Demand Estimation and Forecasting

Finance 30210: Managerial Economics

Page 4: Demand Estimation and Forecasting Finance 30210: Managerial Economics

The distribution for temperature in south bend is a bit more complicated because there are so many possible outcomes, but the concept is the same

Probability

Temperature

We generally assume a Normal Distribution which can be characterized by a mean (average) and standard deviation (measure of dispersion)

Mean

Standard Deviation

Page 5: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Probability

Temperature

Without some math, we can’t find the probability of a specific outcome, but we can easily divide up the distribution

Mean Mean+1SD Mean+2SDMean -1SDMean-2SD

2.5% 2.5%13.5% 34% 34% 13.5%

Page 6: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Annual Temperature in South Bend has a mean of 59 degrees and a standard deviation of 18 degrees.

Probability

Temperature59 77 954123

95 degrees is 2 standard deviations to the right – there is a 2.5% chance the temperature is 95 or greater (97.5% chance it is cooler than 95)

Can’t we do a little better than this?

Page 7: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Conditional distributions give us probabilities conditional on some observable information – the temperature in South Bend conditional on the month of July has a mean of 84 with a standard deviation of 7.

Probability

Temperature84 91 987770

95 degrees falls a little more than one standard deviation away (there approximately a 16% chance that the temperature is 95 or greater)

95

Conditioning on month gives us a more accurate probabilities!

Page 8: Demand Estimation and Forecasting Finance 30210: Managerial Economics

5.PrPr TailsHeads

We know that there should be a “true” probability distribution that governs the outcome of a coin toss (assuming a fair coin)

Suppose that we were to flip a coin over and over again and after each flip, we calculate the percentage of heads & tails

FlipsTotal

Headsof

#5.

That is, if we collect “enough” data, we can eventually learn the truth!

(Sample Statistic) (True Probability)

Page 9: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We can follow the same process for the temperature in South Bend

Temperature ~ 2,N

We could find this distribution by collecting temperature data for south bend

N

iixN

x1

1

2

1

22 1

N

ii xx

Ns

Sample Mean

(Average)

Sample Variance

Note: Standard Deviation is the square root of the variance.

Page 10: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Mean = 1

Variance = 4

Std. Dev. = 2

Probability distributions are scalable

22

2

σ,kkNy

kxy

μ,σNx

3 X =

Mean = 3

Variance = 36 (3*3*4)

Std. Dev. = 6

Some useful properties of probability distributions

Page 11: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Mean = 1

Variance = 1

Std. Dev. = 1

Probability distributions are additive

xyyxyx

yy

xx

σ,σNyx

,σNy

,σμNx

cov222

2

2

+Mean = 2

Variance = 9

Std. Dev. = 3

COV = 2

=Mean = 3

Variance = 14 (1 + 9 + 2*2)

Std. Dev. = 3.7

Page 12: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Mean = 8

Variance = 4

Std. Dev. = 2

Mean = $ 12,000

Variance = 4,000,000

Std. Dev. = $ 2,000

Suppose we know that the value of a car is determined by its age

Value = $20,000 - $1,000 (Age)

Car Age Value

Page 13: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We could also use this to forecast:

Value = $20,000 - $1,000 (Age)

How much should a six year old car be worth?

Value = $20,000 - $1,000 (6) = $14,000

Note: There is NO uncertainty in this prediction.

Page 14: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Searching for the truth….

You believe that there is a relationship between age and value, but you don’t know what it is….

1. Collect data on values and age

2. Estimate the relationship between them

Note that while the true distribution of age is N(8,4), our collected sample will not be N(8,4). This sampling error will create errors in our estimates!!

Page 15: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Value = a + b * (Age) + error 20,σNerror

We want to choose ‘a’ and ‘b’ to minimize the error!

0 2 4 6 8 10 12 140.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

14000.00

16000.00

18000.00

a

Slope = b

Page 16: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficients Standard Error t Stat

Intercept 12,354 653 18.9

Age - 854 80 -10.60

Value = $12,354 - $854 * (Age) + error

We have our estimate of “the truth”

Intercept (a)

Mean = $12,354

Std. Dev. = $653

Age (b)

Mean = -$854

Std. Dev. = $80

T-Stats bigger than 2 in absolute value are considered statistically significant!

