1-74 5425 2-98 1993 Specifications Houston District Special Specifications 5425 Water Mains Table of Contents Page 1. Description. 6 2. Materials. 6 (1) General. 6 (2) Steel Pipe and Fittings. 6 (a)Steel Carrier Pipe 6 (b)Steel Casing Pipe. 8 (c)Steel Pipe Fittings. 9 (d)Steel Pipe Flanges. 9 (e)Steel Pipe Protective Coatings. 9 (3) Ductile-Iron Pipe and Fittings. 13 (a)Ductile-Iron Pipe, 4-Inch Through 48-Inch. 13 (b)Fittings for Ductile-Iron Pipe 13 (4) Cast-Iron Pipe and Fittings. 14 (a)Cast-Iron Pipe, 4-Inch Through 24-Inch. 14 (b)Cast-Iron Fittings. 14 (5) Polyvinyl Chloride Pipe and Fittings. 14 (a)Polyvinyl Chloride (PVC) Pipe, 2-Inch Through 16-Inch. 14 (b)Fittings for Polyvinyl Chloride Pipe, 2-Inch. 15 (c)Polyvinyl Chloride Pipe, 4-Inch Through 16-Inch. 15 (d)Bends and Fittings for PVC Pipe, 4-inch Through 16-Inch. 15 (e)Nonmetallic Pipe Detection. 15 (6) Prestressed Concrete Cylinder Pipe and Fittings. 16 (a)General. 16

1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

  • Upload
    ngoanh

  • View
    220

  • Download
    3

Embed Size (px)

Citation preview

Page 1: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

1-74 54252-98

1993 Specifications Houston District

Special Specifications

5425

Water Mains

Table of Contents Page

1. Description. 6

2. Materials. 6

(1) General. 6

(2) Steel Pipe and Fittings. 6(a)Steel Carrier Pipe 6(b)Steel Casing Pipe. 8(c)Steel Pipe Fittings. 9(d)Steel Pipe Flanges. 9(e)Steel Pipe Protective Coatings. 9

(3) Ductile-Iron Pipe and Fittings. 13(a)Ductile-Iron Pipe, 4-Inch Through 48-Inch. 13(b)Fittings for Ductile-Iron Pipe 13

(4) Cast-Iron Pipe and Fittings. 14(a)Cast-Iron Pipe, 4-Inch Through 24-Inch. 14(b)Cast-Iron Fittings. 14

(5) Polyvinyl Chloride Pipe and Fittings. 14(a)Polyvinyl Chloride (PVC) Pipe, 2-Inch Through 16-Inch. 14(b)Fittings for Polyvinyl Chloride Pipe, 2-Inch. 15(c)Polyvinyl Chloride Pipe, 4-Inch Through 16-Inch. 15(d)Bends and Fittings for PVC Pipe, 4-inch Through 16-Inch. 15(e)Nonmetallic Pipe Detection. 15

(6) Prestressed Concrete Cylinder Pipe and Fittings. 16(a)General. 16

Page 2: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

2-74 54252-98

(b)Prestressed Concrete Cylinder Pipe Design. 16(c)Prestressing Wire. 17(d)Prestressed Concrete Cylinder Pipe. 18(e)Fittings and Specials for Prestressed Concrete Cylinder Pipe. 19(f)Grout for Joints. 19(g)Manufacturer's Quality Control. 20

(7) Joint Bonding and Electrical Insulation. 20(a)Insulating Gasket: 21(b)Sleeves and Washers: 21

(8) Copper Tubing for Copper Service Lines and Small Mains. 21

(9) Brass Fittings for Underground Services Lines and Small Mains. 21(a)General. 22(b)Corporation Stops. 22(c)Curb Stops. 22(d)Service Saddles. 23(e)Angle Stops. 23(f)Fittings. 23

(10)Gate Valves, Tapping Valves and Tapping Sleeves. 23(a)Gate Valves. 23(b)Tapping Valves. 26(c)Tapping Sleeves. 26(d)Air Release and Vacuum Relief Valve. 27(e)External Coating Above Ground Valves. 28

(11)Butterfly Valves. 28

(12)Valve Boxes. 29

(13)Fire Hydrants. 29(a)General. 29(b)Hydrant Barrel. 30(c)Shut-off Valve and Inlet Shoe. 31(d)Valve Stem. 31(e)Gaskets and Seals. 31(f)Painting. 32(g)Performance Standards. 33

(14)Polyethylene Film Wrap. 35(a)General. 35(b)Film. 35(c)Polyethylene Tape. 35

(15)Bedding Material. 35(a)Bank Run Sand. 35(b)Concrete Sand. 35

Page 3: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

3-74 54252-98

(c)Pea Gravel. 36(d)Gem Sand. 36

(16)Backfill Material. 36(a)Cement Stabilized Sand. 36(b)Earth or Native Soil. 37(c)Bank Run Sand. 37

(17)Concrete. 37

(18)Grout for Prestressed Concrete Cylinder Pipe Joints. 37(a)General. 37(b)Cement Grout Mixture. 37(c)Nonshrink Grout. 37

(19)Water Meters, Meter Vaults and Meter Boxes. 38(a)Water Meters. 38(b)Meter Vault. 39(c)Meter Box. 40

(20)Affidavit of Compliance. 42

(21)Pressure Reducing Station. 42

3. Construction Methods. 42

(1) Excavation. 42(a)Trenches. 42(b)Existing Streets. 44

(2) Jacking, Tunneling or Augering. 44(a)General. 44(b)Jacking of Steel Casing. 45(c)Tunneling. 45(d)Augering. 45(e)Bedding for Trenches, Jacking, Tunneling, Boring or Augering Pits. 46

(3) Handling of Pipe and Accessories. 47

(4) Pipe Cutting. 48

(5) Defective or Damaged Material. 48

(6) Cleaning of Pipe and Accessories. 48

(7) Laying of Pipe. 49

(8) Joining of Pipe and Accessories. 50(a)Cast-Iron Pipe, Ductile-Iron Pipe Valves, Hydrants and Fittings 50

Page 4: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

4-74 54252-98

(b)Polyvinyl Chloride Pipe and Accessories. 51(c)Welded Joints for Steel Pipe. 51(d)Flanged Joints for Steel Pipe. 52(e)Rubber Gasketed Bell-and-Spigot Joints For Use On Prestressed Concrete

Cylinder Pipe. 52(f)Welded Joints For Use On Prestressed Concrete Cylinder Pipe. 53(g) Flanged Joints For Use On Ductile-Iron Pipe and Prestressed ConcreteCylinder Pipe. 53(h)Joint Grouting For Use On Prestressed Concrete Cylinder Pipe. 53

(9) Closures and Field Modifications of Prestressed Concrete Cylinder Pipe. 54

(10)Thrust Restraint. 55

(11)Electrical Continuity Bonds. 55

(12)Backfilling. 56(a) General. 56(b) Pipe Backfill for Water Mains. 56

(13)Valves and Fire Hydrants. 57

(14)Tapping Sleeves and Valves. 57(a) General. 57(b) Installation. 58

(15)Boxes for Valves. 58

(16)Wet Connections. 59(17)Polyethylene Film Wrap. 59

(a) Tubular Type Wrap. 60(b) Sheet Type Wrap. 60(c) Auger Section Installation. 61

(18)Sterilization of Mains and Testing for Leakage. 61(a) Sterilization of Mains. 61(b) Testing for Leakage. 62

(19)Mains - Use of Completed Sections. 62

(20)Mains - Lowering. 63

(21)Copper Service Line Construction. 63(a) Installing Service Lines. 63(b) Corporation Stop Installation. 64(c) Curb Stop Installation. 65(d) Sequence of Work. 65

Page 5: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

5-74 54252-98

(22)Cutting and Plugging of Water Mains. 65

(23)Service Lines of Public Utilities. 66

(24)Relocation of Meter Vaults. 66(a) Precast Concrete Vault. 66(b) Cast-in-Place Concrete Vault. 66(c) Frame and Cover. 66(d) Inspections. 66

(25)Adjustment of Existing Surface Structures. 67(a) Valve Boxes. 67(b) Meter Boxes. 67(c) Meter Vaults. 67

(26)Relocation of Water Meters and Boxes. 67

(27)Installation of Split Casing. 68

(28)Modifications for Cathodic Protection. 68(a) General. 68(b) Bonded Joints. 68

(29)Removing and Salvaging Fire Hydrants and Water Meters. 69

(30)Installation of the Nonmetallic Pipe Detection System. 69

(31)Removing Water Main and/or Removing Water Main with Casing. 69

4. Measurement. 69

5. Payment. 70

Page 6: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

6-74 54252-98

1993 Specifications Houston District

SPECIAL SPECIFICATION5425

Water Mains

1. Description. This Item shall consist of furnishing all labor, materials and equipmentnecessary to provide a complete water main system in accordance with the plans andspecifications, and in compliance with the Department's Utility Accommodation Policy(Title 43, T.A.C., Sections 21.31-21.55). The water mains shall be of the sizes, materialsand dimensions shown on the plans and shall include all pipe, all joints and connections tonew and existing pipes, all casing, valves, fittings, fire hydrants, meters, blocking, etc., asmay be required to complete the work.

This Item shall also govern for the materials and equipment to be furnished and for themethods to be followed for encasing existing water lines with split steel encasement pipe, bythe open cut method.

The abbreviations AWWA, ASA, ANSI, ASTM and NACE as used in this specification,shall refer to the following organizations or technical societies.

AWWA - American Water Works AssociationASA - American Standards AssociationASTM - American Society for Testing and MaterialsANSI - American National Standards InstituteNACE - National Association of Corrosion Engineers

Where reference is made to specifications of the above organizations, it shall be construed tomean the latest standard or tentative standard in effect on the date of the proposal.

2. Materials.

(1) General. All pipe 6-inch and larger shall be acceptable, without penalty, to the TexasFire Insurance Commission for use in water works distribution systems.

All materials used in this project shall be new and unused unless otherwise specified onthe plans or in the proposal.

(2) Steel Pipe and Fittings.

(a) Steel Carrier Pipe. All steel pipe, 4-inch through 24-inch, which is intended foruse as carrier pipe in the distribution system shall conform to the requirements ofAWWA Standard C200. All pipe and fittings must have manufacturer'scertifications to ensure that they have been hydrostatically tested at the factory inaccordance with AWWA C200, section 3.4. Pipe steel shall meet the requirementsof ASTM A36, ASTM A570 Grade 36, ASTM A53 Grade B, ASTM A135 GradeB, or ASTM A139 Grade B as a minimum. Pipe shall also be subject to the

Page 7: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

7-74 54252-98

requirements of Underwriters Laboratories, Inc. Specification for "Steel Pipelinesfor Underground Water Service".

Pipe and fittings shall be designed to withstand the most critical simultaneousapplication of external loads and internal pressures. The design shall be based onthe minimum of AASHTO HS-20 loading, AREA E-80 loads and depths of bury asindicated on the plans. The design shall provide for the most critical groundwaterlevel condition. The pipe design conditions are as follows:1) Working pressure = 75 psi.2) Hydrostatic field test pressure = 125 psi.

Pipe design (24 inch and larger) shall conform to AWWA M11 with followingconditions:1) Design stress due to working pressure: No more than 50 percent of

minimum yield, 15,000 psi maximum stress for mortar-coated pipe.2) Design stress due to hydraulic test pressure: No more than 75 percent of

minimum yield, 22,500 psi maximum stress for mortar-coated pipe.3) Design stress due to maximum hydraulic surge pressure: No more than 75

percent of minimum yield, 22,500 psi maximum stress for mortar-coated pipe.

4) Modulus of soil reaction (E'), 1500 psi.5) Unit weight of fill (w) > 120 pcf.6) Deflection lag factor (D1) = 1.2.7) Bedding constant (K) = 0.1.8) Fully saturated soil conditions: hw = h = depth of cover above top of pipe.9) Maximum deflection from specified diameter.

A. Two percent for mortar coatings.B. Three percent for flexible coatings and shop-applied mortar lining.

All pipe designs shall be done by a licensed Engineer. The calculations shall besigned, sealed and dated by the licensed Engineer. Prior to manufacturing, thesecalculations shall be submitted to the Engineer for approval.

Pipe shall be supplied in double random lengths unless otherwise specified on theplans. The ends of the pipe shall be beveled for field butt welding.

Minimum allowable steel wall thicknesses shall be in accordance with thefollowing tables for HS-20 live loads and depths of bury of up to 16 feet.

Page 8: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

8-74 54252-98

CARRIER PIPE

CorrespCasing

Pipe

Nom.PipeSize

OutsideDiameter

Min.Wall

Thick.

Approx. Wt. Per Lin. Ft.

Uncoated

8" 4" 4.500" 0.250" 11.35 lbs.10" 6" 6.625" 0.280" 18.97 lbs.12" 8" 8.625" 0.322" 28.55 lbs.14" 10" 10.750" 0.365" 40.48 lbs.16" 12" 12.750" 0.375" 49.56 lbs.20" 16" 16.000" 0.375" 62.58 lbs.24" 20" 20.000" 0.375" 78.60 lbs.30" 24" 24.000" 0.375" 94.62 lbs.

For water mains less than 36 inches in diameter, casing insulators shall be usedbetween the water main and casing unless otherwise noted on the plans. For watermains 4 inches thru 14 inches, 8-inch wide casing insulators shall be used. Forwater mains 16 inches thru 36 inches, 12-inch wide insulators shall be used. Forwelded steel pipe 12 inches and smaller, use of Pipeline Seal and Insulator ModelPE or approved equal shall be required. For other pipe materials up to 12 inches,use Pipeline Seal and Insulator Model C8G-2 or approved equal shall be required.For all water mains larger than 12 inches use of Pipeline Seal and Insulator ModelC12G-2 or approved equal shall be required.

Casing end seals (Pipeline Seal and Insulator Model C or approved equal) shall beused for water mains less than 36" in diameter.

NOTE: It is the design Engineer's responsibility to review the design for conditionsmore extreme than those indicated by this specification and design accordingly. Inno case, however, shall thickness of the pipe wall be less than that defined in theabove table.

(b) Steel Casing Pipe. All pipe intended for use as casing pipe shall be manufacturedin accordance with Section 2.(2)(a), "Steel Carrier Pipe", of this specificationexcept that the minimum allowable steel wall thicknesses shall conform to thoseshown in the following table for HS-20 live loads and depths of bury of up to 16feet.

CASING PIPE

Casing PipeSize

OutsideDiameter

Min.Wall

Thick.

Approx. Wt.Per Lin. Ft.Uncoated

8" 8.625" 0.219" 19.64 lbs.10" 10.750" 0.219" 24.60 lbs.12" 12.750" 0.219" 29.28 lbs.14" 14.000" 0.219" 32.00 lbs.16" 16.000" 0.219" 36.86 lbs.20" 20.000" 0.250" 52.73 lbs.24" 24.000" 0.250" 63.41 lbs.30" 30.000" 0.250" 79.43 lbs.

Page 9: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

9-74 54252-98

NOTE: It is the design Engineer's responsibility to review the design for conditionsmore extreme than those indicated by this specification and design accordingly. Inno case, however, shall thickness of the pipe wall be less than that defined in theabove table.

The steel casing sections for split casing shall be a maximum of 20 feet in length.Each section shall be split in half sections. The ends and split sections shall bebeveled for field butt welding.

Steel casing pipe will not be required to carry the label of the UnderwritersLaboratories, Inc.

(c) Steel Pipe Fittings. All steel pipe fittings, 4-inch through 24-inch, shall be factoryforged fittings unless otherwise shown on the plans. The wall thickness shall beequal to or greater than the pipe to which the fitting is to be welded. The ends ofthe fitting shall be beveled for field butt welding.

All bends shall be long radius fittings unless otherwise shown on the plans.

(d) Steel Pipe Flanges. Steel pipe flanges, where called for on the plans, shallconform to AWWA Standard C207 for Class D Flanges (same diameter anddrilling as Class 125 cast-iron flanges ASA B16.1).

All cast-iron to steel pipe connections shall be made with one (1) cast-iron bellflange and one (1) steel slip-on flange and shall be electrically isolated. The use ofinsulating gaskets, plastic bolt sleeves and washers of insulating gasket materialbacked with zinc plated or hot-dip galvanized washers, or, epoxy coated bolts, nutsand washers used with an insulating gasket are approved for this purpose.

For inline flange joints 12 inches in diameter and greater and butterfly valveflanges, Pyrox LineBacker Type E phenolic gaskets as manufactured by PipelineSeal and Insulator Inc., or approved equal shall be used.

Full-face gaskets for all other flanged joints not listed above shall be used. Cloth-inserted rubber gasket material, 1/8-inch thick in accordance with AWWA C207shall be provided. Gaskets shall be factory cut to proper dimensions.

Maintain electrically isolated flanged joints between steel and cast-iron by usingepoxy coated bolts, nuts, washers and insulating type gaskets unless otherwiseapproved by the Engineer.

(e) Steel Pipe Protective Coatings.

(i) General. All protective coatings shall be shop applied except for field repairsand coatings of field welded joints. The Engineer may provide for witness ofinspection and testing of shop applied coatings, however, such witness shallnot relieve the Contractor of the responsibility to furnish material, performwork and provide quality control in accordance with the applicable AWWAStandard and/or the requirements of these specifications.

Page 10: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

10-74 54252-98

The substrate surface profile and minimum and maximum individual and totaldry film thickness (DFT) indicated herein shall apply. No requirement of thisspecification shall cancel or supersede the specific written directions andrecommendations of the specific coating manufacturer so as to jeopardize theintegrity of the applied system. Dry film thickness shall be measured inaccordance with SSPC PA2.

All shop coating and field repairs shall be field tested by the Contractor forholidays, pinholes or discontinuities at voltage levels required by theapplicable AWWA Standard and in accordance with the applicable NACEprocedure, i.e., PRO 188, RPO 274, TMD 384, etc. The test procedure,including voltage levels to be used, shall be submitted to the City prior totesting. All holidays shall be repaired in accordance with the applicableAWWA Standard. Documentation by a NACE certified inspector ofcompliance with the tests required herein shall be provided by the Contractor.

Handling, storage, and field procedures for shop coated pipe shall be inaccordance with the applicable AWWA Standards. All pipe ends shall beadequately sealed and protected from damage during handling and storage, andsuch protection shall not be removed until immediately prior to installation.Pipe shall not be lifted using caliper clamps or hooks at ends of pipe. Anydamage to the pipe or the protective coating from any cause during theinstallation of the pipe and before final acceptance by the owner shall berepaired as directed by the Engineer and in accordance with the applicablestandards.

The interior of the pipe and fittings shall be kept clean of all foreign matterbefore installation and until the work has been accepted. Joint contact surfacesshall be kept clean until jointing is complete.

The Contractor shall furnish an affidavit of compliance that all materials andwork furnished comply with the requirements of the applicable AWWAStandard and these specifications.

(ii) Internal Lining for Steel. All material used for internal coating of steelcarrier pipe must be NSF61 listed as suitable for contact with potable water asrequired by Chapter 290, Rules & Regulations for Public Systems, TexasNatural Resource Conservation Commission (TNRCC).

All steel carrier pipe and fittings above and below ground, shall be internallylined with either of the following systems unless otherwise shown on the plans.

Liquid Epoxy shall meet the requirements of AWWA C-210, "Liquid EpoxyCoating System for the Interior and Exterior of Steel Water Pipelines," exceptas modified herein. The Liquid Epoxy system shall consist of three coats ofpolyamide epoxy (no coal tar material) as follows:

Page 11: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

11-74 54252-98

Prime Coat - two part, chemically cured, pigmented,polyamide epoxy; 4-6 mils dry filmthickness (DFT).

Intermediate Coat - two part polyamide epoxy; 4-6 mils DFT.

Finish Coat - two part polyamide epoxy, 4-6 mils DFT.

The total system shall have a minimum DFT of 12 mils and a maximum DFTof 18 mils. Each coat shall be in contrasting colors, with the prime andintermediate coat being buff and the finish coat being white. All material shallbe supplied by the same manufacturer. Coal-tar epoxy material is notpermitted. Surfaces to be coated shall be abrasive blast cleaned to a near whitefinish in accordance with SSPC-SP10 (NACE 2) to establish an average anchorprofile of 2.0 to 3.0 mils, with no individual reading greater than 4.0 mils orless than 1.5 mils. Prior to applying, the prepared and cleaned surface is to beinspected for evidence of non-visible contaminants such as soluble salts and/orchlorides in accordance with NACE Technical Committee Report "SurfacePreparation of Contaminated Steel Surfaces," NACE Publication 6G 186. Thesurface shall be recleaned as necessary until free of such contaminants.

Fusion Bonded Epoxy shall be in accordance with AWWA C-213, "Fusion-Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines".

(iii) External Coating.

1) Above Ground. All above ground steel piping and fittings shall beexternally coated with a three (3) coat epoxy/epoxy/polyurethane system inaccordance with AWWA C-218, "Coating the Exterior of AbovegroundSteel Water Pipelines and Fittings", Section 2.5, Coating System No. 4-91,except as modified herein.

Prime Coat - two (2) component, pigmented, catalyzedpolyamide epoxy primer; DFT of 3-4 mils.

Intermediate Coat - two (2) component, catalyzed polyamide epoxy;DFT of 4-6 mils.

