    First  Street  Tunnel 

    Hand ‐Delivered  Information Packet   for 

    Neighbors Residing  Adjacent  to or  Near 

    the  Adams

     Street 

     and 

     Flagler 

     Place

     

    Construction Staging  Area

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    2/17

    Purpose of this Packet

    Update readers on the overall project schedule

    Inform residents about the types of activities and generaltime frames for the remaining activities, including

    The use of a micro-tunnel boring machine (MTBM),

    named Abigail , to make the underground connection(adit) to the First Street Tunnel under Adams Street

    Completion of the diversion chamber and interior

    structures in the drop shaft and adit Restoration of disturbed areas

    2

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    3/17

    Purpose of this Packet, continued 

    Heavy construction activities will continue through March 2016

    During April through June, the contractor will work within the newstructures, demobilize the work area at the corner of First and AdamsStreet, and, if possible, shrink the east side of the ConstructionStaging Area on Adams Street to First Street

    Demolition of selective secant piles to accommodate surfacerestoration and utilities. This will be a very noisy activity occurringintermittently during March, April, and May 2016. We will continue tomonitor noise levels and adjust activities as needed to comply with

    contract and code limits. Most of the Adams and Flagler CSA will remain closed off, and the

    street will remain closed until the contractor’s equipment isdemobilized and disturbed areas are restored

    3

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    4/17

    4

    Long-Range

    Construction ScheduleWe are 78% complete! 

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    5/17

    Current and Future Activities at the Adamsand Flagler Construction Staging Area

    Mobilize supplies and equipment for the micro-tunnel boring machine

    (MTBM) in February 2016, with mining to continue through March 2016

    Continue construction of near surface structures through May 2016

    Delivery of concrete and other equipment will continue using Flagler Place

    Residents will see and hear different types of construction activities

    for the MTBM operation

    that are described in

    detail on the following

    slides

    5Typical slurry treatment plant.

    11 feet

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    6/17

    Adams and Flagler IntersectionConstruction Staging Area

    Building entranceConstruction traffic entrance/ exit

    CSA

    CWZ

    Road Closed ‒ No thrutraffic. Local accessonly at intersection ofFirst Street and AdamsStreet).

     AbbreviationsCSA ‒ Construction Staging Area

    CWZ ‒ Construction Work Zone

    FEMS ‒ Fire and EMS Department

    CSA

    CWZ

    FEMS Access Zone

    4’-wide Pedestrian SidewalkLocal Traffic

    14 feet

    55 feet

    Fire department

    ladder truck clearances

    Legend 

       F   l  a  g   l  e  r   P   l

     Adams St

    The north side (in pink) ofthe Adams Street CSA will

    be used for trucks, cranes,workers, and FEMS access.

    The south side (in gray) ofthe Adams Street CSA will beused for stationary equipment;

    shown as . This equipmentis temporary while the adittunnel is being constructed;completed April 2016.

    Vent PlantSlurryTreatment Plant

    Centrifuge

    Polymer Mix Transformer  

    7 8 9 10

    Pipes 7,8, 9,10

    Electrical Pad

    160'

    6

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    7/17

    Concrete barrier

    with 6-foot-highchain link fence

    8-foot-high chain linkfence all around

     Adams Street NW 

    7

    N

    Freeze pipes installed at the corner ofFirst and Adams where adit tunnelwill connect to First Street Tunnel.

    Concrete barrier with6-foot-high chain link fence

    Open North-Southsidewalk to pedestrians

        F    i   r   s    t    S    t   r   e   e    t    N    W

    Once the adit connection is made

    to the First Street Tunnel, the areaat the corner of Adams and First

    Streets will be disassembled thenrestored to pre-construction

    conditions.

    Traffic sand drum

    Adams and First Intersection

    Construction Work Zone

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    8/178

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    Micro-tunnel Boring Machine (MTBM)

    Starter Chamber (De-aeration Chamber) MTBM Launch

    Connection to the First Street Tunnel

    Adams Street Adit

    The  following  pages contain diagrams, sequencing, 

    and   photos.  This information was compiled  to 

    illustrate how 

     the

     micro

    ‐tunnel 

     will 

     be

     constructed,

     

    and  equipment  used  to assemble and  operate the 

    MTBM  under   Adams Street.

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    9/17

    9

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    Adams Street Adit – Typical Micro-tunnel Setup

     Above-ground 

    Below-ground 

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    10/17

    10

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    Adams Street Adit (AS-A)

    84" RCP Storage

    MTBM Control Unit

    Bentonite/Vent Plant

    Slurry Treatment Plant

    7'‐6" I.D.SEM Chamber

    (Sequential Excavation 

    Method)

    4'‐11" I.D.

     Above-ground 

    Below-ground 

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    11/17

    11

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 1

    1. Install f reeze pipes

    2. Initiate freeze

    12

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 2

    1. Excavate shaf t

    2. Line shaft

    3. Start adit SEM excavation

    11

    Completed!

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    12/17

    13

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 3

    1. Complete starter adit SEM excavation

    2. Freeze AS-A connection zone

    14

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 4

    1. Flow/foam f il l AS-A

    2. Turn off shaft/starter freeze

    12

    Completed!

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    13/17

    15

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 5

    1. Construct First Street Tunnel

    16

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 6

    1. Construct Reception Adit1. Construct Reception Adit for MTBM

    13

    Completed!

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    14/17

    17

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 7

    1. Construct micro-tunnel into reception adit

    18

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 8

    1. Push MTBM into FST. Recover MTBM.

    2. Grout carrier pipe annulus

    14

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    15/17

    19

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    AS-A Construction Sequence – Step 9

    1. Complete concrete at FST connection

    2. Complete invert in de-aeration chamber 

    20

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    MTBM Pipe Jacking

    15

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    16/17

    21

    First Street Tunnel

    Skanska-Jay Dee a Joint Venture with Parsons Brinckerhoff 

    DC Water 

    MTBM Slurry Plant & ControlsSecurity and Safety within

    Construction Staging Areas The Construction Staging Areas

    house large trucks, construction

    equipment, and tools and have

    deep, open excavations

    Reminder: Construction Staging

     Areas are closed to the public

    Security personnel are onsite during

    off hours

    22

    To better ensure your safety and the

    safety of your children and pets, do

    not enter a Construction Staging Area.

    Fencing signage at around aConstruction Staging Area.

    16

  • 8/20/2019 DC Water 1st Street Tunnel DivP_AdamsStMTBM_handout 2016 02 11

    17/17

    For Questions, Call theFirst Street Tunnel Hotline

    If you have any questions about the work described,

    please call the 24/7 FST Hotline at 1-844-FST-INFO

    (1-844-378-4636)

      Please Join Us! The next Tunnel Forum Meeting is onThursday, March 24 at 7 PM, at St. George’s Episcopal

    Church

    Check the project website for updates at:www.dcwater.com/workzones/projects/first_street_tunnel 