Page 17: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Statistics

R Squared 0.36

Standard Error 2250

Error Term

Mean = 0

Std. Dev = $2,250

Percentage of value variance explained by age

Page 18: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We can now forecast the value of a 6 year old car

Value = $12,354 - $854 * (Age) + error

6

Mean = $12,354

Std. Dev. = $653

Mean = $854

Std. Dev. = $ 80

Mean = $0

Std. Dev. = $2,250

errorVarbaXCovbVarXaVarStdDev ,22

bVarXbaCov , (Recall, The Average Car age is 8 years)

259,2$225080862806653 22222 StdDev

Page 19: Demand Estimation and Forecasting Finance 30210: Managerial Economics

8x

+95%

-95%

Age

Value

Note that your forecast error will always be smallest at the sample mean! Also, your forecast gets worse at an increasing rate as you depart from the mean

6Age

Forecast Interval

259,2$225080862806653 22222 StdDev

230,7$6*854354,12 Value

Page 21: Demand Estimation and Forecasting Finance 30210: Managerial Economics

The Strategy: Estimate a relationship for Pat Buchanan’s votes using every county EXCEPT Palm Beach Using Palm Beach data,

forecast Pat Buchanan’s vote total for Palm Beach

DFB

Pat Buchanan’s Votes

“Are a function of”

Observable Demographics

PBPB DFB

Page 22: Demand Estimation and Forecasting Finance 30210: Managerial Economics

The Data: Demographic Data By County

County Black (%)

Age 65 (%)

Hispanic (%)

College (%)

Income (000s)

Buchanan Votes

Total Votes

Alachua 21.8 9.4 4.7 34.6 26.5 262 84,966

Baker 16.8 7.7 1.5 5.7 27.6 73 8,128

What variables do you think should affect Pat Buchanan’s Vote total?

bCaV

% of County that is college educated

# of votes gained/lost for each percentage point increase in college educated population

# of Buchanan votes

Page 23: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Parameter a b

Value 5.35 14.95

Standard Error 58.5 3.84

T-Statistic .09 3.89

Results R-Square = .19

CV 95.1435.5

The distribution for ‘b’ has a mean of 15 and a standard deviation of 4

15

There is a 95% chance that the value for ‘b’ lies between 23 and 7

County College (%)

Predicted Votes

Actual Votes

Error

Alachua 34.6 522 262 260

Baker 5.7 90 73 17

0

Plug in Values for College % to get vote predictions

19% of the variation in Buchanan’s votes across counties is explained by college education

Each percentage point increase in college educated (i.e. from 10% to 11%) raises Buchanan’s vote total by 15

Page 24: Demand Estimation and Forecasting Finance 30210: Managerial Economics

County College (%) Buchanan Votes

Log of Buchanan Votes

Alachua 34.6 262 5.57

Baker 5.7 73 4.29

Lets try something a little different…

bCaVLN

% of County that is college educated

Percentage increase/decease in votes for each percentage point increase in college educated population

Log of Buchanan votes

Page 25: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Parameter a b

Value 3.45 .09

Standard Error .27 .02

T-Statistic 12.6 5.4

Results R-Square = .31

CVLN 09.45.3

The distribution for ‘b’ has a mean of .09 and a standard deviation of .02

.09

There is a 95% chance that the value for ‘b’ lies between .13 and .05

County College (%)

Predicted Votes

Actual Votes

Error

Alachua 34.6 902 262 640

Baker 5.7 55 73 -18

0

Plug in Values for College % to get vote predictions

31% of the variation in Buchanan’s votes across counties is explained by college education

VLNeV

Each percentage point increase in college educated (i.e. from 10% to 11%) raises Buchanan’s vote total by .09%

Page 26: Demand Estimation and Forecasting Finance 30210: Managerial Economics

County College (%) Buchanan Votes

Log of College (%)

Alachua 34.6 262 3.54

Baker 5.7 73 1.74

How about this…

CbLNaV

Log of % of County that is college educated

Gain/ Loss in votes for each percentage increase in college educated population

# of Buchanan votes

Page 27: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Parameter a b

Value -424 252

Standard Error 139 54

T-Statistic -3.05 4.6

Results R-Square = .25

CLNV 252424

The distribution for ‘b’ has a mean of 252 and a standard deviation of 54

.09

There is a 95% chance that the value for ‘b’ lies between 360 and 144

County College (%)

Predicted Votes

Actual Votes

Error

Alachua 34.6 469 262 207

Baker 5.7 15 73 -58

0

Plug in Values for College % to get vote predictions

25% of the variation in Buchanan’s votes across counties is explained by college education

Each percentage increase in college educated (i.e. from 30% to 30.3%) raises Buchanan’s vote total by 252 votes

Page 28: Demand Estimation and Forecasting Finance 30210: Managerial Economics

County College (%)

Buchanan Votes

Log of College (%) Log of Buchanan Votes

Alachua 34.6 262 3.54 5.57

Baker 5.7 73 1.74 4.29

One More…

CbLNaVLN

Log of % of County that is college educated

Percentage gain/Loss in votes for each percentage increase in college educated population

Log of Buchanan votes

Page 29: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Parameter a b

Value .71 1.61

Standard Error .63 .24

T-Statistic 1.13 6.53

Results R-Square = .40

CLNVLN 61.171.