Finish Coat - two (2) component aliphatic polyurethane; DFT 3-4mils.

The total system shall have a minimum DFT of 10 mils and a maximumDFT of 14 mils. Each coat shall be in contrasting colors, with the primecoat being buff and the finish coat being blue or as specified by theEngineer. All material shall be supplied by the same manufacturer.Surfaces to be coated shall be abrasive blast cleaned to a near white finishin accordance with SSPC-SP10(NACE 2) to establish an average anchorprofile of 2.0 to 3.0 mils, with no individual reading greater than 4.0 milsor less than 1.5 mils. Prior to coating, the prepared and cleaned surface isto be inspected for evidence of non-visible contaminants such as solublesalts and/or chlorides in accordance with NACE Technical committee

Page 12: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

12-74 54252-98

Report "Surface Preparation of Contaminated Steel Surfaces," NACEPublication 6G 186. The surface shall be recleaned as necessary until it isfree of such contaminants.

2) Buried Steel Pipe. Buried steel pipe and fittings (except tunneled, cased,or augered holes) shall be coated with either of the following systems:

a) Coal tar enamel and tape, hot applied, in accordance with AWWAC203 "Coal-Tar Protective Coatings and Linings for Steel Water Pipe-Enamel and Tape-Hot Applied."

The system for pipe shall be in accordance with Section 2 of C203 andconsist of a coat of primer, followed by a hot coat of coal-tar enamelonto which shall be applied a single layer of any of the four (4)outerwraps designated by C203, except that coal-tar saturated mineralfelt is to be used instead of coal-tar saturated asbestos felt. Thecoating is to be finished with a single wrap of kraft paper. Coal-tartapes, hot applied, shall be used for special sections, connections, andfitting in accordance with Section 3 of C203.

b) Cold applied tape coating system applied as a three-layer systemconsisting of (1) a prime layer, (2) an inner-layer tape for corrosionprotection, and (3) an outer-layer tape for mechanical protection, inaccordance with the requirements of AWWA C214, "Tape CoatingSystems for the Exterior of Steel Water Pipelines."

Special sections, connections, and fittings shall be coated inaccordance with AWWA C-209, "Cold-Applied Tape Coatings for theExterior of Special Sections, Connections, and Fittings for Steel WaterPipelines."

3) Steel Pipe in Tunneled, Cased, or Augered Holes.

a) Steel pipe in tunneled or cased holes, with annular grout, shall beprimed with 3.0 to 4.0 mils of a two (2) part chemically cured rustinhibitive polyamide epoxy. Surface preparation shall be the same asfor above ground external coating, of Subsection 2.(2)(e)(iii) 1) of thisspecification.

b) Steel pipe in augered holes, or in a tunnel or casing without annulargrout shall be coated with a two-package polyisocyanate, polyol-cured,100 percent solids polyurethane coating system conforming to ASTMD 16 Type V System, applied to a minimum DFT of 25 mils.

The coating material shall be Corropipe II-Tx or Corroclad 2000 asmanufactured by Madison Chemical Industries, Inc., or approvedequal, and applied in strict accordance with manufacturer'srecommendations. For external field welds and other field repairs useMadison Chemical "GP" II or "Tx" Touch Up, or approved equal, inaccordance with manufacturer's recommendations.

Page 13: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

13-74 54252-98

(3) Ductile-Iron Pipe and Fittings.

(a) Ductile-Iron Pipe, 4-Inch Through 48-Inch. All ductile-iron pipe shall conformto the requirements of AWWA Standard C151. Length shall be no less than 18feet long. Unless otherwise specified on the plans, all pipe shall be of thicknessClass 51 regardless of pipe size. Joints shall be of the push-on type or flanged typeunless otherwise specified on the plans. Push-on joints shall conform with therequirements of ASA Specification A21.11 (AWWA C111). Flanged joints shallconform with the requirements of AWWA C115 including a cloth inserted, rubbergasket material 1/8 inch thick for flanged joints. Threaded or grooved type jointswhich reduce pipe wall thickness, below the minimum required, are not acceptable.

Where restrained joints for buried service are required, the Contractor shall providethe following, or equal:

1. Super-Lock Joint by Clow Corporation.

2. Flex-Ring or Lok-Ring by American Cast Iron Pipe Company.

3. TR-Flex or Field-Lok Joint by U.S. Pipe and Foundry Company.

Restrained joints shall have sufficient distance from each side of the bend, tee,plug, or other fitting to resist thrust developed at the design pressure for the pipe.

Water main interior coatings shall conform to AWWA C104 or ANSI A21.4,Cement lined with seal coat.

All material used for internal coating must be NSF 61 and listed as suitable forcontact with potable water as required by Chapter 290, Rules and Regulation forPublic Water Systems, Texas Natural Resources Conservation Commission(TNRCC).

Exterior coating in open cut excavation shall consist of a prime coat and an outsideasphaltic coating conforming to AWWA C110, C115, or C151 for pipe and fittings.The Contractor shall encase the water line in a double wrap of polyethylene.Polyethylene wrap shall conform to the requirements of Subarticles 2.(13),"Polyethylene Film Wrap", and 3.(1), "Polyethylene Film Wrap", of thisspecification. Install bond wire as specified in the item.

Ductile-Iron pipe in augered holes shall be coated with a polyurethane coating.Polyurethane coating shall conform to the same requirements under Subsection2.(2)(e)3., "External Coating" of this specification.

(b) Fittings for Ductile-Iron Pipe. All fittings for use with ductile-iron pipe ofnominal sizes 4-inch through 48-inch shall conform to AWWA Standard C110 orC153.

Joints shall be of the push-on type or flanged type unless otherwise specified on theplans. Push-on joints shall conform to the requirements of ANSI SpecificationA21.11 (AWWA C111), rated for a 250 psig working pressure or A21.53 (AWWAC153). Flanged fittings shall conform to AWWA C110, the material shall be cast

Page 14: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

14-74 54252-98

or ductile iron and conform to ANSI B16.1, class 125 rated at 250 psig workingpressure. Flanged fittings shall be screwed on threaded pipe ends done in the shopin accordance AWWA C115 for attachment, aligning and facing.

The inside and outside surfaces of the fittings shall be coated as specified for theregular lengths of ductile Iron pipe.

(4) Cast-Iron Pipe and Fittings.

(a) Cast-Iron Pipe, 4-Inch Through 24-Inch. All cast-iron pipe shall conform to therequirements of AWWA Standard C106 or AWWA Standard C108.

Unless otherwise specified on the plans, all pipe shall be of the thickness requiredfor "Laying Condition F" and a minimum of five (5) feet of cover and the pipe shallbe designed for a minimum working pressure of 150 psi.

Joints shall be of the push-on type unless otherwise specified on the plans. Push-on joints shall conform with the requirements of ASA Specification A21.11(AWWA C111).

The interior and exterior coatings shall be as specified for ductile-iron pipe of thisspecification in Section 2.(3)(a).

(b) Cast-Iron Fittings. Cast-iron or ductile iron fittings shall be permitted, unlessotherwise shown on the plans.

All fittings for use with cast-iron pressure pipe of nominal sizes 4-inch through 24-inch shall conform to the requirements of AWWA Standard C110 or C153. Thefittings shall be designed for a pressure rating of 250 psi.

Joints shall be of the push-on type unless otherwise specified on the plans. Push-onjoints shall conform to the requirements of ASA Specification A21.11 (AWWAC111).

The inside and outside surfaces of the fittings shall be coated as specified for theregular lengths of cast-iron pipe.

(5) Polyvinyl Chloride Pipe and Fittings.

(a) Polyvinyl Chloride (PVC) Pipe, 2-Inch Through 16-Inch. All PVC pipe 4-inchand larger shall have integral bell type gasketed push-on joints or shall be plain endpipe with twin-gasketed couplings conforming to the requirements of ASTMDesignation D3139 for push-on-type joints. Rubber gaskets shall conform to therequirements of ASTM Designation D1869.

All PVC pipe furnished shall be marked on the spigot end for proper depth ofmakeup to bell end of a joining length of pipe or fitting.

Valves for use with PVC pipe shall conform to the requirements of Subarticle 2.(9),"Gate Valves, Tapping Valves and Tapping Sleeves", of this specification, exceptthat valve ends shall be of the push-on-joint type for use with PVC pipe. Pipe mustcarry the National Sanitation Foundation Seal (NSF).

Page 15: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

15-74 54252-98

(b) Fittings for Polyvinyl Chloride Pipe, 2-Inch. All PVC pipe shall bemanufactured in accordance with the requirements of ASTM Designation D1784for PVC 12454B (Type I, Grade 1) or PVC 12454C (Type I, Grade 1) and shallhave a standard thermoplastic pipe dimension ratio (SDR) equal to 21.

All fittings for 2-inch PVC shall have a minimum pressure rating of 200 psi. Theyshall be solvent-weld, socket type conforming to the requirements of ASTMD2466, or gasketed push-on conforming to the requirements of ASTM D2241. AllPVC solvent cements shall be manufactured in accordance with ASTM D2564.

(c) Polyvinyl Chloride Pipe, 4-Inch Through 16-Inch. All PVC pipe 4-inch through12-inch shall conform to AWWA C900. All 16-inch PVC shall conform toAWWA C905.

It shall be Class 150 DR-18 (4-12 inches) and class 235 DR-18 (16-inch) and havecast-iron equivalent outside diameters unless otherwise specified. It shall befurnished in nominal 20 feet lengths, and shall be marked for proper mate up toadjoining pipe or fitting.

The joints shall conform to the same requirements as those specified for 2-inchPVC pipe.

(d) Bends and Fittings for PVC Pipe, 4-inch Through 16-Inch. Fittings shallconform to the requirements of Section 2.(3)(b), "Fittings for Ductile-Iron Pipe".They shall be polyethylene wrapped as required by Subarticles 2.(13),"Polyethylene Film Wrap", and 3.(14), "Polyethylene Film Wrap", of thisspecification.

Restrained joints shall have sufficient distance from each side of the bend, tee,plug, or other fitting to resist thrust developed at the design pressure for the pipe.Where preventing movement of 12 inch diameter or greater pipe due to thrust isnecessary, provide the following restrained joints, or equal:

1) Fittings: JCM 610 Sur-Grip Fitting Restrainer by JCM Industries, Inc. orSeries 500 Fitting Restrainer by Ebba Iron, Inc., or approved equal.

2) Bell and Spigot: JCM 620 or 621 Sur-Grip Bell Joint Restrainer by JCMIndustries, Inc. or Series 1500 or Series 1100HV Joint Restrainer by Ebba Iron,Inc., or approved equal.

(e) Nonmetallic Pipe Detection. Where nonmetallic pipe is installed longitudinallyunderground a method of detecting the location of the nonmetallic pipe shall berequired. The specific method used shall be as shown on the plans and/or approvedby the Engineer. This system may involve some components to be installed in thetrench around the pipe to be detected using a metal detector. Or the system mayconsist of locating equipment capable of creating a non-destructive pressure wavewhich can be detected above ground using a portable detection device with bothaudible and visual indicators. Either system of detection shall be capable ofaccurately locating the pipe to a maximum depth of three (3) feet over the areasshown on the plans.

Page 16: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

16-74 54252-98

Either system must be capable of locating lines under earth, concrete or asphalticsurfaces. The equipment, materials and installation used shall be as specified bythe manufacturer.

(6) Prestressed Concrete Cylinder Pipe and Fittings.

(a) General. The Utility owner's representative or Engineer reserves the right to visitthe manufacturing facilities for prestressed concrete cylinder pipe, without notice.Such inspection will in no sense make the Utility Agency a party to the contract.The review will be to determine compliance with this specification. Such reviewshall not be construed in any way of relieving the Contractor of his responsibilitiesunder this contract.

(b) Prestressed Concrete Cylinder Pipe Design. Prestressed concrete cylinder pipeshall meet the requirements of AWWA C301-84 and AWWA M9, except asmodified herein. Full circumferential welds at joints requiring welding shall beprovided. When specified on the plans, the pipe shall be modified for CathodicProtection in accordance with the Special Specification Item, "Cathodic ProtectionSystems for Large Diameter Water Main".

The pipe design shall be based upon the lesser of the measured properties of thematerial actually used in the manufacture of the pipe or the minimum stated values,required in this specification, for said properties and not generic values.

Pipe and fittings shall be designed per AWWA C301-84 Appendix B, to withstandthe most critical simultaneous application of external loads and internal pressures.The design shall be based on a minimum of AASHTO HS-20 loading (AREA E-80loads where indicated) and depths of bury as indicated. Marston Earth Loads for atransition width trench shall be used in the pipe design for pipe with zero (0) to 16feet of cover. Marston's Earth Loads for a trench width of Outside Diameter (ofpipe) plus three (3) feet may be used for pipe with greater than 16 feet of cover.The unit weight of fill shall be no less than 120 lbs. per cubic foot. Ninety-degreeOlander coefficients for the earth load and water weight contained in the pipe alongthe 15-degree Olander coefficients for the pipe weight shall be utilized whencalculating the moments and thrusts in the pipe wall. The groundwater level shallbe assumed to be equal to natural ground surface or critical conditions.

The allowance for tensile stress in the concrete core or mortar coating at anycombination of external loadings and internal pressures shall not exceed 3.5 timesthe square root of the compressive strength of concrete. The maximum allowablecompressive stress in the concrete core or mortar coating due to any combination ofexternal loads or internal pressures (working and transient) shall be 0.55 times thecompressive strength of concrete.

The internal design pressures are as follows:

Working pressure = 75 psi.

Hydrostatic field test pressure = 125 psi.

Maximum pressure due to surge = 125 psi.

Page 17: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

17-74 54252-98

Minimum pressure due to surge (D>24") = -5 psi

Modulus of soil reaction (E') = 1500 psi.

Bedding constant (K) = 0.085 psi.

Deflection lag factor (D) = 1.0 psi.

Steel cylinder thickness shall be sufficient for the transfer of these forceslongitudinally along the pipeline.

Pipe from inventory is permitted if all specifications and certifications can be met.Testing records required by specifications must be provided.

(c) Prestressing Wire. Prestress wire must be furnished from an independentmanufacturer (i.e., a manufacturer with no legal or financial ties to the pipemanufacturer). Foreign manufactured wire shall be tested by a local independentlaboratory at the Contractor's expense.

All mechanical tests required in ASTM A648 shall be performed by the wiremanufacturer on a sample taken from one (1) end of each coil and selected to berepresentative of normal wire drawing conditions. The pipe manufacturer shall testa sample, for all mechanical requirements, from one (1) of each five (5)consecutively produced coils or fraction thereof in each lot.

The pipe manufacturer shall require that the wire manufacturer submit certifiedresults of chemical and mechanical tests, performed by the wire manufacturer.Mechanical test shall be performed by the pipe manufacturer. The pipemanufacturer shall attest to such in his affidavit of compliance.

Tests of all prestressing wire are to be submitted for record purposes, indicatingcompliance with the specifications. Submission of the test specimens is notrequired. The expense of the tests shall be borne by manufacturer.

The surface temperature of the prestressing wire at any point in the drawing processshall not exceed 360 F. The wire manufacturer shall audit the surface temperatureof the wire throughout the length of the wire drawing process daily for eachworking shift producing ASTM A648 wire, or shall take similar dependableprecautions to provide the maximum wire surface temperature is not exceeded.

(i) Preparation of Prestressed Concrete Pipe for Bonding:

1) Fabrication: Prestressed concrete pipe used for this project shall befabricated in such a manner as to establish electrical continuity betweenmetallic components of the pipe and the joints.

2) Acceptable Methods: Establish electrical continuity as indicated in theplans and specifications.

3) Criteria for Electric Continuity:

Page 18: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

18-74 54252-98

a.) Tensile Wire: The pipe manufacturer shall obtain a resistance nogreater than 0.03 ohms between any wire and the steel joint ring at theend of the pipe farthest from that wire. The manufacturer shall statethe values obtained and the method of such measurements.

b.) Internal Pipe Joint Components: The pipe manufacturer shallobtain a resistance of less than 0.03 ohms between any componentand the steel pipe cylinder.

4) Tensile Wire Continuity:

a.) Continuity between the tensile wire coils and the steel cylinder shallbe accomplished by tightly wrapping the tensile wire overlongitudinal mild steel straps placed in the mortar during pipe coremanufacture.

1) Two continuous straps 180 degrees apart shall be used andinstalled longitudinally along the pipe. These straps mustmaintain electrical continuity between metallic components.

2) The steel straps shall be mild steel or equal and free of grease, millscale or other high resistance deposits.

3) The longitudinal straps shall be made electrically continuous withthe pipe cylinder by steel fasteners of suitable dimensions placedbetween the steel cylinder and longitudinal straps. The fastenersmust be adequately connected so as to remain intact during thepipe fabrication process.

4) The steel straps shall be securely connected to the joint rings andshall extend to the piping surface, to allow connection of twobonding jumpers across each pipe joint.

5) Steel Cylinder Continuity:

a.) Continuity of joint components and the steel cylinder shall beestablished. These components include the following:

1) Anchor socket brackets.

2) Anchor socket.

3) Spigot ring.

4) Bell ring.

b.) If mechanical contact does not provide a resistance of lessthan 0.03 ohms between components, the components shallbe tack welded to provide electrical continuity.

(d) Prestressed Concrete Cylinder Pipe. The pipe joints shall be rubber gasketed orwelded bell-and-spigot type except where flanged joints are required for valves and

Page 19: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

19-74 54252-98

fittings as shown on the plans. In jacking, boring, tunneling or augeringinstallations, the outside diameter of the pipe shall have a constant outside diameterfrom bell to spigot end. The Contractor is responsible for designing the pipe andpipe joints to carry all loads including but not limited to: overburden and lateralearth pressures; subsurface soil and water loads; grouting; other conditions ofservice; thrust of jacks, and any stress anticipated during the handling andinstallation of the pipe. See paragraphs referring to joints and jointing foradditional requirements. Rubber gasket material for rubber gasketed bell andspigot joints shall be in accordance with AWWA C301-84.

All rubber gasketed joints shall be bonded as shown on the plans to provideelectrical continuity along the entire pipeline except where insulating flanges arecalled for.

A design pressure 1.5 times the pressure class (working pressure)is required.Restrain joints by welding or harnessing joints. Harnessed joints shall be AWWAM9, clamp or snap ring type. Increase longitudinal steel area (cylinder thickness)to prevent cylinder stress from exceeding 40 percent of minimum yield point atrated working pressure and 67 percent of minimum yield point at rated maximumsurge pressure where pipe and fittings subjected to longitudinal stresses induced byrestrained joints or thrust blocks.

Pipe sections shall be provided in standard lengths with a minimum of 16 feetexcept for special fittings or closure sections as indicated on the shop drawings.Each pipe section shall be clearly marked to show locations and pipe pressure.

(e) Fittings and Specials for Prestressed Concrete Cylinder Pipe. The Contractorshall furnish all fittings and specials (bends and elbows) required for bends,branches, access manholes, air valve and blowoff connections, and connections toline valves and other fittings. Fittings and specials shall be designed in accordancewith the design details and AWWA C301. Fittings and specials are subject to thesame internal and external loads as the straight pipe. Fabricated fittings from pipesections, may use steel pipe welded to proper shape, coated and lined with wirereinforced cement mortar. Provide fabricated bends or fittings with a minimumradius of two and one-half (2-1/2) times the pipe diameter.

Curves and bends shall be made by deflecting the joints, by use of beveled joints,or by a combination of the two (2) methods, unless otherwise indicated on theplans. The Contractor may submit details of other methods of producing curvesand bends for consideration by the Engineer, and if deemed satisfactory, shall beinstalled at no additional cost.

All pipe flanges shall conform to AWWA C207 requirements for standard steelflanges of the pressure class corresponding to the pipe class.

All exposed steel parts of flanges and bolts, shall be coated as specified by thesection for steel pipe of this specification.

(f) Grout for Joints. See Subarticle 2.(17), "Grout for Prestressed Concrete CylinderPipe Joints", of this specification for requirements on grout for joints.

Page 20: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

20-74 54252-98

(g) Manufacturer's Quality Control.

(i) Hydrostatic Test. Pipe cylinders shall be hydrostatically tested at the factoryin accordance with AWWA C301-84, Section 3.5.3. The hydrostatic pressureshall be held for a minimum of 15 minutes for a thorough inspection of thepipe. Any pipe revealing cracks in the mortar coating shall be rejected.

(ii) Proof of Design Tests. The design of each size and class of concrete cylinderpipe shall be verified by tests conducted on representative specimens. Thetests described in this paragraph are for proof of design only. It is notnecessary that these tests be made on pipe manufactured specifically for thiscontract. Certified reports covering tests made on other pipe of the same sizeand design as specified herein and manufactured from materials of equivalenttype and quality may be accepted as adequate proof of design.

Additionally, one (1) pipe from each design class shall be tested in a 3-edgebearing test to an equivalent load of the earth load plus live loadings. Nocracks shall be permitted on the inside of the core.

If any cracks are found, two (2) more samples from that design class shall betested; and if no cracks are found, the lot of pipe from that class shall beaccepted. If either of the two (2) additional tests fail, the lot shall be rejected.The manufacturer may elect to test each pipe from a failed lot and anyindividual pipe that does not fail shall be accepted. Written certification and acopy of all test reports shall be submitted.

