-11-032LAREDO VAL VERDE
REHABILITATION OF EXISTING HIGHWAY
VA AUG 2018
109 LF SOUTH OF UP-RR TRACKS,LIMITS FROM: ALDERETE LANELIMITS TO:
$ 3,306,000
DESCRIPTION:
LC
CBI 2008(418)PROJ NUM:
2.504
NNHS:
0922-11-040ROW CSJ: $ 3,306,0001 Project0922-11-032CONTRACT CSJ: AUG 2018
0922-33-076LAREDO WEBB
NEW LOCATION TWO LANE HIGHWAY
CS AUG 2018
INTERSECTION OF FM 1472 AND FLECHALIMITS FROM: 0.174 MILES EAST OF FM 1472LIMITS TO:
$ 1,810,434
DESCRIPTION:
LC
DMO 2012(628)PROJ NUM:
0.174
NNHS:
0922-33-144ROW CSJ: $ 1,810,4341 Project0922-33-076CONTRACT CSJ: AUG 2018
0922-33-093LAREDO WEBB
CONSTRUCTION OF A GRADE SEPARATION INTERCHANGE
CS AUG 2018
0.25 M EAST OF CALTON/SAN MARIA_INTLIMITS FROM: 0.25 M WEST OF CALTON/SAN MARIA INTLIMITS TO:
$ 16,242,000
DESCRIPTION:
LC
DMO 2002(972)PROJ NUM:
0.500
NNHS:
0922-33-143ROW CSJ: $ 16,242,0001 Project0922-33-093CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 21,358,4343 Projects 3 Contracts
LAREDO $ 25,199,6845 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
LUBBOCK DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
LUFKIN DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
ODESSA DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
PARIS DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.68 $0.00 $0.00 $0.00 $0.00OCTOBER $0.68$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.50$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.57 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.57$0.00 $0.00$0.00$0.00
$0.55 $0.00 $0.00 $0.00 $0.00MARCH $0.55$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.03AUGUST $0.03$0.00 $0.00$0.00$0.00
$2.30 $0.00 $0.00 $0.00 $0.03 $2.33District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0045-03-050PARIS GRAYSON
SH 56 AND RUSK STREET PEDESTRIAN CURB RAMP IMPROVEMENT
SH 56 AUG 2018
INTERSECTION OF RUSK STREETLIMITS FROM: .LIMITS TO:
$ 30,015
DESCRIPTION:
LC
CC 45-3-50PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 30,0151 Project0045-03-050CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 30,0151 Project 1 Contract
PARIS $ 30,0151 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
PHARR DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.35 $0.00 $0.00 $0.00 $0.06SEPTEMBER $0.41$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$14.89 $0.00 $0.00 $0.00 $159.79NOVEMBER $174.68$0.00 $0.00$0.00$0.00
$9.14 $0.00 $0.00 $0.00 $0.00DECEMBER $9.14$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.21 $0.00 $0.00 $0.00 $2.19APRIL $2.40$0.00 $0.00$0.00$0.00
$0.70 $0.00 $0.00 $0.00 $0.00MAY $0.70$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$2.48 $0.00 $0.00 $0.00 $9.22AUGUST $11.70$0.00 $0.00$0.00$0.00
$27.76 $0.00 $0.00 $0.00 $171.26 $199.03District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PHARR DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0921-02-311PHARR HIDALGO
NEW LOCATION 2-LANE RURAL ROADWAY
CS MAY 2018
ON NORTH ALAMO ROAD FROM FM 1925LIMITS FROM: 0.5 MI NORTHLIMITS TO:
$ 703,040
DESCRIPTION:
LC
STP 2016(494)MMPROJ NUM:
0.500
NNHS:
0921-02-330ROW CSJ: $ 703,0401 Project0921-02-311CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 703,0401 Project 1 Contract
0921-02-333PHARR HIDALGO
FEDERAL COMMERCIAL VEHICLE INSPECTION FACILITIES AT DONNAINT L BRIDGE
CS AUG 2018
@ DONNA INTERNATIONAL BRIDGELIMITS FROM: .LIMITS TO:
$ 9,000,000
DESCRIPTION:
LC
CBI 1702(648)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 9,000,0001 Project0921-02-333CONTRACT CSJ: AUG 2018
0921-02-369PHARR HIDALGO
CONSTRUCT NORTH BOUND INSPECTION STATION
VA AUG 2018
ANZALDUAS INTL BRIDGE PORT OF ENTRYLIMITS FROM: NORTH BOUNDLIMITS TO:
$ 2,700,000
DESCRIPTION:
LC
CBI ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,700,0001 Project0921-02-369CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 11,700,0002 Projects 2 Contracts
PHARR $ 12,403,0403 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
SAN ANGELO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.35 $0.00 $0.00 $0.00 $0.00AUGUST $0.35$0.00 $0.00$0.00$0.00
$0.35 $0.00 $0.00 $0.00 $0.00 $0.35District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANGELO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0069-07-106SAN ANGELO TOM GREEN
REPLACE TRAFFIC SIGNAL AND RECONFIGURE INTERSECTION
US 87 AUG 2018
ON US 87 NB (KOENIGHEIM STREET)LIMITS FROM: AT WEST CONCHO AVENUELIMITS TO:
$ 350,000
DESCRIPTION:
LC
NH ( )PROJ NUM:
0.020
YNHS:
ROW CSJ: $ 350,0001 Project0069-07-106CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 350,0001 Project 1 Contract
SAN ANGELO $ 350,0001 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
SAN ANTONIO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$6.77 $0.00 $0.00 $0.00 $0.00OCTOBER $6.77$0.00 $0.00$0.00$0.00
$3.84 $0.00 $0.00 $0.00 $0.67NOVEMBER $4.50$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$1.20 $0.00 $0.00 $0.00 $0.00JANUARY $1.20$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$11.80 $0.00 $0.00 $0.00 $0.67 $12.47District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
TRAFFIC DIVISION DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
TYLER DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$1.36 $0.00 $0.00 $0.00 $0.00FEBRUARY $1.36$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.27 $0.00 $0.00 $0.00 $0.00JUNE $0.27$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$1.63 $0.00 $0.00 $0.00 $0.00 $1.63District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
TYLER DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0910-12-131TYLER VAN ZANDT
CONSTRUCT SIDEWALKS CONNECTING PUBLIC HOUSING TO EDGEWOODISD FOR SAFE ROUTES TO SCHOOL
CS JUN 2018
ON SHADY LN FROM US80, S & WLIMITS FROM: EDGEWOOD ESTATESLIMITS TO:
$ 271,212
DESCRIPTION:
LC
STP 2017(225)TAPSPROJ NUM:
0.297
NNHS:
ROW CSJ: $ 271,2121 Project0910-12-131CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 271,2121 Project 1 Contract
TYLER $ 271,2121 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
WACO DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$5.39 $0.00 $0.00 $0.00 $2.00JANUARY $7.39$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$7.83 $0.00 $0.00 $0.00 $0.00MARCH $7.83$0.00 $0.00$0.00$0.00
$0.56 $0.00 $0.00 $0.00 $0.03APRIL $0.60$0.00 $0.00$0.00$0.00
$0.49 $0.00 $0.00 $0.00 $0.00MAY $0.49$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$14.27 $0.00 $0.00 $0.00 $2.03 $16.30District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR LOCAL LETTING
0909-36-153WACO BELL
CONSTRUCT ROUNDABOUT IN HARKER HEIGHTS
CS MAY 2018
HEIGHTS DRIVELIMITS FROM: COMMERCIAL DRIVELIMITS TO:
$ 489,249
DESCRIPTION:
LC
STP 2017(911)MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 489,2491 Project0909-36-153CONTRACT CSJ: MAY 2018
MAY 2018 TOTAL: $ 489,2491 Project 1 Contract
WACO $ 489,2491 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
WICHITA FALLS DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
YOAKUM DISTRICT
CURRENT LOCAL LET SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $2.78$0.00 $2.78$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $2.78District Total: $0.00 $2.78$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:20:36 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE OVERSIGHT
State Total: 44 Projects $ 228,426,784
ESTIMATE
43 Contracts
FISCAL YEAR 2018CURRENT LOCAL LET PROJECTS SUMMARY
BASED ON CURRENT ESTIMATE
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:02 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
TotalSIB1 2 Texas Mobility Fund
BASED ON CURRENT ESTIMATE
Rail Funds
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
Prop 1
ABILENE $0.50 $0.00 $0.00 $0.00 $0.00 $0.50$0.00 $0.00$0.00$0.00
AMARILLO $0.50 $0.00 $0.00 $0.00 $0.00 $0.50$0.00 $0.00$0.00$0.00
ATLANTA $1.81 $0.00 $0.00 $0.00 $0.00 $1.81$0.00 $0.00$0.00$0.00
AUSTIN $5.11 $0.00 $0.00 $0.00 $0.00 $5.11$0.00 $0.00$0.00$0.00
BEAUMONT $6.58 $0.00 $0.00 $0.00 $0.00 $6.58$0.00 $0.00$0.00$0.00
BROWNWOOD $0.50 $0.00 $0.00 $0.00 $0.00 $0.50$0.00 $0.00$0.00$0.00
