D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on behalf of EN-EL-HT With the contribution of EN-EL-OP section members and in particular G. Fernqvist, G. Cumer & C. Jach ATOP Days - Session 4 - Technical infrastructure

D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

Embed Size (px)

Citation preview

Page 1: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

1

ELECTRICAL NETWORK:

18 KV NETWORK REVIEW AND STATUS OF THE SPS

CONSOLIDATION PLAN

D. Bozzini on behalf of EN-EL-HT

With the contribution of EN-EL-OP section members

and in particular G. Fernqvist, G. Cumer & C. Jach

ATOP Days - Session 4 - Technical infrastructure

Page 2: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

2

Outline

PART I

Major events on HV electrical cable network in 2008

Major events on HV cells in 2008

Historical trend of failures on the SPS 18 kV network

CASE 1: The 2008 SPS joints crisis

CASE 2: BQ1 Compensator

CASE 3: RESTO 1

PART II

SPS Consolidation, status and future program

BE-TI8 network layout

SMB: what do we do?

Failure location on HV cables network

CONCLUSIONS

Page 3: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

3

Major Events on HV Electrical cables Network

SPS 18 kV network

– 6 cable failures on the 18 kV network (Including the 4 ones mentioned by P. Sollander)

• 2 on the pulsed TI8 network, stop of the SPS machine (2001)

• 3 on the pulsed network, operation of SPS possible in open loop (1970)

• 1 failure on the SMB1, redundant network available (1970)

BEQ1 Compensator

– Failure on a 18 kV cable head of the BEQ1 feeder in BE substation, fortunately not in operation during failure period (2003)

RESTO 1 Meyrin

– Elastimold 18 kV elbow connector on a transformer powering the general services of Resto 1. (2001)

– Near miss failure detected tanks to the preventive maintenance and the reinforced visual inspections of the installation by the operation section.

Page 4: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

4

Major Events on CERN HV cells

– ME24 cell explosion ( 1995)

• 10 days stop of the machines feed through the ISOLDE loop

– SE18 near miss ( 1995)

– Preventive action taken

• Problem limited to FLUAIR cell type on Meyrin substations and SE18

• Monitoring of temperature and humidity

• Systematic Partial Discharge (PD) corona effects measurements

• Visual inspection inside cells whenever accessible

Comments: In the past 5 years, 2 similar accidents and 3 near miss !

– ME59 switch closing failure during auto-tranfer exercise ( 1968)

• Design life time 25 years, continuous operation at CERN 41 years !

Comments: Remember the 29 July 2006, same type of equipment !

ME9 Jura substation ( 1968) critical installation

Page 5: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

5

Historical trend of failures on the 18 kV SPS network

1980 1985 1990 1995 2000 2005 20100

1

2

3

4

5

6

7 6 (2008)

Nature of the failures

A) Aged cables, made with XLPE affected by water-treeing effect

B) Not directly the cable but the accessories (joints, terminals)

Remarks for 2008

4 out of 6 failures affected recently installed SPS network segments ( 2001)