The distribution for ‘b’ has a mean of 1.61 and a standard deviation of .24

.09

There is a 95% chance that the value for ‘b’ lies between 2 and 1.13

County College (%)

Predicted Votes

Actual Votes

Error

Alachua 34.6 624 262 362

Baker 5.7 34 73 -39

0

Plug in Values for College % to get vote predictions

40% of the variation in Buchanan’s votes across counties is explained by college education

Each percentage increase in college educated (i.e. from 30% to 30.3%) raises Buchanan’s vote total by 1.61%

VLNeV

Page 30: Demand Estimation and Forecasting Finance 30210: Managerial Economics

It turns out the regression with the best fit looks like this.

County Black (%)

Age 65 (%)

Hispanic (%)

College (%)

Income (000s)

Buchanan Votes

Total Votes

Alachua 21.8 9.4 4.7 34.6 26.5 262 84,966

Baker 16.8 7.7 1.5 5.7 27.6 73 8,128

IaCaHaAaBaaPLN 54365221

Parameters to be estimated

Error termBuchanan Votes

Total Votes*100

Page 31: Demand Estimation and Forecasting Finance 30210: Managerial Economics

The Results:Variable Coefficient Standard Error t - statistic

Intercept 2.146 .396 5.48

Black (%) -.0132 .0057 -2.88

Age 65 (%) -.0415 .0057 -5.93

Hispanic (%) -.0349 .0050 -6.08

College (%) -.0193 .0068 -1.99

Income (000s) -.0658 .00113 -4.58

Now, we can make a forecast!

ICHABPLN 0658.0193.0349.0415.0132.146.2 65

R Squared = .73

County Predicted Votes

Actual Votes

Error

Alachua 520 262 258

Baker 55 73 -18

County Black (%) Age 65 (%) Hispanic (%) College (%) Income (000s)

Buchanan Votes

Total Votes

Alachua 21.8 9.4 4.7 34.6 26.5 262 84,966

Baker 16.8 7.7 1.5 5.7 27.6 73 8,128

Page 32: Demand Estimation and Forecasting Finance 30210: Managerial Economics

County Black (%)

Age 65 (%)

Hispanic (%)

College (%)

Income (000s)

Buchanan Votes

Total Votes

Palm Beach 21.8 23.6 9.8 22.1 33.5 3,407 431,621

004.2PLN

%134.004.2 eP

578621,43100134. This would be our prediction for Pat Buchanan’s vote total!

ICHABPLN 0658.0193.0349.0415.0132.146.2 65

Page 33: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Probability

LN(%Votes)

There is a 95% chance that the log of Buchanan’s vote percentage lies in this range

-2.004 – 2*(.2556) -2.004 + 2*(.2556)= -2.5152 = -1.4928

004.2PLN We know that the log of Buchanan’s vote percentage is distributed normally with a mean of -2.004 and with a standard deviation of .2556

Page 34: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Probability

% of Votes

There is a 95% chance that Buchanan’s vote percentage lies in this range

%134.004.2 eP

%08.5152.2 e %22.4928.1 e

Next, lets convert the Logs to vote percentages

Page 35: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Probability

Votes

There is a 95% chance that Buchanan’s total vote lies in this range

348621,4310008. 970621,4310022.

Finally, we can convert to actual votes 578621,43100134.

3,407 votes turns out to be 7 standard deviations away from our forecast!!!

Page 36: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We know that the quantity of some good or service demanded should be related to some basic variables

Quantity

Price

D

,..., IPDQD

Quantity Demanded Price

Income

Other “Demand Shifters”

“ Is a function of”

Page 37: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time

Dem

and

Fact

ors

t t+1t-1

Cross Sectional estimation holds the time period constant and estimates the variation in demand resulting from variation in the demand factors

For example: can we estimate demand for Pepsi in South Bend by looking at selected statistics for South bend

Page 38: Demand Estimation and Forecasting Finance 30210: Managerial Economics

City Price Average Income (Thousands)

Competitor’s Price

Advertising Expenditures (Thousands)

Total Sales

Granger 1.02 21.934 1.48 2.367 9,809

Mishawaka 2.56 35.796 2.53 26.922 130,835

Suppose that we have the following data for sales in 200 different Indiana cities

Lets begin by estimating a basic demand curve – quantity demanded is a linear function of price.

PaaQ 10

Change in quantity demanded per $ change in price (to be estimated)

Page 39: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 155,042 18,133 8.55

Price (X) -46,087 7214 -6.39

PQ 087,46042,155

That is, we have estimated the following equation

Regression Statistics

R Squared .17

Standard Error 48,074

Every dollar increase in price lowers sales by 46,087 units.