BRYAN $0.25 $0.00 $0.00 $0.00 $0.00 $0.25$0.00 $0.00$0.00$0.00
CHILDRESS $0.03 $0.00 $0.00 $0.00 $0.00 $0.03$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $0.96 $0.00 $0.00 $0.00 $0.00 $0.96$0.00 $0.00$0.00$0.00
DALLAS $13.72 $0.00 $0.00 $0.00 $1.58 $15.30$0.00 $0.00$0.00$0.00
EL PASO $5.10 $0.00 $0.00 $0.00 $23.65 $28.75$0.00 $0.00$0.00$0.00
FORT WORTH $44.16 $0.00 $20.00 $0.00 $0.27 $64.43$0.00 $0.00$0.00$0.00
HOUSTON $97.62 $0.00 $0.00 $0.00 $0.00 $97.62$0.00 $0.00$0.00$0.00
LAREDO $1.57 $0.00 $0.00 $0.00 $0.07 $1.63$0.00 $0.00$0.00$0.00
LUBBOCK $1.25 $0.00 $0.00 $0.00 $0.00 $1.25$0.00 $0.00$0.00$0.00
LUFKIN $2.24 $0.00 $0.00 $0.00 $0.00 $2.24$0.00 $0.00$0.00$0.00
ODESSA $4.45 $0.00 $0.00 $0.00 $0.00 $4.45$0.00 $0.00$0.00$0.00
PARIS $40.41 $0.00 $0.00 $0.00 $40.14 $80.55$0.00 $0.00$0.00$0.00
PHARR $1.98 $0.00 $0.00 $0.00 $0.00 $1.98$0.00 $0.00$0.00$0.00
RAILROAD DIVISI $1.05 $0.00 $0.00 $0.00 $0.00 $1.05$0.00 $0.00$0.00$0.00
SAN ANGELO $0.75 $0.00 $0.00 $0.00 $0.00 $0.75$0.00 $0.00$0.00$0.00
SAN ANTONIO $2.07 $0.00 $0.00 $0.00 $0.00 $2.07$0.00 $0.00$0.00$0.00
TYLER $1.04 $0.00 $0.00 $0.00 $0.00 $1.04$0.00 $0.00$0.00$0.00
WACO $1.87 $0.00 $0.00 $0.00 $0.00 $1.87$0.00 $0.00$0.00$0.00
WICHITA FALLS $0.01 $0.00 $0.00 $0.00 $0.00 $0.01$0.00 $0.00$0.00$0.00
YOAKUM $0.04 $0.00 $0.00 $0.00 $0.00 $0.04$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$1.05 $0.00 $0.00 $0.00 $0.00 $1.05$0.00 $0.00RAILROAD DIVISION $0.00$0.00
$235.55 $0.00 $20.00 $0.00 $65.71 $321.26District Total $0.00 $0.00
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
$0.00$0.00
* Actual totals may include other obligations remaining to be obligated and/or concurrence of award.
*
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
ABILENE DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00AUGUST $0.50$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00 $0.50District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ABILENE DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0908-33-096ABILENE TAYLOR
UPGRADE/INSTALL RR XING PROTECTION
CS AUG 2018
GRAPE STREETLIMITS FROM: UPRR DOT#796044YLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0908-33-096CONTRACT CSJ: AUG 2018
0908-33-097ABILENE TAYLOR
UPGRADE/INSTALL RR XING PROTECTION
CR AUG 2018
ON CR 349_NEAR TRENTLIMITS FROM: DOT#796084W_UP RRLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0908-33-097CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 500,0002 Projects 2 Contracts
ABILENE $ 500,0002 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
AMARILLO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00AUGUST $0.50$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00 $0.50District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AMARILLO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0788-01-020AMARILLO CARSON
DOT#014566N FED RAILROAD SIGNAL PROGRAM
FM 294 AUG 2018
AT FM 294LIMITS FROM: IN WHITE DEERLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project0788-01-020CONTRACT CSJ: AUG 2018
0904-02-044AMARILLO POTTER
DOT#014602G FED RAILROAD SIGNAL PROGRAM
CS AUG 2018
AT EASTERN STREETLIMITS FROM: IN AMARILLOLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project0904-02-044CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 500,0002 Projects 2 Contracts
AMARILLO $ 500,0002 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
ATLANTA DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.81 $0.00 $0.00 $0.00 $0.00AUGUST $1.81$0.00 $0.00$0.00$0.00
$1.81 $0.00 $0.00 $0.00 $0.00 $1.81District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ATLANTA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0843-06-021ATLANTA HARRISON
RAILROAD CROSSING UPGRADES
FM 450 AUG 2018
UP CROSSING IN HALLSVILLELIMITS FROM: DOT NO. 794619L, DOT NO. 794620FLIMITS TO:
$ 810,719
DESCRIPTION:
XX
STP 1802(355)FRS2PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 810,7191 Project0843-06-021CONTRACT CSJ: AUG 2018
0919-03-061ATLANTA HARRISON
RAILROAD CROSSING UPGRADES
CR AUG 2018
INDUSTRIAL AVENUELIMITS FROM: DOT NO. 795627D IN LONGIVEWLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project0919-03-061CONTRACT CSJ: AUG 2018
0919-19-081ATLANTA BOWIE
RAILROAD CROSSING UPGRADES
CS AUG 2018
ROBISON ROADLIMITS FROM: UPRR - DOT NO. 789578YLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project0919-19-081CONTRACT CSJ: AUG 2018
0946-01-044ATLANTA CASS
RAILROAD CROSSING UPGRADES
FM 250 AUG 2018
KCS - DOT NO. 331487ALIMITS FROM: IN HUGHES SPRINGSLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP 1802(354)FRS2PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project0946-01-044CONTRACT CSJ: AUG 2018
1231-01-071ATLANTA BOWIE
RAILROAD CROSSING UPGRADES
FM 989 AUG 2018
KINGS HIGHWAYLIMITS FROM: UPRR - DOT NO. 789584CLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.010
NNHS:
ROW CSJ: $ 250,0001 Project1231-01-071CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,810,7195 Projects 5 Contracts
ATLANTA $ 1,810,7195 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
AUSTIN DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$2.63 $0.00 $0.00 $0.00 $0.00MARCH $2.63$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$2.48 $0.00 $0.00 $0.00 $0.00AUGUST $2.48$0.00 $0.00$0.00$0.00
$5.11 $0.00 $0.00 $0.00 $0.00 $5.11District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
AUSTIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0285-03-059AUSTIN HAYS
ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES ANDPED CROSSINGS
RM 12 AUG 2018
0.13 MI N OF RM 3237LIMITS FROM: 0.12 MI S OF RM 3237LIMITS TO:
$ 200,001
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.250
NNHS:
ROW CSJ:
0805-04-030AUSTIN HAYS
ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES ANDPED CROSSINGS
RM 3237 AUG 2018
RM 12LIMITS FROM: 0.22 MI E OF RM 12LIMITS TO:
$ 200,001
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.220
NNHS:
ROW CSJ: $ 400,0022 Projects0285-03-059CONTRACT CSJ: AUG 2018
0914-00-394AUSTIN TRAVIS
HERO PROGRAM
VA AUG 2018
VARIOUS LOCATION IN MPO AREALIMITS FROM: .LIMITS TO:
$ 1
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.003
NNHS:
ROW CSJ: $ 11 Project0914-00-394CONTRACT CSJ: AUG 2018
0914-00-412AUSTIN TRAVIS
FY 2018 NON-SITE SPECIFIC ITS IMPROVEMENTS_ON SL 1, IH 35 &US 183
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,000,000
DESCRIPTION:
XX
NH ( )PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 1,000,0001 Project0914-00-412CONTRACT CSJ: AUG 2018
0914-22-070AUSTIN CALDWELL
LULING RELIEF ROUTE STUDY
VA AUG 2018
US 183 NORTH OF LULINGLIMITS FROM: US 183/SH 80 SOUTH OF LULINGLIMITS TO:
$ 225,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.003
NNHS:
ROW CSJ: $ 225,0001 Project0914-22-070CONTRACT CSJ: AUG 2018
1378-01-040AUSTIN TRAVIS
CONSTRUCT LEFT & RIGHT TURN LANES @ BALCONES CANYONLANDS NWRENTRANCE
RM 1431 AUG 2018
0.168 MI. W OF BALCONES CANYON ENT.LIMITS FROM: 0.122 MI. E OF BALCONES CANYON ENT.LIMITS TO:
$ 856,550
DESCRIPTION:
XX
FLA 2017(227)PROJ NUM:
0.290
NNHS:
ROW CSJ: $ 856,5501 Project1378-01-040CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 2,481,5536 Projects 5 Contracts
AUSTIN $ 2,481,5536 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
BEAUMONT DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.37 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.37$0.00 $0.00$0.00$0.00
$0.69 $0.00 $0.00 $0.00 $0.00MARCH $0.69$0.00 $0.00$0.00$0.00
$3.56 $0.00 $0.00 $0.00 $0.00APRIL $3.56$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.95 $0.00 $0.00 $0.00 $0.00AUGUST $1.95$0.00 $0.00$0.00$0.00
$6.58 $0.00 $0.00 $0.00 $0.00 $6.58District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BEAUMONT DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0601-02-024BEAUMONT JEFFERSON
PROTECTIVE DEVICES
SH 326 AUG 2018
AT UP RRLIMITS FROM: (DOT 762743D)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.015
NNHS:
ROW CSJ: $ 250,0001 Project0601-02-024CONTRACT CSJ: AUG 2018
0920-00-120BEAUMONT JEFFERSON