(iii) Absorption Test. A water absorption test shall be performed on samples ofcured mortar coating taken from each working shift. The mortar coatingsamples shall have been cured in the same manner as the pipe. A test valueshall consist of the average of a minimum of three (3) samples taken from thesame working shift. The test method shall be in accordance with ASTM C497,Method A. The average absorption value for any test shall not exceed nine (9)percent and no individual sample shall have an absorption exceeding 11percent.

Tests for each working shift shall be performed on a daily basis untilconformance with the absorption requirements has been established basedupon the passing of 10 consecutive tests, at which time testing may beperformed on a weekly basis for each working shift. With failing absorptiontest results, daily testing shall be resumed for each working shift and shall bemaintained until conformance to the absorption requirements is reestablishedby 10 consecutive passing tests.

(7) Joint Bonding and Electrical Insulation. Electrical bond wires shall be a minimumNo. 2 AWG, seven (7) strand, copper cable, furnished with high molecular weightpolyethylene insulation (HMWPE). One inch of HMWPE insulation shall be removedfrom each end of the bond wire. The minimum number of bond wires shall be providedas shown on the plans for steel or ductile-iron pipe.

Page 21: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

21-74 54252-98

Three ASTM 366 steel bonding clips, each approximately 0.13 inches thick, 2.5 incheslong, and 1.25 inches wide, shall be welded with 1/8-inch filet welds to the bell andspigot of adjacent unwelded prestressed concrete cylinder pipe or steel pipe with rubbergasketed joints. The clips shall be manufactured so electrical continuity will bemaintained regardless of small deflections of finished (mortared) joints.

Electrical Flange insulation shall be provided through the installation of the followingmaterials:

(a) Insulating Gasket:

(i) For piping sized 30 inches in diameter and greater, provide Pyrox G-10 withnitrile seal, Type E LineBacker gasket as manufactured by Pipeline Seal andInsulator, Inc., or approved equal.

(ii) For piping sized between 12 inches and 24 inches in diameter, providePhenolic PSI with nitrile seal, Type E LineBacker gasket as manufactured byPipeline Seal and Insulator, Inc., or approved equal.

(iii) The Contractor may provide a plain-faced phenolic gasket, as manufactured byPipeline Seal and Insulator, Inc., or approved equal. The phenolic gasket shallbe placed between two full-faced gaskets. Provide cloth-inserted rubber gasketmaterial, 1/8-inch thick in accordance with AWWA C207. Gaskets shall befactory cut to proper dimensions.

(b) Sleeves and Washers:

(i) For piping sized 30 inches in diameter and greater, provide full length Mylarsleeves with Pyrox G-10 washers, double washer sets as manufactured byPipeline Seal and Insulator Inc., or approved equal.

(ii) For piping sized between 12 inches and 24 inches in diameter, provide fulllength Mylar sleeves with phenolic washers, double washer sets asmanufactured by Pipeline Seal and Insulator, Inc., or approved equal.

(8) Copper Tubing for Copper Service Lines and Small Mains. All 3/4-inch, 1-inch, 1-1/2 inch and 2-inch diameter copper tubing for underground service shall be Type "K"soft annealed and seamless with the proper bending temper and shall conform to ASTMDesignation B88 and Federal Specification WW-T-799 with the following exceptions:

Section 14 of ASTM Designation B88 is hereby modified to provide for the followingnumber of samples for each size of tubing:

For each 7500 feet of tubing one (1) sample

Items of less than 7500 feet of tubing one (1) sample

3/4-inch and 1-inch tubes shall be furnished in coils, each containing 60 feet. 1-1/2-inch and 2-inch tubes shall be furnished in coils of minimum 40 feet lengths. Minimumjoint spacing shall be in multiples of 60 feet or 40 feet respectively.

(9) Brass Fittings for Underground Services Lines and Small Mains.

Page 22: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

22-74 54252-98

(a) General. Unless otherwise provided herein, brass fittings will be required inunderground installations of service lines and small mains in the water distributionsystem.

Brass fittings shall be composed of Copper Alloy No.C 83600 conforming to therequirements of ASTM Designation B62. The general pattern for each fitting shallconform to that of standard brass fittings as manufactured by Mueller Company,Hays Manufacturing Company or an approved equal.

Compression fittings may be used for unions except where they occur underexisting or future paving. Compression tube fittings shall have Buna-N beveledgaskets.

Each fitting shall have the manufacturer's name or trademark and size plainlystamped into or cast on the body. Pipe adjacent to fittings shall be straight for atleast 10 inches.

Waterways shall not be smaller in diameter than the nominal size of the stop andshall be accurately finished to a watertight joint; all nuts and washers shall be facedto a true fit; and the design shall be such that the joint will remain watertight andreasonably easy to operate after repeated use over a number of years. All externalthreads shall conform with AWWA Standard C800 and, on corporation stops, shallbe protected in shipment by plastic coatings or an alternate approved method.

(b) Corporation Stops. Inlet ends shall be of one of the following types: Standardcorporation stop threads as specified in Table 1, AWWA C800; iron pipe thread(permissible for use with service saddles only) or Hays 4200- 4202 or approvedequal.

The valve body shall be of one of the following types: Tapered plug type; o-ringseat ball type; or the rubber seat ball type.

Outlet ends shall be a flared-copper connection for use with type-k, soft copper orcompression type fitting.

For PVC pipe, corporation stops shall be all brass and specifically designed for usewith PVC pipe.

(c) Curb Stops. Inlet ends shall have flared copper connections or compression typefittings.

The valve body shall be of straight through or angled meter stop design equippedwith padlock wings and shall be of the "O-ring" seal straight plug type or therubber seat ball type.

The outlet shall have female iron pipe threads or swivel nut meter spud threads 3/4-inch and 1-inch stops and shall have two hole flanges for 1-1/2-inch and 2-inchsizes.

Page 23: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

23-74 54252-98

(d) Service Saddles. Service saddles shall have dual straps and shall consist of one ofthe following types: Brass body and straps; ductile-iron body and straps, vinylcoated; ductile-iron body, vinyl coated with stainless steel straps.

Taps for PVC Water Mains: Use dual strap or single, wide band strap saddleswhich provide full support around the circumference of the pipe and bearing area ofsufficient width along the axis of the pipe two (2) inches minimum, ensuring thatthe pipe will not be distorted when the saddle is tightened. Use Romac Series101N wide band, stainless-steel tapping saddle with AWWA standard thread(Mueller thread) or equal.

(e) Angle Stops. Angle stops shall be in accordance with AWWA C800; ground-key,stop type with bronze lock-wing head stop cap; inlet and outlet threads shallconform to the application tables of AWWA C800; and inlet side shall be a flaredconnection or Mueller 110 compression type or an approved equal.1. Outlet for 3/4-inch and 1-inch size: Meter swivel nut with saddle support.2. Outlet for 1-1/2-inch through 2-inch size: "O-ring" sealed meter flange, ironpipe threads.

(f) Fittings. Fittings shall be in accordance with AWWA C800 and as describedbelow:

1) Castings: Smooth, free from burrs, scales, blisters, sand holes, and defectswhich would make them unfit for intended use.

2) Nuts: Smooth cast and have symmetrical hexagonal wrench flats.

3) Flare-joint fittings: Smooth cast. Seating surfaces for metal-to-metal sealshall be machined to proper taper or curve, free from any pits or protrusions.

4) Thread fittings, of all types, shall have N.P.T. Threads, and male threaded endsshall be protected in shipment by plastic coating or other equally satisfactorymeans.

5) Compression tube fittings shall have Buna-N beveled gasket.

Brass fittings will require the following factory testing:

1) Submerge in water for 10 seconds at 85 p.s.i. with stops in both closed and openpositions.

2) Reject any fittings that show air leakage. The State may confirm tests locally.An entire lot from which samples were taken will be rejected when randomsampling discloses unsatisfactory fittings.

(10) Gate Valves, Tapping Valves and Tapping Sleeves.

(a) Gate Valves. Gate valves shall conform to AWWA Standard C500, C509 and thefollowing supplemental specifications:

Valves used in direct bury and in subsurface vaults shall open clockwise andabove-ground valves shall open counter clockwise.

Page 24: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

24-74 54252-98

If type of valve is not indicated on the plans, gate valves shall be used as linevalves for sizes less than 16 inches. If type of valve is specified, no substitute willbe allowed.

The valve body shall be straight-through or angled, meter-stop design equippedwith the following:

1) O-Ring seal straight plug type.

2) Rubber seat ball type.

The outlet end shall be female, iron-pipe thread or swivel-nut, meter-spud thread on3/4-inch and 1-inch stops and 2-hole flange on 1-1/2 and 2-inch sizes.

(i) Gate valves 1-1/2-inch diameter and smaller shall have an operatingpressure of 125 psi; bronze mounting; rising-stem; single-wedge; disc type;screwed ends; Crane No. 428, or equal.

(ii) Gate valves 2 inches in diameter shall have an iron body; double gate; non-rising stem; 150-pound test; 2-inch square nut operating clockwise to open.

(iii) Gate valves 4-inch to 12-inch diameter shall be non-directional; and resilientseated in accordance with (AWWA C509) or parallel seat double disc inaccordance with (AWWA C500);operating pressure of 200 psi; bronzemounting; push-on bell ends with rubber joint rings and nut operated unlessotherwise specified; resilient seated provide by American Darling AFC-500,US Pipe Metroseal 200 or approved equal; double disc provided by AmericanDarling 52, Clow F-6102 or approved equal; and comply with following:1) Design: Fully encapsulated rubber wedge or rubber seat ring

mechanically attached with minimum 304 stainless steel fasteners or screws; threaded connection isolated from water by compressed rubber around opening.

2) Body: Cast or ductile iron; flange bonnet and stuffing box together with ASTM A307 Grade B bolts. Cast in body manufacturer's initials, pressure rating, and year manufactured.

3) Bronze: Valve components in waterway shall contain not more than 15 percent zinc and not more than 2 percent aluminum.

4) Stems: ASTM B763 bronze, alloy number 995 minimum yield strength of 40,000 psi; minimum elongation in 2-inches of 12 percent; non-rising.

5) "O-rings": AWWA C509, Sections 2.2.6 and 4.8.2.6) Stem Seals: Consist of three (3) "O-rings", two (2) above and one (1)

below the thrust collar with an anti-friction washer located above the thrust collar.

7) Stem Nut: Independent or integrally cast of ASTM B62 bronze.8) Resilient Wedge: Molded; synthetic rubber; vulcanized and bonded to

cast or ductile iron wedge tested to meet or exceed ASTM D429 Method B;or attached with 304 stainless steel screws; seat against epoxy-coated surface in valve body.

Page 25: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

25-74 54252-98

9) Bolts: AWWA C509 Section 2.2.5; stainless steel; cadmium plated, or zinc coated.

(iv) Gate valves 14-inch to 24-inch diameter shall be in accordance with AWWAC500; push-on bell ends with rubber rings and nut operated unless otherwisespecified; double disc; 150 psi; and comply with following:1) Body: Cast or ductile iron; flange together bonnet and stuffing box with

ASTM A307 Grade B bolts. Cast in body manufacturer's initials, pressure rating, and year manufactured. Equip with rollers, tracks and scrapers.

2) Stems: Machined from ASTM B62 bronze rod with an integral forged thrust collar machined to size; non-rising.

3) Stem Seals: Consist of one (1) "O-ring" above and one (1) "O-ring" below the thrust collar with an anti-friction washer located above the thrust collar for operating torque.

4) Stem Nut: Independent or integrally cast of ASTM B62 bronze.5) Discs: Cast iron with bronze disc rings securely peened into machined

dovetailed grooves.6) Wedging Device: Solid bronze or cast-iron, bronze-mounted wedges.

Thin plates or shapes integrally cast into cast-iron surfaces are acceptable. Other moving surfaces integral to wedging action shall be bronze monel or nickel alloy-to-iron.

7) Bronze Mounting: Built as integral unit mounted over, or supported on, cast-iron base and of sufficient dimensions to be structurally sound and adequate for forces which will be imposed on it.

8) Gear Cases: Cast iron; furnished on all 18-inch and larger valves and of extended type with steel side plates; lubricated; gear case enclosed with oil seal or "O-rings" at all shaft openings.

9) Stuffing Boxes: Located on top of bonnet and outside gear case.

(v) Gate valves 20-inch and larger shall be furnished and equipped with bypassvalves.1) Provide 3-inch bypass valves for 20-inch gate valves.2) Provide 4-inch bypass valves for 24-inch gate valves.

Valves 4-inch through 12-inch for installation in vertical pipe lines shall have doubledisc, square bottom.

Valves 14-inch and larger for installation in vertical pipe lines shall be equipped withbronze shoes and slides.

Gate valves installed at greater than four-foot depth shall provide non-rising, extensionstem having coupling sufficient to attach securely to operating nut of valve. Upper endof extension stem shall terminate in square wrench nut no deeper than four (4) feet fromfinished grade.

Gate valves in factory mutual type meter installations shall conform to the provisions ofthis specification with outside screw and yoke valves and should carry the label ofUnderwriters' Laboratories, Inc.

Page 26: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

26-74 54252-98

Coatings shall be in accordance with AWWA C550; Indurall 3300 or approved equaland be: Non-toxic; not impart taste to water; function as physical, chemical, andelectrical barrier between base metal and surroundings; minimum 12-mil-thick; fusion-bonded epoxy; prior to assembly of valve, apply protective coating to interior andexterior surfaces of body.

Provide flange joints when the valve is connected to steel or prestressed concretecylinder pipe.

(b) Tapping Valves. Tapping valves shall be double disc type and meet all therequirements of gate valves, as listed above, except for the type of joints; inletflanges shall meet AWWA C110, Class 125 or shall meet AWWA C110, Class 150or higher and have a minimum eight-hole flange. Outlets shall have standardmechanical or push-on type joints which shall fit any standard tapping machine.

The valve seat opening shall be such that a full size shell cutter for the nominal sizetap may pass through the valve without any contact with the valve body.

Valve boxes shall be furnished and installed as required by this specification.

(c) Tapping Sleeves. Tapping sleeve bodies shall be in accordance with AWWAC110 cast or ductile iron; or AWWA C111 carbon steel; in two (2) sections to bebolted together with high-strength, corrosion-resistant, low-alloy, steel bolts andshall have mechanical joint ends.

Branch outlets of tapping sleeves shall be flanged; machined recess in accordanceAWWA C207 Class D, ANSI 150 pound drilling. The gasket shall be affixedaround recess of the tap opening to preclude rolling or binding during installation.

Steel sleeves shall not be used for taps greater than 75 percent of pipe diameter.

Welded steel tapping sleeve bodies may be used in lieu of cast-iron or ductile iron,subject to the following limitations and requirements:

Flanges shall be AWWA C207, Class D, ANSI 150 pound drilling. Gasket shall beaffixed around recess of tap opening to preclude rolling or binding duringinstallation.

Steel sleeves are restricted to use on pipes sizes 6-inch and larger. No "size-on-size" sleeve will be permitted (i.e., 6 inches x 6 inches, etc.). To accomplish size-on-size connections, the next smaller tap may be made and a LEB (large end bell)increaser used. Where fire service from a 6-inch main is approved, a cast-iron splitsleeve only will be permitted.

The body shall be of heavy welded steel construction. The top half of the bodyshall be grooved to permanently retain a neoprene o-ring seal against the outsidediameter of the pipe.

Steel sleeves shall be fusion-bonded epoxy coated to a minimum 12 mil thickness.The finished epoxy coat shall be free of laminations and blisters; not peel; remain

Page 27: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

27-74 54252-98

pliant and resistant to impact. Ship steel sleeves in wooden crates that provideprotection from damage to epoxy coating during transport and storage.

Bolts and nuts shall conform to AWWA Standard C500, Section 3.5, and shall becoated with a 100 percent vinyl resin (or shall be made of corrosion resistantmaterial).

Tapping sleeves shall be provided with a 3/4-inch NPT test opening for testingprior to tapping. Provide a 3/4-inch bronze plug for the opening.

Steel tapping sleeves shall be Smith Blair No. 622, Rockwell No. 623, JCM No.412 or approved equal.

(d) Air Release and Vacuum Relief Valve. Combination air valves shown on theplans, means combination valves designed to fulfill the functions of air release(permitting escape of air accumulated in the line at the high point of elevation whilethe line is under pressure) and vacuum relief. Air release and vacuum relief valves8-inch and smaller in diameter shall be self-contained in one (1) unit.

(i) Air release valves shall be provided with flanged inlet and outlet connectionsas specified on the plans. For 2-inch and 3-inch single body valves, the orificeshould be sized for 100 psi working pressure. The air relief valve shall beconstructed of materials as follows: body and cover, ASTM A 48, Class 30cast iron; float and leverage mechanism, ASTM A 240 or A 276 stainless steel;orifice and seat shall be stainless against Buna-N or viton mechanicallyretained with hex head nut and bolt. All other valve internals shall be stainlesssteel or bronze. Valve exterior shall be painted with an epoxy shop-appliedprimer. Provide Apco Model 200 or GA Industries Fig. 2-AR or approvedequal.

(ii) Air Release and Vacuum Valves shall be single-body, standard combinationor duplex-body custom combination valves as shown on the plans.

1) For 2-inch and 3-inch, single-body valves, provide inlet and outlet sizes asshown on the plans and an orifice sized for a 100 psi working pressure.Valve materials: Body, cover and baffle, ASTM A48, Class 35, or ASTMA126, Grade B cast iron; plug or poppet, ASTM A276 stainless steel; float,ASTM A240 stainless steel; seat, Buna-N; other valve internals shall bestainless steel. Valve exterior shall be painted with an epoxy shop-appliedprimer. Provide Apco Model 145C or 147C, Val-Matic Series 200, orapproved equal.

2) For 3-inch and larger duplex body valves as shown on the plans, provide anApco Series 1700 with a No. 200 air release valve, GA Industries Fig. No.AR/GH-21K/280, or equal. Air and vacuum valve materials: Body andcover, ASTM A48, Class 35, cast iron; float, ASTM A240 stainless steel;seat, Type-304, stainless steel and Buna-N; other valve internals, stainlesssteel or bronze. Air release valve: Constructed as specified in previousparagraph above on Air Release Valves.

Page 28: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

28-74 54252-98

Valve boxes shall conform to the requirements of Subarticle 2.(11), "Valve Boxes",of this specification.

(e) External Coating Above Ground Valves. Coat valves with a polyurethanecoating conforming to the same requirements under Paragraphs 2.(2)(e)(iii)3.b.).

(11) Butterfly Valves. Butterfly valves and operators shall conform to the requirements ofAWWA Standard C504 Class 150B, except as modified or supplemented herein.

Valves shall be short-body, flanged design for closing against a flow velocity of 16 feetper second at a normal working pressure of 150 psi and with a downstream pressure ofzero (0) psi (Class 150B).

Direct-bury valves and valves in subsurface vaults shall open clockwise. All above-ground and plant valves shall open counter clockwise.

Body shall be cast iron, ASTM 126, Class B.

Discs for valves 12 inches in size and smaller shall be ASTM A435, Type 1 (Ni-Resist),cast iron disc with ni-chrome edge (Pratt TM) or ductile iron with Type 304 or Type316 stainless steel mating edge. Discs for valves 14 inches and larger shall be cast ironor ductile iron.

Valves shall have Buna-N or neoprene seats mounted either on the disc or in the body.The seats shall be mechanically secured and may not rely solely on adhesive propertiesof epoxy or similar bonding agents to attach the seats to the body. Seats on the discshall be mechanically retained by Stainless Steel (18-8) retaining rings held in place bystainless steel (18-8) cap screws that pass through a rubber seat for added retention.When the seat is on the disc, the seat shall be retained in position by shoulders locatedon both the disc and the stainless-steel retaining ring. Mating surfaces for seats shall beType 304, or 316, stainless steel and secured to the disc by mechanical means. Sprayedon or plated mating surfaces will not be allowed. The disc shall be cast-ironconforming to ASTM A126, Class B or ductile-iron conforming to AWWA C151.

Coat all interior wetted ferrous surfaces of valve, including disc, with epoxy suitable forpotable-water conditions. Epoxy, surface preparation, and epoxy application shall be inaccordance with AWWA C550 and coating manufacturer's recommendations. Providetwo (2) coats of two-component, high-build epoxy with minimum dry thickness of 10mils. Epoxy coating shall be Indurall 3300 or equal. Coatings shall be holiday testedand measured for thickness.

Valve shaft and keys, dowel pins, or taper pins used for attaching valve shaft to valvedisc shall be Type-304 or 316 stainless steel. All portions of shaft bearings: Stainlesssteel, bronze, nylon, or Teflon (supported by fiberglass mat or backing material withproven record of preventing Teflon flow under load) in accordance with AWWA C504.

Packing shall be field-adjustable, split-V type, and replaceable without removingoperator assembly.

Page 29: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

29-74 54252-98

Retaining hardware for seats shall be Type-304 or 316 stainless steel. Nuts and screwsused with clamps and discs for rubber seats: Securely held with locktight, or otherapproved method, from loosening by vibration or cavitational effects.