Page 40: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Values For South BendPrice of Pepsi $1.37

903,9137.1087,46042,155 Q

P

Q

$1.37

91,903

68.903,91

37.1087,46

Page 41: Demand Estimation and Forecasting Finance 30210: Managerial Economics

City Price Average Income (Thousands)

Competitor’s Price

Advertising Expenditures (Thousands)

Total Sales

Granger 1.02 21.934 1.48 2.367 9,809

Mishawaka 2.56 35.796 2.53 26.922 130,835

As we did earlier, we can experiment with different functional forms by using logs

Adding logs changes the interpretation of the coefficients

PLNaaQ 10

Change in quantity demanded per percentage change in price (to be estimated)

Page 42: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 133,133 14,892 8.93

Price (X) -103,973 16,407 -6.33

PLNQ 973,103133,133

That is, we have estimated the following equation

Regression Statistics

R Squared .17

Standard Error 48,140

Every 1% increase in price lowers sales by 103,973 units.

Page 43: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Values For South BendPrice of Pepsi $1.37

Log of Price .31

P

Q

$1.37

100,402

31.973,103133,133 Q

402,100

1973,103

1

%

973,103%

Qp

Q

p

Q

Page 44: Demand Estimation and Forecasting Finance 30210: Managerial Economics

City Price Average Income (Thousands)

Competitor’s Price

Advertising Expenditures (Thousands)

Total Sales

Granger 1.02 21.934 1.48 2.367 9,809

Mishawaka 2.56 35.796 2.53 26.922 130,835

As we did earlier, we can experiment with different functional forms by using logs

PaaQLN 10

Percentage change in quantity demanded per $ change in price (to be estimated)

Adding logs changes the interpretation of the coefficients

Page 45: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 13 .34 38.1

Price (X) -1.22 .13 -8.98

PQLN 22.113

That is, we have estimated the following equation

Regression Statistics

R Squared .28

Standard Error .90

Every $1 increase in price lowers sales by 1.22%.

Page 46: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Values For South BendPrice of Pepsi $1.37

P

Q

$1.37

83,283

We can now use this estimated demand curve along with price in South Bend to estimate demand in South Bend

283,83

33.1137.122.11333.11

eQ

QLN

1

37.122.1

1

%

22.1%

p

p

Q

p

Q

Page 47: Demand Estimation and Forecasting Finance 30210: Managerial Economics

City Price Average Income (Thousands)

Competitor’s Price

Advertising Expenditures (Thousands)

Total Sales

Granger 1.02 21.934 1.48 2.367 9,809

Mishawaka 2.56 35.796 2.53 26.922 130,835

As we did earlier, we can experiment with different functional forms by using logs

PLNaaQLN 10

Percentage change in quantity demanded per percentage change in price (to be estimated)

Adding logs changes the interpretation of the coefficients

Page 48: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 12.3 .28 42.9

Price (X) -2.60 .31 -8.21

PLNQLN 6.212

That is, we have estimated the following equation

Regression Statistics

R Squared .25

Standard Error .93

Every 1% increase in price lowers sales by 2.6%.

Page 49: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Values For South BendPrice of Pepsi $1.37

Log of Price .31

P

Q

$1.37

72,402

402,72

19.1131.6.21219.11

eQ

QLN

6.2%

%

p

Q

Page 50: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We can add as many variables as we want in whatever combination. The goal is to look for the best fit.

cPLNaILNaPaaQLN 3210

% change in Sales per $ change in price

% change in Sales per % change in income

% change in Sales per % change in competitor’s price

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 5.98 1.29 4.63

Price -1.29 .12 -10.79

Log of Income 1.46 .34 4.29

Log of Competitor’s Price 2.00 .34 5.80

R Squared: .46

Page 51: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Values For South BendPrice of Pepsi $1.37

Log of Income 3.81

Log of Competitor’s Price .80

P

Q

$1.37

87,142

142,87

36.1180.00.281.346.137.129.198.536.11

eQ

QLN

Now we can make a prediction and calculate elasticities

00.2%

%

46.1%

%

76.11

37.129.1

1

%

cCP

I

P

Q

I

Q

P

P

Q

Page 52: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time

Dem

and

Fact

ors

t t+1t-1

We could use a cross sectional regression to forecast quantity demanded out into the future, but it would take a lot of information!