REPLACE 15 TRANSIT BUSES WITH ALTERNATELY FUELED VEHICLES
VA AUG 2018
SOUTH EAST TEXAS TRANSITLIMITS FROM: .LIMITS TO:
$ 1,200,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,200,0001 Project0920-00-120CONTRACT CSJ: AUG 2018
0920-30-084BEAUMONT ORANGE
PROTECTIVE DEVICES
CS AUG 2018
ON ALLIE PAYNE RD AT UP RRLIMITS FROM: (DOT 762385W)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.015
NNHS:
ROW CSJ: $ 250,0001 Project0920-30-084CONTRACT CSJ: AUG 2018
0920-38-259BEAUMONT JEFFERSON
PROTECTIVE DEVICES
CS AUG 2018
ON E LUCAS STREET AT BNSF RRLIMITS FROM: (DOT 023668F)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.015
NNHS:
ROW CSJ: $ 250,0001 Project0920-38-259CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,950,0004 Projects 4 Contracts
BEAUMONT $ 1,950,0004 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
BROWNWOOD DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00AUGUST $0.50$0.00 $0.00$0.00$0.00
$0.50 $0.00 $0.00 $0.00 $0.00 $0.50District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BROWNWOOD DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0128-01-112BROWNWOOD BROWN
INSTALL PROTECTIVE DEVICES
US 377 AUG 2018
US 377 SBLIMITS FROM: BNSFLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
21.555
YNHS:
ROW CSJ: $ 250,0001 Project0128-01-112CONTRACT CSJ: AUG 2018
0923-06-081BROWNWOOD BROWN
INSTALL PROTECTIVE DEVICES
VA AUG 2018
FROM FISK AVELIMITS FROM: BNSFLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.168
NNHS:
ROW CSJ: $ 250,0001 Project0923-06-081CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 500,0002 Projects 2 Contracts
BROWNWOOD $ 500,0002 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
BRYAN DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.25 $0.00 $0.00 $0.00 $0.00AUGUST $0.25$0.00 $0.00$0.00$0.00
$0.25 $0.00 $0.00 $0.00 $0.00 $0.25District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
BRYAN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0917-19-052BRYAN WASHINGTON
FEDERAL RAILROAD SIGNAL PROGRAM
CS AUG 2018
AT BENTON DR (BRENHAM, TX)LIMITS FROM: BNSF RR CROSSING_(DOT # 022857Y)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.032
NNHS:
ROW CSJ: $ 250,0001 Project0917-19-052CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 250,0001 Project 1 Contract
BRYAN $ 250,0001 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
CHILDRESS DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.03 $0.00 $0.00 $0.00 $0.00AUGUST $0.03$0.00 $0.00$0.00$0.00
$0.03 $0.00 $0.00 $0.00 $0.00 $0.03District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
CHILDRESS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
3184-01-011CHILDRESS HARDEMAN
RR REPLANKING
FM 2568 AUG 2018
BN RR @ FM 2568LIMITS FROM: . DOT 274748RLIMITS TO:
$ 27,680
DESCRIPTION:
XX
CRX 3184-1-11PROJ NUM:
0.005
NNHS:
ROW CSJ: $ 27,6801 Project3184-01-011CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 27,6801 Project 1 Contract
CHILDRESS $ 27,6801 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
CORPUS CHRISTI DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.10 $0.00 $0.00 $0.00 $0.00DECEMBER $0.10$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.73 $0.00 $0.00 $0.00 $0.00MARCH $0.73$0.00 $0.00$0.00$0.00
$0.14 $0.00 $0.00 $0.00 $0.00APRIL $0.14$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.96 $0.00 $0.00 $0.00 $0.00 $0.96District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DALLAS DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$5.15 $0.00 $0.00 $0.00 $1.57OCTOBER $6.72$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00JANUARY $0.01$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$8.57 $0.00 $0.00 $0.00 $0.00AUGUST $8.57$0.00 $0.00$0.00$0.00
$13.72 $0.00 $0.00 $0.00 $1.58 $15.30District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
DALLAS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0918-00-258DALLAS DALLAS
FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2018 FUNDING;INTERAGENCY COMMUNICATIONS NETWORK & SOFTWARE - PHASE III
VA AUG 2018
M&O - REGIONAL COMMUNICATION SYSTEMLIMITS FROM: (EASTERN SUB)LIMITS TO:
$ 2,737,999
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,737,9991 Project0918-00-258CONTRACT CSJ: AUG 2018
0918-00-273DALLAS DALLAS
AIR QUALITY MARKETING AND EDUCATION PROGRAM
VA AUG 2018
M&O PROGRAMLIMITS FROM: FY 2018LIMITS TO:
$ 1,640,000
DESCRIPTION:
XX
CM 1802(321)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,640,0001 Project0918-00-273CONTRACT CSJ: AUG 2018
0918-00-281DALLAS DALLAS
DART VANPOOL PROGRAM
VA AUG 2018
DART VANPOOL PROGRAMLIMITS FROM: FY 2018LIMITS TO:
$ 1,327,593
DESCRIPTION:
XX
STP 1802(475)MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,327,5931 Project0918-00-281CONTRACT CSJ: AUG 2018
0918-22-156DALLAS ELLIS
PRELIMINARY ENGINEERING FOR MIDLOTHIAN-WAXAHACHIE SHARED USEPATH
VA AUG 2018
MIDLOTHIAN PKWY@HAWKINS SPRING PARKLIMITS FROM: EXISTING TRAIL IN GETZENDANER PARKLIMITS TO:
$ 250,000
DESCRIPTION:
XX
CM 2018(235)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0918-22-156CONTRACT CSJ: AUG 2018
0918-24-235DALLAS COLLIN
IMPLEMENT ADAPTIVE TRAFFIC SIGNAL SYSTEMS ON PRESTON RD,GAYLORD PKWY, & WARREN PKWY
VA AUG 2018
VARIOUS LOCATIONS ONLIMITS FROM: SH 289,GAYLORD PKWY,AND WARREN PKWYLIMITS TO:
$ 320,000
DESCRIPTION:
XX
CM 2017(292)PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 320,0001 Project0918-24-235CONTRACT CSJ: AUG 2018
0918-24-240DALLAS COLLIN
INSTALL GRADE CROSSING WARNING DEVICES
CR AUG 2018
CR99 NEAR CELINALIMITS FROM: AT BNSF DOT #672101RLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.200
NNHS:
ROW CSJ: $ 250,0001 Project0918-24-240CONTRACT CSJ: AUG 2018
0918-46-304DALLAS DENTON
INSTALL GRADE CROSSING WARNING DEVICES
CR AUG 2018
CRAWFORD RD IN ARGYLELIMITS FROM: AT UPRR DOT #795330BLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.121
NNHS:
ROW CSJ: $ 250,0001 Project0918-46-304CONTRACT CSJ: AUG 2018
0918-47-069DALLAS DALLAS
RAILROAD ADVANCED PREEMPTION
VA AUG 2018
RAILROAD CROSSINGS AT UPRR, FROMLIMITS FROM: SH161 TO BAGDAD IN GRAND PRAIRIELIMITS TO:
$ 1,541,880
DESCRIPTION:
XX
STP 2012(401)FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,541,8801 Project0918-47-069CONTRACT CSJ: AUG 2018
2512-01-014DALLAS KAUFMAN
INSTALL GRADE CROSSING WARNING DEVICES
FM 2728 AUG 2018
FM 2728 IN ELMOLIMITS FROM: AT UPRR DOT #794759NLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.106
NNHS:
ROW CSJ: $ 250,0001 Project2512-01-014CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 8,567,4729 Projects 9 Contracts
DALLAS $ 8,567,4729 Projects 9 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DESIGN DIVISION DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
EL PASO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$1.12 $0.00 $0.00 $0.00 $0.00OCTOBER $1.12$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $23.65MARCH $23.65$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$2.17 $0.00 $0.00 $0.00 $0.00JUNE $2.17$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.80 $0.00 $0.00 $0.00 $0.00AUGUST $1.80$0.00 $0.00$0.00$0.00
$5.10 $0.00 $0.00 $0.00 $23.65 $28.75District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
EL PASO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0924-06-561EL PASO EL PASO
OPERATING ASSISTANCE FOR FIRST YEAR OF NEW STREETCAR RELATED OPERATIONS
VA JUN 2018
FATHER RAHMLIMITS FROM: GLORY ROADLIMITS TO:
$ 2,174,640
DESCRIPTION:
TR
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,174,6401 Project0924-06-561CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 2,174,6401 Project 1 Contract
0924-06-556EL PASO EL PASO
EL PASO COUNTY VAN POOL PROGRAM
VA AUG 2018
COUNTYWIDELIMITS FROM: .LIMITS TO:
$ 1,800,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 1,800,0001 Project0924-06-556CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,800,0001 Project 1 Contract
EL PASO $ 3,974,6402 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