Valve disc shall seat in a position 90 degrees to the pipe axis and shall rotate 90 degreesbetween full-open and tight-closed position. Install valves with valve shafts horizontaland the convex side of the disc facing the anticipated direction of flow, except whereshown otherwise on the plans.

Joint types for installation with cast-iron or ductile-iron pipe shall be push-on or flanged(flanged valves coupled to Bell-Flange adapters may be used). Flanges shall conform indimensions and drilling to ANSI B16.1 for cast-iron body valves, Class 125. Boltsconforming to AWWA Standard C500, Section 9, shall be used in all valveinstallations, including bolts for operators, housing, etc. Flanged joints shall be used forall steel or concrete steel cylinder pipe.

Actuators for valves shall be properly sized gear type for valves 8-inch and larger. GearActuators shall be fully enclosed and traveling-nut type, rack and pinion type, or worm-gear type. Direct bury valves shall be equipped with a 2-inch square nut operatingclockwise to open the valve. The space between the actuator housing and the valvebody shall be completely enclosed. No moving parts shall be exposed to the soil orelements. Actuators shall be oil tight and water tight, and shall be factory packed with asuitable grease. Operators shall conform to the requirements of AWWA Standard C504and shall be equipped with adjustable limit stop devices.

Design for worm-gear and traveling-nut operators shall be such that a torque of 150foot-pounds, or less, will operate valve at the most adverse condition for which valve isdesigned. Vertical axis of operating nut shall not move as valve is opened or closed.

Butterfly valves shall be used as line valves in lieu of gate valves in sizes 16-inch, 20-inch, and 24-inch, except where valve type is specified on the plans, and shall be usedexclusively in sizes larger than 24 inches.

(12) Valve Boxes. Provide Type "A", cast iron, slide-type valve boxes as manufactured byBass and Hays Foundry, Inc. or approved equal. The chemical composition of Casting"A" shall conform to the requirements of AWWA Standard C110. The base of eachvalve box shall be 6-inch cast-iron or ductile iron pipe, conforming to the requirementsof this Special Specification except that the lining & coating will comply with thissection.

Cast a letter "W" into lid, 1/2 inch in height and raised 3/32 inch, for valves servingpotable water lines.

Coat boxes, bases, and lids by dipping in hot bituminous varnish.

(13) Fire Hydrants.

(a) General. Fire hydrants shall conform to the requirements of AWWA C502, exceptas modified or supplemented herein. They shall be of dry-barrel, tamper resistant,and collision-safety construction design. Hydrants shall be from samemanufacturer throughout project.

Page 30: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

30-74 54252-98

Installation of used, salvaged, or reconditioned fire hydrants will not be permittedunless otherwise shown on the plans.

(b) Hydrant Barrel. The lower hydrant barrel shall be fabricated as a single piece,and shall be connected to the upper hydrant barrel by means of a joint coupling thatwill provide 360 degree rotation of the upper barrel. Clearly mark the finish gradeon the barrel. The bury length shall be as specified and shall be the distance fromthe bottom of the inlet to the ground line.

The hydrant barrel shall be provided with a non-tapped, non-corrodible drain ordrip valve, completely of bronze or bronze lined. The drain valve shall operate,automatically and positively, to drain the barrel when the hydrant valve is in thefully-closed position and to completely close the drain opening so as to preventleaking when the hydrant valve is in the open position.

Each hydrant barrel shall be equipped with two (2) 2-1/2 inch nominal insidediameter hose nozzles and one (1) four (4) inch nominal inside diameter pumpernozzle conforming with National (American) Standard Fire Hose Coupling ScrewThreads, bronze (minimum Grade D) (per NFPA No. 194 and ANSI B26-1925).

Field-replaceable nozzles shall be securely fastened into the upper barrel bymechanical means, installed by turning counterclockwise, sealed with O-rings andshall be mechanically locked in place with a security device. All nozzles shall beprovided with nozzle caps and neoprene gasket seals. The caps shall be securelyattached to the hydrant barrel with chains of not less than 1/8-inch diameter. Thepumper nozzle shall be so situated as to allow an unobstructed radius of 10 inchesfrom the threaded surface of the nozzle throughout the path of travel of a wrench orother device used to fasten a hose to the nozzle.

The hydrant shall be oriented so that the pumper nozzle faces the curb or streetnearest the hydrant.

The barrel joint connecting the upper and lower hydrant sections shall be designedso that the hydrant shut-off valve will remain closed and reasonably tight againstleakage in the event of an impact accident resulting in damage or breaking of thehydrant above or near ground level. The joint shall be provided with a breakablebolt flange or breakable coupling that will include an adequate number of bolts,above finish grade.

The operating and hold down nuts shall be fabricated of stainless steel, cast iron orductile iron with bronze inserts. Provide a security device with each hydrantemploying a bronze operating nut to protect this feature of the hydrant frommalicious mischief or unauthorized removal. Any such security devices shall notrequire a special tool for normal off/on operation of the hydrant. The operating nutshall be tapered pentagon 1-1/2 inch point to face at base, and 1-1/8 inch point toface at top of nut, open left (counter clockwise). Hold down assemblies shall befabricated of suitable metallic materials for the service intended.

Page 31: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

31-74 54252-98

The hydrant barrel shall be designed to permit the use of one or more standardextensions, which shall be available from the hydrant manufacturer, in lengths from6-inches to 60-inches in 6-inch increments.

(c) Shut-off Valve and Inlet Shoe. Hydrants shall have circular, compression-typeshut-off valves which close with the water pressure, with center stem constructionand which remains closed and tight against leakage upon impact. Each shut-offvalve shall be circular and not less than 5-1/4 inches in diameter. Seal bottom endof stem threads from contact with water with cap nut. The valve seat ring shall bebronze, threaded into a bronze drain ring to provide an all-bronze drainway. Theseat ring and main valve assembly shall be such that it can be removed from aboveground through the upper barrel by means of a light-weight seat removal wrench.The valve seat facing shall be constructed of molded rubber having a Durometerrating of 90 plus or minus five (5), and shall be a minimum thickness of 1/2 inchand resistant to microbiological attack.

Unless otherwise specified on the plans the hydrant inlet shoe shall be an elbowwith AWWA Standard bell designed for a nominal 6-inch mechanical joint hubend, or push-on assembly as specified. The hydrant shoe shall be of cast or ductileiron pipe and be flanged, swivel or slip joint with harnessing lugs for restrainedjoints. Coat interior of shoe with minimum 12 mils of fusion-bonded epoxyconforming to NSF Standard 61. Underground flanging shall incorporate minimumof six (6) full 3/4-inch diameter electro-galvanized or cadmium coated steel bolts orfour (4) 5/8-inch diameter stainless or cadmium coated steel bolts.

(d) Valve Stem. The operating stems shall be Everdur, or other high-quality non-corrodible metal where threads are located in barrel or waterway. Bronze-to-bronze working parts in waterway; genuine wrought-iron or steel where threads arenot located in barrel or waterway, bronze bushed at penetration of stuffing box; sealthreads against contact with water regardless of open or closed position of mainvalve. The valve stem shall be provided with a breakable stem coupling oppositethe barrel breakaway feature. Connecting pins and locking devices shall beconstructed of bronze or other corrosion-resistant material. The valve stem shall beprovided with a bronze sleeve, o-ring seals and travel stop. Operating threads,working parts and bearing surfaces shall be fully lubricated during normaloperation of fire hydrant. The lubricant shall be contained in a lubricating reservoirwhich shall be sealed at the top and bottom. The operating assembly shall beequipped with a thrust bearing or lubricated thrust collar to minimize operatingtorque. The lubricant shall meet the requirements of FDA 21 CFR 178.3570 and bemanufactured with FDA approved oxidation inhibitors.

The valve stem shall operate to open counterclockwise (turning to the left).

(e) Gaskets and Seals. All dynamic seals shall be "O-ring" type, oil-resistantmaterial, which does not require adjustment for a watertight seal. All moving partsin contact with the seal shall be bronze or other corrosion-resistant material.

Static seals shall be Buna "N", or other approved synthetic composition.

Page 32: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

32-74 54252-98

(f) Painting. Fire hydrant's exterior shall be shop coated with one (1) coat of rustprohibitive primer. Top half of the hydrant from the traffic flange up shall receiveone (1) coat of blue enamel prior to delivery to the job site as outlined by thefollowing:

(i) Exterior Above Traffic Flange (Including Bolts & Nuts). Surfacepreparation shall be in accordance with SSPC-SP10(NACE 2), near white blastcleaned surface.

Coated with a three-coat alkyd/silicone alkyd system with a total dry filmthickness (DFT) of 6-9 mils as follows:

Prime Coat-Oil Modified Alkyd Primer, Acro Products No. 1104, Heavy DutyTank & Steel Primer, or approved equal, shall be in general conformance withSSPC Paint Specification No. 25. Total dry film thickness (DFT) of 2-3 mils.

Intermediate Coat - Heavy Duty Industrial Alkyd Enamel, Acro Products No.2214, or approved equal, shall be in general conformance with SSPC PaintSpecification No. 104, and Federal Standard TT-E-489. Total dry filmthickness (DFT) of 2-3 mils.

Finish Coat - Silicone Alkyd Resin Enamel, Acro Products No. 2215, orapproved equal, shall be in general conformance with SSPC PaintSpecification No. 21. Total dry film thickness (DFT) of 2-3 mils. Except thehydrant bonnet shall not be finish shop coated, only intermediate coated.Finish coating shall be field applied and color coded when installed.

Colors - Primer to be manufacturer's standard color. Finish coat of hydrantbody shall be blue (Acro 555 crystal blue or equivalent). The hose connectioncaps shall be finish coated white, and a white band of finish coat two (2) inchesin width shall be painted on the hydrant body approximately six (6) inchesabove the traffic flange and parallel thereto. Intermediate coat shall be of acontrasting color to the blue finish coat, such as white.

(ii) Exterior Below Traffic Flange. Surface preparation shall be in accordancewith SSPC-SP10 (NACE 2), near - white blast cleaned surface.

Coat with a three (3) coat system as follows:

Primer and intermediate coat - coal tar epoxy, Acro Products No. 4467, orapproved equal, shall be in general conformance with SSPC PaintSpecification No. 16. Apply two (2) coats with a dry film thickness (DFT) of8-10 mils each for a total dry film thickness (DFT) of 16-20 mils.

Finish coat - water based vinyl acrylic mastic, Acro Products No. 7782, orapproved equal. Apply one (1) coat with a dry film thickness (DFT) of 6-8mils. Color of finish coat shall be the same as the finish coat for the exteriorabove the traffic flange i.e., blue (Acro 555 crystal blue or equivalent)

(iii) Interior Surfaces Above and Below Main Valve. All material used forinternal coating of hydrant interior ferrous surfaces below the main valve must

Page 33: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

33-74 54252-98

be NSF61 listed as suitable for contact with potable water as required byChapter 290, "Rules and Regulation for Public Water Systems," Texas NaturalResources Conservation Commission (TNRCC).

Surface preparation shall be in accordance with SSPC-SP10 (NACE 2), near-white blast cleaned surface.

Coating shall be liquid or powder epoxy system and be in accordance withAWWA Standard C-550. Coating may be applied in two (2) or three (3) coats,according to manufacturer's recommendations, for a total dry film thickness of12-18 mils.

(iv) General. All coatings shall be applied in strict accordance with manufacturer'srecommendation. No requirement of this specification shall cancel orsupersede the written directions and recommendations of the specific coatingmanufacturer so as to jeopardize the integrity of the applied system.

The hydrant supplier shall furnish an affidavit of compliance that all materialsand work furnished comply with the requirements of this specification andapplicable standards referenced herein.

After all hydrants have been installed and prior to the main being accepted, theContractor shall paint the bonnet portion of each fire hydrant as follows:

Size of Supply Line Color of Bonnet

6" Yellow8" White

10"-20" Green24"-and larger Orange

The color shades and paint quality shall comply with the current specificationsand is subject to the approval of the Engineer.

(g) Performance Standards.

(i) Provide hydrants capable of a free discharge of 1500 gpm or greater fromsingle pumper nozzle at a hydrant inlet static pressure not exceeding 20 psig asmeasured at or corrected to hydrant inlet at its centerline elevation.

(ii) Provide hydrants capable of a discharge of 1500 gpm or greater from singlepumper nozzle at a maximum permissible head loss of 8.0 psig (whencorrected for inlet and outlet velocity head) for an inlet operating pressure notexceeding 37 psig as measured at or corrected to hydrant inlet at its centerlineelevation.

Hydraulic Performance Testing: AWWA C502; certified pressure loss andquantity of flow test shall be conducted by qualified testing laboratory onproduction model (5-foot bury length) of hydrant (same catalog number)proposed for certification. Submit certified test report containing followinginformation:

Page 34: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

34-74 54252-98

1) Date of test, no more than five (5) years prior, on fire hydrant with similarhydraulic characteristics.

2) Name, catalog number, place of manufacture, and date of production ofhydrant(s) tested.

3) Schematic drawing of testing apparatus, containing dimensions of pipingelements including:

a) Diameter and length of inlet piping.

b) Distance from flow measuring points to pressure measurement point.

c) distance from flow and pressure monitoring points to hydrant inlet.

d) Distance from pressure monitoring point to nozzles.

e) Diameter and length of discharge tubing.

4) Elevation of points of measurement, inlet, and outlet.

5) Reports, or certificates documenting accuracy of measuring devices used intest.

Conduct test on at least three (3) hydrants of the same fabrication design.Inlet water temperature: 70 F plus or minus 5 F.

For Traffic Impact Testing submit a certified test report which outlinesresults of traffic impact test involving standard production models of firehydrant with breakable barrels same in design to that proposed forcertification. Install these hydrants per AWWA C600; strike at point 18inches plus or minus 2 inches above designated ground line. Point ofimpact on hydrant barrel shall be within 2 inches of line perpendicular tobase and equidistant from pumper nozzle and one hose nozzle. Conductsuccessive tests simulating impacts by standard American-made vehicleswith gross weights of 3500, 5500 and 10,500 pounds.

Document tests to provide the following minimum information:

a) Detailed schematic drawing(s) of test facility.b) Complete description of mechanical impact testing equipment used.c) Complete list of hydrant parts and materials damaged in each impact

test.d) Photographs.e) Size and static pressure of line to which hydrant is attached.f) Estimate of amount of water discharged, if any, from hydrant within

thirty minutes immediately following collision.h) Hydrant Leads. Provide hydrant branch leads conforming to the same

requirements under Subarticles 2.(2), 2.(3), 2.(4), or 2.(5) of this specification.

Page 35: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

35-74 54252-98

(14) Polyethylene Film Wrap.

(a) General. Except where noted on the plans, polyethylene film shall be used as awrap to protect cast-iron pipe, ductile-iron pipe and fittings. Polyethylene filmshall conform to the requirements outlined herein and shall only be used in open-cut construction.

(b) Film. The polyethylene film shall be in accordance with ASTM 1248 and AWWAC105, Type 1, Class C, Category 5, Grade J-3, 2.5 to 3 percent carbon blackcontent. Unless otherwise specified on the plans, the film shall be eight (8) milsthick and minimum tensile strength of 1200 to 2500 psi with elongation up to 600percent. It may be furnished either in tubular form or in sheet form. Film intubular form shall be furnished in the following minimum widths:

Minimum Width of Film Tube (when laying flat)

NominalPipe Size

Push-on JointFlat Tube Width

4" 14"6" 17"8" 21"

10" 25"12" 29"14" 33"16" 37"18" 41"20" 45"24" 53"

Film in sheet form shall have a width equal to twice that shown for tube widths.

(c) Polyethylene Tape. The tape used to tape film edges and overlaps shall be three(3) inch wide plastic backed adhesive tape. The tape shall be Polyken No. 900,Scotch Wrap No. 50 or approved equal.

(15) Bedding Material. Unless otherwise specified on the plans bedding for water mainsshall be one of the following:

(a) Bank Run Sand. Bank run sand may be used for bedding as called for in thesespecifications and shall consist of soil classified as SP, SW or SM by the UnifiedSoil Classification System (USCS). The sand shall have a plasticity index, whentested, of less than seven (7) percent and shall have a liquid limit of 25 or less.Bank run sand shall have no more than 15 percent passing the No. 200 sieve whentested. The material shall be free of any roots, organic material, trash, clay lumpsor other deleterious or other objectionable material.

(b) Concrete Sand. Concrete sand may be used as bedding material for water mainsand shall conform to the specifications for Fine Aggregate specified in ASTMStandard C-33. Fine Aggregate shall consist of natural sand, manufactured sand ora combination thereof and shall be graded within the following limits.

Page 36: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

36-74 54252-98

Sieve Size Percent Passing

3/8 inch 100No. 4 95-100No. 8 80-100

No. 16 50-85No. 30 25-60No. 50 10-30

No. 100 2-10

The aggregates shall not consist of any roots, organic material, trash, clay lumps orother deleterious or other objectionable materials, in excess of limits prescribed inthe C-33 Standard.

(c) Pea Gravel. Pea Gravel may be used as bedding material for water mains and shallconform to the specifications for Coarse Aggregates specified for No. 8 size inASTM Standard C-33. Coarse Aggregates shall consist of gravel composed ofsmall, smooth, rounded stones or pebbles and shall be graded within the followinglimits.

Sieve Size Percent Passing

1/2 inch 1003/8 inch 85-100

No. 4 10-30No. 8 0-10

No. 16 0-5

The aggregates shall not consist of any roots, organic material, trash, clay lumps orother deleterious or other objectionable materials, in excess of limits prescribed inthe C-33 Standard.

(d) Gem Sand. Gem sand may be used as bedding material for water mains and shallgenerally conform to specifications for Coarse Aggregates specified for No. 8 sizein ASTM Standard C-33. Specifically, the aggregates shall be graded within thefollowing limits.

Sieve Size Percent Passing

3/8 inch 95-1001/4 inch 60-80

No. 4 15-40No. 10 0-5

The aggregates shall not consist of any roots, organic material, trash, clay lumps orother deleterious or other objectionable materials in excess of limits prescribed inthe C-33 Standard.

(16) Backfill Material. Unless otherwise specified on the plans, sand for backfillencasement of water mains shall be one of the following materials:

(a) Cement Stabilized Sand. Cement stabilized backfill shall contain a minimum offive (5) percent Portland cement per cubic yard of material as placed based on the

Page 37: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

37-74 54252-98

dry weight of the aggregate in accordance with Test Method Tex-120-E. Thematerials shall consist of aggregate, Portland cement, and water. Cement and watershall conform to the material requirements of Item 421, "Portland CementConcrete". Aggregate shall be sand, free from deleterious matter, with a plasticityindex not greater than six (6) when tested by Test Method Tex-106-E.

(b) Earth or Native Soil. Earth or native soil backfill shall consist of soil containingno deleterious material to include trash, wood fragments, organics, or otherobjectionable material. The material may be from either the material removed fromthe excavation or offsite sources. The material may consist of soil classified by theUnified Soil Classification System (USCS) as ML, CH, CL, CL-ML, SC, SP, SM,SW or GC. Earth Backfill proposed to be used shall meet the compactionrequirements specified herein and shall not cause any settlement.

(c) Bank Run Sand. Bank Run Sand may be used for backfill as called for in thesespecifications and shall conform to the same requirements under Section 2.(15)(a),"Bank Run Sand".

(17) Concrete. All concrete shall be Class "A" conforming to the requirements of Item 421,"Portland Cement Concrete", unless otherwise specified on the plans.

All forms shall be left in place unless the Engineer directs that certain sections of theforms be removed.

(18) Grout for Prestressed Concrete Cylinder Pipe Joints.

(a) General. Water shall have total dissolved solids less than 1000 mg/l as measuredin accordance with ASTM D 1888, Method A; chloride ions less than 100 mg/l forslurry and mortar cure, as measured in accordance with ASTM D 512; pH greaterthan 6.5 as measured in accordance with ASTM D1293.

(b) Cement Grout Mixture. Provide cement grout consisting of one (1) part cement,conforming to ASTM C150-Type II, and two (2) parts of fine graded plaster sand,conforming to ASTM C35.

Interior joint grout shall be mixed with as little water as possible so that the groutwill be very stiff but workable.

It shall be capable of being placed with a plastic consistency in the interior pipejoint.

(c) Nonshrink Grout. The nonshrink grout shall meet the following requirements:

It shall be a pre-blended factory packaged material manufactured under rigidquality control, suitable for use in the joints of prestressed concrete cylinder pipe.

It shall contain nonmetallic natural aggregate and shall be nonstaining andnoncorrosive.

It shall conform to the requirements of the Corps of Engineers' Nonshrink GroutSpecification CRD C-621, and ASTM C1107, when tested at fluid consistency.

Page 38: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

38-74 54252-98

It shall be suitable for use in contact with potable water supply.

It shall be highly flowable so that the joint wrapper around the exterior pipe jointcan be filled without leaving any voids or trapped air.

It shall be nonbleeding and nonsegregating at a fluid consistency.

It shall not contain any chlorides or additives which may contribute to corrosion ofthe steel material.

It shall be free of gas-producing or gas-releasing agents.

It shall resist attack by oil and water.

"EUCON N-S Grout" as manufactured by Euclid Chemical Company, Cleveland,Ohio, "Gilco Construction Grout" as manufactured by Cormix ConstructionChemicals, Dallas, Tx. or approved equal shall be considered acceptable.