Estimate a demand curve using data at some point in time

Use the estimated demand curve and forecasts of data to forecast quantity demanded

Page 53: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time

Dem

and

Fact

ors

t t+1t-1

Time Series estimation ignores the demand factors and estimates the variation in demand over time

For example: can we predict demand for Pepsi in South Bend next year by looking at how demand varies across time

Page 54: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time series estimation ignores the demand factors and looks at variations in demand over time. Essentially, we want to separate demand changes into various frequencies

Trend: Long term movements in demand (i.e. demand for movie tickets grows by an average of 6% per year)

Business Cycle: Movements in demand related to the state of the economy (i.e. demand for movie tickets grows by more than 6% during economic expansions and less than 6% during recessions)

Seasonal: Movements in demand related to time of year. (i.e. demand for movie tickets is highest in the summer and around Christmas

Page 55: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Suppose that you work for a local power company. You have been asked to forecast energy demand for the upcoming year. You have data over the previous 4 years:

Time Period Quantity (millions of kilowatt hours)

2003:1 11

2003:2 15

2003:3 12

2003:4 14

2004:1 12

2004:2 17

2004:3 13

2004:4 16

2005:1 14

2005:2 18

2005:3 15

2005:4 17

2006:1 15

2006:2 20

2006:3 16

2006:4 19

Page 56: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

2003-1 2004-1 2005-1 2006-1

First, let’s plot the data…what do you see?

This data seems to have a linear trend

Page 57: Demand Estimation and Forecasting Finance 30210: Managerial Economics

A linear trend takes the following form:

btxxt 0

Forecasted value at time t (note: time periods are quarters and time zero is 2003:1)

Time period: t = 0 is 2003:1 and periods are quarters

Estimated value for time zero

Estimated quarterly growth (in millions of kilowatt hours)

Page 58: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 11.9 .953 12.5

Time Trend .394 .099 4.00

Regression Statistics

R Squared .53

Standard Error 1.82

Observations 16txt 394.9.11

Lets forecast electricity usage at the mean time period (t = 8)

50.3ˆ

05.158394.9.11ˆ

t

t

xVar

x

Page 59: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

2003-1 2004-1 2005-1 2006-1

Here’s a plot of our regression line with our error bands…again, note that the forecast error will be lowest at the mean time period

T = 8

Page 60: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

10

20

30

40

50

60

70

Sample

We can use this linear trend model to predict as far out as we want, but note that the error involved gets worse!

7.47ˆ

85.4176394.9.11ˆ

t

t

xVar

x

Page 61: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

2003-1 2004-1 2005-1 2006-1

Lets take another look at the data…it seems that there is a regular pattern…

Q2

Q2Q2

Q2

There appears to be a seasonal cycle…

Page 62: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time Period Actual Predicted Ratio Adjusted

2003:1 11 12.29 .89 12.29(.87)=10.90

2003:2 15 12.68 1.18 12.68(1.16) = 14.77

2003:3 12 13.08 .91 13.08(.91) = 11.86

2003:4 14 13.47 1.03 13.47(1.04) = 14.04

2004:1 12 13.87 .87 13.87(.87) = 12.30

2004:2 17 14.26 1.19 14.26(1.16) = 16.61

2004:3 13 14.66 .88 14.66(.91) = 13.29

2004:4 16 15.05 1.06 15.05(1.04) = 15.68

2005:1 14 15.44 .91 15.44(.87) = 13.70

2005:2 18 15.84 1.14 15.84(1.16) = 18.45

2005:3 15 16.23 .92 16.23(.91) = 14.72

2005:4 17 16.63 1.02 16.63(1.04) = 17.33

2006:1 15 17.02 .88 17.02(.87) = 15.10

2006:2 20 17.41 1.14 17.41(1.16) = 20.28

2006:3 16 17.81 .89 17.81(.91) = 16.15

2006:4 19 18.20 1.04 18.20(1.04) = 18.96

Average Ratios• Q1 = .87• Q2 = 1.16• Q3 = .91• Q4 = 1.04

One seasonal adjustment process is to adjust each quarter by the average of actual to predicted

For each observation:• Calculate the ratio of

actual to predicted• Average the ratios by

quarter• Use the average ration to

adjust each predicted value

Page 63: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time Period Actual Adjusted Error

2003:1 11 10.90 -0.12003:2 15 14.77 -0.232003:3 12 11.86 -0.142003:4 14 14.04 0.042004:1 12 12.30 0.32004:2 17 16.61 -0.392004:3 13 13.29 0.292004:4 16 15.68 -0.322005:1 14 13.70 -0.32005:2 18 18.45 0.452005:3 15 14.72 -0.282005:4 17 17.33 0.332006:1 15 15.10 0.12006:2 20 20.28 0.282006:3 16 16.15 0.152006:4 19 18.96 -0.04

With the seasonal adjustment, we don’t have any statistics to judge goodness of fit. One method of evaluating a forecast is to calculate the root mean squared error

n

FARMSE tt

2

Number of Observations

Sum of squared forecast errors

26.RMSE

Page 64: Demand Estimation and Forecasting Finance 30210: Managerial Economics

10

11

12

13

14

15

16

17

18

19

20

2003-1 2004-1 2005-1 2006-1

Looks pretty good…

26.RMSE

Page 65: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

10

20

30

40

50

60

70

52.4304.185.4176394.9.11ˆ tx

Recall our prediction for period 76 ( Year 2022 Q4)

Page 66: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We could also account for seasonal variation by using dummy variables

33221100 DbDbDbtbxxt

else ,0

iquarter if ,1iD

Note: we only need three quarter dummies. If the observation is from quarter 4, then

tbxx

DDD

t 00

321 0

Page 67: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 12.75 .226 56.38

Time Trend .375 .0168 22.2

D1 -2.375 .219 -10.83

D2 1.75 .215 8.1

D3 -2.125 .213 -9.93

Regression Statistics

R Squared .99

Standard Error .30

Observations 16

321 125.275.1375.2375.75.12 DDDtxt

Note the much better fit!!