FORT WORTH DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$4.58 $0.00 $0.00 $0.00 $0.00OCTOBER $4.58$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$1.74 $0.00 $0.00 $0.00 $0.00DECEMBER $1.74$0.00 $0.00$0.00$0.00
$0.84 $0.00 $0.00 $0.00 $0.18JANUARY $1.02$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$37.00 $0.00 $20.00 $0.00 $0.09AUGUST $57.10$0.00 $0.00$0.00$0.00
$44.16 $0.00 $20.00 $0.00 $0.27 $64.43District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0134-07-074FORT WORTH WISE
INSTALL MEMORIAL HIGHWAY SIGNS (JAMES BENNETT)
US 380 AUG 2018
WEST OF BU 380FLIMITS FROM: EAST OF FM 51LIMITS TO:
$ 3,187
DESCRIPTION:
XX
CC 134-7-74PROJ NUM:
3.234
YNHS:
ROW CSJ: $ 3,1871 Project0134-07-074CONTRACT CSJ: AUG 2018
0353-03-102FORT WORTH TARRANT
RELOCATE ITS FIBER OPTIC CABLE DUE TO CONFLICT WITH TEX RAILBRIDGE PROJECT OVER SH 121/SH 114 CONSTRUCTED BY FWTA
SH 114 AUG 2018
WEST OF INTERNATIONAL PARKWAYLIMITS FROM: INTERNATIONAL PARKWAYLIMITS TO:
$ 62,334
DESCRIPTION:
XX
CC 353-3-102PROJ NUM:
0.750
YNHS:
ROW CSJ: $ 62,3341 Project0353-03-102CONTRACT CSJ: AUG 2018
0902-00-168FORT WORTH TARRANT
EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOCCONTROLS & OTHER DESIGNATED POLLUTANTS
VA AUG 2018
EMISSION REDUCTION STRATEGIESLIMITS FROM: FY 2017LIMITS TO:
$ 400,000
DESCRIPTION:
XX
CM 1802(479)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 400,0001 Project0902-00-168CONTRACT CSJ: AUG 2018
0902-00-169FORT WORTH TARRANT
EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOCCONTROLS & OTHER DESIGNATED POLLUTANTS
VA AUG 2018
EMISSIONS REDUCTION STRATEGIESLIMITS FROM: FY 2018LIMITS TO:
$ 400,000
DESCRIPTION:
XX
CM 1802(480)PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 400,0001 Project0902-00-169CONTRACT CSJ: AUG 2018
0902-00-172FORT WORTH TARRANT
REGIONAL MINOR INTERSECTION EQUIP PRGRAM POOL FOR FUTUREMINOR IMPR IE TRAFFIC CABINETS ETC.
VA AUG 2018
MINOR INTERSECTION EQUIP PROGRAMLIMITS FROM: FY 17LIMITS TO:
$ 2,500,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,500,0001 Project0902-00-172CONTRACT CSJ: AUG 2018
0902-00-175FORT WORTH TARRANT
CONGESTION MGMT OPERATIONS & DATA ARCHIVING, REG ITS ARCH,REIMB OF MANAGED LN COST FOR VANPOOL, MOB ASSIST PATROL
VA AUG 2018
CONGESTION MANAGEMENT OPERATIONS &LIMITS FROM: DATA ARCHIVING (FY 2018)LIMITS TO:
$ 291,350
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 291,3501 Project0902-00-175CONTRACT CSJ: AUG 2018
0902-00-178FORT WORTH TARRANT
PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLININGINITIATIVE, PROCUREMENT, CONTRACTING, DBE PROCESS & LEGAL
VA AUG 2018
M&O PROGRAM OVERSIGHT COORDINATIONLIMITS FROM: FY 2017LIMITS TO:
$ 312,500
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 312,5001 Project0902-00-178CONTRACT CSJ: AUG 2018
0902-00-180FORT WORTH TARRANT
BOTTLENECK REMOVAL THROUGH USE OF FREEWAY SHOULDERS
VA AUG 2018
BOTTLENECK REMOVALLIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE FY17LIMITS TO:
$ 100,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 100,0001 Project0902-00-180CONTRACT CSJ: AUG 2018
0902-00-186FORT WORTH TARRANT
LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING,TRANSIT DEV, DEV OF REG PED SAFETY PROG,IMPL OF SUS DEV INIT
VA AUG 2018
LAND USE/TRANS & BIKE/PED INITLIMITS FROM: FY 18LIMITS TO:
$ 650,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 650,0001 Project0902-00-186CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:03 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0902-00-187FORT WORTH TARRANT
M&O CORRIDOR STUDIES & CAPITAL ASSET MANAGEMENT
VA AUG 2018
M&O CORRIDOR STUDIESLIMITS FROM: FY 18LIMITS TO:
$ 400,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 400,0001 Project0902-00-187CONTRACT CSJ: AUG 2018
0902-00-214FORT WORTH TARRANT
MULTIPURPOSE AUTOMATID VEHICLE DESIGN, DEVELOPMENT, TESTING,AND DEPLOYMENT
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: WITHIN MPOLIMITS TO:
$ 660,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 660,0001 Project0902-00-214CONTRACT CSJ: AUG 2018
0902-90-034FORT WORTH TARRANT
CONSTRUCTION OF EAST-WEST CONNECTOR 0 TO 4 LANES DIVIDED
VA AUG 2018
SH 360; EAST-WEST CONNECTORLIMITS FROM: RENTAL CAR DRIVE; DFW AIRPORTLIMITS TO:
$ 20,000,000
DESCRIPTION:
XX
C 902-90-34PROJ NUM:
0.100
NNHS:RTR
ROW CSJ: $ 20,000,0001 Project0902-90-034CONTRACT CSJ: AUG 2018
0902-90-042FORT WORTH TARRANT
DIRECT STATE CHARGES FOR TEX RAIL CONNECTION_PROJECTS
VA AUG 2018
DFW INTERNATIONAL AIRPORTLIMITS FROM: COTTONBELT RAILWAYLIMITS TO:
$ 25,000
DESCRIPTION:
XX
CC 902-90-42PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 25,0001 Project0902-90-042CONTRACT CSJ: AUG 2018
0902-90-051FORT WORTH TARRANT
ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCESFY 2017
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: IN TARRANT COUNTYLIMITS TO:
$ 300,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 300,0001 Project0902-90-051CONTRACT CSJ: AUG 2018
0902-90-052FORT WORTH TARRANT
ITS EQUIPMENT UPGRADE FOR TECHNOLOGY ADVANCESFY 2018
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: IN TARRANT COUNTYLIMITS TO:
$ 300,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
YNHS:
ROW CSJ: $ 300,0001 Project0902-90-052CONTRACT CSJ: AUG 2018
0902-90-054FORT WORTH TARRANT
DEVELOP AND IMPLEMENT TRAFFIC SIGNAL COORDINATION IN 9COUNTY NONATTAINMENT AREA
VA AUG 2018
REGIONAL TRAFFIC SIGNAL RETIMINGLIMITS FROM: VARIOUS LOCATIONS FY 18LIMITS TO:
$ 1,000,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,000,0001 Project0902-90-054CONTRACT CSJ: AUG 2018
0902-90-055FORT WORTH TARRANT
ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITSDEVICES, INCLUDING FOR DATA COLLECTION (FY18)
VA AUG 2018
VARIOUS LOCATIONS IN TARRANTLIMITS FROM: COUNTYLIMITS TO:
$ 50,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 50,0001 Project0902-90-055CONTRACT CSJ: AUG 2018
0902-90-056FORT WORTH TARRANT
ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITSDEVICES, INCLUDING FOR DATA COLLECTION (FY17)
VA AUG 2018
VARIOUS LOCATIONS IN TARRANTLIMITS FROM: COUNTYLIMITS TO:
$ 50,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 50,0001 Project0902-90-056CONTRACT CSJ: AUG 2018
0902-90-060FORT WORTH TARRANT
VANPOOL PROGRAM FY 18; OPER VANPOOL SUBSIDY INITIATIVE FORCOMMUTERS TRAV LONG DIST & IN AREAS W/ LITTLE OR NO FIXED RT
VA AUG 2018
REGIONAL VANPOOL PROGRAMLIMITS FROM: WESTERN SUBREGIONLIMITS TO:
$ 2,091,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 2,091,0001 Project0902-90-060CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
FORT WORTH DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0902-90-074FORT WORTH TARRANT
COMPLETION OF THE DFW CORE EXPRESS HIGH SPEED RAIL PROJECTENVIRONMENTAL PROCESS
VA AUG 2018
DFW CORE EXPRESS SERVICE HIGHLIMITS FROM: SPEED RAIL PROJECTLIMITS TO:
$ 5,000,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 5,000,0001 Project0902-90-074CONTRACT CSJ: AUG 2018
0902-90-086FORT WORTH TARRANT
CONSTRUCTION OF NEW COMMUTER RAIL LINE
VA AUG 2018
TEXRAIL CORRIDOR RAIL LINE PROJECTLIMITS FROM: .LIMITS TO:
$ 20,000,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 20,000,0001 Project0902-90-086CONTRACT CSJ: AUG 2018
0902-90-090FORT WORTH TARRANT
2018 FEDERAL RR SIGNAL PROGRAMDOT # 020856K
CS AUG 2018
AT FWWR; IN FORT WORTHLIMITS FROM: ON HULEN STLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0902-90-090CONTRACT CSJ: AUG 2018
0902-90-091FORT WORTH TARRANT
2018 FEDERAL RR SIGNAL PROGRAMDT #765229V
CS AUG 2018
AT UPRR; IN MANSFIELDLIMITS FROM: ON WALNUT CREEK DRLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0902-90-091CONTRACT CSJ: AUG 2018
0902-90-092FORT WORTH TARRANT
2018 FEDERAL RR SIGNAL PROGRAMDOT # 795369E
CS AUG 2018
AT UPRR; IN FORT WORTHLIMITS FROM: ON N SYLVANIA AVELIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0902-90-092CONTRACT CSJ: AUG 2018
0902-90-093FORT WORTH TARRANT
2018 FEDERAL RR SIGNAL PROGRAMDOT # 020523J
CS AUG 2018
AT BNSF; IN FORT WORTHLIMITS FROM: ON DECATUR AVE (NE 28TH ST)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0902-90-093CONTRACT CSJ: AUG 2018