The nonshrink grout shall be mixed, placed and cured in accordance with themanufacturer's instructions and recommendations.

The manufacturer of the nonshrink grout shall make available, at no additional cost,and upon 72 hours notice, the services of a qualified representative to aid theContractor in assuring proper use of the product under job conditions and shall beon site when the product is first used.

The grout shall have a minimum 7-day unconfined compressive strength of 2500psi, and a minimum 28-day unconfined compressive strength of 5000 psi. Strengthshall be tested in accordance with ASTM C1107.

Joint wrappers shall have minimum width of nine (9) inches for 33-inch diameterpipe and 12 inches for larger diameter pipe. The wrapper shall be hemmed at eachedge to allow threading with a minimum 5/8-inch wide steel strap. Wrappers shallhave a minimum 4-inch wide ethafoam strip sewn circumferentially in the center ofthe 12-inch wrapper and a 6-inch strip in the 9-inch wrapper to resist backfillpenetration into the exterior joint recess.

All forms shall be left in place unless the Engineer directs that certain sections ofthe forms be removed.

(19) Water Meters, Meter Vaults and Meter Boxes.

(a) Water Meters. Provide meters of the type and size as indicated on the plans.

(i) Provide bolted split casings. Main casings of meters and external fasteners:Copper alloy with minimum 75 percent copper for 5/8 inch to 2 inches, bronzeor cast-iron, hot-dipped galvanized or epoxy coating for coating for three (3)inches and larger.

(ii) Straightening Vanes: Noncorrosive material compatible with case material.

Page 39: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

39-74 54252-98

(iii) Intermediate gear train not to come in contact with water; operate in suitablelubricant.

(iv) Register: Standard; permanently sealed; straight-reading; center-sweep testhand; magnetic driven; U.S. gallons; adaptable to remote read. Digits: 6,black in color with lowest registering three digits (below 1,000-gallonregistration) having contrasting digit and background color. Register capacityof meters: 9.99 million gallons for 5/8 inch to 2 inches and 999.999 milliongallons for 3 inches and larger.

(v) Connections: 5/8 inch to 1 inch: Threads at each end; 1-1/2 to 2 inches:Two-bolt oval flanges each end; 3 inches and larger: Flange at each end.

(vi) Register Boxes: Glass: High-impact strength tempered, encased in highcontent copper or stainless steel housing; rings and covers; copper alloy withminimum 57 percent copper.

(vii) Stamp manufacturer's meter serial number on outer case and on outside ofregister lid. Manufacturer's serial numbers shall be individual and notduplicated.

(viii) Meters: Be adaptable to direct-reading, remote registers or electronic meterreading technology. Compound Meter manufactured by: Hersey Products,Neptune, Sensus or equal. Turbine or Fire Service Meter manufactured by:Badger, Hersey Products, Neptune, Sensus or equal. Displacement meter:Badger, Neptune, Sensus or equal.

(ix) Manufacturing Quality Control: Permit successful interchangeability fromone meter to another of same size; registers, measuring chambers and units,discs or pistons as units, change gears, bolts, nuts, and washers withoutaffecting herein specified accuracy of new meter.

(x) Commercial Meter Valves for Meter Installations. Commercial metervalves shall be identical with line valves except that they shall have Class 125flanges, and be equipped with handwheels operating counterclockwise to open.

All pipe and fittings inside the meter box or meter vault shall be ductile-iron orcast-iron conforming with Subarticles 2.(3), "Ductile-Iron Pipe and Fittings"and 2.(4), "Cast-Iron Pipe and Fittings", of this specification and as specifiedon the plans.

(b) Meter Vault.

(i) General. Meter vaults may be furnished in either of the following designs:precast concrete vault, cast-in-place concrete vault or solid masonry, unlessspecific type of construction is required on plans. All concrete shall be Class"S" conforming to the requirements of Item 421, "Portland Cement Concrete".

(ii) Precast Concrete Vault. Precast concrete vault shall be constructed as shownon the plans. All reinforcing steel shall conform to the requirements of Item440, "Reinforcing Steel".

Page 40: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

40-74 54252-98

Install precast vaults in accordance with the manufacturers recommendations.Set level on a minimum 3-inch-thick bed of sand conforming to therequirements of Subarticle 2.(15), "Backfill", of this specification. Liftingholes shall be sealed with cement mortar or non-shrink grout.

(iii) Meter Vault Floor Slab:

1. Construct floor slabs of 6-inch-thick reinforced concrete. Slope floor 1/4-inch per foot toward sump. Make sump 12 inches in diameter, or 12inches square, and four (4) inches deep, unless other dimensions areshown on the plans. Install dowels at maximum of 18 inches, center-to-center, or install mortar trench for keying walls to floor slab.

2. Precast floor slab elements may be used for precast vault construction.

(iv) Cast-In-Place Concrete Vault. Cast-in-place concrete vaults shall beconstructed as shown on the plans. All reinforcing steel shall conform to therequirements of Item 440, "Reinforcing Steel". Key walls to the floor slab.The minimum wall thickness shall be four (4) inches. Walls shall be castmonolithically unless vault depth exceeds 12 feet. If vault depth is 12 feet orgreater, one (1) cold joint shall be allowed.

(v) Frame and Cover. All welded steel shall be A-36 or equal. Cover plate shallbe 1/4 inch skid resistant raised pattern floor plate. Meter access door shall bemade from the same material as cover plate. All welding shall beaccomplished in accordance with the provisions of Item 441, "SteelStructures". Nondestructive testing will not be required.

Castings for frames, grates, rings and covers shall conform to ASTM A48Class 30. Provide locking covers if indicated on the plans. Castings shall becapable of with standing the application of an AASHTO HS-20 loading, unlessotherwise specified.

Covers and frames shall conform to the shapes dimensions, and be providedwith the wording or logos shown on the plans. Standard dimension for allmanhole covers shall be 32 inches. Frames, grates, rings and covers shallconform to Item 471 "Frames, Grates Rings and Covers" except as noted aboveand except for measurement and payment.

(c) Meter Box.

(i) General. Meter boxes for 5/8-inch through 1-inch meters shall be of thefollowing materials:

a) Non-traffic bearing locations shall be Cast-Iron, concrete or plastic asspecified on the plans.

b) Traffic bearing location: Cast-Iron.

Meter boxes for 1-1/2-inch and 2-inch meters shall be cast iron at all locations.

Page 41: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

41-74 54252-98

Meter box lids shall have key-operated, spring type, locking device and shallhave a reading lid. Lids shall contain sufficient metals that meter box can beeasily located with metal detector. If words are specified on the plans, theyshall be cast into lid with letters of 1/2-inch height and raised by 3/32-inch.Size shall read 5/8-inch to 1-inch or 1-1/2-inch to 2-inch.

Meter box dimensions shall conform to the following approximate dimensions.

a) Length: At top 15-1/2 inches; at bottom 20 inches

b) Width: At top 12-1/2 inches; at bottom 14-3/4 inches

c) Height: 12 inches

Meter box extensions 3 inches and 6 inches in height shall be available fromthe manufacturer.

(ii) Cast-Iron Meter Boxes. Cast-iron boxes shall be clean and free from sandblow-holes or other defects and shall conform to the requirements of ASTMA48. Bearing surfaces shall be machined so that covers seat evenly in frames.Boxes and lids shall have dipped, coal-tar-pitch, varnish finish. Provide lock-type meter boxes when shown on the plans. Lock mechanisms shall work withease.

(iii) Concrete Meter Boxes. Concrete meter boxes shall be made of Class "A"concrete conforming to requirements of Item 421 "Portland Cement Concrete".Construct boxes as shown on the plans. Castings shall be free from fractures,large or deep cracks, blisters or surface roughness or any other defects thatmay affect serviceability.

(iv) Plastic Meter Boxes. Plastic meter boxes shall be made of high densitypolyethylene conforming to the following ASTM Specifications:

ASTM Requirement

D256 Impact Strength = 1.9 Ft. Lb./Inch(Izod, Notched)

D256 Impact Strength = 6.4 Ft. Lb./inch(Izod, Un-Notched)

D638 Tensile Strength (2.0 Min) = 3,400 psiD648 Deflection Temperature = 170 degrees FD790 Flexural Modulus = 90,000 psiD676 Shore D Hardness, 55-65 Impact

Strength, Falling Dart Method,100-inch-lb.

Meter boxes shall meet the following test requirements:

1) Static Load: Not less than 2500 pounds using 6-inch disc with directcompression exerted at center of top of meter box with solid plasticlid.

Page 42: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

42-74 54252-98

2) Deflection: Not less than 1000 pounds load required to deflect topedge of meter box 1/8 inch.

Meter box body, without lid, shall weigh approximately seven (7) pounds.

(20) Affidavit of Compliance. Unless otherwise directed by the Engineer, the Contractorwill be required to furnish a manufacturer's affidavit of compliance for each of thematerials used in this project. The affidavit shall certify that factory inspection and allspecified tests have been made and that the material furnished complies with therequirements outlined herein.

(21) Pressure Reducing Station. All station piping, valves and fittings shall be new andunused unless otherwise specified on the plans and shall be of the same type asspecified on the plans.

Concrete shall be Class "S" conforming to Item 421, "Portland Cement Concrete".

Reinforcing steel shall conform to Item 440, "Reinforcing Steel".

A pressure reducing valve (PRV) with strainer shall be provided in the location andarrangement as shown on the plans. The valve body shall be ASTM A 48 cast iron orASTM A 126, Class B cast iron with 125 Class ANSI B16.1 flanges. The valve covershall be ASTM A 48 cast iron. All valve internals shall be Type 303 stainless steel orB-62 bronze. All rubber parts shall be Buna-N. No leather parts shall be allowed.Resilient seat shall have a rectangular cross section.

Control tubing shall contain shutoff cocks with a "Y" strainer. The valve shall beequipped with a valve position indicator.

The valve and valve box shall be initially set in the field by an authorizedmanufacturer's representative. The downstream pressure shall be set at 60 psi. ThePRV shall come with an adjustable and pressure sustaining pilot systems. The mainvalve shall be a diaphragm type valve or piston type valve.

A Cla-Val Model 90-01, or approved equal shall be provided for PRV's 16 inches andsmaller. Cla-Val Model 690-01 or approved equal for 20 inches and 24 inches PRV's.

A basket strainer upstream of the pressure reducing valve shall be provided as shown onthe plans. Strainer body shall be quick-opening type, fabricated steel construction withANSI Class 150 flanges. The basket shall be Type 304 stainless steel.

A Hayward Model 90 or equal shall be used for PRV's 4 inches to 24 inches shall beprovided. When there are space constraints, A Hayward Model 510 or equal for PRV's14 inches or greater, shall be provided.

3. Construction Methods.

(1) Excavation.

(a) Trenches. All water lines shall be constructed in open cut trenches with verticalsides except in those locations where the pipe is to be tunneled, cased or augered.

Page 43: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

43-74 54252-98

The trench shall conform to the dimensions shown in the excavation and backfilldiagram.

Trenches shall be sheathed and braced to the extent necessary to maintain the sidesof the trench in a vertical position throughout the construction period. Excavationgreater than five (5) feet in depth shall be protected as specified by Item 402,"Trench Excavation Protection" or Item 403 "Temporary Special Shoring".

The trench must be opened and excavated to the finished grade. Water mains, towhich the mains under construction are to be connected, must be definitely locatedwell in advance of such connection to allow for possible adjustment of alignmentand/or grade.

Water mains shall be constructed in dry trenches. If it becomes necessary toemploy well pointing or additional sheathing to accomplish this objective, thisadditional work shall be performed by the Contractor without additionalcompensation.

For pipes under 20 inches in diameter, minimum trench width below top of pipeshall be outside diameter of pipe plus 12 inches. For pipes 20 inches and larger,trench width below top of pipe shall be not less than outside diameter of pipe plus18 inches, but not wider than outside diameter of pipe plus 24 inches. Additionalwidth will be required for unstable conditions. Unstable conditions will bedetermined by the Engineer.

Where it is necessary to excavate trenches adjacent to improved property, theContractor will be required to take necessary precautions so as not to damage orimpair that property. Where it is necessary to disturb grass, shrubs, driveways, etc.,the Contractor will be required to restore such improvements to their originalcondition.

Use sufficient trench width or benches above the embedment zone for installationof well point headers or manifolds and pumps where depth of trench makes ituneconomical or impractical to pump from the surface elevation. Provide sufficientspace between shoring cross braces to permit equipment operations and handling offorms, pipe, embedment and backfill, and other materials.

Before moving supports, place and compact embedment to sufficient depths toprovide protection of pipe and stability of trench walls. As supports are moved,finish placing and compacting embedment.

Immediately prior to placement of embedment materials, the bottoms and sidewallsof trenches shall be free of loose, sloughing, caving, or otherwise unsuitable soil.

Perform placement and compaction directly against the undisturbed soils in thetrench sidewalls, or against sheeting which is to remain in place.

Do not place trench shields or shoring within height of the embedment zone unlessmeans to maintain the density of compacted embedment material are used. Ifmoveable supports are used in embedment zone, lift the supports incrementally toallow placement and compaction of the material against undisturbed soil.

Page 44: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

44-74 54252-98

Place haunching material around the pipe and compact it to provide uniformbearing and side support.

Place trench dams in Class I embedments near the midpoint of line segments longerthan 100 feet between manholes.

Where damage to completed pipe installation work is likely to result fromwithdrawal of sheeting, leave the sheeting in place.

(b) Existing Streets. Unless otherwise shown on the plans, all existing streets shall beopen cut.

Where water line construction necessitates cutting through existing streets outsidethe limits of new street construction, said streets shall be replaced in kind inaccordance with the appropriate specifications in the proposal or as directed by theEngineer.

Where, in the opinion of the Engineer, it is necessary to maintain traffic across atrench, the Contractor will be required to construct temporary bridges as necessaryto facilitate the movement of traffic.

At locations where the proposed water main parallels the edge of an existingpermanent pavement (i.e., concrete pavement, concrete base with asphalt surface,etc.), and is three (3) feet or less from the edge of that pavement, the trench shall beprotected with timber sheathing and bracing. Bracing shall be left in place atintervals not to exceed five (5) feet.

The street surface adjacent to the trench must be kept free of surplus spoil.Construction materials shall be placed at locations that will minimize interferencewith the traveling public.

No more than two (2) street intersections shall be closed at any one time unlessauthorized by the Engineer in writing.

(2) Jacking, Tunneling or Augering.

(a) General. Jacking, tunneling or augering for water mains shall be performed at thelocations shown on the plans and at such other locations specifically designated bythe Engineer.

Unless otherwise shown on the plans, casing pipe shall conform to the requirementsof Section 2.(2)(b), "Steel Casing Pipe", of this specification.

All auger pits shall be excavated to a finished grade at least six (6) inches lowerthan that indicated by the construction stakes or as approved by the Engineer toensure that a dry bottom is encountered.

The minimum width of jacking, tunneling or augering pits shall be such that thereshall be at least six (6) inches of space between the pipe and the walls of the augerpit. The maximum allowable width of the pit shall be five (5) feet unless approvedby the Engineer. The width of the pit at the surface shall not be less than at the

Page 45: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

45-74 54252-98

bottom. The maximum allowable length of the pit shall be not more than five (5)feet longer than one (1) full joint of pipe of the type being used and shall notexceed 25 feet unless approved by the Engineer.

There must be no inadvertent metallic contact between casing and carrier pipe.Spacing of spacers should ensure that carrier pipe is adequately supportedthroughout its length, particularly at ends, to offset settling and possible electricalshorting. End spacer must be within six (6) inches of end of casing pipe, regardlessof size of casing and carrier pipe or type of spacer used. Casing spacers aredesigned to withstand much greater loads than can be safely applied to mostcoatings. Therefore, spacing between spacers depends largely on load bearingcapabilities of pipe coating and flexibility of pipe.

Casing spacers should be installed in accordance with manufacturer's instructions.Special care should be taken to ensure that all subcomponents are correctlyassembled and evenly tightened, and that no damage occurs during tightening ofinsulators or carrier pipe insertion.

Annulus between carrier pipe and casing should be sealed with casing end seals ateach end of casing.

Insulator Spacing:

1) Spacing shall be as shown on the plans with the maximum distancebetween spacers to be 10 feet for pipe sizes 4-inch to 14-inch and 8 feetfor pipe sizes 16-inch to 30-inch.

2) For ductile iron pipe, flanged pipe, or bell-and-spigot pipe, spacers shouldbe installed within one (1) foot on each side of the bell or flange and onein the center of the joint when 18 to 20 foot-long joints are used.

3) If casing or carrier pipe is angled or bent, spacing should be reduced.

Bedding and backfill of jacking, tunneling, boring or augering pits shall be inaccordance with details on the plans and these specifications.

(b) Jacking of Steel Casing. Jacking of steel casing shall conform to the requirementsof Item 476, "Jacking, Boring or Tunneling Pipe".

(c) Tunneling. Tunneling shall conform to the requirements of Item 476, "Jacking,Boring or Tunneling Pipe".

(d) Augering. Boring or augering shall conform to the requirements of Item 476,"Jacking, Boring or Tunneling Pipe".

Do not exceed 100 feet for length of auger hole without intermediate pit.

Do not exceed 75 feet for length of auger hole for PVC pipe 12 inches and less indiameter without intermediate pit.

Do not exceed 40 feet for length of auger hole for PVC pipe 16 inches and greaterin diameter without intermediate pit.

Page 46: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

46-74 54252-98

At all locations where water pipes cross underneath driveways (of 16 feet or less inwidth) and/or sidewalks, pipe shall be installed in tight fitting augered holes.

At locations where the centerline of the proposed water main is 10 feet or less fromthe centerline of an eight (8)inch diameter or larger growing tree, the pipe shall beplaced in a tight fitting augered hole. The bored hole shall extend at least four (4)feet beyond each side of the tree.

The void space around the pipe in the augered hole shall be blocked withapproximately 12 inches of packed clay or similar material approved by theEngineer, in such a manner that the bedding or backfill does not escape into thevoid around the pipe in the auger hole when compacted. The minimum volume ofthe clay or similar acceptable material to be used around the pipe shall be asfollows:

Pipe Diameter Minimum Quantity

4" thru 8" 0.5 cubic feet12" thru 16" 0.75 cubic feet

(e) Bedding for Trenches, Jacking, Tunneling, Boring or Augering Pits.

(i) Pipe Bedding for Water Mains less than 30 inches in Diameter.

1) Open Cut Installation. All trenches shall have a minimum of six-inchbedding.

The soil in the bottom of the trench, excavated for a depth of six (6) inchesbelow the bottom of pipe, shall be removed and replaced with beddingmaterial. All saturated material from the bottom of the pit shall be removedprior to placing the bedding. The pipe shall be placed in the bedding suchthat there is a six-inch bedding below and up to the spring line of the pipe.All bedding material shall be compacted to standard density within five (5)percent of optimum moisture as determined by Test Method Tex-113-E.All bedding material shall be mechanically compacted by using vibratoryequipment or any other equipment acceptable to the Engineer.

2) Auger Pits. All auger pits shall have a minimum of six-inch bedding. Thesoil in the pit, excavated for a minimum depth of six (6) inches below thebottom of pipe shall be removed and replaced with bedding material.

All saturated material from the bottom of the pit shall be removed, prior toplacing the bedding material. The pipe shall be placed in the bedding suchthat there is a six-inch bedding below and up to the spring line of the pipe.

All bedding material shall be mechanically compacted by using vibratoryequipment or any other equipment acceptable to the Engineer. All beddingmaterial shall be compacted to 90 percent of the standard density withinfive (5) percent of optimum moisture, as determined by Test Method Tex-113-E.

Page 47: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

47-74 54252-98

3) The following are the acceptable materials for bedding as described inSubarticle 2.(15), "Bedding Material", of this specification:

a) Pea Gravel; b) Concrete Sand; c) Gem Sand.

Bank run sand may be used as bedding material around the pipe only if, inthe opinion of the Engineer, the trench bottom and sides are dry. If sand isused, the pipe shall be placed in the bedding such that there is at least a six-inch bedding around and on top of the pipe. Sand shall be compacted asdescribed in (1) above.

(ii) Pipe Bedding for Large Diameter Water Mains (30 Inches or Greater inDiameter).

Open Cut. The soils in the bottom of the trench shall be excavated six (6)inches below the specified bottom of pipe for either concrete, ductile iron pipe,or steel waterlines. The six-inch space shall be backfilled with bank run sandand compacted to 90 percent of the standard maximum density within five (5)percent of optimum moisture, as determined by Test Method Tex-113-E.

If, the bottom of the excavation becomes wet due to the presence ofgroundwater and a dewatering system is not required and if directed by theEngineer, the Contractor shall over excavate an additional six (6) inches to adepth of one (1) foot below the bottom of the pipe. The Contractor shall placea non-woven geotextile fabric and then compact 12 inches of bank run sand orconcrete sand in one (1) lift on top of the fabric. The upper six (6) inches shallbe compacted to 90 percent of the standard maximum density as determined byTest Method Tex-113-E. The Engineer may require removal of unstable orunsuitable material by the Contractor, even though the Contractor has notdetermined the material to be unsuitable.

Cement stabilized sand utilized as backfill or as pipe bedding as specified onthe plans shall be compacted in six-inch lifts to 90 percent of the standardmaximum density as determined by Test Method Tex-113-E, at optimummoisture content.

