June 2002 Desert Sky Wind Power Project

WelcomeWelcome

Desert Sky Desert Sky

Wind ProjectWind Project

Page 2: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Power’s PlaceWind Power’s Place Important part of mix

Free fuel No emissions management

Maturing technology Cost competitive

Predictable at proven sites Low risk at proven sites

Germany #1, U.S. #2 Fastest growing source Future looks bright

Page 3: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Growth 2001Wind Growth 2001 1,700 MW in U.S. 2001 16 states, Texas leads 900 MW in Texas 2001 More in Texas than entire country in previous years U.S. installed capacity total 4,258 MW, 26 states

Page 4: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

US Wind ProjectsUS Wind Projects

Page 5: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Industry DriversWind Industry Drivers

Low cost PTC, 1.7 cents per KWH Texas SB 7 Becoming “mainstream” Rural development Skilled workforce Good remote locations Transmission network

Page 6: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Declining Cost of WindDeclining Cost of Wind

0

5

10

15

20

25

30

35

40

1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006

$’s Per MWH

Page 7: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Site ConsiderationsWind Site Considerations

Willing landowners and public Windy site

1-5 years of data mesa few trees

Lots of land -- rural Environmental studies

Endangered species Avoid bird flyways

Archaeology studies Transmission network

Page 8: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

U.S. Wind ResourcesU.S. Wind Resources

Page 9: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Energy PotentialWind Energy Potential

0 200 400 600 800 1000 1200 1400

N.Dakota

Texas

Kansas

S.Dakota

Montana

Nebraska

Wyoming

Oklahoma

Minnesota

Iowa

In Billions of KWH

Page 10: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Desert Sky Wind ProjectDesert Sky Wind Project

GE Wind Energy built and O&M

CPS buying power

AEP owns

Page 11: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Desert Sky DetailsDesert Sky Details

AEP $175 Million investment107 turbines, GE Wind 1.5 MWGE Wind Energy O&MCPS buys power long-termRemote and rural

Indian Mesa Pecos County Iraan, Texas

Project Covers 15 Square Miles

Page 12: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

GE Wind Energy 1.5 Operation GE Wind Energy 1.5 Operation

Operates in 8-56 MPH wind Onboard weather station Electronically controlled Each turbine self-contained Desert Sky a 107 unit plant Yaw control facing wind Variable speed via blade pitch Operates at 11-20 RPM

Page 13: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Tower & Turbine ProfileTower & Turbine Profile

328’ base to blade Each blade 112’ Span greater than 747 163.3 tons total Foundation 20’ deep Rated at 1.5 megawattSupply at least 350 homes

Page 14: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wide SweepWide Sweep

231 ft.231 ft.

211 ft.211 ft.

GE Wind Energy 1.5 MW turbines 231 ft. blade tip to tip

Page 15: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Wind Turbine UnitsWind Turbine Units

Nacelle56 tons

Tower3 sections

Workers Blade112’ long

Page 16: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

NacelleNacelle

Nacelle (nuh-cell) Houses generator and gearbox Resembles large travel trailer Weighs 56 tons

Page 17: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Inside NacelleInside Nacelle

Page 18: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Desert Sky MapDesert Sky Map

Dallas, 400 Miles San Antonio, 266 Miles Odessa, 90 Miles

Ft. Stockton, 50 miles McCamey, 20 Miles Iraan, 12 Miles

Desert Sky

Page 19: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

More InformationMore Information

AWEA.ORGAmerican Wind Energy Association

AEP.COMAEP’s web

CITYPUBLICSERVICE.COMCity Public Service

GEWIND.COMEnron Wind

DESERTSKYWIND.COMDesert Sky Wind

Page 20: Desert Sky Wind Power Project June 2002 Welcome Desert Sky Wind Project

June 2002 Desert Sky Wind Power Project

Thank You!Thank You!