0902-90-094FORT WORTH TARRANT
2018 FEDERAL RR SIGNAL PROGRAMDOT # 275249D
CS AUG 2018
AT UPRR; IN FORT WORTHLIMITS FROM: ON DECATUR AVE (NE 23RD ST)LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0902-90-094CONTRACT CSJ: AUG 2018
0902-90-100FORT WORTH TARRANT
TEXAS AUTOMATED VEHICLES PROVING GROUND ALONG THE IH 30CORRIDOR
VA AUG 2018
TEXAS AUTOMATED VEHICLES PROVINGLIMITS FROM: GROUND ALONG THE IH 30 CORRIDORLIMITS TO:
$ 1,250,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,250,0001 Project0902-90-100CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 57,095,37127 Projects 27 Contracts
FORT WORTH $ 57,095,37127 Projects 27 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
HOUSTON DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$2.92 $0.00 $0.00 $0.00 $0.00OCTOBER $2.92$0.00 $0.00$0.00$0.00
$3.88 $0.00 $0.00 $0.00 $0.00NOVEMBER $3.88$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$2.50 $0.00 $0.00 $0.00 $0.00JANUARY $2.50$0.00 $0.00$0.00$0.00
$1.65 $0.00 $0.00 $0.00 $0.00FEBRUARY $1.65$0.00 $0.00$0.00$0.00
$6.39 $0.00 $0.00 $0.00 $0.00MARCH $6.39$0.00 $0.00$0.00$0.00
$8.75 $0.00 $0.00 $0.00 $0.00APRIL $8.75$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$17.88 $0.00 $0.00 $0.00 $0.00JUNE $17.88$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$53.65 $0.00 $0.00 $0.00 $0.00AUGUST $53.65$0.00 $0.00$0.00$0.00
$97.62 $0.00 $0.00 $0.00 $0.00 $97.62District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0912-00-581HOUSTON HARRIS
HOUSTON CONNECTSMART
VA JUN 2018
VARIOUS LOCATIONSLIMITS FROM: .LIMITS TO:
$ 17,878,124
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 17,878,1241 Project0912-00-581CONTRACT CSJ: JUN 2018
JUN 2018 TOTAL: $ 17,878,1241 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0912-00-500HOUSTON HARRIS
COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING2 ADDITIONAL TASKS FOR RIDE-SHARING ACTIVITIES (FY 2016)
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 1,380,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 1,380,0001 Project0912-00-500CONTRACT CSJ: AUG 2018
0912-00-539HOUSTON HARRIS
REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018)
VA AUG 2018
VARIOUS LOCATIONSLIMITS FROM: .LIMITS TO:
$ 8,000,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 8,000,0001 Project0912-00-539CONTRACT CSJ: AUG 2018
0912-00-541HOUSTON HARRIS
REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIESAND COMMUNICATIONS (FY 2018)
VA AUG 2018
AT HOUSTON TRANSTARLIMITS FROM: .LIMITS TO:
$ 2,000,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,000,0001 Project0912-00-541CONTRACT CSJ: AUG 2018
0912-00-546HOUSTON HARRIS
METRO STAR VANPOOL PROGRAM (FY 2017)
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 3,750,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 3,750,0001 Project0912-00-546CONTRACT CSJ: AUG 2018
0912-00-547HOUSTON HARRIS
METRO STAR VANPOOL PROGRAM (FY 2018)
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 2,400,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,400,0001 Project0912-00-547CONTRACT CSJ: AUG 2018
0912-00-548HOUSTON HARRIS
METRO STAR VANPOOL PROGRAM (FY 2018)
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 3,750,000
DESCRIPTION:
XX
STP ( )HESPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 3,750,0001 Project0912-00-548CONTRACT CSJ: AUG 2018
0912-00-549HOUSTON HARRIS
TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLICEDUCATION
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 4,438,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 4,438,0001 Project0912-00-549CONTRACT CSJ: AUG 2018
0912-00-552HOUSTON HARRIS
CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLEREPLACEMENT, ALTERNATE FUELS, EDUCATION) (FY 2018)
VA AUG 2018
VARIOUS LOCATIONS DISTRICTWIDELIMITS FROM: .LIMITS TO:
$ 15,000,000
DESCRIPTION:
XX
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 15,000,0001 Project0912-00-552CONTRACT CSJ: AUG 2018
0912-34-194HOUSTON FORT BEND
REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATIONAND OPERATIONS FACILITY (1 OF 2)
VA AUG 2018
AT COTTONWOOD SCHOOL RDLIMITS FROM: .LIMITS TO:
$ 3,500,000
DESCRIPTION:
TR
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 3,500,0001 Project0912-34-194CONTRACT CSJ: AUG 2018
0912-34-198HOUSTON FORT BEND
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H)
CR AUG 2018
THRID STEET IN ROSENBERG @ UPRRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.013
NNHS:
ROW CSJ: $ 250,0001 Project0912-34-198CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0912-37-234HOUSTON MONTGOMERY
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y)
CR AUG 2018
NORTHPARK DRIVE IN PORTER @ UPRRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.013
NNHS:
ROW CSJ: $ 250,0001 Project0912-37-234CONTRACT CSJ: AUG 2018
0912-37-235HOUSTON MONTGOMERY
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M)
CR AUG 2018
NORTHPARK DRIVE IN NEW CANEY @ UPRRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-37-235CONTRACT CSJ: AUG 2018
0912-37-236HOUSTON MONTGOMERY
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G)
CR AUG 2018
MARTIN DRIVE IN PORTER @ UPRRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-37-236CONTRACT CSJ: AUG 2018
0912-70-120HOUSTON HARRIS
FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X)
CS AUG 2018
BISSONET STREET IN HOUSTON AT UPRRLIMITS FROM: .LIMITS TO:
$ 622,802
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 622,8021 Project0912-70-120CONTRACT CSJ: AUG 2018
0912-70-122HOUSTON HARRIS
FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E)
CS AUG 2018
BELLAIRE BLVD IN HOUSTON AT UPRRLIMITS FROM: .LIMITS TO:
$ 583,590
DESCRIPTION:
XX
STP ( )FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 583,5901 Project0912-70-122CONTRACT CSJ: AUG 2018
0912-70-123HOUSTON HARRIS
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C)
CR AUG 2018
WEST TIDWELL RD IN HOUSTON @ BNSFLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-70-123CONTRACT CSJ: AUG 2018
0912-70-124HOUSTON HARRIS
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N)
CR AUG 2018
HILLCROFT STEET IN HOUSTONLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-70-124CONTRACT CSJ: AUG 2018
0912-70-125HOUSTON HARRIS
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C)
CR AUG 2018
FONDREN RD IN MISSOURI CITY @ UPPRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-70-125CONTRACT CSJ: AUG 2018
0912-70-126HOUSTON HARRIS
FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R)
CR AUG 2018
TRENTHAM PLACE IN HOUSTON @ UPPRLIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0912-70-126CONTRACT CSJ: AUG 2018
0912-72-370HOUSTON HARRIS
RECONSTRUCT & WIDEN SIDEWALKS AND ADA RAMPS AND INSTALLATIONOF LIGHTING, BENCHES AND BUS SHELTERS
CS AUG 2018
SHEPHERD AND FARNHAM; WESTHEIMER STLIMITS FROM: IH 69LIMITS TO:
$ 3,523,000
DESCRIPTION:
TR
STP ( )TPPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 3,523,0001 Project0912-72-370CONTRACT CSJ: AUG 2018
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
HOUSTON DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0912-73-208HOUSTON GALVESTON
CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKINGSPACES AND PASSENGER TERMINAL
VA AUG 2018
TEXAS CITY PARK AND RIDELIMITS FROM: .LIMITS TO:
$ 2,454,000
DESCRIPTION:
TR
CM ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,454,0001 Project0912-73-208CONTRACT CSJ: AUG 2018
0976-01-042HOUSTON HARRIS
INSTALL GRADE CROSSING WARNING DEVICES
FM 865 AUG 2018
CULLEN BLVD AT UNION PACIFIC RRLIMITS FROM: DOT NUMBER 755630FLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP 1802(355)FRS2PROJ NUM:
0.010
YNHS:
ROW CSJ: $ 250,0001 Project0976-01-042CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 53,651,39222 Projects 22 Contracts
HOUSTON $ 71,529,51623 Projects 23 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
LAREDO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.57 $0.00 $0.00 $0.00 $0.07AUGUST $1.63$0.00 $0.00$0.00$0.00