(3) Handling of Pipe and Accessories. At all times during pipe construction operations,the Contractor shall use every precaution to prevent injury to the pipe, protective liningsand coatings in accordance with manufacturer's recommendations. The Contractor shallnot place debris, tools, or other materials in the pipe.

Any damage to the pipe or the protective lining and coating from any cause during theinstallation of the pipeline and before final acceptance by the purchaser shall berepaired at the expense of the laying contractor as directed by the Engineer and inaccordance with the applicable standards.

Pipe, fittings, valves and accessories shall be unloaded at the point of delivery andhauled to the site of the project. The material shall be distributed opposite or near theplace where it is to be laid in the trench such that storm water or runoff will not enter or

Page 48: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

48-74 54252-98

pass through the pipe. Under no circumstances shall the materials be dropped. Pipehandled on skidways shall not be skidded or rolled against pipe already on the ground.

All pipe and fittings shall be loaded, transported, unloaded and otherwise handled in amanner and by methods which will prevent damage of any kind thereto. Pipe shall behandled and transported with equipment designed, constructed and arranged to preventdamage to the pipe, lining and coating. Bare chains, hooks, metal bars, or narrow skidsor cradles will not be permitted to come in contact with the coatings. Provide pipefittings with sufficient interior strutting or cross-bracing to prevent deflection undertheir own weight.

Pipe and fittings shall be hoisted from the trench side into the trench by means of a slingof smooth steel cable, canvas, leather, nylon or similar material. Pipe shall not be liftedusing hooks at each end of the pipe. When pipe is stacked, pipe is to be packaged ontimbers. Protective pads are to be placed under banding straps at the time of packaging.

When fork trucks are used to relocate pipe, the forks shall be padded using carpet orsome other suitable type of materials. When pipe is relocated using a crane or backhoe,nylon straps or smooth steel cable and not chains shall be used around the pipe for lift.

(4) Pipe Cutting. Cast-iron and ductile-iron pipe, 12 inches in diameter and smaller, shallbe cut in accordance with the manufacturers recommendations. All pipe larger than 12inches shall be cut in a manner approved by the Engineer. Each cut shall be at rightangles to the axis of the pipe and shall be filed or grind to remove sharp edges.

(5) Defective or Damaged Material. Pipe and accessories shall be inspected for defectsprior to being lowered into the trench. Any defective, damaged, or unsound materialshall be repaired or replaced as directed by the Engineer.

Should a damaged piece of pipe furnished by the Contractor be placed in the watermain, the Contractor shall furnish at his expense all labor and materials required forremoving and replacing the defective pipe and restoring the street to its originalcondition. Should the Contractor damage the pipe after installation, the Engineer maypermit the damaged section to be cut from the length unless it is the opinion of theEngineer that the entire length was damaged. The cost and replacement of broken pipewill be at the expense of the Contractor.

(6) Cleaning of Pipe and Accessories. All lumps, blisters and excess coating shall beremoved from the bell and spigot ends of cast-iron pipe, ductile-iron pipe, valves,hydrants and fittings. The outside of the spigot and the inside of the bell shall be wirebrushed and wiped clean, dry and free from oil and grease before the pipe is laid.

All foreign matter or dirt shall be removed from the interior of all water pipe andaccessories and from the mating surfaces of the joints prior to lowering the material intothe trench. The pipe and accessories shall be kept clean during and after laying bymeans approved by the Engineer.

Cleaning solutions, detergents, solvents, etc. should be used with caution when cleaningPVC pipe.

Page 49: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

49-74 54252-98

(7) Laying of Pipe. For the work of laying the pipe, the Contractor shall employ onlyworkers who are skilled and experienced in laying pipe of the type and jointconfiguration being furnished. It shall be the responsibility of the Contractor to providewatertight pipe and pipe joints. Pipe shall be laid with bell ends facing in the directionof laying, unless otherwise directed by the Engineer.

Pipe shall be laid to the lines and grades shown on the plans. To ensure properplacement, the Contractor shall use adequate surveying methods and equipment andshall employ personnel competent in the use of this equipment. The pipe shall notdeviate from the horizontal and vertical alignment as indicated on the plans by morethan 0.10 foot without prior approval of the Engineer. The Contractor shall measureand record the "as-built" horizontal alignment and vertical grade at a maximum of every50 feet on the on-site recorded plans.

Pipe trenches shall be kept free of water which might impair pipe laying operations atall times during laying operations. Holes for bells shall be of ample size to prevent bellsfrom coming in contact with the subgrade. Pipe trenches shall be carefully graded so asto provide uniform support along the bottom of pipe.

Not more than 50 feet of pipe shall be laid in the trench ahead of backfilling operationsand if pipe laying operations are interrupted overnight, all pipe laid in the trench shallbe covered simultaneously on each side of the pipe or backfill completed to avoidlateral displacement of the pipe and damage to the joints. If adjustment of the positionof a length of pipe is required after it has been laid, it shall be removed and re-laid inaccordance with these specifications and at the Contractor's expense. After all pipelaying and joining operations are completed, the inside of the pipe shall be cleaned andall debris removed.

Care shall be taken to prevent damage to the coating when placing backfill. Backfillingshall be in accordance with Subarticle 3.(9), "Backfilling", of this specification.

Pipe shall be laid in a straight line unless otherwise shown or approved by the Engineer.Long radius curves, either horizontal or vertical, may be laid with standard pipe bydeflections at the joints. If the pipe is shown curved and no special fittings are needed,the curves can be made by deflection of the joints with standard lengths of pipe asapproved by the Engineer. Maximum pipe joint deflection, if permitted, shall notexceed the pipe manufacturer's recommendation. Gasketed pipe shall be jointed in astraight alignment and then deflected to the curved alignment.

If the deflection exceeds the maximum recommended by the manufacturer, theContractor shall be required to remove the entire portion of the deflected pipe sectionand install new pipe as directed by the Engineer. This work will not be paid for but willbe at the Contractor's entire expense.

Where field conditions require deflection curves not shown on the plans, the Engineerwill determine the methods to be used. No additional payment will be made for layingpipe on curves as shown, nor for field changes involving standard lengths of pipedeflected at the joints.

Page 50: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

50-74 54252-98

Assessment of deflection may be measured by the Engineer at any location along pipe.Arithmetical averages of the deflection or similar average measurement methods willnot be deemed as meeting the intent of the standard.

The pipe, valves, hydrants and fittings shall be adjusted so as to be at their properlocations and each joint shall be prepared as specified in Subarticle 3.(8), "Joining ofPipe and Appurtenances", of this specification. As each joint of pipe is laid in thetrench, the spigot end shall be centered in the bell of the previously laid pipe; the pipeshall be forced home and brought to correct line and grade. Each length of pipe shallrest on the bottom of the trench throughout its entire length.

Whenever the laying of pipe is discontinued for the day or for an indefinite period, acap or plug shall be tightly placed in the end of the last pipe laid to prevent the intrusionof water. When water is excluded from the interior of pipe, enough backfill shall beplaced on the pipe to prevent floating. The Contractor shall schedule his work toprevent the possibility of floatation. Any pipe that has floated shall be removed fromthe trench and relaid as directed by the Engineer.

When PVC pipe has been assembled on top of the trench, it shall be allowed to cool toground temperature before backfilling to prevent pull out due to thermal contraction.

For Prestressed Concrete Cylinder Pipe, the manufacturer shall provide the services of aservice representative for a period of not less than two (2) weeks at the beginning of theactual pipe laying operations to advise the Contractor in all aspects of installationincluding but not limited to handling and storing, cleaning and inspecting, coatings andlinings repairs, and general construction methods as to how they may affect the pipe.

Confirm that separation from gravity sanitary sewers and manholes or from force mainshave minimum clearance as specified herein or nine (9) feet in all directions unless aspecial design is shown on the plans.

(i) Parallel water line and gravity sanitary sewer, force main or manhole with noleaks: Minimum four (4) foot horizontal clearance from outside wall of waterline to outside wall of gravity sanitary sewer, force main, or manhole.

(ii) Water line crossing above a gravity sanitary sewer or force main with no leaks:Minimum two (2) foot vertical clearance.

(8) Joining of Pipe and Accessories.

(a) Cast-Iron Pipe, Ductile-Iron Pipe, Valves, Hydrants and Fittings. Followingthe thorough cleaning of the inside of the bell and the outside of the spigot,members shall be installed in accordance with the manufacturer's recommendationand AWWA C600 or as modified by these specifications.

Pipe and accessories that are not furnished with a depth mark shall be markedbefore assembly to assure that the spigot end is inserted to the full depth of thejoint.

The fittings on small mains shall be braced with short pieces of two-inchgalvanized pipe as directed by the Engineer.

Page 51: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

51-74 54252-98

Each cast-iron plug installed under this contract shall be braced by a standard pipeclamp, a 3-foot nipple of the same diameter pipe as the nearby sections of mains,and a block of concrete. Pipe clamps for 4-inch through 12-inch water mains shallbe Underwriters approved for underground water service piping. Pipe clamps forwater mains 16-inch and larger shall conform to details shown on the plans.

Lubrication for rubber-gasketed joints shall be water soluble, non-toxic, non-objectionable in taste and odor imparted to the fluid, non-supporting of bacteriagrowth, and have no deteriorating effect on coatings or the rubber gaskets.

(b) Polyvinyl Chloride Pipe and Accessories. Plastic pipe shall be joined inaccordance with the instructions furnished by the manufacturer. Pipe joined usingsolvent cementing techniques shall not be handled or installed in the trench untilafter the joints are sufficiently "cured" to prevent weakening the joint.

Lubrication for rubber-gasketed joints shall be water soluble, non-toxic, non-objectionable in taste and odor imparted to the fluid, non-supporting of bacteriagrowth, and have no deteriorating effect on PVC or the rubber gaskets.

(c) Welded Joints for Steel Pipe. The joints shall receive a butt weld type doubleweld, in accordance with AWWA C206. Either automatic or hand welders may beused at the Contractor's option. Prior to work being started, the Contractor shallprovide proof of certification of qualification for all welders employed on theproject for all the type of work procedures and positions involved. Qualificationshall be in accordance with AWWA C206. Complete penetration of depositedmetal with base metal shall be assured. The inside fittings and joints must be freefrom globules of weld metal which would restrict flow or become loose.

For 36-inch diameter and larger pipe, the joints are to be furnished with trimmedspigots (Carnegie shaped joint only) and interior welded. For 30-inch diameter andsmaller pipe, the joints to be welded are to be exterior welded.

Miter end cuts of both ends of butt-welded joints may be used for joint deflectionsof up to 2-1/2 degrees.

All fittings and joints shall be set square and true, and the alignment shall bepreserved during welding operations. The alignment of the butting ends shall besuch as to minimize the offset between surfaces. For pipe of the same nominal wallthickness, the offset shall not exceed 1/16 inch. Line-up clamps shall be used forthis purpose; however, care must be taken to avoid damage to linings and coatings.

During welding, the lining shall be protected by draping an 18-inch-wide strip ofheat-resistant material over the top half of pipe on each side of lining holdback toavoid damage to the lining by the hot splatter. The tape coating shall be similarlyprotected.

Welding rods shall be of a type compatible with the metal to be welded to obtainthe strongest bond, E-70XX.

Page 52: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

52-74 54252-98

The metal shall be deposited in successive layers so that there will be at least two(2) passes or beads for automatic welding and three (3) passes or beads for manualwelding in the completed weld.

On all welds, not more than 1/4-inch of metal shall be deposited on each pass.Each individual pass, including the final one, shall be thoroughly cleaned by wirebrushing and/or hammering to remove dirt, slag, or flux.

Welding shall not be performed under any weather condition that would impair thestrength of the weld, such as wet surface, rain or snow, dust or high winds, unlessthe work is properly protected.

Tack welds, if used must be of the same material and made by the same procedureas the completed weld. Otherwise, tack welds shall be removed during weldingoperation.

Dirt, scale and other foreign matter shall be removed from inside piping beforetying in sections, fittings or valves.

The Contractor shall have an independent certified testing laboratory, approved bythe Engineer, to perform weld tests on all portions of the job. The cost of suchtesting shall be included in the contract unit bid price for the water main. Copies ofall test reports shall be furnished to the Engineer for review. Testing shall be madeby X-ray methods for butt welds, for 100 percent of all joint welds. If a defectiveweld is revealed, the cost of the repair and the retesting of the repaired weld will bepaid for by the Contractor. The Engineer shall have the full and final decision as tothe suitability of all welds tested. If any interior or exterior coating or lining isdamaged during the welding process, it shall be repaired and returned to its originalstate as approved by the Engineer in accordance with all applicable AWWAStandards.

(d) Flanged Joints for Steel Pipe. Prior to the installation of bolts, the flange jointsshall be accurately centered and aligned to prevent mechanical prestressing offlanges, pipe and appurtenances. Bolt holes shall be aligned to straddle the vertical,horizontal or north-south center line. The inclination of the flange face from truealignment shall not exceed 3/64-inch per foot.

Use full-face gaskets for all flanged joints. Provide 1/8-inch thick cloth insertedrubber gasket material. Cut gaskets at the factory to proper dimensions.

Use Cadmium plated steel nuts and bolts. Bolts shall be tightened progressively toprevent unbalanced stress. Bolts shall be drawn tight to ensure proper seating ofgaskets.

The Contractor shall pay particular attention to procedures used in tightening andtorquing flanged joints. Improper methods may result in leakage and necessitatecorrective measures. The Contractor should follow recommended industrystandards and guidelines as set forth by the various fabricators and manufacturers.

(e) Rubber Gasketed Bell-and-Spigot Joints For Use On Prestressed ConcreteCylinder Pipe. After the rubber gasket is placed in the spigot groove of the pipe,

Page 53: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

53-74 54252-98

the rubber gasket cross section shall be equalized by inserting a tool or bar such asa large screwdriver under the rubber gasket and moving it around the periphery ofthe pipe spigot. The gaskets shall be lubricated with a nontoxic water-solublelubricant before the pipe units are jointed. The pipe units shall be fitted together ina manner to avoid twisting or otherwise displacing or damaging the rubber gasket.After the pipe sections are joined, the gaskets shall be checked with a feeler gaugeto ensure that no displacement of the gasket has occurred. If displacement hasoccurred, the pipe section shall be removed and the joint shall be remade as if fornew pipe. Remove the old gasket, inspect for damage and replace if necessarybefore remaking the joint.

(f) Welded Joints For Use On Prestressed Concrete Cylinder Pipe. See therequirements of Section 3.(8)(c), "Welded Joints for Steel Pipe", of thisspecification.

(g) Flanged Joints For Use On Ductile-Iron Pipe and Prestressed ConcreteCylinder Pipe. See the requirements of Section 3.(8)(d), "Flanged Joints for SteelPipe", of this specification.

(h) Joint Grouting For Use On Prestressed Concrete Cylinder Pipe. The groutshall be mixed in a machine mixer except when less than 1/2 cubic yard will beused. Where less than 1/2 cubic yard is required, grout may be hand mixed. Onlythe amount of grout needed for immediate use shall be mixed. Grout that has setshall be discarded. Retempering of grout by any means is not permitted.

Grout shall be prepared in small batches so as to prevent stiffening before it is used.Any grout which has become so stiff that proper placement cannot be assured shallbe discarded. Grout for filling grooves shall be of such consistency that it willadhere to the ends of the pipe.

Surface preparation shall involve the removal of all defective concrete, dirt, oil,grease and other foreign material from concrete surfaces by brush, hammering,chipping or other similar means, until a sound, clean concrete surface is achieved.Rust and all foreign materials shall be removed from all metal surfaces that willcontact with the grout.

Refer to Item 420, "Concrete Structures", for special precautions to be used forconcreting during periods of hot or cold weather.

The completion of the outside joint operations and backfilling of the pipe trenchesshall follow pipelaying operations as closely as practical.

Prior to filling the joint with grout, the outside space shall be flushed with water sothat the surfaces of the joint in contact with the grout filling will be thoroughlycleaned and moistened before the grout is poured.

After each joint is fully engaged, a joint grout band consisting of an ethyfoamdiaper material shall be secured around the pipe, over the exterior joint recess insuch a manner that there will be essentially no leakage of grout. There shall be no

Page 54: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

54-74 54252-98

additional bedding or backfill material placed on either side of the pipe until afterthe grout band is filled and the grout has mechanically stiffened.

The band shall be completely filled with grout in one (1) operation by filling fromone (1) side only until the grout rises on the opposite side, and then rodded oragitated on both sides of the pipe alternately to settle the grout. The grout shallthen not be agitated for at least 15 minutes to allow excess water to seep throughthe joint band and to allow the grout to mechanically stiffen. After this period,more grout shall be added if necessary to fill the joint completely.

The gap at the top of the joint band shall be protected from backfill by allowing thegrout to stiffen, or by covering with a structurally protective material. The bandshall not be removed from the joint.

For 36-inch and larger diameter pipe, once the backfill has been placed andcompacted up to the natural ground surface, pavement or subgrade, the inside jointspace shall be cleaned and the joint surfaces shall be thoroughly wetted beforebeing filled with stiff grout which shall be troweled smooth and flush with theinside surfaces of the pipe.

For 30-inch and smaller pipe, prior to backfill being placed and compacted, theinside joint recess shall be filled immediately prior to placing the pipe together by"buttering" the bell end with grout. After the joint is engaged, the joint grout shallbe finished off smooth and clean as follows:

A swab as approved by the Engineer, shall be used for pipe 20 inches and smallerin diameter.

For the 24-inch diameter pipe and larger, joints shall be finished with a handtrowel.

All improperly cured or otherwise defective grout shall be removed and replaced bythe Contractor at the Contractor's expense. The Engineer reserves the right to testthe grout strength at random.

When prestressed concrete cylinder pipe is installed in a tunnel or encasement pipeand clearance within the casing does not permit the outside grout to be placed in thenormal manner, a flexible sealer, such as Flex Protex or approved equal, shall beapplied to the outside of the joint prior to joint engagement. The surfaces receivingthe sealer shall be cleaned and primed in accordance with the manufacturer'srecommendation. Sufficient quantities of sealer shall be applied to assure completeprotection of all steel in the joint area. The interior of the joint shall be filled withgrout as specified after joint closure.

Grouting of the inside joint space for 36-inch diameter pipe and larger shall beaccomplished as the joints are engaged. Contractor must obtain written acceptancefrom the Engineer of the inside joints before proceeding with the next day's pipelaying operation.

(9) Closures and Field Modifications of Prestressed Concrete Cylinder Pipe. Applywelded-wire fabric reinforcement to interior and exterior of all exposed interior and

Page 55: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

55-74 54252-98

exterior surfaces greater than six (6) inches in diameter. Welded-wire fabric: MinimumW1; maximum spacing two (2) inches by four (4) inches; 3/8-inch from surface of steelplate or middle third of lining or coating thickness for mortar thickness less than 3/4-inch.

Fill all exposed interior and exterior surfaces with nonshrink grout.

(10) Thrust Restraint. Provide adequate temporary blocking of fittings when makingconnections to distribution system and during hydrostatic tests. Provide sufficientanchorage and blocking to resist all stresses and forces encountered while tappingexisting waterline. For new water lines 12 inches in diameter and larger, restrain jointsas specified in this section. For existing waterlines and waterlines less than 12 inches indiameter, restrain pipe joints with concrete thrust blocks or provide joints as specified inthis section.

The length of the restrained joints, as shown on the plans, assumes that hydrostatictesting will begin upstream and proceed downstream with respect to the normal flow ofthe water in the pipe. If installation or testing of the pipe differs from this assumption,the Contractor shall submit for approval a revised method of restraining the pipe jointsupstream and/or downstream of the device used to test against (i.e., block valve, blindflange, or dished head plug).

(11) Electrical Continuity Bonds. General: Bond wires shall be attached at the requiredlocations by the thermite welding process.

Thermite Welding Methods: Thermite welding of bond wires to the piping shall beperformed in the following manner:

1) The pipe to which the wires are to be attached shall be clean and dry.

2) Use a grinding wheel to remove coating, mill scale, oxide, grease and dirt from anarea approximately three (3) inches square. Grind the surface to bright metal.

3) The wires to be thermite welded to the structure shall have approximately 1-inch ofinsulation removed from each end, exposing clean, oxide-free copper for welding.

4) Select the proper size thermite weld mold as recommended by the manufacturer.Placed the wire between the graphite mold and the prepared metal surface. All wiresNo. 12 AWG size shall use a copper sleeve crimped over the wire.

5) Place the metal disk in the bottom of the mold.

6) Place the thermite weld charge in the mold. Squeeze the bottom of the cartridge tospread ignition powder over the charge.

7) Close the mold cover and ignite the starting powder with a flint gun.

8) After the exothermic reaction, remove the thermite weld mold and gently strike theweld with a hammer to remove the weld slag. Pull on the wire to assure a secureconnection. If the weld is not secure or the wire breaks, repeat the procedure with anew wire.

Page 56: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

56-74 54252-98

9) If the weld is secure, coat bare metal and weld metal with a coal-tar compound. If apolyurethane dielectric coating has been used, use a compatible polyurethanecoating.

(12) Backfilling.