2 remaining failures on old cables

Page 6: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

6

CASE 1: SPS joints crisis (1) - Failures

BE

BB3 BA4 BA51360 m 1270 m

1595 m

BB5

Fou

ille

D

Fou

ille

C

Gal

lerie

Fou

ille

B

Fou

ille

A

Reg

ard

BA

4

Ref dwg SPSEM___0003

D. Bozzini TS/EL/HT

Fault #2

EDMS 944129

Date:25-jui-2008

Fault 2007

EDMS 846414

Date:27-mai-2007

Fault #1

EDMS 924713

Date:24-mai-2008

SPSStable loop

SPSPulsed loop

TI8Line

Fault #3

EDMS NA

Date:26-Dec-2008

Page 7: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

7

CASE 1: SPS joints crisis (2)- Analysis

BE

BB3 BA4 BA51360 m 1270 m

1595 m

BB5

Fo

uill

e D

Fo

uill

e C

Ga

llerie

Fo

uill

e B

Fo

uill

e A

Re

ga

rd B

A4

Ref dwg SPSEM___0003

D. Bozzini TS/EL/HT

Work done in 2001 by SPIE sub contractors

Work done in 2001 by SPIE technicians

Analysis report #1

Cellpack PB-08-27

1 faulty joint

Date: 27-jul-2008

Analysis report #2

Cellpack PB-07-38

1 faulty joint

Date: 25-jul-2008

SPSStable loop

SPSPulsed loop

TI8Line

Analysis report #3

Cellpack PB-08-34

1 faulty joint

2 in service joints

Date: 07-sep-2008

Analysis #4

CERN

1 in service joint

Date: sepl-2008

Analysis #5

CERN

1 in service joint

Date: Oct-2008

Analysis #6

CERN

1 in service joint

Date: Nov-2008

Analysis #7

CellPack

1 faulty joint

Date: Feb-2009

Page 8: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

8

CASE 1: SPS joints crisis (3) - Analysis

Analysis of the joints

Conclusions of ALL 8 joints examined

ASSEMBLY PROCEDURE NOT FOLLOWED

POOR QUALITY OF WORK

Page 9: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

9

CASE 1: SPS joints crisis (4) - Repair

Corrective actions

• Repair of all joints that failed

Preventive actions

• Replacement of all joints

• Improvement of the shielding continuity across the joints

• 2 new joints for each repair/replacement

• Now we have 80 joints instead of 40

BE

BB3 BA4 BA51360 m 1270 m

1595 m

BB5

Fou

ille

D

Fou

ille

C

Gal

lerie

Fou

ille

B

Fou

ille

A

Reg

ard

BA

4Ref dwg SPSEM___0003

D. Bozzini TS/EL/HT

SPSStable loop

SPSPulsed loop

TI8Line

Repair #5 SPIE Oct 2008, 13 joints

Repair #4 CERN Sep 2008, 24 joints

Repair #3 CERN Jun 2008, 1 joint

Repair #2 CERN Mai 2008, 1 joint

Repair #1 CERN Mai 2007, 1joint

Repair #6 SPIE Jan 2009, 1 joint

Page 10: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

10

CASE 1: SPS shield currents

Preventive action

• 68/80 joints have a reinforced shield continuity

• Modified assembly procedure approved by joint manufacturer

Standard

Reinforced shield continuity

Signs of heating confirmed by the conclusions of the joints analysis

• This triggered a campaign to measure shields currents

• Sources and reasons not yet fully understood

CNGS TI8

100 A/div

Page 11: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

11

CASE 2: BEQ1 compensator – 18 kV cable terminal failure

Conclusion

ASSEMBLY PROCEDURE NOT FOLLOWED

POOR QUALITY OF WORK

Failure on a 18 kV cable terminal

Date of installation 2003, place BE, Indoor

Discharge to ground without load

Analysis by third party (Cellpack Laboratory, DE)

Outcome of the analysis

Length of insulation dimensions not done according to the procedure

Use of inappropriate tooling (knife) causing serious weaknesses on the insulation

Page 12: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

12

CASE 3: RESTO 1 - Elastimold 18 kV elbow connector failure

Failure on a 18 kV Elastimold connector

Date of installation 2003, place Bdg 500, Indoor

Discharge to ground, circuit was on load

Analysis by third party (Cellpack Laboratory, DE)

Outcome of analysis

Preparatory dimensions not done according to the procedure

Use of inappropriate tooling (knife) causing serious weaknesses on the insulation

Conclusion

ASSEMBLY PROCEDURE NOT FOLLOWED

POOR QUALITY OF WORK

Page 13: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

13

SPS Consolidation - Status on March 2009

18 kV cable network (SMB not included) and substations

March-09

Segment Length Stable Pulsed[m] Done Done

BE-B3 350 350 350B3-B4 1300 1300 1300B4-B5 1350 1350 1350B5-B6 1260    B6-B7 550 550 550B7-B1 1100    B1-B2 1520    B2-BE 1100 1100  Total [m] 8530 4650 3550Done [%] 55 42