$1.57 $0.00 $0.00 $0.00 $0.07 $1.63District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LAREDO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0922-33-175LAREDO WEBB
PS&E INCLUDING ROW MAPPING ONLY
CS AUG 2018
FM 1472LIMITS FROM: IH 35 WEST FRONTAGE ROADLIMITS TO:
$ 1,634,277
DESCRIPTION:
XX
STP 2017(589)MMPROJ NUM:
8.620
NNHS:
ROW CSJ: $ 1,634,2771 Project0922-33-175CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,634,2771 Project 1 Contract
LAREDO $ 1,634,2771 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
LUBBOCK DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.25 $0.00 $0.00 $0.00 $0.00AUGUST $1.25$0.00 $0.00$0.00$0.00
$1.25 $0.00 $0.00 $0.00 $0.00 $1.25District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUBBOCK DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0067-04-053LUBBOCK HALE
RAIL HWY CROSSING SIGNALS/STRUCTURES
IH 27 AUG 2018
IH 27 FRONTAGE ROAD AT COUNTY RD VLIMITS FROM: DOT# 017251V BNSFLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0067-04-053CONTRACT CSJ: AUG 2018
0800-05-028LUBBOCK HALE
RAIL HWY CROSSING SIGNALS/STRUCTURES
FM 400 AUG 2018
AT FM 400LIMITS FROM: DOT# 017271G BNSFLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0800-05-028CONTRACT CSJ: AUG 2018
0905-06-112LUBBOCK LUBBOCK
RAIL HWY CROSSING SIGNALS/STRUCTURES
CS AUG 2018
WEST 34TH ST AT UPLANDLIMITS FROM: DOT# 017591G LUB & WESTERN RAILWAYLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0905-06-112CONTRACT CSJ: AUG 2018
0905-06-113LUBBOCK LUBBOCK
RAIL HWY CROSSING SIGNALS/STRUCTURES
CS AUG 2018
ALCOVE AVE AT 34TH ST.LIMITS FROM: DOT# 017594C LUB & WESTERN RAILWAYLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0905-06-113CONTRACT CSJ: AUG 2018
3520-01-022LUBBOCK PARMER
RAIL HWY CROSSING SIGNALS/STRUCTURES
FM 3333 AUG 2018
US 60 AT FM 3333LIMITS FROM: DOT# 014783N BNSFLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project3520-01-022CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,250,0005 Projects 5 Contracts
LUBBOCK $ 1,250,0005 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
LUFKIN DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.70 $0.00 $0.00 $0.00 $0.00DECEMBER $0.70$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.42 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.42$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.02 $0.00 $0.00 $0.00 $0.00APRIL $0.02$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.11 $0.00 $0.00 $0.00 $0.00AUGUST $1.11$0.00 $0.00$0.00$0.00
$2.24 $0.00 $0.00 $0.00 $0.00 $2.24District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
LUFKIN DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0177-01-108LUFKIN POLK
REPLACE DAMAGED RIPRAP AND REPAIR SLOPE FAILURE NEXT TO RIPRAP SLOPE AT SOUTH ABUTMENT
US 59 AUG 2018
0.445 MILES N OF FM 1988LIMITS FROM: 1.507 S OF US 190 & US-59 LOOP SLIMITS TO:
$ 430,594
DESCRIPTION:
XX
ER ( )PROJ NUM:
2.000
NNHS:
ROW CSJ: $ 430,5941 Project0177-01-108CONTRACT CSJ:
0177-02-102LUFKIN SAN JACINTO
REPAIR PAVING EROSION, REPLACE DAMAGED MBGF AND REBUILD BACKSLOPE; PLACE RIPRAP AND STABILIZE THE REMAINING SLOPE
US 59 AUG 2018
2.885 MILES N OF FM 1127LIMITS FROM: 2.766 MILES S OF FM 2665 NLIMITS TO:
$ 624,386
DESCRIPTION:
XX
ER ( )PROJ NUM:
2.000
NNHS:
ROW CSJ: $ 624,3861 Project0177-02-102CONTRACT CSJ:
0403-01-049LUFKIN SAN JACINTO
RE-ESTABLISH THE SLOPE AND RESET GUARDRAIL. CONCRETE RIRAP WILL BE ADDED TO PROTECT THE SLOPE FROM FURTHER EROSION.
SH 156 AUG 2018
3.953 MILES N OF FM 946 INTERSECTIOLIMITS FROM: 5.058 MILES S OF US 190 INTERSETIONLIMITS TO:
$ 53,076
DESCRIPTION:
XX
ER ( )PROJ NUM:
2.000
NNHS:
ROW CSJ: $ 53,0761 Project0403-01-049CONTRACT CSJ:
AUG 2018 TOTAL: $ 1,108,0563 Projects 3 Contracts
LUFKIN $ 1,108,0563 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
ODESSA DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.25 $0.00 $0.00 $0.00 $0.00JULY $0.25$0.00 $0.00$0.00$0.00
$4.20 $0.00 $0.00 $0.00 $0.00AUGUST $4.20$0.00 $0.00$0.00$0.00
$4.45 $0.00 $0.00 $0.00 $0.00 $4.45District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
ODESSA DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
1371-01-021ODESSA WINKLER
INSTALL LIGHTS AND GATES FOR DOT# 864 593F
FM 1232 JUL 2018
AT 3 MILES WEST OF SH 18LIMITS FROM: .LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS4PROJ NUM:
0.200
NNHS:
ROW CSJ: $ 250,0001 Project1371-01-021CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 250,0001 Project 1 Contract
0005-09-021ODESSA MIDLAND
CORRIDOR INTERCONNECT FOR PRE-EMPTION
BI 20-E AUG 2018
GARFIELD STLIMITS FROM: EAST WALL STLIMITS TO:
$ 4,000,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
1.546
NNHS:
ROW CSJ: $ 4,000,0001 Project0005-09-021CONTRACT CSJ: AUG 2018
1370-01-021ODESSA WARD
INSTALL PROTECTIVE DEVICES FOR CROSSING DOT# 864588J
FM 1219 AUG 2018
@ SH 18LIMITS FROM: .LIMITS TO:
$ 204,073
DESCRIPTION:
XX
STP ()FRS3PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 204,0731 Project1370-01-021CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 4,204,0732 Projects 2 Contracts
ODESSA $ 4,454,0733 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
PARIS DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.77 $0.00 $0.00 $0.00 $0.14DECEMBER $0.92$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$38.43 $0.00 $0.00 $0.00 $0.00JULY $38.43$0.00 $0.00$0.00$0.00
$1.20 $0.00 $0.00 $0.00 $40.00AUGUST $41.20$0.00 $0.00$0.00$0.00
$40.41 $0.00 $0.00 $0.00 $40.14 $80.55District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PARIS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0081-10-040PARIS GRAYSON
BRIDGE REPLACEMENT
US 377 JUL 2018
US 377LIMITS FROM: AT LAKE TEXOMALIMITS TO:
$ 27,336,796
DESCRIPTION:
CX
BR 2018(434)PROJ NUM:
0.100
NNHS:
ROW CSJ:
0081-10-043PARIS GRAYSON
REPLACE BRIDGE APPROACH IN TEXAS
US 377 JUL 2018
AT LAKE TEXOMALIMITS FROM: .LIMITS TO:
$ 2,729,959
DESCRIPTION:
CX
BR 2018(433)PROJ NUM:
0.100
NNHS:
0081-10-045ROW CSJ: $ 30,066,7552 Projects0081-10-040CONTRACT CSJ: JUL 2018
0173-06-042PARIS HUNT
WIDEN 2 LANE RURAL TO 5 LANE UNDIVIDED ARTERIALENGINEERING ONLY AS APPROVED BY NCTCOG
SH 34 JUL 2018
3.1 MILES NORTH OF FM 2101LIMITS FROM: CR 2312LIMITS TO:
$ 893,700
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
11.705
NNHS:
ROW CSJ:
0173-07-054PARIS HUNT
WIDEN 2 LANE RURAL TO 5 LANE UNDIVIDED ARTERIALENGINEERING ONLY AS APPROVED BY NCTCOG
SH 34 JUL 2018
IH 30LIMITS FROM: 3.1 MILES NORTH OF FM 2101LIMITS TO:
$ 548,600
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
7.185
NNHS:
ROW CSJ: $ 1,442,3002 Projects0173-06-042CONTRACT CSJ: JUL 2018
0279-02-040PARIS FANNIN
REPLACE BRIDGE AND APPROACHES
SH 78 JUL 2018
AT RED RIVERLIMITS FROM: .LIMITS TO:
$ 5,428,581
DESCRIPTION:
CX
BR ( )PROJ NUM:
0.100
NNHS:
ROW CSJ:
0279-02-041PARIS FANNIN
REPLACE BRIDGE APPROACH IN TEXAS
SH 78 JUL 2018
AT RED RIVERLIMITS FROM: .LIMITS TO:
$ 1,493,666
DESCRIPTION:
CX
BR ( )PROJ NUM:
0.100
NNHS:
0279-02-046ROW CSJ: $ 6,922,2472 Projects0279-02-040CONTRACT CSJ: JUL 2018
JUL 2018 TOTAL: $ 38,431,3026 Projects 3 Contracts
0901-22-114PARIS HUNT
UPDATE HUNT CO TRANS PLAN TO ID IMPROVEMENTS TO IH 30, SH 66& US 380 AND START A MULTIMODAL TRANS PLAN IN COLLIN CO
VA AUG 2018
NCTCOGLIMITS FROM: .LIMITS TO:
$ 1,200,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
1.000
YNHS:
ROW CSJ: $ 1,200,0001 Project0901-22-114CONTRACT CSJ: AUG 2018
0901-32-098PARIS FANNIN
MISCELLANEOUS CONSTRUCTION
VA AUG 2018
US 82LIMITS FROM: FM 1396LIMITS TO:
$ 40,000,000
DESCRIPTION:
XX
CC 901-32-98PROJ NUM:
6.382
NNHS:
ROW CSJ: $ 40,000,0001 Project0901-32-098CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 41,200,0002 Projects 2 Contracts
PARIS $ 79,631,3028 Projects 5 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
PHARR DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.98 $0.00 $0.00 $0.00 $0.00AUGUST $1.98$0.00 $0.00$0.00$0.00
$1.98 $0.00 $0.00 $0.00 $0.00 $1.98District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
PHARR DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0921-06-291PHARR CAMERON
NEW 4 LANE ROADWAY.