(a) General. The Contractor will be required to backfill all trenches in accordancewith the requirements of Item 400,

"Excavation and Backfill for Structures", except for measurement and payment.

The backfill and clean-up of each section of main, i.e., from valve to valve, shallbegin immediately upon the completion of the hydrostatic test and shall continueuntil a final and complete clean-up of the section is obtained. Any portion of thetrench which is left open in excess of that required to facilitate hydrostatic testingmay be ordered closed by the Engineer.

Surplus excavated materials are to be used in the embankments or disposed of asdirected by the Engineer.

(b) Pipe Backfill for Water Mains.

(i) Open Cut. Following completion of the pipe joints being made up andinspected. All trenches shall be backfilled with excavated materials or anyother backfill material covered by this specification as approved by theEngineer. The portion from springline of the pipe (or from six (6) inches ontop of pipe if sand bedding is used) to the top of the trench shall be backfilledin lifts not to exceed nine (9) inches loose measurement. (Provided the trenchis not located in sidewalks, roadways, roadway shoulders, driveways, etc. thatare being used for automobile or pedestrian traffic). The backfill material shallbe mechanically compacted by using vibratory equipment or any otherequipment acceptable to the Engineer so that no settlement shall occur. In nocase shall the density be less than 90 percent of the maximum dry density asdetermined in accordance with Test Method Tex-114-E. The Engineerreserves the right to perform compaction tests on an as-needed basis.Compaction by water tamping is prohibited.

Care shall be taken to see that no dirt, clods or trench sides are allowed to falland/or rest against the pipe prior to the completion of embedment or backfill.

The allowable materials for backfill are listed in Subarticle 2.(16), "BackfillMaterial", of this specification. Backfilling and compaction shall continue inthis manner to the minimum elevation shown in the excavation and backfilldiagram.

(ii) Auger Pits. All auger pits shall be backfilled with bank run sand up to one (1)foot from the top of the natural ground. The final 12 inches of the backfillshall consist of 10 inches of native soil in the bottom and two (2) inches ofbank run sand below the grass.

Page 57: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

57-74 54252-98

The portion from the spring line of the pipe to the top of the pit shall bebackfilled in lifts not to exceed nine (9) inches (loose measurement). Thebackfill shall be mechanically compacted by using vibratory equipment or anyother equipment acceptable to the Engineer, so that no settlement shall occur.The material should be compacted to a minimum of 90 percent of themaximum dry density at optimum moisture content as determined inaccordance with Test Method Tex-113-E or Tex-114-E. The Owner reservesthe right to perform compaction tests on an as-needed basis. Compaction bywater tamping is prohibited.

Care shall be taken to see that no dirt, clods or auger pit sides are allowed tofall and/or rest against the pipe prior to the completion of embedment orbackfill.

The allowable material for backfill, in auger pits shall only be bank run sand,described in Subarticle 2(16), "Backfill Material", of this specification.

(13) Valves and Fire Hydrants. Each valve and fire hydrant must be completely closedwhen placed in the pipe line.

Valves and hydrants shall be installed in accordance with AWWA C600, except wheremodified by this specification. Drainage shall be provided at the base of the hydrant inaccordance with AWWA C600.

Each hydrant shall be set at the location and grade indicated by the stakes and shall beplumbed and braced and shall be installed in accordance with AWWA's requirementsfor fire hydrant installation. If the barrel of a hydrant is to pass through a concrete slab,a piece of one-inch thick preformed bituminous expansion joint material shall be fittedclosely around the section of the barrel passing through the concrete.

Locate nozzle centerline minimum 18 inches above finish grade.

Place 12-inch x 12-inch yellow indicators (plastic, sheet metal, plywood, or othermaterial approved by the Engineer) on pumper nozzles of new or relocated fire hydrantsinstalled on new mains not in service. Remove indicators after new main is tested andapproved by the Engineer.

(14) Tapping Sleeves and Valves.

(a) General.

(i) Install tapping sleeves and valves at the locations and using the sizes shown onthe plans.

(ii) Thoroughly clean the tapping sleeve, tapping valve and pipe in accordancewith the manufacturer's instructions prior to installation.

(iii) Hydrostatically test the installed tapping sleeve to 150 psig for a minimum of15 minutes. Inspect the sleeve for leaks, and remedy any leaks prior to thetapping operation.

Page 58: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

58-74 54252-98

(iv) When tapping concrete pressure pipe, size on size, use a shell cutter onestandard size smaller than that of the water line being tapped.

(v) Do not use Large End Bell (LEB) increases with a next size tap except forexisting asbestos-cement pipe.

(b) Installation.

(i) Tighten bolts in the proper sequence so that undue stress is not placed on thepipe.

(ii) Align the tapping valve properly and attach it to the tapping sleeve.

(iii) Make the tap with a sharp shell cutter using the following criteria:

1) For 12-inch and smaller taps, use a minimum cutter diameter one half inch less than the nominal tap size.

2) For 16-inch and large taps, use the manufacturer's recommended cutter diameter.

(iv) Withdraw the coupon and flush all cuttings from the newly-made tap.

(v) Wrap the completed tapping sleeve and valve in accordance with thisspecification.

(vi) Place the concrete thrust block behind the tapping sleeve (NOT over thetapping sleeve and valve).

(vii) Arrange for the mandatory inspection of the installation prior to backfilling.Completion of the inspection shall not be required before backfilling.

(viii) Backfill in accordance with this specification and as shown on the plans.

(15) Boxes for Valves.

(a) The cast-iron or ductile-iron pipe shall be cut to proper length and the box shall beassembled and braced as approved by the Engineer. Butterfly valves for sizes 30-inch and larger will require manholes to be constructed over the operators.

(b) Concrete for valve box placement:1. For locations in new concrete pavement, use strength and mix design of new

pavement.2. For other locations, use Class "A" concrete, conforming to the requirements of

Item 421, "Portland Cement Concrete."

(c) Install valve box and riser piping plumbed in a vertical position. Provide 6-inchtelescoping freeboard space between riser pipe top butt end, and interior contactflange of valve box, for vertical movement damping. Riser may rest on valveflange, or provide suitable foot piece to support riser pipe.

Page 59: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

59-74 54252-98

(d) After valve box has been set, aligned, and adjusted so that lid is level with finalgrade, pour a 24-inch by 24-inch by 8-inch thick concrete block around valve box.Center valve box horizontally within concrete block.

(e) Paint covers of new valve boxes in "Fluorescent Orange" when installed. Aftercompletion and acceptance by the City, repaint covers in "Black". This work isincidental and no separate payment will be made.

(16) Wet Connections. The Contractor shall make the wet connections, under the directionof the Engineer, in such a manner and at such hours as to minimize inconvenience to thepublic. When the existing mains have been cut or a plug removed for a connection, thework of making the connection shall progress without interruption until complete.

Whenever the Contractor desires to proceed with a wet connection without a completeshut-off, there will be no extra compensation for damages or extra work resulting fromthe incomplete shut-off.

The Utility owner shall operate all gate valves in the existing system and in sections ofcompleted mains which have been placed in service. The Contractor shall notify theUtility owner at least 48 hours in advance of making connections.

Wet connections which are 2-inch or smaller are sometimes referred to on the plans as2-inch standard connections or gooseneck connections. Items which may be necessaryto complete these types of wet connections include corporation cock, saddle, coppertubing, brass fittings and 2-inch valves. These connections are not to be used orconstrued as any part of a 2-inch service line.

The Utility owner will handle at no cost to the Contractor, all operations involvingopening and closing valves for wet connections.

(17) Polyethylene Film Wrap. Except as noted on the plans, cast-iron and/or ductile-ironpipe (including fittings and other appurtenances) shall be wrapped with a polyethylenefilm. Fire hydrant barrels shall be wrapped.

Remove all lumps of clay, mud, cinders, etc., on pipe surface prior to installation ofpolyethylene encasement. Prevent soil or embedment material from becoming trappedbetween pipe and polyethylene. Fit polyethylene film to contour of pipe to effect asnug, but not tight; encase with minimum space between polyethylene and pipe.Provide sufficient slack in contouring to prevent stretching polyethylene where itbridges irregular surfaces, such as bell-spigot interfaces, bolted joints, or fittings, and toprevent damage to polyethylene due backfilling operations. Secure overlaps and endswith adhesive tape to hold polyethylene encasement in place until backfilling operationsare complete.

For installations below water table and/or in areas subject to tidal actions, seal both endsof polyethylene tube with adhesive tape at joint overlap.

Repairs: Repair any cuts, tears, punctures, or damage to polyethylene with adhesivetape or with short length of polyethylene sheet or cut open tube, wrapped around pipe tocover damaged area, and secured in place.

Page 60: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

60-74 54252-98

Openings in Encasement: Provide openings for branches, service taps, blowoffs, airvalves, and similar appurtenances by making an X-shaped cut in polyethylene andtemporarily folding back film. After appurtenance is installed, tape slack securely toappurtenance and repair cut, as well as other damaged area in polyethylene, with tape.Service taps may also be made directly through polyethylene, with any resultingdamaged areas being repaired as described above.

Junctions between Wrapped and Unwrapped Pipe: Where polyethylene-wrapped pipejoins an adjacent pipe that is not wrapped, extend polyethylene wrap to cover adjacentpipe for distance of at least three (3) feet. Secure end with circumferential turns of tape.Wrap service lines of dissimilar metals with polyethylene or suitable dielectric tape forminimum clear distance of three (3) feet away from cast-or ductile-iron pipe.

(a) Tubular Type Wrap. When the polyethylene film is supplied in tubular form, itshall be installed on the pipe prior to placing the pipe in the trench and in thefollowing manner:

Elevate the spigot end of the pipe; brush mud and debris from the pipe, and slip alength of film (approximately two (2) feet longer than the joint of pipe) over thejoint of pipe. Wrap the film tightly around the spigot end, leaving about one footextending beyond the end of the pipe, and tape the edge down lightly withpolyethylene tape.

When the joint of pipe is picked up for placing in the trench, remove any remainingmud, clay or debris. Insert the spigot end into the bell end of the joint previouslyplaced, push home, and release the pipe into the trench. Pick up the pipe joint atthe bell, slide the film to a point back of the bell, and prepare a bell hole.

When the next joint is laid, pull the film beyond the bell so as to overlap the filmattached to the spigot of the new pipe joint. Wrap the film by folding itlongitudinally and tape securely in place to prevent damage during backfill. Do nottape the end that has just been slipped over the last bell but bind it with twine orother approved material.

At each corporation, draw the loose material up around the corporation base andseal it with tape to insulate the two (2) dissimilar metals.

Wrap all fittings and fire hydrant leads, and tape or bind the wrap with heavy twine.Fittings, such as bends and reducers, shall be wrapped similarly to the methodoutlined above. Specials, such as valves, tees, crosses, etc., shall be wrapped bysplitting, tucking and overlapping the polyethylene tube, then closing the fieldmade splices with the required tape. Material to cover the valves may be acquiredfrom excess overlapping polyethylene tubing on adjacent pipe joints. Thepolyethylene tubing should be drawn over the bell of the pipe on either side andinsulated with field made seams as described above. All fittings and specials thatrequire concrete blocking shall be completely wrapped prior to placing concrete.

(b) Sheet Type Wrap. For sheet type wrap, the wrap may be applied around the pipeeither prior to or after pipe has been positioned in the trench. "Above ground"

Page 61: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

61-74 54252-98

installation shall be similar to that described above for tubular installation. "Intrench" installation shall also be made in a manner similar to that described below.

(i) Cut polyethylene sheet to a length approximately two (2) feet longer than pipesection. Center length to provide 1-foot overlap on each adjacent pipe section,bunching it until it clears pipe ends. Wrap polyethylene around pipe so that itcircumferentially overlaps top quadrant of pipe. Secure cut edge ofpolyethylene sheet at intervals of approximately three (3) feet.

(ii) Lower wrapped pipe into trench and make up pipe joint with preceding sectionof pipe. Make shallow bell hole at joints to facilitate installation ofpolyethylene. After completing joint, make overlap and secure ends.

(iii) Repair cuts, tears, punctures, or other damage to polyethylene. Proceed withinstallation of next section of pipe in same manner.

(c) Auger Section Installation. Use cast-iron or ductile-iron pipe with a polyurethanecoating as specified in this item.

(d) A final seal against the intrusion of the backfill material shall be made bycompletely encasing the tapping sleeve with sheet vinyl of eight (8) mil thickness.Tape to secure this wrapping shall be that manufactured for this purpose of PolykenNo. 900, Scotch Wrap No. 50 or approved equal.

(18) Sterilization of Mains and Testing for Leakage.

(a) Sterilization of Mains. The Utility owner will furnish water for chlorination andflushing without charge to the Contractor.

The Contractor shall furnish the necessary taps, risers and jumpers of such sizesand materials as are specified by the Engineer, and shall install the subject materialin the locations designated by the Engineer. Normally, each valved section of mainwill require two (2) 3/4-inch taps; however, on larger mains the Engineer mayorder that 1-1/2-inch or 2-inch taps and risers be used. The Contractor shall alsofurnish and install the necessary temporary blind flanges, sleeves, plugs, etc., asrequired to sterilize and pressure test the new mains.

Fire hydrants shall be used as blow-offs to flush newly constructed waterlines 8-inch diameter and above.

After the pipe has been laid and backfilled, all newly laid pipe shall be sterilized.Unless otherwise specified on the plans the Utility owner, at his own expense, willfurnish the labor and materials necessary for the initial application of the sterilizingagent. Each valved section of pipe shall be slowly filled with water and all airexpelled from the pipe. Should taps at points of highest elevation be required toaccomplish this, they shall be furnished and installed by the Contractor. After themain is filled with water and all air expelled, the pipe shall be charged with thesterilizing agent and allowed to stand for 24 hours. Unless otherwise specified onthe plans the Utility owner will then flush the main with water. After flushing,samples will be drawn from the main and tested at a valid, testing facility approvedby the Engineer. After samples are drawn, the Contractor may then proceed with

Page 62: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

62-74 54252-98

the pressure test and any necessary repairs. If the samples do not pass, the pipeshall be re-sterilized until the samples taken are passed by the certified andapproved testing facility. Unless otherwise specified on the plans in the event thatmore than one sterilization of the main (or portion of the main) is required, alladditional sterilizations will be charged to the Contractor at rates established by theUtility owner.

(b) Testing for Leakage. Following the first sterilization test, all newly laid pipe shallbe subjected to a hydrostatic pressure of 125 psi, unless otherwise shown on theplans. Where practicable, pipe lines shall be tested in length, between line valvesor plugs, not to exceed 1500 feet unless otherwise approved by the Engineer. Thepressure test shall be performed by means of a pump connected to the pipe in amanner satisfactory to the Engineer. The Contractor shall furnish, install andoperate the necessary connections, pump, meter and gauges. Prior to running thepressure test, the meter shall be tested, sealed and approved (at the Contractor'sexpense) by a certified testing facility approved by the Engineer. The duration ofthe test shall not be less than eight (8) hours. If a large quantity of water is requiredto maintain pressure during the test, testing shall be discontinued until cause ofwater loss is identified and corrected.

The following general regulations shall be observed during each leakage test forcast-iron, ductile-iron prestressed concrete cylinder and PVC pipe.

Except for welded steel pipe in which no leakage is permitted, pipe lines, whensubjected to the specified pressure test, shall not show leakage in excess of 11.65gal./Dia.(inches) per mile/per 24 hrs.

All portions of the pipe showing visible leaks shall be repaired regardless of thetotal leakage shown by the pressure test. Any cracked or defective pipes, fittings,valves or hydrants discovered by means of this pressure test shall be removed andreplaced with sound material by the Contractor. If the main is opened for anyreason, it shall then be re-sterilized until satisfactory samples are obtained. It shallalso be pressure tested until the requirements of this specification are met.

Immediately upon completion of sterilization and pressure testing, the Contractorshall remove all taps, risers, and blow-offs and shall backfill the remainder of thetrench in accordance with the requirements of this specification.

No payment shall be made to the Contractor for performing hydrostatic testing(Leakage Test).

(19) Mains - Use of Completed Sections. The Utility owner shall be permitted to use andoperate any or all portions of the water mains which have passed the leakage test andhave been sterilized. Unless otherwise specified on the plans, the valves in suchcompleted sections shall be operated only with the express permission of the Utilityowner.

The use of the mains shall not be construed as acceptance of same and the Contractorwill not be relieved of any of his responsibilities for fulfilling the conditions of the

Page 63: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

63-74 54252-98

contract unless the mains are damaged due to negligence on the part of the Utilityowner.

(20) Mains - Lowering. When a main is to be lowered, the initial excavation shall be donein such a manner as to permit the mains to rest on a number of dirt benches. If soilconditions are unsatisfactory for dirt benches, wooden blocks shall be used to supportthe mains. The pipe shall then be attached by ropes, cable or chains to overheadsupports; the dirt benches or wooden blocks shall then be removed and the pipe slowlyand evenly lowered into position. After the mains have been lowered, each damagedjoint shall be repaired as directed by the Engineer.

(21) Copper Service Line Construction. The use of Hays-Seal and Mueller Companycatalog numbers to describe various fittings is not intended to be proprietary, but merelyto indicate clearly the respective types of fittings which are to be furnished.

(a) Installing Service Lines. Copper service lines in curb and gutter streets shall belaid with a minimum of 30 inches of cover from top of curb to the top of the serviceline. Service lines laid in crowned streets with open ditches shall be laid with aminimum of 30 inches of cover at the crown and with a minimum of 18 inches ofcover from the flow line of the ditch to the top of the service line. Service linelocations shall be clear of all proposed paving and underground work.

Care shall be exercised to keep the lines free of dirt and foreign matter at all times.Copper lines shall be put together in an entirely slack position and shall be free ofkinks. Service lines shall consist of one continuous run of copper tubing wherepossible. Bends shall be no greater than that originally found in the coil of tubingas packaged. For 1-1/2-inch and 2-inch copper tubing shipped in straight lengths,the following bend criteria shall be used: For 2-inch copper tubing, a maximum ofone (1) 45 degree bend may be accomplished in a four-foot section; for 1-1/2-inchcopper tubing, a maximum of one (1) 45 degree bend in a three-foot section. NoKinks, dents, flats or crimps will be permitted.

Meters should, in general, be located one (1) foot into the street right-of-way.Where this is not applicable, meters should be located approximately one (1) footfrom the sidewalk on the curb side. If the present meter location conflicts withproposed driveway turnouts or other proposed street improvements, the metershould be shifted to miss the obstruction and re-connected to the customer's serviceline. Meters shall be reset at positions such that the top of the meter will be four (4)to six (6) inches below finished grade.

Where plans call for salvaging and relocating meter, meter box and curb stop, thesematerials shall be removed with care, thoroughly cleaned, and inspected by theEngineer prior to installation in the new location. If the plans call for relocating themeter (other than at some point along the existing service line), a new service linewill be required.

Where it is necessary to cross a paved street, the service line shall be pushed underthe paving through a predrilled and prepared opening. Only full lengths of coppertubing shall be used and care shall be taken not to damage the tubing when pullingit through the prepared hole. A compression type union is only permitted if the

Page 64: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

64-74 54252-98

Contractor cannot span the required length with a full length of tubing.Compression type unions are NOT to be used under the paved street.

(b) Corporation Stop Installation. The main shall be tapped at a location such that astraight line passing through the meter and the corporation stop will be at 90degrees to the main. Taps shall be located in the upper portion of the main within45 degrees of the pipe springline. The cutting operation shall be performed with asharp shell cutter tool and shall be approved by the Engineer.

Taps for service lines shall conform to the requirements of the following tables.Taps shall be spaced a minimum of two (2) feet apart.

PIPE TAPPING SCHEDULE

SERVICE SIZEWATER MAINTYPE AND DIAMETER 3/4" 1" 1-1/2" 2 "

4" Cast-Iron orDuctile-Iron

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

4" Asbestos-Cement WBSS WBSS DSS,WBSS DSS ,WBSS

4" PVC(AWWA C900) DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

6" and 8" Cast-Ironor Ductile-Iron

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

6" and 8" Asbestos-Cement

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

6" and 8" Cast-Ironor Ductile-Iron

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

6" AND 8" PVC(AWWA C900)

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

12" Cast-Ironor Ductile-Iron

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

12" Asbestos-Cement DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

12" PVC(AWWA C900)

DSS,WBSS DSS,WBSS DSS,WBSS DSS ,WBSS

16" and Up Cast-Ironor Ductile-Iron

DWBSS DWBSS DWBSS DW BSS

16" and Up Asbestos-Cement

DWBSS DWBSS DWBSS DW BSS

16" and Up PVC(AWWA C900)

DWBSS DWBSS DWBSS DW BSS

DSS - DUAL STRAP SADDLESWBSS - WIDE BAND STRAP SADDLESDWBSS - DUAL WIDE BAND STRAP SADDLES* Mueller H-15092, or equal

Page 65: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

65-74 54252-98

(c) Curb Stop Installation. Curb stops or angle stops shall, in all cases, be set at theouter end of the service line just ahead of the meter. Secure opening in the curbstop to prevent unwanted material from entering. Eighth bend or quarter bendcouplings may be used to accomplish close quarter turns in the service line. In all3/4-inch and 1-inch services, a meter coupling or swivel nut meter spud curb stopshall be installed ahead of the meter. A straight meter coupling shall also beinstalled on the outlet end of the meter. A new curb stop shall be installed whenthe service line is extended.