Page 68: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Time Period Actual Ratio Method Dummy Variables

2003:1 11 10.90 10.75

2003:2 15 14.77 15.25

2003:3 12 11.86 11.75

2003:4 14 14.04 14.25

2004:1 12 12.30 12.25

2004:2 17 16.61 16.75

2004:3 13 13.29 13.25

2004:4 16 15.68 15.75

2005:1 14 13.70 13.75

2005:2 18 18.45 18.25

2005:3 15 14.72 14.75

2005:4 17 17.33 17.25

2006:1 15 15.10 15.25

2006:2 20 20.28 19.75

2006:3 16 16.15 16.25

2006:4 19 18.96 18.75

26.RMSE

Ratio Method

25.RMSE

Dummy Variables

Page 69: Demand Estimation and Forecasting Finance 30210: Managerial Economics

10

11

12

13

14

15

16

17

18

19

20

2003-1 2004-1 2005-1 2006-1

Dummy Ratio

A plot confirms the similarity of the methods

Page 70: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

10

20

30

40

50

60

70

Recall our prediction for period 76 ( Year 2022 Q4)

25.4176375.75.12 tx

Page 71: Demand Estimation and Forecasting Finance 30210: Managerial Economics

btxxt 0

Recall, our trend line took the form…

This parameter is measuring quarterly change in electricity demand in millions of kilowatt hours.

Often times, its more realistic to assume that demand grows by a constant percentage rather that a constant quantity. For example, if we knew that electricity demand grew by G% per quarter, then our forecasting equation would take the form

t

t

Gxx

100

%10

Page 72: Demand Estimation and Forecasting Finance 30210: Managerial Economics

tt gxx 10

If we wish to estimate this equation, we have a little work to do…

Note: this growth rate is in decimal form

gtxxt 1lnlnln 0

If we convert our data to natural logs, we get the following linear relationship that can be estimated

Page 73: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Regression Results

Variable Coefficient Standard Error t Stat

Intercept 2.49 .063 39.6

Time Trend .026 .006 4.06

Regression Statistics

R Squared .54

Standard Error .1197

Observations 16

txt 026.49.2ln

Lets forecast electricity usage at the mean time period (t = 8)

0152.ˆ

698.28026.49.2ˆln

t

t

xVar

xBE CAREFUL….THESE NUMBERS ARE LOGS !!!

Page 74: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0152.ˆ

698.28026.49.2ˆln

t

t

xVar

x

The natural log of forecasted demand is 2.698. Therefore, to get the actual demand forecast, use the exponential function

85.14698.2 e

Likewise, with the error bands…a 95% confidence interval is +/- 2 SD

945.2,451.20152.2/698.2

00.19,60.11, 945.2451.2 ee

Page 75: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

30

2003-1 2004-1 2005-1 2006-1

Again, here is a plot of our forecasts with the error bands

T = 8 70.1RMSE

Page 76: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

100

200

300

400

500

600

1 13 25 37 49 61 73 85 97

8.221,8.352/

22.8949.4

SD

e

Errors is growth rates compound quickly!!

Page 77: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Let’s try one…suppose that we are interested in forecasting gasoline prices. We have the following historical data. (the data is monthly from April 1993 – June 2010)

Does a linear (constant cents per gallon growth per year) look reasonable?

Page 78: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Let’s suppose we assume a linear trend. Then we are estimating the following linear regression:

btppt 0

Price at time t Price at April 1993 Number of months from April 1993

monthly growth in dollars per gallon

Regression Results

Variable Coefficient Standard Error t Stat

Intercept .67 .05 12.19

Time Trend .010 .0004 23.19

R Squared= .72

Page 79: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We can check for the presence of a seasonal cycle by adding seasonal dummy variables:

33221100 DbDbDbtbppt

else

iquarterifDi ,0

,1

dollars per gallon impact of quarter I relative to quarter 4

Regression Results

Variable Coefficient Standard Error t Stat

Intercept .58 .07 8.28

Time Trend .01 .0004 23.7

D1 -.03 .075 -.43

D2 .15 .074 2.06

D3 .16 .075 2.20

R Squared= .74

Page 80: Demand Estimation and Forecasting Finance 30210: Managerial Economics

If we wanted to remove the seasonal component, we could by subtracting the seasonal dummy off each gas price