CS AUG 2018
MORRISON RD., FM 1847LIMITS FROM: FM 511LIMITS TO:
$ 200,000
DESCRIPTION:
XX
STP 1602(479)MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 200,0001 Project0921-06-291CONTRACT CSJ: AUG 2018
0921-06-292PHARR CAMERON
PROPOSED 2 LANE ROADWAY W/ CONTINUOUS LEFT TURN LANE
CS AUG 2018
ON WHIPPLE RD, FM 1575LIMITS FROM: FM 1847LIMITS TO:
$ 380,268
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 380,2681 Project0921-06-292CONTRACT CSJ: AUG 2018
0921-06-293PHARR CAMERON
HIKE AND BIKE TRAIL W/ PROPOSED ROADWAY
CS AUG 2018
PALM BLVD @ CURRENT RAIL LINELIMITS FROM: I-69E SB FRTG RD W OF OLD ALICELIMITS TO:
$ 1,000,000
DESCRIPTION:
XX
STP ( )MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,000,0001 Project0921-06-293CONTRACT CSJ: AUG 2018
0921-06-294PHARR CAMERON
FEASABILITY STUDY
CS AUG 2018
WITHIN THE CITY OF BROWNSVILLELIMITS FROM: BROWNSVILLE SERVICE AREALIMITS TO:
$ 400,000
DESCRIPTION:
XX
STP 1602(480)MMPROJ NUM:
0.100
NNHS:
ROW CSJ: $ 400,0001 Project0921-06-294CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,980,2684 Projects 4 Contracts
PHARR $ 1,980,2684 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
RAILROAD DIVISION DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.05 $0.00 $0.00 $0.00 $0.00AUGUST $1.05$0.00 $0.00$0.00$0.00
$1.05 $0.00 $0.00 $0.00 $0.00 $1.05District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
RAILROAD DIVISION DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
8300-00-035RAILROAD DIVISI TRAVIS
STATEWIDE PROJECT DEVELOPMENT BY RAILRAOD AND CONSULTANTS ATVARIOUS RAILROAD CROSSINGS.
VA AUG 2018
VARIOUS LOCATIONS ON UP RRLIMITS FROM: .LIMITS TO:
$ 500,000
DESCRIPTION:
XX
STP ( )FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 500,0001 Project8300-00-035CONTRACT CSJ: AUG 2018
8300-00-036RAILROAD DIVISI TRAVIS
STATEWIDE PROJECT DEVELOPMENT BY RAILRAOD AND CONSULTANTS ATVARIOUS RAILROAD CROSSINGS.
VA AUG 2018
VARIOUS LOCATIONS ON BNSF RRLIMITS FROM: .LIMITS TO:
$ 300,000
DESCRIPTION:
XX
STP ( )FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 300,0001 Project8300-00-036CONTRACT CSJ: AUG 2018
8300-00-037RAILROAD DIVISI TRAVIS
STATEWIDE PROJECT DEVELOPMENT BY RAILRAOD AND CONSULTANTS ATVARIOUS RAILROAD CROSSINGS.
VA AUG 2018
VARIOUS LOCATIONS ON KCS RRLIMITS FROM: .LIMITS TO:
$ 150,000
DESCRIPTION:
XX
STP ( )FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 150,0001 Project8300-00-037CONTRACT CSJ: AUG 2018
8300-00-038RAILROAD DIVISI TRAVIS
STATEWIDE PROJECT DEVELOPMENT BY RAILRAOD AND CONSULTANTS ATVARIOUS RAILROAD CROSSINGS.
VA AUG 2018
VARIOUS LOCATIONS ON LS4E RRLIMITS FROM: .LIMITS TO:
$ 100,000
DESCRIPTION:
XX
STP ( )FRSPROJ NUM:
0.001
NNHS:
ROW CSJ: $ 100,0001 Project8300-00-038CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,050,0004 Projects 4 Contracts
RAILROAD DIVISI $ 1,050,0004 Projects 4 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
SAN ANGELO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.75 $0.00 $0.00 $0.00 $0.00AUGUST $0.75$0.00 $0.00$0.00$0.00
$0.75 $0.00 $0.00 $0.00 $0.00 $0.75District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANGELO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0344-02-047SAN ANGELO RUNNELS
RAILROAD SIGNALS
SH 158 AUG 2018
ON BROADWAY STREET AT RAILROADLIMITS FROM: DOT# 021425WLIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP 1802(356)FRS2PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0344-02-047CONTRACT CSJ: AUG 2018
0907-00-189SAN ANGELO TOM GREEN
RAILROAD SIGNALS
VA AUG 2018
ON HARRIS AVENUE AT RAILROADLIMITS FROM: DOT# 018746ALIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP 1802(356)FRS2PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0907-00-189CONTRACT CSJ: AUG 2018
0907-00-190SAN ANGELO TOM GREEN
RAILROAD SIGNALS
VA AUG 2018
ON SPAULDING STREET AT RAILROADLIMITS FROM: DOT# 018743ELIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP 1802(356)FRS2PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 250,0001 Project0907-00-190CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 750,0003 Projects 3 Contracts
SAN ANGELO $ 750,0003 Projects 3 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
SAN ANTONIO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$2.07 $0.00 $0.00 $0.00 $0.00AUGUST $2.07$0.00 $0.00$0.00$0.00
$2.07 $0.00 $0.00 $0.00 $0.00 $2.07District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
SAN ANTONIO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0073-03-065SAN ANTONIO ATASCOSA
REMOVE CANTILEVERS AND INSTALL MEDIAN GATES ATUPRR DOT 435749U
US 281 AUG 2018
300' SOUTH OF SH 97 EASTLIMITS FROM: 900' SOUTH OF SH 97 EASTLIMITS TO:
$ 70,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
1.000
NNHS:
ROW CSJ: $ 70,0001 Project0073-03-065CONTRACT CSJ: AUG 2018
0915-00-199SAN ANTONIO BEXAR
DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2018
VA AUG 2018
DISTRICTWIDE ITS FY 2018LIMITS FROM: .LIMITS TO:
$ 2,000,000
DESCRIPTION:
XX
STP ( )PROJ NUM:
0.001
NNHS:
ROW CSJ: $ 2,000,0001 Project0915-00-199CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 2,070,0002 Projects 2 Contracts
SAN ANTONIO $ 2,070,0002 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
TRAFFIC DIVISION DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
TYLER DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$1.04 $0.00 $0.00 $0.00 $0.00NOVEMBER $1.04$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$1.04 $0.00 $0.00 $0.00 $0.00 $1.04District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:04 AM
WACO DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$1.87 $0.00 $0.00 $0.00 $0.00AUGUST $1.87$0.00 $0.00$0.00$0.00
$1.87 $0.00 $0.00 $0.00 $0.00 $1.87District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:05 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WACO DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0909-36-162WACO BELL
PURCHASE BUSES TO PROVIDE TRANSPORTATION
VA AUG 2018
HILL COUNTRY TRANSITLIMITS FROM: KILLEEN UZALIMITS TO:
$ 1,615,000
DESCRIPTION:
TR
STP ( )PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 1,615,0001 Project0909-36-162CONTRACT CSJ: AUG 2018
0909-36-164WACO BELL
UPGRADE RR CROSSING SIGNALS FEDERAL SAFETY PROGRAM (FSP)
CS AUG 2018
DOT #024 487 ELIMITS FROM: 25TH STREET TEMPLE,TX RRMP 218.980LIMITS TO:
$ 250,000
DESCRIPTION:
XX
STP ( )FRS1PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 250,0001 Project0909-36-164CONTRACT CSJ: AUG 2018
AUG 2018 TOTAL: $ 1,865,0002 Projects 2 Contracts
WACO $ 1,865,0002 Projects 2 Contracts
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:05 AM
WICHITA FALLS DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00AUGUST $0.01$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00 $0.01District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:05 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE
WICHITA FALLS DISTRICT
ESTIMATE
FISCAL YEAR 2018 CURRENT PROJECT DETAIL FOR OTHER OBLIGATIONS
0903-03-114WICHITA FALLS WICHITA
2017 FEDERAL SIGNAL PROGRAM
CS AUG 2018
IN WICHITA FALLS ATLIMITS FROM: 7TH STREETLIMITS TO:
$ 10,381
DESCRIPTION:
XX
STP 1802(353)FRS2PROJ NUM:
0.100
NNHS:
ROW CSJ: $ 10,3811 Project0903-03-114CONTRACT CSJ:
AUG 2018 TOTAL: $ 10,3811 Project 1 Contract
WICHITA FALLS $ 10,3811 Project 1 Contract
TYPE: LC = LET BY LOCAL ENTITY XX = PROJECT NOT PROCESSED THROUGH STATEWIDE LETTING TR = TRANSFER OF FUNDS NC = NO CHARGE LN = LET BY LOCAL ENTITY AND NO CHARGE CDA = COMPREHENSIVE DEVELOPMENT AGREEMENT PTF = PASS-THROUGH FINANCING CONC = CONCESSION FUNDS SIB = STATE INFRASTRUCTURE BANK LOANS LBS = LOCAL BOND SALES CX = CROSSING STATE PROJECT P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD LB = LOCAL LET DESIGN BUILD
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:05 AM
YOAKUM DISTRICT
CURRENT OTHER OBLIGATIONS SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00OCTOBER $0.01$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.02 $0.00 $0.00 $0.00 $0.00MARCH $0.02$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.04 $0.00 $0.00 $0.00 $0.00 $0.04District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:18:05 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE OVERSIGHT
State Total: 120 Projects $ 244,990,308
ESTIMATE
117 Contracts
FISCAL YEAR 2018CURRENT OTHER OBLIGATIONS SUMMARY
BASED ON CURRENT ESTIMATE
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:04 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
TotalSIB1 2 Texas Mobility Fund
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
Rail Funds
Prop 1
ABILENE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AMARILLO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ATLANTA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AUSTIN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BEAUMONT $0.01 $0.00 $0.00 $0.00 $0.00 $0.01$0.00 $0.00$0.00$0.00
BROWNWOOD $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BRYAN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
CHILDRESS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
DALLAS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