(d) Sequence of Work. Open trench for proposed service line or prepare jacking andreceiving pits.

Install corporation stop in a workmanlike manner using proper equipment.

Install copper service line and connect to corporation stop.

Install curb stop on the meter end of the service line.

With curb stop open, and prior to connecting service line to meter, opencorporation stop and flush service line adequately. Close curb stop, leavingcorporation stop in full open position.

Check service line for apparent leaks. Repair leaks before proceeding.

Connect service line to meter and if necessary adjust meter location. Care shall betaken to make sure that the inlet side of meter is connected to water service line.Momentarily open curb stop to verify proper registration of meter.

Backfill all excavations; tamp the backfill material in place to the density of thesoil in the adjacent trench walls.

If the meter is to be relocated, the meter box shall be replaced so that it is centeredover the meter with top of lid flush with finished grade. When the meter must belocated in driveways or sidewalks, the Contractor will be required to furnish andinstall an approved traffic type meter box with cast-iron lid.

(22) Cutting and Plugging of Water Mains. Where plans call for the abandonment ofwater mains, the following general procedure shall be followed:

After the replacement main has been constructed, sterilized, tested and placed inservice, and all services transferred to the replacement main, the main to be abandonedshall be located and traced back to the feeder main and at this point cut and plugged atthe tee. Normally, this is done by installing a plug, clamp and a concrete thrust block.In cases of 1-1/2-inch or 2-inch Corporation Cock or TS & V connections, the valveshall be removed and a cap or plug installed at the Tee. In no instances shall the line tobe abandoned be valved off at the nearest valve or cut and plugged other than at thesupply main.

All ends or openings in abandoned mains shall be adequately plugged or capped in anapproved manner and all excavation backfill and any street surfaces replaced, to the

Page 66: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

66-74 54252-98

Engineer's satisfaction. This shall be done in accordance with Subarticles 3.(1),"Excavation" and 3.(9), "Backfilling", of this specification.

All surface identification shall be removed, i.e., valve boxes and fire hydrants. Valveboxes, when in improved streets other than shell, may be poured full of concrete withthe cap permanently removed.

(23) Service Lines of Public Utilities. Where any pipe or conduit of a public utilitycorporation crosses the water main trench, such pipe or conduit shall be supported in amanner satisfactory to the Engineer.

Should the Contractor consider it necessary for a utility corporation to relocate utilitylines or other improvements, the Contractor must notify the Engineer in advance. TheEngineer will make the necessary arrangements with the utility corporation if heconsiders it imperative that the change be made.

(24) Relocation of Meter Vaults. Existing valves, meters and strainers inside a vault shallbe salvaged and returned to the utility owner or as designated on the plans.

Pipe, valves, service lines and other appurtenances shall be installed in accordance withthe pertinent Articles of this specification or as directed by the Engineer.

In general the type of meter vault shall be installed as shown on the plans or asapproved by the Engineer.

(a) Precast Concrete Vault. The precast concrete vault shall be constructed andfurnished as shown on the plans.

The precast concrete vault shall be set level on a minimum 3-inch bed of sand in anexcavation and brought to grade. Piping shall then be installed and sand shall bebackfilled around vault.

(b) Cast-in-Place Concrete Vault. The cast-in-place concrete vault shall beconstructed as shown on the plans. Key the walls to the floor slab and form to thedimensions as shown on the plans. Minimum wall thickness shall be four (4)inches. Cast walls monolithically. One (1) cold joint will be allowed when vaultdepth exceeds 12 feet. Set the frame for the cover while the concrete is still green.

(c) Frame and Cover. Frame and cover shall be constructed as shown on the plans.

In grass areas, the frame and cover shall be set 2 inches to 3 inches above naturalground or finished grade and parallel to it (maximum angle from horizontal shall be20 degrees). Backfill shall be sloped away from meter.

In sidewalk areas, the frame and cover shall be set 1/2 inch to 1 inch above adjacentconcrete and parallel to it.

Replacement concrete shall be sloped away from meter to meet adjacent concrete.

(d) Inspections. The following inspections shall be made jointly by the Engineer andrepresentatives of the Utility owner:

Page 67: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

67-74 54252-98

(1) Site Location Inspection - proposed meter location must be approved prior tocommencing work.

(2) Final Inspection - to be conducted after all backfill is in place, cover installed,cleanup completed, and surface is restored.

(25) Adjustment of Existing Surface Structures.

(a) Valve Boxes. Salvage and reuse valve box. Remove and replace 6-inch ductile-iron riser pipe with suitable length for depth of cover required to establish theadjusted elevation to accommodate actual finished grade.

Reinstall valve box and riser piping plumbed in vertical position. Provideminimum 6-inch telescoping freeboard space between the riser pipe top butt endand interior contact flange of valve box for vertical movement damping.

After valve box has been set, aligned, and adjusted so that top lid is level with finalgrade, place 24-inch by 24-inch by 8-inch thick concrete block around the valvebox. Center the valve box horizontally within the concrete box.

(b) Meter Boxes. Salvage and reuse meter boxes when possible. Reinstall inaccordance with manufacturer's recommendations. Any damage to the meter boxduring relocation or service transfer shall be at the expense of the Contractor.

If the existing meter box requires replacement, the Contractor may obtain a newbox from the Utility owner by providing adequate documentation of the existingand proposed locations.

(c) Meter Vaults. Adjustment of all meter vaults will be in accordance with thedetails as shown on the plans. The Contractor shall salvage and reuse accesscovers.

(26) Relocation of Water Meters and Boxes. Existing curb stops, meters, unions, andmeter boxes shall be salvaged, cleaned, inspected, and installed at the new location inaccordance with specifications in this section. When the meter and box is relocated, itwill be moved the minimum distance to enable access for new connections. Anydamage to the meter box during relocation or service transfer shall be at the expense ofthe Contractor.

If the Contractor is unable to salvage the existing boxes, new boxes can be obtainedfrom the Utility owner with proper documentation of the existing and proposed locationof the meter.

With the approval of the Engineer, meter boxes, when located adjacent to existingpavement, may be relocated when this operation will facilitate construction or decreasethe costs. Approval of the Engineer must be obtained in writing in all cases and allrelated costs such as excavation, piping, meter box relocation, removal and replacementof paving, etc. will be incidental to the project and born by the Contractor.

Page 68: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

68-74 54252-98

(27) Installation of Split Casing. The Contractor shall notify the Utility owner, not lessthan 48 hours in advance, of any work planned involving existing water lines. Waterlines to be encased shall not have more than 20 feet exposed at any time.

6-inch x 6-inch x 1-1/4-inch neoprene pads shall be placed between the split casingsections and the top and bottom of the water lines at approximately six (6) foot spacingsor as directed by the Engineer.

The trench when completed and shaped to receive the casing shall be of sufficient widthto provide free working space for satisfactorily installing the casing and backfillingunder and around the casing.

The split casing shall be held in place for welding by hinges, coupling bands or anyother method acceptable to the Engineer.

All welded joints shall conform to the requirements of AWWA Standard C 206. Weldsshall be such as to develop the full strength of the pipe throughout the joint.

The ends of the encasement pipe shall be sealed with casing and seals in accordancewith Section 2.(2)(a), "Steel Carrier Pipe", to prevent entrance of excessive groundwater.

(28) Modifications for Cathodic Protection.

(a) General. Cathodic protection systems shall be in accordance with SpecialSpecification Item, "Cathodic Protection Systems for Large Diameter WaterMain", as specified herein and as shown on the plans.

References to steel pipe shall be interpreted to apply to tape coated welded steelpipe. Where damage occurs to pipe coatings during welding process. Affectedarea is to be refurbished to original condition.

Prestressed concrete cylinder pipe shall be modified for cathodic protection asrequired to ensure that all metallic components, including the wire wrap are tiedtogether. The wire shall be attached to the cylinder at each end of the joint bywelding in accordance with paragraph 5.5.2 of AWWA C205.

(b) Bonded Joints.

(i) Where rubber gasket bell and spigots are provided, the Contractor shallprovide for bonded joints by either welding a strap or clip between the bell andthe spigot of each joint or by providing a thermite welded cable between thebell and the spigot of each joint. All pipe, whether installed in a tunnel or opencut, shall have bonded joints, except where insulating flanges are to beprovided. Where joints are welded for thrust restraint, no additional bondingwill be required.

(ii) Bonding Strap or Clip. The strap or clip for bonding the bell to the spigot shallbe free of all foreign material that may increase the contact resistance betweenwire and strap or clip.

Page 69: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

69-74 54252-98

Unless otherwise noted, insulation kits shall be provided at connections to theexisting water system or at locations to isolate one (1) type of cathodic systemfrom another type, between the water main, and extra piping or as shown onthe plans.

(29) Removing and Salvaging Fire Hydrants and Water Meters. Fire hydrants and watermeters to be removed and salvaged shall be delivered to their owner at the location setforth on the plans or as directed by the Engineer.

(30) Installation of the Nonmetallic Pipe Detection System. The nonmetallic pipedetection system shall be installed concurrently with the proposed pipe placement. Thisinstallation shall be as specified by the manufacturer and/or as approved by theEngineer.

(31) Removing Water Main and/or Removing Water Main with Casing. Removingwater mains and/or water mains with casing shall be in accordance with Item 100,"Preparing Right of Way" or as shown on the plans. This shall include the removal anddisposal of all pipe and appurtenances as shown on the plans or as directed by theEngineer. Excavation and backfill, required, will not be measured or paid for directlybut will be considered subsidiary to this Item.

4. Measurement. This Item will be measured as follows:

(1) Water Main Pipe and Steel Casing will be measured by the linear foot, of the varioussizes and types specified. The water mains and/or casing will be measured along theaxis of the pipe and no deductions will be made for valves or fittings. Reducers shall beclassed as pipe of the size of the larger end.

(2) Split Steel Casing will be measured by the linear foot, of the various sizes shown onthe plans, complete in place.

(3) Jacking, Tunneling, Boring or Augering, for water main and steel casing, will bemeasured by the linear foot, of the sizes, types and wall thicknesses (applicable only forcasing) specified.

(4) New Copper Service Lines will be measured by each service line, installed.

Short Side service line shall refer to service connections to be made to meters on thesame side of the street on which the supply main is located. Long side service line shallrefer to service connections to be made to meters on the opposite side of the street onwhich the supply main is located, or from the center of the street where the supply mainis located in the center of the street.

(5) Tapping Sleeves and Valves and Butterfly Valves will be measured by eachassembly, of the various sizes, with the valve box installed.

(6) Fire Hydrants will be measured by each assembly installed, for all depths. It shall bethe Contractor's responsibility to install the fire hydrant such that it meets the standardinstallation requirement of this specification and/or the manufacturer's specifications.

(7) Meters and Vaults will be measured by each assembly constructed, complete in place.

Page 70: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

70-74 54252-98

(8) Air Release and Vacuum Relief Valves will be measured by each assembly, of thevarious sizes, with the valve box installed.

(9) Pressure Reducing Stations will be measured by the lump sum unit constructed,complete in place.

(10) Blow Off Valves will be measured by each assembly, of the various sizes and types,with the valve box installed.

(11) Removing Fire Hydrants will be measured by each removed and disposed of properly.

(12) Removing Water Valves and Boxes will be measured by each removed and disposedof properly.

(13) Removing and Relocating Meters and Boxes will be measured by each assemblyremoved, cleaned and installed at the new location.

(14) Removing Meters and Vaults will be measured by each assembly removed.

(15) Removing and Salvaging Water Meters will be measured by each assembly removedand salvaged.

(16) Removing and Salvaging Fire Hydrants will be measured by the each.

(17) Removing and Relocating Water Meters and Meter Vaults will be measured by eachassembly removed and relocated.

(18) Adjusting Meter Vaults will be measured by each assembly adjusted.

(19) Adjusting Meter Boxes will be measured by each assembly adjusted.

(20) Lowering Water Mains will be measured by the linear foot, of the sizes and types ofpipe lowered.

(21) Cutting and Plugging Water Mains will be measured by the each, of the sizesindicated.

(22) Removing Pressure Reducing Stations will be measured by each complete pressurestation removed.

(23) Wet Connections will be measured by each connection, of the sizes specified.

(24) Extra Hand Excavation or Extra Machine Excavation will be measured by the cubicyard in its original position. Excavation performed by manual labor at the locationsspecifically designated by the Engineer, and which is not included under or subsidiaryto other bid items contained in this specification, shall be considered Extra HandExcavation or Extra Machine Excavation.

5. Payment. The work performed and materials furnished in accordance with this Item andmeasured as provided under "Measurement" will be paid for at the unit prices bid for theitems of work hereinafter described. These prices shall be full compensation for furnishingand hauling all materials; for placing or installing the materials; for inspection and testing;

Page 71: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

71-74 54252-98

and for all other items of material, labor, equipment, tools and incidentals necessary tocomplete the work in accordance with the plans and specifications.

(1) Payment for water main pipe and steel casing will be made at the unit prices bid for"Water Main Pipe (Cast-Iron)", "Water Main Pipe (Steel)", "Water Main Pipe (Ductile-Iron)", "Water Main Pipe (Copper)", "Water Main Pipe (Polyvinyl Chloride)(PVC)","Water Main Pipe (Prestressed Concrete Cylinder Pipe)(PCCP)" and "Casing (Steel)",of the various sizes and types specified, installed by the open cut method.

Unless otherwise shown on the plans or specifications, excavation, unsuitable excavatedmaterial disposal backfill and the material for backfill for the complete installation ofthe water main system will not be paid for directly but will be considered subsidiary tothis bid item.

(2) Payment for split steel casing will be made at the unit price bid for "Split Steel Casing",of the various sizes, installed by the open cut method.

(3) Payment for jacking, tunneling, boring or augering water main will be made at the unitprice bid for "Jacking, Tunneling, Boring or Augering (Water Main)" of the sizes andtypes specified. This price shall include furnishing the pipe.

Payment for jacking, tunneling, boring or augering steel casing will be made at the unitprice bid for "Jacking, Tunneling, Boring or Augering Casing (Steel)" of the sizes, typesand wall thicknesses (applicable only if exceeding minimum thickness, shown inSection 2.(2)(6), "Steel Casing Pipe", of this specification) specified. This price shallinclude the casing. Water mains placed in the casing will be paid for by the appropriatebid item.

Excavation, backfill, backfill material and disposal of the unsuitable excavated materialfor jacking, tunneling, boring or augering pits will not be paid for directly but will beconsidered subsidiary to these bid items.

(4) Payment for copper service lines will be made at the unit price bid for "Service Line(Short Side 5/8" to 1")", "Service Line (Long Side 5/8" to 1")", "Service Line (ShortSide 1-1/2" to 2")" and "Service Line (Long Side 1-1/2" to 2")", installed. This priceshall be full compensation for all labor, materials, excavation and backfill required toinstall the facility complete in place, including connection to the customer's service line.

(5) Payment for tapping sleeves and valves and butterfly valves will be made at the unitprice bid for "Gate Valve", "Tapping Sleeve and Valve", and "Butterfly Valve", of thevarious sizes, with the valve box installed.

(6) Payment for fire hydrants will be made at the unit price bid for "Fire Hydrant" installed,for all depths.

Any adjustment required either in the flow line of the water main or to the barrel lengthof the fire hydrant will not be paid for directly but will be considered subsidiary to thisbid item.

(7) Payment for meters and vaults will be made at the unit price bid for "Meter and Vault"constructed, complete in place.

Page 72: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

72-74 54252-98

(8) Payment for air release and vacuum relief valves will be made at the unit price bid for"Air Release and Vacuum Relief Valves", of the various sizes, with the valve boxinstalled.

(9) Payment for pressure reducing stations will be made at the unit price bid for "PressureReducing Stations". This price shall be full compensation for performing the necessaryexcavation, backfill and finish grading constructing the concrete structure, andfurnishing and installing all station appurtenances addressed under Article 2.,"Materials" of this specification.

(10) Payment for blow off valves will be made at the unit price bid for "Blow Off Valve" ofthe various sizes and types, with the valve box installed.

(11) Payment for removing fire hydrants will be made at the unit price bid for "RemovingFire Hydrant". This price shall include removing valves from the existing location,disposal of valves and plugging at the tee. Excavation and backfill required forremoving fire hydrants will not be paid for directly but will be considered subsidiary tothis bid item.

(12) Payment for removing water valves and boxes will be made at the unit price bid for"Removing Water Valves and Boxes". Excavation and backfill required for removingwater valves and boxes will not be paid for directly but will be subsidiary to this biditem.

(13) Payment for removing and relocating meters and boxes will be made at the unit pricebid for "Removing and Relocating Meter and Box".

(14) Payment for removing meters and vaults will be made at the unit price bid for"Removing Meter and Vault". This includes salvaging of the meter strainers and valvesand delivering them to their owner at the location shown on the plans or as directed bythe Engineer.

(15) Payment for removing and salvaging water meters will be made at the unit price bid for"Removing and Salvaging Water Meters". This price shall include removal from theexisting location and delivery to the owner. Excavation and backfill and finish gradingrequired for removing the water meters will not be paid for directly but will beconsidered subsidiary to this bid item.

(16) Payment for removing and salvaging fire hydrants will be made at the unit price bid for"Removing and Salvaging Fire Hydrant". The salvaging of fire hydrants will be a cashreimbursement to the owner by the Contractor where the fire hydrants will become theproperty of the Contractor or the Contractor will deliver the fire hydrants to the ownerat the location shown on the plans. Excavation, backfill and finish grading required forremoving fire hydrants will not be paid for directly but will be considered subsidiary tothis bid item.

(17) Payment for removing and relocating water meters and meter vaults will be made at theunit price for "Removing and Relocating Water Meter and Meter Vault".

(18) Payment for adjusting meter vaults will be made at the unit price bid for "AdjustingMeter Vault". This price shall be full compensation for furnishing all required

Page 73: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

73-74 54252-98

materials, including backfill as required, excavation, tools, labor, equipment andincidentals required to complete the work.

(19) Payment for adjusting meter boxes will be made at the unit price for "Adjusting MeterBox".

(20) Payment for lowering water mains will be made at the unit price bid for "LoweringWater Mains", of the sizes and types of pipe lowered. This price shall be fullcompensation for lowering and adjusting pipes, valves, boxes and service lines whichare connected thereto. Excavation and backfill required for lowering water mains willnot be paid for directly but will be considered subsidiary to this bid item.

(21) Payment for cutting and plugging water mains will be made at the unit price bid for"Cut and Plug Water Main" of the sizes indicated. This price shall be full compensationfor performing all excavation, backfill, finish grading and other incidental itemsrequired to abandon or cut and plug the water main as set forth herein. Where grout isrequired, as shown on the plans, it will not be paid for directly but will be consideredsubsidiary to this bid item.

(22) Payment for removing pressure reducing stations will be made at the unit price bid for"Removing Pressure Reducing Station". This price shall be full compensation forperforming the necessary excavation, backfill, finish grading pipe removal, structureremoval, and all tools, equipment and incidentals necessary to perform this work.

(23) Payment for wet connections will be made at the unit price bid for "Wet Connections",of the sizes specified.

(24) Payment for extra hand excavation or extra machine excavation will be made at the unitprice bid for "Extra Hand Excavation" or "Extra Machine Excavation". This price shallbe full compensation for all labor, hand tools, machines, dewatering and handling anddisposal of any excess excavated material not suitable for bedding and backfill for thisproject.

Trench excavation protection or temporary special shoring for trenches which weregreater than five (5) feet in depth, and/or sloping the sides of these trenches to precludecollapse, will be measured and paid for as required by Item 402, "Trench ExcavationProtection" or Item 403, "Temporary Special Shoring".

No direct payment will be made for furnishing and placing bedding material, this workwill be considered subsidiary to the various bid items.

No direct payment will be made for fittings, including necessary concrete thrustblocking, pipe clamps, nipples, pipe coatings, lubricants, etc. These items will beconsidered subsidiary to the water mains in which they are installed. In addition,fittings required due to plan changes or alterations in line and grade will not bemeasured and paid for directly but will be considered subsidiary to the water mains inwhich they are installed.

No direct payment will be made for furnishing and installing taps, risers, jumpers, blindflanges, cast-iron sleeves, plugs, reducers etc., as required to sterilize and pressure testthe new mains. This work will be considered subsidiary to the various bid items. In

Page 74: 1993 Specifications Houston Districtftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es... · 2-74 5425 2-98 (b)Prestressed Concrete Cylinder Pipe Design. 16 (c)Prestressing

74-74 54252-98

addition, the Contractor shall perform, without extra compensation, all necessaryexcavation and backfill, site graphing, and maintenance until completion of pressuretesting.

Unless otherwise specified on the plans, the work performed and materials furnished tosupport the pipes or conduits of public utilities will not be paid for directly but will beconsidered subsidiary to the various bid items.

No direct payment will be made for furnishing and/or installing the nonmetallic pipedetection system. The work and materials necessary for the system will be consideredsubsidiary to the various bid items. In addition, the Contractor shall ensure that thedetection system is complete and operational and satisfactory to the owner of the utility.

No direct Payment will be made for adjusting valve boxes, this work shall beconsidered subsidiary to the various bid items.