Seasonalizing

Date PriceRegression

coefficientSeasonalized

data

1993 – 04 1.05 .15 .90

1993 - 07 1.06 .16 90

1993 - 10 1.06 0 1.06

1994 - 01 .98 -.03 1.01

1994 - 04 1.00 .15 .85

2nd Quarter

3rd Quarter

4th Quarter

1st Quarter

2nd Quarter

Page 81: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Note: Once the seasonal component has been removed, all that should be left is trend, cycle, and noise. We could check this:

btppt 0~

Seasonalized Price Series

Regression Results

Variable Coefficient Standard Error t Stat

Intercept .587 .05 11.06

Time Trend .010 .0004 23.92

33221100~ DbDbDbtbppt

Seasonalized Price Series

Regression Results

Variable Coefficient Standard Error t Stat

Intercept .587 .07 8.28

Time Trend .010 .0004 23.7

D1 0 .075 0

D2 0 .074 0

D3 0 .075 0

Page 82: Demand Estimation and Forecasting Finance 30210: Managerial Economics

321 16.15.03.01.58. DDDtpt

The regression we have in place gives us the trend plus the seasonal component of the data

Trend Seasonal

If we subtract our predicted price (from the regression) from the actual price, we will have isolated the business cycle and noise

Business Cycle Component

Date Actual Price

Predicted Price (From

regression)Business Cycle

Component

1993 - 04 1.050 .752 .297

1993 - 05 1.071 .763 .308

1993 - 06 1.075 773 .301

1993 - 07 1.064 .797 .267

1993 - 08 1.048 .807 .240

Predicted

Page 83: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We can plot this and compare it with business cycle dates

tt pp ˆActual Price

Predicted Price

Page 84: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Data Breakdown

Date Actual Price Trend Seasonal Business Cycle

1993 - 04 1.050 .58 .15 .320

1993 - 05 1.071 .59 .15 .331

1993 - 06 1.075 .60 .15 .325

1993 - 07 1.064 .61 .16 .294

1993 - 08 1.048 .62 .16 .268

Regression Results

Variable Coefficient Standard Error t Stat

Intercept .58 .07 8.28

Time Trend .01 .0004 23.7

D1 -.03 .075 -.43

D2 .15 .074 2.06

D3 .16 .075 2.20

Page 85: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Perhaps an exponential trend would work better…

An exponential trend would indicate constant percentage growth rather than cents per gallon.

Page 86: Demand Estimation and Forecasting Finance 30210: Managerial Economics

We already know that there is a seasonal component, so we can start with dummy variables

33221100ln DbDbDbtbppt

else

iquarterifDi ,0

,1

Percentage price impact of quarter I relative to quarter 4

Regression Results

Variable Coefficient Standard Error t Stat

Intercept -.14 .03 -4.64

Time Trend .005 .0001 29.9

D1 -.02 .032 -.59

D2 .06 .032 2.07

D3 .07 .032 2.19

R Squared= .81

Monthly growth rate

Page 87: Demand Estimation and Forecasting Finance 30210: Managerial Economics

If we wanted to remove the seasonal component, we could by subtracting the seasonal dummy off each gas price, but now, the price is in logs

Seasonalizing

Date Price Log of PriceRegression

coefficientLog of Seasonalized

dataSeasonalized

Price

1993 – 04 1.05 .049 .06 -.019 .98

1993 - 07 1.06 .062 .07 -.010 .99

1993 - 10 1.06 .062 0 .062 1.06

1994 - 01 .98 -.013 -.02 .006 1.00

1994 - 04 1.00 .005 .06 -.062 .94

2nd Quarter

3rd Quarter

4th Quarter

1st Quarter

2nd Quarter

98.019. e

Example:

Page 88: Demand Estimation and Forecasting Finance 30210: Managerial Economics

321 07.06.02.005.14.ln DDDtpt

The regression we have in place gives us the trend plus the seasonal component of the data

Trend Seasonal

If we subtract our predicted price (from the regression) from the actual price, we will have isolated the business cycle and noise

Business Cycle Component

Date Actual PricePredicted Log Price

(From regression)Predicted

PriceBusiness Cycle

Component

1993 - 04 1.050 -.069 .93 .12

1993 - 05 1.071 -.063 .94 .13

1993 - 06 1.075 -.057 .94 .13

1993 – 07 1.064 -.047 .95 .11

1993 - 08 1.048 -.041 .96 .09

Predicted Log of Price

93.069. e

Page 89: Demand Estimation and Forecasting Finance 30210: Managerial Economics

As you can see, very similar results

tt pp ˆActual Price

Predicted Price

Page 90: Demand Estimation and Forecasting Finance 30210: Managerial Economics

73.2

005.1007.106.002.217005.14.ln005.1

e

pt

90.2016.115.003.21701.58. tp

In either case, we could make a forecast for gasoline prices next year. Lets say, April 2011.