EL PASO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
FORT WORTH $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
HOUSTON $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LAREDO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LUBBOCK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LUFKIN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ODESSA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
PARIS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
PHARR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
SAN ANGELO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
SAN ANTONIO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
TYLER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
WACO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
WICHITA FALLS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
YOAKUM $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00 $0.01District Total $0.00 $0.00
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
ABILENE DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
AMARILLO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
ATLANTA DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
AUSTIN DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
BEAUMONT DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00MARCH $0.01$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.01 $0.00 $0.00 $0.00 $0.00 $0.01District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
BROWNWOOD DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
BRYAN DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
CHILDRESS DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
CORPUS CHRISTI DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
DALLAS DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
DESIGN DIVISION DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
EL PASO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
FORT WORTH DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
HOUSTON DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
LAREDO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
LUBBOCK DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
LUFKIN DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
ODESSA DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
PARIS DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
PHARR DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
SAN ANGELO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
SAN ANTONIO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:05 AM
TRAFFIC DIVISION DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:06 AM
TYLER DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:06 AM
WACO DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:06 AM
WICHITA FALLS DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:06 AM
YOAKUM DISTRICT
CURRENT CDA SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:27:06 AM
DISTRICT COUNTY HIGHWAY NUM PROJECT IDBID
DATEPROJECT LENGTH TYPE OVERSIGHT
State Total: 0 Projects $ 0.00
ESTIMATE
0 Contracts
FISCAL YEAR 2018CURRENT CDA PROJECTS SUMMARY
BASED ON CURRENT ESTIMATE
District
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:00 AM
State Highway
Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds
Total
SIB1 2 Texas Mobility Fund
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
Rail Funds
Prop 1
ABILENE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AMARILLO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ATLANTA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
AUSTIN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BEAUMONT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BROWNWOOD $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
BRYAN $50.00 $0.00 $48.72 $0.00 $0.00 $223.19$0.00 $124.48$0.00$0.00
CHILDRESS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
CORPUS CHRISTI $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
DALLAS $565.38 $0.00 $31.89 $0.00 $3.08 $600.35$0.00 $0.00$0.00$0.00
EL PASO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
FORT WORTH $4.19 $0.00 $0.00 $0.00 $0.00 $4.19$0.00 $0.00$0.00$0.00
HOUSTON $193.00 $0.00 $106.26 $0.00 $0.00 $299.26$0.00 $0.00$0.00$0.00
LAREDO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LUBBOCK $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
LUFKIN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
ODESSA $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
PARIS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
PHARR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
SAN ANGELO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
SAN ANTONIO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
TYLER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
WACO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
WICHITA FALLS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
YOAKUM $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00DESIGN DIVISION $0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00TRAFFIC DIVISION $0.00$0.00
$812.57 $0.00 $186.86 $0.00 $3.08 $1,126.98District Total: $0.00 $124.48
State Highway Fund consists of federal, state and local funds.1
2 State Infrastructure Bank Loans.
$0.00$0.00
* Actual totals may include local letting and other obligations remaining to be obligated and/or concurrence of award.
*
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
ABILENE DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
AMARILLO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
ATLANTA DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
AUSTIN DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
BEAUMONT DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
BROWNWOOD DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
BRYAN DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$50.00 $0.00 $48.72 $0.00 $0.00NOVEMBER $223.19$0.00 124.48$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$50.00 $0.00 $48.72 $0.00 $0.00 $223.19District Total: $0.00 $124.48$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
CHILDRESS DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
CORPUS CHRISTI DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
DALLAS DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$565.38 $0.00 $31.89 $0.00 $3.08DECEMBER $600.35$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$565.38 $0.00 $31.89 $0.00 $3.08 $600.35District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
DESIGN DIVISION DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
EL PASO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
FORT WORTH DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
*SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$4.19 $0.00 $0.00 $0.00 $0.00FEBRUARY $4.19$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$4.19 $0.00 $0.00 $0.00 $0.00 $4.19District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
HOUSTON DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$193.00 $0.00 $106.26 $0.00 $0.00NOVEMBER $299.26$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$193.00 $0.00 $106.26 $0.00 $0.00 $299.26District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
LAREDO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
LUBBOCK DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
LUFKIN DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
ODESSA DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
PARIS DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
PHARR DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
SAN ANGELO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
SAN ANTONIO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
TRAFFIC DIVISION DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
TYLER DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
WACO DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
WICHITA FALLS DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00District Total: $0.00 $0.00$0.00$0.00
April 23, 2018Data Date:Run Date: 4/23/2018 @ 9:24:01 AM
YOAKUM DISTRICT
CURRENT DESIGN BUILD SUMMARY (In Millions)FISCAL YEAR 2018
BASED ON CURRENT ESTIMATE
MonthState
Highway Fund
Pass Through Finance
Toll Rev
Funds
SH 130 Conc Funds
Local Funds Total
SIB Texas Mobility
Fund
Rail Funds
Prop 1
$0.00 $0.00 $0.00 $0.00 $0.00SEPTEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00OCTOBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00NOVEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00DECEMBER $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JANUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00FEBRUARY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MARCH $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00APRIL $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00MAY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JUNE $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00JULY $0.00$0.00 $0.00$0.00$0.00
$0.00 $0.00 $0.00 $0.00 $0.00AUGUST $0.00$0.00 $0.00$0.00$0.00