Page 14: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

14

SPS Consolidation – Short term work plan

From March 2009 till December 2010

• Install cables between BA6-BA6 (2X), BA1-BA2 (2X), BA2-BE (1X)

• Digging 6.6 km

• Prepare renovation of substations BA4 and BA2

• Define and implement scheme for parallel coupling of the BE-TI8 antenna with BE-BA4 pulsed loop

During shutdown 2010-2011

• Commissioning of installed cables

• Renovation and commissioning of substations in BA4 and BA2

• Installation and commissioning of parallel coupling BE-TI8 with BE-BA4 pulsed loop

Page 15: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

15

SPS Consolidation – Mid term work plan

By the end of shutdown 2012

• Installation and commissioning of cables between BA4-BA1 (2X)

• Digging 1.1 km

• Renovation and commissioning of substations BA1 and BA3

By the end of shutdown 2013

• Renovation and commissioning of substation BA6

Page 16: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

16

BA4-TI8 network layout

Situation

• Power line added in 2004 to power the CNGS experiment

• On this line we also have the SPS stable network for BA4

• Not being part of a loop -> no redundancy for powering CNGS and SPS pulsed network in BA4

TI8

Consequences

• If a fault appears on this line (ex: joint to be replaced), one week of shut down minimum

Remedies

• Implement possibility to operate the TI8 line in // to the SPS pulsed loop from BE to BA4

Page 17: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

17

SMB

Consequences

• If a fault appears on this line, one week of shut down minimum of the affected segment

How to proceed?

• 1) Receive guidelines whether to include these circuits in the EN/EL SPS consolidation mandate or:

• 2) as recommended by the ATC on 27th Oct. 2006 study and find procedures for a fast repair and shorten DTTR

Situation

• Old power lines affected by water treeing effect ( 1970)

• Failure rate going up with the time

• Operation is not 100 % redundant (see 4th ATC minutes 27th October 2006)

• Fully operated by TE-EPC, maintained by EN/EL

Page 18: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

18

Failure location on HV network

Current procedure

• As soon as a failure is detected, ERDF (Electricite Reseau Distribution France) is contacted and they intervene on average within three days to precisely localize the failure.

Technique

• In most of t he cases reflectometry coupled with a pulsed surge generator.

Limits

• Time of intervention depends on availability of ERDF. Also to consider that EDF network diagnostic has priority with respect to CERN.

How to improve

• EN/EL has almost all the equipment to perform the same type of diagnostic

• A bit old but can be upgraded with a dedicated budget

• Today there are weaknesses on expertise, but if necessary on a short mid term period we can envisage to set up a EN/EL team for such diagnostic

What is needed?

• Dedicated personnel, time for set-up and time for training on real cases

Page 19: D. Bozzini, EN-EL-HT, ATOP Days 2009, 4-6 March 2009 1 ELECTRICAL NETWORK: 18 KV NETWORK REVIEW AND STATUS OF THE SPS CONSOLIDATION PLAN D. Bozzini on

D.

Boz

zini

, E

N-E

L-H

T, A

TO

P D

ays

2009

, 4-

6 M

arch

200

9

19

CONCLUSION

Failures

• 6 out of 8 major failures or near miss are related to bad assembly of HV components

• For the SPS, except for the “joint crisis”, 2008 as not been a bad year, 2 faults due to aging cables. One affecting SMB. But…remember what we saw on the video!

• Cells and substations: let us not underestimate the status of ME59 and ME9

Serious problem of HV components assembly quality

• Identification of specialized firms in ongoing with good results

• In-house expertise must be improved in order to follow the execution of repair

High currents in SPS shields

• Require more time to investigate the sources of these currents

Consolidation of SPS 2009-2010 (assuming LHC will run over the winter)

• Installation of cables on two segments (BA5-BA6 and BA7-BA1)

• Re-configure substations in BA2, BA4 and improve the TI8 network layout

• Require solid budget and availability of sufficient and fully qualified personnel

• SMB: We need to know now what to do

• Failure location: there is room for improvement of the MTTR