Forecasting Data

Date Time Period Quarter

April 2011 217 2

OR

By the way, the actual price in April 2011 was $3.80

Page 91: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Quarter Market Share

1 20

2 22

3 23

4 24

5 18

6 23

7 19

8 17

9 22

10 23

11 18

12 23

Consider a new forecasting problem. You are asked to forecast a company’s market share for the 13th quarter.

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 10 11 12

There doesn’t seem to be any discernable trend here…

Page 92: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Smoothing techniques are often used when data exhibits no trend or seasonal/cyclical component. They are used to filter out short term noise in the data.

Quarter Market Share

MA(3) MA(5)

1 20

2 22

3 23

4 24 21.67

5 18 23

6 23 21.67 21.4

7 19 21.67 22

8 17 20 21.4

9 22 19.67 20.2

10 23 19.33 19.8

11 18 20.67 20.8

12 23 21 19.8

A moving average of length N is equal to the average value over the previous N periods

N

ANMA

t

Ntt

1

Page 93: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 10 11 12

Actual

MA(3)

MA(5)

The longer the moving average, the smoother the forecasts are…

Page 94: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Quarter Market Share

MA(3) MA(5)

1 20

2 22

3 23

4 24 21.67

5 18 23

6 23 21.67 21.4

7 19 21.67 22

8 17 20 21.4

9 22 19.67 20.2

10 23 19.33 19.8

11 18 20.67 20.8

12 23 21 19.8

Calculating forecasts is straightforward…

MA(3)

33.213

231823

MA(5)

6.205

1722231823

So, how do we choose N??

Page 95: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Quarter Market Share

MA(3) Squared Error

MA(5) Squared Error

1 20

2 22

3 23

4 24 21.67 5.4289

5 18 23 25

6 23 21.67 1.7689 21.4 2.56

7 19 21.67 7.1289 22 9

8 17 20 9 21.4 19.36

9 22 19.67 5.4289 20.2 3.24

10 23 19.33 13.4689 19.8 10.24

11 18 20.67 7.1289 20.8 7.84

12 23 21 4 19.8 10.24

Total = 78.3534 Total = 62.48

95.29

3534.78RMSE 99.2

7

48.62RMSE

Page 96: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Exponential smoothing involves a forecast equation that takes the following form

ttt FwwAF 11

Forecast for time t+1

Actual value at time t

Forecast for time t

Smoothing parameter

Note: when w = 1, your forecast is equal to the previous value. When w = 0, your forecast is a constant.

1,0w

Page 97: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Quarter Market Share

W=.3 W=.5

1 20 21.0 21.0

2 22 20.7 20.5

3 23 21.1 21.3

4 24 21.7 22.2

5 18 22.4 23.1

6 23 21.1 20.6

7 19 21.7 21.8

8 17 20.9 20.4

9 22 19.7 18.7

10 23 20.4 20.4

11 18 21.2 21.7

12 23 20.2 19.9

For exponential smoothing, we need to choose a value for the weighting formula as well as an initial forecast

Usually, the initial forecast is chosen to equal the sample average

8.216.205.235.

Page 98: Demand Estimation and Forecasting Finance 30210: Managerial Economics

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 10 11 12

Actual w=.3 w=.5

As was mentioned earlier, the smaller w will produce a smoother forecast

Page 99: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Calculating forecasts is straightforward…

W=.3

04.212.207.233.

W=.5

45.219.195.235.

So, how do we choose W??

Quarter Market Share

W=.3 W=.5

1 20 21.0 21.0

2 22 20.7 20.5

3 23 21.1 21.3

4 24 21.7 22.2

5 18 22.4 23.1

6 23 21.1 20.6

7 19 21.7 21.8

8 17 20.9 20.4

9 22 19.7 18.7

10 23 20.4 20.4

11 18 21.2 21.7

12 23 20.2 19.9

Page 100: Demand Estimation and Forecasting Finance 30210: Managerial Economics

Quarter Market Share

W = .3 Squared Error

W=.5 Squared Error

1 20 21.0 1 21.0 1

2 22 20.7 1.69 20.5 2.25

3 23 21.1 3.61 21.3 2.89

4 24 21.7 5.29 22.2 3.24

5 18 22.4 19.36 23.1 26.01

6 23 21.1 3.61 20.6 5.76

7 19 21.7 7.29 21.8 7.84

8 17 20.9 15.21 20.4 11.56

9 22 19.7 5.29 18.7 10.89

10 23 20.4 6.76 20.4 6.76

11 18 21.2 10.24 21.7 13.69

12 23 20.2 7.84 19.9 9.61

Total = 87.19 Total = 101.5

70.212

19.87RMSE 91.2

12

5.101RMSE